HomeMy WebLinkAbout4544
RESOLUTION NO. 4 5 4 4
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AUBURN, WASHINGTON, APPROVING THE 2010-2015
TRANSPORTATION IMPROVEMENT PROGRAM OF THE CITY
OF AUBURN PURSUANT TO CHAPTER 35.77 OF THE REVISED
CODE OF WASHINGTON (RCW)
WHEREAS, Section 35.77.010 of the Revised Code of Washington (RCW)
requires that the legislative body of each City prepare and adopt a comprehensive
Transportation Improvement Program (TIP) for the ensuing six years, but only after
conducting a public hearing; and
WHEREAS, a public hearing to review the 2010-2015 Transportation
Improvement Program for the City of Auburn was held on December 7, 2009 at the hour
of 7:30 p.m. in the Council Chambers of the Auburn City Hall, pursuant to notice
published in the legal newspaper of the City of Auburn on November 19, 2009; and
WHEREAS, said amendment to the 2010-2015 Transportation Improvement Plan
of the City of Auburn was approved by the City Council by motion duly made and
carried in said hearing.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, HEREBY RESOLVES as follows:
Section 1. There is attached hereto and denominated as Exhibit "A," the terms
of which are incorporated herewith by reference as though fully set forth, a designation
of the streets within the corporate limits of the City of Auburn to be improved in the
manner therein set forth during the year set for the improvement of such street or
streets.
Section 2. That the City Engineer of the City of Auburn is hereby directed to
forward a certified copy of this Resolution to the Washington State Department of
Transportation for filing not more than thirty (30) days after the adoption of this
Resolution.
Resolution No. 4544
December 2, 2009
Page 1
Section 3. That the Mayor is hereby authorized to implement such
administrative procedures as may be necessary to carry out the directions of this
legislation.
Section 4. That this Resolution shall take effect and be in full force upon
passage and signatures hereon.
e
DATED this '~day of December,
CI F R
i~
PETER B. LEWIS
MAYOR
ATTEST:
Da i Ile E. Daskam,
City Clerk
APP VD~A TO FO M:
~
an . id,
~it Attorney
Resolution No. 4544
December 2, 2009
Page 2
Transportation
Improvement Program
2010-2015
Department of Public Works
Transportation Section
Approved December 2009
City of Auburn Transportation Improvement Program
,AUBURN
T U
00 Transportation Improvement
Program
2010-2015
Approved by Auburn City Council
December 2009
City of Auburn
25 West Main Street
Auburn, WA 98001
(253)-931-3010
www.auburnwa.gov
City of Auburn Transportation Improvement Program
Cover Photos: Top Left: Rendering of M St SE Grade Separation, Top Right: Terrace Drive NW
Bike Lanes Re-channelization project, Bottom: ITS Traffic Management Center at City Hall.
11
~ , , 4L-V.L, 1. U IMAGINtV
City of Auburn Transportation Improvement Program
RESOLUTION NO. 4 5 4 4
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AUBURN. WASHINGTON, APPROVING THE 2010-2015
TRANSPORTATION IMPROVEMENT PROGRAM OF THE CITY
OF AUBURN PURSUANT TO CHAPTER 35,77 OF THE REVISED
CODE OF WASHINGTON (RCVV)
WHEREAS. Section 35,77.010 of the Devised Code of Washington (RCW)
requires that the legislative body of each City prepare and adopt a comprehensive
Transportation Improvement Program (TIP) for the ensuing six years, but only after
conducting a public hearing; and
WHEREAS, a public hearing to review the 2410-2015 Transportation
Improvement Program for the City of Auburn was held on December 2049 at the hour
of 7:30 p.m. in the Council Chambers of the Auburn City Hall. pursuant to notice
published in the legal newspaper of the City of Auburn on November 19, 2009; and
WHEREAS, said amendment to the 2010-2015 Transportation? Improvement Plan
of the City of Auburn was approved by the City Council by motion duly made and
carried in said hearing,
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON. HEREBY RESOLVES as follows:
Section 11_ There is attached hereto and denominated as Exhibit "A," the terms
of which are incorporated herewith by reference as though fully set forth, a designation
of the streets within the corporate limits of the City of Auburn to be improved in the
manner therein set forth during the year set for the improvement of such strut or
streets.
Section 2. That the City Engineer of the City of Auburn is hereby directed to
forward a certified Dopy of this Resolution to the Washington State Department of
Transportation for filing not more than thirty (30) days after the adoption of this
Resolution.
Resolution No. 4544
December 2, 2009
Page 1
Resolution 4544 iii
City of Auburn Transportation Improvement Program
Sectlon 3. That the Mayor is hereby authorized to implement such
a idmiriislrative procedures as may be nei esssry to carry out the directions of this
legislation.
Section 4. That this Resolution shall take effect and be in full farce upon
passage and signatures hereon.
ri
DATED this °day of December,
Ck F
PETER B. LEWI
MAYOR
ATTEST:
Dai ir;lle E_ Daskarn,
City Cleric
Resolution No. 4544
[December 2. 2009
Page 2
iv Resolution 4544
City of Auburn Transportation Improvement Program
Transportation Improvement Program
2010-2015
Table of Contents
Executive Summary 1
Introduction 1
Projects & Financing Plan Summary
3
Transportation Fund Balances
11
Roadway Improvement Projects
A Street NW, Phase 1
13
Auburn Way Corridor Imp
14
I Street NE Corridor
15
M Street Grade Separation
16
South 277th Street
17
15th Street SW Reconstruction
18
A Street NW, Phase 2
19
D Street NW
20
F Street SE
21
M Street NE
22
BNSF Railyard Grade Crossing
23
West Valley Highway Imp
24
8th Street NE Widening
25
49th Street NE
26
124th Ave SE Corridor Imp. Phase 1
27
124th Ave SE Corridor Imp. Phase 2
28
124th Ave SE Corridor Imp. Phase 3
29
SE 320th Street Corridor Imp
30
Downtown Promenade Imp
31
Intersection Improvement Projects
Harvey Rd. & 8th Street NE Imp
33
8th Street NE & R Street NE
34
Auburn Way North & 1 st Street NE
35
Auburn Way South & M Street SE
36
C Street NW & West Main Street
37
F Street SE & 4th Street SE
38
Railroad Crossing Imp
39
Auburn Way South & Riverwalk Dr SE
40
Intelligent Transportation System (ITS) Projects
Citywide ITS Phase 2
41
Auburn South ITS Expansion
42
ITS Dynamic Message Signs
43
East Valley HWY ITS Expansion
44
v
City of Auburn Transportation Improvement Program
Transportation Improvement Program
2010-2015
Table of Contents (cont.)
Non-Motorized Improvement Projects
Skinner Road/ 3rd Avenue Trail 45
BNSF/ East Valley HWY Ped. Underpass 46
Academy Drive Class 1 Trail 47
A St NE Ped. Imp 48
Interurban Trailhead Imp 49
37th Street SE & R St SE Ped Connector 50
Studies and Miscellaneous Projects
Metro Shuttles
51
41 st Street SE & A St SE Access Study
52
104th Ave SE & Green River Rd Study
53
Environmental Park Study
54
Downtown to Les Gove Non-Motorized Study
55
S 316th Bike and Ped Study
56
Kersey Way SE Study
57
Mary Olson Farm Imp
58
Auburn Transit Station Parking Garage
59
Level of Effort Projects
Annual Bridge Maintenance Project
61
South 277th Wetland Mitigation
62
Citywide Pedestrian Crossing Program
63
Citywide Roadway Safety Imp
64
Citywide Sidewalk Imp
65
Traffic Calming Imp
66
Traffic Signal Imp
67
Pavement Preservation Projects
Annual Arterial Street Preservation 69
Annual Arterial Crackseal Program 70
Local Street Imp. Program (SOS) 71
Project Summary Spreadsheet ........................................................................Appendix A
City Wide Transportation Project Map .............................................................Appendix B
vi
City of Auburn Transportation Improvement Program
Executive Summary
The Transportation Improvement Program (TIP) is a 6-year plan (2010-2015) for transportation
improvements that supports the City of Auburns current and future growth. The TIP along with the
Comprehensive Transportation plan serve as source documents for the City of Auburn Capital Facilities
Plan which is a Comprehensive Plan element required by Washington's Growth Management Act. The
program may be revised at any time by a majority of the City Council after a public hearing. The 2010-
2015 TIP recognizes approximately $146 million worth of transportation improvements (including Non-
Motorized and pavement preservation) over the next six years.
Introduction
pTTUpncF.
The purpose of the TIP is to identify priority transportation projects and assure that the city has
advanced plans as a guide in carrying out a coordinated transportation program. There are always more
projects than available revenues. Therefore, a primary objective of the TIP is to integrate the two to
produce a comprehensive, realistic program for the orderly development and maintenance of our street
system. Projects are required to be included in the TIP in order to be eligible for state and federal grants.
Grant funding for projects listed may not yet be secured.
STATUTORY REQUIREMENTS
Six Year Transportation Improvement Program - RCW 35.77.010 requires that each city prepare and
adopt a comprehensive transportation improvement program for the ensuing six calendar years
consistent with its Comprehensive Transportation Plan. This six-year Transportation Improvement
Program (TIP) shall be filed with the Secretary of the Washington State Department of Transportation
(WSDOT) each year within 30 days of adoption.
Projects ofRegional Significance - RCW 35.77.010 also requires each city to specifically set forth those
projects and programs of regional significance for inclusion in the transportation improvement program
for that region. The 2010-2015 TIP includes 6 projects of regional significance:
• Citywide ITS, Phase 2, TIP #2
• M Street Grade Separation, TIP #5
• S277 th St Widening, TIP #6
• Auburn South ITS Expansion, TIP #13
• ITS Dynamic Message Signs, TIP #50
• East Valley Highway ITS Expansion, TIP #51
Executive Summary & Introduction 1
City of Auburn Transportation Improvement Program
METHODOLOGY
Annual updates of the TIP begins with developing a revenue forecast to provide a reasonable estimate of
funding available to accomplish the transportation improvement needs. Since the desire to construct
transportation improvements typically exceeds the available forecast revenue, it is necessary to establish
some method of prioritizing the needs.
Transportation needs are identified by examining the latest information concerning safety and accident
history, growth trends, traffic studies and the City's adopted Comprehensive Transportation Plan. The
likelihood of receiving federal or state grants for various improvements, community interests and values
are also considered. All of these factors yield a prioritized list of transportation improvements.
Detailed project costs and funding sources are identified and provided for each project listed in the
proposed TIP. The prioritized list is then financially constrained in the first three years to reflect the
financial projections to yield the six-year Transportation Improvement Program. After completing all
reviews and compiling the document staff makes final recommendations to the Public Works Committee
and City Council for approval.
2 Executive Summary & Introduction
City of Auburn Transportation Improvement Program
Projects &
Financing
Plan
Summary
2010
2011
2012
2013
2014 2015
Total
TIP# Roadway Improvement Protects
1
'A' Street NW, Phase 1
Capital Costs 3,909,500
4,050,000
7,959,500
Funding Sources:
Unrestricted Street Revenue -
-
-
Grants 3,729,500
4,050,000
7,779,500
Traffic Impact Fees 180,000
-
180,000
Other (Developer) -
-
-
-
3
Auburn Way Corridor Imp.
Capital Costs
818,700
3,000,000
3,818,700
Funding Sources:
Unrestricted Street Revenue
110,000
600,000
710,000
Grants
708,700
2,400,000
3,108,700
Other
-
-
4
'I' Street NE Corridor
Capital Costs 5,000
5,000
460,000
1,020,000
4,280,000
5,770,000
Funding Sources:
Unrestricted Street Revenue -
-
-
-
-
-
Grants -
-
-
Traffic Impact Fees 5,000
5,000
-
-
-
10,000
Other (Developer) -
-
460,000
1,020,000
4,280,000
5,760,000
5
'M' Street Grade Separation
Capital Costs 5,561,800
7,627,000
7,823,000
-
-
21,011,800
Funding Sources:
Unrestricted Street Revenue 150,000
-
-
150,000
Grants 4,622,800
6,627,000
4,148,400
15,398,200
Traffic Impact Fees 789,000
1,000,000
1,161,400
2,950,400
Other (OtherAgencies) -
-
2,513,200
-
-
2,513,200
6
South 277th -Auburn Way North to Green River
Bridge
Capital Costs
-
325,000
2,725,000
3,050,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
Grants
-
1,362,500
1,362,500
Traffic Impact Fees
100,000
-
100,000
Other (Developer)
225,000
1,362,500
1,587,500
7
15th St SW Reconstruction
Capital Costs
375,000
3,000,000
-
3,375,000
Funding Sources:
Unrestricted Street Revenue
75,000
500,000
575,000
Grants
300,000
2,500,000
2,800,000
Other
-
-
-
8
'A' Street NW, Phase 2
Capital Costs 100,000
1,200,000
1,250,000
2,550,000
Funding Sources:
Unrestricted Street Revenue -
-
-
-
Grants -
1,038,000
1,081,300
2,119,300
Traffic Impact Fees 100,000
162,000
168,700
430,700
Other -
-
-
- -
-
9
'D' Street NW, 37th to 44th ($6 Million beyond 2
015)
Capital Costs
200,000 200,000
400,000
Funding Sources:
Unrestricted Street Revenue
- -
-
Grants
160,000 160,000
320,000
Traffic Impact Fees
40,000 40,000
80,000
Projects & Financing Plan Summary 3
City of Auburn Transportation Improvement Program
2010
2011
2012
2013
2014
2015
Total
TIP# Roadway Improvement Projects (Cont.)
10
'F' Street SE, 4th to AWS
Capital Costs
200,000
1,000,000
1,200,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
Grants
-
780,000
780,000
Traffic Impact Fees -
200,000
220,000
420,000
11
'M' Street NE, E. Main to 4th
Capital Costs 50,000
275,000
1,000,000
1,325,000
Funding Sources:
Unrestricted Street Revenue -
-
-
-
Grants -
225,000
897,500
1,122,500
Traffic Impact Fees 50,000
50,000
102,500
202,500
12
Grade-Separated Crossing of BNSF Railyard ($31 Million beyond 2015)
Capital Costs
-
1,000,000
1,000,000
Funding Sources:
Unrestricted Street Revenue
-
-
Grants
-
-
Other (Developer)
1,000,000
1,000,000
14
West Valley Hwy Improvements (SR-18 to West Mai
n Street)
Capital Costs 320,000
4,535,000
-
4,855,000
Funding Sources:
Unrestricted Street Revenue -
55,000
55,000
Grants 183,000
2,730,000
2,913,000
Other (REET2) 62,000
-
62,000
Traffic Mitigation Fees 75,000
530,000
605,000
Other (Storm Fund 432) -
1,220,000
1,220,000
15
8th Street NE Widening (Pike Street to R Street NE)
Capital Costs
-
450,000
1,000,000
1,450,000
Funding Sources:
Unrestricted Street Revenue
90,000
200,000
290,000
Grants
360,000
800,000
1,160,000
Traffic Impact Fees
-
-
-
-
16
49th Street NE from Auburn Way North to M Street NE
Capital Costs 850,000
1,150,000
2,000,000
Funding Sources:
Unrestricted Street Revenue -
-
-
Grants
Traffic Impact Fees -
-
-
Other (Developer) 850,000
1,150,000
-
2,000,000
39
124th Ave SE Corridor Improvements Phase 1
Capital Costs -
100,000
750,000
850,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
Grants
85,000
650,000
735,000
Traffic Impact Fees
15,000
100,000
-
115,000
40
124th Ave SE Corridor Improvements Phase 2
Capital Costs
-
150,000
1,370,000
1,520,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
Grants
125,000
1,185,000
1,310,000
Traffic Impact Fees
25,000
185,000
-
210,000
41
124th Ave SE Corridor Improvements Phase 3
Capital Costs
-
50,000
450,000
500,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
Grants
43,000
389,500
432,500
Traffic Impact Fees
7,000
60,500
67,500
4 Projects & Financing Plan Summary
City of Auburn Transportation Improvement Program
2010
2011 2012 2013
2014
2015
Total
TIP# Roadway Improvement Projects (Cont.)
42 SE 320th St Corridor Improvements
Capital Costs
60,000
580,000
640,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
Grants
51,500
502,100
553,600
Traffic Impact Fees -
-
8,500
77,900
86,400
52 Downtown Promenade Improvements
Capital Costs 1,000,000
6,985,000
-
-
7,985,000
Funding Sources:
Unrestricted Street Revenue -
-
-
Grants 500,000
2,500,000
3,000,000
Other (GO Bonds) 500,000
4,485,000
4,985,000
Subtotal, Roadway Improvement Projects:
Capital Costs 11,796,300 25,652,000 10,808,000 7,033,700 12,190,000 3,780,000 71,260,000
TIP# Intersection Improvement Projects
17 Harvey Rd. & 8th St. NE Intersection Improvements ($1.2 Million beyond 2015)
Capital Costs 100,000 100,000 100,000 100,000 100,000 100,000
600,000
Funding Sources:
Unrestricted Street Revenue - - - - - -
-
Grants
PWTF - - - - - -
-
Traffic Impact Fees 100,000 100,000 100,000 100,000 100,000 100,000
600,000
18 8th Street NE and R Street NE Traffic Signal
Capital Costs 500,500 - - - - -
500,500
Funding Sources:
Unrestricted Street Revenue 400,500
400,500
Grants 100,000
100,000
Other -
-
19 Auburn Way North / 1st Street NE Signal Improvements
Capital Costs 20,000 580,000 600,000
Funding Sources:
Unrestricted Street Revenue 20,000 130,000 150,000
Grants - 450,000 450,000
Other - -
20 Auburn Way South and M Street SE Intersection Improvements
Capital Costs 100,000 650,000
750,000
Funding Sources:
Unrestricted Street Revenue 100,000 -
100,000
Grants - 520,000
520,000
Traffic Mitigation Fees 130,000 - -
130,000
21 C Street NW and West Main Street
Capital Costs - 100,000 1,000,000
1,100,000
Funding Sources:
Unrestricted Street Revenue 20,000 200,000
220,000
Grants 80,000 800,000
880,000
Other - -
-
25 F St SE and 4th St SE Traffic Signal
Capital Costs 359,700 359,700
Funding Sources:
Unrestricted Street Revenue - -
Grants 359,700 359,700
Other - -
Projects & Financing Plan Summary 5
City of Auburn Transportation Improvement Program
2010 2011
2012
2013
2014
2015
Total
TIP# Intersection Improvement Projects (Cont.)
38 Railroad Crossing Safety Improvements
Capital Costs
150,000
850,000
1,000,000
Funding Sources:
Unrestricted Street Revenue
25,000
110,000
135,000
Grants
125,000
740,000
865,000
Other
-
-
-
-
-
43 Auburn Way South & Riverwalk Intersection Improvements
Capital Costs
150,000
2,250,000
2,400,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
Grants
125,000
1,951,000
2,076,000
Traffic Impact Fees - -
-
-
25,000
299,000
324,000
Subtotal, Intersection Imp. Projects:
Capital Costs 1,080,200 1,330,000
350,000
1,950,000
250,000
2,350,000
7,310,200
TIP# Intelligent Transportation System (ITS) Projects
2 Citywide ITS Phase 2
Capital Costs 35,800 35,800 35,800 35,800 143,200
Funding Sources:
Unrestricted Street Revenue - - - - -
Grants - - - - -
Traffic Mitigation Fees 35,800 35,800 35,800 35,800 143,200
Other - - - - -
13 Auburn South ITS Expansion
Capital Costs 803,400 803,400
Funding Sources:
Unrestricted Street Revenue - -
Grants 693,400 693,400
Traffic Mitigation Fees 110,000 110,000
Other - -
50 ITS Dynamic Message Signs ($660K beyond 2015)
Capital Costs -
220,000
220,000
220,000
660,000
Funding Sources:
Unrestricted Street Revenue
30,000
30,000
30,000
90,000
Grants
190,000
190,000
190,000
570,000
Traffic Mitigation Fees
-
-
-
-
-
51 East Valley Highway ITS Expansion
Capital Costs
800,000
800,000
Funding Sources:
Unrestricted Street Revenue
-
-
Grants
692,000
692,000
Traffic Impact Fees -
-
- -
108,000
-
108,000
Subtotal, ITS Projects:
Capital Costs 839,200
255,800
35,800 255,800
800,000
220,000
2,406,600
6 Projects & Financing Plan Summary
City of Auburn Transportation Improvement Program
2010
2011 2012
2013 2014
2015
Total
TIP# Non-Motorized Improvement Projects
22
Skinner Road to 3rd Avenue (Auburn Pacific Trail
Phase2)
Capital Costs
146,800
146,800
Funding Sources:
Unrestricted Street Revenue
3,600
3,600
Grants
107,000
107,000
Other (City of Pacific)
36,200
-
36,200
23
BNSF/E. Valley Highway Pedestrian Underpass ($5 Million beyond 2015)
Capital Costs
4,800,000
4,800,000
Funding Sources:
Unrestricted Street Revenue
-
-
Grants
4,550,000
4,550,000
Other (KC & Other)
250,000
250,000
24
Academy Drive Multi-Use Trail
Capital Costs
10,000
150,000 425,000
425,000
1,010,000
Funding Sources:
Unrestricted Street Revenue
10,000
150,000 42,500
42,500
245,000
Grants
-
- 382,500
382,500
765,000
Other
-
-
-
-
44
A ST NE Pedestrian Improvements
Capital Costs
150,000
150,000
Funding Sources:
Unrestricted Street Revenue
-
-
Grants
150,000
150,000
Traffic Impact Fees
-
-
45
Interurban Trailhead Improvements
Capital Costs
210,000
210,000
Funding Sources:
Unrestricted Street Revenue
-
-
Grants
185,000
185,000
Traffic Mitigation Fees
-
25,000
25,000
53
37th St Se & R St SE Pedestrian Connector
Capital Costs
110,700
-
110,700
Funding Sources:
Unrestricted Street Revenue
-
-
Grants
110,700
110,700
Traffic Impact Fees
-
-
Subtotal, Non-Motorized Projects:
Capital Costs 257,500 360,000 10,000 150,000 425,000 5,225,000 6,427,500
Projects & Financing Plan Summary 7
City of Auburn Transportation Improvement Program
2010 2011 2012 2013 2014 2015
Total
TIP# Studies and Miscellaneous Projects
26 METRO Shuttle: Auburn Community and Lakeland Shuttles
Capital Costs 240,000 220,000 220,000 220,000 220,000 220,000
1,340,000
Funding Sources:
Unrestricted Street Revenue 240,000 - - - - -
240,000
Grants - 220,000 220,000 220,000 220,000 220,000
1,100,000
Other - - - - -
-
27 41st Street SE and A Street SE Access Management Study
Capital Costs 10,000
10,000
Funding Sources:
Unrestricted Street Revenue 10,000
10,000
Grants -
-
Other
46
104th Ave SE & Green River Road Study
Capital Costs 5,000
5,000
Funding Sources:
Unrestricted Street Revenue 5,000
5,000
Grants -
-
Traffic Mitigation Fees
-
47
Environmental Park Roadway Improvements Study
Capital Costs 5,000
5,000
Funding Sources:
Unrestricted Street Revenue 5,000
5,000
Grants -
-
Traffic Impact Fees
-
48
Downtown to Les Gove Non-Motorized Improvements Study
Capital Costs 10,000
10,000
Funding Sources:
Unrestricted Street Revenue 10,000
10,000
Grants -
-
Traffic Impact Fees
-
49
S 316th St Bicycle & Pedestrian Improvement Study
Capital Costs 5,000
5,000
Funding Sources:
Unrestricted Street Revenue 5,000
5,000
Grants -
-
Traffic Impact Fees -
-
54
Kersey Way Study
Capital Costs 100,000
100,000
Funding Sources:
Unrestricted Street Revenue -
-
Grants -
-
Traffic Impact Fees 100,000
100,000
55
Mary Olson Farm Improvements
Capital Costs 51,400
51,400
Funding Sources:
Unrestricted Street Revenue -
-
Grants 51,400
51,400
Other -
- - -
56
Transit Station Parking Structure
Capital Costs
7,700,000 23,900,000 31,600,000
Funding Sources:
Unrestricted Street Revenue
- - -
Grants
- - -
Other(Sound Transit)
7,700,000 23,900,000 31,600,000
Subtotal, Studies and Misc. Projects:
Capital Costs 426,400 220,000 220,000 220,000 7,920,000 24,120,000 33,126,400
8 Projects & Financing Plan Summary
City of Auburn Transportation Improvement Program
2010 2011 2012 2013 2014 2015 Total
TIP# Level of Effort Protects
28
Annual Bridge Improvement Project
Capital Costs
50,000
50,000
50,000
50,000
50,000
50,000
300,000
Funding Sources:
Unrestricted Street Revenue
50,000
50,000
50,000
50,000
50,000
50,000
300,000
Grants
-
-
-
-
-
-
-
Traffic Impact Fees
-
-
-
-
-
29
So. 277th, Wetland Mitigation
Capital Costs
25,000
25,000
25,000
25,000
100,000
Funding Sources:
Unrestricted Street Revenue
25,000
25,000
25,000
25,000
100,000
Grants
-
-
-
-
-
Other
-
-
-
-
30
Citywide Pedestrian Crossing Program
Capital Costs
100,000
100,000
100,000
300,000
Funding Sources:
Unrestricted Street Revenue
100,000
100,000
100,000
300,000
Grants
-
-
-
-
Other
-
-
-
-
-
-
31
Citywide Arterial Bicycle and Safety Improv.
Capital Costs
100,000
100,000
100,000
100,000
100,000
500,000
Funding Sources:
Unrestricted Street Revenue
100,000
100,000
100,000
100,000
100,000
500,000
Grants
-
-
-
-
-
-
Other
-
-
-
-
-
-
32
Citywide Sidewalk Improvements
Capital Costs
180,000
20,000
180,000
20,000
180,000
580,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
-
-
Grants
Other (REET2 in Fund 328)
-
-
-
-
-
-
-
33
Traffic Calming Improvements
Capital Costs
100,000
200,000
200,000
200,000
200,000
200,000
1,100,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
-
-
-
Grants
-
-
-
-
-
-
-
Other (Redflex in Fund 328)
100,000
200,000
200,000
200,000
200,000
200,000
1,100,000
34
Traffic Signal Improvements
Capital Costs
100,000
-
200,000
-
200,000
-
500,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Grants
-
-
-
-
Other (REET 2 in Fund 328)
100,000
-
200,000
-
200,000
-
500,000
Subtotal, Level of Effort Projects:
Capital Costs
375,000
555,000
695,000
555,000
670,000
530,000
3,380,000
Projects & Financing Plan Summary 9
City of Auburn Transportation Improvement Program
TIP# Pavement Preservation Projects
2010 2011 2012 2013 2014 2015 Total
35 Annual Arterial Street Preservation
Capital Costs
Funding Sources:
Unrestricted Street Revenue
Grants
Arterial Street Fund 105
1,400,000
-
-
1,400,000
1,400,000
-
-
1,400,000
1,400,000
-
-
1,400,000
1,400,000
-
-
1,400,000
1,400,000
-
-
1,400,000
1,400,000
-
-
1,400,000
8,400,000
-
-
8,400,000
36 Annual Arterial Crackseal Program
Capital Costs
100,000
100,000
100,000
100,000
100,000
100,000
600,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
-
-
-
Grants
-
-
-
-
-
-
-
Arterial Street Fund 105
100,000
100,000
100,000
100,000
100,000
100,000
600,000
37 Local Street Preservation Program
SOS
Capital Costs
1,500,000
2,200,000
2,200,000
2,200,000
2,200,000
2,200,000
12,500,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
-
-
-
Grants
-
-
-
-
-
-
-
Local Street Fund 103
1,500,000
2,200,000
2,200,000
2,200,000
2,200,000
2,200,000
12,500,000
Subtotal, Preservation Projects:
Capital Costs 3,000,000 3,700,000 3,700,000 3,700,000 3,700,000 3,700,000 21,500,000
SUMMARY:
CAPITAL COSTS
Roadway Projects
11,796,300
25,652,000
10,808,000
7,033,700
12,190,000
3,780,000
71,260,000
Intersection Projects
1,080,200
1,330,000
350,000
1,950,000
250,000
2,350,000
7,310,200
ITS Projects
839,200
255,800
35,800
255,800
800,000
220,000
2,406,600
NonMotorized Projects
257,500
360,000
10,000
150,000
425,000
5,225,000
6,427,500
Studies and Misc. Imp.
426,400
220,000
220,000
220,000
7,920,000
24,120,000
33,126,400
Level of Effort Projects
375,000
555,000
695,000
555,000
670,000
530,000
3,380,000
Pavement Preservation Proj.
3,000,000
3,700,000
3,700,000
3,700,000
3,700,000
3,700,000
21,500,000
Total Costs
17,774,600
32,072,800
15,818,800
13,864,500
25,955,000
39,925,000
145,410,700
FUNDING SOURCES:
Unrestricted Street Revenue
1,124,100
390,000
405,000
1,365,000
1,092,500
222,500
4,599,100
Traffic Impact Fees
1,324,000
1,282,000
1,555,100
392,000
592,000
839,400
5,984,500
Traffic Mitigation Fees
220,800
720,800
35,800
35,800
-
-
1,013,200
Local Street Fund 103
1,500,000
2,200,000
2,200,000
2,200,000
2,200,000
2,200,000
12,500,000
Arterial Street Fund 105
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
9,000,000
Grants
10,457,500
18,745,000
6,729,700
6,746,700
6,808,000
9,633,100
59,120,000
Other (REET2)
62,000
-
-
-
-
-
62,000
Other (REET2 in Fund 328)
100,000
200,000
200,000
-
500,000
Other (Other Agencies)
36,200
-
2,513,200
7,700,000
24,150,000
34,399,400
Other (Storm Fund 432)
-
1,220,000
-
-
-
1,220,000
Other (Redflex in Fund 328)
100,000
200,000
200,000
200,000
200,000
200,000
1,100,000
Other (Developer)
850,000
1,150,000
460,000
1,245,000
5,642,500
1,000,000
10,347,500
Other (GO Bonds)
500,000
4,485,000
-
-
-
-
4,985,000
Total Funding
17,774,600
31,892,800
15,798,800
13,684,500
25,935,000
39,745,000
144,830,700
10 Projects & Financing Plan Summary
City of Auburn Transportation Improvement Program
Transportation Fund Balances
2010
2011
2012
2013
2014
2015
Unrestricted Street Revenue
Previous Year Fund Balance
1,017,183
373,083
528,083
668,083
(151,917)
(699,417)
Annual Revenue
545,000
545,000
545,000
545,000
545,000
545,000
Project Expenses
1,124,100
390,000
405,000
1,365,000
1,092,500
222,500
Interfund Charges
65,000
65,000
70,000
70,000
75,000
75,000
End of Year Fund Balance
373,083
528,083
668,083
(151,917)
(699,417)
(376,917)
Traffic Impact Fees
Previous Year Fund Balance
1,876,900
1,352,900
870,900
115,800
523,800
731,800
Annual Revenue
800,000
800,000
800,000
800,000
800,000
800,000
Project Expenses
1,324,000
1,282,000
1,555,100
392,000
592,000
839,400
End of Year Fund Balance
1,352,900
870,900
115,800
523,800
731,800
692,400
Traffic Mitigation Fees
Previous Year Fund Balance
1,013,200
792,400
71,600
35,800
-
-
AnnualRevenue
-
-
-
-
-
-
Project Expenses
220,800
720,800
35,800
35,800
-
-
End of Year Fund Balance
792,400
71,600
35,800
-
-
-
Local Street Fund 103
Previous Year Fund Balance
-
-
-
-
-
-
Annual Revenue
1,500,000
2,200,000
2,200,000
2,200,000
2,200,000
2,200,000
Project Expenses
1,500,000
2,200,000
2,200,000
2,200,000
2,200,000
2,200,000
End of Year Fund Balance
-
-
-
-
-
-
Arterial Street Fund 105
Previous Year Fund Balance
-
-
-
-
-
-
Annual Revenue
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
Project Expenses
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
End of Year Fund Balance
-
-
-
-
-
-
Grants
Annual Revenue
10,457,500
18,745,000
6,729,700
6,746,700
6,808,000
9,633,100
Project Expenses
10,457,500
18,745,000
6,729,700
6,746,700
6,808,000
9,633,100
Other (REET2)
-
-
-
-
-
-
Annual Revenue
62,000
-
-
-
-
-
Project Expenses
62,000
-
-
-
-
-
Other (REET2 in Fund 328)
Annual Revenue
100,000
-
200,000
-
200,000
-
Project Expenses
100,000
-
200,000
-
200,000
-
Other (Other Agencies)
Annual Revenue
36,200
-
2,513,200
-
7,700,000
24,150,000
Project Expenses
36,200
-
2,513,200
-
7,700,000
24,150,000
Other (Storm Fund 432)
Annual Revenue
-
1,220,000
-
-
-
-
Project Expenses
-
1,220,000
-
-
-
-
Other (Redflex in Fund 328)
Annual Revenue
100,000
200,000
200,000
200,000
200,000
200,000
Project Expenses
100,000
200,000
200,000
200,000
200,000
200,000
Other (Developer)
Annual Revenue
850,000
1,150,000
460,000
1,245,000
5,642,500
1,000,000
Project Expenses
850,000
1,150,000
460,000
1,245,000
5,642,500
1,000,000
Other (GO Bonds)
Annual Revenue
500,000
4,485,000
-
-
-
-
Project Expenses
500,000
4,485,000
-
-
-
-
Projects & Financing Plan Summary 11
City of Auburn Transportation Improvement Program
12 Projects & Financing Plan Summary
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: A Street NW, Phase 1 (3rd St. NW to 14th St. NW)
Project No: c207aO
Project Type: Capacity
Project Manager: Helbig
TIP # 1
Description:
Construct a multi-lane arterial from 3rd St. NW to 14th St. NW. This project will improve mobility a
nd is tied to corridor
development. It is consistent with the Comprehensive Plan and contributes to the completion of a
north/south arterial corridor.
Progress Summary:
Pre-design was completed prior to 2007. Final design will be completed
in 2009 along with the environmental pro
cess. It is
anticipated that significant ROW purchase will begin in 2009.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $25,830
.
Budget:
2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009
Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
-
-
-
326,606
Grants (Fed, State, Local) 298,778
1,480,000
3,729,500
4,050,000
5,508,278
9,849,460
REET -
-
-
-
-
-
TrafficImpact Fees 69,318
370,000
180,000
619,318
659,448
Other Sources (Developer)* -
500,000
-
-
500,000
500,000
Total Funding Sources: 368,096
2,350,000
3,909,500
4,050,000
6,627,596
11,335,514
Capital Expenditures:
Design 368,096
275,000
179,500
-
822,596
1,224,140
Right of Way -
2,075,000
1,396,000
-
3,471,000
3,727,374
Construction -
-
2,334,000
4,050,000
2,334,000
6,384,000
Total Expenditures: 368,096
2,350,000
3,909,500
4,050,000
6,627,596
11,335,514
Forecasted Project Cost:
Total
Expenditures
2012
2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
Grants (Fed, State, Local)
7,779,500
REET
-
Traffic Impact Fees
180,000
Other Sources (Developer)*
-
Total Funding Sources:
7,959,500
Capital Expenditures:
Design
179,500
Right of Way
1,396,000
Construction
6,384,000
Total Expenditures:
7,959,500
Grants / Other Sources: *Other funds include developer contributions, ROW dedications, and construction completed by others.
Other funds shown never go through the City. Approximately $4 Million of grants is still unsecured.
Roadway Improvement Projects 13
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Auburn Way Corridor Imp. (4th Street NE to 4th Street SE) TIP # 3
Project No: c409aO
Project Type: Non-Capacity
Project Manager: TBD
Description:
This project is based on a pre-design study and is intended to improve pedestrian accessibility, appearance, and link the
downtown area along Auburn Way South between 4th St NE and 4th St SE. This project may include some pavement
repairs. However, an overlay was completed as part of the City's Arterial Pavement Preservation Program in
2007. Although
this was considered a temporary fix, the scope has been modified to account for the pavement work. The project length is
approximately a half mile.
Progress Summary:
The pavement portion has been minimized due to the work completed in 2007 under the Arterial Pavement P
reservation
Program.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2009 YTD Actual 2010
09 Budget
Budget Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate 2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue 78,251
78,251
788,251
Grants (Fed, State, Local) -
-
3,108,700
REET
-
Traffic Impact Fees
Other Sources -
-
-
Total Funding Sources: 78,251
78,251
3,896,951
Capital Expenditures:
Design 78,251
78,251
696,951
Right of Way -
-
200,000
Construction -
-
3,000,000
Total Expenditures: 78,251
78,251
3,896,951
Forecasted Project Cost:
Total
Expenditures
2012 2013 2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue 110,000 600,000
710,000
-
Grants (Fed, State, Local) 708,700 2,400,000
3,108,700
REET - -
-
Traffic Impact Fees
Other Sources - -
-
Total Funding Sources: 818,700 3,000,000
3,818,700
Capital Expenditures:
Design 618,700 -
618,700
Right of Way 200,000 -
200,000
Construction - 3,000,000
3,000,000
Total Expenditures: 818,700 3,000,000
3,818,700
Grants / Other Sources: Grant funding is not secured.
14 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: I Street NE Corridor (40th St. NE to 52nd St. NE) TIP # 4
Project No: c415a0
Project Type: Capacity
Project Manager: TBD
Description:
The final alignment of the I Street Corridor is being analyzed as part of the Northeast Auburn Special Area Plan
Environmental Impact Study. A portion of the ROW and Construction will be developer funded.
The cross section will likely
be a 5-lane arterial per the city's Comprehensive Plan. The project length is approximately three-quarters of a mile. This
project may be split into two phases. Phase 1 would be 40th Street NE to 45th Street NE. Pha
se 2 would be 45th Street NE
to 52nd Street NE (S. 277th Street).
Progress Summary:
This project is development driven. The project has been delayed due to the delay of the nearby pending development. The
City has budget available to coordinate as needed and look for grant funding/partnership opportunities. If grant funds are
available prior to 2012, a budget amendment will be required to accept the funding.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $25,200.
Budget: 2009 YTD Actual
2010 09 Budget
Budget Expenditures
Budget Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate 2010 Budget
2011 Budget Project Total
Cost
Unrestricted Street Revenue 11,827
11,827
11,827
Grants (Fed, State, Local) -
-
-
REET -
- -
-
TrafficImpact Fees 5,000
5,000 5,000
10,000
Other Sources (Developer)* - -
- -
5,760,000
Total Funding Sources: 11,827 5,000
5,000 16,827
5,781,827
Capital Expenditures:
Design 10,957 5,000
5,000 15,957
480,957
Right of Way 870 -
- 870
1,020,870
Construction - -
- -
4,280,000
Total Expenditures: 11,827 5,000
5,000 16,827
5,781,827
Forecasted Project Cost:
Total
Expenditures
2012 2013 2014
2015 2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
Grants (Fed, State, Local)
REET - - -
-
Traffic Impact Fees
10,000
Other Sources (Developer)* 460,000 1,020,000 4,280,000
5,760,000
Total Funding Sources: 460,000 1,020,000 4,280,000
5,770,000
Capital Expenditures:
Design 460,000 - -
470,000
Right of Way - 1,020,000 -
1,020,000
Construction - - 4,280,000
4,280,000
Total Expenditures: 460,000 1,020,000 4,280,000
5,770,000
Grants / Other Sources: *Developer Funding. The City will continue to look for grant funding opportunities.
Roadway Improvement Projects 15
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: M Street Grade Separation (E. Main to Auburn Way So.)
Project No: c201 a0
Project Type: Capacity
Project Manager: Jacob Sweeting
TIP # 5
Description:
Construction of a grade separated railroad crossing
of M Street SE at the BNS
F Stampede Pa
ss tracks.
Progress Summary:
The pre-design has been completed. 30% Design Drawings were
completed in 2009. Right of
way acquisition will occur in
2010 and construction is expected to start in 2011.
Design work includes the lengthy environmental process and
coordination with BNSF.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $21,827.
Budget:
2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources:
Prior to 2009
Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue
-
-
150,000
-
150,000
150,000
Grants (Fed, State, Local)
122,500
4,622,800
6,627,000
4,745,300
15,520,700
REET
-
-
-
-
-
-
Traffic Impact Fees
128,600
877,500
789,000
1,000,000
1,795,100
4,206,500
Other
-
-
-
-
-
2,513,200
Total Funding Sources:
128,600
1,000,000
5,561,800
7,627,000
6,690,400
22,140,400
Capital Expenditures:
Design
128,600
1,000,000
961,800
249,700
2,090,400
2,590,100
Right of Way
-
-
4,600,000
-
4,600,000
4,600,000
Construction
-
-
-
7,377,300
-
15,200,300
Total Expenditures:
128,600
1,000,000
5,561,800
7,627,000
6,690,400
22,140,400
Forecasted Project Cost:
Total
Expenditures
2012
2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
150,000
Grants (Fed, State, Local)
4,148,400
15,398,200
REET
-
-
Traffic Impact Fees
1,161, 400
2,950,400
Other Sources (Other Agencies)'
2,513,200
2,513,200
Total Funding Sources:
7,823,000
21,011,800
Capital Expenditures:
Design
-
1,211,500
Right of Way
-
4,600,000
Construction
7,823,000
15, 200, 300
Total Expenditures:
7,823,000
21,011,800
Grants / Other Sources: 'Funding partners include Port of Seattle, Port of Tacoma, BNSF, PSE, and more.
16 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: South 277th (Auburn Way North to Green River Bridge) TIP # 6
Project No: c222a0
Project Type: Capacity
Project Manager: TBD
Description:
This project includes major widening on S. 277th Street, including the addition of three lanes, one westbound
and two
eastbound, plus a Class 1 trail. The project length is nine-tenths of a mile. The final configuration will include three lanes
eastbound and two lanes westbound.
Progress Summary:
The majority of this roadway is currently in the City of Kent's jurisdiction. Because the property served from the roadway is in
the City of Auburn, the plan is to annex this portion of the roadway from Kent into the City of Auburn. The majority of this
project is expected to be completed by developers.
Future Impact on Operating Budget:
The annual maintenance costs for this project is estimated to be $27,250.
Budget: 2009 YTD Actual 2010
09 Budget
Budget Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate 2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue 19,085
19,085
19,085
Grants (Fed, State, Local) -
-
1,362,500
REET
-
Traffic Impact Fees
100,000
Other (Developer)* -
-
1,587,500
Total Funding Sources: 19,085
19,085
3,069,085
Capital Expenditures:
Design 18,510
18,510
343,510
Right of Way 575
575
319,375
Construction -
-
2,406,200
Total Expenditures: 19,085
19,085
3,069,085
Forecasted Project Cost:
Total
Expenditures
2012 2013 2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue -
-
-
Grants (Fed, State, Local) 1,362,500
1,362,500
REET - -
-
TrafficImpact Fees 100,000 -
100,000
Other (Developer) * 225,000 1,362,500
1,587,500
Total Funding Sources: 325,000 2,725,000
3,050,000
Capital Expenditures:
Design 325,000 -
325,000
Right of Way - 318,800
318,800
Construction - 2,406,200
2,406,200
Total Expenditures: 325,000 2,725,000
3,050,000
Grants / Other Sources: *Developer funds or in kind services. Grant funding is not secured.
Roadway Improvement Projects 17
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title:
15th Street SW Reconstruction
Project No:
cpxxxx
Project Type:
Non-Capacity
Project Manager:
TBD
TIP # 7
Description:
This project was originally scoped to include pavement preservation
. The pavement preservat
ion component could still be
combined with this project, but is also eligible for the Arterial Pavement Preservation Program.
This project should look to
improve the railroad crossing grades as well as the vertical sight distance to the interurban trai
l to the west of the tracks. The
cost estimate listed below is planning level cost.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street m
aintenance.
Budget:
2009 YTD Actual
2010 09 Budget
Budget Expenditures
Budget Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009
Estimate 2010 Budget
2011 Budget Project Total
Cost
Unrestricted Street Revenue -
575,000
Grants (Fed, State, Local)
2,800,000
REET
-
Traffic Mitigation Funds
Other
-
Total Funding Sources:
3,375,000
Capital Expenditures:
Design
375,000
Right of Way
-
Construction
3,000,000
Total Expenditures:
-
3,375,000
Forecasted Project Cost:
Total
Expenditures
2012
2013 2014
2015 2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue 75,000
500,000
575,000
-
Grants (Fed, State, Local) 300,000
2,500,000
2,800,000
REET -
-
-
Traffic Mitigation Funds
Other -
-
-
Total Funding Sources: 375,000
3,000,000
3,375,000
Capital Expenditures:
Design 375,000
-
375,000
Right of Way -
-
-
Construction -
3,000,000
3,000,000
Total Expenditures: 375,000
3,000,000
3,375,000
Grants / Other Sources: Grant funding is unsecured.
18 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: A Street NW, Phase 2 (W. Main to 3rd St. NW)
Project No: cpxxxx
Project Type: Capacity
Project Manager: TBD
TIP # 8
Description:
Construct a multi-lane arterial from W. Main to 3rd St. NW. This project will connect A Street NW, Phase 1 to
the Sound
Transit Station and the Central Business District. This project may end up being funded in all or part by devel
opers. The
project length is one fifth of a mile.
Progress Summary:
It is anticipated that the parking garage being const
ructed by the Auburn Regional Medical Center will complete a portion of
this project in 2008.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2009 YTD Actual
2010
09 Budget
Budget Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources:
Prior to 2009 Estimate 2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue
-
-
Grants (Fed, State, Local)
1,038,000
2,119,300
REET
-
-
-
-
Traffic Impact Fees
- 100,000
162,000
100,000
430,700
Other (Developer)'
150,000 -
-
150,000
150,000
Total Funding Sources:
150,000 100,000
1,200,000
250,000
2,700,000
Capital Expenditures:
Design
- 100,000
-
100,000
100,000
Right of Way
- -
1,200,000
-
1,200,000
Construction
150,000 -
-
150,000
1,400,000
Total Expenditures:
150,000 100,000
1,200,000
250,000
2,700,000
Forecasted Project Cost:
Total
Expenditures
2012 2013 2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
Grants (Fed, State, Local)
1,081,300
2,119, 300
REET
-
-
Traffic Impact Fees
168,700
430,700
Other (Developer)'
-
-
Total Funding Sources:
1,250,000
2,550,000
Capital Expenditures:
Design
-
100,000
Right of Way
-
1,200,000
Construction
1,250,000
1,250,000
Total Expenditures:
1,250,000
2,550,000
Grants / Other Sources: 'Anticipated developer contributions (cash or in kind services). Grant funding shown is unsecured.
Roadway Improvement Projects 19
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2016 Special Revenue Funds
Project Title: D Street NW (37th St. NW to 44th St. NW) TIP # 9
Project No: cpxxxx
Project Type: Capacity
Project Manager: TBD
Description:
Construct a four-lane arterial per the city Comprehensive Plan. It will improve
north/south mobility. This proje
ct is tied to
potential future development and will complete a major north/south arterial cor
ridor from Ellingson Road SW (41 st Street SE)
to S. 277th Street. The D ST NW project length is approximately 0.42 miles.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $11,450.
Budget: 2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
Grants (Fed, State, Local)
4,320,000
REET
-
Traffic Impact Fees
2,080,000
Other
-
Total Funding Sources:
6,400,000
Capital Expenditures:
Design
1,150, 000
Right of Way
1,750,000
Construction
3,500,000
Total Expenditures:
-
6,400,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Grants (Fed, State, Local)
160,000
160,000
320,000
4,000,000
REET
-
-
-
-
Traffic Impact Fees
40,000
40,000
80,000
2,000,000
Other
-
-
-
-
Total Funding Sources:
200,000
200,000
400,000
6,000,000
Capital Expenditures:
Design
200,000
200,000
400,000
750,000
Right of Way
-
-
-
1,750,000
Construction
-
-
-
3,500,000
Total Expenditures:
200,000
200,000
400,000
6,000,000
Grants / Other Sources: Grant Funding shown is unsecured.
20 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: F Street SE (4th St. SE to Auburn Way So.) TIP # 10
Project No: Cp0911
Project Type: Capacity
Project Manager: TBD
Description:
The F Street SE project includes pavement reconstruction, installation of curbs, gutters, an 8-foot wide sidewalk on both
sides, parking on one side, and a center turn-lane, as well as crash attenuation at the supports for the BNSF railroad bridge.
This project improves mobility and safety and provides an alternate route to mitigate traffic impacts during construction of the
M Street SE Grade Separation project. The project length is approximately 0.3 miles.
Progress Summary:
Preliminary design and survey work was completed in 2009.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $4100.
Budget: 2009 YTD Actual
2010
09 Budget
Budget Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate 2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
Grants (Fed, State, Local)
780,000
REET -
-
-
TrafficImpact Fees 7,620
7,620
427,620
Other -
-
-
Total Funding Sources: 7,620
7,620
1,207,620
Capital Expenditures:
Design 7,620
7,620
207,620
Right of Way -
-
60,000
Construction -
-
940,000
Total Expenditures: 7,620
7,620
1,207,620
Forecasted Project Cost:
Total
Expenditures
2012 2013 2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
-
Grants (Fed, State, Local)
780,000
780,000
REET -
-
-
TrafficImpact Fees 200,000
220,000
420,000
Other -
-
-
Total Funding Sources: 200,000
1,000,000
1,200,000
Capital Expenditures:
Design 200,000
-
200,000
Right of Way -
60,000
60,000
Construction -
940,000
940,000
Total Expenditures: 200,000
1,000,000
1,200,000
Roadway Improvement Projects 21
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title:
M Street NE (E
Project No:
cpxxxx
Project Type:
Capacity
Project Manager:
TBD
Main St. to 4th St. NE)
TIP # 11
Description:
This project will construct a complete 4 lane street section on M St NE betwee
n E main St. and 4th St NE.
Progress Summary:
Pre-design will be done in 2010 to refine project scope, alignment, and cost.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $1,500.
Budget: 2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
Grants (Fed, State, Local)
1,122,500
REET
-
-
-
TrafficImpact Fees
50,000
50,000
202,500
Other
-
-
-
Total Funding Sources:
50,000
50,000
1,325,000
Capital Expenditures:
Design
50,000
50,000
125,000
Right of Way
-
-
200,000
Construction
-
-
1,000,000
Total Expenditures:
50,000
50,000
1,325,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Grants (Fed, State, Local)
225,000
897,500
1,122,500
REET
-
-
-
TrafficImpact Fees
50,000
102,500
202,500
Other
-
-
-
Total Funding Sources:
275,000
1,000,000
1,325,000
Capital Expenditures:
Design
75,000
-
125,000
Right of Way
200,000
-
200,000
Construction
-
1,000,000
1,000,000
Total Expenditures:
275,000
1,000,000
1,325,000
Grants / Other Sources:
Grant funding is unsecured.
22 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Grade-Separated Crossing of BNSF Railyard TIP # 12
Project No: cpXXXX
Project Type: Capacity
Project Manager: TBD
Description:
This project consists of a grade-separated crossing of the BNSF Railyard, either from SR-18 to 6th Street SE or from 15th
Street SW to A Street SE. The first alternative would entail realigning the SR-1
8 eastbound ramp, grade separating the main
north/south line and the Stampede Pass line, and connecting to 6th Street SE.
The second alternative would provide a new
corridor from 15th Street SW to A Street SE in the vicinity of 12th Street SE an
d 17th Street SE, either via an overpass or
underpass of the BNSF Railyard. This project improves traffic flow significantly due to the potential development of the
BNSF yard as an intermodal freight facility.
Progress Summary:
Future Impact on Operating Budget:
Not scheduled for completion until after 2015.
Budget: 2009
YTD Actual 2010 09 Budget
Budget
Expenditures Budget Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget 2011 Budget Project Total
Cost
Unrestricted Street Revenue -
Grants (Fed, State, Local)
REET
Traffic Impact Fees
-
Other
32, 000, 000
Total Funding Sources:
32,000,000
Capital Expenditures:
Design
3,500,000
Right of Way
4,000,000
Construction
24, 500, 000
Total Expenditures:
32,000,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014 2015 2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
Grants (Fed, State, Local)
REET
Traffic Impact Fees
- -
-
Other (Developer)
1,000,000 1,000,000
31,000,000
Total Funding Sources:
1,000,000 1,000,000
31,000,000
Capital Expenditures:
Design
1,000,000 1,000,000
2,500,000
Right of Way
- -
4,000,000
Construction
- -
24,500,000
Total Expenditures:
1,000,000 1,000,000
31,000,000
Grants / Other Sources:
Roadway Improvement Projects 23
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title:
West Valley Hwy Improvements (SR-18 to West Main Street)
Project No:
cp0916
Project Type:
Non-Capacity
Project Manager:
TBD
TIP # 14
Description:
Widen roadway to accommodate a two way left turn lane; install a traffic median to prohibit traffic from driving into on coming lanes;
add curb, gutter, and storm drainage; repair failing roadway surface; install sidewalk along the east side of the roadway; install
illumination; accommodate bicycle usage with 3 foot shoulder on both sides of the roadway; and install a new traffic signal at and
improve the intersection of West Main Street and West Valley Highway. This project will improve efficiency, safety, and driving
comfort, as well as reduce the amount of time maintenance staff has to spend doing temporary repairs that do not last.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2009 YTD Actual 2010
09 Budget
Budget Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate 2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue - - - 55,000
-
55,000
Grants (Fed, State, Local) 87,000 183,000 2,730,000
270,000
3,000,000
REET2 33,000 62,000 -
95,000
95,000
Traffic Mitigation Fees 25,000 75,000 530,000
100,000
630,000
Other (Storm Fund) 1,220,000
1,220,000
Total Funding Sources: 145,000 320,000 4,535,000
465,000
5,000,000
Capital Expenditures:
Design 145,000 320,000 -
465,000
465,000
Right of Way - - -
-
-
Construction 4,535,000
4,535,000
Total Expenditures: 145,000 320,000 4,535,000
465,000
5,000,000
Forecasted Project Cost:
Total
Expenditures
2012 2013 2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
55,000
-
Grants (Fed, State, Local)
2,913,000
REET 2
62,000
Traffic Mitigation Fees
605,000
Other (Storm Fund)
1,220,000
Total Funding Sources:
4,855,000
Capital Expenditures:
Design
320,000
Right of Way
-
Construction
4,535,000
Total Expenditures:
4,855,000
Grants/ Other Sources: TIB Grant (secured). Other funding source is to Storm 432 Fund.
24 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: 8th Street NE Widening (Pike Street to R Street NE) TIP # 15
Project No: cpXXXX
Project Type: Capacity
Project Manager: TBD
Description:
Add eastbound lane to southside of 8th Street NE.
Currently the lane exists from M Street NE and drops as a right turn only
lane at the intersection of 8th Street NE and Pike Street. This would extend the
lane to R Street NE where it would then be a
right turn only lane onto R Street NE southbound.
This is a planning level cost
estimate.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2009
YTD Actual 2010
09 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources:
Prior to 2009 Estimate
2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue
-
290,000
Grants (Fed, State, Local)
1,160,000
REET
-
Traffic Impact Fees
Other
-
Total Funding Sources:
1,450,000
Capital Expenditures:
Design
150,000
Right of Way
300,000
Construction
1,000,000
Total Expenditures:
-
1,450,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
90,000
200,000
290,000
-
Grants (Fed, State, Local)
360,000
800,000
1,160,000
REET
-
-
-
Traffic Impact Fees
Other
-
-
-
Total Funding Sources:
450,000
1,000,000
1,450,000
Capital Expenditures:
Design
150,000
-
150,000
Right of Way
300,000
-
300,000
Construction
-
1,000,000
1,000,000
Total Expenditures:
450,000
1,000,000
1,450,000
Grants / Other Sources: Grant funding is unsecured.
Roadway Improvement Projects 25
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2016 Special Revenue Funds
Project Title: 49th Street NE from Auburn Way North to M Street NE TIP # 16
Project No: cpxxxx
Project Type: Capacity
Project Manager: TBD
Description:
Construct east/west corridor from Auburn Way North to M Street NE. The existing 49th Street NE extends we
sterly to B
Street NE. This project also includes a traffic signal at the intersection of Aub
urn Way North and 49th Street NE. This
roadway was evaluated and recommended in the NE Special Planning Area.
It is anticipated that this will be constructed by
future development. It is approximately 3/4 of a mile in length.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $27,050.
Budget: 2009
YTD Actual 2010
09 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
Grants (Fed, State, Local)
REET
Traffic Mitigation Funds
- -
-
Other (Developer)*
850,000 1,150,000
850,000
2,000,000
Total Funding Sources:
850,000 1,150,000
850,000
2,000,000
Capital Expenditures:
Design
200,000 -
200,000
200,000
Right of Way
650,000 -
650,000
650,000
Construction
- 1,150, 000
-
1,150, 000
Total Expenditures:
850,000 1,150,000
850,000
2,000,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
Grants (Fed, State, Local)
REET
Traffic Mitigation Funds
-
Other (Developer)'
2,000,000
Total Funding Sources:
2,000,000
Capital Expenditures:
Design
200,000
Right of Way
650,000
Construction
1,150, 000
Total Expenditures:
2,000,000
Grants / Other Sources: 'Future development is expected to fund and construct this project.
26 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: 124th Ave SE Corridor Improvements Phase 1 TIP # 39
Project No: cpxxx
Project Type: Capacity
Project Manager: TBD
Description:
This project will fund the design, right of way aqcuisition, and construction of improve
ments to the signalized intersection of SE 320th St
and 124th Ave SE. Improvements include constructing bike lanes, sidewalks, dual so
uthbound left turn lanes into GRCC, and ITS. A
portion of this project is the main entrance to Green River Community College and wi
ll require additional on-site improvements by
GRCC.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2009
YTD Actual 2010
09 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
-
Grants (Fed, State, Local)
85,000
735,000
Traffic Impact Fees
15,000
115,000
PWTFL
-
-
Other
-
-
Total Funding Sources:
100,000
850,000
Capital Expenditures:
Design
100,000
100,000
Right of Way
-
50,000
Construction
-
700,000
Total Expenditures:
100,000
-
850,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue -
-
-
Grants (Fed, State, Local) 650,000
735,000
Traffic Impact Fees 100,000
115,000
PWTFL -
-
Other -
-
Total Funding Sources: 750,000
850,000
Capital Expenditures:
Design -
100,000
Right of Way 50,000
50,000
Construction 700,000
700,000
Total Expenditures: 750,000
850,000
Grants / Other Sources: Grant Funding is unsecured.
Roadway Improvement Projects 27
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: 124th Ave SE Corridor Improvements Phase 2 TIP # 40
Project No: cpxxx
Project Type: Capacity
Project Manager: TBD
Description:
This project will fund the design, right of way agcuisition,
and construction of a 4-lane
section with bicylcle and pedestrian facilities on
124th Ave SE between SE 318th St and SE 312th St.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget
for street maintenance.
Budget:
2009
YTD Actual 2010
09 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources:
Prior to 2009
Estimate
2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue
-
-
Grants (Fed, State, Local)
1,310,000
Traffic Impact Fees
210,000
PWTFL
-
Other
-
Total Funding Sources:
1,520,000
Capital Expenditures:
Design
150,000
Right of Way
170,000
Construction
1,200,000
Total Expenditures:
-
1,520,000
Forecasted Project Cost:
Total
Expenditures
2012
2013
2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Grants (Fed, State, Local)
125,000
1,185,000
1,310,000
Traffic Impact Fees
25,000
185,000
210,000
PWTFL
-
-
-
Other
-
-
-
Total Funding Sources:
150,000
1,370,000
1,520,000
Capital Expenditures:
Design
150,000
-
150,000
Right of Way
-
170,000
170,000
Construction
-
1,200,000
1,200,000
Total Expenditures:
150,000
1,370,000
1,520,000
Grants / Other Sources:
Grant funding is unsecured.
28 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: 124th Ave SE Corridor Improvements Phase 3 TIP # 41
Project No: cpxxx
Project Type: Capacity
Project Manager: TBD
Description:
This project will fund the design, right of way agcuisition, and construction of improvements to the signalized intersectio
n of SE 312th St
and 124th Ave SE. Improvements include adding bike lanes, dual westbound left turn
lanes, dual southbound thru lanes, ITS and
pedestrian safety improvements.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2009
YTD Actual 2010
09 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009
Estimate
2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
Grants (Fed, State, Local)
432,500
Traffic Impact Fees
67,500
PWTFL
-
Other
-
Total Funding Sources:
500,000
Capital Expenditures:
Design
50,000
Right of Way
50,000
Construction
400,000
Total Expenditures:
-
500,000
Forecasted Project Cost:
Total
Expenditures
2012
2013
2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Grants (Fed, State, Local)
43,000
389,500
432,500
Traffic Impact Fees
7,000
60,500
67,500
PWTFL
-
-
-
Other
-
-
-
Total Funding Sources:
50,000
450,000
500,000
Capital Expenditures:
Design
50,000
-
50,000
Right of Way
-
50,000
50,000
Construction
-
400,000
400,000
Total Expenditures:
50,000
450,000
500,000
Grants / Other Sources: Grant funding is unsecured.
Roadway Improvement Projects 29
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title:
SE 320th St Corridor Improvements
Project No:
cpxxx
Project Type:
Capacity
Project Manager:
TBD
TIP # 42
Description:
This project will fund the design, right of way agcuisition, and construction of a 3 lane
roadway with bicycle and pedestrian facilities on
SE 320th St between 124th Ave SE and the western entrance to GRCC.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
Grants (Fed, State, Local)
553,600
Traffic Impact Fees
86,400
PWTFL
-
Other
-
Total Funding Sources:
640,000
Capital Expenditures:
Design
60,000
Right of Way
60,000
Construction
520,000
Total Expenditures:
-
640,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Grants (Fed, State, Local)
51,500
502,100
553,600
Traffic Impact Fees
8,500
77,900
86,400
PWTFL
-
-
-
Other
-
-
-
Total Funding Sources:
60,000
580,000
640,000
Capital Expenditures:
Design
60,000
-
60,000
Right of Way
-
60,000
60,000
Construction
-
520,000
520,000
Total Expenditures:
60,000
580,000
640,000
30 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Downtown Promenade Improvements
Project No: cpxxx
Project Type: Non-Capacity
Project Manager: TBD
TIP # 52
Description:
This project will fund the design, coordination, permitting and construction of Downtown Promenade im
provements. Project includes
storm, sewer, water and roadway improvements of Division Street between Main St and 2nd St SW.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
-
-
-
Grants (Federal)
500,000
2,500,000
500,000
3,000,000
REET
-
-
-
-
PWTFL
-
-
-
-
Other(GO Bonds)
500,000
4,485,000
500,000
4,985,000
Total Funding Sources:
1,000,000
6,985,000
1,000,000
7,985,000
Capital Expenditures:
Design
1,000,000
1,425,000
1,000,000
2,425,000
Right of Way
-
-
-
-
Construction
-
5,560,000
-
5,560,000
Total Expenditures:
1,000,000
6,985,000
1,000,000
7,985,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
Grants (Federal)
3,000,000
REET
-
PWTFL
-
Other(GO Bonds)
4,985,000
Total Funding Sources:
7,985,000
Capital Expenditures:
Design
2,425,000
Right of Way
-
Construction
5,560,000
Total Expenditures:
7,985,000
Grants / Other Sources: Grant Funding is Federal EDA Grant. Other Funding is GO Bond revenue.
Roadway Improvement Projects 31
City of Auburn Transportation Improvement Program
32 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102)
Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Harvey Rd. & 8th St. NE Intersection Improvements TIP # 17
Project No: cp0611
Project Type: Capacity
Project Manager: Jacob Sweeting
Description:
Add one eastbound through/right turn lane on 8th Street NE approaching Harvey Road. Modify traffic signals and traffic
channelization to accommodate the new lane. The additional lane will improve traffic delays a
nd vehicle queui
ng at the
intersection of Harvey Road and 8th Street NE in all directions. This project will reconstruct M
Street NE from 4th Street NE to
8th Street NE, a segment of roadway approximately 0.3 miles in length with four travel lanes.
The reconstruction will fix the
existing poor pavement condition and fill in any gaps in the sidewalk network.
Progress Summary:
Design is currently underway and construction is anticipated to begin in early summer of 2009
.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2009 YTD Actual
2010
09 Budget
Budget Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate 2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
1,200,000
Grants (Fed, State, Local) - - -
-
-
-
Traffic Impact Fees 15,500 130,000 100,000
100,000
245,500
745,500
PWTF - 1,800,000 -
-
1,800,000
1,800,000
Total Funding Sources: 15,500 1,930,000 100,000
100,000
2,045,500
3,745,500
Capital Expenditures:
Design 15,500 214,500 -
-
230,000
230,000
Right of Way - 50,000
50,000
50,000
Construction 1,656,500 -
-
1,656,500
1,656,500
Long Term Debt - PWTF 9,000 100,000
100,000
109,000
609,000
Total Expenditures: 15,500 1,930,000 100,000
100,000
2,045,500
2,545,500
Forecasted Project Cost:
Total
Expenditures
2012 2013 2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
1,200,000
Grants (Fed, State, Local) - - -
-
-
-
TrafficImpact Fees 100,000 100,000 100,000
100,000
600,000
PWTF - - -
-
-
-
Total Funding Sources: 100,000 100,000 100,000
100,000
600,000
1,200,000
Capital Expenditures:
Design - - -
-
-
-
Right of Way
Construction - - -
-
-
LongTermDebt - PWTF 100,000 100,000 100,000
100,000
600,000,
11200,000
Total Expenditures: 100,000 100,000 100,000
100,000
600,000
Grants/ Other Sources: Capacity Improvement eligible for traffic impact fees. Other funding is Public Works Trust Fund Loan
Intersection Improvement Projects 33
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: 8th Street and R Street NE Traffic Signal
Project No: cp0701
Project Type: Non-Capacity Intersection Improvement
Project Manager: Vondrak
TIP # 18
Description:
This project includes the construction of a new traffic signal at the intersection of 8th Street NE and R Street NE. Intersection
improvements will include crosswalks and pedestrian signals. This project was selected on accident history, surrounding
land uses, and pedestrian flow patterns.
Progress Summary:
The design is anticipated to be started in 2007, with construction scheduled for 2010.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $6,600.
Budget: 2009 YTD Actual 2010
09 Budget
Budget Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate 2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue - - 400,500
400,500
400,500
Grants (Federal) 107,298 40,500 100,000
247,798
247,798
REET - - -
-
-
Traffic Impact Fees
Other - - -
-
-
Total Funding Sources: 107,298 40,500 500,500
648,298
648,298
Capital Expenditures:
Design 107,298 35,500 -
142,798
142,798
Right of Way - 5,000 -
5,000
5,000
Construction - - 500,500
500,500
500,500
Total Expenditures: 107,298 40,500 500,500
648,298
648,298
Forecasted Project Cost:
Total
Expenditures
2012 2013 2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
400,500
-
Grants (Federal)
100,000
REET
-
Traffic Impact Fees
Other
-
Total Funding Sources:
500,500
Capital Expenditures:
Design
-
Right of Way
-
Construction
500,500
Total Expenditures:
500,500
Grants / Other Sources: Grant is Federal Intersection & Corridor Safety Grant.
34 Intersection Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Auburn Way North / 1st Street NE Signal Improvements TIP # 19
Project No: cpXXXX
Project Type: Non-Capacity
Project Manager: TBD
Description:
This project will construct a new complete traffic signal with controller cabinet and battery backup along with n
ecessary
intersection improvements.
Progress Summary:
Predesign will be completed in 2010. Final design and construction is planned for 2011.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
20,000
130,000
20,000
150,000
Grants (Fed, State, Local)
-
450,000
-
450,000
REET
-
-
Traffic Impact Fees
Other
-
-
-
-
Total Funding Sources:
20,000
580,000
20,000
600,000
Capital Expenditures:
Design
20,000
80,000
20,000
100,000
Right of Way
-
50,000
-
50,000
Construction
-
450,000
-
450,000
Total Expenditures:
20,000
580,000
20,000
600,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
150,000
-
Grants (Fed, State, Local)
450,000
REET
-
Traffic Impact Fees
Other
-
Total Funding Sources:
600,000
Capital Expenditures:
Design
100,000
Right of Way
50,000
Construction
450,000
Total Expenditures:
600,000
Grants / Other Sources: Grant funding unsecured.
Intersection Improvement Projects 35
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Auburn Way South and M Street SE Intersection Imp. TIP # 20
Project No: cpxxxx
Project Type: Capacity
Project Manager: TBD
Description:
Construct a westbound to northbound right turn lane at the intersection of Auburn Way South and M Street SE.
This project
would also improve the turning radius at this same corner allowing drivers to make a safe right
turn on red (afte
r stopping and
yielding to oncoming vehicles). Currently the intersection geometry has necessi
tated the City placing a legal re
striction on
this movement.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
100,000
-
100,000
100,000
Grants (Fed, State, Local)
-
520,000
-
520,000
REET
-
-
Traffic Mitigation Funds
130,000
130,000
Other
-
-
-
-
Total Funding Sources:
100,000
650,000
100,000
750,000
Capital Expenditures:
Design
100,000
-
100,000
100,000
Right of Way
-
130,000
-
130,000
Construction
-
520,000
-
520,000
Total Expenditures:
100,000
650,000
100,000
750,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
100,000
-
Grants (Fed, State, Local)
520,000
REET
-
Traffic Mitigation Funds
130,000
Other
-
Total Funding Sources:
750,000
Capital Expenditures:
Design
100,000
Right of Way
130,000
Construction
520,000
Total Expenditures:
750,000
Grants / Other Sources: Grant funding unsecured.
36 Intersection Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: C Street NW and West Main Street
Project No: cpXXXX
Project Type: Non Capacity
Project Manager: TBD
TIP # 21
Description:
Reconstruct intersection at C Street NW and West Main Street. P
roject would include a new t
raffic signal and modifications
to the turning radii at each corner to help facilitate vehicular movements. The new traffic signal would allow for protected left
turn phasing for northbound and southbound left turn movements.
This would also provide ad
ditional safety related to the
railroad pre-emption.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street
maintenance.
Budget:
2009 YTD Actual
2010 09 Budget
Budget Expenditures
Budget Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009
Estimate 2010 Budget
2011 Budget Project Total
Cost
Unrestricted Street Revenue -
220,000
Grants (Fed, State, Local)
880,000
REET
-
Traffic Impact Fees
Other
-
Total Funding Sources:
1,100,000
Capital Expenditures:
Design
100,000
Right of Way
550,000
Construction
450,000
Total Expenditures:
-
1,100,000
Forecasted Project Cost:
Total
Expenditures
2012
2013 2014
2015 2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue 20,000
200,000
220,000
-
Grants (Fed, State, Local) 80,000
800,000
880,000
REET -
-
-
Traffic Impact Fees
Other -
-
-
Total Funding Sources: 100,000
1,000,000
1,100,000
Capital Expenditures:
Design 100,000
-
100,000
Right of Way -
550,000
550,000
Construction -
450,000
450,000
Total Expenditures: 100,000
1,000,000
1,100,000
Grants / Other Sources: Grant Funding is unsecured.
Intersection Improvement Projects 37
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: F St SE & 4th St SE Traffic Signal
Project No: cp0914
Project Type: Non-Capacity Intersection Improvement
Project Manager: Leah Dunsdon
TIP # 25
Description:
This project includes the construction of a new traffic signal at the intersection of 4th Street SE and F Street SE. Intersection
improvements will include crosswalks and pedestrian signals. This proje
ct was selected based on accident history, traffic volumes, and
pedestrian flow patterns.
Progress Summary:
Preliminary design will begin in 2009. Final design and construction will be completed in 2010.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $6,600.
Budget:
2009
YTD Actual 2010
09 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009
Estimate
2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
-
-
-
Grants (Fed, State, Local)
37,000
359,700
396,700
396,700
REET
-
-
-
-
PWTFL
Other
-
-
-
-
Total Funding Sources:
37,000
359,700
396,700
396,700
Capital Expenditures:
Design
37,000
30,000
67,000
67,000
Right of Way
-
-
-
-
Construction
-
329,700
329,700
329,700
Total Expenditures:
37,000
359,700
396,700
396,700
Forecasted Project Cost:
Total
Expenditures
2012
2013
2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
Grants (Fed, State, Local)
359,700
REET
-
PWTFL
Other
-
Total Funding Sources:
359,700
Capital Expenditures:
Design
30,000
Right of Way
-
Construction
329,700
Total Expenditures:
359,700
Grants / Other Sources: Grant is Federal HSIP funded and does not require a city match.
38 Intersection Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Railroad Crossing Safety Improvements
Project No: cpxxx
Project Type: Intersection Safety (Non-Capacity)
Project Manager: TBD
TIP # 38
Description:
This project will fund the design, coordination, permitting and construction of Quad gates at the West Main St, 3rd St NW, and 37th St
NW BNSF Railroad crossings.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimate
d to be $1,000.
Budget:
2009
YTD Actual 2010
09 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources:
Prior to 2009
Estimate
2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue
-
135,000
Grants (Fed, State, Local)
865,000
REET
-
PWTFL
Other
-
Total Funding Sources:
1,000,000
Capital Expenditures:
Design
150,000
Right of Way
-
Construction
850,000
Total Expenditures:
-
1,000,000
Forecasted Project Cost:
Total
Expenditures
2012
2013
2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
25,000
110,000
135,000
-
Grants (Fed, State, Local)
125,000
740,000
865,000
REET
-
-
-
PWTFL
Other
-
-
-
Total Funding Sources:
150,000
850,000
1,000,000
Capital Expenditures:
Design
150,000
-
150,000
Right of Way
-
-
-
Construction
-
850,000
850,000
Total Expenditures:
150,000
850,000
1,000,000
Grants / Other Sources: Grant funding is unsecured.
Intersection Improvement Projects 39
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Auburn Way South & Riverwalk Intersection Improvements TIP # 43
Project No: cpxxx
Project Type: Capacity
Project Manager: TBD
Description:
This project will fund the design, right of way agcuisition and construction of intersect
ion capacity and safety improveme
nts at Auburn
Way South and Riverwalk Dr SE. This project will include creating eastbound/westbo
und dual left turn l
anes, auxiliary signal heads and
pedestriasn safety enhancements.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
Grants (Fed, State, Local)
2,076,000
Traffic Impact Fees
324,000
PWTFL
-
Other
-
Total Funding Sources:
2,400,000
Capital Expenditures:
Design
150,000
Right of Way
200,000
Construction
2,050,000
Total Expenditures:
-
2,400,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Grants (Fed, State, Local)
125,000
1,951,000
2,076,000
Traffic Impact Fees
25,000
299,000
324,000
PWTFL
-
-
-
Other
-
-
-
Total Funding Sources:
150,000
2,250,000
2,400,000
Capital Expenditures:
Design
150,000
-
150,000
Right of Way
-
200,000
200,000
Construction
-
2,050,000
2,050,000
Total Expenditures:
150,000
2,250,000
2,400,000
Grants / Other Sources: Grant funding is unsecured.
40 Intersection Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Citywide Intelligent Transportation System (ITS) PHASE 2 TIP # 2
Project No: c307bO
Project Type: Capacity
Project Manager: Nutter
Description:
This project includes interconnect and coordination for traffic signals in the city.
The project also includes traffic management
cameras, fiber optic interconnect and related hardware along the Auburn Way North and So. 277th St. corridors. Other
corridors that may be connected as funding allows are 15th Street NE/NW; Harvey Road/M Street and 37th Street NE/NW;
This project is the second phase of the Intelligent Transportation System and builds off of Phase 1, which included SR164
(Auburn Way South).
Progress Summary:
Phase 1 was completed in 2006. Phase 2 will be completed in 2009.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $6600. In addition, staff time will be required upon
completion of the project to monitor the system.
Budget: 2009
YTD Actual 2010 09 Budget
Budget
Expenditures Budget Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget 2011 Budget Project Total
Cost
Unrestricted Street Revenue - -
-
-
Grants (Fed, State, Local) 113,764 673,431
787,195
787,195
Other - 225,000
- - 225,000
225,000
Traffic Mitigation Fees 51,800 62,800
35,800 35,800 150,400
257,800
PWTFL 163,713 -
- - 163,713
163,713
Total Funding Sources: 329,277 961,231
35,800 35,800 1,326,308
1,433,708
Capital Expenditures:
Design 329,277 72,271
- - 401,548
401,548
Right of Way - -
-
-
Construction 852,960
- - 852,960
852,960
Long Term Debt- PWTF - 36,000
35,800 35,800 71,800
179,200
Total Expenditures: 329,277 961,231
35,800 35,800 1,254,508
1,433,708
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014 2015 2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
Grants (Fed, State, Local)
Other - -
-
Traffic Mitigation Fees 35,800 35,800
143,200
PWTFL - -
-
Total Funding Sources: 35,800 35,800
143,200
Capital Expenditures:
Design - -
-
Right of Way
Construction - -
-
Long Term Debt- PWTF 35,800 35,800
143,200
Total Expenditures: 35,800 35,800
143,200
Grants / Other Sources: Grant funding is secure and includes federal earmark and CMAQ funding. Other funds include 81 K IS contribution from
518Fund and a 144K Signal Improvement contribution from Fund 328.
Intelligent Transportation System Projects 41
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Auburn South Intelligent Transportation System (ITS) Expansion TIP # 13
Project No: cpxxxx
Project Type: Capacity
Project Manager: Scott Nutter
Description:
The Auburn South ITS Expansion project includes connecting and prov
iding new ITS infrastructure on 15th ST SW, C ST SW and A ST
SE. It also includes 6th ST SE, A ST SE and 41st ST SE, (Ellingson Road). This ITS expansion will
be accomplished through existing
conduits recently installed under capital improvement projects, and with wireless line of sight options.
With this extension and additional
equipment the project adds an additional 14 signals to the existing cent
ral signal system and brings back new cameras along three
heavily congested corridors.
Progress Summary:
Project will be designed and constructed in 2010.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5000.
In addition, staff time will be required upon completion of the
project to monitor the system.
Budget:
2009 YTD Actual
2010 09 Budget
Budget Expenditures
Budget Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009
Estimate 2010 Budget
2011 Budget Project Total
Cost
Unrestricted Street Revenue -
-
-
-
Grants (Fed, State, Local)
693,400
693,400
693,400
REET
-
-
-
Traffic Mitigation Fees
110,000
110,000
110,000
Other
-
-
-
Total Funding Sources:
803,400
803,400
803,400
Capital Expenditures:
Design
40,500
40,500
40,500
Right of Way
-
-
-
Construction
762,900
762,900
762,900
Total Expenditures:
803,400
803,400
803,400
Forecasted Project Cost:
Total
Expenditures
2012
2013 2014
2015 2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
Grants (Fed, State, Local)
693,400
REET
-
Traffic Mitigation Fees
110,000
Other
-
Total Funding Sources:
803,400
Capital Expenditures:
Design
40,500
Right of Way
-
Construction
762,900
Total Expenditures:
803,400
Grants / Other Sources: Grant Funding is CMAQ and requires a 13.5% city match.
42 Intelligent Transportation System Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: ITS Dynamic Message Signs
Project No: cpxxx
Project Type: Non-Capacity (ITS)
Project Manager: TBD
TIP # 50
Description:
This project will fund the design and construction of Dynamic Message signs at various locations throu
ghout the city. Dynamic message
signs are an important tool in ITS for informing roadway users. Priority locations for sign installations are based on the Comprehensive
Transportation Plans ITS map and include Auburn Way North, Auburn Way South, West Valley Highway, East Valley H
ighway and Lea
Hill Road.
Progress Summary:
The first phase of this project is scheduled to begin in 2011 on Au
burn Way South.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5000.
Budget:
2009 YTD Actual
2010
09 Budget
Budget Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009
Estimate 2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
30,000
180,000
Grants (Fed, State, Local)
190,000
1,140,000
REET
-
-
PWTFL
Other
-
-
Total Funding Sources:
220,000
1,320,000
Capital Expenditures:
Design
20,000
120,000
Right of Way
-
-
Construction
200,000
1,200,000
Total Expenditures:
220,000
-
1,320,000
Forecasted Project Cost:
Total
Expenditures
2012
2013 2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
30,000
30,000
90,000
90,000
Grants (Fed, State, Local)
190,000
190,000
570,000
570,000
REET
-
-
-
-
PWTFL
Other
-
-
-
-
Total Funding Sources:
220,000
220,000
660,000
660,000
Capital Expenditures:
Design
20,000
20,000
60,000
60,000
Right of Way
-
-
-
-
Construction
200,000
200,000
600,000
600,000
Total Expenditures:
220,000
220,000
660,000
660,000
Grants / Other Sources: Grant funding is unsecured.
Intelligent Transportation System Projects 43
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title:
East Valley Highway ITS Expansion
Project No:
cpxxx
Project Type:
Capacity
Project Manager:
TBD
TIP # 51
Description:
This project will fund the design, coordination, permitting and construction of ITS facil
ities from 41 st St
SE to Lake Tapps Parkway.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5000.
Budget:
2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009
Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
Grants (Fed, State, Local)
692,000
REET
-
Traffic Impact Fees
108,000
Other
-
Total Funding Sources:
800,000
Capital Expenditures:
Design
85,000
Right of Way
-
Construction
715,000
Total Expenditures:
-
800,000
Forecasted Project Cost:
Total
Expenditures
2012
2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
-
Grants (Fed, State, Local)
692,000
692,000
REET
-
-
Traffic Impact Fees
108,000
108,000
Other
-
-
Total Funding Sources:
800,000
800,000
Capital Expenditures:
Design
85,000
85,000
Right of Way
-
-
Construction
715,000
715,000
Total Expenditures:
800,000
800,000
Grants / Other Sources: Grant funding is unsecured.
44 Intelligent Transportation System Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Skinner Road to 3rd Avenue (Auburn Pacific Trail Phase2) TIP # 22
Project No: c507BO
Project Type: Class 1 Trail / Sidewalk (Capacity)
Project Manager: Leah Dunsdon
Description:
This project will construct minor road widening and bicycle lane striping on Skinner Road and 3rd Avenue SE from Ellingson
Road SW to Pacific Park. Sidewalks will be constructed along the western side of Skinner Road where there are gaps in the
sidewalk network. The project length is approximately 1.2 miles.
The project will connect to the Phase 1 improvements
constructed in Auburn in 2007.
Progress Summary:
Phase 1 (portion in Auburn) was constructed in 2007. Phase 2 (portion in Pacific) will be constructed in 2010.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2009 YTD Actual 2010
09 Budget
Budget Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009
Estimate 2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue 3,300
- 3,600
6,900
6,900
Grants (Fed, State, Local) -
4,080 107,000
111,080
111,080
REET2
7,920 -
7,920
7,920
Traffic Impact Fees
- -
-
Other (City fo Pacific) -
- 36,200
36,200
36,200
Total Funding Sources: 3,300
12,000 146,800
162,100
162,100
Capital Expenditures:
Design 3,300
12,000 -
15,300
15,300
Right of Way -
- -
-
-
Construction -
- 146,800
146,800
146,800
Total Expenditures: 3,300
12,000 146,800
162,100
162,100
Forecasted Project Cost:
Total
Expenditures
2012
2013 2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
3,600
-
Grants (Fed, State, Local)
107,000
REET2
-
Traffic Impact Fees
-
Other (City fo Pacific)
36,200
Total Funding Sources:
146,800
Capital Expenditures:
Design
-
Right of Way
-
Construction
146,800
Total Expenditures:
146,800
Grants / Other Sources: Other is a reimbursable commitment of funds from City of Pacific.
Non Motorized Improvement Projects 45
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102)
Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: BNSF/E. Valley Highway Pedestrian Underpass TIP # 23
Project No: c229a0
Project Type: Class 1 Trail (Capacity)
Project Manager: TBD
Description:
Project to construct an undercrossing of the BNSF Railroad in conjunction with a pedestrian bridge to allow a sa
fe, direct,
attractive non-motorized access between neighborhoods in the City of Pacific
and schools in the City of Auburn.
Progress Summary:
The design is on hold. Funding source is most likely a federal earmark. Currently this project is on hold pending some
discussions with BNSF RR. They are in the process of planning for a third rail
which would significantly impact the design.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $240.
Budget: 2009
YTD Actual 2010
09 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue 53,900
53,900
53,900
Grants (Fed, State, Local) 170,400
170,400
9,720,400
REET -
-
-
Traffic Impact Fees
-
Other
250,000
Total Funding Sources: 224,300
224,300
10,024,300
Capital Expenditures:
Design 224,300
224,300
974,300
Right of Way -
-
50,000
Construction -
-
9,000,000
Total Expenditures: 224,300
224,300
10,024,300
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
-
Grants (Fed, State, Local)
4,550,000
4,550,000
5,000,000
REET
-
-
-
Traffic Impact Fees
-
-
Other (Other Agencies)'
250,000
250,000
-
Total Funding Sources:
4,800,000
4,800,000
5,000,000
Capital Expenditures:
Design
750,000
750,000
-
Rightof Way
50,000
50,000
-
Construction
4,000,000
4,000,000
5,000,000
Total Expenditures:
4,800,000
4,800,000
5,000,000
Grants / Other Sources: 'KC Open Space Bond and High Speed Rail Safety Money.
46 Non Motorized Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Academy Drive Multi-Use Trail
Project No: cpXXXX
Project Type: Class 1 Trail (Capacity)
Project Manager: TBD
TIP # 24
Description:
This project will use existing right-of-way to repair the damaged roadbed to a usable multi-use
trail on Academy Drive from
the Green River Road to Auburn Way South.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is esti
mated to be $1
,680.
Budget:
2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources:
Prior to 2009
Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue
-
245,000
Grants (Fed, State, Local)
765,000
REET
-
Traffic Impact Fees
Other Sources
-
Total Funding Sources:
1,010,000
Capital Expenditures:
Design
160,000
Right of Way
-
Construction
850,000
Total Expenditures:
-
1,010,000
Forecasted Project Cost:
Total
Expenditures
2012
2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
10,000
150,000
42,500
42,500
245,000
-
Grants (Fed, State, Local)
-
-
382,500
382,500
765,000
REET
-
-
-
Traffic Impact Fees
Other Sources
-
-
-
-
-
Total Funding Sources:
10,000
150,000
425,000
425,000
1,010,000
Capital Expenditures:
Design
10,000
150,000
-
-
160,000
Right of Way
-
-
-
-
-
Construction
-
-
425,000
425,000
850,000
Total Expenditures:
10,000
150,000
425,000
425,000
1,010,000
Grants / Other Sources: Grant Funding is unsecured
Non Motorized Improvement Projects 47
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title:
A ST NE Pedestrian Improvements
Project No:
cpxxxx
Project Type:
Sidewalk Improvements (Non-Capacity)
Project Manager:
TBD
TIP # 44
Description:
This project completes a pedestrian connection between Downtown Auburn and the 8th Street NE business district. This project will
improve a pedestrian crossing at 3rd Street NE, and construct sidewalks/access ramps along the A Street NE corridor.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $500.
Budget: 2009
YTD Actual 2010
09 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
-
Grants (Fed, State, Local)
150,000
150,000
REET
-
-
PWTFL
Other
-
-
Total Funding Sources:
150,000
150,000
Capital Expenditures:
Design
15,000
15,000
Right of Way
-
-
Construction
135,000
135,000
Total Expenditures:
150,000
-
150,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
Grants (Fed, State, Local)
150,000
REET
-
PWTFL
Other
-
Total Funding Sources:
150,000
Capital Expenditures:
Design
15,000
Right of Way
-
Construction
135,000
Total Expenditures:
150,000
Grants / Other Sources: Grant funding is unsecured.
48 Non Motorized Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Interurban Trailhead Improvements
Project No: cpxxxx
Project Type: Class 1 Trail (Non-Capacity)
Project Manager: TBD
TIP # 45
Description:
This project provides funding for enhancements to existing trailheads and construction of new trailheads. Improvements include bike
racks, kiosks, parking and access.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
-
Grants (Fed, State, Local)
185,000
185,000
Traffic Mitigation Fees
25,000
25,000
PWTFL
-
-
Other
-
-
Total Funding Sources:
210,000
210,000
Capital Expenditures:
Design
20,000
20,000
Right of Way
-
-
Construction
190,000
190,000
Total Expenditures:
210,000
-
210,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
Grants (Fed, State, Local)
185,000
Traffic Mitigation Fees
25,000
PWTFL
-
Other
-
Total Funding Sources:
210,000
Capital Expenditures:
Design
20,000
Right of Way
-
Construction
190,000
Total Expenditures:
210,000
Grants / Other Sources: Grant funding is unsecured.
Non Motorized Improvement Projects 49
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: 37th St SE & R ST SE Pedestrian Connector
Project No: CP0803
Project Type: Class 1 Trail (Capacity)
Project Manager: Leah Dunsdon
TIP # 53
Description:
This project will construct a pedestrian connection between 37th ST SE
& R St providi
ng a link between south Auburn and the White
River Trail and Game Farm Park.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget
for street maintenance.
Budget:
2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources:
Prior to 2009
Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue
-
-
-
-
-
Grants (State)
337
13,263
110,700
124,300
124,300
Traffic Mitigation Fees
-
-
-
-
-
PWTFL
Other
-
-
-
-
-
Total Funding Sources:
337
13,263
110,700
124,300
124,300
Capital Expenditures:
Design
337
13,263
-
13,600
13,600
Right of Way
-
-
-
-
-
Construction
-
-
110,700
110,700
110,700
Total Expenditures:
337
13,263
110,700
124,300
124,300
Forecasted Project Cost:
Total
Expenditures
2012
2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
Grants (State)
110,700
Traffic Mitigation Fees
-
PWTFL
Other
-
Total Funding Sources:
110,700
Capital Expenditures:
Design
-
Right of Way
-
Construction
110,700
Total Expenditures:
110,700
Grants / Other Sources: Grant funding is State Ped & Bike Safety Grant.
50 Non Motorized Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: METRO Shuttle: Auburn Community and Lakeland Shuttles TIP # 26
Project No: NA
Project Type: Other
Project Manager: TBD
Description:
Operation costs associated with two new Metro routes: a Commuter Shuttle from the Lakeland Hills nei
ghborhood to Au
burn Station and
a Community Shuttle linking residential neighborhoods with commercial
and service centers.
Progress Summary:
Lakeland Hill Service began in 2009. The community shuttle will b
egin service
in 2010. Funding assistance w
ill be requested
through the Transit Now Partnership Program.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009
Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
140,000
240,000
-
380,000
380,000
Grants (Fed, State, Local)
-
-
220,000
-
1,100,000
REET
-
-
Traffic Mitigation Fees
Other (TBD)
-
-
-
-
-
Total Funding Sources:
140,000
240,000
220,000
380,000
1,480,000
Capital Expenditures:
Design
-
-
-
-
-
Right of Way
-
-
-
-
-
Operating Costs
140,000
240,000
220,000
380,000
1,480,000
Total Expenditures:
140,000
240,000
220,000
380,000
1,480,000
Forecasted Project Cost:
Total
Expenditures
2012
2013
2014
2015
2010-2015
Beyond 2014
Funding Sources:
Unrestricted Street Revenue -
-
-
-
240,000
-
Grants (Fed, State, Local) 220,000
220,000
220,000
220,000
1,100,000
REET -
-
-
-
-
Traffic Mitigation Fees
Other (TBD) -
-
-
-
-
Total Funding Sources: 220,000
220,000
220,000
220,000
1,340,000
Capital Expenditures:
Design -
-
-
-
-
Right of Way -
-
-
-
-
Operating Costs 220,000
220,000
220,000
220,000
1,340,000
Total Expenditures: 220,000
220,000
220,000
220,000
1,340,000
Grants / Other Sources: Grant Funding is unsecured.
Studies and Miscellaneous Projects 51
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: 41st Street SE and A Street SE Access Management Study TIP # 27
Project No: cpxxxx
Project Type: Safety (Non-Capacity)
Project Manager: TBD
Description:
Study the area from 37th Street SE to the White River on A Street SE including
41 st Street SE from D Street SE to C Street
SE. The study to should review the safety and access needs of the traveling public and the adjacent properties.
Progress Summary:
Pre-design will be done to refine project scope, alignment, and cost.
Future Impact on Operating Budget:
This study will have no impact on the operating budget for street maintenance.
Budget: 2009
YTD Actual 2010
09 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
10,000
10,000
10,000
Grants (Fed, State, Local)
-
-
-
REET
Traffic Mitigation Fees
Other
-
-
-
Total Funding Sources:
10,000
10,000
10,000
Capital Expenditures:
Design
10,000
10,000
10,000
Right of Way
-
-
-
Construction
-
-
-
Total Expenditures:
10,000
10,000
10,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
10,000
-
Grants (Fed, State, Local)
-
REET
Traffic Impact Fees
Other
-
Total Funding Sources:
10,000
Capital Expenditures:
Design
10,000
Right of Way
-
Construction
-
Total Expenditures:
10,000
Grants / Other Sources:
52 Studies and Miscellaneous Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: 104th Ave SE & Green River Road Study
Project No: cpxxxx
Project Type: Non-Capacity (Intersection Safety)
Project Manager: TBD
TIP # 46
Description:
This project will fund a pre-design study to determine the right of way, evironmental and construction requirements for i
ntersection safety
improvements. This safety project scope will include sight distance improvements, constructing turn lanes, channelization, environmental
mitigation, signage and clear zone improvements.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2009
YTD Actual 2010
09 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
5,000
5,000
5,000
Grants (Fed, State, Local)
-
-
-
REET
PWTFL
Other
-
-
-
Total Funding Sources:
5,000
5,000
5,000
Capital Expenditures:
Design
5,000
5,000
5,000
Right of Way
-
-
-
Construction
-
-
-
Total Expenditures:
5,000
5,000
5,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
5,000
-
Grants (Fed, State, Local)
-
REET
PWTFL
Other
-
Total Funding Sources:
5,000
Capital Expenditures:
Design
5,000
Right of Way
-
Construction
-
Total Expenditures:
5,000
Grants / Other Sources:
Studies and Miscellaneous Projects 53
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Environmental Park Roadway Improvements Study TIP # 47
Project No: cpxxx
Project Type: Capacity
Project Manager: TBD
Description:
This project will fund a study to determine the feasibility, scope and cost of low impact roadway, bicycle and pedestrian
improvements in
the Environmental Park area. Included in this study scope is a connection between C
lay St NW and Western St NW.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2009
YTD Actual 2010
09 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
5,000
5,000
5,000
Grants (Fed, State, Local)
-
-
-
REET
PWTFL
Other
-
-
-
Total Funding Sources:
5,000
5,000
5,000
Capital Expenditures:
Design
5,000
5,000
5,000
Right of Way
-
-
-
Construction
-
-
-
Total Expenditures:
5,000
5,000
5,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
5,000
-
Grants (Fed, State, Local)
-
REET
PWTFL
Other
-
Total Funding Sources:
5,000
Capital Expenditures:
Design
5,000
Right of Way
-
Construction
-
Total Expenditures:
5,000
Grants / Other Sources:
54 Studies and Miscellaneous Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Downtown to Les Gove Non-Motorized Improvements Study TIP # 48
Project No: cpxxxx
Project Type: Bike Lanes,Sidewalks and Transit Improvement Study (Capacity)
Project Manager: TBD
Description:
This project provides funding to complete a study of the 2nd St SE & F St SE corrido
r between Les Gove Park and Downtown Auburn.
Improvements may include pavement reconstruction, sidewalks, access ramps, signal modifications and route signing.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2009
YTD Actual 2010
09 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
10,000
10,000
10,000
Grants (Fed, State, Local)
-
-
-
REET
PWTFL
Other
-
-
-
Total Funding Sources:
10,000
10,000
10,000
Capital Expenditures:
Design
10,000
10,000
10,000
Right of Way
-
-
-
Construction
-
-
-
Total Expenditures:
10,000
10,000
10,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
10,000
-
Grants (Fed, State, Local)
-
REET
PWTFL
Other
-
Total Funding Sources:
10,000
Capital Expenditures:
Design
10,000
Right of Way
-
Construction
-
Total Expenditures:
10,000
Grants / Other Sources:
Studies and Miscellaneous Projects 55
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: S 316th St Bicycle & Pedestrian Improvement Study TIP # 49
Project No: cpxxxx
Project Type: Class 2 Bike Lanes / Sidewalks (Capacity)
Project Manager: TBD
Description:
This project provides funding for completing a study to add bicycle and pedestrian facilities on S 316th
St from east of Evergreen
Heights Elementary to 51 st Ave S.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
5,000
5,000
5,000
Grants (Fed, State, Local)
-
-
-
REET
PWTFL
Other
-
-
-
Total Funding Sources:
5,000
5,000
5,000
Capital Expenditures:
Design
5,000
5,000
5,000
Right of Way
-
-
-
Construction
-
-
-
Total Expenditures:
5,000
5,000
5,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
5,000
-
Grants (Fed, State, Local)
-
REET
PWTFL
Other
-
Total Funding Sources:
5,000
Capital Expenditures:
Design
5,000
Right of Way
-
Construction
-
Total Expenditures:
5,000
Grants / Other Sources:
56 Studies and Miscellaneous Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title:
Kersey Way Study
Project No:
cpXXXX
Project Type:
Capacity
Project Manager:
TBD
TIP # 54
Description:
This project will study improvements to the Kersey Way SE corridor from the White River Bridge to the southern city limits. The
study will develop the scope and costs for horizontal/vertical geometric roadway improvements, roadside hazard mi
tigation, street
lighting and non-motorized trail construction. The project length is approximately two miles.
Progress Summary:
It is anticipated that pre-design will begin in 2010.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $14,056.
Budget: 2009 YTD Actual 2010
09 Budget
Budget Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate 2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
Grants (Fed, State, Local)
REET -
-
Traffic Impact Fees 100,000
100,000
100,000
Other
Total Funding Sources: 100,000
100,000
100,000
Capital Expenditures:
Design 100,000
100,000
100,000
Right of Way -
-
-
Construction -
-
-
Total Expenditures: 100,000
100,000
100,000
Forecasted Project Cost:
Total
Expenditures
2012 2013 2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
Grants (Fed, State, Local)
REET
-
Traffic Impact Fees
100,000
Other (Developer)*
-
Total Funding Sources:
100,000
Capital Expenditures:
Design
100,000
Right of Way
-
Construction
-
Total Expenditures:
100,000
Grants / Other Sources:
Studies and Miscellaneous Projects 57
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title:
Mary Olson Farm Improvements
Project No:
CP0815
Project Type:
Non-Capacity
Project Manager:
Leah Dunsdon
TIP # 55
Description:
This is a historical preservation project required as mitigation for S 277th Reconstructi
on Project.
Progress Summary:
Phase 1 of project was completed in 2009 and Phase 2 is schedul
ed to be completed in 2010.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009
Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
-
-
-
Grants (Federal)
49,650
51,400
101,050
101,050
REET
-
-
-
-
PWTFL
Other
-
-
-
-
Total Funding Sources:
49,650
51,400
101,050
101,050
Capital Expenditures:
Design
-
-
-
-
Right of Way
-
-
-
-
Construction
49,650
51,400
101,050
101,050
Total Expenditures:
49,650
51,400
101,050
101,050
Forecasted Project Cost:
Total
Expenditures
2012
2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
Grants (Federal)
51,400
REET
-
PWTFL
Other
-
Total Funding Sources:
51,400
Capital Expenditures:
Design
-
Right of Way
-
Construction
51,400
Total Expenditures:
51,400
Grants / Other Sources:
58 Studies and Miscellaneous Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Auburn Transit Station Parking Garage
Project No: CPXXXX
Project Type: Non-Capacity
Project Manager: TBD
TIP # 56
Description:
This project will fund the design, right of way and construction of a new 600 car parki
ng garage at the Auburn Transit Station.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
Grants (Federal)
REET
PWTFL
-
Other(Sound Transit)
31,600,000
Total Funding Sources:
31,600,000
Capital Expenditures:
Design
6,700,000
Right of Way
1,000,000
Construction
23, 900, 000
Total Expenditures:
31,600,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
Grants (Federal)
REET
PWTFL
-
-
-
Other(SoundTransit)
7,700,000
23,900,000
31,600,000
Total Funding Sources:
7,700,000
23,900,000
31,600,000
Capital Expenditures:
Design
6,700,000
-
6,700,000
Right of Way
1,000,000
-
1,000,000
Construction
-
23,900,000
23,900,000
Total Expenditures:
7,700,000
23,900,000
31,600,000
Grants / Other Sources:
Studies and Miscellaneous Projects 59
City of Auburn Transportation Improvement Program
60 Studies and Miscellaneous Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Annual Bridge Maintenance Project
Project No: cpxxxx
Project Type: Non-Capacity (Annual)
Project Manager: Pablo Para
TIP # 28
Description:
This is an annual level of effort project used to fund brid
ge improvements as identified
by the city's ann
ual bridge inspection program.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget
for street maintenance.
Budget:
2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources:
Prior to 2009
Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue
-
50,000
50,000
50,000
300,000
Grants (Fed, State, Local)
-
-
-
-
REET
Traffic Mitigation Fees
Other
-
-
-
-
Total Funding Sources:
50,000
50,000
50,000
300,000
Capital Expenditures:
Design
-
-
-
-
Right of Way
-
-
-
-
Construction
50,000
50,000
50,000
300,000
Total Expenditures:
50,000
50,000
50,000
300,000
Forecasted Project Cost:
Total
Expenditures
2012
2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
50,000
50,000
50,000
50,000
300,000
-
Grants (Fed, State, Local)
-
-
-
-
-
REET
Traffic Mitigation Fees
Other
-
-
-
-
-
Total Funding Sources:
50,000
50,000
50,000
50,000
300,000
Capital Expenditures:
Design
-
-
-
-
-
Right of Way
-
-
-
-
-
Construction
50,000
50,000
50,000
50,000
300,000
Total Expenditures:
50,000
50,000
50,000
50,000
300,000
Grants / Other Sources:
Level of Effort Projects 61
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: South 277th - Wetland Mitigation
Project No: c41 0a0
Project Type: Non-Capacity
Project Manager: Nutter
TIP # 29
Description:
Wetland mitigation for the 277th Street Grade Sepa
ration project.
Progress Summary:
This is a 10-year obligation, which began in 2004.
Future Impact on Operating Budget:
This project will have no impact on the operating bu
dget for street
maintenance.
Budget:
2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources:
Prior to 2009
Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue
67,775
100,000
25,000
25,000
192,775
267,775
Grants (Fed, State, Local)
-
-
-
-
-
-
REET
Traffic Impact Fees
Other
-
-
-
-
-
-
Total Funding Sources:
67,775
100,000
25,000
25,000
192,775
267,775
Capital Expenditures:
Design
30,210
25,000
10,000
10,000
65,210
95,210
Right of Way
-
-
-
-
-
-
Construction
37,565
75,000
15,000
15,000
127,565
172,565
Total Expenditures:
67,775
100,000
25,000
25,000
192,775
267,775
Forecasted Project Cost:
Total
Expenditures
2012
2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
25,000
25,000
100,000
-
Grants (Fed, State, Local)
-
-
-
REET
Traffic Impact Fees
Other
-
-
-
Total Funding Sources:
25,000
25,000
100,000
Capital Expenditures:
Design
10,000
10,000
40,000
Right of Way
-
-
-
Construction
15,000
15,000
60,000
Total Expenditures:
25,000
25,000
100,000
Grants / Other Sources:
62 Level of Effort Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Citywide Pedestrian Crossing Program
Project No: cpXXXX
Project Type: Non-Capacity (Bi-Annual)
Project Manager: TBD
TIP # 30
Description:
This is a bi-annual level of effort project used to fun
d small pedestrian safety studies and improvement projects. This project
provides for pedestrian safety studies and improvements at various locations cit
ywide. Projects are prioritized annually
based on safety issues and pedestrian demands.
Progress Summary:
Projects for 2010 are being analyzed.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2009
YTD Actual 2010
09 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources:
Prior to 2009 Estimate
2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Street Revenue
11,700
100,000
111,700
311,700
Grants (Fed, State, Local)
-
-
-
-
REET
Traffic Impact Fees
Other
-
-
-
-
Total Funding Sources:
11,700
100,000
111,700
311,700
Capital Expenditures:
Design
11,700
10,000
21,700
41,700
Right of Way
-
-
-
-
Construction
-
90,000
90,000
270,000
Total Expenditures:
11,700
100,000
111,700
311,700
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
100,000
100,000
300,000
-
Grants (Fed, State, Local)
-
-
-
REET
Traffic Impact Fees
Other
-
-
-
Total Funding Sources:
100,000
100,000
300,000
Capital Expenditures:
Design
10,000
10,000
30,000
Right of Way
-
-
-
Construction
90,000
90,000
270,000
Total Expenditures:
100,000
100,000
300,000
Grants / Other Sources:
Level of Effort Projects 63
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title: Citywide Arterial Bicycle & Safety Improvements TIP # 31
Project No: cpxxx
Project Type: Non-Capacity (Safety)
Project Manager: Various
Description:
This is an annual level of effort project focused on funding bicycle
and safety im
provements on classified road
ways. Projects
are prioritized annually based upon field studies. Project was previ
ously called "
Citywide Roadway Safety Infrastructure
Improvements.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street
maintenance.
Budget:
2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009
Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue -
19,500
100,000
19,500
519,500
Grants (Fed, State, Local)
-
-
-
-
REET
Traffic Impact Fees
Other
-
-
-
-
Total Funding Sources:
19,500
100,000
19,500
519,500
Capital Expenditures:
Design
19,500
10,000
19,500
69,500
Right of Way
-
-
-
-
Construction
-
90,000
-
450,000
Total Expenditures:
19,500
100,000
19,500
519,500
Forecasted Project Cost:
Total
Expenditures
2012
2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue 100,000
100,000
100,000
100,000
500,000
-
Grants (Fed, State, Local) -
-
-
-
-
REET
Traffic Impact Fees
Other -
-
-
-
-
Total Funding Sources: 100,000
100,000
100,000
100,000
500,000
Capital Expenditures:
Design 10,000
10,000
10,000
10,000
50,000
Right of Way -
-
-
-
-
Construction 90,000
90,000
90,000
90,000
450,000
Total Expenditures: 100,000
100,000
100,000
100,000
500,000
Grants / Other Sources:
64 Level of Effort Projects
City of Auburn Transportation Improvement Program
CAPITAL IMPROVEMENT FUND (328)
Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Capital Projects Fund
Project Title: Citywide Sidewalk Improvements
Project No: varies
Project Type: Non-Capacity (Bi-Annual)
Project Manager: Seth Wickstrom
TIP #32
Description:
Project will fund sidewalk improvements to a variety of locations throughout the city. A sidewa
lk inventory was completed in
2004. Annual projects are selected based upon criteria such as: gap closure, safe walking rou
tes to schools,
completion of
downtown pedestrian corridor or "linkage", connectivity to transit services, ADA requirements, and "Save our Streets" (SOS)
project locations.
Progress Summary:
Future Impact on Operating Budget:
Budget:
2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009
Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Cap. Improv. Revenue -
200,000
180,000
200,000
780,000
Grants (Fed, State, Local)
-
-
-
-
REET2
Other
-
-
-
-
Total Funding Sources:
200,000
180,000
200,000
780,000
Capital Expenditures:
Design
20,000
10,000
20,000
54,000
Right of Way
-
-
-
-
Construction
180,000
170,000
180,000
726,000
Total Expenditures:
200,000
180,000
200,000
780,000
Forecasted Project Cost:
Total
Expenditures
2012
2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Cap. Improv. Revenue 20,000
180,000
20,000
180,000
580,000
-
Grants (Fed, State, Local) -
-
-
-
-
REET2
Other -
-
-
-
-
Total Funding Sources: 20,000
180,000
20,000
180,000
580,000
Capital Expenditures:
Design 2,000
10,000
2,000
10,000
34,000
Right of Way -
-
-
-
-
Construction 18,000
170,000
18,000
170,000
546,000
Total Expenditures: 20,000
180,000
20,000
180,000
580,000
Grants / Other Sources:
Level of Effort Projects 65
City of Auburn Transportation Improvement Program
CAPITAL IMPROVEMENT FUND (328)
Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Capital Projects Fund
Project Title:
Traffic Calming Improvements
Project No:
cpxxxx
Project Type:
Annual
Project Manager:
Pablo Para
TIP #33
Description:
The City's Neighborhood Traffic Calming Program was adopted by City C
ouncil in November of 2005.
Staff receives co
mplaints from
citizens and then gathers data to confirm that a speeding issue and/or cut through traffic issue is present. This money is for physical
improvements to the streets once all other options have been exhausted.
Physical im
provements may include items such as speed
humps, speed tables, chicanes, traffic circles, and median treatments.
Progress Summary:
Future Impact on Operating Budget:
Budget:
2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009
Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Cap. Improv. Revenue -
Grants (Fed, State, Local)
REET2
-
-
-
-
-
Other(Redflex)
165,000
100,000
200,000
265,000
1,265,000
Total Funding Sources:
165,000
100,000
200,000
265,000
1,265,000
Capital Expenditures:
Design
5,000
10,000
20,000
15,000
115,000
Right of Way
-
-
-
-
-
Construction
160,000
90,000
180,000
250,000
1,150,000
Total Expenditures:
165,000
100,000
200,000
265,000
1,265,000
Forecasted Project Cost:
Total
Expenditures
2012
2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Cap. Improv. Revenue
-
Grants (Fed, State, Local)
REET2 -
-
-
-
-
Other(Redflex) 200,000
200,000
200,000
200,000
1,100,000
Total Funding Sources: 200,000
200,000
200,000
200,000
1,100,000
Capital Expenditures:
Design 20,000
20,000
20,000
20,000
110,000
Right of Way -
-
-
-
-
Construction 180,000
180,000
180,000
180,000
990,000
Total Expenditures: 200,000
200,000
200,000
200,000
1,100,000
Grants / Other Sources: Redflex money transferred from General Fund.
66 Level of Effort Projects
City of Auburn Transportation Improvement Program
CAPITAL IMPROVEMENT FUND (328)
Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Capital Projects Fund
Project Title: Traffic Signal Improvements
Project No: cpxxxx
Project Type: Non-Capacity (Bi-Annual)
Project Manager: Scott Nutter
TIP #34
Description:
The City analyzes accident data and identifies locations
with higher than average rates
. Typically these involve signal locations where
volumes have grown significantly requiring signal modifications. Signals that have acci
dent patterns that are correctabl
e are identified
and the modifications are implemented. Signals are also evaluated annually for potent
ial capacity enhancements.
Progress Summary:
Future Impact on Operating Budget:
Budget:
2009
YTD Actual 2010
09 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources:
Prior to 2009 Estimate
2010 Budget 2011 Budget
Project Total
Cost
Unrestricted Cap. Improv. Revenue
-
Grants (Fed, State, Local)
-
-
-
REET 2
100,000
100,000
500,000
Other
-
-
-
Total Funding Sources:
100,000
100,000
500,000
Capital Expenditures:
Design
10,000
10,000
50,000
Right of Way
-
-
-
Construction
90,000
90,000
450,000
Total Expenditures:
100,000
100,000
500,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014 2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Cap. Improv. Revenue
-
Grants (Fed, State, Local)
-
-
-
REET 2
200,000
200,000
500,000
Other
-
-
-
Total Funding Sources:
200,000
200,000
500,000
Capital Expenditures:
Design
20,000
20,000
50,000
Right of Way
-
-
-
Construction
180,000
180,000
450,000
Total Expenditures:
200,000
200,000
500,000
Grants / Other Sources:
Level of Effort Projects 67
City of Auburn Transportation Improvement Program
0 ' IMAGINVO
68 Level of Effort Projects
City of Auburn Transportation Improvement Program
STREET FUND (105)
Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title:
Annual Arterial Street Preservation
Project No:
cpxxxx
Project Type:
Non-Capacity
Project Manager:
Seth Wickstrom
TIP #35
Description: Implement regular pavement maintenance and/or rehabilitation of various classified streets citywide. These
projects may include overlays, rebuilds, spot repairs, or a combination of these.
It is anticipated that this prog
ram will be
funded through bond proceeds that will be repaid by the 1 % utility tax that was adopted by Council in 2008.
Progress Summary:
This program is being expanded from previous years. Prior years this program
provided approximately $675,000 from the
REET funding to go towards the purpose of preserving classified streets.
Future Impact on Operating Budget:
None
Budget: 2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs) 2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009 Estimate
2010 Budget
2011 Budget
Project Total
Cost
Street Fund -
Property Tax
-
-
-
-
Utility Tax
1,400,000
1,400,000
1,400,000
8,400,000
REET2
-
-
-
-
Bond Proceeds
-
-
-
-
Total Funding Sources:
1,400,000
1,400,000
1,400,000
8,400,000
Capital Expenditures:
Design
50,000
50,000
50,000
300,000
Right of Way
-
-
-
-
Construction
1,350,000
1,350,000
1,350,000
8,100,000
Total Expenditures:
1,400,000
1,400,000
1,400,000
8,400,000
Forecasted Project Cost:
Total
Expenditures
2012 2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Street Fund
-
-
Property Tax - -
-
-
-
Utility Tax 1,400,000 1,400,000
1,400,000
1,400,000
8,400,000
REET2 - -
-
-
-
Bond Proceeds - -
-
-
-
Total Funding Sources: 1,400,000 1,400,000
1,400,000
1,400,000
8,400,000
Capital Expenditures:
Design 50,000 50,000
50,000
50,000
300,000
Right of Way - -
-
-
-
Construction 1,350,000 1,350,000
1,350,000
1,350,000
8,100,000
Total Expenditures: 1,400,000 1,400,000
1,400,000
1,400,000
8,400,000
Grants / Other Sources:
Pavement Preservation Projects 69
City of Auburn Transportation Improvement Program
STREET FUND (105) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title:
Annual Arterial Crack Seal Program
Project No:
cpxxxx
Project Type:
Non-Capacity
Project Manager:
Seth Wickstrom
TIP #36
Description:
Implement regular maintenance of various classified streets by sealing newly formed cracks. Sealing t
he cracks will pro
long the life of
the pavement by stopping water from draining into the subbase of the road.
Progress Summary:
Future Impact on Operating Budget:
Budget:
2009
YTD Actual
2010
09 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources:
Prior to 2009
Estimate
2010 Budget
2011 Budget
Project Total
Cost
Unrestricted Street Revenue
-
-
-
-
-
Utility Tax
100,000
100,000
100,000
600,000
REET
-
-
-
-
Bond proceeds
-
-
-
-
Total Funding Sources:
100,000
100,000
100,000
600,000
Capital Expenditures:
Design
10,000
10,000
10,000
60,000
Right of Way
-
-
-
-
Construction
90,000
90,000
90,000
540,000
Total Expenditures:
100,000
100,000
100,000
600,000
Forecasted Project Cost:
Total
Expenditures
2012
2013
2014
2015
2010-2015
Beyond 2015
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
-
-
Utility Tax
100,000
100,000
100,000
100,000
600,000
REET
-
-
-
-
-
Bond proceeds
-
-
-
-
-
Total Funding Sources:
100,000
100,000
100,000
100,000
600,000
Capital Expenditures:
Design
10,000
10,000
10,000
10,000
60,000
Right of Way
-
-
-
-
-
Construction
90,000
90,000
90,000
90,000
540,000
Total Expenditures:
100,000
100,000
100,000
100,000
600,000
Grants / Other Sources:
70 Pavement Preservation Projects
City of Auburn Transportation Improvement Program
LOCAL STREET FUND (103) Capital Facilities Plan
Six Year Capital Facilities Plan, 2010-2015 Special Revenue Funds
Project Title:
Local Street Improvement Program
Project No:
Various
Project Type:
Non-Capacity
Project Manager:
Wlckstrom
TIP #37
Description:
This program was created after passage of Proposition 1 on the Novem
ber'04 ballot, setting the City'
s property tax levy limits and
creating a dedicated local street fund to be used solely for local street improvements. The program wi
ll consist of a number of different
contracts focused on the preservation of local streets (unclassified streets) within the City of Auburn.
These contracts will include work
such as crack sealing, asphalt patching, pre-leveling, asphalt overlays a
nd roadway reconstruction. The property tax levy lift that was
voted in in 2004 will be used to repay the bonds that are anticipated to c
omplete the program.
Progress Summary:
This program has successfully completed overlays in 2005, 2006,
2007, and is on track to co
mplete overlays in 2008. In
2009 and 2010 the program will begin tackling the streets that require a complete reconstruct
ion because the street surface
and underlying base has failed.
Future Impact on Operating Budget:
None
Budget:
2009 YTD Actual
2010 09 Budget
Budget Expenditures
Budget Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2009 YE
2010 Year End
Total Project
Funding Sources: Prior to 2009
Estimate 2010 Budget
2011 Budget Project Total
Cost
Local Street Fund 25,000
15,000 -
- 40,000
40,000
Property Tax 1,582,700
810,000 1,500,000
2,200,000 3,892,700
14,892,700
Utility Mitigation 450,000
225,000 -
- 675,000
675,000
Bond Proceeds -
-
-
-
Other 2,655,000
1,545,000 -
- 4,200,000
4,200,000
Total Funding Sources: 4,712,700
2,595,000 1,500,000
2,200,000 8,807,700
19,807,700
Capital Expenditures:
Design 240,000
440,000 300,000
300,000 980,000
2,480,000
Right of Way -
- -
- -
-
Construction 4,472,700
2,155,000 1,200,000
1,900,000 7,827,700
17,327,700
Total Expenditures: 4,712,700
2,595,000 1,500,000
2,200,000 8,807,700
19,807,700
Forecasted Project Cost:
Total
Expenditures
2012
2013 2014
2014 2010-2015
Beyond 2015
Funding Sources:
Local Street Fund -
- -
- -
-
Property Tax 2,200,000
2,200,000 2,200,000
2,200,000 12,500,000
Utility Mitigation -
- -
- -
Bond Proceeds
Other
Total Funding Sources: 2,200,000
2,200,000 2,200,000
2,200,000 12,500,000
Capital Expenditures:
Design 300,000
300,000 300,000
300,000 1,800,000
Right of Way -
- -
- -
Construction 1,900,000
1,900,000 1,900,000
1,900,000 10, 700, 000
Total Expenditures: 2,200,000
2,200,000 2,200,000
2,200,000 12,500,000
Grants / Other Sources:
Pavement Preservation Projects 71
U07A0
1
A St NW, Phase 1 (3rtl St NW to 14th St NW)
PS
3376,014
3,909,500
4,050,000
11 335,514
C409A0
3
Auburn Way lmp(4th St NE to 4th St SE)
A'12
78,251
818,700
3,000,000
3,896,951
C415A0
4
I St NE (40th St NE to 52nd St NE)
WA
11,82]
5,000
5,000
460,000
1,020,000
4280,000
5,]81,82]
C201A0
5
M St SE Gratle Separation(E Main to AWS)
PS
1,128,600
5,561,800
],62],000
7,823,000
22,140,400
C222A0
6
5277th &-t (AM to Green River Bridge)
A'12
19,085
325,000
2,/25000
3,909,985
cpxxxx
7
15th St SW Re construction(C St SW to UPRR)
A'11
375,000
3,000,000
3,375,000
cpxxxx
8
A St NW, Phase 2(W Main to 3rtl St NW)
A'10
150,000
100,000
1,200,000
1,250,000
2,700,000
cPxxxx
9
D St NW (37th St NW to 44th St NW)
A'13
200,000
200,000
0,000,000
0,400,000
CP0911
10
F St SE (4th St SE to AWS)
A'13
7,620
200,000
1,000,000
1,20],620
cpxxxx
11
M St NE (E Main St to 4th St NE)
All
50,000
275,000
1,000,000
1,325,000
cpxxxx
12
Gratle-Sep araled Crossing of BNSF Railyard
WA
1,000000
31,000,000
32,000000
CP.16
14
W Valley Hwy (SR 18 to W Main St)
S
145,000
320,000
4,535,000
5,000,000
cpxxxx
15
Bah St NE (Pike Sa to R St NE)
All
459,999
1,999,999
1,459,999
cpxxxx
16
49th St NE from Auburn Way North to M St NE
WA
850,000
1,150000
2000000
cpxxxx
39
124th Ave SE Corritlor Imp Phase I
A'10
100 000
750 000
850 000
cpxxxx
40
124th Ave SE Corritlor Imp Phase ll
A-11
150,000
13/0000
1,520,000
cpxxxx
41
124th Ave SE Corritlor Imp Phase III
A'12
50,000
450 000
500 000
cpxxxx
42
SE 32(Ith St Corritlor Imp
A'13
60,000
580,000
640000
cpxxxx
52
Downtown Promenade Imp
s
1,000,000
6,985,000
7,985,000
Subtotal
4,916,397
11,796,300
25,652,000
10,808,000
],033,]00
12,190,000
3,780,000
37,000,000
113,176,397
CP.11
17
Harveyi8th Street Imp - Debt Service
WA
1945,500
100,000
100,000
100,000
100,000
100,000
100,000
1,200,000
3,745500
CP0701
18
8th SheehR Street NE Traffic Signal
s
14/,/98
500,500
.8 2U8
cpxxxx
19
Auburn Way NOrtN1 Street NE Signal Imp
A'10
20000
580000
600000
cpxxxx
M
Auburn Way SOUth antl M Street SE
A'10
100000
650000
750000
cpxxxx
21
C Street NW antl West Main Street
A'11
100,000
1,000,000
1100,000
cpxxxx
25
FStreet SE&4th St SE Traffic Signal
S
37,000
359,700
396,700
cpxxxx
38
Railroad Crossing Safety Improve-M,
A'10
150000
850000
1000000
cpxxxx
43
Auburn Way SOUth&Rivenvalk Imp
A'13
150,000
2250,000
2,400,000
Subtotal
2,130,298
1,080,200
1,330,000
%0,000
1,950,000
250,000
2,350,000
1,200,000
10,640,498
C307B0
2
Auburn Way North (ITS)Imp Ph 2-Debt Service
WA
1290,508
35,800
35,800
35,800
35,800
1,4378
cpxxxx
13
Auburn South ITS Expansion
S
8U3,499
803,400
cpxxxx
.
ITS Dynamic Message Signs
A'10
220,000
220,000
220,000
660,000
1,320,000
cpxxxx
51
East Valley Hwy ITS Expansion
A'13
800000
800000
Subtotal
1,290,508
839,200
255,800
35,830
255,800
800,000
22(1,000
650,000
4,357,103
C507130
22
Skinner Rd to 3rtl Ave(AUburn Pacific Trail Ph 2)
S
15,300
146,800
162,100
M29A0
23
BNSFIEast Valley Hwy. Ped Undercrossmg
PS
224,300
4,800000
5000000
10,024300
cpxxxx
24
Acatlemy Drive Multi USe Trail
A'12
10000
150,000
425000
425000
1,010,000
cpxxxx
44
A St. NE Petlestrian Improvements
A'10
150000
150000
cpxxxx
45
IMerurban Trailh-cl Improvements
Al. '
210000
210000
cpxxxx
53
3/th St SE& R St SE Petlestrian Connector
S
13000
110,/00
124300
Subtotal
253,2(10
257,500
%0,000
10,000
150,000
425,000
5,225,000
5,000,000
11,680,700
NA
26
Auburn Community antl Lakeland Shuttles
A'10
140,000
240,000
220,000
220,000
220,000
220,000
220,000
1,480,000
cpxxxx
ZI
41st St SE antl A St SE Access Managemena Saudy
WA
19,999
19,999
cpxxxx
46
104th Ave SE& Green River Study
WA
5,000
5,000
cpxxxx
47
Environmental Park Roadway Improve-M. Study
WA
5,000
5,000
cpxxxx
48
Downtown to Les GOVe Non-Motorized Imp Study
WA
10,000
10,000
cpxxxx
49
S. 316th St Bicycle& Petlestrian Imp Study
WA
5,000
5,000
cpxxxx
54
Kersey Way Study
WA
100000
100000
cpxxxx
55
Mary Olson Farm Improvements
WA
49,050
51,400
101,050
cpxxxx
56
Au burn Transit Station Parking Garage
WA
],]00,000
23900,000
31,600000
Subtotal
189,650
426,400
220,000
220,000
220,000
7,920,000
24,12(1,000
33,316,050
cpxxxx
28
Annual Bridge Maintenance
WA
50,000
50,000
50,000
50,000
50,000
50,000
300,000
C410A
29
5277th Street-Wetland Mitigation
WA
167,775
25,000
25,000
25,000
25,000
267,775
Varies
.
Pedestrian Crossing Program
WA
11,]00
100,000
100,000
100,000
311,]00
Varies
31
Citywide Arterial Bicycle & Safety Imp
WA
200,000
100,000
100,000
100,000
100,000
100,000
/00,000
Varies
32
Sidewalk Improvements
WA
200,000
180000
20,000
180000
20000
180,000
780000
Varies
33
Traffic Calming Imp
WA
165,000
100,000
200,000
200,000
200,000
200,000
200,000
1,265,000
Varies
34
Traffic Signal Imp
WA
100,000
200000
200000
500000
Subtotal
]44,4]5
375,000
555,000
695,000
555,000
670,000
1.,.0
4,124,475
Varies
35
Arterial Streets(105F-d)
WA
1400000
1400,000
1400,000
1400,000
1400000
1400000
8400,000
Varies
36
Arteri al Crack Seal (105 Fund)
WA
100,000
100,000
100,000
100,000
100,000
100,000
bU0,999
Varies
31
Local Streets-SOS (1. Fund)
WA
]
30],]00
1,500,000
2,200,000
2,200,000
2200,000
2200,000
2,200,000
19,80],]00
Subtotal
,
]30],]00
3,000,000
3,]00,000
3,]00,000
3,]00,000
3,]00,000
3,]00,000
28,7,700
TOTAL
16,832,218
17,774,600
32,012,.00
15,818,800
13,864,5.
25,955,0.
39,925,.0
43,850,000
206,102,928
NIA
M
SR-167 Expansion(1405-SR.9)-WSDOT
From 1-405 to Sr-18, atltl one NB antl SIB general purpose lane; from SR-18 to SR-161, atltl one NB HOT lane antl one SIB HOT lane, atltl
direct NBISB HOVIHOT Iane-rlectionramps between SR-167&1405; atltl NB antl SIB auxiliary lanes between SR516 antl S 277th
Sheet; extend Sr 167 from SR-161 to -09.
4400000,000
NIA
81
SR-18&SR-16/lnterchange-MOOT
Complete freeway interchange by atltling eastbound SR-18 ramp to southbound SR-167, atltling northbound SR-167 ramp to WB SR-18
antl closing SR-18 access to West Valley Highway.
45000,000
NIA
82
SR-164 Corritlor Improvement. (SR-18 to Acatlemy Drive) -
MOOT
Construct corridor improvements consistent with MOOT SR-164 Corridor Improvement Study. Project includes intersection
improvements, roadwaywidening antl roadside improvements.
61 000,000
NIA
83
SR-164 Auburn Bypass Road (SR-164 to SR-18) -MOOT
Construct Auburn bypass road connecting SR-164 antl SR-18 east of RST corridor.
65 000,000
NIA
84
Green River Cl... I Trail, (SR-18 to Northern City Limit) -King
County
Construct Class I Trail along Green River from Sr-18 to Northern City limits.
2000000
NIA
51 st Ave S& S 316th St Signal - King County
Construct new traffcsig-i at intersection of 51 st Ave S antl S 316th St with turn lanes.
650,000
NIA
86
Stewart Road Widening (EVH to SR-167) -Pierce County
Complete a five lane section roadway with new bridge over the white river antl railroad gratle separation from EVH to SR-167.
32 300,000
TOTAL
4,605,950,000
*Grant S=Securetl
Status PS = Partially Secured
A = Applied or will apply
'10 =Year
Appendix A
N
w ~E City of Auburn 2010-2015 AUBURN
Transportation Improvement Program WASIIINGTON
I
2 6
~'---i2~]nHK re - '3
I ~ 16 ,
~ , N ( 1 ~ 5E-2a157~rI
~ 1 ml I I ~ ' °xN~n
_ T 1 f
.re:. s 1
P, ~
TMnl 9
I
ATIC r,--
- - - n- - - -
38 J,(EXAC,T
I
PTO
]TS13T &f'-DETERW
~ ~ To-°n N~ 3 ELI '
~ II 4~ ~rz,a.x sr _II I ` 'a ,s noc
3 t~'rd w , z
167
>mx oo*re:. z:.N~rvw :.xn ~oxxn NE I~ 8
~ I
J OATH ST
11 : ~ u.renN hz 5E3
3 ~W ~1E ~rere
E
°s.re P~
646
C
16
ST
_
-15
`W
~
z SE 31lTM K4
J(
rtren <°=..E 40
S 316TH ST 1 \ sz s xv
*xsr NZ~ 15`
Ids v e.x 3 10TH14 NE I
42 8
~ ,renNE 11 ~P,
„n„~~
a e~38 NW
~
~n°.ren - ~wnaNST ~I s'
14 8 9 EMAIN ST 11 1 21
T
~
C
52 m 2~
] 8 _
n=E
RR EMS
_2~r3,~
more 10
A
=,PE«wre.
r 7 83 ti
80
BOUNDARY-BLVD SW_ v 13 20 r HS E- (FUTURE ALIGNMENT
43 TO B NED)
_
~t~~~°~ 4 12
' s
_ II
3 _ ~,=29TH ST=SE---J<=X JI>.j~~ rea 8L `r~ s*
, , ECM s II r~ ~ ~
~.xsxse
5 3
(167 ! ~ _ u ~ ~ I
H `M
22. 23 «ren=E
51
' 6q'+F
a
85
~i n7~ -
t \
Intersection Improvements Recommended Regional Projects Potential Annexation Areas
Parks
- . Non-Motorized Improvements Studies and Misc Improvements _
Water Feature
dppendlsB
Roadway Improvements Intelligent Transportation System (ITS) Auburn City Limits
I