Loading...
HomeMy WebLinkAbout3762 RESOLUTION NO.3 7 6 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, ADOPTING THE 2005-2010 SIXYEAR TRANSPORTATION IMPROVEMENT PROGRAM OF THE CITY OF AUBURN PURSUANT TO R.C.W. CHAPTER 35.77 OF THE LAWS OF THE STATE OF WASHINGTON WHEREAS, R.C.W. Chapter 35.77 of the Laws of the State of Washington requires that the legislative body of each city and town within the State of Washington prepare and adopt a six year transportation program for the ensuing six calendar years and that such program be reviewed annually each year thereafter; and WHEREAS, a public hearing to consider the adoption of the 2005-2010 six year transportation program for the City of Auburn was held on September 20, 2004, at the hour of 7:30 p.m. in the Council Chambers of the Auburn City Hall, pursuant to notice published in the legal newspaper of the City of Auburn on September 10, 2004; and WHEREAS, said 2005-2010 Six Year Transportation Improvement Plan of the City of Auburn was approved by the City Council by motion duly made and carried in said hearing. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, HEREBY RESOLVES as follows: --------------------------- Resolution No. 3762 September 8, 2004 Page 1 Section 1. There is attached hereto and denominated as Exhibit "A" and the terms of which are incorporated herewith by reference as though fully set forth, a designation of the streets within the corporate limits of the City of Auburn to be improved in the manner therein set forth during the year set for the improvement of such street or streets. Section 2. That the City Engineer of the City of Auburn is hereby directed to forward a certified copy of this Resolution to the Washington State Department of Transportation for filing not more than thirty (30) days after the adoption of this Resolution. Section 3. That the Mayor is hereby authorized to implement such administrative procedures as may be necessary to carry out the directions of this legislation. Section 4. That this Resolution shall take effect and be in full force upon passage and signatures hereon. DATED this2C~Gaay of September, 2004. PETER B. LEWIS MAYOR --------------------------- Resolution No. 3762 September 8, 2004 Page 2 ATTEST: dk' J1 1 / j '~.)" 1/" I ( {I' \ ~/""-J i .(....(... Danielle E. Daskam, City Clerk APPROVED AS TO FORM: --------------------------- Resolution No. 3762 September 8, 2004 Page 3 ~.. Exhibit "A" Resolution No. 3762 * * ---- --~---- AUßU '" ow. 11-lAN YOU lMAGn~t.0 ~ Six Year Transportation Improvement Program 2005-2010 Mayor Pete Lewis City Council Rich Wagner, Public Works Committee Chainnan Gene Cerino, Public Works Committee Roger Thordarson, Public Works Committee Bill Peloza Lynn Nonnan Nancy Backus Sue Singer Dennis Dowdy Dennis Selle Laura Philpot Joe Welsh Staff Public Works Director City Engineer Traffic Engineer Transportation Planner Photos on the Cover Listed Left to Right: 1. Oravetz Road Guardrail; 2. School Zone Flashing Beacons on SR-I64; 3. Lakeland Hills and East Valley HWY Traffic Signal Table of Contents Table of Contents..................... ............................. ................................................... i Introduction......................... ................................................................................... iii Proiect List Roadway Improvements 3 rd Street SE/Cross Street SE .......................................................................1 A Street SW Loop ......... ....... .......... ............. ......... ................. ............ ...... .....2 Auburn Way South Safety Imjrovements ...................................................3 C Street SW (Ellingson to 15 Street SW) ........................................ ..........4 Lea Hill Slope Repair. ........ ..... ..................... ............. ................................ ...5 Urban Area Transportation System Management Improvements ...............6 A Street NW, Phase 1 (3rd Street NW to 14th Street NW) ...........................7 Intelligent Transportation System (ITS) Improvements ..............................8 Auburn Way Corridor Improvements (4th Street NE to 4th Street SE) ........9 I Street NE (40th Street NE to 52nd Street NE)...........................................1 0 M Street SE Grade Separation (E. Main to Auburn Way South) ..............11 Temporary Opening of Academy Drive PHASE 1....................................12 Re-Opening of Academy Drive PHASE 2..............................................12A S 277th Street (AWN to Green River Bridge) ............................................13 15th Street SW Reconstruction (C Street SW to UPRR)............................l4 A Street NW, Phase 2 (West Main Street to 3rd Street NW) .....................15 C Street NW (West Main Street to 3rd Street NW) ....................................16 D Street NW (3th Street NW to 44th Street NW)......................................17 F Street SE (4th Street to Auburn Way South) ...........................................18 M Street NE (East Main Street to 8th Street NE/Harvey Road)................. 19 SR-18 EB Ramp (6th StSE to A WS wi Grade Separation at BNSF) ........20 Intersection Improvements Kersey Way/Oravetz Road Signal.. ............... .................. ......................... .21 Harvey Road/8th Street Capacity Improvement .........................................22 Non-Motorized Improvements West Valley Hwy Pedestrian Trail (Peasley Canyon to 15th St SW).........23 Auburn/Pacific Trail (C St SW from 15th S1. SW to Pacific City Park) ....24 West Main Street Non-Motorized (Interurban to Transit Center) .............25 BNSF/East Valley Hwy Pedestrian Undercrossing ..................................26 Six Year Transportation Improvement Program 2005-2010 Table of Contents Non-Motorized Improvements Continued... A Street SE Pedestrian Improvement ...................................... ........ ..........27 White River Trailhead Class 1 (Roegner Park to EVH) ............................28 37th St SE/R Street SE Connector (Olympia St to R St SE) ......................29 Green River Trail, Phase 1 (Green River Access to Brannan Park) ..........30 Green River Trail, Phase 2 (Brannon Park to 2nd St SE) ...........................31 Green River Trail, Phase 3 (2nd St SE to SR-18) .......................................32 Studies and Miscellaneous Improvements A Street SE - Class 2 Trail (6th St to Ellingson along BNSF Yard)..........33 Auburn Black Diamond Road - Class 1 or 2 TraiL..................................34 Downtown Lighting Program .................................................................... 3 5 Kersey Way Trail........... ........... ...... ...... ...... ...... ... ..................................... .36 M Street SE (37th St Se to 29th St. SE).......................................................37 Annual Level of Effort Projects S. 277th Street (AWN to Frontage Road) Wetland Mitigation ..................38 Citywide Pedestrian Crossing Program .......... .............. ......... ............... .....39 Citywide Roadway Safety Infrastructure Improvements...........................40 Pavement Preservation Arteria1.................................................................41 Appendices City Wide Transportation Project Map.................................................. Appendix A Detailed Funding Spreadsheet .................................,............................. Appendix B Six Year Transportation Improvement Program 2005-2010 11 Introduction BACKGROUND The six-year program is updated each year in accordance with RCW, chapter 35.77, requiring that cities file an adopted program yearly with the Department of Transportation. The purpose of this program is to "assure that each city and town shall perpetually have available advanced plans looking to the future for not less than six years as a guide in carrying out a coordinated street construction program". This annual update also infonns neighboring jurisdictions of the City's construction schedule for the purposes of coordination and compatibility. METHODOLOGY · Transportation needs are identified by examining the latest infonnation concerning safety and accident history, growth trends, the city's traffic model, traffic studies and the City's adopted (1997) and updated (1998/1999) Transportation Plan. · A revenue forecast is prepared to provide a reasonable estimate of funding available to accomplish the transportation improvement needs. Since the desire to construct transportation improvements typically exceeds the available forecast revenue, it is necessary to establish some method of prioritizing the needs. · The Public Works Committee and Staff review transportation needs and priorities. The likelihood of receiving federal or state grants for various improvements is considered. Safety, capacity and access needs are considered. Community interest and values are also considered. All of these factors yield a prioritized list of transportation improvements. The prioritized list is then financially constrained to reflect the financial projections to yield the Six-Year Transportation Improvement·Program. Six Year Transportation Improvement Program 200S-2010 III NOTE The program recognizes approximately $83 million worth of transportation improvements on or adjacent to our classified roadway system (including Non- Motorized and pavement preservation) for the next six years. There are also four projects of regional significance listed in this document as recommended projects to be sponsored by others totaling over $1.7 billion. PROJECTS COMPLETED (OR PLANNED FOR COMPLETIONtlli 2004 · B Street NW Wetland Mitigation . 415t Street SE and A Street SE Capacity Improvements · Crossing Gate UPRR and West Main Street · Transportation Plan Update · Lakeland Hills and EVH Traffic Signal · Sign Management Inventory · Pavement Preservation Arterial - Auburn Ave. · Citywide Crossing Program - 3rd Street NW Near Auburn Post Office · Lake Tapps Parkway Median Guardrail Six Year Transportation Improvement Program 2005-2010 IV Roadway Improvements CAPITAL FACILITIES PLAN 2005-2010 TIP# 1 Project Title: 3rd Street SE I Cross Street SE Project No: C1006 Project Type: Capacity Project Manager: Jennifer Dvorak Description: . .,.,.,., ........A'...., :t:,.: _ " _ - - .- _ - - -.- _..:"'y.;~rh~;:·: Widen 3rd Street SElCross Streetfrom3 to 5 lanes at 'A' Street to Au6µm Way South. Add a second left turn lane from northbound 'A'Street SE towestbound 3rdStreetSE.Theproj~indudessignal modifications. Install a 12 inch ductile iron water pipe from 'A' StreetSE to Auburn Way So. The project is a continuation of the corridor enhanced by the 3rd St. SW Grade Separation project. ' It will improve mobility. and is consistentwith the Comprehensive Plan. Progress Summary: Property Acquisition and Design are being completed in 2004. Construction is scheduled for 2005. . .. Impact on Operating Budget Once.Completec/: The annual maintenance cost for this project is estimated to be $1,757. buddy 2005 YTD Actual Budget Budget Expenditures Balance - Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total ~ Funding Sources: Unrestricted Street Revenue 9,973 55,000 148.719 213,692 213.692 Grants 79,200 297.500 959.300 1.336.000 1.336.000 Reet2 9,419 200.000 - 209.419 209.419 Impact Fees - 247,900 40.100 288.000 288.000 Total Fundina Sources: 98.592 800,400 1,148,119 2,047,111 2,047.111 Expenditures: Design 94,278 90,000 - 184.278 184.278 Right of Way 4,314 680,400 - 684,714 684.714 Construction - 30.000 1.148,119 1.178,119 1.178.119 Total Exoenditure: 98,592 800,400 1,148,119 2,047,111 2,047,111 Forecasted Project Cost: 2006 2007 2008 2009 2010 Toml Expenditure Fundina Sources: 2005 . 2010 BellOlld 2010 Unrestricted Street Revenue - - - - - 148,719 Grants - - - - - 959,300 Reet 2 - - - - - · ImDact Fees - - - - - 40,100 Total Funding Sources: - - - - . 1,148,119 EXDenditures: Design - - - - - · Right of Way - - - - - · Construction - - - . - 1148,119 lotal ExDenditure: . - . . . 1,148 119 ,...J"f'\"~\n'^1 ^--",......, "T"..........~ "',..,..,.,,., ",,...,.,,.....' CAPITAL FACILITIES PLAN 2005-2010 TIP# 2 Project Title: Project No: Project Type: Project Manager: Description: ,,,,"Iii This project ,is the final phase'of.thé3rd Street SW Grade Separa connecting A StreetSWandDîvision' Street and thereby provide Garage. "Landscapestrips,sicleWalks,'.~~veways,..'Ughting'éind,sto 'A' Street Loop PR529F Capacity Jennifer Dvorak ;,</. " , roject.ltwill construct a new asphalt road Ie access routes into the Auburn Station rainage will be ,included. '. ;.,.,., Progress Summary: ' 'c" ,,' Design and Right of Way are being completed in2004. Construction scheduled for2005, ", Impact on Operating Budget Once Completed: The annual maintenance cost for this project is estimated to 00$851. " Current Year Budget 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Funding Sources: Unrestricted Street Revenue 6.365 7,035 134.850 148.250 148.250 Grants - 45.000 254,900 299.900 299.900 Bond Proceeds - - - - - Imaact Fees - - - - - Total Fundino Sources: 6,365 52,035 389,750 448,150 448,150 Exøenditures: Design 6.365 30,000 - 36,365 36,365 Right of Way - 22.035 - 22.035 22.035 Construction - - 389.750 389.750 389.750 Total Exøenditure: 6,365 52,035 389,750 448,150 448,150 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Expenditure Funding Sources: 2005· 2010 Bevond 2010 Unrestricted Street Revenue - - - - - 134,8110 Grants - - - - - 254,900 Bond Proceeds - - - - - · Imøact FHs - - - - - · Total Funding Sources: - . - . · 389,750 EXDendltures: Design - - - - · · Right of Way - - - - - · Constnlctlon - - - - - 389,7110 I Total ExDendlture: . . . - · 389,750 '\ I E:\Bud2005IPW Art SII TIP 05-SS102,xls\ (PR52¡jF) Q/1 J;./"'JnnA 0-')1 ^ U CAPITAL FACIUTIESPLAN 2005-2010 TIP# 3 Project Title: Project No: Project Type: Project Manager: Auburn Way South Safety Improvements C1014 Non-Capacity (Safety) Jennifer Dvorak Description: ."" :~·\;¥;f; ¿g~' A~",#*,,"_' ' Thisprojedwas created in resPö\ísetoaState safety study. ..The proj~jncludes safety improvements along Aubum Way South (AWS) between 6th Street SEandM Street SE. . The anticiþated improvements include rechannelization ofAWSto limit left tums, a new traffic signalattheintersection of Aubur:l'lWay South and 'P Street SE signal interconnection, and widening for an additional lane between D Street SEand 6th StreetSE. ···This project will significantly improve the safetyófthe corridor: ... Progress Summary: The design and right of way are being completed in2004. Construction is startir'!g in.2004 and scheduled for complètetion in 2005. . . Impact on .OperatingBudgetOnceCompleted: This projed will have no impad on the operating budget for street maintenance. The.State maintains the pavement on SR-164; ...... CurrentYearBudge~ 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budc1et Proiect Total Cost Funding Sources: Unrestricted Street Revenue 124,813 120,732 709,477 955,022 955.022 Grants 196,063 450,000 185,523 831,586 831,586 Developer Funds · 98,000 - 98,000 98,000 Imoact Fees - - - - . Total Fundinø Sources: 320,876 668,732 895,000 1,884,608 1,884,608 Exoenditures: Design 319,799 68.732 - 388,531 388,531 Right of Way 1,077 40,000 - 41,077 41,077 Construction · 560,000 895,000 1,455,000 1,455,000 Total Exoenditure: 320,876 668,732 895,000 1,884,608 1,884,608 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Expenditure FundinaSources: 2005· 2010 Bevond 2010 Unrestricted Street Revenue - - · - - 709,477 Grants - · · - - 185,523 Developer Funds - - - - - · ImDllct Fees - - - - - · Total Fundina Sources: · · · · · 895,000 Exøenditures: Design - - - - · · Right of Way - - - - - · Construction · · - · - . 895.000 Total Exoenditure: · - · · · 895,000 " F·\RlIri?()n.t;\p\A/ Art c::.f\ TID n.c:;-,::~c::: 1("" vl..\ fr 1 111 A\ CAPITAL FACILITIES PLAN 2005-2010 TIP# 4 Project Title: C Street SW (15th St SW to Ellingson) Project No: C326A Project Type: Capacity Project Manager: Bill Helbig Description: . .~, .,~ '~ \/Viden 'C' Street SW between 15th Street SWand Ellingson to accommodate 2 southbound lanes, ·1·northbouncl through lane and required tumlanes.Thisproject includes two new signals, one at the new Safeway distributio center entrance and the otheraUheGSAentrance, Progress Summary: The design and right-of-way are being completed in 2004. Construction will begin in 2004 and is scheduled for completion in 2005. Impact on Operating Budget Once Completed: The annual maintenance cost for this project is estimated to be $22,838 Current Year Budgeú 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - - - Budget Amendments - - - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Prolect Total Cost Fundlno Sources: Unrestricted Street Revenue - - 400,000 400.000 400.000 Traffic Impact Fees - - 200,000 200.000 200.000 EDA Grants - 624,000 1,376,000 2,000,000 2,000,000 King County - 50,000 - 50,000 50,000 Deve/oøer 600,000 750.000 1,350.000 1,350,000 Total Fundino Sources: . 1,274,000 2,726,000 4,000,000 4,000,000 EXDenditures: Design 436.000 - 436.000 436,000 Right of Way - 3.000 - 3,000 3,000 Construction - 835,000 2,726,000 3,561,000 3,561,000 Total EXDenditure: - 1,274,000 2,726,000 4,000,000 4,000,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Expenditure Fundino Sources: 2005·2010 Bevond 2010 Unrestricted Street Revenue - - - - - 400,000 Traffic Impact Fees - - - - - 200,000 EDA Grants - - - - - 1.376,000 King County - - - - - · Develoøer - - - . · 750,000 Total Funding Sources: · - . - · 2,726,000 Expenditures: Design - - - - · · Right of Way · - - - - · Construction - - - - - 2,726 000 Total Expenditure: · . - . · 2,726,000 CAPITAL FACILITIES PLAN 2005-2010 TIP# 5 Project Title: Lea Hill Slide Slope Repair Project No: C219A Project Type: Safety (Non-Capacity) Project Manager: Bill Helbig Description:"" A portion of 105th PlaceSE(LèåHiIIRd/107th) has experiencedslid~ope failure. This project will include slideslope repair as required. .. ..'; . ... ........... .. ... . .....,:r~, ;:*I~~~'~· . ~,'.M<'" Progress Summary: . ,- The right-of-way issues are being completed in 2004. Construction is scheduled for2005. Impact.on . Operating Budget·Once Completed: This project will have no impact on the operating budget for streetmaintenan~. .. .. Cu"entYearBudge~ 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundina Sources: Unrestricted Street Revenue 38.888 25.000 100.000 163.888 163,888 Grants - - - - - Bond Proceeds - - - - - ImDact Fees - - - - - Total Fundino Sources: 38,888 25,000 100,000 163,888 163,888 EXDenditures: Design 38.888 5.000 10.000 53.888 53.888 Right of Way - 20,000 - 20.000 20.000 Construction - - 90.000 90.000 90.000 Total EXDenditure: 38 888 25,000 100,000 163.888 163,888 Forecasted Project Cost: 2006 2007 200. 2009 2010 Total Expenditure FundinaSourcea: 2005·2010 8e-nd 2010 Unrestricted Street Revenue - - - - - 100,000 Grants - - - - - . Bond Proceeds - - - - - - ImDIICt Fees - - - - - . Total FundinaSources: - - - . - 100,000 EXDenditures: Design - - - - - 10,000 Right of Way - - - - - - Construction - - - - - 90 000 ... TotalEiiMnditure: - - - - - 100000 t='\C"M"nn'::;\D\^' ^.... c-.\ TIn f"lt: ("'('""<4"'" ..1_\ ''''''"",..,A\ CAPITAL FACILiTIES PLAN 2005-2010 TIP# 6 Project Title: Urban Area Transportation System Management Improvments Project No: Project Type: Non-Capacity Project Manager: TBD Description:;b ;~~'¥. ~~<:,~f ,. ",;<}¿/ . .",,,,-\",", ,,' "",' ',,-', "'.," : -" - ,-:-:"-::,::>':--::" This project will moclifyfourinteÍ'sectionsto improve bus tuming radii arilW¡IIreconstrud 2nd Street SW between A Street SWandAStreet SE. .. ... .. '. '. "";*":' rrogteSS SUI7"ry; I Impact on Operating Budge.tOnce. Completed: This project will have no impad on the operating budget for streetmaintenance. CurrentYearBudge~ 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Funding Sources: Unrestricted Street Revenue - - - 6,794 Grants - - - - 554,243 King County Metro - - - - 100,000 Imøact Fees - - - - - Total Fundina Sources: - - - - 661,037 Expenditures: Design - - - 207.152 Right of Way - - - - 47.688 Construction - - - 406,197 Total Exøenditure: . - - - 661,037 Forecasted Project Cost: 2008 2007 2008 2009 2010 Total Expenditure Fundlnø Sources: 2005· 2010 Sevond 2010 Unrestricted Street Revenue 6,794 - - - - 6,794 Grants 554,243 - - - - 554,243 King County Metro 100,000 - - - - 100,000 Imøact Fees - - - - - . Total Funding Sources: 661,037 . - . - 661,037 EXDendltures: Design 207,152 - - - - 207,152 Rightof.W,y 47,688 - - - - 47,688 Construction 406,197 - - - - 406197 Total Expenditure: 661,037 . . . . 661 037 I ;.; .};; .... ..... .'. ;." ..;; .... .......... .......;.... ~·H:~llrf..,nnt:;:\C\^f ^... C-J\ TI~ t"'IC C'c-'""v.... ..1_\ III_L__ ",___\ CAPITAL FACILITIES PLAN 2005-2010 TIP# 7 Project Title: A Street NW Phase 1: 3rd Street to 14th Street NE Project No: C207A Project Type: Capacity Project Manager: Bill Helbig Description: .... .. Construct a multi lane arterial frorTL3rd St. NW to 14th St.NW.. .. This p,;j~ witt improve mobility and is tied development. It is consistent with the comprehensive plan and contributes tothecomP!etion of a North-South arterial corridor. . . . :d~h:" .¥.;t~--. j{-' Progress Summary: The predesign (30% design) has been completed. A portion of the right..,()f-way has been acquired. This project is partially funded, which will help it score well in theTIB'sTPP Program. A Public Works Trust Fund Loan In the amount of $275,000 in the. year 2006. Impact on Operating Budget Once Completed: The annual maintenance cost for this project is estimated to be $17,568. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundina Sources: Unrestricted Street Revenue - 261.000 - 261,000 878.000 Grants - - - - 5.807,000 Other - - - - 727.000 Imoact Fees 39,149 - 10,000 49,149 324,149 Total Fundinn Sources: 39,149 261,000 10,000 310,149 7,736,149 Exoenditures: Design 39,149 10,000 10,000 59,149 622.149 Right of Way - 251,000 - 251,000 1,696.000 Construction - - - - 5.418,000 Total Emenditure: 39,149 261,000 10,000 310,149 7,736,149 ForecastedProject Cost: 2006 2007 2008 2009 2010 Total ExpendIture Fund/na Sources: 2005 - 2010 Bevond 201D Unrestricted Street Revenue 75,000 - 200,000 342,000 - 617,000 Grants 738.000 735,000 1.600.000 2,734,000 - 5,807,000 Other 275,000 110,000 - 342.000 - 727,000 Imosct Fees - 75.000 200,000 - - 285.000 Total Funding Sources: 1,088,000 920,000 2,000,000 3,418,000 - 7.436.000 EXDenditures: Design 563.000 - - - .. 573,000 Right of Way 525.000 920,000 - - - 1,445,000 Construction - 2,000.000 3418.000 - 5418.000 TotsIExoend/ture: 1,088,000 920 000 2,000,000 3,418,000 - 7,436,000 "- C-ID...-.I"nf"\l::lnl^' "..... I"'~\ "T'",..... "",. ro,...,..,.,.... , , '............._a' CAPITAL FACILITIES PLAN 2005-2010 TIP# 8 Project Title: Project No: Project Type: Project Manager: Citywide Intelligent Transportation System C307 A Capacity Ryan Johnstone Description:,;;, ,,"" This project includes interconnei!and coordination for all signals in tnittitY. . The project also includes traffic management cameras, fiberopticjnterconnectandrelatedhardwareatc:mg 5R.;,164 (Aubum Way So) and S. 277th Street corridors.. The project will construct a traffic control centerat~;eXiSting M&O facility. . This project is required for special event traffic management and incident response; > . .. .. .....;~;) rrogress Summary; Impact on Operating Budget Once . Completed: The annual maintenance cost for this project is estimated to be $5,000. CurrentYearBudge~ 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundin Sources: Unrestricted Street Revenue 3.000 2.000 63.981 68.981 113.000 Grants 175.000 688.981 863.981 2.292.000 Muckleshoot Indian Tribe 175.000 125.000 300.000 300.000 Kin Count 500.000 500.000 500.000 Total Fundin Sources: 3,000 352,000 1,377,962 1,732,962 3,205,000 Ex enditures: Design 3.000 352.000 170.000 525.000 525.000 Right of Way Construction 1.207.962 1.207.962 2.680.000 Total Ex enditure: 3,000 352,000 1,377,962 1,732,962 3,205 000 Forecasted Project. Cost: 2006 2007 200. 2009 2010 Toml Expenditure 2005 . 2010 Be nd 2010 Fundln Sources: Unrestricted Street Revenue Grants Muckleshoot Indian Tribe Kin Coun Total FundinSources: Exøenditures: Design Right of Way Construction Total Ex end/ture: 44,019 1.428.019 108,000 2,117,000 125,000 500 000 2,850,000 1,472,038 170,000 1.472,038 1,472,038 2 680,000 2,860 000 L.\n....J",""t"Ir"\IA' "'~,...... .....,.........'" ,..,,....~....^ " ,,........""_.. I ./ CAPITAL FACILITIES PLAN 2005-2010 TIP# 9 Project Title: Project No: Project Type: Project Manager: Auburn Way Corridor-Pedestrian Crossing C409A Non-Capacity Jennifer Dvorak Description: ," ,"w This project will determine the feasibility, cost and concept of improvem~ts including enhanced pedestrian crossings, landscaped medians and restricted.lefUumJanesonAubumWayfrom~JhStreet NEtoCross Street. '-'. .-.,. --; e~~? Progress Summary: This maypotentiðUyscorewell for TIS's PSMP Program. " Impact on Operating Budget Once Completed: Thjs project will have no impact on the operating budget for streetmaintenance. .. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - é Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total ~ Fundina Sources: Unrestricted Street Revenue - - - - Grants - - - - - Transfer In (001.17.558.100.41) - - 50,000 50.000 50.000 ImDact Fees - - - - - Total Fundina Sources: - - 50,000 50,000 50,000 EXDenditures: Design - - 10.000 10.000 10.000 Right of Way - - - - - Construction - - 40,000 40,000 40,000 Total EXDenditure: . - 50,000 50,000 50,000 Forecasted'Project Cost: 2006 2007 2008 2009 2010 Total Expenditure Fund/no Sources: 2005 . 2010 Bevond 2010 Unrestricted Street Revenue - - - - - · Grants - - - - - · -ransfer /n (001.17.558.100.41 - - - - - 50.000 Imnsct Fees - - - - - · Total Fundlna Sources: - - - . - 50,000 Exoenditures: Design - - - - - 10,000 Right of Way - - - - - · Construction - - - - 40,000 !otaIExþafldlture: . . . . . 50 000 r L.. CAPITAL FACILITIES PLAN 2005-2010 TIP# 10 Project Title: Project No: Project Type: Project Manager: '" Street NE Corridor C415A Capacity Scott Nutter Description: ..,,:;!i~~:~;<' The final alignment ofthe'l'StreetCorridoris beinganalizedaspalt.of\lt\eNortheast Auburn Special Area Plan Environmental Impact Study. · A portion of the ROW and Construction maY be developer funded. The cross section will likely be a 5-lane arterial per the City Comprehensive Plan; It will imP'9vemobility and is consistent with the Comprehensive Plan.ltwillcomplete a major north south arterial from'52nd St NE to Harvey Rd. Future sewer line proposed to bea combination 10 in. &30 in. line. Progress Summary: ...... A pr9:'design·report (including public involvement) is scheduled for 2005. Impact on Operating Budget Once Completed: .. The annual maintenance cost for this project is estimated to be $17,568. Current Year Budgeê 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Funding Sources: Unrestricted Street Revenue - 5,000 40,000 45,000 45,000 Developer - - - - - Other - - - - 5.760,000 Impact Fees - - - - - Total Funding Sources: - 5,000 40,000 45,000 5,805,000 ExÞenditures: Pre-Design & Design - 5.000 40,000 45,000 505,000 Right of Way - - - - 1,020,000 Construction - - - - 4,280,000 Total ExÞenditure: - 5,000 40,000 45,000 5,805,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Toml Expenditure Funding Sources: 2005· 2010 Bevond 2010 Unrestricted Stìeet Revenue - - - - - 40,000 Developer - - - . Other 460,000 1,020.000 4,280,000 - - 5,760,000 Imøact Fees - - - - - . Total Funding Sources: 460.000 1,020,000 4,280,000 - - 5,800,000 ExDendltures: Pre-Design & Design 460,000 - - - - 500,000 Right of Way . 1,020,000 - - - 1,020,000 Construction - 4.280.000 - - 4.280 000 Total Expenditure: 460,000 1 020,000 4.280,000 . . 5,800 000 ( I E:'·U:J",.. '"')(,"\r\t::\D'^/ ^~ C':'H Tln,.,.,r::: ("O,....~,..,..... .,1_' 'I"'.......^' CAPITAL. FACILITIES PLAN 2005-2010 TIP# 11 Project Title: 'M' Street Grade Separation- E.Main to AWS Project No: C201A Project Type: Capacity Project Manager: Ingrid Gaub Description: .' Construction of a grade separated railroad crossing at M Street SE at,tbeBNSF Stampede Tracks. Projectalso includesconstructionofthe bypass and road connection between MStreet SE and Aubum Black Diamond Road. Progress' Summary: '. Thepre-design report has been completed. Weare searchingforgrantfunding. FASThas committed Design money for 2006. This project will.score well inTIB's AlP program once it reaches Construction, but not before. A Public Works Trust Fund Loan for$1.27M Is anticipated in 2007/2008. Impact on Operating Budget Once . Completed: The annual maintenance cost tor this' project is estimated to' 00$21,827. .' CurrentYearBudge~ 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - .' Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budoet Proiect Total Cost Fundina Sources: Unrestricted Street Revenue - - - 511.000 Grants - - - - 15.872.600 Other - - - - 7.878,000 ImDact Fees 245.000 5.000 5.000 255.000 389.000 Total Fundina Sources: 245,000 5,000 5,000 255,000 24,650,600 Exøenditures: Design 245,000 5.000 5.000 255.000 1.662,600 Right of Way - - - - 8.516,000 Construction - - - - 14,472.000 Total Exøenditure: 245,000 5,000 5,000 255,000 24,650,600 Forecasted Project Cos~ 200t 2007 2001 2009 2010 Total Expenditure Fundina Sources: 2005· 2010 BellDnd 2010 Unrestricted Street Revenue 21.000 - - 490.000 - 511,000 Grants 240,000 4.200.000 7.362.600 4,070.000 - 15,872,600 Other - 800,000 466,000 2,440,000 4,172.000 7,878,000 Imøact Fees 34,000 - 100.000 - - 139,000 Total Fundina Sources: 295,000 5,000,000 7,928,600 7,000,000 4,172,000 24,400,600 Exøenditures: Design 295.000 1.000,000 112.600 - - 1,412,600 Right of Way - 4,000.000 4,516,000 - - 8,516,000 Construction - 3,300,000 7,000,000 4,172,000 14 472 000 fTotal Exøenditure: 295,000 5,000,000 7,928,600 7,000,000 4.172.000 24,400,600 . F·\~ lrf?nn¡:;\P\'" õrl ~+\ TID ru: C'C'1r'1"'1 ..1..\ ',.....'n04 ^) CAPITALFACIUTIES PLAN 2005-2010 TIP# 12 Project Title: Project No: Project Type: Project Manager: Description: The goal of this project Green Temporary Re-Open of Academy Drive PHASE 1 Emergency Access TBD ProgressSummary:«' ..>ii<>,/ .'.""".""""'" ...'...., . . A geotechnical study ,was initiated in2004. The project feasibility, scopeandcostwiUbe determinedupori completion of the study. The figure here represents a best estimate given available information. . . .,., ..... '.' .. . . Impact on Operating ,Budget, Once.. Completed: The annual maintenance. cost tor this projectis estimated to be $6,808, Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget · Budget Amendments - Adjusted Budget · - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budoet Proiect Total Cost Fundino Sources: Unrestricted Street Revenue - - · - · Grants · · - · 450,000 General Fund · · - · 50.000 Imøact Fees · · · - · Total Fundino Sources: · · - · 500,000 Exøendltures: Design - · · - 50,000 Right of Way - - · · · Construction · · · · 450.000 Total Exøenditure: · · - - 500,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Tota' Expenditure FundinøSources: 2005·2010 BellDlJd 2010 Unrestricted Street Revenue . - - - - · Grsnts 450,000 . · - . 450,000 Other 50,000 - - - - 50,000 'møactFees - - - - - - Total Funding Sources: 500,000 - - . . 500,000 Exøenditures: Design 50,000 - - - - 50,000 Right of Way - - - - - - Construction 450,000 - - - - 450000 Tota' Exøenditure: 500,000 . · . - 500,000 1='\J:~ lri")nn¡:;\o\^, ^.-+ Ct\ TIC nJ:: cc..,,,') ~I...\ lï.....__~ ^.........., ..........,,\ CAPITAL FACILITIES PLAN 2005-2010 TIP# 12A Project Title: Re-open Academy Drive PHASE 2 Project No: C411A Project Type: Capacity Project Manager: TBD Description; ~~~~;~~":,, ~~~4;~:; The goal ofthis project is to reŠfure thesJidedamaged portion and r~Pen Academy Drive between SR 164 and Green Valley Road for local traffic. ;;~, ~v(r.· ,~",.-~ Progress Summary: A geotechnical study was initiated in 2004. The project feasibil~, scope and cost will be determined upon completion ofthe'study ,Thefigurehere represents a best estimate given available information. Impact on Operating Budg~tOnceCompleted: The annual maintenance cost for this project is estimated to be $6,808. Current Year Budgeë 2005 YTD Actual Budget Budget Expenditures Salance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Sudoet Proiect Total f2!! Fundino Sources: Unrestricted Street Revenue - - - - - Grants - - - - 8.996.000 Other - 200.000 - 200.000 1.604.000 Impact Fees - - - - - Total Fundina Sources: a 200,000 a 200,000 10,600,000 Expenditures: Design - 200.000 - 200.000 1,100.000 Right of Way - - - - 500,000 Construction - - - - 9.000.000 Total Expenditure: a 200,000 a 200,000 10,600,000 Forecasted Project Cost: 2006 2007 200. 2009 2010 Total Expenditure Fundinø Sources: 2005·2010 Bevond 2010 Unrestricted Street Revenue - - - - - . Grants - 475.750 735,250 2,595.000 5,190.000 8,996,000 Other - 74,250 114.750 405,000 810,000 1,404,000 Imøact Fees a - - a a . Total Fundlnø Sources: . 550,000 850,000 3,000,000 6,000,000 10,400,000 Expenditures: .Deslgn - 550,000 350,000 - a 900,000 Right of Way - - 500,000 - - 500,000 Construction - - 3,000.000 6,000,000 9,000,000 , Total Exøendlture: . 550,000 850000 3,000,000 6,000,000 10,400,000 } CAPITAL FACILITIES PLAN 2005-2010 TIP# 13 Project Title: Project No: Project Type: Project Manager: South 277th-(AWN to Green River Bridge) C222A Capacity Scott Nutter Description: ...·:i,,~ .... .... . This project includes major widening including the addition of three la ne in westbound and one eastbound and a Class 1 trail. Water CFP shows a low priority project in the vicinity whicl'.t\may be accomodated by a developer. (Water CFP Proj DS-603-108.109anciProjDS-601-109;110) ., Progress Summary: .... .... .... ....... .' ". ................ . '.' . The NE Auburn area is currentlyundergoìngarfEnvirònmentallmpact Statement thatincludesthe impacts of future development in the vicinity of thisproject~ 2005 monies are to coordinate with potential developers and to assist in seeking Of grant funding for the project. Impact on Operating Budget Once Completed: The annual.maintenance costs forthisproject is estimated to be $10,541. CurrentYearBudge~ 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total ~ Fundin Sources: Unrestricted Street Revenue 5.000 5.000 10,000 35,000 Grants 2,143.200 Deve/operContribuUons 550,000 1m ctFees 4,091 4,091 41,791 Total Fundin Sources: 4,091 5,000 5,000 14091 2,769,991 Ex enditures: Design 4.091 5,000 5,000 14,091 139,091 Right of Way 500.000 Construction 2,130,900 Total Ex enditure: 4,091 5,000 5,000 14,091 2,769,991 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Expenditure FundlnSources: 2005 - 2010 Be ond 2010 UnrestrIcted Street Revenue 25,000 30,000 Grants 100,000 200,000 1.843.200 2,143,200 DeveloperContrlbuUons 200,000 100,000 250,000 550,000 1m ctFees 37.700 37 700 Total Fundln Sources: 325,000 300,000 2,130,900 2,760,900 EKDenditures: Design 125,000 130,000 Right of Way 200,000 300,000 500,000 Construction 2.130,900 2 130 900 Total Ex diture: 325 000 300,000 2,130,900 2 760 900 CAPITAL FACIUTIESPLAN 2005-2010 TIP# 14 Project Title: Project No: Project Type: Project Manager: 15th Street SW Reconstruction (C Street SW to UPRR) Access Management/Pavement Preservation TBD Description: ;;i4 ,~':;'i;'" ':',it~f>',-:, ,-':,": 'i~~~;:' Rehabilitate 15th Street SW betWeerr'C'StreetSW and the Union Pacmg;Railroad. The project will also construct landscaped medianswhich\'iillC()ntinuethe acc:essmanagementtre~~tthatis currently West of the Union Pacific Railroad Tracks. ','" ",<, , " ' ,,' "', ,', ,~~,:, , . ,,~~~ " " " , Progress Summary: A Public Works Trust Fund Loan for $540 K' S,anticipatedin2006/2007. Impact on 'Operating Budget Once Completed: This project will have no impact onttle operatingbudgeffor,street maintenance. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - , Activity: 2004 YE 2005 Year End Total Project, Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundina Sources: Unrestricted Street Revenue - - - - Grants - - - - 2,160.000 Public Works Trust Fund - - - - 540,000 Imoact Fees - - - - - Total Fundina Sources: · . - · 2,700,000 Exoenditures: Design - - - - 450,000 Right of Way - - - - - Construction - - - - 2.250,000 Total Exnenditure: · - - · 2,700,000 ForecastedProject Cost: 2006 2007 2008 2009 2010 Togl Expenditure FundinaSources: 2005·2010 Selland 2010 Unrestricted Street Revenue - - - - · · Grants 360,000 1,800,000 - - · 2,160,000 Public Works Trust Fund 90,000 450,000 - - - 540,000 Imllllct Fees - - - - - · Total Fundinri Sources: 450,000 2,250,000 · - - 2,700,000 EXDenditures: Design 450,000 - - - - 450,000 Right of Way - - - - - - Construction 2,250 000 - - - 2.250,000 Total Exøenditure: 450,000 2 250.000 - - · 2,700000 CAPITAL FACILITIES PLAN 2005-2010 TIP# 15 Project Title: Project No: Project Type: Project Manager: Description: Construct a multilane arterial. A Street NW, Phase 2 (West Main Street to 3rd Street NW) Capacity TBD se 1 to the Sound Transit Station and the rrogresssummalY: Impact.on .OperatingBudgef..OnceCompletecJ: The annual maintenancecostforthisproject. isestimateclto be $1 ,405. I CurrentYearBudge~ 2005 Budget YTD Actual Expenditures Budget Balance Adopted Budget Budget Amendments Adjusted Budget Activity: Prior to 2004 2004 YE Estimate 2005 Budaet 2005 Year End Proiect T amI Total Project Cost Fundin Sources: Unrestricted Street Revenue Grants Bond Proceeds 1m act Fees Total Fundin Sources: Ex enditures: Design Right of Way Construction Total Ex enditure: 1.038.000 1,250.000 362.000 2,650,000 200,000 1.200.000 1.250,000 2,650,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Expenditure Fund/, Sources: 2005·2010 Be nd 2010 Unrestl1cted Street Revenue Grants 1,038,000 1,038,000 Bond Proceeds 1,250,000 1m t Fees 200,000 162.000 362,000 Total Fundin Sources: 200,000 1,200,000 1,400,000 1.250,000 Exoenditures: DesIgn 200,000 200,000 Right of Way 1,200,000 1,200,000 Construction 1.250,000 Total Ex diture: 200 000 1 200 000 1 400 000 1,250,000 r-.\n_......,..."I'\~\,...,., a ........ __.~ __ __ __ CAPITAL FACILITIES PLAN 2005-2010 TIP# 16 Project Title: C Street NW (Main Street to 3rd Street NW) Project No: Project Type: Capacity and Pavement Restoration Project Manager: TBD Description: .i c c ',Æ~r Restore existing pavement. Widen roadway t05 lanes with CUrb,gutt¡f; and sidewalk. Transition to 4 lane width north of 3rd St NW. Reconstruct.3rd . Street NW easttotheBNSFRailroadTracks and west to DStreetNW. Make signal modifications at CStreet and Main Streetandat·C Streetand3rd StœètNW. ;"->'.;' IProgress sum:_ry: I Impact on Operating. Budget Once Completed: This project will have no impact on the operating budget for street maintenance. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundina Sources: Unrestricted Street Revenue - - - 130.000 Grants - - - - 400.000 Bond Proceeds - - - - - Imøact Fees - - - - - Total Funding Sources: - - . · 530,000 Exøenditures: Design - - - - 22.000 Right of Way - - - - - Construction - - - - 508.000 Total Exøenditure: - - - · 530,000 Forecasted Project Cost: 2006 2007 200B 200' 2010 To'" expenditure Fundinø Sources: 2005 . 2010 BellOnd 2010 UnrestTfcted Street .c·Revenue - 22,000 108.000 - - 130,000 Grants - - 400.000 - - 400,000 Bond Proceeds - - - - - · ImDlct Fees - - - - - · Total Funding Sources: . 22,000 508,000 - . 530,000 Exøenditures: Design - 22.000 - - - 22,000 Right of Way - - - - - · ~ Construction - - 508.000 - - 508 000 \Total Exøendlture: . 22,000 508,000 . . 530,000 ¡::::'\P:lln")"(,,¡C:\O\^' ^r+ c-.' TIn nt C"C''''''' ..1_\ ,,-. r-~ 1..1\1\1\ CAPITAL FACILITIES PLAN 2005-2010 TIP# 17 Project Title: Project No: Project Type: Project Manager: Description: "( " Construct a fourlanearterialpe~1hecity Comprehensive Plan.ltwil toapending development. It will complete a major northlsoutharte D Street NW (37th Street NW to 44th Street NW) Capacity TBD r",gress Summary: Impact on Operating Budget Once Completed: The annual maintenance cost for this project is estimated to be:$14;05'4; rove mobility'north/south; "This project is tied EllingsontoS. 277th Street. Cu"entYearBudge~ 2005 Budget YTD Actual Expenditures Budget Balance Adopted Budget Budget Amendments Adjusted Budget Activity: Prior to 2004 2004 YE Est/mate 2005 Budaet 2005 Year End Proiect Total Total Project Cost Fundin Sources: Unrestricted Street Revenue Grants Bond Proceeds 1m act Fees Total Fundln Sources: Ex enditures: 520.000 2.240.000 40.000 2,800,000 Design Right of Way Construct/on Total Ex endlture: 200.000 1,500.000 1.100.000 2,800,000 Forecasted Project Cost: 2006 2007 200. 2009 FundlnSources: Unrestricted Street Revenue Grants Bond Proceeds 1m ct Fees Tot., Fundi Sources: Exøendltures: Design Right of Way Construction Tota/EIl ndlture: 160,000 2010 Total Expenditure 2005· 2010 Se nd 2010 300,000 300,000 220,000 1,200.000 1,360,000 880,000 40,000 1,500,000 1,700,000 1.100,000 200,000 1,500,000 1,500,000 1,100,000 ( 1,500,000 1,700 000 1.100,000 40.000 200,000 200,000 200 000 r::.\D,...J"'1"\t"\~\n\'" ^..... ,...., ........... ^~ ,.........~.....,.... "_-.....__ ...... CAPITAL FACILITIES PLAN 2005-2010 TIP# 18 Project Title: Project No: Project Type: Project Manager: Description: ,,-'k¡' Widen'F' Street SEta 3Ianes,¡With parking allowed on both sides,tòîfK:rease the roadway capacity. Install curbs, gutters, sidewalks, and bike lanes as well as crashattenuationatthe~portsfor the BNSF railroad bridge. The project may include·a trafficsìgnal at F Street SE and 4th Street SE.:lhis·project improves mobility and safety. This project also provides arterial relief for the'M' Street SEGradeSeparátion Project. F Street SE (4th Street SE to Auburn Way South) Capacity TBD . . iW141J" nOgressSj00o/; I Impact on Operating Budget Once .Completed: The annual maintenance cost for this . project is estimated to be $851. .. CurrentYearBudge~ 2005 YTD Actual Budget BUdget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundina Sources: Unrestricted Street Revenue - - - 200,000 Grants - - - - 1,480,000 Bond Proceeds - - - - - Impact Fees - - - - 170.000 Total Fundina Sources: - . - . 1,850,000 Expenditures: Design - - - - 200.000 Right of Way - - - - 250,000 Construction - - - - 1,400.000 Total Expenditure: - - - - 1,850,000 Forecasted Project Cost: 2006 2007 200. 2009 2010 Total Expenditure Fundinrt Sources: 2005·2010 Bevond 2010 Unrestricted Street Revenue - - 200.000 - - 200,000 'Grants 160,000 520.000 800.000 - - 1,480,000 Bond Proceeds - - - - - . - Imøact Fees 40.000 130,000 - - - 170,000 - Total Funding Sources: 200,000 650,000 1,000,000 . . 1,850,000 - Exøenditures: Design 200,000 - - - - 200,000 - Right of Way - 250.000 - - - ·250,000 - Construction - 400.000 1,000.000 - - 1 400,000 - c'(otal Expenditure: 200,000 650,000 1,000,000 . . 1 8&0 000 - F'\Rllrf?nn,:;\p\M .ð.rl C:t\ TIC nt:. C'C'-1"'" ..1_' I,... 1"''''' ,..,-, CAPITAL FACILITIES PLAN 2005-2010 Project Title: Project No: Project Type: Project Manager: Description: "' VViden roadway to 4 lanes. Construct curb gutter and sidewalk. M safety, capacity and mobility. TJ:tis project is consistent with the Co '.. M Street NE (E Main Street to 8th Street NE) Capacity TBD xisting signals. This project will improve ensivePlan. rG7ss;8~7j'~~ Impact on Operating Budget Once Completed: The annual maintenance cost for this projectisestimated to be $3,514. Cu"entYearBudge~ 2005 Adopted Budget Budget Amendments Adjusted Budget YTD Actual Expenditures Budget Balance BUdget Activity: 2004 YE Estimate 2005 Year End Project Total Prior to 2004 2005 Budaet Fundin Sources: Unrestricted Street Revenue Grants Bond Proceeds 1m act Fees Total Fundin Sources: Ex enditures: Design Right of Way Construction Total Ex enditure: TIP# 19 Total Project Cost 394.200 1.576.800 1,971,000 166.000 480.000 1.325.000' 1,971,000 Forecasted Project Cost: 2006 2007 200. 2009 2010 Toml Expenditure FundinSources: 2005·2010 Be d 2010 Unreatricted Street Revenue 33,200 161,000 200.000 394,200 Grants 132,800 644,000 800,000 1;576,800 Bond Proceeds 1m let Fees Total Funding Sources: 166,000 805,000 1,000,000 1,971,000 EXDenditures: Design 166,000 166,000 Right of Way 480.000 480,000 Construction 325.000 1,000,000 1 325,000 Toml Ex enditure: 186,000 805,000 1 000 000 1,971 000 ç:-·\~tlri.,"n~\D\^, ^" C'H TID rH: C'C'-in"l ,,1...\ ,.... l""T' .",...\ CAPITAL FACILITIES PLAN 2005-2010 TIP# 20 Project Title: Realign SR-18 EB Ramp at AWS, Grade Separate BNSF Yard Project No: Project Type: Capacity Project Manager: TBD Description: .^ , Realign the SR18 eastboundrårnp, build grade separation of main nOdh south line and Stampede Pass line, and connectto 6th Street SE. Widen 6th Street SE roadway from2to 41~~es including signal modifications at "A" Street and Auburn Way South. This.projectimproves traffic flowsignificantlyôue to the potential development of the BNSF yard to anintermodalfreightfacility. Replace a small portion ofsewerJine along 6th Street SE. rrogresssummary: I Impact on Operating Budget Once Completed: Notscheduled for completion until after 2010. Current Year Budgeé 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundina Sources: Unrestricted Street Revenue - - - - Grants - - - - - Other - - - - 32,000.000 ImDact Fees - - - - - Total Fundinn Sources: - - . - 32,000,000 Exøenditures: Design - - - - 3,500.000 Right of Way - - - - 4,000.000 Construction - - - - 24.500.000 Total EXDenditure: - - - - 32,000,000 Forecasted Project Cost: 2008 2007 200. 2009 2010 Total Expenditure Fundinn Sourc..: 2005 - 2010 Bevond 2010 Unrestricted Street Revenue - - - - - - Grants - - - - - - Other - - - - 1,000,000 1,000,000 31,000,000 ImDact Fees - - - - - . - Total Fundino Sources: . . - . 1,000,000 1,000,000 31.000,000 Exøenditures: Design - - - - 1.000,000 1,000,000 2,500,000 Right of Way - - - - - . 4,000,000 Construction - - - - - - 24,500,000 \ Total EXDendlture: . - - - 1,000,000 1,000 000 31.000,000 Interrsecti 0 n Improvements CAPITAL FACILITIES PLAN 2005-2010 21 Project Title: Project No: Project Type: Project Manager: Description: Install a intersection. Kersey Way - Oravetz Road Signal C205A Intersection Improvements (Non-Capacity) TBD Progress Summary:.. .. Design of the project has been completed. . Staff islookíng for opportunities . to apply for grant funds for Construction. Impact onOperatin.g Budget Once Completed: The annual maintenance cost forthis project is estimated to 00$5,643;.. CurrentYearBudge~ 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundina Sources: Unrestricted Street Revenue 28.000 - 174,000 202.000 202.000 Grants - - - - - Bond Proceeds - - - - - Impact Fees - - - - - Total Fundina Sources: 28.000 - 174,000 202 000 202,000 Exøenditures: Design 28,000 - - 28.000 28.000 Right of Way - - - - - Construction - - 174,000 174,000 174.000 Total Exøenditure: 28,000 - 174.000 202,000 202,000 Forecasted Project Cost: 2006 2007 200' 2001 2010 ToYI Expenditure FundinaSources: 2005·2010 Bevond 2010 Unrestricted Street Revenue - - - - 174,000 Grants - - - - · Bond Proceeda - - - - - · Imaact Fees - - - - - · Total Fundina Sources: . · - · - 174,000 Exoenditures: Design - - - - - · Right of Way - · - · - · Construction - - - - 174.000 Total Exøenditure: - · . · - 174,000 l C·\D".....")/"H"'Ir'lnlfl' ^.... t".., "T"I,.......~ ,...,.............. '.I,,..,^^,,,,a, CAPITAL FACILITIES PLAN 2005-2010 Project Title: Project No: Project Type: Project Manager: Description: Add an EB combined throughahdright tum lane on 8th Street NE . . . ching Harvey Road. . Modify traffic signals and traffic channelization to accommodate the new lane. The additionall~ne (additional capacity) will improve traffic delays and vehicle queuing at the intersection of Haveyand8thStreetNEi .. . directions. Harvey and 8th Street NE Intersection Improvements Capacity TBD rrogresssummary: Impact on Operating Budget Once Completed: The annual maintenance cosUorthis project is estimated to be $703. 2005 Cu"entYearBudge~ Adopted Budget Budget Amendments Adjusted Budget Activity: Prior to 2004 Fundin Sources: Unrestricted Street Revenue Grants Other 1m act Fees Total Fundin Sources: Ex enditures: Design Right ot Way Construction Total Ex enditure: Forecasted Project Cost: 2008 2007 2008 FundlnSourcu: Unrestricted Street Revenue GMiJt$ O1her 1m ct Fees Total Fundi Sources: Exøendltures: Design Right otWay Construction Total Ex ndlture: 339,000 160,000 160,000 11.000 350,000 60,000 100,000 160,000 350,000 350,000 [:·\c.........,nf'\t:\D\^' ^.... c.\ Tin ".I:' C"C"'''''''' ..1_\ 111____.. __....I n.u..., Budget 2004 YE Estimate 200t YTD Actual Expenditures Budget Balance 2005 Budaet 2005 Year End Proiect Total 2010 TIP# 22 Total Project Cost 339,000 171.000 510,000 60.000 100.000 350.000 510,000 Total Expenditure 2005 - 2010 Se nd 2010 339,000 171,000 510,000 60,000 100,000 350 000 510 000 \ Non·,Motorized Impr'ovements CAPITAL FACIUTIES PLAN 200~2010 TIP# 23 Project Title: Project No: Project Type: Project Manager: Description:'í¡i# Construct a Class 1 bike trail alol1g the eastern side of West Valley along the trail. The funding forìhisprojectifthroughJIB.Westyall same stretch of roadway. . . West Valley Hwy Pedestrian Facilities C302B Non-Capacity Bill Helbig Progress Summary: The project is schedule to be completed in 2005. >,.,:. y. The project includes pedestrian lighting 'ghw~ywasreconstructed in 2003 along the Impact on Operating Budget Once Completed: The annual maintenance cost for this project is estimated to be $840. CurrentYearBudge~ 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundina Sources: Unrestricted Street Revenue 2.426 134.000 136.426 136.426 Grants - - 403.221 403.221 403,221 Sewer Fund Transfer - 10.000 - 10.000 10.000 Imøact Fees - - - - - Total Funding Sources: 2,426 10,000 537,221 549.647 549,647 Exøenditures: Design 2,426 10.000 20.000 32.426 32.426 Right of Way - - 145.000 145.000 145,000 Construction - - 372.221 372,221 372.221 Total Exøenditure: 2,426 10,000 537,221 549,647 549,647 Forecasted Project Cost: 2006 2007 200. 2009 2010 Total Expenditure FundinaSources: 2005 ·2010 Beyond 2010 Unrestricted Street Revenue - - - - - 134,000 Grants - - - - - 403,221 Sewer Fund Transfer - - - - - . Im".ct Fees - - - - - . Total Funding Sources: . . . . - 537,221 EXDenditures: Design - - - - - 20,000 Right of Way - - - - - 145,000 Construction - - - - 372 221 rJ'otaIExøendlture: . . . - . 537,221 . ¡::.\c.....I"}n('lt::\n\A' ^... t'~\ Tin ",.. '-''''''~''''''' " CAPITAL FACILITIES PLAN 2005-2010 TIP# 24 Project Title: Project No: Project Type: Project Managér: AuburnlPacific Trail (C Street SW) Class 1 Trail TBA Description: < . ..tí.;i; ;~,,-,.:.:_,,:- - - ,.' ,_ ,f'??" This project will construct a Class 1 'meandering trail between the Cities of Aûtl9rnand Pacìfic along the west side of C Street SW (Auburn) and Skinner Road (Pacific). (It will start ¡nAubum at1S'" Street S,^,c~~endat the southern tenninus of Skinner Road. Striping will be installed along 3/11 Avenue SEinPaciflC to connect a bike la~1trom where the trail ends at Skinner Road to the southern endofthe Interurban TraiL The Class 1 trail will be approximately 2'.05 miles and the striping portion will be 1.42 miles. . ... Progress. Summary: This project is fully funded withSTPfunds.lt will be constructed concurrently with the C Street SW widening project (C326A). Impact on· Operating Budget Once.CompJeted: The annual maintenance cost for this project is estimated to be $2;688. CurrentYearBudge~ 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundina Sources: Unrestricted Street Revenue - - - - 32.000 Grants - - - - 341.914 City of Pacific - - - - 22. 000 ImDact Fees - - - - - Total Fundina Sources: - - . . 395,914 EXDenditures: Design - - - - 79,183 Right of Way - - - - - Construction - - - - 316,731 Totai EXDenditure: - · - - 395,914 ForecastedProject Cost: 2006 2007 2008 2009 2010 Total Expenditure Fundino Sources: .. 2005· 2010 Bevond 2010 Unrestricted Street Revenue 32,000 . - - - 32,000 Grants 341,914 - . - · 341,914 City Of Pacific 22,000 - - - · 22,000 ImoactFees . - - - - . Total Funding Sources: 395,914 - - · · 395,914 EXDenditures: Design 79,183 - - - · 79.183 Right ofW.y . - - · - . Construction 316.731 - - - · 316,731 Total Exøenditure: 395 914 . . · · 395 914 / r-.''''' _......^,..'''-.,.."., A...... ...._ __ ",........_ " CAPITAL FACILITIES PLAN 2005-2010 TIP# 25 Project Title: Project No: Project Type: Project Manager: West Main Street Streetscape C322A Non-Capacity TBD Description:;x¡: '<,ti;¿; ,....'^'-',...,' .. .:...":~,,,{.:. Develop' bike lanes and restore sidewalk to· link the Interurban Trail to DôWntown Auburn and the Sound Transit Center. "'\ÿ\,- -~;if> Progress Summary: Federal STPfunds are being obligated . prior to January ·1.2005. PUblic involvement will be completed in 2004; design is scheduled for 2005. Impact on Operating Budget Once Completed: Thi.s project will have no impact on the operating budget for street maintenance (rebuildinQ-"in--kind project). Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundinq Sources: Unrestricted Street Revenue - - 22,000 22,000 109.523 Grants - 140,250 140.250 701,656 Other - - - - Imoact Fees - - - - - Total Fundinq Sources: - - 162,250 162,250 811,179 Exoenditures: Design - 162,250 162,250 162.250 Right of Way - - - - - Construction - - - - 648,929 Total Exoenditure: · · 162,250 162,250 811,179 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Expenditure Fundina Sources: 2005 - 2010 Sellond 2010 Unrestricted Street Revenue 87,523 - - - - 109,523 Grants 561,406 - · - · 701,656 Other . · · - - - ImDBct Fees - - - - - . Total Fundinø Sources: 648,929 - - · · 811,179 EXDenditures: Design · · - · 162,250 Right of Way · · · - . Construction 648.929 - - · - 648,929 Totai Exøenditure: 648,929 · · · · 811179 C·\D,,~'"If\"'C'\nl.lI' A...... .......\ -r...........~ ,..........~........ . . ,....___. CAPITAL FACILITIES PLAN 2005-2010 TIP# 26 Project Title: Project No: Project Type: Project Manager: Description:,. "h~ft:<' , ' ,,', .:{::fur"!::~<, This project will construct an undercrossing ofthe BNSFRailroad incol' jûction with a pedestrian bridge to allow a direct, attractive non-motorized access between nejghborhoods. in the Gil:ycificand schools in the City of Aubum. BNSF/East Valley Highway Pedestrian Underpass C229A Non-Capacity Jennifer Dvorak Prog". ess Sum.m..a.. IY. ..:.. ............ .........m,.'..,.·..·.,~..::,......'.....·.i.:..........·................ ...'.........'........,.. The project predesign (30%clesign) is being completed in 2004. The current grant source ·is to supplement the. design of the project only. . AdditionaldesigndollarsareneededalongwithiGonstruction and Rightof Way . TheGil:yis applying for grant resources. . The Gil:yis anticipating $150,000 ¡nFederal High Speed Rail Money (section 11 03G). -.,- . Impact on Operating Budget Once Completed: The annualma1ntenance cosUorthisprojectis estimated to be $420. CurrentYearBudge~ 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundin Sources: Unrestricted Street Revenue 100.000 Grants 3.817 146.183 150,000 2,850,000 KC Open Space Bond 40.000 40.000 40.000 Other 500,000 Total Fundin Sources: 3,817 186,183 190,000 3,490,000 Ex enditures: Design 3.817 186.183 190,000 340,000 Right of Way 150.000 Construction 3.000.000 Total Ex enditure: 3,817 186,183 190,000 3,490,000 Forecasted Project Cost: 2006 300.000 2007 2008 2009 50,000 50,000 1,200.000 1,200,000 250,000 250,000 1,500,000 1,500,000 2010 Total Expenditure 2005·2010 Be nd 2010 Fundin Sources: Unrestricted Street Revenue Grants KC Open 'Spece Bond Other Total Fundin Sources: EXDendltures: Design Right of Way Construction Total Ex endlture: 100,000 2,700,000 300,000 SOO 000 3.300,000 150,000 150,000 300,000 1.500,000 1,600,000 1.500.000 1 600 000 160,000 160,000 3,000,000 3,300,000 [:·\O,.ri"')r\f'\I:'\ -'" II I ^~ ,...~, ~I"" "',.. ..........~,.,... ., ,.....___. CAPITAL FACILITIES PLAN 2005-2010 TIP# 27 Project Title: Project No: Project Type: Project Manager: Description: Design and construct pedestrairfi'pathon West sideofAStreef SE uri existing stairs and create an AD~'accessbiletravel path. A Street SE Pedestrian Improvement Non-Capacity (Non-Motorized) TBD r1097ssumnJa<y. ilroad bridge on BNSF property to bypass Impact on Operating Budget Once Co.mpleted: This project will have no Împact on.the operating budget for street maintenance. Current Year Budgeê 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total f2!! Fundina Sources: Unrestricted Street Revenue - - - 43.000 Grants - - - - 150.000 Bond Proceeds - - - - - Imøact Fees - - - - - Total Fundina Sources: - - - - 193,000 Exøenditures: Design - - - - 55.000 Right of Way - - - - - Construction - - - - 138,000 Total EXDenditure: - - - - 193,000 Forecasted Project Cost: 2006 2007 2001 2009 2010 Totlll Expenditure Fundina Sources: 2005·2010 SellOnd 2010 Unrestricted Street 'Revenue - - 43,000 - - 43,000 Grants - - 150.000 - - 150,000 Bond Proceeds - - - - - - Imoact Fees - - - - - . Total Funding Sources: . . 193,000 . . 193,000 Exøenditures: Deaign - - 55,000 " - 55,000 Right of Way - - - - - - Construction - 138.000 - - 138 000 fotal Exøenditure: . - 193,000 . - 193 000 r:,\D..-I"'I"nf:"lnl,ll1 ^~ t'"'" "'T"tr"...,..... ..........^^ 1_' '.. ..... r"'\ ." CAPITAL FACILITIES PLAN 2005-2010 Project Title: White River Trail Extension Project No: Project Type: Non-Capacity (Non-Motorized) Project Manager: TBD Description:<'-:i·~!;X; The proposed project is the 1,050'footextension of the existing Class tWhitè'RiverTrail from itstenninus in Roegner Park to A Street SElEast Valley Highway. The trail extension will link the existing pedestrian facilities from Riverside High School and lIalkoElementary School toAStreet SE. This project will grant school child~n safe passage across the White River via the bridge on A Street SE.1t will also connect to Auburn's BNSF/East Valley HighwayUndercrossing, providing direct access from the residential areas in the city of Pacific to schools in Auburn, '.' ..,.. rrogress Su",",sry: Impact on Operating Budget Once Completed: The annual maintenance costforthis project is estimated to be $168. CurrentYearBudge~ Adopted Budget Budget Amendments Adjusted Budget Activity: Fundin Sources: Unrestricted Street Revenue Grants Bond Proceeds 1m act Fees Total Fundin Sources: Ex enditures: Design Right of Way Construction Total Ex enditure: Forecasted Project Cost: 2006 2007 Fundin Sourcu: Unrestricted Street Revenue Grants Bond Proceeds 1m actFees TotslFundin Sources: Exøendltures: Design Right of Way Construction Total Ex enditure: [:".\D......",""'-'='\r""IIA/ A.... ,....~, ................. ...................... , , "."', 2005 Prior to 2004 2008 27,200 174,200 201,400 17,500 140.000 43.900 201 400 Budget 2004 YE Estimate 2009 YTD Actual Expenditures 2005 Budaet 2010 Budget Balance 2005 Year End Proiect Total TIP# 28 I Total Project Cost 27.200 174.200 201,400 17.500 140.000 43,900 201,400 Total Expenditure 2005·2010 Be nd 2010 27,200 174,200 201,400 17,500 140,000 43,900 201 400 CAPITAL FACILITIES PLAN 2005-2010 TIP# 29 Project Title: Project No: Project Type: Project Manager: Description: This project 37th Street SErR' Street Connector Class 1 Trail TBD Progress Summary: This . project is a good candidate for. a SafeWalking· Route grant Impact on Operating Budget Once Completed: Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundina Sources: Unrestricted Street Revenue - - - - - Grants - - - - 50.400 Other - - - - 12.600 Imøact Fees - - - - - Total Fundina Sources: - - - - 63,000 EXDenditures: Design - - - - 13.000 Right of Way - - - - - Construction - - - - 50.000 Total EXDenditure: - - · - 63,000 Forecasted Project Cost: 2006 2007 200. 2009 2010 To"" Expenditure FundinaSources: 2005· 2010 BeVðltd 2010 Unrestricted Snet Revenue - - - - - . Grants - 50,400 - - - 50,400 Other - 12,600 - - - 12,600 ImD.ct Fees - - - - - - Tota' FUndina-Sources: - 63,000 - . · 63,000 Exøendltures: Design - 13,000 - - - 13,000 Right of Way - - - - - . Construction 50,000 - - - 50.000 Tota' Exøendlture: . 63,000 . - · 63,000 ç:·\R.Ilf'i,)f'ln¡;\p\M ^rl ~+\ TIC"~ C'C'1t"1") .....1...1 ,.,.,.u... ï_~:1\ CAPITAL FACILITIES PLAN 2005-2010 Project Title: Green River Trail, Phase 1 Project No: Project Type: Non-Motorized Trail Project Manager: TBD Description: ,,,,,,,,. Design and construct a Class tNon-Motorized TrailfromGreen RivårXBeach Access to Brannan Park. Coordinate with AubumParks Department and King County Parks. ~i': rrogresssum:~; Impact on Operating Budg,tOnce Completed: The annual maintenance cost for this project is estimated to be $2,856. Current Year Budget: 2005 Adopted Budget Budget Amendments Adjusted Budget Activity: Prior to 2004 Fundin Sources: Unrestricted Street Revenue Grants Bond Proceeds 1m act Fees Total Fundin Sources: Ex enditures: Design Right of Way Construction Total Ex enditure: Forecasted Project Cost: 2006 2007 2008 Fundin Sourc..: Unrestricted Street Revenue Grants Bond Proceeds 1m tFe.. Total Fundln Sources: EXDenditures: .Design Right of Way Construction Total E dlture: 125.000 495.000 125,000 495,000 125.000 100.000 395 000 125,000 495,000 -""$."; Budget 2004 YE Estimate 2009 YTD Actual Expenditures 2005 Budaet 2010 Budget Balance 2005 Year End Proiect Total TIP# 30 Total Project Cost 620.000 620,000 225.000 395.000 620,000 Total Expenditure 2006·.2010 8e nd 2010 620,000 620,000 225,000 395,000 620 000 CAPITAL'FACILITIES.PLAN 2005-2010 TlP# 31 Project Title: Project No: Project Type: Project Manager: Description: 9>· Design and construct a Class1'!Non-Motorized Trail from Brannan Parks Department and KirJg County Parks. Green River Trail, Phase 2 Non-Motorized Trail TBD rrog~s SUlnmar: 4th Street SE. Coordinate with Auburn Impact on Operating Budget Once Completed:.. ..... Not scheduled for completion until after 2010. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundina Sources: Unrestricted Street Revenue - - - - Grants - - - - 450.000 Rev-Other - - - . 280,000 Imnact Fees - - - - - Total Fundina Sources: - - . - 730,000 EXDenditures: Design - - - - 150,000 Right of Way - - - - - Construction - . . - 580.000 Total Exnenditure: - - - - 730.000 Forecasted Project Cost: 2006 2007 200' 2009 2010 Total Expenditure Fundina Sources: 2005 - 2010 Bevnnd 2010 Unrestricted Street Revenue - - - - - - · Grants - - - 120,000 330.000 450,000 - Rev-Other - - - 30,000 150.000 180,000 100,000 Imøact Fees - - - - - - - Total Fundina Sources: . · . 150,000 480,000 630,000 100,000 EXD.nditures: Design - · - 150,000 - 150,000 · Right of Way - - - - - . · Construction - - - 480,000 480.000 100,000 . Total Eiiiiiiditure: - · - 150,000 480,000 630 000 100.000 ~'U:~"n?nn&;:'D'^, ^.-+ CH TID "I: C'C'1n"J ,,1...\ ,,-............... n:.._~ Ï..._:' '"'J\ CAPITAL FACILITIES PLAN 2005-2010 TIP# 32 Project Title: Green River Trail, Phase 3 Project No: Project Type: ' Non-Motorized Trail Project Manager: TBD Description: :..<._.'i'.'_""__"__ _ . __,;'~':;~~~~~:~; :::.:':--~;'-:- " " - , - ,: . :':-"-":"-·':·h;{'" Désignand construct a Class 1 Non-Motorízéd Trail from 4th StreetSE)JþSR 18. Coordinate with AubumParks Department and King County Parks. I r9rvss summa~ Impact on Operating Budget Once Completed: Not scheduled for completion until after2010. Current Year Budget: 2005 Budget YTD Actual Expenditures Budget Balance Adopted Budget Budget Amendments Adjusted Budget Activity: Prior to 2004 2004 YE Estimate 2005 Budaet 2005 Year End Proiect Total Total Project Cost Fundin Sources: Unrestricted Street Revenue Grants Bond Proceeds 1m act Fees Total Fundin Sources: Ex enditures: 575,000 150,000 725,000 Design Right of Way Construction Total Ex enditure: 725.000 725,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Expenditure Fundin Sources: 2005 . 2010 B d 2010 Unrestricted Street Revenue Grants 575,000 BondProceeds 30,000 30,000 120,000 1m ct Fees Total Fundin Sources: 30,000 30,000 695,000 Exøenditures: Design 30,000 30,000 695,000 Right of Way Construction Total Ex nditure: 30 000 30 000 695.000 ..... ..... .--- _. _.. Studies and Miscellaneous Improvements CAPITAL FACIUTIES PLAN 200s.;2010 TIP# 33 Project Title: A Street SE - Class 2 (Transit Center to Ellingson along BNSF) Project No: Project Type: Non-Capacity (Non-Motorized) Project Manager: TBD Description:'~it Feasibility study for the design and construction of a Class2pedestria 'jftrailfrom the Transit Center from A Street SW to A Street SE and along A StreetSEto EllingsonRoad,alongtheBNSljtright of way. , ::::!i~~: ";;,'av· Pfress Summary: Impact on ,Operating BudgetOnce.Completed: The annual maintenance costfor this project is estimated. to be $3,696 CurrentYearBudge~ 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundina Sources: Unrestricted Street Revenue - - - - Grants - - - - - Other - - - 75.000 ImDact Fees - - - - - Total Fundina Sources: - - - - 75,000 EXDenditures: Design - - - - 75,000 Right of Way - - . - - Construction - - - - - . Total EiDenditure: . - - - 75,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Toml Expenditure FundinaSources: 2005· 2010 Sevond 2010 Unrestricted Street Revenue - · - - - - Grants - - - - - . Other - · 75.000 - - 75,000 ImDact Fees - · - - - - Total Funding Sources: - - 75,000 - - 75.000 Exøenditures: Design - · 75,000 - - 75,000 Right of Way - - - - - . Construction · - . - - Total Expenditure: - · 75,000 - . 75,000 \ E'IBud200SIPW Art St\ TIP n~-SS1n? viol fA ,St SI= rl~<o ?\ CAPITAL FACILITIES PLAN 2005-2010 TIP# 34 Project Title: Project No: Project Type: Project Manager: Description: Widen. roadwayshoulderstoac:êòmmodate bicyclists and pedestrian regional recreation bike route. . Mmgateexpected impacts to wetlands in2004. . . Auburn Black Diamond Non-Motorized Class I Trail Study TBD 11 provide a multi-modalenhancement to a ntto the. road. Feasibility study to be initiated rrogt8SS S~~InB~ Impact onOperatingBudgetOnceCompleteci: The annual F11aintenancecostforthis project is estimated to be $1,260; ""."'d, CurrentYearBudge~ 2005 Budget YTD Actual Expenditures Budget Balance Adopted Budget Budget Amendments Adjusted Budget Activity: Prior to 2004 2004 YE Estimate 2005 Year End Total Project 2005 Budaet Proiect Total Cost 35,000 35.000 35.000 35,000 35,000 35,000 35,000 35.000 35.000 35,000 35 000 35,000 Fundin Sources: Unrestricted Street Revenue Grants Bond Proceeds 1m ct Fees Total Fundin Sources: Ex enditures: Design Right of Way Construction Total Ex enditure: Forecasted Project Cost: 2000 2007 2008 2009 2010 Total 2005 . 2010 Expenditure Se d 2010 35,000 35,000 35,000 35,000 E'\Bud2005\PW Art St\ TIP n<;-SS1n? yl<\ IA"h"rn Rn Porll n I~ ~ /....."',..., A,...,...... ..... CAPITAL FACILITIES PLAN 2005-2010 TIP# 35 Project Title: Downtown Lighting Program Project No: C315A Project Type: Non-Capacity Project Manager: Brian Coleman Description: .:,' ;;~5ir; Perf()rm an engineering study tCI'determine the adequacy of existing ligb.-ting in the downtown plan area. Peñorm public informationJinvolvement activities to determineappropriateimp~ements for downtown pedestrian lighting. Design and construct downtown pedestrian lightingirnprovements. .. P~isSPOnSOred.bythe Auburn· Downtown Association.:;!~ . Progress Summary: Various existing lighffixturesin the downtown .areaare.being upgraded in 2004. The areas that reœiveimprovements will be 're-evaluated during 2004. Impact on Operating Budg'!tOnceCompleted: This project will have no impact on the operatingbudgetfor.streetrnaintenance. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budoet Project Total Cost Fundino Sources: Unrestricted Street Revenue 57.200 20,000 72,800 150,000 150,000 Grants - - - - - Bond Proceeds - - - - - Imoact Fees - - - - - Total Funding Sources: 57,200 20,000 72,800 150,000 150,000 Exoenditures: Study 57.200 10.000 5.000 72.200 72,200 Right of Way - - - - - Construction - 10.000 67.800 77.800 77,800 Total Exoenditure: 57,200 20,000 72,800 150,000 150,000 Forecasted Project Cost: 2006 2007 200. 2009 2010 Total Expenditure Funding Sources: 2005 . 2010 BellOnd 2010 Unrestricted Street Revenue - - - - - 72,800 - Grants - - - - · · - BondProceeds - - - - - · - Imoact Fees - - - - - · - Total Funding Sources: . . - - · 72,800 - Exøenditures: Study - - - - - 5,000 - Right of Way - - - - - · - Construction - . - - 87,800 - ,Total Exøendlture: . . . . · 72.800 - E:\Bud2005\PW Art St\ TIP 05-SS1n? yk\ 1(,115A\ CAPITALFACILITIESPLAN 2005-2010 TIP# 36 Project Title: Kersey Way Trail Project No: Project Type: Study Project Manager: TBD Description:. ., ....;~;¥;. .. .';r,¡~.'. ...... Feasibility study for design and (:Ónstruction of a Non;.Motorized Equestrian Accessible trail along Kersey Way to connectR StreetSE, the Stuck River Horse Trail and the Lakeland Hilt$neighborhood non-motorized trails. p~ress Summ~ Impact on. Operating Budget Once Completed: The annual maintenance cost forthisprojedisestimatedto be $1,680. I CurrentYearBudge~ 2005 Budget YTD Actual Expenditures Budget Balance Adopted Budget Budget Amendments Adjusted Budget Activity: Prior to 2004 2004 YE Estimate 2005 Year End Total Project 2005 Budaet Proiect Total Cost 40,000 40.000 40.000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 Fundin Sources: Unrestricted Street Revenue Grants Other 1m act Fees Total Fundin Sources: Ex enditures: Design Right of Way Construction Total Ex enditure: Forecasted Project Cost: 2006 2007 200. 2001 2010 Total Expenditure 2005 -2010 Se nd 2010 Fund/n Soun:es: Unrestricted Street Revenue Grants Other 1m Ict Fees Total Fundin Sources: EXDenditures: 'Design Right of Way Construction Total Ex enditure: 40,000 40,000 40,000 40,000 t:'·\c"~"')""r'n\",, A... f"J.I "T",,........,. ,....,......"".... __1_' ,,/ CAPITAL FACIUTIES PLAN 2005-2010 TIP# 37 Project Title: Project No: Project Type: Project Manager: M St SE (37th I 29th) Design Study Non-Capacity TBA Description: ",è,; .<;~.;;" Perform a predesignandfeasibilitystudy. The intern is to program a projettto remedy the pavement condition of the road; upgrade the road to current standards;. and ìmprovethepedestrian'facilities. Replace sewer from 32nd Street SE north to 29th Street Se.:j;'Ä' i'l! '."/~. Progress Summary: Predsign study will be completed in 2004. Impact on Operating BudgeiOnceCompleted: No operating impact because ,this is design study only. Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget · · - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundina Sources: Unrestricted Street Revenue - 10.000 - 10.000 10.000 Grants - · - - . Bond Proceeds · · - · . Impact Fees - - · - - Total Fundina Sources: · 10,000 · 10,000 10,000 Expenditures: Pre-Design - 10.000 - 10.000 10,000 Right of Way - - - - - Construction - · - - - Total EXDenditure: · 10,000 · 10,000 10,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Expenditure Fundina Sources: 2005· 2010 Bevond 2010 i Unrestricted Street I Revenue - · - · - · I Grants · - - - - · Bond Proceeds - - - - - · ImnaetFees - - - · - · Total Funding Sources: · · · · · · EXDenditures: Pre-Design - - - - - · Right of Way - - - - · - 'pnstructlon - · - · · -' l' Exøenditure: · · · · · · - F'\Rllrl?nn<;IP\M /In C:::t\ TIP n<;.C:::C:::1n? vi. I (h~ C:::T c::¡: ')at",~ .,""'" Annual Level of Effo·rt Proje,cts CAPITALFACIUTIES PLAN 2005-2010 TIP # 38 Project Title: Project No: Project Type: Project Manager: Description: y Wetland mitigation for the 277th'iStreetGrade Separationprojed. So 277th Wetland Mitigation C410A Non-Capacity Scott Nutter Progress Summary: Thisisa to year obligation. > Impact on Operating Budget Once Completed: Thisdproject will have no impact on the operating budgetforstreetmaintenancé. CurrentYearBudge~ 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget Budget Amendments Adjusted Budget Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundin Sources: Unrestricted Street Revenue 25.000 6.000 31.000 79,000 Grants Bond Proceeds 1m act Fees Total Fundin Sources: 25,000 6,000 31,000 79,000 Ex enditures: Design 15.000 15.000 15.000 Right of Way Construction 10,000 6.000 16.000 64.000 Total Ex end/ture: 25,000 6,000 31,000 79,000 Forecasted Project Cost: 2006 2007 200. 200. 2010 To",1 Expenditure FundinSourcea: 2005· 2010 Be nd 2010 Unrestricted Street R&venue 6,000 6,000 6.000 6,000 6,000 36,000 18,000 Gunts BondProceeds 1m act Fees Total Fundi Sources: 6,000 6,000 6,000 6,000 6,000 36,000 18,000 EXDenditu,..: De$ign Right of Way Construction 6.000 6,000 6.000 6.000 6,000 36 000 18,000 , To"" Ex ndlture: 6,000 6000 6,000 6000 6000 36 000 18,000 ç::·H:~.lIrf?nn'::;\D\^, ^ri C+\ TJD ru: C"C"04n""l ..1_\ 11"'~04"^\ CAPIT ALFACILITIES PLAN 2005-2010 TIP# 39 Project Title: Project No: Project Type: Project Manager: Description: v.;; This project provides forpedestnan safety studies at various locatio· ·de.Projects are prioritized annually based on safety issues and pedestrian demands. ... . . . .:;>; Budget Notes: This is an annual level ofeffort project used to fiJndsmallpedestriansafetystudiesancti#nprovement projects. '····Üh,'<' -vW·,- Citywide Pedestrian Crossing Program Non-Capacity (Annual) TBD Progress Summary: 2004 focus is in the downtown area. 2005wiUcomplete area identified that require special design in the downtown area, ånd begin to expand to other areas in the City. . . Impact on Operating Budget Once Completed: This project will have no impact on the operating budget forstreetmaintenance. CurrentYearBudge~ 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budaet Proiect Total Cost Fundina Sources: Unrestricted Street Revenue - 20.000 50.000 70.000 170.000 Grants - - - - - Bond Proceeds - - - - - ImDact Fees - - - - - Total Fundino Sources: - 20,000 50,000 70,000 170,000 EXDenditures: Design - 5.000 10.000 15.000 15.000 Right of Way - - - - - Construction - 15.000 40.000 55.000 155.000 Total EXDenditure: - 20,000 50,000 70,000 170,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Toœt Expenditure FundlnaSources: 2005·2010 Bevond 2010 UnrestrlctedStreet Revenue 20.000 20.000 20,000 20.000 20,000 150,000 GT/Jnts - - - - - · Bond Proceeds - - - - - · Imoact Fees - - - - - - Total Fundlno Sources: 20,000 20,000 20,000 20,000 20,000 150,000 EXDendltures: Design - - - - - 10,000 Right of Way - - - - - · Construction 20.000 20.000 20.000 20.000 20,000 . 140 000 Totlll Exøenditure: 20,000 20,000 20,000 20,000 20 000 150,000 . [:'·\C",...,..,nrH::IO,^, "'..4 C"~\ Tlr"'I f'\r:: C"(","""'I "I_I Ir"'I_-' ,-..____:_. \ CAPITAL FACILITIES PLAN 2005-2010 TIP# 40 Project Title: Project No: Project Type: Project Manager: Description: This project provides for infrastructure. improvements to enhance traffic . ty. Projects are prioritized annually based on field studies. Terrace Drive is scheduled for 2004 and theSouthside of~ke Tapps Parkway is scheduled for 2005. ;>;t; Citywide Roadway Safety Infrastructure Improv. Non-Capacity (Safety) TBA :,-«x,'· Progress . Summary: The money dedicated in2005 will be used to complete the lea Hill Slide Repair project. ... Impact on Operating Budget Once Completed: This project will have no impact on the operating budgetfor street maintenance. ... Current Year Budget: 2005 YTD Actual Budget Budget Expenditures Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - Activity: 2004 YE 2005 Year End Total Project Prior to 2004 Estimate 2005 Budoet Prolect Total Cost Fundino Sources: Unrestricted Street Revenue - 100,000 - 100.000 600,000 Grants - - - - - Bond Proceeds - - - - - Impact Fees - - - Total Fundlno Sources: · 100,000 - 100,000 600,000 Exoenditures: Design - 20,000 · 20.000 70.000 Right of Way - - - Construction - 80,000 - 80,000 530,000 Total Expenditure: · 100,000 - 100,000 600,000 Forecasted Project Cost: 2006 2007 2008 2009 2010 Total Expenditure FundintJSources: 2005 ·2010 Bevond 2010 Unrestricted Street Revenue 100,000 100.000 100.000 100,000 100.000 500,000 Grants - - - · · Bond Proceeds - . - - · · Impact Fees - · . · · Total FundinoSources: 100,000 100,000 100,000 100,000 100,000 500,000 Exoenditures: Design 10,000 10,000 10,000 10,000 10,000 50,000 Right of Way - - - - · · Construction 90,000 90.000 90,000 90.000 90,000 450.000 Total Exoendlture: 100,000 100,000 100,000 100 000 100.000 500 000 ... ,- ':;'\I:~llrl?nn&:¡\P\'" ð.rl <:t\ TIO ('.~ C<::'''1r''10 vl...\ 1<::'....1"'..., 1....1.....\ CAPITAL FACILITIES PLAN 2005-2010 TIP# 41 Project Title: Project No: Project Type: Project Manager: Annual Arterial Pavement Preservation Non-Capacity (Annual) TBD Description: IP':~0~<š¡n·~I~: Impact on Operating Budget. Once Completed: This project will have no· impact on the operating budgetforstreet maintenance. ·v I "'--:0·"),/:':'"" CurrentYearBudge~ 2005 Budget YTD Actual Expenditures Budget Balance Adopted Budget Budget Amendments Adjusted Budget Activity: Prior to 2004 2004 YE Estimate 2005 Year End Total Project 2005 Budaet Proiect Total Cost 500,000 500,000 3.000.000 500,000 500,000 3,000,000 40.000 40.000 540,000 460,000 460.000 2.460,000 500,000 500,000 3,000,000 Fundin Sources: Unrestricted Street Revenue Grants REET Funding 1m act Fees Total Fundin Sources: Ex enditures: Design Right of Way Construction Total Ex enditure: Forecasted Project Cost: 2006 2007 2008 2009 2010 TOÚlI 2005· 2010 expenditure Be nd 2010 FundinSources: UnresttictedStreet Revenue Grants REETFunding 1m ct Fees Total Fundln Sources: Exoenditures: Design Right of Way Construction TotalEx. dlture: 500,000 500,000 500,000 500.000 500,000 3,000,000 500,000 500,000 500.000 500,000 500,000 3,000,000 100,000 100,000 100,000 100,000 100,000 540,000 400,000 400,000 400,000 400 000 400,000 2,460,000 500,000 500,000 500.000 500 000 500 000 3 000 000 F'\RllrI?nnF;\PW Art ~t\ TIP n~__C:::C::::1n") vl~\ (D~".c':IoI'·"\./::::Io"'+ ....................."....+i.........\ Appiendix A: City W'ide Project Map. Ap,pendix B: . Detailed Funding Spirjeadsheet