HomeMy WebLinkAbout20000301000859 STORM EASEMENT 030100Return Address:
City of Auburn
City Clerk
25 West Main
Auburn, WA 98001
20000301000859
PACIFIC NW TIT AG 23.00
PAGE 001 OF 008
03/01/2000 12:09
KING COUNTY, WA
Above this line reserved for recording information:
STORM WATER EASEMENT AND MAINTENANCE AGREEM T
(FA00017-98)
Reference # (if applicable): N/A Additional on page:
Grantor/Borrower: 1) Scarff Motors, Inc. 2)
Additional on page:
rn.
L .n. Grantee/Assignee/Beneficiary: City of Auburn
cn
C=_ Legal Description/STR: NW 'A 18-21-5 Additional on page: .
ca
C= Assessor's Tax Parcel ID#: 605340-0195 and 605340-0170
r--
clr>
es THIS EASEMENT AND AGREEMENT made and entered into this P~'T-l day of
C= bw 19 , by and between the City of Auburn, a municipal corporation of
° o King County, Washington, hereinafter referred to as "CITY" and Scarff Motors, Inc., a
c~ Washingto corporation, located at 501 Auburn Way N., Auburn, WA 98002, hereinafter referred
to as "PROPERTY OWNER".
WHEREAS, PROPERTY OWNER has applied for certain permits with the CITY for the.
construction of facilities at 107 7`h St. NE, Auburn, WA, which create impervious surface; and
WHEREAS, the PROPERTY OWNER will complete a storm system; and
WHEREAS, the PROPERTY OWNER and the CITY desire that the storm system be
maintained to provide adequate facilities for controlling both the quantity and quality of storni
drainage; and
WHEREAS, for maintenance of a storm system it is necessary to have appropriate right-
of-way to bring in equipment to conduct maintenance functions; and
WHEREAS, maintenance requirement is a covenant runip, * . ft, l~and,a, td burong
upon all heirs, successors and assigns of both parties; and rec.rc by Paci is .4crihwvnt Tide as
ornexias ion oniv. It mA been
rx:'ire:^c:d nrrnur oxocuson or
Storm Water Easement and Maintenance Agreement as to its r:f,~ t upon iitis.
Page I of 8
EXCISE TAX NOTd Ra CS IRED
Ing'
eplAy
1%
WHEREAS, the parties desire that this Agreement be recorded to advise heirs, successors
and assigns of both parties as to the existence of this easement and agreement; and
WHEREAS, an easement is needed to bring in maintenance equipment; and
WHEREAS, the parties are both desirous of permitting inspection of the storm system to
make certain that it is functioning properly and for purposes of determining the appropriate
CD
repairs.
NOW, THEREFORE, BASED UPON MUTUAL COVENANTS TO BE DERIVED
THE PARTIES AGREE AS FOLLOWS:
0
o Section 1, EASEMENT
N
PROPERTY OWNER hereby provides an easement over, under and on that portion of the
property as showing on the approved Record Drawings revised pursuant to construction records
for the City of Auburn under Permit No. FA00017-98, which Record Drawings are hereby
incorporated by reference as if set out in full. This easement shall be a burden to that real estate
which is legally described and attached as Exhibit A and incorporated herein by this reference,
and shall be of benefit to the City storm utility system.
Section 2, HEIRS, SUCCESSORS AND ASSIGNS
This Agreement shall be binding upon the heirs, successors and assigns of the parties.
Section 3, MAINTENANCE
The PROPERTY OWNER agrees to maintain the storm system in accordance with the
ordinances and all applicable codes of the CITY and the Stormwater Pollution Prevention
Maintenance and Operation Schedule attached as Exhibit "B" and incorporated herein by this
reference. The PROPERTY OWNER does hereby agree that the CITY may enter onto the
property of the PROPERTY OWNER via the easement described above to inspect and perform
necessary maintenance if, after the PROPERTY OWNER is given notice to maintain, the
PROPERTY OWNER fails to maintain. Further, the PROPERTY OWNER agrees the CITY
may enter onto the property of PROPERTY OWNER via the easement described above to
perform emergency maintenance in the event of the storm system's failure which might result in
adverse impacts(s) on public facilities or private facilities of other property owners. In both
events the PROPERTY OWNER agrees he/she/they/it shall reimburse the CITY for the costs
incurred by the CITY in maintaining the storm system. Should the CITY incur attorney's fees
and/or costs in enforcing the agreement and/or in maintaining or collecting maintenance fees, the
PROPERTY OWNER agrees to pay reasonable attorney's fees and all costs incurred by the
CITY.
Storm Water Easement and Maintenance Agreement
Page 2 of 8
Section 4, ACKNOWLEDGMENT OF OTHER ENFORCEMENT ACTIONS
PROPERTY OWNER acknowledges that there may be liability for violations of codes
that could result in additional fines and/or the possibility of incarceration in addition to the fees
for maintenance should violations occur.
EXECUTED as of the date first written above.
C"
Ln
GC?
C=
Cf
M
O
C:)
cm
cm
CITY OF AUBURN
DIRECTOR OF PUBLIC WO S
Owner
Date
Storm Water Easement and Maintenance Agreement
Page 3 of 8
4.
STATE OF WASHINGTON)
)ss.
County of King )
I certify that I know or have satisfactory evidence that Wau`CX'A ' SCOCW
is the person who appeared before me, and said perso acknowledged that he/she signed
°O this instrument, on oath stated that he/she was authorized to execute the instrument and
o acknowledged it as the of
o , a corporation, to be the free and voluntary act of such
party for the uses and purposes mentioned in this instrument.
o Dated c( - qq
M
C=D vo
Notary Public in aAd for the State of Washington
12-0 • residing at P i e C nui-vtrk
*k4 n►►..? *V My appointment expires l a - -a ors t
STATE OF WASHINGTON)
)ss.
County of King )
I certify that I know or have satisfactory evidence that ( y I e,
is the person who appeared before me, and said person acknowledged that he signed this
instrument, on oath stated that he was authorized to execute the instrument and acknowledged it
as the DIRECTOR OF PUBLIC WORKS of THE CITY OF AUBURN to be the free and
voluntary act of such party for the uses and purposes mentioned in this instrument.
Dated f42'
1111e1ee11/1~
~
NE F.
/ t
~
,,,o
%
S\CN
Notary Public ' and for to
State o Washington
" J:0 o NpTARY cn i
v
residing at.
g
- - -:Z=
My appointment expires « 2 0 y
~Nj;%~p PugtlC moo.
%
1
111111110
WW/bd
REF. H:\FAC\FAC1785\E98=918
Storm Water Easement and Maintenance Agreement
Page 4 of 8
EXHIBIT "A"
LEGAL DESCRIPTION
LOT "A" OF CITY OF AUBURN LOT LINE ADJUSTMENT NUMBER LLA-0026-90, AS RECORDED
UNDER RECORDING NUMBER 9008061561, RECORDS OF KING COUNTY, WASHINGTON. SITUATED
IN THE NW 'A OF THE NW/, OF SECTION 18, T 21 N, R 5 E, W.M.
PARCEL NO. 605340-0195.
LOTS I AND 2 OF CITY OF AUBURN SHORT PLAT NUMBER SPL0014-90, AS RECORDED UNDER
RECORDING NUMBER 9303231052, RECORDS OF KING COUNTY, WASHINGTON. SITUATED IN THE
NW OF THE NW '/4 OF SECTION 18, T 21 N, R 5 E, W.M.
rn
Ln
oa
0
0
rn,
O
CD
Cf
C'V
Storm Water Easement and Maintenance Agreement
Page 5 of 8
F
EXHIBIT "B"
(Z"t
cx= :
c~
c~
r-
0
M
O
em.
co
cS.
N
STO A ER POLLUTION PREVENTION PLAN
for
SCARFF FORD/ISUZU
107 7th St N.S.
Auburn, WA
SEPA # SEP-0044-97 PAC # SAC 0017-98
GRA # GRA 0018-97 BLD # BLD 0328-98
Parcel #'s 605340-0195-00,.605340-0163-06
Introduction:
The scarff Ford/Isuzu Develcpment Building will have a storm drainage
system comprised of an open to air storm drainage detention pond with a
water quality biofiltraticn Swale.
The proposed Building is 9,200 sL and is located at 701 7th St.
N.E. Auburn, Washington. The total site area is 4.59 acres. The total
impervious area of the site is approximately 1.30 acres.
The existina storm drainage system directs surface water runoff via
sheet flow from the undeveloped open fields to the surrounding soils and
eventually to the existing catch basins within "A" Street S.E. No
connection to a tightlined public conveyance system has been observed.
The developed storm drainage runoff is conveyed to the storm water open
detention pond system via tightline. Stormwater runof: is then routed
through the flow control structure (attached to the concrete retaining
wall inside pond) to the biofilcration swale. After bioswale treatment,
stormwater is discharged to the public conveyance system located at the
northwest corner of the site within "A" St. N.E. Right-6f-Way.
Plan Goal
The specific purpose for the storm water facility is to minimize
pollution that is typically. associated with modern development. In
general, pollution from motor vehicles and pollution generated from
erosion. Attached to this narrative is a maintenance manual which
offers guidelines to the owner for storm water facility maintenance.
Preventative BMP'S
The owner shall be responsible for sweeping the lot, installing storm
drainage stenciling and provide spill control procedures. In case of
spill call 1-206-649-700.
" BMP RO.05 Spill Control (sc-type) Oil/ water Separator
• BMP RB.11 Detention Pond (open to air)
3MP RB.os Biofiltration Swale
These BMP'S will be inspected a minimum of 2 times per year or as
directed in the Maintenance and Operation Manual. The owner shall keep
a record of inspection and maintenance for a period o_° 5 years and will
provide a copy of the records and maintenance checklist for the City
Inspector to review.
The City of Auburn Utilities Section is to review and approve any changes to
this stormwater Pollution Prevention. Plan prior to changes in its
implementation. Additionally, any changes in ownership or person of
responsibility are to be reported to the City Utilities Sections.
Persons of Responsibility: SCARFF MOTORS
501 AUBURN WAY N.
Auburn, WA 98002
Fn # (253) 833-1500
(Changes to ownership shall be reported
[o the City of Auburn's Utilities Section.)
Storm Water Easement and Maintenance Agreement
Page 6 of 8
t
inspection: Maintenance:
Regular inspections of the drainage facilities should be carried out twice per
year, in the spring and fail. The responsible party should keep records of
these inspections available for review by the City. Additional inspections
may be required after severe seasonal storms.
Routine maintenance of the site will inciuae mowing, care of landscaping and
the removal of trash and debris from the drainage system. The parking lots
and driveways should be kept clean and in repair. Events such as major storms
or heavy winds will require immediate inapections for damages..
To ensure proper water quality and treatment, the detention pond and the
bioswale: must be properly maintained. During susuaer months the grasses must
be mowed regularly, maintaining a grass length of approximately 3 inches zo 6
inches, with prompt removal and proper disposal of grass clippings and trash
cr debris. Removal of any sediment 6 inches deep or covering vegetation is
also necessary within the biofiltraticn swale. Remove sediments, fertilize,
and reseed as necessary. °e careful to avoid introducing fertilizer to
receiving waters or groundwater. If pond side slopes become eroded over 2
rn inches deep, stabilize by using appropriate erosion control measures (e.g._,
LS.1 rock reinforcement, planting of grass, compaction)
CO
CD Catch Basins shall be cleaned when sumo is 1/3' full of sediment or debris.
0
0
r--
C=
Cn.
L7
o,
Cs
cn
Storm Water Easement and Maintenance Agreement
Page 7 of 9
i
INSPECTION / MAINTENANCE CHECKLIST
cn:
C~^
CP
O~
m~
C=
C]
O
Cd
C~Q
STRUCTURE
Results/ Date Comments
Maintenance
ALL CATCH BASINS
Inspection
Results
Maintenance
Done
STORM DRAINAGE
Inspection
POND WALLS & SIDS
Results
SLOPES
Maintenance
Done
DETENTION RISER
Inspection
PIPE WITHIN
Results
POND
Maintenance
Done
PLOW CONTROL
Inspection
STRUCTURE
Results
Maintenance
Done
HIOSWALE
Inspection
Results
Maintenance
Done
WW/bd
REF. H:\FAC\FAC1785\E98-918
S
Storm Water Easement and Maintenance Agreement
Page 8 of 8