Loading...
HomeMy WebLinkAboutITEM II-B AGENDA BILL APPROVAL FORM Agenda Subject:Date: July 10, 2009 Permission to Advertise Project No. CP0904 Department:Attachments:Budget Impact: Public WorksBudget Status Sheet, Map$0 Administrative Recommendation: City Council grant permission to advertise for bids for Project No. CP0904, 2009 Citywide Sidewalk Repair Project. Background Summary: The purpose of this project is to repair damaged sidewalks on approximately 3.6 miles of streets throughout the City with an emphasis on fixing potential tripping hazards. This will mainly be accomplished by removing and replacing damaged concrete sidewalk panels. Sidewalks located in the grey area (with a black outline) shown on the attached map will be comprehensively repaired as part of this project. Sidewalks located in the white area (with a grey outline) shown on the attached map will be added to the project as the budget allows. These project areas were selected based on the severity of the sidewalks, citizen complaints, and coordination with past SOS street improvements. Tree roots that are damaging the sidewalk will be pruned. Trees will only be removed if root pruning would be insufficient to properly fix the sidewalk (if the tree is located too close to the sidewalk for example). All tree removals will be coordinated with the adjacent property owner. This project will also install ADA compliant wheelchair ramps on certain streets scheduled to be repaired by the Save Our Street Program; as required by the Americans with Disabilities Act. The specific ramp replacement locations are shown on the attached map. These ramp replacements will be funded by the 103 (Local Street) fund. $210,700 is budgeted in the 328 Fund for sidewalk improvements in 2009. $25,000 of this budget will be spent on sidewalk repairs as part of the R Street SE Utility Improvement Project (Project C504A). The remaining $185,700 will fund this project. Approximately $45,000 from the 103 (Local Street) Fund will be utilized for wheelchair ramp replacements. W0720-2 Reviewed by Council & Committees:Reviewed by Departments & Divisions: Arts Commission COUNCIL COMMITTEES: Building M&O Airport Finance Cemetery Mayor Hearing Examiner Municipal Serv. Finance Parks Human Services Planning & CD Fire Planning Park Board Public Works LegalPolice Planning Comm. OtherPublic Works Human Resources Action: Committee Approval: Yes No Council Approval: Yes NoCall for Public Hearing___/___/____ Referred to _________________________________ Until ____/___/____ Tabled ______________________________________ Until___/___/____ Councilmember:Staff: Wagner Dowdy Meeting Date:Item Number: : July 20, 2009 BUDGET STATUS SHEET Project No: CP0904Project Title: 2009 Citywide Sidewalk Improvements Project Manager: Seth Wickstrom Project Initiation Permission to Advertise Initiation Date: _February 2, 2009_______ Date: July 10, 2009 Contract Award Advertisement Date: ________________ Change Order Approval Award Date: ______________________ Contract Final Acceptance The "Future Years" column indicates the projected amount to be requested in future budgets. Funds Budgeted (Funds Available) Prior YearsFuture Years Funding2009Total 328 Fund - Capital Improvement Fund 175,000175,000 328 Fund - Capital Improvement Fund 10,70010,700 (carry-forward from 2008) 103 Fund - Local Street Fund 45,00045,000 (for wheelchair ramps replacements) Total0230,7000230,700 Estimated Cost (Funds Needed) Prior YearsFuture Years Activity2007Total Design Engineering - City Costs*1,0001,000 Construction Estimate207,909207,909 Project Contingency (10%)20,79120,791 Construction Engineering - City Costs*1,0001,000 Total0230,7000230,700 *City staff costs will be charged against the Engineering Budget and not the Project Budget, and are not shown here. 328 Capital Improvement Budget Status Prior YearsFuture Years 2007Total **328 Funds Budgeted ( )0(185,700)0(185,700) 328 Funds Needed0185,7000185,700 0000 **328 Fund Project Contingency ( ) 0000 328 Funds Required 103 Local Street Budget Status Prior YearsFuture Years 2007Total **103 Funds Budgeted ( )0(45,000)0(45,000) 103 Funds Needed045,000045,000 0000 **103 Fund Project Contingency ( ) 0000 103 Funds Required ** ( # ) in the Budget Status Sections indicates Money the City has available. W0720-2A1 of 1 å   ú