Loading...
HomeMy WebLinkAbout20010316000326 BRIDGE EASEMENT 031601After Recording Return to: Puget Sound Energy Corporate Facilities Dept. P.O. Box 97034 Bellevue, WA 98009-9734 III 11111111111111111 il 11111111111 2001031 000 26 PACIFIC NW TIT EAS 21.0 PAGE 001 OF 014 Document below minimum digital imaging quality Reproduction npa not b le ible. d Approved: be w c~ c~ c*-s c~ t--j CV Document Title(s) (or transactions contained therein): 1. Bridge Easement and Agreement --p 3. Reference Number(s) of Documents assigned or released: (or page _ of document(s)) Grantor(s) (Last name first, then first name and initials): % km d6 J.-M~(9) ~ 1. Puget Sound Energy, Inc. ^e0O1 d by P*C fto Not'Th vset TWO ft mo"+trnorfaMfart artier. It ha net bMM 2. MMVMk10d &S 10 per oxen or oft. aw to lk Mhcyt upon 3. a Additional names on page - of document. Grantee(s) (Last name first, then first name and initials): 1. City of Auburn 2. 3. Additional names on page - of document. Legal Description (abbreviated: i.e., lot, block, plat or section, township, range) 36-22-4 EX Additional legal on page 8 of document. Assessor's Property Tax Parcel/Account Number 000220-0004-00, 000680-0010-05 Bridge Easement and Agreement [07772-052911 EXLD: l, o0% E f XX N0T Page I of 14 1/17101 7) .,ti BRIDGE EASEMENT AND AGREEMENT This Bridge Easement and Agreement ("Agreement"), dated as of this 4_- day of _M ►A 9C4 , 2041, is made and entered into by and between Puget Sound Energy, Inc., a Washington corporation ("PSE"), and the City of Auburn, a Washington municipal corporation ("City"). RECITALS A. PSE has an interest in certain real property more particularly described on Exhibit A attached hereto and incorporated herein by this reference ("Property"). PSE owns and operates certain electric transmission facilities known as the White River - O'Brien #2 115kV transmission line, the O'Brien - Christopher #2 115kV transmission line and the O'Brien 230kV Tap. These facilities, as well as 12.5kV electric distribution facilities, occupy and use a portion of the Property. Additionally, PSE uses of the Property include various existing and anticipated future network transmission and distribution systems (including, without limitation, systems, facilities, appurtenances and uses for the transmission, distribution and sale of gas, electricity, communications and other network commodities and services). PSE's existing and anticipated future uses are referred to collectively herein as the "Systems". B. The City desires to construct certain improvements to South 2776' Street between the West Valley Highway and the East Valley Highway, consisting of an elevated road and bridge structure for vehicle and pedestrian use, as depicted on Exhibit B attached hereto and incorporated herein by this reference, over and across a portion of the Property for South 277' Street, and the list of plans and specifications more particularly described on Exhibit C attached hereto and incorporated herein by this reference (such improvements are collectively referred to as the "Bridge Improvements"). The City desires to construct, use and maintain the Bridge Improvements over and across that portion of the Property more particularly described as the "Bridge Easement Area" on Exhibit D attached hereto and incorporated herein by this reference. cra C. In conjunction with the construction of the Bridge Improvements, the City desires to construct one o (1) twelve inch (12") diameter ductile iron water pipeline in accordance with the list of plans and specifications ° C=:) more particularly described on Exhibit C, and as depicted on Exhibit B. Upon completion of the Bridge Lca Improvements, PSE and the City anticipate that the City of Kent will assume ownership of the water pipeline, and will operate the water pipeline subject to the terms and conditions of an easement agreement to be executed between cr") the City of Kent and PSE. Unless and until PSE and the City of Kent execute such agreement, the use, operation (M and maintenance of the water pipeline shall be subject to all applicable terms and conditions of this Agreement. r-- c D. PSE is willing to convey and quitclaim easements to the City as to the Bridge Easement Area and ° that portion of the Property adjacent to and under the Bridge Easement Area, subject to the following terms and conditions. NOW THEREFORE, for and in consideration of the mutual covenants contained herein and other good and valuable consideration the receipt and sufficiency of which are hereby acknowledged, PSE and the City agree as follows: 1. Grant of Easements. 1.1 PSE hereby conveys and quitclaims to the City a perpetual, nonexclusive aerial easement upon, over, along, and across the Bridge Easement Area set forth on Exhibit D for such purposes, and subject to such terms and conditions, as are hereinafter set forth. Bridge Easement and Agreement Page 2 of 14 [07772-052M 1/17101 1.2 PSE hereby conveys and quitclaims to the City a perpetual, nonexclusive easement upon, over, along and across that portion of the surface of the Property which is under and adjacent to the Bridge Easement Area and described on Exhibit E attached hereto and incorporated herein by this reference ("Construction, Maintenance and Access Easement Area") for the limited purposes of access, construction, maintenance and inspection of the Bridge Improvements, subject to such terms and conditions as are hereinafter set forth. CC7 VNJ t.m r~ c-> w cz 1.3 PSE hereby conveys and quitclaims to the City a temporary, nonexclusive easement upon, over, along and across that portion of the surface of the Property as described on Exhibit F attached hereto and incorporated herein by this reference ("Temporary Construction Easement Area") for the limited purpose, and subject to such terms and conditions, as are hereinafter set forth. This temporary easement shall terminate upon final completion of the Bridge Improvements, restoration of the Interurban Trail and surface area of the Property in accordance with this Agreement, but not later than thirty (30) months after the date of this Agreement. 1.4 PSE hereby conveys to the City the right to construct one (1) twelve inch (12") diameter water pipeline, over, along and across the north half of the Bridge Easement Area subject to such terms and conditions as are hereinafter set forth. This right shall terminate upon final completion of the Bridge Improvements, but not later than thirty (30) months after the date of this Agreement. 1.5 The City acknowledges that the rights granted herein are subject to any and all restrictions, reservations, limitations or other matters of record. The City shall have the sole responsibility for determining the applicability of such restrictions, reservations, limitations or other matters. PSE does not warrant title to or the condition (including, without limitation, environmental condition) of the Property or the Bridge Easement Area or their suitability for any use intended by the City and shall not be liable for any defect therein or failure thereof, and the City accepts and shall be deemed to accept the same "AS IS," "WHERE IS," and "WITH ALL FAULTS AND DEFECTS." Without limiting the generality of the foregoing, the City accepts all risks associated with acquiring the rights described herein. 2. Purpose of Easements. The City shall have the right, at its sole risk, cost and expense: 2.1 to use the Bridge Easement Area to construct, use, maintain, repair and remove the Bridge Improvements and use the Bridge Improvements for public right of way purposes; 2.2 to use the Construction, Maintenance and Access Easement Area for access to and construction of the Bridge Improvements, and to conduct, from time to time, as necessary in accordance with applicable drawings noted on Exhibit C, or to the extent prescribed by applicable law, inspection and maintenance of the Bridge Improvements which is anticipated to consist of (i) visual inspections made from the ground or from a medium-duty lift buck on a semi-annual basis, (ii) girder painting which is anticipated to occur every twenty-five years, and (iii) use of measures located within or immediately adjacent to the Bridge Easement Area which are necessary or required by applicable law for containment of paint spray; and 2.3 to use the Temporary Construction Easement Area for construction of the Bridge Improvements, and reconstruction of the Interurban Trail and surface area of the Property in accordance with applicable drawings noted on Exhibit C. 3. Manner of Exercising the Permitted Uses. 3.1 The City shall, at all times, exercise its rights hereunder so as to prevent death, injury or bodily harm to persons (whomsoever) and to prevent damage, injury, harm or loss to or of property (whatsoever). Without limiting the generality of the foregoing, the City shall be strictly liable to PSE for any and all damage, Bridge Easement and Agreement Page 3 of 14 [07772-05291] 1 / 17/01 injury, harm or loss to Systems (including, but not limited to, any and all damage, injury, harm or loss of commodities and services provided by such Systems) caused by the City's exercise of its rights hereunder. 3.2 The City shall at all times ensure that all activities undertaken in accordance with this Agreement are in compliance with all applicable laws. The City shall obtain all necessary permits, approvals or licenses required by any governmental agency with jurisdiction to undertake any activity in or on the Temporary Construction Easement Area, the Construction, Maintenance and Access Easement Area, the Property or the Bridge Easement Area 3.3 The City shall maintain and repair the Bridge Improvements in accordance with the plans and specifications listed on Exhibit C as the same may be changed in accordance with this Agreement, so as to keep the same safe and functional. The City agrees to maintain the Bridge Improvements and Bridge Easement Area in a manner suitable for PSE's present and future uses of the Property. 3.4 The Bridge Improvements shall be constructed and maintained in strict accordance with plans and specifications listed on Exhibit C, attached hereto, and any material changes thereto which (without limiting the generality of the foregoing) affect the Systems, impact established clearances or involve the disturbance of the surface of the Property shall require approval by PSE, which approval shall not be unreasonably withheld (provided that PSE's determination, in its sole discretion, that any changes to such plans and specifications interfere with PSE's use of the Property for the Systems or involve disturbance of the surface of the Property not shown upon Exhibit C shall not be deemed unreasonable, as such determinations are reserved to PSE). The City shall complete such activities in a timely, careful and workmanlike manner. The City shall ensure that all labor, services, materials, equipment, supplies or other items employed or provided in connection with the Bridge Improvements are of good quality and suitable for their intended purposes. Upon completion of the construction of the Bridge Improvements, the City shall promptly provide to PSE as-built drawings and a survey showing the location and elevations of such improvements. The City shall promptly pay (and secure the discharge of any liens asserted by) all persons or cn r,,; entities furnishing any labor, services, materials, equipment, supplies or other items to or upon the Bridge to Improvements. No approval by PSE of any such plans or specifications, nor any failure by PSE to approve any cm such plans orspecifications, nor any failure by PSE to discover any fact or matter in connection with the review of ca any such plans or specifications, shall relieve or release the City of or from any of its obligations arising under this Agreement or applicable law; nor shall any such approval, failure to approve, or failure to discover any fact or matter give rise to any liability on the part of PSE to the City or to any one or more third parties. c•7 3.5 The City shall exercise, and shall require that all persons or entities acting on behalf of the City exercise, the highest degree of care and precaution to prevent any contact with Systems. ,C=) 0 r., 3.6 Upon completion of activities which may disturb the surface or subsurface of the Property, the City shall restore the Property to a condition as good or better than its original condition before the City began its activities which caused the disturbance. Any and all excavation work shall be completed with the highest degree of care and caution to preserve the stability of soils in, on, under and around Systems and in a manner which will protect the stability of the soils on the Property. 3.7 The City shall not, in connection with any maintenance or repair, disturb the surface of the Property or cause the Bridge Improvements to materially differ from the depiction shown on Exhibit B or the plans and specifications therefor set forth in Exhibit C, unless the City shall have obtained PSE's prior written consent to such maintenance or repair causing material alteration, modification or change. PSE shall have the right, but not the obligation, to review any plans or specifications prepared in connection with any maintenance or repair for which PSE's approval is required hereunder. No approval by PSE of Exhibit C or any plans or specifications for maintenance or repair involving material alteration or disturbance of the surface of the Property, nor any failure by PSE to approve any such plans or specifications, nor any failure by PSE to discover any fact or matter in connection with the review of any such plans or specifications, shall relieve or release the City of or from any of its obligations Bridge Easement and Agreement Page 4 of 14 [07772-0529/ 1117/01 arising under this Agreement or applicable law; nor shall any such approval, failure to approve, or failure to discover any fact or matter give rise to any liability on the part of PSE to the City or to any one or more third parties. Upon completion of any such approved alteration, modification, or change to the Bridge Improvements, the City shall promptly provide to PSE as-built drawings and a survey showing the location and elevations of such improvements, as altered, modified or changed. 3.8 In the event applicable law requires inspection or maintenance which materially differs from the current requirements set forth herein, the City shall notify PSE in writing before commencing such inspection or maintenance and comply with PSE's reasonable conditions upon the exercise of the City's rights to use the Construction, Maintenance and Access Easement Area for such construction, inspection and maintenance. 3.9 The City shall access the Temporary Construction Easement Area and Construction, Maintenance and Access Easement Area from the east side of the Property approximately fifteen (15) feet south of the centerline of South 277'h Street "access road". Subject to PSE's prior written consent, which shall not be unreasonably withheld, the City may access the Temporary Construction Easement Area and Construction, Maintenance and Access Easement Area from the Property at areas other than the "access road"; provided, however, any access taken pursuant to this subparagraph 3.9 shall: (i) minimize surface disturbance of the Property; (ii) not involve excavation or otherwise disturb the subsurface of the Property; and (iii) be in accordance with access plans to be provided (and kept up to date) in accordance with subparagraph 3.7 above. 4. Reserved Rights. 4.1 PSE reserves the right to use the Property and the Bridge Easement Area in any manner that is consistent with the rights herein granted. C.n 4.2 In addition to, and without limitation of, any and all other rights and remedies available cv to PSE, in the event the City fails to perform any of its obligations arising under this Agreement, PSE may, without c any obligation to do so whatsoever, perform the same at the City's sole risk and expense; provided, however, before o commencing any such action on the City's behalf, PSE shall give the City notice of such failure and allow the City C=) fifteen (15) days after such notice in which to perform such obligation. In the event the City's failure cannot, in the exercise of reasonable diligence, be remedied within fifteen (15) days, PSE shall not commence any action on the City's behalf so long as the City commences the performance of its obligation within fifteen (15) days of PSE's notice and diligently prosecutes such performance thereafter until complete. The City shall reimburse PSE for such expenses within thirty (30) days of receipt of an invoice from PSE which indicates the nature of work completed by o PSE. ev 5. Indemnification. 5.1 The City releases and shall defend, indemnify and hold harmless PSE, PSE's directors, officers, employees, and representatives, and the respective successors and assigns of each and all of the foregoing (collectively, "Indemnitees") from and against any and all allegations, claims, demands, harm, liens, losses, costs, damages, expenses (including, but not limited to, reasonable attorneys' fees) and liabilities directly or indirectly arising from or in connection with any and all of the following: (i) this Agreement; (ii) the City's performance of or failure to perform any one or more of its obligations arising under this Agreement; (iii) the City's exercise, or failure to exercise, any one or more of its rights arising under this Agreement; or (iv) any negligent act or omission of the City, its employees or agents. 5.2 The parties intend that, to the fullest extent permitted by applicable law, and consistent with the provisions of RCW 4.24.115 if and as applicable, the foregoing release, indemnity and hold harmless shall apply regardless of any act, omission, fault, negligence or strict liability of the Indemnitees. In connection with any action to enforce this paragraph 5, the City hereby waives any immunity, defense, or protection under any workers' Bridge Easement and Agreement Page 5 of 14 [07772-0529! 1/17/01 compensation, industrial insurance or similar laws (including, but not limited to, the Washington Industrial Insurance Act, Title 51 of the Revised Code of Washington). This paragraph 5 was mutually negotiated by the parties: Initialed by: C1 City PSE 6. Insurance. The City is a self-insured municipality through the Washington Cities Insurance Authority. A letter, in form acceptable to PSE, certifying and committing the City's self-insurance program to the commitments and obligations set forth in this Agreement shall be provided to PSE upon execution of this Agreement. Thereafter, such self-insurance shall be maintained in full force and effect by the City at all times during the term of this Agreement. In the event of a decision by the City to replace such self-insurance program with commercial insurance, the City shall provide PSE with certificates of public liability insurance with coverage limits of $2,000,000 per occurrence naming PSE as an additional insured, which shall be maintained in full force and effect by the City at all times during the term of this Agreement. 7. Successors and Assigns. This Agreement shall be binding upon and inure to the benefit of the parties' respective successors and assigns. 8. Notices. c.n ev Any notice, request, designation, direction, statement or other communication under this Agreement shall be in writing and shall be delivered in person or mailed, properly addressed and stamped with the required postage, C=3 to the intended recipient as follows: If to PSE: Puget Sound Energy, Inc. C" Corporate Facilities Department Cz P. O. Box 97034 Bellevue, WA 98009-9734 C=3 Attn: Director Corporate Facilities 0 cv If to the City: The City of Auburn 25 West Main Auburn, WA 980014998 Attn: Public Works Director Bridge Easement and Agreement Page 6 of 14 [07772-052911 1/17/01 Either party may change its address specified in this paragraph by giving the other party notice of such change in accordance with this paragraph. CV ccr. c~ c:s 0 C.0 cYs G7 ca cv PUGET SOUND ENERGY, INC.: Puget Sound Energy, Inc., a Washington corporation By: Au- Its Date: ~'~7-Q f O I THE CITY: The City of Auburn, a Washington municipal corporation By: (~/~-~Tt QR~ kJa c Mayor ) Date: A ST: P O AS O Aubu City Clerk t City Attorney, City of Auburn Bridge Easement and Agreement [07772-0529! Page 7 of 14 1/17/01 Bridge Easement and Agreement Puget Sound Energy - Grantor City of Auburn - Grantee STATE OF WASHINGTON } ) ss. COUNTY OF KING On this Zvi day of FOMLAAP-i , 2001 , before me, the undersigned, a Notary Public in and for the State of Washington, duly commissioned and sworn, personally appeared ?I , -,.,l M c- A( U 1.1 , to me known to be the person who signed as Naec""DC- CMRiY-itiTc FK-616S of Puget Sound Energy, Inc., the corporation that executed the within and foregoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said corporation for the uses and purposes therein mentioned, and on oath stated that t4 was authorized to execute said instrument and that the seal affixed, if any, is the corporate seal of said corporation. written. IN WITNESS WHEREOF I have hereunto set my hand and official seal the day and year first above ,iW OV#OT4 " 40 Y C"i Uzi colossal'I w t-Z)",'e T Print Name/ I,c%4 `/j46 WCWkQ-~' Notary Public in and for the State of Washington, residing at My commission expires: 6-13--02- STATE OF WASHINGTON ) ) ss. COUNTY OF KING ) V- CZ On this 6JXA _ day of 20_~L, before me, the undersigned, a Notary Public in and for the cv State ogto , duly co issioned and sworn, personally appeared d~filt and to me known to be the persons who signed as Mayor and City Clerk of the City of Auburn, the municipal corporation that executed the within and foregoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said municipal corporation for the uses and purposes therein mentioned; and on oath stated that they were authorized to execute the said instrument on behalf of the City of Auburn. rPp~A A, Q~~tt Ot IN ve hereunto set my hand and official seal the day and year first above written. i ?O`rN OT t'o'• Cc►ti i • U ~~Y • IC Print Name: 0 N r Notary Public in and for the State of Washington, ttl Q' 9. 0 3 residing atu ~0 . My commission expires: ~a _ 9 - Q3 Bridge Easement and Agreement Page 8 of 14 [07772-052911 1117/01 Bridge Easement and Agreement Puget Sound Energy - Grantor City of Auburn - Grantee EXHIBIT A LEGAL DESCRIPTION OF PROPERTY A STRIP OF LAND LOCATED IN THE NORTHWEST QUARTER OF SECTION 36, TOWNSHIP 22 NORTH, RANGE 4 EAST, W.M., KING COUNTY, WASHINGTON BEING ONE HUNDRED (100) FEET IN WIDTH AND HAVING FIFTY (50) FEET OF SUCH WIDTH LYING ON EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE: BEGINNING ON THE SOUTH LINE OF THE DONATION LAND CLAIM OF JOHN M. THOMAS AND NANCY THOMAS, NO. 42, IN SAID SECTION 36, AT A POINT SIXTY SEVEN (67) FEET WEST, AS MEASURED ALONG SAID SOUTH LINE, FROM THE NORTH AND SOUTH LINE DIVIDING SAID SECTION 36; THENCE RUNNING NORTH 00° 07' EAST 851 FEET TO A POINT SEVENTY SIX (76) FEET WEST FROM THE SAID NORTH AND SOUTH LINE DIVIDING SAID SECTION 36 AND THE TERMINUS OF THE HEREIN DESCRIBED CENTERLINE. CONTAINING 1.95 ACRES MORE OR LESS. TOGETHER WITH cQ ~ A STRIP OF LAND LOCATED IN THE NORTHWEST QUARTER AND THE SOUTHWEST QUARTER OF C113 SECTION 36, TOWNSHIP 22 NORTH, RANGE 4 EAST, W.M., KING COUNTY, WASHINGTON BEING ONE HUNDRED (100) FEET IN WIDTH AND HAVING FIFTY (50) FEET OF SUCH WIDTH LYING ON EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE: m BEGINNING ON THE SOUTH LINE OF WILLIAM A. COX DONATION CLAIM NO. 43, IN SAID SECTION 36, AT A POINT 385 FEET EAST, AS MEASURED ALONG SAID SOUTH LINE, FROM THE SOUTHWEST C= CORNER OF SAID DONATION CLAIM; THENCE RUNNING NORTH 00° 07' EAST 2,678 FEET, MORE OR CZ, CIV LESS, TO THE NORTH LINE OF SAID DONATION CLAIM, AT A POINT 405 FEET EAST, AS MEASURED ALONG SAID NORTH LINE, FROM THE NORTHWEST CORNER OF SAID DONATION CLAIM AND THE TERMINUS OF THE HEREIN DESCRIBED CENTERLINE. CONTAINING 6.15 ACRES MORE OR LESS. Bridgc Easement and Agreement Page 9 of 14 [07772-0529/1 1/17/01 2001 0~ 600062ir aaa ;;x•xs ..a. <.u Xra+t a oc •-eao-.r•-ssss t rr-a i r- - - - v ur-7a GENERAL NOTES: raatr arc ra`cawresorn d wAS x rmr AASrm m sf X ARatMr+S rF .x \ -J.. " , uc to vavxiaTrws \ 1 r r frro,a Ds'rmrrw mra. -Iola ! " _ (JOr f ~ ! ~ .=w araA'rN IOU AIO rrM rl9rCmM fT.w AJ•Imtt3f SW J. - } jrpraQlT Pr asxmiorurr« watt ILN' i YAW WS lrII rYl .rte - Qrt~JYrf _ _ t--- 1 - - J, b~... i • . taw sm~ vo z - E X/il6D¢t• ; ` - ror Mr rKrm atsrx z' - _ "I aut -'f . nxs ow, xt eau sabcnax tsmrs or warm r _ YII ifl ;7a'c • -l: i L r eocnaua «F eF Latwt~rf a to+o rAC= ttvw _ ow - - ~w•«• 3 o OK fa1•crut mvaa/S rF o119w r-A ti• j`~ i...- i.. r • i r' x•eun~• n. J .o.m ol ve A w DSOKwrfM / M l M & Mna 9su star. , ..1 . ar.at se ar .i i' ~s .m~ora+ st.r rna ~w noma.aw rn r or am r..f xw use - «F A fQ mats nos: S.• _ _ ! )N -j 3r +b +VY _ as:~_ _ ~n = 1 Xt YaT~bL3.V0 aGlouw9~ Dolt L N.ROdvAS rF De AmmCKNa w tsr irAx d a9•rarov - f -'sr4~SNaa . r :'JPa1 J. _ _ _ _ _ Lr.N11Oft O aLVmYXr AiI frA,4W sKOYJ aWf Q F r r rJ oar Xsa ro a ..o w. s.t ma wcro o.rza rrra -1. AW aK DYnLL Xrab4lm $W 1r fam r atr ! _ _ _ -[-~WC._ 4.1.: - .r--- a..- - atreermouearoo~aorau'arwvaovr JLb1XCS Y11p1[f - _ - - _ •r - - _ _ _ . _YJ r _ •I~ {Lsi?r¢ _ _ _...1 _ _ Ol~`MAQI r +VlddM MM /d1 ~ t• I ~ _ _ i_. ~ y r ~ r IIQ1M11R LTM3l4K ~rr~r@ IKQIIMY. qq I:" F s Au rAa soot AAa+ro rD moro Lta-san aw ra awry evlorarrr. 3 s-fT aua[ n a a( Nrr01[A !ar K W rw-IR,arf J!M Doti L P. C. DECK GtRDERS (W530G) ! cLyt arP CAfr-wAxr on.axsf so. L a.ss am t dADIM6% HS-25 r-r ELM r. rxsr o Duo w a♦sFnsir alt m m r r . • ~ ~ YAar m opt fJita M riL SrAKri/C Tt'4C) 24K AXLES AT 4' CTS ; . a t = Q.Vh= D ar « 9( furs ar C.M.T UN/dN PAGYfTC RR k r n w 19-AM ma Duo L C. ;f Mawr ur • Aau iid ~•-0• V raaDAi Y AT At rw P' raaa+G +,D r rp- Xr aAr r/r ' 'VP sw sL s -sp. r Au soar trcAaoa d 4 4 a &mw *Ndx x s- m X rr.rd A{i ow m cow" Aro mar sruLL Iw . A .W' V Aware Arn Au «ranr oorswe Duo wAK A stn. m .KwC I f'Q DQr m3 ra tssvr roe aK 0.= Ara MAW Hal Cs Cri1a &.4-m /!A'Q aKrr VRr aftwx is►AaQ floc w fAfm rF 116afID YxA y IrrOij CRA4Y tK m . tpF O I ~O• raar++r•t oriC A it. Au a.cmaa Asf wastwrx m Kraut crsra lamas ~w tssr "a rm! rAtt r r aay Ira t0 OaflYy alltlO Irr IR lei I o ~ ✓Y Wt / iYLiii[. EG f? - - - aiAR r LC 7rrar - g - -Ilj • • ~ C,~ 3- i. • F3FY .ta } a r_•-_.'1 r :7--tw[a a'[ec av ~ orora tr ~ oaawc v m~iar fr»! Armen atwr~a ~ wi sr¢ ware m .raerx ro s aAu CAT Jla X (X•LrtJl64M ~ QAa HaLY~ ass. r+r • mwr t A. D+aw ,ur n.nr m,at Al AP ar .n waa s r. aeAe 3• Ao OrORtr Ar t m sJa•!a -0 AN sox m /rro u asAac ttt''' Ato AUMM am o rfrf ELM 77Qd( }r _ 99% REVIEW SET Y•4(4[.rr M000 pY[b "1 trlr4 wb - r+••'.~- a...++.~^ f~ ?~~"~Ji ~ ~rQ s--yo' ae anf famrrmxrr.srs rfaeanu.~rarrwrr.~ 562 rr..•.r~ `V6' PuB::C WORKS CCPAR TUCNI .,m a~lormoi MG S3 2s WEST uuu STREET T - ItAw .ro nsr.m. S9-tl~ i + W ~T• AUCURN, WAsm.GTON EXHIBIT B 2001 031 6 0 0 0 6 2 5 QRAVANG INDEX M-- SHEET NO. REFERENCE NO, TITLE I C1 COVER SHEET 2 INI INDEX 3 VW VICINITY MAP 4-5 VM2 - VM3 SHEET LAYOUT 6 VM4 WETLAND MITiGATON SiTE LOCATION 7 VM5 TYPICAL SECTION LAYOUT 8-16 SOI - S09 SUMMARY OF OUANTITI£S 17-25 TSI - TS9 TYPICAL R ADWAY SECTIONS 26-40 ALI - At 15 ALIGNMENT & RIGHT OF IWAY 41-59 ECT - ECi9 SITE PREPARATION & EROSION CONTROL 60 ECOI EROSION CONTROL DETAILS 61-73 GPI - GPI} GRADING PLAN 74-94 SP1 - SP21 STREET PLAN & PROFILE 95-98 IDI - ID4 INTERSECTION DETAILS 99 PVDI PAVING DETAILS 100 ORD) DRAINAGE DE TAILS 101-103 OPI - OP3 DETENT:CN WATER CUALITY POND PLANS 104-106 OPDi - OPD3 OETENTiON WATER DUALITY POND OETA!L S 107 DPD4 SERVICE ROAD PROFILES & TYPICAL SECTIONS 108-116 CHI - CH9 CHANNEOZAPON, SIGNING, & ILLUMINATION PLANS 117 CHID CHANNELIZATION. SIGNING. & ILLUMINATION DETAILS 118-122 SI - S5 TRAFFIC SIGNAL PLAN 123-127 SWI - SWS SIGNAL WIRING DIAGRAM 128 SS1 TRAFFIC SIGNALIZATION POLE DETAILS 129-146 U1 - U18 UTILITY PLAN AND PROFILE 147-155 156 U19 - U27 U28 CIVIL DETAILS UTILITY PLAN AND PROFILE - 72 INCH SEWER CROSSING 157 U29 CIVIL DETAILS 158-159 U30 - U31 OEWATERiNG SCHEMATIC PLAN 160-t74 7 - LIi PLANTING PLAN 171-178 L12 - L19 IRRIGATION PLAN 179 L0t PLANTING NOTES PLANT SCHEDULE 180 LD2 PLANTING DETAILS 181 L03 IRRIGATION DETAILS 182 WMi l4ETLAND Mi TIGATiON - SITE PREPARATION 18} WM2 WETLAND MITIGATION - GRADING PLAN 184 wM3 WETLAND MITIGATION - CROSS SECTION DETAILS 185 Wt WETLAND AIITICATON SITE - PLANTING PLAN 186 WDI WETLAND MITIGATION - PLANTNC DETAILS AND NOTES 187 Fui FLOODP! AiN MITIGATION PLAN 188 FMD1 FLOODPLAW MITIGATION PLAN CROSS SECTIONS 189-191 CDI - CD3 CONSTRUCTION DETOUR PLAN 192-212 RWI - RW21 RETAINING WALL PLAN AND PROFILE 213-220 Rw22 - Rw29 RETAINING WALL & MISCELLANEOUS DETAILS 221-243 UPI - UP23 UNION PACIFIC RAILROAD OVERCROSSING' - ' 244-263 8NI - ON20 BURLINGTON NORTHERN SANTA FE RAILROAD OVERCROSSMG ww~ouw w~womwm 'r ' Off `ula PUBLIC ■DRYS DEPA 25 WEST "N sn AUSURR. ■ASRINC EXHIBIT G Bridge Easement and Agreement Puget Sound Energy - Grantor City of Auburn - Grantee EXHIBIT D LEGAL DESCRIPTION OF BRIDGE EASEMENT AREA AN EASEMENT IN THE COUNTY OF KING, STATE OF WASHINGTON, BEING A PORTION OF SECTION 36, TOWNSHIP 22 NORTH, RANGE 4 EAST, WILLAMETTE MERIDIAN, AND BEING THAT PORTION OF THE 100 FOOT WIDE PUGET SOUND ENERGY RIGHT OF WAY KNOWN AS THE PUGET SOUND ELECTRIC RAILWAY RIGHT OF WAY, SAID EASEMENT BEING DESCRIBED AS FOLLOWS: BEGINNING AT A POINT ON THE WESTERLY LINE OF SAID RIGHT OF WAY, AT S. 271T" ST. STATION 35+03.49,36.50 FEET LEFT; THENCE EASTERLY TO THE EASTERLY LINE OF SAID RIGHT OF WAY AT S. 277" ST. STATION 36+03.49,36.50 FEET LEFT; THENCE SOUTHERLY ALONG SAID EASTERLY LINE TO S. 277TH ST. STATION 36+03.02,46.00 FEET RIGHT; THENCE WESTERLY TO THE WESTERLY LINE c v OF SAID RIGHT OF WAY, AT S. 277"" ST. STATION 35+03.02,46.00 FEET RIGHT; THENCE NORTHERLY cc ALONG SAID WESTERLY LINE TO THE POINT OF BEGINNING. 0 c:s CD %Mo THE BOTTOM PLANE OF THE VERTICAL SPACE CONTAINED WITHIN SAID EASEMENT SHALL BE c*~ AT ELEVATION 35.00 FEET, AND THE TOP PLANE SHALL BE AT ELEVATION 85.00 FEET. THESE r~ ELEVATIONS ARE BASED ON THE NATIONAL GEODETIC VERTICAL DATUM OF 1929, USING AS A BENCH MARK THE BRASS SURFACE MONUMENT AT S. 277TH ST. AND D STREET NW, SAID BRASS C: SURFACE MONUMENT HAVING AN ELEVATION OF 46.20 FEET. C'V THE STATIONING REFERENCED IS RELATED TO THE STATIONING LINES SHOWN ON THAT CERTAIN RECORD OF SURVEY BY W&H PACIFIC, FOR THE CITY OF AUBURN, RECORDED IN BOOK 130 OF SURVEYS, AT PAGES 236 THROUGH 236C INCLUSIVE, UNDER RECORDING NUMBER 19990708900014, KING COUNTY RECORDS. Bridge Easement and Agreement Page 12 of 14 [07772.0529/] 1/17/01 Bridge Easement and Agreement Puget Sound Energy - Grantor City of Auburn - Grantee EXHIBIT E LEGAL DESCRIPTION OF CONSTRUCTION, MAINTENANCE AND ACCESS EASEMENT AREA AN EASEMENT IN THE COUNTY OF KING, STATE OF WASHINGTON, BEING A PORTION OF SECTION 36, TOWNSHIP 22 NORTH, RANGE 4 EAST, WILLAMETTE MERIDIAN, AND BEING THAT PORTION OF THE 100 FOOT WIDE PUGET SOUND ENERGY RIGHT OF WAY KNOWN AS THE PUGET SOUND ELECTRIC RAILWAY RIGHT OF WAY, SAID EASEMENT BEING DESCRIBED AS FOLLOWS: C-0 BEGINNING AT A POINT ON THE WESTERLY LINE OF SAID RIGHT OF WAY, AT S. 277771 ST. STATION c`14 35+03.60,56.50 FEET LEFT; THENCE EASTERLY TO THE EASTERLY LINE OF SAID RIGHT OF WAY AT c S. 277771 ST. STATION 36+03.60, 56.50 FEET LEFT; THENCE SOUTHERLY ALONG SAID EASTERLY LINE TO S. 27777; ST. STATION 36+02.94,60.50 FEET RIGHT; THENCE WESTERLY TO THE WESTERLY LINE OF SAID RIGHT OF WAY, AT S. 27777` ST. STATION 35+02.94, 60.50 FEET RIGHT; THENCE NORTHERLY ALONG SAID WESTERLY LINE TO THE POINT OF BEGINNING. cn G^> o THE STATIONING REFERENCED IS RELATED TO THE STATIONING LINES SHOWN ON THAT CERTAIN RECORD OF SURVEY BY W&H PACIFIC, FOR THE CITY OF AUBURN, RECORDED IN BOOK 130 OF SURVEYS, AT PAGES 236 THROUGH 236C INCLUSIVE, UNDER RECORDING NUMBER 19990708900014, KING COUNTY RECORDS. Bridge Easement and Agreement Page 13 of 14 [07772-0529/1 1/17/01 Bridge Easement and Agreement Puget Sound Energy - Grantor City of Auburn - Grantee EXHIBIT F LEGAL DESCRIPTION OF TEMPORARY CONSTRUCTION AREA EASEMENT IN THE COUNTY OF KING, STATE OF WASHINGTON, BEING A PORTION OF SECTION 36, TOWNSHIP 22 NORTH, RANGE 4 EAST, WILLAMETTE MERIDIAN, AND BEING THAT PORTION OF THE 100 FOOT WIDE PUGET SOUND ENERGY RIGHT OF WAY KNOWN AS THE PUGET SOUND ELECTRIC RAILWAY RIGHT OF WAY, SAID EASEMENT BEING DESCRIBED AS FOLLOWS: BEGINNING AT A POINT ON THE WESTERLY LINE OF SAID RIGHT OF WAY, AT S. 277TH ST. STATION 35+02.94, 60.50 FEET RIGHT; THENCE EASTERLY TO S. 277TH ST. STATION 35+80.29, 60.50 FEET RIGHT; THENCE SOUTHERLY TO S. 277TH ST. STATION 35+80.29,142.40 FEET RIGHT; THENCE WESTERLY TO THE WESTERLY LINE OF SAID RIGHT OF WAY, AT S. 277TH cr, ST. STATION 35+02.48, acs 143.69 FEET RIGHT; THENCE NORTHERLY ALONG SAID WESTERLY LINE TO THE POINT OF ° BEGINNING. Q C=3 LCI C" THE STATIONING REFERENCED IS RELATED TO THE STATIONING LINES SHOWN ON THAT 'Q CERTAIN RECORD OF SURVEY BY W&H PACIFIC, FOR THE CITY OF AUBURN, RECORDED IN BOOK 130 OF SURVEYS, AT PAGES 236 THROUGH 236C INCLUSIVE, UNDER RECORDING NUMBER 0 19990708900014, KING COUNTY RECORDS. C%4 THIS TEMPORARY EASEMENT SHALL TERMINATAE UPON FINAL COMPLETION OF THE BRIDGE IMPROVEMENTS, RESTORATION OF THE INTERURBAN TRAIL AND SURFACE AREA OF THE PROPERTY IN ACCORDANCE WITH THIS AGREEMENT, BUT NOT LATER THAN THIRTY (30) MONTHS AFTER THE DATE OF THIS AGREEMENT. Bridge Easement and Agreement Page 14 of 14 107772-0529/1 1117101