HomeMy WebLinkAbout08-03-2009 ITEM V-C-3elo CITY OF AGENDA BILL APPROVAL FORM WASHINGTON Agenda Subject: Change order No. 4 to Contract 05-17 Date: July 27, 2009 Department: Attachments: Budget Impact: Public Works Budget Status Sheet & Ma $ 0.00 Administrative Recommendation: City Council approve Change order No. 4 in the amount of $135,938 to Contract 05-17 with Interwest Development for work on project C504A, R Street SE Utility Improvements. Background Summary: The purpose of this project is to construct utility improvements including pavement restoration aiong 21 St Street SE, R Street SE, M Street SE, 0 Court SE, and 17th Street SE. Previously, Change order 3 was approved to construct storm drainage improvements on K Street SE (18 thSt SE to 17 thSt SE), on 17 thSt SE (K Street SE to M Street SE) and on M St SE (17th St SE to Auburn Way South). Change order 4 will modify Change order 3 by installing a larger diameter pipe on 17th St SE and changing the point of connection with the existing storm system on Auburn Way S from the southwest corner of M Street SE/Auburn Way S intersection to the southeast corner of Auburn Way South/17th St SE intersection (including crossing Auburn Way South). These storm modifications have been designed consistent with the draft 2009 Storm Drainage Comprehensive Plan and are part of the strategy to alleviate flooding issues on Auburn Way South at SR -18. Flooding should be decreased by diverting storms flows in this area from the Auburn Way South storm main to the 21St Street Regional Retention Facility. Construction for the overall project began in March 2009 and based on the Contractor's performance to date, is anticipated to be complete in September 2009, including the added Change order work. 04.5.3 C504A W0803-8 Reviewed by Council & Committees: Reviewed by Departments & Divisions: ❑ Arts Commission COUNCIL COMMITTEES: ❑ Building ❑ M&O ❑ Airport ❑ Finance ❑ Cemetery ❑ Mayor ❑ Hearing Examiner ❑ Municipal Serv. ❑ Finance ❑ Parks ❑ Human Services ❑ Planning & CD ❑ Fire ❑ Planning ❑ Park Board ®Public Works ❑ Legal ❑ Police ❑ Planning Comm. ❑ other ® Public Works ❑ Human Resources Action: Committee Approval: ❑Yes ❑No Council Approval: ❑Yes []No Call for Public Hearing 1 1 Referred to Until 1 1 Tabled Until 1 1 Councilmember: Wagner Staff: Dowd Meeting Date: August 3, 2009 Item Number: V.C.3 AUBURN.* MOM THAN YOU IMAGINED BUDGET STATUS SHEET Project No: C604A Project Title: R Street SE Utility Improvements Project Manager: Robert Lee 0 Project Initiation Initiation Date: May 12005 0 Permision to Advertise Date: August 3, 2009 Advertisement Date: November 18, 2008 ^ 0 Contract Award Award Date: - January 20, 2009 _ Change Order #4 Approval 0 Contract Final Acceptance The "Future Years" column indicates the projected amount to be requested in future budgets. Funds Budaeted (Funds Available) Funding Prior Years 2008 2009 Future Years Total 328 Fund - Sidewalk Improvement 0 0 25,000 0 25,000 430 Fund - Water Utility Fund 9,082 38,898 680,000 0 727,981, 431 Fund - Sanitiary Sewer Fund 15,291 53,318 1,339,959 0 1,448,568 431 Fund - Muckleshoot Sewer Grant 0 ❑ 1,602,500 0 1,602, 500 432 Fund - Storm Utility Fund 58,385 74,736 1,633,864 0 1,766,985 105 Fund - Arterial Street Preservation 0 0 11,748 0 11,748 Total 1 82,7581 166,952 1 5,293,072 1 0 5,542,782 t irnatea t;osL 1runas neeaea Activity Prior Years 2008 2009 Future Years Total Design Engineering - City Costs 83,821 133,829 0 0 217,650 Design Engineering - Consultant Costs (1,063) 33,123 0 0 32,060 Construction Contract Bid 0 0 2,597,232.07 ❑ 2,597,232 Change Order #1 0 0 0 0 0 Change Order#2 0 0 11,748 0 11,748 Change Order #3 0 0 220,231 0 220,231 Change Order #4 0 0 136,938 0 136,938 Authorizied Contingency (10%) 0 0 259,723 0 259,723 Construction Engineering - City Costs 0 0 170,000 0 170,000 Construction Engineering - Consultant Costs 0 0 20,000 ❑ 20,000 Total 82,758 166,952 3,415,872 0 3,665,582 328 Budget Status (Sidewalk Imp.) 430 Water Budaet Status Prior Years 2008 2009 Future Years Total *328 Funds Budgeted [ } 0 ❑ (25,000) 0 (25,000) 328 Funds Needed 0 0 25,000 0 25,000. *328 Fund Pro ect Contingency [) 0 0 0 0 0 328 Funds Required 0 0 0 0 0 430 Water Budaet Status 431 Sewer Budget Status Prior Years 2008 2009 Future Years Total *430 Funds Budgeted } (9,082) (38,898) (680.000) ❑ (727,981) 430 Funds Needed 9,082 38,750 543,952 0 591,784 *430 Fund Project Contingency(0)( 0 148 136,048 136,196 430 Funds Required.7 0 0 0 1 0 1 D 431 Sewer Budget Status 432 Storm Budget Status Prior Years 2008 2009 Future Years Total *431 Funds Budgeted () (15,291) (53,318) (2,942,459 0 (3,011,068) 431 Funds Needed 15,291 53,318 1,395,319 0 1,463,927 '431 Fund Pro ect Contingency ) 0 0 11547041) 0 1,547,140 F_ 431 Funds Required 0 0 0 0 0 432 Storm Budget Status 105 Arterial Street Preservation Budget Status Prior Years 2008 2009 Future Years Total *432 Funds Budgeted (} (58,385) (74,736) 1,633,864) 0 (11,766,985) 432 Funds Needed 58,385 74,736 1,414,853 0 1,547,974 *432 Fund Pro ect Contingency (j 0 0 219,011 0 219,011 432 Funds Required 0 0 1 D 0 0 105 Arterial Street Preservation Budget Status W110803 -8A * ( # ) in the Budget Status Sections indicates Money the City has available. 1 Of 1 Prior Years 2008 2009 Future Years Total *105 Funds Budgeted (} 0 0 (11,748) 0 (11,748) 105 Funds Needed ❑ 0 11,748 0 11,748 *106 Fund Project Contingency 0 0 0 0 0 105 Funds Required 0 0 0 0 0 W110803 -8A * ( # ) in the Budget Status Sections indicates Money the City has available. 1 Of 1 CITYOF - R STREET SE UTILITY s IMPROVEMENTSWASHINGTON N CHANGE ORDER 4 LIMITS NOT To SCALE W0803 -BB PUBLIC WORKS DEPARTMENT JULY, 2009