HomeMy WebLinkAbout3648RESOLUTION NO. 3648 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NUMBER ONE TO THE CITY'S CONTRACT WITH W & H PACIFIC, INC. WHEREAS, the City of Auburn is engaged in various municipal functions, including airport operations; and WHEREAS, the City Council approved a contract with W & H Pacific, Inc., for design engineering and bid preparation for the City of Auburn Municipal Airport runway rehabilitation project, which contract was approved by Resolution 3599; and WHEREAS, the contract with W & H Pacific, Inc., needs to be amended to accommodate the need for supplemental design and construction pertaining to subsurface edge drains on Runway 16-34, and new hold apron pavement construction. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, HEREBY RESOLVES as follows: Section 1. That the Mayor and the City Clerk are authorized to execute Amendment Number One to the agreement with W & H Pacific, Inc., approved by Resolution Number 3599 in substantial conformity with the Amendment attached hereto, marked as Exhibit "A" and incorporated herein by this reference. Section 2. That the Mayor is authorized to implement such administrative procedures as may be necessary to carry out the directives of this legislation. Resolution 3648 September 30, 2003 Page 1 Section 3. That this Resolution shall take effect and be in full force upon passage and signatures hereon. Dated and Signed this~ ~ day of ~)~-. ~-~-'~' ,200-~-~ ATTEST: PETER B. LEWIS MAYOR Danielle E. Daskam, City Clerk APPROVED ASTO FORM: Resolution 3648 September 30, 2003 Page 2 AUBURN MUNICIPAL AIRPORT Amendment No. 1 to Agreement Dated May 19, 2003 Between the City of Auburn and W&H Pacific, Inc. Whereas the City of Auburn, hereinafter called OWNER, requestS services in addition to the services described .in above said agreement. Whereas, W&H Pacific, Inc., hereinafter called WHP, shall provide additional services for the OWNER in accordance with above said agreement. Said services shall constitute Extra Services. By mutual agreement, consent, and benefit, the OWNER and WHP do hereby modify and amend the above said agreement in the following manner: EXHIBIT "A" SCOPE OF SERVICES add the following: Provide supplemental design and construction phase services pertaining to subsurface edge drains on Runway 16-34 and on new hold apron pavement construction as detailed in the attached Amendment No. 1, Exhibit A. Paragraph 3.a., Payments to ENGINEER, add the following: 1. For Extra Services as set forth in Amendment No. 1, the not-to-exceed amount for Design Phase Services shall be increased by $19,686.00, from $74,916.80 to $94,602.80. 2. For Extra Services as set forth in Amendment No. 1, the not-to-exceed amount for Construction Phase Services shall be increased by $13,392.00, from $43,088.40 $56,480.40. The fee for Optional Services shall remain unchanged. In performing the above, it is understood and agreed that all other terms and conditions of the original agreement are still in effect. IN WITNESS WHEREOF, the OWNER and WHP have executed this Agreement the day and year written below. CITY OF AUBURN By: Title: Date: ATTESTED TO: Date: APPP~ A~-'~RM:]/'~ Owner Da W&H PACIFIC, I;C~///, x,,~,~/ Title: b/ ~c"ro ~.,~ Date: ~-7_~ -~'=J I:\Projects\City of Auburn\30872 2003 Runway Improvemen\Office\Word\2003AuburnSupplementContract DOC 08/28/03 EXHIBIT A SCOPE OF SERVICES AUBURN MUNICIPAL AIRPORT 2003 RUNWAY IMPROVEMENTS AMENDMENT #1 Description of Project The City of Auburn proposes the following supplemental improvements to the Auburn Municipal Airport: 1. Install subsurface edge drains on Runway 16-34 and on new hold apron pavement construction. Scope of Services The Consultant shall provide the following Specified Services for the Project as described below. All engineering work shall be performed using accepted engineering principles and practices and shall provide quality products that meet or exceed industry standards. Designs shall be in accordance with FAAAdvisory Circular 150/5300-13 Airport Desitin and related circulars. Supplemental Design Phase Services The Consultant shall provide the following services, in addition to those included in the original contract, during the design phase of this project. Provide project management and administration, liaison with the City, prepare monthly progress reports and/or invoices, and manage subconsultants for the supplemental design phase services. Provide surveying services as follows: ao Conduct a topographic survey of the existing ground surface in the vicinity of the proposed edge drain improvements for use in development of construction plans, including standard topographic surveying methods in infield grass areas and all other survey areas. The topographic survey work shall include the survey of existing surface features, including, but not limited to, catch basins, lights, signs, all other electrical surface features, and known utilities. Provide a summary of new project elements to City personnel responsible for the preparation of a SEPA checklist. Prepare preliminary construction plans for the edge drains. See Exhibit A-1 for estimated sheet count. Prepare preliminary bid items and technical specifications for the construction of edge drains. Contract documents shall include FAA technical specifications and general provisions. 10. Update the project phasing plan to incorporate the construction of edge drains. Attend one meeting with Airport Advisory Board to review updated phasing plan and revise as necessary. I:\Projects\City of Auburn\30872 2003 Runway Improvemen\Office\Word\2003AuburnSupplementScope.doc - A-1 - August 28, 2003 14. Update final construction cost estimates. 16. Submit final plans, contract documents, and technical specifications for review and approval by the City and FAA. 18. Prepare a Stormwater Pollution Prevention Plan and NPDES Construction Permit Application. Submit to the Department of Ecology to obtain the permit. Supplemental Construction Phase Services Provide project management and administration, liaison with the City, prepare monthly progress reports and/or invoices, and manage subconsultants for the construction phase Services for an additional nineteen (19) days. Review contractor subsurface edge drain submittals. Provide construction administration for an additional nineteen (19) days, to include preparation of change orders, if required; preparation and submittal of daily and weekly inspection reports; and preparation of monthly construction pay estimates for City approval and processing. Conduct one meeting weekly at the Airport offices to coordinate progress of the construction work with City staff, Airport tenants, and the Contractor. 10. Provide resident engineer for an additional nineteen (19) calendar days to monitor and document construction progress; confirm conformance with schedules, plans and specifications; measure and document construction pay quantities; document significant conversations or situations; document input or visits by local authorities; etc. Amendment Assumptions · No boundary survey is included in this item. · No wetland delineations, permits or approvals will be necessary for wetlands. · The City will prepare and submit a SEPA checklist as needed. · No floodplain permits are required. · A biological evaluation is not required. · Construction observation is based on estimated construction duration of 49 calendar days. Resident engineering is based on a three-week period of 8 hours per day, 5 days per week and a four-week period of 8 hours per day, 2 days per week. I:\Projects\City of Auburn\30872 2003 Runway Improvemen\Office\Word~003AuburnSupplementScope.doc - A-2 - August 28, 2003 EXHIBIT A-1 W&H PACIFIC ESTIMATED PLAN SHEETS FOR AUBURN MUNICIPAL AIRPORT 2003 RUNWAY IMPROVEMENTS AMENDMENT #1 Sheet Number 1 2 3-8 9 10 11 12 13 14 15 16 17 18 19 2O Description Cover Sheet Construction Site Plan Construction Phasing/Safety Plan - 2 supplemental sheets Temporary Erosion Control Plan Runway 16-34 Plan & Profile (1" = 50') Runway 16-34 Plan & Profile (1"= 50') Runway 16-34 Plan & Profile (1"= 50') Subsurface Edge Drain Plan (1" = 50') - supplemental sheet Subsurface Edge Drain Plan (1" = 50') -supplemental sheet Hold Apron Expansion w/Subsurface Edge Drain Plan (1" = 50') Typical Sections and Civil Details Typical Sections and Civil Details - supplemental sheet Runway Marking Plans and Threshold Lighting Plan Electrical One-Line Diagram Electrical Details Note: Bold type indicates additional sheets or additional work on sheets included in Amendment #1. l:\Projects\City of Auburn\30872 2003 Runway lmprovemen\Office\Word\2003AuburnSupplementScope doc - C-1 - August 28, 2003 PROJECT TITLE: CLIENT: PHASE: .lOB NUMBER: ExhibitB-I Consultant Fee Determination- Summary Sheet Fee Schedule AUBURN MUNICIPAL AIRPORT - 2003 RUNWAY IMPROVEMENTS CITV OF AUBURN AMENDMENT/ti - DESIGN PHASE SERVICES 18-Jul-03 LABOR: ProJect Task / Principal Manager Sheet # Task (Scope of Selwices) 13000 12000 2 Project Management and Administration 4 4 3 Topo Smvey and Basemapping 0 2 6 SEPA/NEPA Information 0 0 8 Preliminary Construction Plans Construction Safety/Phasing Plan (2 sheets) 0 2 Subsurf'ace Edge Drain Plan (1"=50') 0 2 Subsurface Edge Drain Plan (I "=50') 0 2 tlold Apron Expansion w/Subsurface Edge Drain Plan 0"=50) 0 2 Typical Sections and Civil Details (1 sheet) 0 2 9 Preliminary Contract Docs & Technical Specs 0 0 10 Construction Phasing Plan 0 0 14 Finalize Plans, Specs, Const Docs & Estimates 0 2 16 Final Submittal & Approval 0 2 18 NPDES Construction Permit 0 2 Civil Designer/ Prqiect Engineer Surveyor Technician Coord 95 O0 8500 7500 5500 Clerical 5000 Survey Crew 14400 Total 000 Hours 0 0 0 0 4 0 2 0 0 4 0 8 8 0 16 8 0 16 8 0 8 8 0 8 4 0 0 4 0 0 12 0 16 2 0 0 16 0 0 Labor Cost 0 0 0 16 1,44000 0 8 0 14 1,73200 2 0 0 4 29O.0O 0 0 0 14 1,22000 0 0 0 26 2,200.00 0 0 0 26 2,200.00 0 0 0 18 1,600 00 0 0 0 18 1,600 00 4 0 0 8 58000 0 0 0 4 380.00 4 0 0 38 3,000.00 0 0 0 6 540.00 4 0 0 26 2,180.00 Labor Subtotal 4 TOTAL LABOR EXPENSES: Item Mileage Per Diem Plottin~dPrinting 22 76 4 72 18 14 8 Cost Quantity Unit per Unit Markup 160 Miles 0 40 1.0 0 Day 12500 10 200 Each 3 00 I I 0 218 18,962.00 18,962.00 Expenses Cost 6400 0.00 660.00 TOTAL EXPENSES SUBCONSULTANTS: Geotechnical Subconsultant Electrical Subconsultant 724.00 Subcontract Subcon. Amount Markup Cost 000 11 0.00 000 I 1 0.00 TOTALSUBCONSULTANTS 0.00 Total - Labor 18,962.00 I Total - Expenses 724.00l Total ~ Subconsultants 0.00 TOTAL ~ AMENDMENT #1 - DESIGN PHASE SERVICES 19,686.00 PROJECT TITLE: CLIENT: PHASE: JOB NUMBER: Exhibit B-2 Consultant Fee Determination - Summary Sheet Fee Schedule AUBURN MUNICIPAL AIRPORT - 2003 RUNWAY IMPROVEMENTS CITY OF AUBURN AMENDMENT #1 - CONSTRUCTION PHASE SERVICES 28-Aug-03 LABOR: Task No. Total 0.00 Hours Labor Cost Project Civil Designer/ Prqiect Survey Principal Manager Engineer Surveyor Techaician Coord Clerical Crew Task (Scope of Servicest 130.00 120.00 95.00 85.00 75.00 55.00 50.00 144.00 I Prqiect Management 0 4 0 0 0 4 0 0 0 8 Review Snbmittals 0 0 2 0 0 2 0 0 0 9 Construction Administration 0 4 16 0 0 8 0 0 0 10 Resident Engineering, 0 4 96 0 0 0 0 0 0 Labor Snbtotal 0 12 I 14 0 0 14 0 0 0 TOTAL LABOR 8 4 28 100 700.00 300.00 2,440.00 9,600.00 140 13,040.00 13,040.00 EXPENSES: Item Quantity Mileage Per Diem Plotting/Printing 880 0 0 Unit Miles Day Each Cost per Unit Markup 0.40 1.0 125.00 1.0 3.00 I.I Expenses Cost 352.00 0.00 0.00 TOTAL EXPENSES 352.00 SUBCONSULTANTS: Testing Subconsultant Electrical Subconsultant Subcontract Amount Markup 0.00 I. I 000 I.I Subcon. Cost 0.00 0.00 TOTAL SUBCONSULTANTS 0.00 Total - Labor Total - Expenses Total - Subconsaltants TOTAL - AMENDMENT #1 - CONSTRUCTION PIIASE SERVICES 13,040.00I 352.00I 0.00 13,392.00