AGENDA BILL APPROVAL FORM
Agenda Subject:
Date: October 26, 2009
Award Contract 09-08
Department:
Attachments: Budget Status Sheet,
Budget Impact:
Pubiic Works
Bid Tab Summa & Ma
$0
Administrative Recommendation: City Council award Contract 09-08, Project Number CP0904, 2009
Cit ide Sidewalk Re air Project, to Giobal Contractors, LLC on their low bid of $135,409.95.
Background Summary:
The purpose of this project is to repair damaged sidewalks on approximately 3.6 miles of streets
throughout the City with an emphasis on fixing potential tripping hazards. This wiil mainly be
accomplished by removing and replacing damaged concrete sidewalk panels. Sidewalks located in the
grey area (with a black outline) shown on the attached map wiil be comprehensively repaired as part of
this project. Sidewalks located in the white area (with a grey outline) shown on the attached map will be
added to the project as the budget allows. These project areas were selected based on the severity of
the sidewalks, citizen complaints, and coordination with past SOS street improvements.
Construction of this project is anticipated to begin December 2009 and be complete in spring 2010.
Tree roots that are damaging the sidewalk will be pruned. Trees will only be removed if root pruning
would be insufficient to properly fix the sidewalk (if the tree is located too close to the sidewalk for
example). All tree removals will be coordinated with the adjacent property owner.
This project will also install ADA compliant wheelchair ramps on certain streets that were repaired by this
year's Save Our Street Program; as required by the Americans with Disabilities Act. The specific ramp
replacement locations are shown on the attached map. These ramp replacements will be funded by the
103 (Local Street) fund.
$210,700 is budgeted in the 328 Fund for sidewalk improvements in 2009. Approximately $3,000 of this
budget was spent on sidewalk repairs as part of the R Street SE Utility Improvement Project (Project
C504A). The remaining $207,700 will fund this project. Currently, a project budget contingency of
$89,208 remains in the 328 fund. Staff anticipates utilizing this contingency to make additional sidewalk
repairs in the `optional project areas' shown on the attached map.
Approximately $45,000 from the 103 (Local Street) Fund will be utilized for wheelchair ramp
replacements.
W 1102-3
04.12.1 CP0904
Reviewed by Council & Committees:
Reviewed by Departments & Divisions:
❑ Arts Commission COUNCIL COMMITfEES:
❑ Building ❑ M&O
❑ Airport ❑ Finance
❑ Cemetery ❑ Mayor
❑ Hearing Examiner ❑ Municipal Serv.
❑ Finance ❑ Parks
❑ Human Services ❑ Planning & CD
❑ Fire ❑ Planning
❑ Park Board SPublic Works
❑ Planning Comm. ❑ Other
❑ Legal ❑ Police
0 Public Works ❑ Human Resources
Action:
Committee Approval: ❑Yes ❑No
Council Approval: ❑Yes ❑No Call for Public Hearing
Referred to Until
Tabled Until
Councilmember: Wa ner
Staff: Dowd
Meetinq Date: November 2, 2009 _
Item Number: V.C.1
AUBUR.N * M0RE THAN YOU IMAGINED
BUDGET STATUS SHEET
Project No: CP0904 Project Titie: 2009 Citywide Sidewalk Improvements
Project Manager: Seth Wickstrom
Initiation Date: February 2, 2009
Advertisement Date: Seatember 24, 2009
Award Date:
0 Project Initiation
0 Permission to Advertise Date: October 26, 2009
* Contract Award
0 Change Order Approval
0 Contract Final Acceptance
The "Future Years" column indicates the projected amount to be requested in future budgets.
Funds Budcteted (Funds Available)
Funding
Prior Years
2009
2010
Future Years
Total
328 Fund - Capital Improvement Fund
175,000
175,000
328 Fund - Capital Improvement Fund
10,700
10,700
(carry-forward from 2008)
-
- - - -
328 Fund - Capital Improvement Fund
-
(remaining balance from Project C504A -
22,000
22,000
R St SE Utility Improvement Project)
103 Fund - local Street Fund
45,000
45,000
(for wheelchair ramps replacements)
Total
0
252,700
0
0
252,700
Estimated Cost Funds Needed
Activity
Prior Years
2009
2010
Future Years
Total
Design Engineering - City Costs'
500
500
Construction Estimate
13,541
121,869
135,410
Project Contingency (20%)
27,082
27,082
Construction Engineering - City Costs*
500
500
Total
0
14,041
149,451
0
163,492
'City staff costs are charged against the Engineering Budget and not the Project Budget, and are not shown here.
328 Canital Imnrovement Budqet Status
Prior Years
2009
2010
Future Years
Total
*'328 Funds Budgeted
0
(207,700)
0
0
(207,700)
328 Funds Needed
0
14,041
104,451
0
118,492
**328 Fund Project Contingency
0
193,659
0
0
89,208
328 Funds Required
0
0
104,451
0
0
103 Local Street Budget Status
Prior Years
2009
2010
Future Years
Total
"*103 Funds Budgeted
0
(45,000)
0
0
(45,000)
103 Funds Needed
0
45,000
0
45,000
**103 Fund Project Contingency
0
45,000
0
0
0
103 Funds Required
0
0
45,000
0
0
in the Budget Status Sections indicates Money the City has available.
W 1102-3A 1 of 1
~
~
02
F-- ~
~
J fn
~
~
Fa- Fa-
Q Q
m Q
m
O
O O
M ~
f0
9)
CD V
Q.
M M
~
~A O
O LC)
W)
601
~
d'
~
1~ N
~
Go
O
O)
O
r
V
i
O
=3
ap LO
0
~
Q
c~o
v
d
0
'p
m
M
e- ~
i
(L
V
L
m
iR EA
a
a~
~
Y
~
3
(D
.a
O N LO
O 0) O
N
N 4 L6
V
co m W)
00 N tl~
0
•3
N- ~ N
e
J
V
N ~
J 2
V
~ o
Q L
IA EA E9,
~
O
7
N
F;
N
~ C
~
~
Zf-
~(q
~
Q
D Z
o
ujg0
~s a
U°
Q p Q
o~
U
~ m p
U Z
y U W
~
~
WQ~
~
u~
y
-
m~
m
W W ~
o
w
132
~
m c
.O Q
w U)
U
0
wQm
~ n
aam
d
~
~
C1 O O O O O O O
~ O O O O O O O
~ O ~ ~ O ~A O
Q- M N 00 00 O~ 01 ~
Q O I~ ~O 00 Qf ~ e-
<D N ~ N N N t0
= N N N N N N N
K
l0
H
441~ 69fR696q Vi V%
0
m 6
U
V
O
C ~
O V
C C
V ~
cu N
L E C y
o,~,~, coCj ~
cA ~ ~ ,.r ~ c
~ C m ~ U +O
V
Q ~ ~
~ ~ Q C Vl 'a-U-+
~ -j
a Q U3: U
d
~
~
~
Q N O O~ ~ O O O O O O O O O O O Y~ M O O ~ O O
Q Q> 111 O 00 M OLIY O O O OIO O 1, OR O O O O O O O
Q Q1 M et ~ ef O t~ M O~f O~~~ I~ ~ff ~ O~~1 ~0
O t0 N M Q<D O~O Q1 N<D 1~ f~ N N 1~ M C1 t" O ~ (C U)
~ ~ N ~ Q> 00 O f ~ 1~ M~- OtC ~ d- - M e- 00 00 et
C ~ O N I~ 1~ O - ~ tG C~ 1"~ M N M Q1 ~ O ~ ~ M ~ O ~
M~ er ~ er 1p ~f! e0 (O c0 t- f- 1- 00 0) C~ 01 G) Q~ N N
~ N N
F
C
m ER 449. fA 44 69 fR 64 iJ} V), fA 44 fA 69 tA 41? Vi 41). 444 44) 69 69 !f? iA
a C:
t1 ~
o O
• >
m O O ~ U
m ~ U ~ U ~ Z
J ` J C C N ~ ~ C C
r.+ C
J O O E C cm C C ~ O C C
C ~ c C0 U Y U~.0 a Y O O E U~o~j
L O N N N L O`~ 0 0 V V ~
V U C Q- `(~p U
o Q c~o i f n ( n ~ 0 ~ ~ , rn ~ ~ N ~ c`o ~ c
U N N U C O~
a > j W U W U ~ o c~ o U ~ y ~ V V~ otS a>
V ots E rn ~ o a U ~ V~ 00 c~ o aNi ~ a V
c~ L j c ~.rn .0 c~ 3 c . ~ U ~ v ~o N
T M ~
~ ~ ~ W •V ~ Q~ ~ ~ ~ O L W0 a~ a~ 0 co V w ~ 0 v, o$ ~ cu a) ~ Q~- ~ o 0~ co
UZ=a~wF-acnQw cl) 2 Y02 U) w ZCn0 a
YC
H
~
Q o
~
~ o
CN U
~
~ y
C) PQ
O ~ M
N ! i
N
M ~ 0
~
o
~r
BL
a
41h ST
h 9T NE
VETERANS
v
FULMER
FIELD
8°NE
MEMORlAL
6tn 9T NE 8T NE
5th
W
z
t
ST NE
ARK A
VE PARK x
W
P
F
~
ST
W
z
W
z
Z
NE
d
4th
AUBURN
~
NE
~
E..
~
3r
E
F
HlCH m
w
z
m
zn
2nd ST
N
x
~
,S'C[-[OO[, -
Ist
8T
NE
z
lst S N
EAS
S
W
U1
w
V1
W U]
~
Vwl
~
~
E
~
o
2R
F, F
, F
F,
E
F.
z
~
m
vi u
i m
v~
~
3r
Q
"
CROS
W
SE
x
a
S 4th
ST
~
BUR NOTON w ~ORTHER_N
er eNr
L 6th ST
W
~
sth g ARX
E-
F
m
7th M ST
~
7th
SE
gth ST
SE x
~
8th
5T SE
F
" 9th ~
w
E-
SE LES
stnm
GOVE
loth
h
PARK °1
SE
~''i a
llth
q
W
~
12th
ST SE
13TH
SE
m
1
4th
m
15th
SE
x
16th
SE
~
F
~
1
7th
ST
5E
w
m
4th
ST
z
z
E
~w
T
E
UBURN
E- 3rd ST NE
~
E-
~
~
z 3r
E..•
m
HIGH
W
z
U)
2n
~ 2nd
ST
NE
x,
>
~
N
SCHOOL,
ist s~
NE
z
Q
lst ST
IT~z
mZ
EAS
s
w
W
U)
W W W
Z/1 L!) U)
W
L/1
~
U)
E-
2n
O
2nd
~
ST
W
~
U]
>
~
r~n ~ ~
3 d
Q
CROSS
Q
W
C-~ -
'
SE
4th
ST
~
HURLINGTON
W NORTHERN
, = RAMP REPLACEMENT LOCATION
c rL
` V
ai
18th S
gq
~
~ da
6~
W
~
Y
19th
S
SE
P
vi
W
~
21et
x
F
SE 20th
E- _ 20TF[
T
; ~
S
MUCKGE
{
E ~
219t
~
~
°
0
UTFj
AT
CASI`V 0
~
CEDAR DR 9E X
'~'~RCI S'C SE
~
23rd ST SE
22nd
&I W
6T 0~
23
23rd ST SE
RA
0 rd m
23
5T gE
~
zun y5,
24th ST
24th ST SE
~
SE
25th
ST
5E
25th ST SE
d
F
m
CEDAR
d' p y 28
TH 9T 9E
F
T SE
LANESzscn
S
T s
e
PS '
7h
ST SE
znn
5 P
sc
r
t7u sr
d
s~.
G~ P py y0
28th
ST SE
28th ST
~
~
*s
e
sF
°
q ~
CITY
29th
ST
S
G
-
G
R`oCE
~
30thF gT yE
FL UB URIV
3`.`
aE
~
CAME
~
31et 5T E
FARM
¢
32n SE
33
m
1
~s
STUCK
SHAUCNN6SSY z~ ~
PAR
m rn M
I1Q J5N si SE ,a.. Ci sE F ~ ~ ~ f~ rt~(~P,/F ~ 0.
~
o
~jm 37th ST SE
i1
D PL 9E
2009 Citywide Sidewalk Repair Project
Q PROJECT AREA: Sidewalks in these ED OPTIONAL PR07ECT AREA: Sidewalks
areas will be repaired as part of this in these areas will be repaired as part of o 'sso, 1,700-
project. this project as the budget allows.
Scale: 1" = 1,700'
W1102-3C
prl'rteG On: I0/13/3W9 locatlm: H:\PkO]\~9G9 2009 Cltywlde 9tlewalk Repalr Project\7NCCwr~InPoWwartl (TNC 11-2-09hpiaPMy