HomeMy WebLinkAboutITEM V-C-5
F " *
~ AGENDA BILL APPROVAL FORM
AANI[01JI;
Y7 WASHWGTON
=
Agenda Subject: Date: July 10, 2009
Permission to Advertise Pro'ect No. CP0904
Department: Attachments: Budget Impact:
Public Works Bud et Status Sheet, Ma $0
Administrative Recommendation:
City Council grant permission to advertise for bids for Project No. CP0904, 2009 Citywide Sidewalk
Repair Pro'ect.
Background Summary:
The purpose of this project is to repair damaged sidewalks on approximately 3.6 miles of streets
throughout the City with an emphasis on fixing potential tripping hazards. This will mainly be
accomplished by removing and replacing damaged concrete sidewalk panels. Sidewalks located in the
grey area (with a black outline) shown on the attached map will be comprehensively repaired as part of
this project. Sidewalks located in the white area (with a grey outline) shown on the attached map will be
added to the project as the budget allows. These project areas were selected based on the severity of
the sidewalks, citizen complaints, and coordination with past SOS street improvements.
Tree roots that are damaging the sidewalk will be pruned. Trees will only be removed if root pruning
would be insufficient to properly fix the sidewalk (if the tree is located too close to the sidewalk for
example). All tree removals will be coordinated with the adjacent property owner.
This project will also install ADA compliant wheelchair ramps on certain streets scheduled to be repaired
by the Save Our Street Program; as required by the Americans with Disabilities Act. The specific ramp
replacement locations are shown on the attached map. These ramp replacements will be funded by the
103 (Local Street) fund.
$210,700 is budgeted in the 328 Fund for sidewalk improvements in 2009. $25,000 of this budget will be
spent on sidewalk repairs as part of the R Street SE Utility Improvement Project (Project C504A). The
remaining $185,700 will fund this project.
Approximately $45,000 from the 103 (Local Street) Fund will be utilized for wheelchair ramp
replacements.
W0720-2
04.12.1 CP0904
Reviewed by Council & Committees: Reviewed by Departments & Divisions:
❑ Arts Commission COUNCIL COMMITTEES: ❑ Building ❑ M&O
❑ Airport ❑ Finance ❑ Cemetery ❑ Mayor
❑ Hearing Examiner ❑ Municipal Serv. ❑ Finance ❑ Parks
❑ Human Services ❑ Planning & CD , ❑ Fire ❑ Planning
❑ Park Board SPublic Works ❑ Legal ❑ Police
❑ Planning Comm. ❑ Other ~ Public Works ❑ Human Resources
Action:
Committee Approval: ❑Yes ❑No
Council Approval: ❑Yes ❑No Call for Public Hearing
Referred to Until
Tabled Until
Councilmember: Wa ner Staff: Dowd
Meetin Date: Jul 20, 2009 Item Number: V.C.5
.AUBUR.N *MOR.E THAN Yov rn~~~INED
BUDGET STATUS SHEET
Project No: CP0904 Project Title: 2009 Citywide Sidewalk Improvements
Project Manager: Seth Wickstrom
0 Project Initiation
Initiation Date: Februarv 2, 2009 Q Permission to Advertise Date: July 10, 2009
Advertisement Date: 0 Contract Award
Award Date: 0 Change Order Approval
0 Contract Final Acceptance
The "Future Years" column indicates the projected amount to be requested in future budgets.
Funds Bud eted Funds Available)
Funding Prior Years 2009 Future Years Total
328 Fund - Capital Improvement Fund 175,000 175,000
328 Fund - Capital Improvement Fund 10,700 10,700
(carry-forward from 2008)
103 Fund - Local Street Fund 45,000 45,000
(for wheelchair ramps replacements)
Total 0 230,700 0 230,700
Estimated Cost (Funds Needed)
Activity Prior Years 2007 Future Years Total
Design Engineering - City Costs' 1,000 1,000
Construction Estimate 207,909 207,909
Project Contingency (10%) 20,791 20,791
Construction Engineering - City Costs" 1,000 1,000
Total 0 230,700 0 230,700
'City staff costs will be charged against the Engineering Budget and not the Project Budget, and are not shown here.
328 Capital Im rovement Bud et Status
Prior Years 2007 Future Years Total
"328 Funds Budgeted ( ) 0 (185,700) 0 (185,700)
328 Funds Needed 0 185,700 0 185,700
"328 Fund Project Contingency 0 0 0 0
328 Funds Required 0 0 0 0
103 Local Street Bud et Status
Prior Years 2007 Future Years Total
"103 Funds Budgeted ( ) 0 (45,000) 0 (45,000)
103 Funds Needed 0 45,000 0 45,000
**103 Fund Project Contingency 0 0 0 0
103 Funds Required 0 0 0 0
in the Budget Status Sections indicates Money the City has available.
W0720-2A 1 of 1
~ E z
z
4th ST
X Z F PL NE u. ^ st ~ ~
R ~ 3rd ST NE ~
v~n st Ne ~ z FULME ~ UB URN
~ s1VETERANS ~ F/ELo ST NE
`~T~ ~T-~ UD 2RC1
NET MEMORlAL sin ST Ne
SLh ST NE PARK AVE PARK S 5th ST N~ 2 4, ~T~ HIGH
e.. w z NE z ~ 211d ST iv
a~ 4th ST S C11 OOL 15t S49NE Z
sra auauRN m Q ~ ST N ~
$ T NE ~ w rn 2n 1st
HICH
z s
z F J~ nd ST N x ITV ~,i'As
~ SCHOOL lst ST NE z N'~Z m W
rE° Q lst~ S N S a ~ E-W r~ W W W W ~ C/~
EAS C/) ~ E- 2n
~ U)
n w
r~ F W
rF m ~ rWi~ vi ~ ai
~ H ~
oN~ o zn , w SE E vWi z 2riC~ E-, C1~
r~ n 3 r d
~ v~~
ST m m~ mF ~ ~ U1 Ul ~ ~
Q I a
Q ti s E x q CR 0
o sE,
CR0 S S 4th L7 ~
~ w NORTNERN
aUa NG,oN 4th ST
w ~ W
~ 6th ST S ~ BURLINGTON NORTHERti
6th SE "R" F w F
7th ~ ST `n S
~ 7th SE gth ST SE ,
~ 8th ST HE ~
w 9th SE LES = RAMP REPLACEMENT LOCATION
, 9th~' COVE F
' iott, ST ~I'-`~ PARK
G~,su
JE
lith q!
~ 12th ST SE
~ 13TH SE 0~
14th SE J~ w~ AG Nf ~
15th SE z ~ J,
w
16th SE ~ ~ ~ ~ ~
17th ST SE
~ vl V a q i r
ri. lBth ST
19th1 S ~ SE
~ ST sE
~ 20th ST SE
r 20th ~ _ ~ ~
ziimU z' ~ SE rFn zoTx cT ~ S~ MUCKLG S E i,a. , 57' SE ~
se ~ 215C T vTN sxaucxNessr
T~ ~ CEJAR OR SE ~ [E GASINO ppR U
22nd ST
i 22nd ST SE 'N za
23rd ST SE 'J
0 23rd v~ ST S E 23rd ST SE
J 2n~n sT l J
24th ST 24th S"C SE_ SE --T= POPLAR
?St~ ST SE 25th ST SE
CEDEIK r Izsrn sr e \
rL6tn .T SLANESzstn sr sF a ~ r ~a r~~' t A° I
T i I
d ~I27th ST cE F~ARK ,.i i . Q~`~ oa
z8t,n sT se zatn sT IE- ~ _rls
CITY T S aioce
h c
~
v;
~
~ I LJ aocn~ sm sE AUBURN
sisc s9Ts e G A M E'
FA RM
32-L_SE
3~ SPUCK
33 RIVER _ DR1VE
~ 3~r
_
~''llf li I ~ _ oi ~,I ~
IL
F wi 37th ST SE
L- .
n; r I I D PL SE
2009 Citywide Sidewalk Repair Project
OPTIONAL PRO]ECT AREA: Sidewalks
PRO]ECT AREA: Sidewalks in these
areas will be repaired as part of this in these area will be repaired as part of o eso, 1,700-
project. this project as the budget allows.
Scale: 1" = 1,700'
wo7zo-zB
vnM o a,: 7noizoos loatlm: H:\FRO1KPo904 2009 RywlEe Stlewalk Repair RoJect\WVCfw~Onb\Permlssbn N PdvatiseVmxP.dw9