HomeMy WebLinkAbout20010521001558 STORM EASEMENT 052101r
Return Address:
City of Auburn
City Clerk
25 West Main
Auburn, WA 98001
01052 0015,58
IC NU TIT EAS 25.00
001 OF 008
e2091 11:58
MUNTY, WA
Above this line reserved for recordine information.
Un
U-1
u-;
C&
u7.
C=D
0
cl~
STORM WATER EASEMENT AND MAINTENANCE AGREEMENT
(FA000-0031 & GRA00-0017)
Reference # (if applicable): N/A Additional on page:
Grantor/Borrower: 1) Residential Resource Associates 2)
Additional on page:
Grantee/Assignee/Beneficiary: City of Auburn
Legal Description/STR: SE 13-21N-4E Additional on page:
Assessor's Tax Parcel ID#: 391500-0105
-PAfW 7-
THIS EASEMENT AND AGREEMENT made and entered into this 0.,20 day of
20~, by and between the City of Auburn, a municipal corporation of
Kid County, Washington, hereinafter referred to as "CITY" and Residential Resource
Associates, located at 101 Stewart St., Suite 1102, Seattle, WA 98101-1748, hereinafter referred
to as "PROPERTY OWNER".
WHEREAS, PROPERTY OWNER has applied for certain permits with the CITY for the
construction of facilities at 602 West Main Street which create impervious surface; and
WHEREAS, the PROPERTY OWNER will complete a storm system; and
WHEREAS, the PROPERTY OWNER and the CITY desire that the storm system be
maintained to provide adequate facilities for controlling both the quantity and quality of storm
drainage; and
WHEREAS, for maintenance of a storm system it is necessary to have appropriate right-
of-way to bring in equipment to conduct maintenance functions; and
WHEREAS, maintenance requirement is a covenant running with the land and binding
upon all heirs, successors and assigns of both parties; and 88id d01°u 'M( r Ned for
rocard by 111W c W~,
1'ft
&i.x?m+rw+od *w onty. IC`4Wtb e6n
Storm Water Easement and Maintenance Agreement e:a Pmp.r'iXecubon or
Page 1 of 8 as to r ~ upon oft. -
WHEREAS, the parties desire that this Agreement be recorded to advise heirs, successors
and assigns of both parties as to the existence of this easement and agreement; and
WHEREAS, an easement is needed to bring in maintenance equipment; and
WHEREAS, the parties are both desirous of permitting inspection of the storm system to
make certain that it is functioning properly and for purposes of determining the appropriate
repairs.
NOW, THEREFORE, BASED UPON MUTUAL COVENANTS TO BE DERIVED
THE PARTIES AGREE AS FOLLOWS:
Section 1, EASEMENT
a
o.
PROPERTY OWNER hereby provides an easement over, under and on that portion of the
c.: property as showing on the approved Record Drawings revised pursuant to construction records
for the City of Auburn under Permit Nos. FA000-0031 and GRA00-0017, which Record
Drawings are hereby incorporated by reference as if set out in full. This easement shall be a
c~ burden to that real estate which is legally described and attached as Exhibit A and incorporated
herein by this reference, and shall be of benefit to the City storm utility system.
Section 2-, HEIRS, SUCCESSORS AND ASSIGNS
This Agreement shall be binding upon the heirs, successors and assigns of the parties.
Section 3, MAINTENANCE
The PROPERTY OWNER agrees to maintain the storm system in accordance with the
ordinances and all applicable codes of the CITY and the Stormwater Pollution Prevention
Maintenance and Operation Schedule attached as Exhibit "B" and incorporated herein by this
reference. The PROPERTY OWNER does hereby agree that the CITY may enter onto the
property of the PROPERTY OWNER via the easement described above to inspect and perform
necessary maintenance if, after the PROPERTY OWNER is given notice to maintain, the
PROPERTY OWNER fails to maintain. Further, the PROPERTY OWNER agrees the CITY
may enter onto the property of PROPERTY OWNER via the easement described above to
perform emergency maintenance in the event of the storm system's failure which might result in
adverse impacts(s) on public facilities or private facilities of other property owners. In both
events the PROPERTY OWNER agrees he/she/they/it shall reimburse the CITY for the costs
incurred by the CITY in maintaining the storm system. Should the CITY incur attorney's fees
and/or costs in enforcing the agreement and/or in maintaining or collecting maintenance fees, the
PROPERTY OWNER agrees to pay reasonable attorney's fees and all costs incurred by the
CITY. ; . ; ,..r
Storm Water Ea§event and Maintenance Agreement
Page 2 of 8 :v ,k~ .
r°
Section 4, ACKNOWLEDGMENT OF OTHER ENFORCEMENT ACTIONS
PROPERTY OWNER acknowledges that there may be liability for violations of codes
that could result in additional fines and/or the possibility of incarceration in addition to the fees
for maintenance should violations occur.
EXECUTED as of the date first written above.
CITY OF AUBURN
z-o o%
wnerG~~~`L•I'>?^-~ ate...
Owner Date
co.
LS.
Sm
G7
G`V
DIRECTOR OF PUBLIC WORK61
1
E'VV
Storm Water Easement and Maintenance Agreement
Page 3 of' 8
..r
o.
r~
STATE OF WASHINGTON)
)SS.
County of King )
I certify that I know or have satisfactory evidence that I -f Y n E av y-
and is/sue the person( who appeared before
me, and said partner(s) acknowledged that he/she/they signed this instrument and acknowledged
it to be his/her/their free and voluntary act for the uses and purposes mentioned in this
instrument.
Dated ' A'pf? I ZD , 2.001
M' 1
r d 00TA
ca:
PUBLIC Notary Public in and for the Stale of Washington
residing at •P>&he I I W "V1 ice. j
~1 9 • B 9-O
~1 ~cZ` • ~ My appointment expires us-1- ZDO
%FWASa
I~'E►~ -
STATE OF WASHINGTON)
)SS.
County of King )
I certify that I know or have satisfactory evidence that M . ~4 e*- is the person who appeared before me, and said person acknowledged thatshe signed f ilk
instrument, on oath stated thatke was authorized to execute the instrument and acknowledged it
as the DIRECTOR OF PUBLIC WORKS of THE CITY OF AUBURN to be the free and
voluntary act of such party for the uses and purposes mentioned in this instrument.
Dated - 2 t
C. W
1
i ~G•~~e?S1~NFAC9~ 11~ V` r Gll~
0 NOTARY m ~0 Notary Publi in and for the State Washington
co S4 0 ' residing at
PUBLIC My appointment expirl
- Z -0
~7.?9_ptk
WASM
AWms/bd
File: 4.1, 2.1
REF. FA000-0031 (STM WAT EASE & MAINT AGREE)\E01-535 GRA00-0017 (STM WAT EASE & MAINT AGREE)\E01-535
Storm Water Easement and Maintenance Agreement
Page 4 of 8
r'
EXHIBIT `A'
LEGAL DESCRIPTION
LOTS 3, 4, 5, AND 6, BLOCK 2 KNICKERBOCKER'S FIRST ADDITION TO THE
TOWN OF AURBURN, AS PER PLAT RECORDED IN VOWME 16 OF PLATS,
PAGE 23 IN KING COUNTY, WASHINGTON.
w?
",I.
Lp~
irr
c;A
CZ.?
.7.-
Cp
C~4
Storm Water Easement and Maintenance Agreement
Page 5 of 8
sz~r
Czs
sc
env
EXHIBIT `B'
Qapc R913:
C014SULTING ENGINEERS/CIVIL AND STRUCTURAL
POLLUTION PREVENTION PLAN
I OF
RESIDENTIAL RESOURCE ASSOCIATES
602 W. MAIN STREET
AUBURN, WA 98061
FOR
THE KEIMIG ASSOCIATES
AUGUST 2000
R.E. JOB NO. 99176.
1519 West Valley Highway North/Suite 101
Post Office Box 836/Auburn. WA 98071
25'1-833.7776 J%ax 253-930-216E
Storm Water Easement and Maintenance Agreement
Page 6 of 8
fI
Stormwater Pollution Prevention Plan
Site Address
This project is located in SE 1/a of Section 13, Township 21 N., Range 4 E. W.M. The site is
located at 602 W. Main Street Auburn, WA. Tax Parcel No. is 391500-0105-02. The site is
0.492 acres.
Introduction
This project involves the construction of an approximately 0.3-acre new parking lot and
associated utilities, and re-construction of a building destroyed by a fire. Detention and water
quality is required for the 0.3-acre parking lot; detention will be in a parking lot surface pond.
Runoff from the parking lot will be treated via a "Stonnceptor" water quality facility before
being released into the public storm system. All roof runoff will be collected into roof drains
and conveyed directly to the public storm system.
Plan Goal
Q0 The goal of the plan is treat the runoff from the parking lot for water quality before discharging
tX7k to the public storm system in Main St. north of the site.
cam., The property owner is required to enhance and protect water quality due to stormwater
discharges from the parking lot, as dictated by the City of Auburn's Developer Design Manual.
In this document, the parking lot's storm drainage system is generally described and the
Lill
inspection and maintenance requirements are outlined.
Preventative BMP's
. c,
c.,
Preventative Best Management Practices (BMP's) shall be implemented to ensure that the water
quality measures are provided to site discharge. Such practices include the following:
1) Areas which discharge runoff to the storm drainage system should be kept free of
debris and any dangerous wastes which may pollute the storm drainage system.
Storm drains shall be stenciled "DUMP NO WASTE, DRAINS TO STREAM."
2) The storm drainage utilities sliould be properly maintained, as described in the
following sections.
Treatment BMP's
The Stormceptor has been designed to convey and treat runoff for conventional pollutants.
Storm Water Easement and Maintenance Agreement
Page 7 of 8
i
'7
Q O'
LX)s
0
co
N
Ln
0
0
0
CV
Stormwater Pollution Prevention Plan (Cont.)
Inspection
Regular inspection of the storm drainage facilities will ensure their proper function. Inspection
shall occur at least twice a year. Records of inspection and maintenance shall be kept for five
years and shall be available for City inspector to review:
Maintenance
Regular maintenance of the storm drainage facilities will ensure their proper function. See King
County Washington. Surface Water Design Manual. Appendix A. Maintenance Requirements
for Privately Maintained Drainage and Section 5 of The Stormcotor System Technical Manual
for maintenance requirements. .
Person of Responsibility
Residential Resource Associates
101 Stewart St., Suite 1102
Seattle, WA 98101-1748
Contact: Stephen Burr
Signature:
Phone: 206-441-0182
Design Engineer: Rupert Engineering, Inc.
Contact: Jeff Baker
1519 West Valley Hwy. N., Suite 101
Auburn, WA 98001
(253) 833-7776
Plan and/or Information Updates
The City of Auburn Utilities Section is to review and approve any changes to this Stormwater
Pollution Prevention Plan prior to changes in its implementation. Additionally, any changes in
ownership or person of responsibility are to be. reported to the City Utilities Section.
AWms/bd
File: 4.1, 2.1
REF. FAC00-0031 (STM WAT EASE & MAMT AGREE)\E01-535 GRA00-0017 (STM WAT EASE & MATNT AGREE)\E01-535
Storm Water Easement and Maintenance Agreement
Page 8 of 8