HomeMy WebLinkAbout200411080922 STORM EASEMENT 110804Pwg2so-lti
Return Address:
City of Auburn
City Clerk
25 West Main
Auburn, WA 98001
PGS
PIE LE2COUNiY.2~gHINGiON
3.1-3. 2
Above this line reserved for recording information.
STORM WATER EASEMENT AND MAINTENANCE AGREEMENT
FAC04-0008
Reference # (if applicable): N/A
Grantor/Borrower: Waterstone 11, LLC t ~2 `1 $ t q
Y~
Grantee/Assignee/Beneficiary: City of Auburn
Legal Description/STR: NE '/A, 06-20-05E
Assessor's Tax Parcel iD#: 052006-1058
THIS EASEMENT AND AGREEMENT made and entered into this day of
2004, by and between the City of Auburn, a municipal corporation of King
County, Washington, hereinafter referred to as "CITY" and Waterstone II, LLC, hereinafter
referred to as "PROPERTY OWNER".
WHEREAS, PROPERTY OWNER has applied for certain permits with the CITY for the
construction of facilities for Waterstone II located at 5909 Panorama DR SE
which create impervious surface; and
WHEREAS, the PROPERTY OWNER will complete a storm system; and
WHEREAS, the PROPERTY OWNER and the CITY desire that the storm system be
maintained to provide adequate facilities for controlling both the quantity and quality of storm
drainage; and
WHEREAS, for maintenance of a storm system it is necessary to have appropriate right-
of-way to bring in equipment to conduct maintenance functions; and
WHEREAS, maintenance requirement is a covenant running with the land and binding
upon all heirs, successors and assigns of both parties; and
WHEREAS, the parties desire that this Agreement be recorded to advise heirs, successors
and assigns of both parties as to the existence of this easement and agreement; and
WHEREAS, an easement is needed to bring in maintenance equipment; and
Storm Water Easement and Maintenance Agreement
Page 1 of 11 EXCISE TAX EXEMPT DATE
Pierce County'
7~ &-Auth. Sag
WHEREAS, the parties are both desirous of permitting inspection of the storm system to
make certain that it is functioning properly and for purposes of determining the appropriate
repairs.
NOW, THEREFORE, BASED UPON MUTUAL COVENANTS TO BE DERIVED
THE PARTIES AGREE AS FOLLOWS:
Section 1, EASEMENT
PROPERTY OWNER hereby provides a non-exclusive easement to the City for access,
inspection, and maintenance for the purposes of this Agreement and the attached Storm Water
Pollution Prevention Plan, over, under and on that real estate described in Exhibit "A" and on
that portion of the property as showing on the approved Record Drawings revised pursuant to
construction records for the City of Auburn under. Permit No. FAC04-0008, which record
drawings are hereby incorporated by reference as if set out in full. This easement shall be a
burden to that real estate which is legally described and attached as Exhibit "A" and incorporated
herein by this reference, and shall be a benefit to the City Storm Drainage Utility System.
Section 2, HEIRS, SUCCESSORS AND ASSIGNS
This Agreement shall be binding upon the heirs, successors and assigns of the parties.
Section 3, MAINTENANCE
The PROPERTY OWNER agrees to maintain the storm system in accordance with the
ordinances and all applicable codes of the CITY and the Storm Water Pollution Prevention
Maintenance and Operation Schedule attached as Exhibit "B" and incorporated herein by this
reference. The PROPERTY OWNER does hereby agree that the CITY may enter onto the
property of the PROPERTY OWNER via the easement described above to inspect and perform
necessary maintenance if, after the PROPERTY OWNER is given notice to maintain, the
PROPERTY OWNER fails to maintain. Further, the PROPERTY OWNER agrees the CITY
may enter onto the property of PROPERTY OWNER via the easement described above to
perform emergency maintenance in the event of the storm system's failure which might result in
adverse impacts(s) on public facilities or private facilities of other property owners. In both
events the PROPERTY OWNER agrees to reimburse the CITY for the costs incurred by the
CITY in maintaining the storm system. Should the CITY incur attorney's fees and/or costs in
enforcing the agreement and/or in maintaining or collecting maintenance fees, the PROPERTY
OWNER agrees to pay reasonable attorney's fees and all costs incurred by the CITY.
Storm Water Easement and Maintenance Agreement
Page 2 of 11
STATE OF WASHINGTON)
ss
COUNTY OF KING )
I certify I have know or have satisfactory. evidence that -Rich a r J i~n m) I 1 n aS
Wad the
person(, who appeared before me, and said person(s)acknowledged that he/she/they signed this
instrument on. oath stated that he/she/they was/were authorized to execute the instrument and
acknowledge as the Akthyri zea -AQer,f
of Wa erstone- IL I LLC- a limited liability company, to be the free
and voluntary act. of such party for the uses and purposes mentioned in the instrument.
Dated IU' l4.-.QAi _
% P1..L. S ~ij~
•
v NOTARY y=
N,► UBUC s
o Crc,~ s . bpi n s
~ Notary Public in and for the State of Washington
Residing at K i n
My appointmefff Rp e's $ - 2r 2007
STATE OF WASHINGTON)
)ss.
County of King )
I certify that I know or have satisfactory evidence that Tim Carlaw is the person who appeared
before me, and said person acknowledged that he signed this instrument, on oath stated that he
was authorized to execute the instrument and acknowledged it as the STORM DRAINAGE
ENGINEER of THE CITY OF AUBURN to be the free and voluntary act of such party for the
uses and purposes mentioned in this instrument.
Dated l a / i s~ ~t~
~vo~noavnaaiu9 °
BADS
O
;:off '~XOTARI'
I
PUBLIC'
°•a mil; • , r r 1 g_p1,.~ Notary Public in and for the St of ashing on
e0o° F Residing at--T='cq.~ c-o U tv
My appointment expires / d d
W W/tlb
File: #995
REF. RDevelopmentTormsTegal Documents\2004
Storm Water Easement and Maintenance Agreement
Page 4 of I I
Section 4, ACKNOWLEDGMENT OF OTHER ENFORCEMENT ACTIONS
PROPERTY OWNER acknowledges that there may be liability for violations of codes
that could result in additional fines and/or the possibility of incarceration in addition to the fees
for maintenance should violations occur.
EXECUTED as of the date first written above.
CITY OF AUBURN
St rainage Engineer Date
o-G-o
Owne Date
it/~6 n+e , G•G•Ci•
Owner
Date
Storm Water Easement and Maintenance Agreement
Page 3 of 11
I ~
Exhibit `A'
LEGAL DESCRIPTION - WATERSTONE II:
LOT 1, CITY OF AUBURN LOT LINE ADJUSTMENT NO. LLA-02-0021,
RECORDED UNDER AUDITOR'S FILE NO. 200221020767, RECORDS OF PIERCE
COUNTY, WASHINGTON, ALL IN SECTION 6, TOWNSHIP 20 NORTH, RANGE 5
EAST, W.M.
Storm Water Easement and Maintenance Agreement
Page 5 of 1 I
EXHIBIT B
STORM WATER POLLUTION PREVENTION PLAN
For
Waterstone II
FAC#04-0008
Site Address:
The project is located in (QTR Section) NE, (Section) 6 - (Township) 20 N -
(Range) 5 East, W.M., northwest of Evergreen Way S.E. and north of Panorama
Drive S.E. The Tax Parcel # is 0520061058.
Introduction:
This storm drainage technical information report has been prepared to address
the City of Auburn's site development and storm drainage requirements for the
proposed Lakeland, Waterstone II project located northwest of Evergreen Way
S.E. and north of Panorama Drive S.E. The site has an area of approximately
10.4 acres and is currently cleared and rough graded. The subject site will
developed as a multi-family townhome project.
The subject site will include 21 separate residential townhouse buildings
containing a total of 79 units.
According to the City of Auburn's Construction Standards for storm water
management, the city requires storm water quantity and quality control to all
proposed developments. We have proposed to collect all of the storm water
runoff from the landscaped, building and pavement areas in a series of catch
basins. This water will be conveyed by storm drainage pipe to the existing
conveyance system in Lakeland Hills Way, which will convey the water to a
storm water detention and water quality pond that was already constructed per
the Master Drainage Plan, located in the Mill Pond/North Basin. Here the storm
water will be released into an existing storm drainage conveyance system, which
flows westward via overland pipes to the East Valley Highway and ultimately
discharges to a constructed channel known as the "Tailrace". The "Tailrace"
ultimately drains to the White River.
Storm Water Easement and Maintenance Agreement
Page 6 of I I
P i
Plan Goal
The specific purpose for the storm water facility is to minimize pollution that is
typically associated with modern development. In general, pollution from motor
vehicles and pollution generated from erosion. Attached to this. narrative is a
maintenance manual, which offers guidelines to the owner for storm water facility
maintenance.
Prevention BMP'S
The catch basins shall have stenciled on them "DUMP NO WASTE - DRAINS
TO STREAM. The owner shall be responsible for sweeping the lot, installing
storm drainage stenciling and provide spill control procedures. In case of spill
call DOE at 1-425-649-7000. The catch basins, detention/wet pond, and control
structures will be visually.inspected for accumulation of debris and silt and will be
maintained as required by this pollution prevention plan and attachments.
Maintenance Standards for Drainage Facilities
Since the project site is part of the Lakeland Hills master planned community, the
stormwater detention and water quality facilities that will serve this project have
already been constructed by others. The only facilities that will be constructed
as a part of this project are the components of the tight line conveyance system
needed to convey. the stormwater runoff to the existing facilities. For this reason,
the only portion of Chapter 4.6 "Maintenance Standards for Drainage Facilities"
of the August 2001 edition of the Washington . State Dept. of Ecology's
Stormwater Management Manual for Western Washington that is applicable to
this project is:
No. 5 - Catch Basins
(Department of Ecology Storm Water Manual, August 2001).
Treatment BMP'S
This section was not applicable to this project since no on-site "Treatment
BMP's" will be constructed for this project.
Storm Water Easement and Maintenance Agreement
Page 7 of 11
Inspection / Maintenance:
Regular inspections of the drainage facilities should be carried out twice per
year, in the spring and fall. The responsible party should keep records of these
inspections available for review by the City. Additional inspections may be
required after severe seasonal storms.
Routine maintenance of the site will include mowing, care of landscaping and the
removal of trash and debris from the drainage system. The parking lots and
driveways should be kept clean and in repair. Events such as major storms or
heavy winds will require immediate inspections for damages.
Be careful to avoid introducing landscape fertilizer to receiving waters or
groundwater.
Catch Basins shall be cleaned when sump is 1/3' full of sediment or debris.
Person of Responsibility:
Waterstone II, LLC
11624 S.E. 5th Street, Suite #200
Bellevue, WA 98005
Design Engineer:
Core Design, Inc.
14711 N.E. 29th Place, Suite #101
Bellevue, WA 98007
Plan and / or Information Updates:
The City of Auburn Utilities Section is to review and approve any changes to this
stormwater Pollution Prevention Plan prior to changes in its implementation.
Additionally, any changes in ownership or person of responsibility are to be
reported to the City Utilities Sections.
(Changes to ownership shall be reported to the City of Auburn's Utilities Section.)
Storm Water Easement and Maintenance Agreement
Page 8 of 11
INSPECTION/MAINTENANCE CHECKLIST
STRUCTURE
DATE OF INSPECTION/MAINTENANCE
Results/
T
Maintenance
Date
Inspection
All Catch Basins
Results
Maintenance
Done
Inspection
Conveyance Pipes
Results
Maintenance
Done
Yard Drains and
Inspection
Cleanouts
Results
Maintenance
Done
Maintenance Standards for Drainage Facilities
The facility-specific maintenance standards contained in this section.
are intended to be conditions for determining if maintenance actions
are required as identified through inspection. They are not intended
to be measures of the facility's required condition at all times
between inspections. In other words, exceeding these conditions at
any time between inspections and/or maintenance does not
automatically constitute a violation of these standards. However,
based upon inspection observations, the inspection and
maintenance schedules shall be adjusted. to minimize the length of
time that a facility is in a condition that requires a maintenance
action.
Storm Water Easement and Maintenance Agreement
Page 9 of 11
No. 5 - Catch Basins
Maintenance'
Defect
Conditions When Maintenance is Needed
Results Expected Wh''
Component
Maintenance is't
performed'' ' i
General
Trash &
Trash or debris which is located immediately
No Trash or debris
Debris
in front of the catch basin opening or is
located immediately in
blocking inletting capacity of the basin by
front of catch basin or on
more than 10%.
grate opening.
Trash or debris (in the basin) that exceeds 60
No trash or debris in the
percent of the sump depth as measured from
catch basin.
the bottom of basin to invert of the lowest
pipe into or out of the basin, but in no case
less than a minimum of six inches clearance
from the debris surface to the invert of the
lowest pipe.
Trash or debris in any inlet or outlet pipe
Inlet and outlet pipes free
blocking more than 1 /3 of its height.
of trash or debris.
Dead animals or vegetation that could
No dead animals or
generate odors that could cause complaints
vegetation present within
or dangerous gases (e.g., methane).
the catch basin.
Sediment
Sediment (in the basin) that exceeds 60
No sediment in the catch
percent of the sump depth as measured from
basin
the bottom of basin to invert of the lowest
pipe into or out of the basin, but in no case
less than a minimum of 6 inches clearance
from the sediment surface to the invert of the
lowest pipe.
Structure
Top slab has holes larger than 2 square
Top slab is free of holes
Damage to
inches or cracks wider than 1/4 inch
and cracks.
Frame and/or
Top Slab
(Intent is to make sure no material is running
into basin).
Frame not sifting flush on top slab, i.e.,
Frame is sitting flush on
separation of more than 3/4 inch of the frame
the riser rings or top slab
from the top slab. Frame not securely
and firmly attached.
attached
Fractures or
Maintenance person judges that structure is
Basin replaced or
Cracks in
unsound.
repaired to design
Basin Walls/
standards.
Bottom
Grout fillet has separated or cracked wider
Pipe is regrouted and
than 1/2 inch and longer than 1 foot at the
secure at basin wall.
joint of any inletioutlet pipe or any evidence
of soil particles entering catch basin through
cracks.
Settlement/
If failure of basin has created a safety,
Basin replaced or
Misalignment
function, or design problem.
repaired to design
standards.
Vegetation
Vegetation growing across and blocking
No vegetation blocking
more than 10% of the basin opening.
opening to basin.
Storm Water Easement and Maintenance Agreement
Page 10 of 11
n.
'ill
No. 5 - Catch Basins
Maintenance
Defect
Conditions When Maintenance is Needed
Results Expected When
Component
Maintenance is
performed
Vegetation growing in inlet/outlet pipe joints
No vegetation or root
that is more than six inches tall and less than
growth present.
six inches apart.
Contamination
See "Detention Ponds" (No. 1).
No pollution present.
and Pollution
Catch Basin
Cover Not in
Cover is missing or only partially in place.
Catch basin cover is
Cover
Place
Any open catch basin requires maintenance.
closed
Locking
Mechanism cannot be opened by one
Mechanism opens with
Mechanism
maintenance person with proper tools. Bolts
proper tools.
Not Working
into frame have less than 1/2 inch of thread.
Cover Difficult
One. maintenance person cannot remove lid
Cover can be removed by
to Remove
after applying normal lifting pressure.
one maintenance person.
(Intent is keep cover from sealing off access
to maintenance.)
Ladder
Ladder Rungs
Ladder is unsafe due to missing rungs, not
Ladder meets design
Unsafe
securely attached to basin wall,
standards and allows
misalignment, rust, cracks, or sharp edges.
maintenance person. safe
access.
Metal Grates
Grate opening
Grate with opening wider than 7/8 inch.
Grate opening meets
(If Applicable)
Unsafe
design standards.
Trash and
Trash and debris that is blocking more than
Grate free of trash and
Debris
20% of grate surface inletting capacity.
debris.
Damaged or
Grate missing or broken member(s) of the
Grate is in place and
Missing.
grate.
meets design standards.
Storm Water Easement and Maintenance Agreement
Page I I of I I