HomeMy WebLinkAbout11 APPENDIX
·
·
·
PARKS, RECREATION AND OPEN SPACE PLAN
OPEN SPACE EVALUATION FORM
Score Summary
1. Wildlife Habitat
2. Shoreline
3. Wetlands
4. Scenic Resources/Community Separators
5. Recreational Resources/Regional Trails
6. Historical, Cultural and Educational Resources
7. Open Space Significance
points
points
points
points
points
points
points
TOTAL SCORE:
points
WILDLIFE HABITAT Score: Weighted Total
Oto4 Value Score
1. The property provides habitat supporting, or capabie
of supporting endangered, threatened or uncommon
species: - Great Blue Heron 4
_ Bald Eagle - Green Backed Heron
- Elk - Salmon
2. Provides habitat for semi-common species:
Deer, Coyote, Otter, Mink, Beaver, Migratory 3
Waterfowl, Redtail Hawk, Reptile and Amphibian
Species e.g. Frogs, W. Painted Turtles
3. Provides habitat for common species: 2
Field Mice, Crows, Robins, Non-migratory
Waterfowl, Muskrat
4. Identified on the City of Auburn's Known Wildlife 3
Areas map or Suspected Wildlife Areas map.
** Maps are located in the City of Auburn Planning Department
A-j
SHORELINE ACCESS Score: Weighted Total
o to4 Value Score
1. Property abuts or contains a water body:
- Green River _White or Stuck River 3
_Mill Creek _Other
2. The property will provide shoreline access to the public:
a. Physical access 4
b. Visual access (especially from the public right-of-way) 2
c. Up to 200 feet shoreline 1
d. Over 200 feet shoreline 2
WETLANDS
1. Contains wetlands with these characteristics:
a. Hydrologic Function
Lower scores: isolated depressions, temporarily 2
saturated/inundated
Higher scores: part of a larger drainage system,
permanent saturation, inundation.
b. Storm and Floodwater Protection
Lower scores: remote area, little woody cover, 2
permanently flooded
Higher scores: large size, urban or developable areas,
greater than 30% woody cover, seasonal hydroperiod.
c. Water Quality Function
Lower scores: Less than 50% vegetation density, less 2
than 5 acres
Higher scores: greater than 80% vegetation density, more
than 10 acres, downstream from point discharges.
·
·
·
·
·
·
WETLANDS (Continued) Score: Weighted Total
o to 4 Value Score
d. Groundwater Recharge/Discharge
Lower scores: small isolated depressions (less than 5 1
acres), temporarily saturated/Inundated, impermeable
substrate
Higher scores: more than 10 acres, permanent
inundation, several feet deeD, Dermeable substrate.
e. Natural Biologic Functions
Lower scores: low species diversity, small size, one 2
vegetation iayer
Higher scores: High species diversity, unique species,
larqe size manv veqetation lavers.
2. Has flood control value: 2
- Flood Plain _Potential Storage Site
3. Has water resource buffer or protection value: 1
(i.e. protects stream, water body, well field or groundwater
supply from development or pollution)
SCENIC RESOURCES!
COMMUNITY SEPARATORS
1. Significant views are available from the site:
_Water Body - Mt. Rainier 3
_Valley Floor _Other:
2. The property will provide scenic views to passersby
on nearby: 2
- Arterial Roads _Collector Roads
- Other Roads _Trails
3. The site contains a significant, unique or distinctive
natural area or feature, such as a specimen tree or rock 3
outcrop.
_ (List:)
4. The property physically and visually separates:
_ Incompatible Land Uses 4
- Communities within Auburn
_ Auburn and surrounding jurisdictions
RECREATIONAL RESOURCES! Score: Weighted Total
REGIONAL TRAILS Oto4 Value Score
1. Would provide a link in a recreation/transportation 4
trail corridor:
_ Existing Trail - Potential Trail
2. Is suitable and appropriate for outdoor recreation. 3
Potential for passive .use park of:
- o to 20 acres - 20 + acres
3. Has adequate public access now _ 3
Or has access potential_
4. Located in an area identified as having a deficit in 2
parks or open spaces.
- Yes - No
HISTORICAL, CULTURAL AND
EDUCATIONAL RESOURCES
1. Property contains prime or other productive 2
agricultural soil, or is in present agricultural use.
- Yes - No
2. Property contains historic, cultural or archaeological
resources. Interest level is: 3
- Local _Regional_ Statewide
3. Is the site of a historic: 1
- Event - Tradition
4. The property would provide a buffer to a historic 1
resource on an adjacent property.
5. Provides unique educational or interpretive
opportunities. 3
- Yes - No
6. Site is within .s or 1 mile of an activity center such as
a school or park. 2
·
·
·
·
·
·
OPEN SPACE SIGNIFICANCE Score: Weighted Total
Oto4 Value Score
1. Property constitutes an important remaining open 2
space in an otherwise built-up area.
2. Site is an integral piece of an overall open space system: 3
_Forms a linkage with other protected open spaces
_Forms a linkage between activity centers
3. Helps to achieve a balanced distribution of open space
land in the community. 2
- Yes - No
4.Is vulnerable to development because of:
_ Development Proximity - Listed for Sale 2
_ Existing Zoning _ Physical Suitability
- Available Utilities
5. Acquisition is facilitated by:
_Joint cooperation with another public agency 2
- Gift - Grant
6. Acquisition is aided by alternative protection
opportunities:
- Easement 1
_ Public/Private Agreement
_ Intergovernmental Agreement
_ Purchase/Transfer of Development Rights
This page left blank intentionally
CI1Y OF AUBURN, WASHINGTON
A-6
·
·
·
.
.\
.
Insert large chart of Capital Improvement Projects
A-7
This page left blank intentionally - back of chart
·
·
·
A-B
·
Project Title:
Project No:
Project Type:
Project Manager:
Auburndale II
Capacity Project
CurrentYearBudge~
2005
Budget
YTD Actual
Expenditures
Budget
Balance
·
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budaet
2005 Year End
Proiect Total
Fundin Sources:
General Fund
Other/ King County Youth SF Grant
Grants/lA C
Impact FeeslFee in lieu of
REET
Total Fundln Sources:
Ex: enditures:
Design
Right of Way
Construction
Total Ex: enditure:
·
A-9
·
Project Title:
Project No:
Project Type:
Project Manager:
Auburndale Park
Non Capacity - Park Improvements
Current Year Budget
2005
Budget
YTD Actual
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
·
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budaet
2005 Year End
Proiect Total
Fundin Sources:
General Fund
other
GrantsIJAC
Impact Fees/Fee in lieu of
REET
Total Fundin Sources:
Ex. enditures:
Design
Right of Way
Construction
Total Ex. nditure:
·
A-lO
·
·
·
Project Title:
Project No:
Project Type:
Project Manager:
Brannan Park
Non Capacity - Park Improvements
Cu"entYearBudge~
2005
YTD Actual
Expenditures
Budget
Balance
Budget
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
2004 YE
Estimate
2005 Year End
Proiect Total
Prior to 2004
2005 Budaet
Fundi Sources:
General Fund
Other
Grants/lAC
Impact Fees/Fee in lieu of
REÈT
Total Fundln Sources:
Ex end/lures:
Design
Right of Way
Construction
Total Ex enditure:
A-ll
·
Project Title:
Project No:
Project Type:
Project Manager:
Cameron Park
Non Capacity - Park Improvements
CurtentYearBudge~
2005
Budget
YTD Actual
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
·
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budaet
2005 Year End
Profect Total
Fundin Sources:
General Fund
Other
GrantsRA C
Impact Fees/Fee in lieu of
REET
Total Fundin Sources:
Ex nditures:
Design
Right of Way
Construction
Total Ex enditure:
·
A-12
·
Project Title:
Project No:
Project Type:
Project Manager:
Cedar Lanes Park
C408A
Non Capacity - Park Improvements
Budget
YTD Actual
Expenditures
Budget
Balance
·
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budaet
2005 Year End
Project Total
Fundin Sources;
General Fund
Other
GrantsllA C
Impact Fees/Fee In lieu of
REET
Total Fundln Sources:
Ex nditures:
SS,OOO
95,000
1 SO,OOO
55,000
95,000
ISO 000
Design
Right of Way
Construction
Total Ex nditure:
150,000
150,000
150,000
150 000
·
A-13
·
Project Title:
Project No:
Project Type:
Project Manager:
Centennial View Point Park
Non Capacity - Park Improvement
Current Year Budget:
2005
Budget
YTD Actual
Expenditures
Budget
Balance
Adapted Budget
Budget Amendments
Adjusted Budget
·
Activity:
Prior 10 2004
2004 YE
Estimate
2005 Budaet
2005 Year End
Proiect Total
Fundin Sources:
General Fund
Other
GrantsRAC
Impact Fees/Fee in lieu of
REET
Total Fundin Sources:
Ex enditures:
Design
RIght of Way
Construction
Total Ex enditure:
·
A-14
.
Project Title:
Project No:
Project Type:
Project Manager:
Community Center
Capacity Project
Budget
YTD Actual
Expenditures
Budget
Balance
.
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budaet
2005 Year End
Proiect Total
Fundin Sources:
General Fund
Other O.O.Bonds
GrantsllAC
Impact Fees/Fee in lieu of
REET
Total Fundin Sources;
Ex. nditures:
100,000
100,000
Design
Right of Way
Construction
Total Ex. enditure:
100 000 100,000
100,000 100,000
100,000 100,000
.
A-1S
.
Project Title:
Project No:
Project Type:
Project Manager:
Dykstra Park
Non Capacity. Park Improvements
CunentYearBudge~
2005
Budget
YTD Actual
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
.
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budoet
2005 Year End
Proiect Total
Fundin Sources:
General Fund
Other
GrantsnA C
Impact Fees/Fee in lieu of
REET
Total Fundin Sources:
Ex enditures:
Design
Right of Way
Construction
Total Ex enditure:
.
A-16
·
·
·
Project Title:
Project No:
Project Type:
Project Manager:
Fenster Farm Site Planl Phase 1 Development
Non Capacity
CurrentYearBudge~
2005
YTD Actual
Expenditures
Budget
Balance
Budget
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
2004 YE
Estimate
2005 Budaet
2005 Year End
Proiect Total
Prior to 2004
Fundin Sources:
General Fund
State Salmon Recovery Fund
State Aquatic Lands Enhancement
Impact Fees
REET
Total Fundin Sources:
Ex end/lures:
30,000
30,000
30,000 30,000
30,000 30,000
30,000 30,000
Design
Right of Way
Construction
Total Ex nditure:
A-17
·
Project Title:
Project No:
Project Type:
Project Manager:
Fulmer Park
Non Capacity - Park improvements
CurÆntYearBudge~
2005
Adopted Budget
Budget Amendments
Adjusted Budget
Budget
200,000
YTD Actual
Expenditures
Budget
Balance
200,000
200,000
200,000
·
Activity:
Fundin Sources:
Prior to 2004
2004 YE
&timate
2005 Sudast
2005 Year End
Project Total
General Fund
Other
GrantsllAC
Impact Fees/Fee in lieu of
REET
Total FuiJdin Sources:
Ex. end/tures:
Acquisition/Design
Right of Way
Construction
Total Ex enditure:
200,000 200,000
200,000 200,000
200,000 200,000
200,000 200 000
·
A-iS
.
.
.
Project Title:
. Project No:
Project Type:
Project Manager:
Gaines Park
Non Capacity - Park Improvements
Cu"entYearBudge~
2005
YTD Actual
Expenditures
Budget
Balance
Budget
Adapted Budget
Budget Amendments
Adjusted Budget
Activity:
2004 YE
Estimate
2005 Year End
Proiect Total
Prior to 2004
2005 Budaet
Fundin Sources:
General Fund
Other
Grants/lAC
Impact FeesIFee in lieu of
REET
Total Fundin Sources:
Ex enditures:
Design
Right of Way
Construction
Total enditure:
A-19
.
Project Title:
Project No:
Project Type:
Project Manager:
Game Farm Park
Non Capacity. Park Improvements
Cu"entYearBudge~
2005
Budget
YTD Actual
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
.
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budaet
2005 Year End
Proiect Total
Fundfn Sources:
General Fund
Other
GrantsllA C
Impact Fees/Fee in lieu of
REET
Total Fundin Sources:
Ex enditures:
Design
Right of Way
Construction
Total Ex. enditure:
100,000
1,205,000
1,305,000
.
A-20
·
·
·
Project Title:
Project No:
Project Type:
Project Manager:
Game Farm Wilderness Park
Non Capacity - Park Improvements
CurrentYearBudge~
2005
YTD Actual
Ex"enditures
Budget
Balance
Budget
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
2004 YE
Estimate
2005 Year End
Project Total
Prior to 2004
2005 Budaet
Fundin Sources:
General Fund
Other
Grants/lAC
Impact FeesIFee in lieu of
REET
Total Fundin Sources:
Ex enditures:
Design
Right of Way
Construction
Total Ex enditure:
--------- -
A-21
·
Project Title:
Project No:
Project Type:
Project Manager:
GSA Park
Non Capacity - Park Improvement
Cu"entYearBudge~
2005
Budget
YTD Actual
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
·
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budaet
2005 Year End
Proiect Total
Fundin Sources:
General Fund
Other
GrantshAC
Impact Fees/Fee in lieu of
REET
Total Fundln Sources:
Ex nditures:
Design
Right of Way
Construction
Total Ex enditure:
--.---
·
A-22
·
·
----------
·
Project Title:
Project No:
Project Type:
Project Manager:
Indian Tom Park
Non Capacity· Park Improvement
CurrentYearBudge~
2005
YTD Actual
Exøenditures
Budget
Balance
Budget
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
2004 YE
Estimate
2005 Year End
Proiect Total
Prior to 2004
2005 Budaet
Fundin Sources:
General Fund
Other
Grants/lAC
Impact Fees/Fee ;n lieu of
REET
Total Fundin Sources:
Ex nditures:
Design
Right of Way
Construction
Total Ex enditure:
A-23
·
Project Title:
Project No:
Project Type:
Project Manager:
Isaac Evans Park
No.n Capacity - Park Improvements
CurrentYearBudge~
2005
Budget
YTD Actual
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
·
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budaet
2005 Year End
Prolect Total
Fundin Sources:
General Fund
Other
Grants/lAC
Impact Fees/Fee in lieu of
REET
Total Fundin Sources:
Ex endffures:
Design
Right of Way
Construction
Total Ex. nditure:
------------
·
A-24
·
Project Title:
Project No:
Project Type:
Project Manager:
Jacobsen Tree Farm Site Plan
Capacity Project
Current Year Budget:
2005
Budget
YTD Actual
Expenditures
Budget
Balance
·
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budaet
2005 Year End
Proiect Total
Fundln Sources:
General Fund
Other
Grants/tAC
Impact FeesIFee in lieu of
REET
Total Fundln Sources:
Ex nditures:
30,000
30,000
Design
Right of Way
-Construction
Total Ex ndiluTe:
30,000 30,000
30,000 30,000
30,000 30,000
·
A-25
·
Project Title:
Project No:
Project Type:
Project Manager:
Jornada Park
Non Capacity - Park improvement
Current Year Budget:
2005
Budget
YTD Actual
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
·
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budoet
2005 Year End
Proiect Total
Fundin Sources:
General Fund
Other
Grants/lAC
Impact Fees/Fee In lieu of
REET
Total Fundln Sources:
Ex enditures:
Design
Right of Way
Construction
Total Ex enditure:
·
A-26
·
Project Title:
Project No:
Project Type:
Project Manager:
Lakeland Hills Community Park (8 acres)
Capacity Project
Current Year Budget:
2005
Budget
YTD Actual
Expenditures
Budget
Balance
·
AdOpted Budget
Budget Amendments
Adjusted Budget
Activity:
Prior to 2004
2004 YE
Estimate
2005 Year End
2005 Budaet Proiect Total
50,000 50,000
180,000 180,000
30,000 30,000
260,000 260,000
10,000 10,000
250,000 2S0,OOO
260 000 260 000
Fundin Sources:
General Fund
Other I developer
GrantsllAClKCYSG
Impact Fees/Fee in lieu of
REET
Total Fundin Sources:
Ex: nditures:
Design
Right of Way
Construction
Total Ex nditure:
·
A-27
·
Project Title:
Project No:
Project Type:
Project Manager:
lakeland Hill Park
Non Capacity· Park Improvements
Cu~ntYearBudge~
2005
Budget
YTD Actual
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
·
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budaet
2005 Year End
Proiect Total
Fundin Sources:
General Fund
Other
GrantsllAC
Impact FeesIFee in lJeu of
REET
Total Fundin Sources:
Ex, endltures:
Design
Right of Way
Construction
Total Ex nditure;
.."._,_.~-_._-~.-_._--
·
A-28
·
·
---------
·
CAPITAL
Project Title:
Project No:
Project Type:
Project Manager:
Lea Hill Park
Capacity Project
Current Year Budget
2005
YTD Actual
Expenditures
Budget
Balance
Budget
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
2004 YE
Estimate
2005 Year End
Proiect Total
Prior to 2004
2005 Budoet
Fundin Sources:
General Fund
Other
Grants/JA C
Impact Fees/Fee in lÎeu of
REET
Total Fundi Sources:
Ex. enditures:
Design
Right of Way
Construction
Total Ex enditure:
A-29
·
Project Title:
Project No:
Project Type:
Project Manager:
Les Gove Park
Non Capacity - Park Improvements
Current Year Budget:
2005
Budget
YTD Actual
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
·
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budaet
2005 Year End
Proiect Total
Fundin Sources:
General Fund
Other
GrantsllAC
Impact Fees/Fee in lieu of
REET
Total Fundin Sources:
Ex enditures:
Design
Right of Way
Construction
Total Ex enditure:
·
A-30
·
Project Title:
Project No:
Project Type:
Project Manager:
Mary Olson Farm
Non Capacity - Project Development
CurrentYearBudge~
2005
Budget
YTD Actual
Expenditures
Budget
Balance
·
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
Prior 10 2004
2004 YE
Estimate
2005 Budaet
2005 Yeàr End
Proieet Total
Fundin Sources:
General Fund
Other
Grants/lAC
Impact Fees/Fee in lieu of
Private Donation
Total Fundin Sources:
Ex nditures:
Design
Right of Way
Construction
Total Ex. end/fure:
·
--.--
A-31
·
Project Title:
Project No:
Project Type:
Project Manager:
Roegner Park
Non Capacity - Park improvements
Current Year Budgeé
2005
Budget
YTD Actual
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
·
Activity:
Prior to 2004
2004 YE
EstImate
2005 Budaet
2005 Year End
Project Total
Fundin Sources:
General Fund
Other
GrantsllAC
Impact Fees/Fee in lieu of
REET
Total Fundi Sources:
Ex. enditures:
Design
Right of Way
Construction
Total Ex nd/ture:
·
A-32
·
·
--..----- ~
·
Project Title:
Project No:
Project Type:
Project Manager:
Rotary Park
Non Capacity - Park Improvements
Current Year Budget:
2005
YTD Actual
Expenditures
Budget
Balance
Budget
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
2004 YE
Estimate
2005 Year End
Proiect Total
Prior to 2004
2005 Budaet
Fundin Sources:
General Fund
Other
Grants/lAC
Impact Fees/Fee in lieu of
REET
Total Fundi Sources:
Ex ndltures:
Design
Right of Way
Construction
Total Ex. nditure:
------
A-33
·
Project Title:
Project No:
Project Type:
Project Manager:
Scootie Brown Park
Non Capacity - Park Improvements
Current Year Budget:
2005
Budget
YTD Actual
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
·
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budaet
2005 Year End
Proiect Total
Fundin Sources;
General Fund
Other
GrantsllAC
Impact Fees/Fee In lieu of
REET
Total Fundin Sources:
enditures:
Design
Right of Way
Construction
Total Ex enditure:
·
A-34
·
Project Title:
Project No:
Project Type:
Project Manager:
Shaughnessy Park
Non Capacity - Park improvements
CurrentYearBudge~
2005
Budget
YTD Actual
Expenditures
Budget
Balance
·
Adopted Budget
Budget Amendments'
Adjusted Budget
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budaet
2005 Year End
Proiect Total
Fundln Sources:
General Fund
Other
Grants/fA C
Impact Fees/Fee in lieu of
REET
Total Fundln Sources:
Ex nditures:
Design
Right of Way
Construction
Total Ex enditure:
·
A-35
·
Project Title:
Project No:
Project Type:
Project Manager:
Sunset Park
Non Capacity - Park Improvements
Cu~ntYearBudge~
2005
Budget
YTD Actual
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
·
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budaet
2005 Year End
Pro/eet Total
Fundin Sources:
General Fund
Other Fee in Lue of $~s
GrantsllAC
Impact Fees/Fee in. lieu of
REET
Total Fundin Sources:
Ex endilures:
Design
Right of Way
Construction
TotalEx. enditure:
~---
·
A-36
·
Project Title:
Project No:
Project Type:
Project Manager:
Terminal Park
Non Capacity· Park Improvement
Cu"entYearBudge~
2005
Budget
YTD Actual
Expenditures
Budget
Balance
·
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budae'
2005 Year End
Proiect Total
Fundin Sources:
General Fund
Other
Grants/lAC
Impact Fees/Fee In lieu of
REET
Total Fundi Sources:
Ex diluTes:
Design
Right of Way
Construction
Total E enditure:
·
A-37
·
Project Title:
Project No:
Project Type:
Project Manager:
Veterans Memorial Park Redevelopment
Non Capacity - Park Improvements
Cu~ntYearBudgeé
2005
Budget
YTD Actual
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
·
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budaet
2005 Year End
Proiect Total
Fundin Sources:
General Fund
American Legion Post 78
GrantsllAC
Impact Fees/Fee in lieu of
REEf
Total FundJn Sources:
Ex. end;tures:
Design
Right of Way
Construction
Total Ex enditure:
·
A-38
·
·
----~-------~--
·
Project Title:
Project No:
Project Type:
Project Manager:
Lakeland Nature Area
Capacity Project
currentYearBudge~
2005
YTD Actual
Expenditures
Budget
Balance
Budget
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
2004 YE
Estimate
2005 Year End
Pro/set Total
Prior to 2004
2005 Budaet
Fundin Sources:
General Fund
Other
GrantsRAC
Impact Fees/Fee in lieu of
REET
Total Fundln Sources:
Ex end/tures:
Design
Right of Way
Construction
Total Ex enditure:
A-39
·
Project Title:
Project No:
Project Type:
Project Manager:
Interurban Trail
Non Capacity - Park Improvement
currentYearBudge~
2005
Budget
YTD Actual
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
·
Activity:
Prior to 2004
2004 YE
Estimate
2005 Budaet
2005 Year End
Pro/eet Total
Fundin Sources:
-General Fund
Grants
Bond Proceeds
1m ct Fees
Total Fundin Sources:
Ex enditures:
Design
Right of Way
Construction
Total Ex. enditure:
-------
·
A-40
·
·
·
Project Title:
Project No:
Project Type:
Project Manager:
Misc Improvements
Non Capacity
Dan Scamporlina
CUffent Year Budget:
2005
YTD Actual
Expenditures
Budget
Balance
Budget
Adapted Budget
Budget Amendments
Adjusted Budget
Activity:
2004 YE
Estimate
2005 Year End
Proiect Total
Prior to 2004
2005 Budaet
Fundin Sources:
General Fund
REET
Bond Proceeds
1m t Fees
Total Fundin Sources:
Ex enditures:
Design
Right of Way
Construction
Total Ex endlture:
---..---------
A-41
·
Project Title:
Project No:
Project Type:
Project Manager:
Park Acquisitions
Capacity Project
Current Year Budget:
2005
Budget
YTD Actual
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
·
Activity:
Prior to 2004
2004 YE
Est/mats
2005 Budaet
2005 Year End
Proiect Total
Fundi Sources:
General Fund
REET
State Grant (lAC)
KCCF
Total Fundln Sources:
enditures;
Design
Right of Way
Construction
Total Ex. enditure:
·
A-42
·
Project Title:
Project No:
Project Type:
Project Manager:
Public Art
Non Capacity Project
Cu"entYearBudge~ 2005 YTD Actual Budget
Budget Expenditures Balance
Adopted Budget
Budget Amendments
· Adjusted Budget
Activity: 2004 YE 2005 Year End
Prior to 2004 Estimate 2005 Budaet Project Total
Fundín Sources:
Capital Project Fund 328 30,000 30,000 60,000
Grants
Bond Proceeds
1m ct Fees
Total Fundin Sources: 30,000 30,000 60,000
Ex nditures:
Design
Right of Way
Construction 30,000 30,000 60,000
Total Ex enditure: 30,000 30,000 60 000
______n_____
·
A-43
TABLE PR-2
CFP PROJECTS AND FINANCING PLAN
,lIi~~II,j~", ...~ .. ..........- ·
COSTSIREVENUES 2005 2006 2007 2008 2009 2010 TOTAL
Capacity Projects:
j",
Cost 83,000 83,000
Rev - Grant 30,000 30,000
Rev - General Fund 50,000 50,000
Rev - REET 3,000 3,000
0%% {j
Cost 260,000 260,000
Rev - Grant 30,000 30,000
Rev - General Fund 50,000 50,000
Rev - Other 180,000 . 180,000
123,000 123,000
123,000 123,000
Cost 30,000 300,000 330,000
Rev - Grant 100,000 100,000
Rev - General Fund 30,000 100,000 130,000
Rev ~ Other 100,000 100,000
) Subtotal 260,000 30,000 300,000 83,000 123,000 796,000 ·
Non-Capacity Projects:
Community Parks
Cost 10,000 125,000 135,000
Rev - Grant 7S,OOO 75,000
Rev - Other 50,000 50,000
Rev. General Fund 10,000 10,000
68,000 68,000
Rev· General Fund 38,000 38,000
Rev - Other 30,000 30,000
32,000 55,000 87,000
Rev - General Fund 32,000 55,000 87,000
Cost
Rev - General Fund
Rev - Grant
35,000 35,000
Rev - General Fund 35,000 35,000
550,000 600,000 1,150,000 ·
Rev - General Fund 200,000 550,000 750,000
Rev - Other 350,000 350,000
Rev - REET 50,000 50,000
Ä-44
COSTSlREVENUES
200S
2006
2007
2008
2009
2010
TOTAL
.
'''ljl!ll'!lf+rs'!--1ìf~~'''_'2'<_''''1!¡¡¡¡¡_IJill~'''·
RÞ¡ÄÜ~'~S.BW1:~~~~1~ti!ï~:!ª1f~jj~Hm,t . .. <.~ . ,:,.
Cost 30,000 570,000
Rev - General Fund 30,000 30,000
Rev -Grant 540,000
Cost 200,000 200,000 75,000 725,000 1,200,000
Rev - General Fund 150,000 250,000 400,000
Rev - Other 200,000 200,000
Rev ~Grant 50,000 75,000 200,000 325,000
Rev· Impact Fees 75,000 75,000
Rev - REET 200,000 200,000
1,305,000 260,000 120,000 120,000 1,805,000
Rev - General Fund 55,000 260,000 120.000 120,000 555,000
Rev -Grant 1,250,000 1,250,000
40,000 113,000 153,000
Rev - General Fund 40,000 113,000 153,000
280,000
Rev - General Fund 50,000 130,000 180,000
Rev -Grant 50,000 50,000
Rev - Other 50,000 50,000
.) """1>,,,, ..
37,000 37,000
Rev - General Fund 37,000 37,000
55,000 80,000 175,000 385,000
Rev - General Fund 55,000 75,000 80,000 175,000 385,000
30,000 30,000
Rev * General Fund 30,000 30,000
Rev - General Fund
Rev - General Fund
35,000
35,000
35,000
Cost
Rev - General Fund
Rev -Grant
250,000
200,000
50,000
250,000
200,000
50,000
.
Cost
Rev - General Fund
Rev - Other
Rev· Private Donation
300,000
t 50,000
150,000
250,000
125,000
125,000
250,000
125,000
125,000
250,000
125,000
125,000
1 ,050,000
525,000
400,000
125,000
A-45
COSTSIREVENUES 2005 2006 2007 2008 2009 2010 TOTAL
250,000 55,000 ·
Rev - General Fund 250,000 55,000
~!IiIIf~¡&
' , .. " n.__~.,,\!M 'H"'_ . ~,_ _ .' .. ~. ~ ,~
Cost 7,000 20,000 120,000 147,000
Rev - General Fund 7,000 60,000 67,000
Rev - Other 60,000 60,000
Rev - REET 20,000 20,000
·~IIíJB(¡¡~~~.~
Cost 5,500 160,000 165,500
Rev - General Fund 5,500 160,000 165,500
8,000 118,000 126,000
Rev - General Fund 8,000 118,000 126,000
<'",-
45,000 45,000
Rev - General Fund 20,000 20,000
Rev· Other 25,000 25,000
'T!
Cost 100,000 100,000
Rev - General Fund 100,000 100,000
,
Cost 200,000 200,000
Rev - General Fund 120,000 120,000
Rev - Private Donation 80,000 80,000 ·
Cost 50,000
Rev - General Fund 50,000 50,000
~.
Cost 50,000 100,000 50,000 100,000 50,000 350,000
Rev - General Fund 50,000 100,000 50,000 100,000 50,000 350,000
600,000 200,000 600,000
Rev - REET 200,000 200,000 200,000 200,000 200,000 1,000,000
Rev -Grant 400,000 400,000 400,000 1,200,000
---'---~-'-~'--
- ~,.~--_._----
--------
·
A-46
.!
COSTSIREVENUES 2005 2006 2007 2008 2009 2010 TOTAL
COSTS/REVENUES 2005 2006 2007 2008 2009 2010 TOTAL
.;¡" ' "
30,000 . ,
Cost 30,000 30,000 30,000 30,000 30,000 180,000
Rev - General Fund 30,000 30,000 30,000 30,000 30,000 30,000 180,000
Subtotal 290,000 2,250,000 2,637,500 1,733,000 1,717,500 2,5S0,OOO 5,844,500
SUMMARY; COSTS AND REVENUES
COSTS:
Capacity Projects
Community Parks 260,000 - 30,000 300,000 83,000 123,000 796,000
Subtotal 260,000 - 30,000 300,000 83,000 123,000 796,000
Non-Capacity Projects
Community Parks 260,000 2,220,000 2,607,500 1,703,000 , ,687,500 2,520,000 10,998,000
Special Use Areas 30,000 30,000 30,000 30,000 30,000 30,000 180,000
Subtotal 290,000 2,250,000 2,637,500 1,733,000 1,717,500 2,550,000 11,178,000
Total Costs 550,000 2,2S0,000 2,667,500 2,033,000 1,800,500 2,673,000 11,974,000
REVENUES;
Rev - General Fund 140,000 780,000 937,500 1,088,000 957,500 , ,423,000 5,326,000
Rev - REET 200,000 200,000 200,000 220,000 203,000 250,000 1,273,000
Rev - Grant 30,000 1,040,000 1,300,000 500,000 , 05,000 675,000 3,650,000
Rev - Other 180,000 150,000 230,000 225,000 410,000 2S0,OOO 1,445,000
Rev- Impact Fees - - - - - 75,000 75,000
Rev - Private Donation - 80,000 - - 125,000 - 205,000
Total Revenues 550,000 2,250,000 2,667,500 2,033,000 1,8OO,SOO 2,673,000 11,974,000
BALANCE - - - - - - -
.)
----------------
---------------
.'
A-47
CFP PROJECTS AND FINANCING PLAN
:']mm.I!BIIIII'"III_1íti_Jil!l!lf.j'.~"'" 11_
I COSTSlREVENUES
I Capacity Projects:
'1M$;!
..
2005
2006
2007
2008
2009
2010
TOTAL"
H
Cost
Rev· General Funds
Rev, G.O. Bonds
100,000
100,000
"I~¡m¡¡_· .
:tJil4H!i'~Jml¡!tT~iJMiLif.
100,000 3,200,000
100,000
.'~
3,400,000
200,000
3,200,000
3,200,000
SUMMARY: COSTS AND REVENUES
COSTS:
Capacity Projects
Total Cost
100,000
100,000
100,000
100,000
3,200,000
3,200,000
3,400,000
3,400,000
REVENUES:
Rev, General Funds
Rev, G.O. Bonds
Total Revenues
100,000
100,000
100,000
100,000
3,200,000
3,200,000
200,000
3,200,000
3,400,000
BALANCE
.
________w__~
.
A-48
.
Table A-l
Cost Summary Arts, Cultural and Recreation Improvements
1 Current Additional
Annual Line Item Projected New
Program Needs Cost Cost Timeline Costs for 201 0
Try new marketing avenues to increase
General Needs awareness of recreation programs.
Offer classes with daytime, evening and
General Needs weekend hours
Reinforce family structure by offering
General Needs activities and outings for families
Increase children's exposure to natural
world through activities and learning
General Needs opportunities
~~
Establish a 501.c.3 foundation (Parks,
Arts, Recreation and Cultural
General Needs Foundation)
Inform residents of the function and
~!al Needs value of open space
Develop strategies for recreation
General Needs programming
Expand the coed, women's and girls
Athletic Program programs $5,000 $2,500 -- --~ - ~J~-,-~
Continue to coordinate programs with
\ Athletic Program schools no cost $0 $0
I .,~-.
Offer classes and programs in new
Athletic Program_ sporls and activities - . $5,000 $2,500 --- _$7,500
Athletic Program Track interest in league sports $2,000 $1,000 $3,000
Expand fitness and dance programs as
Athletic Program gymnasiums are developed $5,000 $2,500 $7,500
Deveiop a maintenance and restoration
<:;ultural Arts Programs program for public art collection $3,000 2007 3000
~---
Participate in a regional economic
&t'ltural Arts Prowams impact survey $2,000 2006 $2,000
Continue and expand community arts
~tural!-rts.£'rograms programs $2,000 2006 $2,000
-
Continue to support and expand $5,000 .
~urif!7'Jfs-Programs - - Artisans In the Schools program 2005 $5,000
-..-----
Continue to support to local artists and ,
Cultural Arts Programs arts org~niza:'io~___ $0 2005 $0
~----,- ...--- - ~--_...--' .-...-....-..-,. -_._.__..... c._
Review and expand funding in the
ClJ~ural Arts Programs existing grantpr~grams _______ $10,000 2005 ...J1Q,O.QQ
.-------.- _______n_
Participate in a Cuitural Facility Needs
¡QtJltur:a~~rts Pr~g_rams Assessment 1----- ---~. 2007 f-----.-------
Develop multiple sources of marketing
Cultural Arts Programs to reach diverse audiences $3,000 2005 $3,000
.
.
A-49
Current Additional
Annual Line Item Proiected .
Program Needs Cost Cost Timeline Costs for
Heritage and Continue restoration and rehabilitation of
Preservation buildings - one time cost $186,000 2006 $186,000
Heritage and
Preservation Acquire adjacent farm properties
Heritage and Develop habitat restoration plan - one
Preservation time cost $46,000 2005 $46,000
Heritage and Develop plan for visitor amenities - one -
Preservation time cost $275,000 2008 $275,000
Heritage and Increase dedicated staff when fully
Preservation operational - annual cost $160,000 2010 $160,000
Continue growth of education programs ,
Museum Programs annually $20,000 2005 $20,000
Increase visible signage on Auburn
Museum Programs Way, J Street SE and 12th Street SE 2005
Museum Programs Increase operating income annually $5,000 2005 $5,000
included
Museum Programs Increase staffing for museum operation above
Leisure and I::ducatlonal Gonllnue to expand community
Programs education and adult programs $5,000 $2,500 $7,500
Leisure and Educational -
Programs Continue course evaluations $2,000 $1,000 $3,000
Marketing & Community Purchase software to allow online
Events registration & IVR __ 5,500 $48,000 T
Marketing & Community Continue to update and unify marketing
Events materials varied
Continue to host community events and
Marketing & Community provide in-kind support to community
Events based local events varied
----------
--. -----.--.---
.
A-50
·
·
·
Current Additional
Annual Line Item Projected New
- Program Needs Cost Cost Timeline Costs for 2010
Additional fulltime office and
programming staffing to meet current
Senior Activity Center and projected increased population and
Programs services needs $121,000 $148,000 2006 $269,000
Continue and expand marketing of the
Senior Activity Center Senior Activity Center programs
Programs (advertising budget) $3,500 $6,500 2005 $10,000
costs primarily
needed for
Senior Activity Center Continue and expand programs and additional staff
Programs services based on above need above and below
Explore projected need for additional --
space for Senior Adult programs &
services in both private and public
facilities (ie. City community center(s), No additional cost
Senior Activity Center Sr. housing complexes such as Wesley in this exploration
Programs Gardens) 2007 phase
-- $$00 in - -~..._~
. !
Senior Activity Center Provide Community Outreach and Social current $17,000 i
Programs Worker program for elderly (2 days/wk) budget $21,000 2007 $38,000
No additional cost
Senior Activity Center Explore need to provide space for in exploration
Programs additional day per week of respne care 2008 phase
Provide transportation from seniors'
\ homes to the Center and other
programming locations. Part time driver
for home pickups and driving for van $00 in
Senior Activity Center trips current $22,000
Programs Vehicle operations direct costs budget $17,000 2008 $39,000
Specialized Recreation Expand growth in inclusionary programs
Programs and programs for children $17,000 $8,500 $25,500
Specialized Recreation ---
Prograrns Train staff with inclusionary training $1,000 -- $1,000 - .._m $2,00.2
Specialized Recreation Improve transportation options with
Programs additional accessible van $0 $60,000 $60,-()()Q
~ialized Reéreation Maintain and expand sCholarship .----
Programs program $2,000 $1,000 $3,000
Maintain and expand fee waiver
Teen Programs program $10,000 $5,000 --- $15,000
Teen Programs Evaluate programs with teen input $1,000 $500 ~--- $1 ,5()()
- Teen PrE>§f£m5- örts-programs for teens ,,1Û;OOO -.-.-- u$3lf.OOO -
, __~__w.
Develop outreach aCtivities for "at risk" --.-'",'-.'--"-
Teen Programs teens $55,000 $28,000 $83,000
f-----~.- TOTAL -~._--- $977,000 $357,500 -- $1,334,500
A-51
^__________m_____
·
·
·
·
PARKS, RECREATION AND OPEN SPACE PLAN
GLOSSARY OF TERMS and ACRONYMS
Appraisal - An estimated value set on property by a qualified appraiser.
APRD - Auburn Parks and Recreation Department
Assessment - The valuation of property for property tax purposes in order to apportion a tax
on it, according to its value or in relation to the benefit received from it.
Bargain Sale - The sale of property to a charitable and tax-exempt organization for less than
its fair market value.
Basis - The cost of property at the time of acquisition, or value when inherited, plus the cost
of certain permanent capital improvements.
Brand or Brand Recognition - Unified look and language used in marketing pieces,
Capital Gain - Profit from the sale of property in excess of its basis,
·
CFP - Capital Facilities Plan is a plan that studies the manner in which the capital needs of the
City can be met and establishes policies and management programs to address those needs,
Capital facilities generally have long useful lives, significant costs and tend not to be mobile,
CIP - Capital Improvement Program is a plan that lists needed improvements to significant
facilities.
Conservation Easement - A legal agreement between a landowner and a conservation
organization or a government agency that permanently limits a property's uses in order to
protect the property's conservation values. Called a "conservation restriction" in some states;
also may be called an agricultural preservation easement, historic preservation easement,
scenic easement, or forever wild easement, etc., depending on the resources it protects.
Convenant (or restriction) - A written promise contained in a contract, lease, deed, or other
form of agreement.
Councilmanic Bond - General obligation bonds authorized by the City Council.
Devise - (v) To give or transmit real estate by will. (n) A gift of real estate by will.
Donee - One who receives a donation,
· Donor - One who makes a donation,
Easement - A right that one has in or over the land of another.
A-53
CI1Y OF AUBURN, WASHINGTON
·
Estate - The property and possessions of a deceased person,
Estate Tax - Tax on certain assets that have been transferred from a deceased person to his
or her heirs, Also called death tax or inheritance tax,
Fair Market Value - The price that a willing buyer would pay a willing seller, neither being
under any compulsion to buy or sell and both having full knowledge of relevant facts sur-
rounding the transactions.
Fee Simple Interest - Absolute ownership of property, (Ownership of "less than fee simple
interest" in property is ownership of fewer than the total possible rights one may have in land.
When a landowner grants a conservation easement to a land trust, the land trust owns less
than fee simple interest.)
GMA - Growth Management Act
HDA - High Density Corridor
HUD - Housing and Urban Development
lAC - InterAgency Committee for Outdoor Recreation
·
Interpretive Sites - Areas that are designed to define its use, i.e. wetland area with signage
that describes types of plants, animals that grow/live in the area.
Interest in Property - A right or share in the ownership of property,
Land Trust - Nonprofit organization that protects land directly, usually by helping landowners
establish a conservation easement, accepting donations and easements, or buying land.
Lessee - One to whom a lease is granted; a tenant holding property by lease,
Lessor - One who grants a lease,
xLife Estate - See reserved life estate.
LOS - Level of Service
Multi-modal - A corridor that provides many ways of travel (car, bicycle, and foot),
NRPA - National Recreation and Park Association
·
A-54
·
·
·
PARKS, RECREATION AND OPEN SPACE PLAN
PAA - Potential Annexation Area - Those currently unincorporated areas the city intends to
annex within the 20-year time frame in the Comprehensive Plan,
Park Impact Fee - A fee to pay for park development when new construction of homes
increases the use of existing facilities.
(In) Perpetuity - Forever.
Real Property or Realty - Land and generally permanent improvements erected on it or
growing on it.
REET - Real Estate Excise Tax
Remainder Interest - An interest in property which does not become possession of the
property until the completion of a prior interest; for example, where a grantor deeds property
to an organization subject to a "reserved life estate," the organization has a remainder interest
which will become possessory when the life tenant (usually grantor) dies.
Reserved Life Estate - The right retained by the owner or other named individuals to live
on or use property,
Revenue Bonds - Bonds that are retired by means of revenue, usually a proprietary fund,
These bonds are not secured by the tax base of the full fair and credit of the City,
SEPA - State Environmental Policy Act
Special Levy - Separate property tax levies authorized by the voters for specific purposes,
Title - The right to or ownership of land,
A-55
·
·
·
RESOLUTION NO. 3831
CITY OF AUBURN 2005-2010 SIX YEAR PARKS IMPROVEMENT
PROGRAM (PIP) CHART
(NOT SCANNED - SEE CITY CLERK'S OFFICE FOR COPY)