HomeMy WebLinkAboutDesign Standards Revision #10 02.16.10 REVISION DIRECTIONS AUBURN DESIGN STANDARDS EFFECTIVE DATE 02/16/2010 Revision No. 10 Chapters 1, 2, 3, 4, 5, 6, 7, 10, and 12 New, reprinted pages included with this revision are listed by page number in the righthand column below. The left-hand column lists obsolete material, which should be removed from the book. Follow the instruction columns in sequence: remove and insert pages as necessary. When completed, insert these directions in a convenient place near the front of the Design Standards Manual. For future reference, the person making these changes may also date and initial this page. Remove these pages Insert these pages Chapter 1 Chapter 1 Chapter 2 Chapter 2 Chapter 3 Chapter 3 Chapter 4 Chapter 4 Chapter 5 Chapter 5 Chapter 6 Chapter 6 Chapter 7 pages 3-6 Chapter 7 pages 3-6 Chapter 10 Chapter 10 Chapter 12 Chapter 12 Chapter 1 -General Information 1.00 Preface The City of Auburn has adopted this Engineering Design Standards manual to encourage the standardization of design elements for consistency and to assure that public safety needs are met. This manual contains engineering standards for use by professional civil engineers when designing facilities within the City of Auburn. The information contained in this manual cannot provide for all situations and conditions that may be encountered. Specific provisions contained within this manual may not be appropriate for all locations and existing conditions. These standards are intended to assist, but not substitute for, competent work by professional civil engineers. The design requirements contained within this manual do not set legal standards of care, but provide guidance for possible engineering treatment under some circumstances. This chapter contains general information on this manual and the City of Auburn. 1.01 Contact Information Permit Center Valley Regional Fire Authority Physical address: North Fire Station Auburn Professional Plaza (2nd Floor) 1101 "D" Street NE One East Main Street Auburn, Washington 98002-4016 Mailing Address: Phone: (253) 288-5800 25 West Main Street Fax: (253) 288-5900 Auburn, Washington 98001-4998 Public Works: Phone: (253) 931-3010 Fax: (253) 931-3053 Planning & Development: Building Phone: (253) 931-3020 Planning Phone: (253) 931-3090 Fax: (253) 804-3114 1.02 Reference Material 1.02.1 City Reference Material The reference material referred to herein may be obtained from the City of Auburn: 1.02.1.1 City of Auburn Engineering Construction Standards Manual The Engineering Construction Standards manual sets forth the standards used during the construction of all civil projects within the City’s jurisdiction including the extension of public water, sanitary sewer, storm drainage, and transportation facilities by private developments. The manual is comprised of two sections. Section I contains the City’s Standard Special Provisions and Section II contains the City’s Standard Details. The Standard Special Provisions are a supplement to, and a modification of, the 02/16/2010 Design Standards Page 1-01 REF. H\DEVELOPMENT\Design Standards\Chapter 1 (2-10) “Washington State Department of Transportation (WSDOT/APWA) Standard Specifications for Road, Bridge and Municipal Construction,”. The Standard Details are comprised of the City’s construction and design detail drawings for temporary erosion control, grading, water, sanitary sewer, storm drainage, and street work within the City that are supplemented by the “Washington State Department of Transportation’s (WSDOT) Standard Plans.” 1.02.1.2 Engineering Handouts The following Handouts are currently available from the City to aid the public in planning and constructing development projects within the City of Auburn. Contact the Permit Center for the most current list available. 1.02.1.2.1 Design Packets These handouts contain checklists for developing a civil plan set for submittal, and updating approved civil plans after construction has been completed: A. Public Facility Extension (FAC) Submittal Packet B. Grading Permit (GRA) Submittal Packet C. Record Construction Document Packet. 1.02.1.2.2 General Handouts These handouts contain information describing various City permit, plan or project requirements: A. Handout of Minimum T.E.S.C. Requirements for Small Sites. B. Handout for Single Family Residential Roof Downspout and Footing Drain Construction. C. Handout on Accessing City Streets. 1.02.1.2.3 Fee Related Handouts These handouts contain information explaining some City development fees: A. Handout on Transportation Impact Fees. B. Handout on School Impact Fees. C. Handout on Utility Connection Fees. 1.02.1.2.4 Summaries These handouts give a brief description of City policies and requirements: A. Developer Public Facility Extension Process Summary. B. Summary of Half-Street Requirements. C. Summary of Guarantee/Bonding Requirements. 1.02.1.2.5 Technical Memos These handouts contain information that are subject to change or are too specific to be included in this manual: A. Sanitary Sewer Pump Station Requirements and Standards. 02/16/2010 Design Standards Page 1-02 REF. H\DEVELOPMENT\Design Standards\Chapter 1 (2-10) 1.02.2 Other Reference Material The following publications should be used as additional reference material for design applications not covered by the City’s publications: A. Washington State Department of Transportation (WSDOT) “Standard Specifications for Street, Bridge and Municipal Construction” as amended by the City’s Construction Standards Section I. These will be referred to in City publications as the "WSDOT Standard Specifications." B. Washington State Department of Transportation (WSDOT) “Design Manual” (latest edition). C. American Association of State Highway and Transportation Officials’ (AASHTO) “A Policy on Geometric Design of Highways and Streets” (latest edition). D. State of Washington Department of Ecology’s “Criteria for Sewage Works Design” (latest edition). E. State of Washington Department of Health (DOH) “Water Systems Design Manual” (latest edition). F. American Water Works Association (AWWA) Standard Specifications (latest edition). G. “IES Lighting Handbook” (Illuminating Engineering Society of North America) (latest edition). H. American National Standard for Roadway Lighting ANSI/IESNA RP-8-00 (latest edition). 1.03 Deviation from Standards The engineering design standards contained herein should be used when designing a development project within the City of Auburn. In special cases, City standards may not best address a particular engineering application. In these instances, a design deviation from the City’s standards may be requested from the City Engineer. All such requests shall include applicable engineering justification for the deviation. Deviation requests and supporting justification must be sealed by a licensed professional civil engineer. The City Engineer will evaluate the request and notify the applicant of his/her decision within fifteen (15) working days of the receipt of a complete deviation request. The following deviations may be obtained from the City of Auburn: 1.03.1 General Deviations General deviations apply to all engineering design standards except for the Surface Water Management Manual’s Minimum Requirement deviations. The engineering design deviation when compelling supporting justification shall clearly demonstrate that the proposed deviation will meet or exceed the corresponding City standard for the following applicable criteria: A. The functional intent of the design element. B. Safety factors associated with the design element. C. Operational concerns associated with the design element. 02/16/2010 Design Standards Page 1-03 REF. H\DEVELOPMENT\Design Standards\Chapter 1 (2-10) D. Maintenance concerns associated with the design element. E. Liability concerns associated with the design element. F. The capacity and/or efficiency of the design element. G. The design life, historical performance, and durability of the design element. H. The aesthetic and visual impacts of the design element. I. The cost effectiveness and availability of any replacement components or materials. J. Consistency with the spirit and purpose of the corresponding City design standard. K. Demonstration that the environment will not be adversely affected. L. Supported by published industry standards. 1.03.2 Surface Water Management Manual Deviations 1.03.2.1 The Ten Minimum Requirements A deviation request from any of the ten minimum requirements in the Surface Water Management Manual (SWMM) goes through a different process which includes a public notice requirement. This is to insure that the Department of Ecology mandated surface water regulations are complied with. The ten Minimum Requirements of the City of Auburn Surface Water Management Manual are as follows: 1. Stormwater Site Plan 2. Construction Stormwater Pollution Prevention Plan 3. Source Control of Pollution 4. Preservation of Natural Drainage Systems 5. On-site Stormwater Management 6. Runoff Treatment 7. Flow Control 8. Wetlands Protection 9. Operation and Maintenance 10. Off-site Analysis and Mitigation 1.03.2.2 Deviation Criteria Deviations from the ten Minimum Requirements of the City of Auburn Surface Water Management Manual may be requested, in writing, in accordance with ACC 13.48.226 to allow a waiver of a requirement, a reduction or modification of a requirement, or to permit an alternative requirement. Public notice of application for a deviation, decision, and written findings will be published in accordance with ACC 13.48.226. Deviations must meet the following criteria: • The minimum requirements would impose a severe and unexpected economic hardship; and • The deviation will not increase risk to the public health and welfare, nor injurious to other properties in the vicinity and/or downstream, and to the quality of waters of the state; and 02/16/2010 Design Standards Page 1-04 REF. H\DEVELOPMENT\Design Standards\Chapter 1 (2-10) • The deviation is the least possible exception that could be granted to comply with the intent of the Minimum Requirements. In accordance with ACC 13.48.226, the City Engineer may grant a deviation following a documented finding that: A. The deviation is likely to be equally protective of public health, safety and welfare, the environment, and public and private property, as the requirement from which an exception is sought; or B. Substantial reasons exist under ACC 13.48.226 C., for approving the requested deviation and the deviation will not cause significant harm. The substantial reasons may include, but are not limited to: o The requirement to be imposed is not technically feasible; or o An emergency situation necessitates approval of the deviation; or o No reasonable use of the property is possible unless the deviation is approved; or o The requirement would cause significant harm or a significant threat of harm to public health, safety and welfare, the environment, or to public and private property, or would cause extreme financial hardship which substantially outweighs its benefits. The decision to grant a deviation is within the sole discretion of the City, and the City Engineer shall only approve a deviation to the extent it is necessary. The City Engineer may impose new or additional requirements to offset or mitigate harm that may be caused by approving the deviation. The City Engineer may require the applicant to submit a licensed engineer’s report or analysis along with a request, in writing, for a deviation. Deviations are intended to maintain necessary flexible working relationship between the City and applicants. The approval of a deviation shall not be construed to be an approval of any violation of any of the other provisions of the City’s Municipal Code, or of any other valid law of any governmental entity having jurisdiction. Applications for a deviation from the Minimum Requirements of ACC13.48.225 must be in writing and include the following information: A. The current (pre-project) use of the site, and B. How the application of the minimum requirement(s) restricts the proposed use of the site compared to the restrictions that existed prior to the adoption of the minimum requirements; and C. The possible remaining uses of the site if the deviation were not granted; and D. The uses of the site that would have been allowed prior to the adoption of the minimum requirements; and E. A comparison of the estimated amount and percentage of value loss as a result of the minimum requirements versus the estimated amount and percentage of value loss as a result of requirements that existed prior to adoption of the minimum requirements; and F. The feasibility for the owner to alter the project to apply the minimum requirements. 02/16/2010 Design Standards Page 1-05 REF. H\DEVELOPMENT\Design Standards\Chapter 1 (2-10) 02/16/2010 Design Standards Page 1-06 REF. H\DEVELOPMENT\Design Standards\Chapter 1 (2-10) 1.03.2.3 Public Notice Requirements The public notice will be issued after the decision and any appeal of the decision per Section 1.04 has been completed. The following public notice requirements apply whenever a request for an exception to the Minimum Requirements contained in ACC 13.48.225 is received by the City: A. Public notice (Notice) shall be made to inform the public about the contents of the Request and the City Engineer’s decision to grant or deny it. Notice of the Request and the decision to grant or deny the Request may be combined. B. The Notice shall be published, at the requestor’s cost, in the City’s newspaper of record and a local newspaper of general circulation within Auburn. C. The Notice shall include: (i) a brief description of the Request; (ii) a brief description of the City Engineer’s decision to grant the Request and reasons supporting the decision, or a statement that the request is denied; (iii) where the Request can be reviewed; and (iv) the name and contact information of a City employee who can answer questions regarding the Request. D. The City shall provide a hardcopy of the City Engineer’s decision to grant or deny a Request to the requester. The City Engineer’s decision to approve or deny a Request shall include a reference to the procedures in City of Auburn Engineering Design Standards for contesting such a decision. 1.04 Appeal of City Engineer’s Decision Appeal of the City Engineer’s decision (Section 1.03) shall follow the following procedure: The applicant shall have fifteen (15) working days from the date of receipt of the City Engineer’s decision in which to submit a written notice to the Public Works Director contesting the written decision of the City Engineer. The Public Works Director shall then have fifteen (15) working days to notify the applicant of his/her decision to uphold or modify the City Engineer’s decision. For engineering deviations requests, the Director’s determination shall be final. If the Public Works Director determines the nature of the deviation requires a nonengineering policy decision by the Public Works Committee of the Auburn City Council, the Public Works Director shall seek such decision from the Committee at the next available Committee meeting. The Public Works Director shall notify the applicant within five (5) working days after the Committee’s decision. 1.05 Changes to Standards The City of Auburn’s Public Works Committee is authorized to make any additions, deletions, or modifications stated in these Standards. (ACC 12.04.010) Chapter 2 – Plan Approval Process 2.00 Preface This chapter contains standards and procedures that apply to the review and approval process for civil engineering plans. Development or redevelopment of property within the City of Auburn, and/or within the limits of Auburn’s Utility Service Area, that require civil engineered plans to support a development action must follow the processes outlined below. 2.01 Types of Plans This section contains information regarding the types of civil engineering plans submitted to the City. Specific plan requirements are described in detail in Chapter 3. Civil engineering plans submitted to the City for review fall within the following four categories. 2.01.1 Grading Plans Grading plans are required prior to the issuance of a Grading Permit and before commencement of construction in the following situations: A. Any application made for a Grading Permit that includes excavations and/or fills exceeding five hundred cubic yards (500 yd3) of material. B. An application made for for a Building Permit for all new non-residential developments and residential construction of three units or more per lot. C. An application made for a Land Clearing Permit when the proposed work involves temporary roads and leveling of the site. D. An application made for construction of a parking lot. E. An application made for a plat or a short plat that requires grading on the site resulting in the movement of over five hundred cubic yards (500 yd3) of material. 2.01.2 Building Site Plans A Building Site Plan includes all civil site development requirements including site layout, site access, parking, utility service, and storm drainage control. An approved Site Plan is required prior to the issuance of a Building Permit and before commencement of construction. Building Site Plans are required for the following situations: A. A Building Site Plan along with a Grading Plan is required in association with a Building Permit application for all new non-residential developments and residential construction of three (3) units or more per lot. B. Where an existing site is redeveloped such that new buildings and additions and/or alterations to existing buildings increase the assessed value of the improvements on the property by greater than fifty percent (50%), and the new plus replaced impervious surface is five thousand square feet (5000 ft2) or more. C. Alteration of site access requirements, and/or connect to and impact City streets and utilities. 2/16/2010 Design Standards Page 2-01 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 2 (2-10) D. Convert ¾ acres or more of native vegetation to lawn/landscaped area or convert 2.5 acres or more of native vegetation to pasture.. E. The Change of Use of an existing site requires one or more of the following. 1. The installation of onsite parking resulting in the addition of over five thousand square feet (5000 ft2) of impervious area. 2. The alteration of the access to and from City streets including adding or removing driveways. 3. The installation of a new storm system to serve impervious area of over five thousand square feet (5000 ft2) of impervious area. 4. The installation of code-required landscaping. (This will require the submittal of a landscape plan for review and approval by the City of Auburn Planning Department). One example is the conversion of a residential property to a commercial use. The work covered by the Building Site Plan may include the building and grading work; however, the applicant must make separate applications for a Building Permit and a Grading Permit. 2.01.3 Public Facility Extension (FAC) Plans An approved Public Facilities Extension Plan (FAC Plan) is required prior to installing new or improving existing public sanitary sewer, water, storm drainage, and/or transportation facilities. FAC Plans are required in the following situations: A. With a Building Site Plan when construction of the building requires the extension of a City water, sanitary sewer, or storm drainage facility. B. With a Building Site Plan when construction of the building requires improvements to the City transportation facility. C. With a Grading Plan for public utility improvements within Plat and Short Plats. D. For county projects where water and sanitary sewer mains within Auburn’s Utility Service Area are extended. Prior to preparing plans for submittal, the applicant should obtain a “Developer Public Facility Extension Process Summary” from the City. This summary explains some of the basic requirements and steps of the FAC process. 2.01.4 Other Plans Some projects may also require other types of plans. The requirements for these additional plans will usually be addressed early in the submittal process. These plans could include, but are not limited to, the following: A. Landscape plans. B. Land clearing plans. C. Irrigation plans. D. Wetland plans. 2/16/2010 Design Standards Page 2-02 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 2 (2-10) 2.02 Review and Approval Process 2.02.1 Submittals When submitting civil engineering plans to the City for review, the following steps should be taken to insure a complete submittal and timely approval of civil engineering plans: A. Applicants are encouraged to meet with City staff prior to plan submittal. (Pre-application information is available through the City of Auburn) All plans and associated documents submitted to the City will be assigned a permit number and receive a preliminary review to make sure that they adequately address the minimum requirements of a complete application. Any such plans and associated documents not meeting these requirements will be returned to the applicant or his designee as unacceptable for review, with a written explanation of necessary corrections required prior to the subsequent resubmission. B. Prior to preparing civil engineering plans for submittal, the applicant should obtain a Plan Submittal Packet from the City, for the appropriate type of plans. This packet contains information necessary to prepare plans in conformance with City guidelines. The checklists within the Plan Submittal Packet shall be completed and submitted along with the civil engineering plans. C. Civil Engineering plans and associated documents are to be submitted to the City for processing. D. After the receipt of a completed Facility Extension (FAC) Application and FAC application fees, the City will make a preliminary review of the plans and supporting data to verify the scope of the proposed extension(s) and check for completeness of the application. Once the City is satisfied with the completeness of the application and has verified the length of the extension(s), a letter will be sent requesting that the following be submitted before any detailed FAC Plan review work will be performed: 1. An executed Facility Extension Agreement. 2. Forty percent (40%) of the total calculated Facility Extension fee. (The remaining sixty percent (60%) will be due prior to construction.) E. The following number of documents and plans are required for a complete submittal: Plan sets Plan Submittal Packet Stormwater Site Plans Geotechnical Reports Grading Plans 5 1 2 1 Building Site Plans 10 1 2 1 FAC Plans 10 1 2 1 F. All Plans submitted to the City shall be non-ammonia based prints. G. All proposed public right-of-way dedications and easements not under the ownership of the applicant shall be dedicated to the City prior to final plan approval. A title report will be required to confirm property ownership. 2/16/2010 Design Standards Page 2-03 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 2 (2-10) H. The following applicable information may be required along with the plan submittal: 1. Title report (required if right-of-way is being dedicated). 2. The final biologist report, including the wetland mitigation plan when appropriate. 3. Traffic reports. 4. A copy of the final SEPA determination (for projects where the City isn’t the lead agency). 5. A copy of other applicable applications (Short Subdivisions, Subdivisions, etc.). 6. Letter indicating how SEPA and/or other applicable application conditions have been accounted for in the development/plan process. I. All plans, calculations, or reports submitted for review shall be stamped by a Washington State licensed professional civil engineer (PE). Mylar plans, calculations, and reports submitted for final approval need to have the PE stamp wet signed and dated. J. Where the plan review process is running concurrent with other applications (SEPA, Subdivisions, etc.), the above-referenced information may not be available at time of plan submittal. In such instances, other required applications shall be provided prior to final plan approval. 2.02.2 City Review The City will review plans and associated calculations and reports for conformance with City development requirements, standards, and policies. Red-line construction drawings, calculations, reports, and written plan review comments will be returned to the applicant’s designated contact person for revisions. The applicant’s engineer shall revise construction drawings, calculations, or reports to address City plan review comments. The revised drawings (the required number will be determined by the City) and associated calculations and reports along with the redline comments shall be resubmitted to the City for additional review. 2.02.3 Plan Approval Once the plan review process is completed and all City review comments have been addressed, the City will request that one copy of sealed mylars be submitted for approval. A. Final reproducible plans shall be placed on a minimum 4-mil thick mylar and will be be signed by the City Engineer or his designate and shall remain on file with the City. (Note: No sticky back transparencies, no sepia mylars, and no Xerox mylars are accepted by the City.) Upon approval, the developer will be required to check out these mylars from the City and make the required number (6 to 18 sets) of prints for the City, plus any required for themselves or the contractors, prior to issuance of any construction permits. B. All applicable AutoCAD files shall be submitted to the City on a compact or floppy disk along with the mylars for integration into the City’s Geographic Information System (GIS). For more information on AutoCAD file submittal, please obtain a copy of the City’s “Record Construction Document Packet.” C. If after plan approval but prior to construction the applicant chooses to make changes to the approved plans, a revised plan reflecting such changes may be required if the City determines the changes will impact the City’s ability to insure construction is completed in conformance with City regulations. In such cases, 2/16/2010 Design Standards Page 2-04 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 2 (2-10) 2/16/2010 Design Standards Page 2-05 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 2 (2-10) the revised plans shall be submitted to the City for review and a new revised Mylar shall be provided for approval with the changes shown, sealed by the design engineer, and approved by the City. 2.02.4 Project Close Out The following is the basic process required for accepting construction completion on a project: A. After completion of construction, a paper plan copy of the approved plan set shall be utilized for a dry run “as-built” set prior to redlining the original Mylar set. A copy of the “Record Construction Document Packet” which outlines the complete record drawing process in detail can be obtained from the City. B. All changes to the approved plan noted by the contractor and/or surveyor during the construction process shall be clearly indicated on the paper copy of the approved plan in red ink. C. The “Record Drawing Certification” block on all sheets of the as-built paper set shall be signed and dated by the Engineer or Surveyor making the corrections and the plan set returned to the City for verification by the City prior to these changes being made to the original Mylar set.. D. After approval of the redlined paper plan copy of the original approved plan set, the approved original Mylars shall be checked out from the City, and the approved corrections shown on the approved “as-built” paper plan set shall be made on the original Mylars in red ink. . These record drawings will become final once the City has verified the corrections are consistent with the approved paper set. Finalized record drawings are required before the project will be accepted. E. A final stormwater site plan with letter shall be submitted by the Engineer of Record to the City verifying that the storm facilities were installed as designed. F. Electronic copy of the Stormwater Site Plan and Geotechnical Report. The following documents shall also be completed for projects prior to project close out. A. All legal documents, including but not limited to a Bill of Sale and Utility Easements, shall be updated as needed and executed. B. A “Developers Contribution Document” shall be obtained from the City and completed, if applicable. C. All Maintenance Bonds or Assignments of Funds for the one-year maintenance period shall be in place. Chapter 3 -Plan Preparation Requirements 3.00 Preface This chapter describes how civil engineering plans should be laid out to meet City requirements and provide a format that is easy to follow and understand. Civil engineering plans need to meet these basic standards in order to move through the review process in an efficient manner. 3.01 General Requirements The following general requirements shall be taken into account when preparing civil engineering plans for review and approval by the City: A. The general construction requirements for the City of Auburn shall be those contained in the City of Auburn’s current Engineering Construction Standards Manual which supplements or modifies the “Washington State Department of Transportation (WSDOT) Standard Specifications for Road, Bridge and Municipal Construction," except where supplemented or modified by the City in this manual. B. The civil engineering plans shall reference City Standard Specifications and Standard Details as necessary. The City’s Standard Specifications and Standard Details are contained in the Engineering Construction Standards Manual, a copy of which shall be on-site during construction. C. All civil engineering plans and reports shall be prepared and sealed by a Washington State licensed professional civil engineer. D. Property surveys shall be performed and sealed by a Washington State licensed professional land surveyor and be tied to the current City datum (NAVD 88). A list of City Benchmarks is available upon request. E. All civil engineering plans and calculations shall be neat, uncluttered, legible, and in conformance with the requirements herein. The City requires that all plans be prepared utilizing AutoCAD software. F. Where applicable, shop drawings shall be submitted for review and approval prior to construction. 3.02 Plan Format The City requires that plan sets be submitted in an order consistent with this section. Depending on the complexity or simplicity of the project, the amount of detail and content required will be subject subject to change. 3.02.1 Grading Plans Grading plans shall consist of the following sheets: A. Cover sheet (See 3.04.1). B. Temporary Erosion and Sediment Control (TESC)/Demo Sheet (Land Clearing when applicable) (See 3.04.2). 2/16/2010 Design Standards Page 3-01 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) C. Grading Plan (See 3.04.3). D. Cross-Sections (See 3.04.4). E. Details (See 3.04.5). 3.02.2 Building Site Plans Building Site Plans shall consist of the following sheets: A. Cover Sheet (See 3.04.1). B. Temporary Erosion and Sediment Control (TESC)/Demo Sheet (Land Clearing when applicable) (See 3.04.2). C. Public Storm Drainage Plan (See 3.04.6). D. Utility Plan (See 3.04.7). E. Cross-Sections (See 3.04.8). F. Details (See 3.04.5). G. Landscape Plan (See 3.04.10). H. Irrigation Plan (See 3.04.11). If a separate associated grading plan has been submitted and approved, those areas covered under the grading plans will not need to be readdressed in the building site plans. 3.02.3 Facility Extension (FAC) Plans These plans will be required whenever public streets, sanitary sewer, storm drainage, and/or water lines are being extended or modified. The FAC portion of a plan set could consist of the following sheets: A. Cover Sheet (See 3.04.1). B. Temporary Erosion and Sediment Control (TESC)/Demo Sheet (Land Clearing when applicable) (See 3.04.2). C. Utility Plan and Profiles (See 3.04.7 & 3.04.8). D. Street and/or Storm Plan and Profiles (See 3.04.8 & 3.04.9). E. Street Cross-Sections and Additional Street Elements (See 3.04.9). F. Details (See 3.04.5). G. Street and/or Site Landscape Plans (See 3.04.10). FAC plans may also contain information normally associated with either a grading or a building site plan. 3.03 General Plan Requirements 3.03.1 Standard Plan Format Applicable information in this section shall be shown on the plan set. A. Each sheet of the plan set shall be stamped by a professional engineer licensed in the State of Washington. The stamp/seal on the final mylars, to be submitted for approval, shall be wet signed and dated per WAC 196-23. B. North arrow and plan alignment shall be to the top, right, or left. 2/16/2010 Design Standards Page 3-02 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) C. A title block shall be provided along the right-hand edge on each plan sheet. The title block shall include the development title (in bold print), the name, address and phone number of the firm preparing the plan and the owner/developer, a revision block (showing the date of the latest revision), page of pages numbering, and sheet title (e.g., road and storm drainage, grading, erosion/sedimentation control, water and sanitary sewer). D. Indicate units of measurement for all slope callouts as either percent (%) or feet per foot (ft/ft). Do not mix units of measurement on a plan set. E. Provide all match lines with matched sheet numbers (stationing). F. The street classification shall be provided under the street name on all plan views. G. A City of Auburn approval block (4"x2") on each plan sheet shall be provided in lower right corner of each plan sheet. Show project reference numbers (BLD for Building Permit, FAC for Public Facility Extension Plan, LND for Land Clearing Permit, STM for Storm Permit and/or GRA for Grading/Erosion Control Permit) in the approval block area. A blank Auburn Engineering approval block is shown as block B-1 in Appendix A of this chapter. H. A sign-off block (4”x2”) on each plan sheet shall be provided for Record Drawing certification, located directly to the left or directly above the approval block. A blank Record Drawing Certification block is shown as block B-4 in Appendix A of this chapter. The locations of the title blocks, approval blocks, and engineering stamp shall remain consistent throughout all the plan sheets. 3.03.2 Drafting Standards Drafting requirements are as follows: A. Plan sheets shall be printed on 24"x36" size paper. Any variation must be approved by the City prior to plan submittal. Approved plans shall be good quality, 4-mil thickness, Mylar or approved equal. No stick-on type material will be allowed. No Xerox, sepia, or toner-printed Mylars are allowed, unless cold rolled. Margins shall be set to provide for ½ size drawings to fit on 11x 17 inches sheet sheet size. B. Lettering size shall be no smaller than one tenth (1/10) of an inch in height and shall be uppercase. Callouts and other information shall be printed horizontally in most cases. C. Existing features shall be shown with dashed lines and/or half-toned (screened). D. Proposed features shall be shown with solid lines. The intent is to clearly distinguish existing features from proposed improvements. 2/16/2010 Design Standards Page 3-03 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) E. Minimum scale shall be: 1. Site work: 1" = 40' horizontal. 2. Public facility work: 1" = 20' horizontal. Vertical scales should typically be 1/10th the horizontal scale. For public facility work in areas with steep slopes, 1” = 5’ may be used in place of 1” = 2’. Use a scale that best utilizes paper space and gives the best overall view of the site. F. Use APWA AutoCAD symbols in the legend to identify both existing and proposed improvements and utilities. 3.04 Plan Sheet Elements The following section covers the basic elements that are required to be shown on the different plan sheets. While all plan sets will have a cover sheet, there are other sheets covered here that may or may not be included in a particular projects plan set. 3.04.1 Cover Sheet The Title sheet(s) shall incorporate all the requirements listed in Section 3.02, plus the following applicable items: A. A general scaled site plan covering an area approximately ten inches (10”) square. B. Vicinity map (approximate scale) with north arrow covering an area approximately five inches (5”) square. C. Site address. D. Owner/Applicant, address, contact, and phone number. E. Engineer/Surveyor/Architect address, contact, and phone number. F. Elevations with City datum (NAVD 88) tied to City benchmarks with reference to the benchmarks’ numbers and locations indicated. G. The permit number in one-inch (1”) bold lettering shall be above the title block (located on the right side of the sheet) on the cover sheet only. H. Sheet Index. I. Legend. J. Legal description including quarter section, section, township, and range. K. Parcel numbers. L. Site zoning and adjacent zoning. M. Applicable plat name and lot numbers. N. Applicable site information including the number of parking spaces required and the number of parking spaces provided. O. Type of building construction as defined by the adopted Building Code. P. Site access including adjacent driveways, roadways, and intersections that may have an impact on the location and type of site access. 2/16/2010 Design Standards Page 3-04 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) Q. An overall site plan key map shall be shown if the plan set includes more than five (5) plan sheets, unless otherwise directed by the city. R. Construction Sequence outlining a basic construction schedule. (See Section 5.05) In addition, depending upon the nature of the project, the construction of some public facilities may also dictate separate construction sequencing requirements that will also need to be indicated on the plans. S. The eight (8) City of Auburn General Notes as shown in Appendix B of this chapter. T. Provide a list of the additional non-building permits required for this project. 3.04.2 Temporary Erosion and Sediment Control (TESC) Plan Sheet TESC design shall be in accordance with Chapter 5 – Grading & Erosion Control, and include the following applicable items: A. Marked clearing work limits, environmentally sensitive areas and their buffers, and trees that are to remain. B. Indicate the location of the construction entrance C. Provide the onsite stormwater facilities during construction. D. Indicate the minimum temporary erosion control measures to be used on the site during construction, this may include, silt fencing, interceptor ditches, detention or retention facilities, flow control structures, etc. E. Show containment locations for storing pollutants, including waste materials and demolition debris, prior to their removal from site. F. In the construction sequence, provide a phasing schedule for installing and removing TESC BMPs, including the transition from the temporary storm drainage system to the permanent storm drainage system. G. All existing site features and conditions shall be shown on this sheet including the existing topography. H. This sheet may also function as a demolition site plan and should indicate all existing features and structures to be removed/demolished and those that will remain. I. Provide the six (6) City of Auburn Grading and Erosion Control Notes as shown in Appendix B of this chapter. 3.04.3 Grading and Private Storm Drainage Plan Sheet The Grading design shall be in accordance with Chapter 5 – Grading & Erosion Control, and include the following applicable items: A. Indicate approximate fill and excavation quantities in cubic yards. B. Indicate slope of any fill or cut slopes. C. Show type of fill material and associated compaction requirements. D. Show existing significant trees (six inches (6”) in diameter and larger for evergreens and four inches (4”) in diameter or larger for deciduous). Indicate if tree is to either be retained or removed. Note that a land-clearing permit may be required. 2/16/2010 Design Standards Page 3-05 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) E. Provide temporary storm drainage retention or detention facilities including City control structure, water surface (W.S.) elevations, seasonal high groundwater elevation, orifice sizes, design storms for the W.S. elevations, and release rates. F. Show horizontal setback between the bottom of any fill placement and the top of the bank of a defined drainage channel per requirements noted in section 5.03.3. G. Show typical ditch sections. H. Show connections of building roof and foundation drains to the site drainage system. I. Show the existing topography shaded back and overlaid by the proposed grades. J. Show existing and finished elevations and contours. Spot elevations may be required for relatively flat sites to supplement the contour elevations as necessary to adequately reflect existing and finish grades. Provide spot elevations along property line and a minimum of thirty feet (30’) beyond property line (at least fifty foot (50’) intervals). K. Reference standard City of Auburn Detail Numbers appropriately. If a project specifies modification to a Standard Detail a new detail must be shown on the plans. L. Provide notes to protect and maintain erosion control facilities during grading operations. M. Provide arrows to indicate drainage flow direction on paved surfaces. N. Show layout of the entire storm drainage pipe with length, slope, and material type labeled and direction of flow indicated. O. Provide site specific details and cross-section sheets for storm drainage detention or retention facilities. P. Indicate the emergency overflow to the public storm system. Q. Show berm dimensions, materials, compaction requirements for ditches and detention ponds where applicable. R. Show locations of manholes and catch basins, indicating type, stationing, offset, lid type, rim and invert elevations. Number manholes and catch basins consecutively. S. Show existing and proposed sanitary sewers and water mains (use ghost lines), identifying crossing and minimum vertical distance between utilities. T. Provide type of material and size of energy dissipaters (riprap, etc.). U. Provide details of storm water quality control facility. V. Provide limits of surface water ponding in parking lots. W. Show trash racks, if applicable. X. Show locations, widths and types of easements. Y. Show locations and types of pumps, if applicable. Z. Show bio-swale location, length, width, slopes, and cross-section. AA. Provide planting and seeding requirements with establishment procedure in construction sequence for water quantity and quality systems. 2/16/2010 Design Standards Page 3-06 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) BB. Show finish floor elevations. CC. Show the controlling downstream storm drainage elevations including the associated design conditions. DD. Address other agency permit requirements, as necessary. EE. For ponds, provide: aesthetics, fencing, power (if applicable), maintenance access, control structure, critical water surface elevations, and other items, such as walls and liners. FF. Address bypass surface flows. GG. Address subsurface flows and indicate water surface elevations. HH. Clearly indicate private drainage facilities on the plans. Justification is needed for any facility proposed to be a joint public and private facility, for City consideration. Some projects may be able to combine the grading sheet with the erosion control and demo plan depending on the complexity of the project. 3.04.4 Cross-Section Sheet The Cross-Section plan sheet(s) shall have the following applicable items: A. Cross-sections for fill and grading shall be shown through all properties to at least thirty feet (30’) beyond the property lines. Adequate cross-sections shall be shown to represent the site. At a minimum this shall include one east-west and one north-south cross-section. B. This sheet may also contain cross-sections for the temporary storm drainage pond. C. The scale used for the site cross-sections on this sheet should match the scale on the other sheets. Some projects may be able to combine the cross-section sheet with the grading sheet depending on the complexity of the project. 3.04.5 Detail Sheet The Detail sheet(s) shall have the following applicable items: A. Any detail that is specific to this project. B. City Standard Details should not be shown on this sheet unless they need to be modified for a project specific application. C. Storm control manholes are normally shown on this sheet. D. This sheet may also contain cross-sections for the temporary storm pond. City Standard Details should be called out on the applicable plan sheet using the detail number. 3.04.6 Public Storm Drainage Plan Sheet Grading and Storm Drainage system design shall be in accordance with Chapter 5 – Grading & Erosion Control, and Chapter 6 – Storm Facilities, and include the following applicable items: A. The layout of all the storm drainage pipes with the length, slope, and material type indicated in the labeling of the storm drainage pipes. Provide arrows to indicate the direction of flow into the structures. 2/16/2010 Design Standards Page 3-07 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) B. Typical ditch section. C. Location of manholes and catch basins. Indicate type, stationing, offset, rim and invert elevations, and number manholes and catch basins consecutively. D. Existing and proposed sanitary sewers and water mains (use ghost lines). Identify crossings and minimum distance between utilities. E. Building downspouts or footing drain locations, inverts and connections to the storm drain system. F. For single-family home sites, indicate means for collection and discharge of water from roof, foundation drains, and driveways. G. Provide arrows to indicate drainage direction in parking lots, roadway intersections and cul-de-sacs. H. Reference to the detail/BMP and/or cross-section sheets for storm drainage detention or retention facilities such as the control discharge structure and pond cross-sections. Indicate water surface elevations, allowable discharge rates, and design storms. I. Show an emergency overflow to the public storm drainage system. J. Berm dimensions, material, and compaction requirements for ditches and detention ponds where applicable. K. Indicate type of material and size of energy dissipaters (riprap, etc.). L. Provide details of the storm drainage water quality facility. M. Limits of surface water ponding within parking lots. N. Trash racks as applicable. O. Location and widths of easements. P. Location and type of pumps, if applicable. Q. Bioswale location, length, width, slopes, and cross-section. R. Planting and seeding requirements with establishment procedure (construction sequence) for water quantity or quality systems. S. Finish floor elevations of all buildings. T. Indicate separation from any pipe, infiltration trench, open ditch, and bioswale to any property line or obstruction. U. Address other agency permit requirements, as necessary. V. For ponds, provide: landscaping, fencing, aeration, maintenance access, critical water surface elevations, and other items, such as walls and liners. W. Number the storm drain structures. (Numbers will be provided by the City prior to final plan approval.) X. Indicate any required easements including their dimensions. 3.04.7 Utility Plan Sheet The Utility sheet will show the private connections to the public water and sanitary sewer systems and any required extensions of the public water and sanitary sewer systems. The Utility sheet(s) shall have the following applicable items: 2/16/2010 Design Standards Page 3-08 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) 3.04.7.1 Water Water system design shall be in accordance with Chapter 7 – Water Facilities, and include the following items: A. Water pipe and fitting size, location, and type of material. B. Details of connections to existing water mains. C. Valve size, locations and type. D. Fire hydrants locations. E. Air vac/blow-off locations. F. Pressure reducing stations and associated valves, vaults and by-pass piping as required. G. Concrete blocking, mechanical, or restrained joint pipe support. H. Watermain, water meter, and fire hydrant easements. I. Meter size and service line size and location. J. Irrigation meter size and service line size location. K. Proposed fire line, FDC line and PIV locations. L. Backflow prevention assembly and detector check meter size, type and location. M. For buildings requiring fire sprinklers, the fire sprinkler notes shall be shown on the plan, as shown in Appendix B of this chapter. N. Table showing physical separation in feet between water lines and other utilities at crossings, when a profile is not required. 3.04.7.2 Sanitary Sewer Sanitary sewer system design shall be in accordance with Chapter 8 – Sanitary Sewer Facilities, and include the following items: A. Sanitary sewer pipe size, locations, type of material, and stationing. B. Location of manholes. Indicate type of manhole, stationing, offset, and number manholes consecutively. During the City review process, manhole numbers shall be assigned by the City to be incorporated into the next submittal. C. Indicate knockouts in manholes for future connections. D. The direction of sewage flow shall be indicated with an arrow at the manhole. Proposed sewer shall have solid arrowheads while existing pipe and manholes shall be shown in ghost or screened lines with the arrowhead and manhole not filled. E. Drop manholes, if approved, are to be detailed on the plans. F. Length, slope, type and class of material, and inverts for side sewers. G. Stationing for side sewers from downstream manholes. H. Connection of a side sewer to the City’s sanitary sewer pipe shall be indicated with a tee. I. Locations of sanitary sewer cleanouts. 2/16/2010 Design Standards Page 3-09 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) J. Locations of sanitary sewer easements. K. Clearly define right-of-way and adjacent property lines. Parcel numbers for all lots adjacent to the improvements shall be indicated. L. Floor drains, drains from other covered areas potentially subject to pollutants, and wash areas within parking lots shall be connected to the sanitary sewer through an approved oil/water separator. 3.04.8 Utility Profile Sheet The Utility Profiles, when required, should be included on the associated utility plan sheet if at all possible. 3.04.8.1 Storm Drainage For complex private storm systems and all public storm lines, a profile will be required. These profiles should include the following items where applicable: A. Public storm drainage located within the street right-of-way shall be shown on the street profile. See Section 3.04.9.2 B. Public storm drainage located in an easement shall have separate profiles. C. Structure size, location, type, station, invert elevation, type of lid or grate, and rim elevation. D. Pipe size, type of material, slope (ft/ft), and lineal footage. E. Utility crossings shall identify size and type of utilities involved. F. Ditches where applicable, size, type and slope. G. Existing and finished grade along pipe centerline. H. Connections to existing structures. 3.04.8.2 Water For complex on-site public water systems and all public water mains within the street, a profile will be required. These profiles should include the following items where applicable: A. Water line located within the street right-of-way shall be shown on the street profile. See Section 3.04.9.2. B. Water line profiles are not generally required for lines located in easements unless there are utility conflicts. C. Pipe size, type of material, lineal footage, cover and stationing. D. Utility crossings shall identify size and type of utility involved. E. Existing and finished grade along pipe centerline. F. Connections to existing mains and fittings. G. Label fittings and valves include blocking. 3.04.8.3 Sanitary Sewer A profile will be required for all public sanitary sewer mains. These profiles should include the following items where applicable. A. Sanitary sewer located within the street right-of-way shall be shown on the street profile. See Section 3.04.9.2 2/16/2010 Design Standards Page 3-010 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) C. Structure size, location, type, station, invert elevations, type of lid, and rim elevation. D. Pipe size, type of material, slope (ft/ft), and lineal footage. E. Utility crossings shall identify size and type of utility involved. F. Existing and finished grade along pipe centerline. G. Connections to existing structures. H. Side sewer locations and stationing. 3.04.9 Public Street Plan and Profile Sheet Whenever a project includes construction within a public street excluding utility connections, both a plan and a profile shall be included in the plan set. The Public Street Plan and Profile sheet(s), when required, shall have the following applicable items: 3.04.9.1 Plan View The plan view should include the following items where applicable: A. Plan views shall be drawn at a 1" = 20' scale. B. Existing and proposed rights-of-way. C. Existing and proposed contours and elevations. D. Existing and proposed street names. E. Existing and proposed centerline bearings. F. Existing and proposed signs and traffic traffic control devices. G. Existing and proposed storm drainage systems. H. Existing and proposed sewers and water mains (use ghost lines). Identify crossings and minimum distances between utilities. I. Horizontal curves. J. Horizontal stationing. K. Location of curbs, sidewalks, wheelchair ramps, and driveways (by station). L. Locations of monuments at all centerline intersections, cul-de-sacs, PCs, and PTs by station. M. Street luminaires, conduit for streetlights, traffic signals, and traffic signal loop detectors located within the vicinity of the project. N. Mailbox types and locations. Submit to postmaster for approval. O. Address any horizontal utility conflicts in plan. P. Street landscaping, if required. Q. Construction limits. R. Slope excavation and/or embankment limits. 3.04.9.2 Profile The profile should include the following items where applicable: A. Profiles shall be drawn using 1" = 20' horizontal and 1" = 2' vertical scales. 2/16/2010 Design Standards Page 3-011 REF. H:\DEVELOPMENT\Manual s\Design Standards\Chapter 3 (2-10) 2/16/2010 Design Standards Page 3-012 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) B. Existing and proposed centerline road grade. C. Existing and proposed storm drainage systems. D. Existing and proposed sewers and water mains (use ghost lines). Identify crossings and minimum distances between utilities. C. Finish grade elevations every fifty feet (50’) and every twenty-five feet (25’) for vertical curves along design centerlines. D. Vertical curve information in profile section. E. Address vertical utility conflicts in profile. 3.04.9.3 Intersections Intersection plans shall be twenty (20) scale drawings in conformance with Standard Detail TRAFFIC-13. 3.04.9.4 Typical Roadway Sections Typical roadway sections shall show pavement depths, widths and materials, cross-slopes of pavement (%), centerline, dimensioned right-of-way lines, curb and gutter, ditches, embankment and excavation slopes (1:1), rockers, walls, etc. Typical sections will be labeled within identified station ranges. 3.04.9.5 Striping and Signing Provide forty (40) scale plans per these Standards and MUTCD, including lane markers, pavement markings, and signing. 3.04.9.6 Signalization Provide twenty (20) scale separate detailed signalization plan per City of Auburn Standards, including poles, bases, conduits, and traffic loops. A. Signal Plan Sheet 1. The plan sheet shall conform to the following requirements: a. For areas that require greater detail (such as the corner that has the controller), a blown-up detail may be necessary at a 1″=10′ scale. b. All proposed signal equipment, including signal poles, mast arms, heads, signs, junction boxes, conduit, loops, controller, and service cabinet shall be shown as bold. c. All existing and proposed right-of-way information shall be shown and labeled on the plan, including easements needed for signal equipment. The line type shall be different for easements and right-of-way. d. All proposed curb, sidewalk, proposed striping, and existing curb/striping (to remain) information shall be shown on the plan in gray scale (screened back). e. Sight triangle lines shall be shown on plans in gray scale. f. All proposed and existing underground and overhead utilities shall be shown and labeled on the plan in gray scale. g. Provide on the plan signal construction notes as shown in Appendix B of this chapter. 2. Construction notes shall contain, but not be limited to: a. Signal pole and foundation installation (including pole type, mast arm length, and installation of items on the pole). b. Controller cabinet and foundation installation. d. Coordination of utility removal/relocation. e. Coordination of connection of power, and power source type. f. Interconnect connection to other signals. g. Removal of existing signal and/or street light equipment. 3. Displays: The plan sheet shall include the following displays: a. Phase diagram display. b. Signal display showing signal layout of all vehicle signal heads and pedestrian heads. 4. Detection: The plan sheet shall include: a. Stop bar, intermediate and advanced loop location and numbering. b. Pedestrian push button location. c. Preemption detection location and numbering. 5. Signal Poles and Associated Equipment: The plan sheet shall contain, but not be limited to: a. Signal Pole Locations and Numbering: The locations shall be called out by the major arterial station and offset. b. Signal head location and numbering. c. Pedestrian head location and numbering. 6. Controller and Service Location: At least one corner of the controller/service foundation shall be called out by the major arterial station and offset. The footprint of the foundation shall be shown on the plans with the controller and service cabinets oriented on the foundation as they would be placed in the field. If the information required to show all the controller/service conduit connections and foundation footprint makes the plan too cluttered, a blown-up detail of the corner containing this information is needed at a 1″=10′ scale. 7. Power Source Location: The location of the power source shall be identified on the plans. 8. Wire Schedule: a. A wire schedule table shall include run numbers, conduit size, wire type, and comments. b. Comments shall include, but not be limited to, number of twisted loop pairs for runs between the detection loops and adjacent junction box, identification of spare conduits, conduits utilized only by interconnect or illumination, and power cables. c. For designs that include modifications to an existing signal, all existing wire runs affected by the design shall be shown on the wire schedule. 2/16/2010 Design Standards Page 3-13 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) 9. Junction box type and approximate location. 10. Signing: a. Signs shall be shown on all mast arms. Signs that are post mounted but are signal related (such as a “signal ahead” sign) shall be shown on the signal plan. b. A sign display shall be shown on the plan with the MUTCD sign designation, dimensions, and lettering type for all signs. c. Indicate removal of existing stop signs after signal is in operation. d. Installation of “New Signal Ahead” or “Signal Revision Ahead” signs. 11. Other Illumination: a. Proposed illumination that will use the signal service cabinet, but is located outside the four quadrants of the intersection, shall be shown as proposed on a separate illumination plan sheet. On the signal plan sheet, the illumination shall be shown as gray scale and labeled as “proposed illumination, see illumination plans.” However, once the illumination enters the quadrants of the intersection (i.e., when it is using the same junction box as the signal equipment), it shall be shown as proposed on the signal plan and gray scale on the illumination plan. b. Indicate the circuit that street lights are on . B. Wire Diagram Plan In general, the wire diagram shall include the following: 1. All signal heads, pedestrian heads, pedestrian push buttons, luminaires, preemption detectors, loops, and junction boxes drawn in schematic forms. 2. All termination points in the controller cabinet. The wire diagram should include every termination point the controller will have, including those that may not be used for this particular signal design. 3. All wiring associated with the items above, as well as the wiring for interconnect. The wire diagram should show how these items are connected to the controller. 4. Location of wire splices. 5. All termination numbering at each end of each wire. For example, the 5-conductor cable connecting a signal head to the controller should have the termination numbering called out at the signal head and in the termination points in the controller. 6. All wire colors at each end of the wire. 7. A call out to each wire run noting the number and type of each wire. 8. Intersection schematic with a north arrow showing approach phase. 9. Pole, signal head, pedestrian head, preemption detection, and loops shall be numbered on the wire diagram. C. Pole Schedule Plan 2/16/2010 Design Standards Page 3-14 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) The pole schedule shall include the following: 1. The pole schedule shall include a signal standard detail chart. 2. The pole schedule shall include pole orientation attachment and base detail, pole foundation detail, and signal standard detail. 3.04.9.7 Illumination Street Light Plans shall be labeled as Street Light Plans, and shall be prepared, stamped, signed and dated by a professional engineer licensed by the State of Washington. Street Light Plans will include references to all applicable City of Auburn Standard Details and/or Washington State Department of Transportation (WSDOT) Standard Plans, or copies of other specific details applicable to the project shall be shown on the plans. Street Light Plans shall be provided on separate and uncluttered sheets that do not show unrelated street, utilities, or on-site improvements. Street Light Plans shall be drawn to an engineer's scale of 1" = 40'. Street Light Plans shall at a minimum include the following applicable items for new or existing street lighting system: A. Lighting schedule with the following information in a table format: 1. Luminaire make and model 2. Lamp/Ballast type 3. Lamp wattage 4. Uniformity Ratio 5. Veiling Luminance Ratio 6. Average Maintained Light Level 7. Light standard type 8. Mounting height (ft) 9. Bracket or davit arm length (ft) 10. Light distribution pattern 11. Luminaire spacing distance (ft) 12. Light standard locations by station and offset from the centerline of the street to the center of the light standard. Show all existing street lights for a distance of 500 feet in both directions from the limits of the project site, including both sides of the street(s) and in medians. 2/16/2010 Design Standards Page 3-15 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) B. Wiring/Conduit schedule with the following information in a table format: 1. Circuit number 2. Conduit size, material, and purpose (street lighting, traffic signal interconnect, spares, etc.). C. Location of points of service (the PSE connection or service location and the new or existing City Electrical Service Cabinet(s). D. Location of junction boxes. Indicate junction box type and purpose (lighting, traffic signal, etc.). E. Existing topography, including but not limited to the location of driveways, street trees (including species), street intersections, overhead utilities (including maximum and minimum heights), underground utilities (including sizes), medians, curb, and lane widths (pavement markings). 3.04.9.8 Streetscape Provide information on planting of the public landscape strips along the street frontage. Information should include the following: A. Type and size of trees. B. Tree spacing. C. Type of ground cover. D. Root control/barrier. E. Irrigation if applicable. F. Show all proposed and and existing surface features and underground utilities. 3.04.9.9 Other Features Include locations of any other feature including mailboxes and bus stops. Any mailbox placement that requires approval from the postmaster shall include the Postmaster approval block B-6 as shown in Appendix A of this chapter. 3.04.10 Site Landscape Plan Sheet The site landscape sheets, when required, shall have the following applicable items: A. Adjacent streets both public and private. B. Have boundaries and dimensions of site. C. The location of on-site buildings. D. The location of on-site parking areas. E. The location and size of landscape areas. F. The location, species, and size of planting materials. G. The location of outdoor storage areas. H. The location of significant trees. I. Show all proposed and existing surface features and underground utilities. J. The Planning approval block B-2 as shown in Appendix A of this chapter. 2/16/2010 Design Standards Page 3-16 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 3 (2-10) 3.04.11 Site Irrigation Plan sheet The site irrigation sheets, when required, shall have the following applicable items: A. The connection point to the City system. B. The size, location, and type of the backflow prevention. C. The proposed layout of the irrigation system. D. Be consistent with the site’s building and landscaping plans. E. Show the existing and/or proposed location of all parcel lines. 3.04.12 Critical Area Restoration/Mitigation A critical area restoration or mitigation sheet, when required, shall include the items as required by the City pursuant to chapter 16.10 of the Auburn City Code, and have the Critical Area approval block B-3 as shown in Appendix A of this chapter. 3.04.13 City Parks and Open Spaces Any plan sheet that includes a park or open space that is to be dedicated to the City shall include the Auburn Parks approval block B-5 as shown in Appendix A of this chapter. 2/16/2010 Design Standards Page 3-17 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) Appendix A – Approval Blocks Sample Engineering Approval Block (B-1): PROJECT REF: __________________________ THESE PLANS ARE APPROVED FOR CONFORMANCE WITH THE CITY OF AUBURN’S ENGINEERING REQUIREMENTS. APPROVED BY: _________________________ DATE APPROVED: _______________________ Sample Planning Approval Block (B-2): PROJECT REF: _________________________ THESE PLANS ARE APPROVED FOR CONFORMANCE WITH THE CITY OF AUBURN’S PLANNING DEPARTMENT REQUIREMENTS. APPROVED BY: _________________________ DATE APPROVED: ______________________ Sample Critical Area Approval Block (B-3): PROJECT REF: _________________________ THESE PLANS ARE APPROVED FOR CONFORMANCE WITH THE CITY OF AUBURN’S CRITICAL AREA REQUIREMENTS. APPROVED BY: _________________________ DATE APPROVED: ______________________ 2/16/2010 Design Standards Page 3-18 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) Appendix A (continued) Sample Record Drawing Certification Block (B-4): RECORD DRAWING CERTIFICATION THESE DRAWINGS CONFORM TO THE CONTRACTOR’S CONSTRUCTION RECORDS. BY _______________________ DATE ___________ TITLE/POSITION _____________________________ CONFIRMED BY CITY ____________ DATE _______ Sample Parks Department Approval Block (B-5): PROJECT REF: _________________________ THIS PLAN SHEET REFLECTS THE CITY OF AUBURN PARKS DEPARTMENT MINIMUM REQUIREMENTS APPROVED BY: _________________________ PARKS DIRECTOR DATE APPROVED: ______________________ Sample Postmaster Approval Block (B-6): CITY OF AUBURN POSTMASTER APPROVAL APPROVED BY: ________________________ TITLE/POSITION: _______________________ DATE APPROVED: ______________________ 2/16/2010 Design Standards Page 3-19 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) Appendix B – Standard Notes GENERAL NOTES 1. THIS DEVELOPMENT PROJECT SHALL CONFORM TO THE CITY OF AUBURN’S REQUIREMENTS AND BE IN ACCORDANCE WITH THE APPROVED PLANS. ANY CHANGES FROM THE APPROVED PLAN WILL REQUIRE APPROVAL FROM THE OWNER, ENGINEER, AND THE CITY. 2. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE “WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (WSDOT) STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION (2008),” EXCEPT WHERE SUPPLEMENTED OR MODIFIED BY THE CITY’S CONSTRUCTION STANDARDS MANUAL. COPIES OF THE ABOVE DOCUMENTS SHALL BE AVAILABLE AT THE JOB SITE DURING CONSTRUCITON. 3. A PRE-CONSTRUCTION MEETING SHALL BE REQUIRED PRIOR TO THE START OF ALL CONSTRUCTION. CONTACT THE PUBLIC WORKS DEPARTMENT AT 253-931-3010, TO SCHEDULE A MEETING. 4. LOCATIONS SHOWN FOR EXISTING UTILITIES ARE APPROXIMATE. THE CONTRACTOR IS CAUTIONED THAT OVERHEAD UTILITY LINES MAY NOT BE SHOWN ON THE DRAWINGS. IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO DETERMINE THE TRUE ELEVATIONS AND LOCATIONS OF ALL UNDERGROUND UTILITIES AND THE EXTENT OF ANY HAZARD CREATED BY OVERHEAD UTILITY LINES. IDENTIFICATION, LOCATION, MARKING, AND RESPONSIBILITY FOR UNDERGROUND FACILITIES OR UTILITIES, IS GOVERNED BY THE PROVISIONS OF CHAPTER 19.122 REVISED CODE OF WASHINGTON (RCW). PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL CALL ONE-CALL (1-800-424-5555) FOR UTILITY LOCATIONS (WATER, SANITARY SEWER, STORM SEWER, GAS, POWER, TELEPHONE, AND CABLE). 5. IF A PROPOSED ROUTE IS NOT INCLUDED ON THESE PLANS, A PROPOSED ROUTE AND SCHEDULE FOR HAULING MATERIAL TO THE SITE SHALL BE SUBMITTED TO THE CITY FOR APPROVAL PRIOR TO THE START OF CONSTRUCTION. IF THE CITY BELIEVES THAT THE PROPOSED HAUL ROUTE WILL ADVERSELY IMPACT THE STREET NETWORK, A SEPA AMENDMENT MAY BE REQUIRED TO EVALUATE THE IMPACTS AND DETERMINE MITIGATION REQUIREMENTS BEFORE BEGINNING WORK. HAULING MAY BE LIMITED TO APPROPRIATE OFF-PEAK HOURS OR ALTERNATIVE ROUTES, AS DETERMINED BY THE CITY. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PUBLIC SAFETY ON AND AROUND THE PROJECT. PRIOR TO THE START OF WORK, ALL METHODS AND EQUIPMENT USED FOR TRAFFIC CONTROL AND STREET MAINTENANCE SHALL BE SUBMITTED TO THE CITY FOR APPROVAL. CONTRACTORS AND THEIR SURETY SHALL BE LIABLE FOR INJURIES AND DAMAGES TO PERSONS AND PROPERTY SUFFERED BECAUSE OF CONTRACTORS OPERATIONS OR NEGLIGENCE CONNECTED WITH THEM. 7. ALL CONSTRUCTION SURVEYING FOR EXTENSIONS OF PUBLIC FACILITIES SHALL BE DONE UNDER THE DIRECTION OF A WASHINGTON LICENSED LAND SURVEYOR OR A WASHINGTON LICENSED PROFESSIONAL CIVIL ENGINEER. 8. CERTIFIED DRAWINGS ARE REQUIRED PRIOR TO PROJECT ACCEPTANCE. REFER TO THE CITY’S “RECORD CONSTRUCTION DOCUMENT” HANDOUT. 2/16/2010 Design Standards Page 3-20 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) Appendix B (continued) GRADING AND EROSION CONTROL NOTES 1. WITHIN THE CITY OF AUBURN, ALL REQUIRED SEDIMENTATION AND EROSION CONTROL FACILITIES INDICATED ON THE PLANS MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR OTHER CONSTRUCTION ACTIVITIES. THESE FACILITIES SHALL BE MAINTAINED AND UPGRADED, IF NECESSARY, TO INSURE THAT SEDIMENT-LADEN WATER AND STORM DRAINAGE RUNOFF DOES NOT IMPACT THE ADJACENT PROPERTIES, NATURAL DRAINAGE WAYS, OR THE EXISTING CITY STORM DRAINAGE SYSTEM. 2. THE SOURCES FOR ALL MATERIAL IMPORTED TO THE SITE SHALL BE APPROVED BY THE CITY. 3. THE STORM DRAINAGE DETENTION (RETENTION IF INFILTRATION SYSTEM IS USED), SEDIMENTATION AND EROSION CONTROL FACILITIES DEPICTED ON THE APPROVED DRAWINGS ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. ADDITIONAL DRAINAGE AND EROSION CONTROL FACILITIES MAY BE REQUIRED AS SITUATIONS WARRANT DURING CONSTRUCTION. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO THESE CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE. 4. THE TEMPORARY EROSION CONTROL FACILITIES, INCLUDING ALL PERIMETER CONTROLS AND THE DETENTION (RETENTION IF INFILTRATION SYSTEM IS USED), CONTROL PONDS, SHALL REMAIN IN PLACE UNTIL FINAL SITE CONSTRUCTION IS COMPLETED. AFTER CITY APPROVAL, THE CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING ALL TEMPORARY FACILITIES. 5. THE CONTRACTOR WILL BE REQUIRED TO WATER THE SITE, AS NECESSARY, TO REDUCE DUST EMISSIONS AS A RESULT OF CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL ALSO SWEEP ALL AFFECTED PUBLIC ROADS, AS NECESSARY, TO REMOVE MATERIAL DEPOSITED AS A RESULT OF PROJECT CONSTRUCTION ACTIVITY. 6. ALL AREAS OF ACTIVE EARTHWORK WHICH HAVE THE POTENTIAL FOR EROSION AND SEDIMENTATION IMPACTS ON ADJACENT PROPERTIES, NATURAL DRAINAGE WAYS, OR THE EXISTING CITY STORM DRAINAGE SYSTEM MUST BE STABILIZED ACCORDING TO THE FOLLOWING SCHEDULE: FROM MAY 1ST TO SEPTEMBER 30TH, AREAS AT FINAL GRADE AND THOSE THAT ARE SCHEDULED TO REMAIN UNWORKED FOR MORE THAN SEVEN (7) DAYS SHALL BE STABILIZED. FROM OCTOBER 1ST TO APRIL 30TH EARTHWORK ACTIVITIES SHALL BE CONDUCTED IN STAGES IN ORDER TO MINIMIZE SOIL EXPOSURE. EXPOSED SOILS WITH AN AREA GREATER THAN 5,000 SQUARE FEET THAT ARE SCHEDULED TO REMAIN UNWORKED FOR MORE THAN 24 HOURS AND EXPOSED AREAS OF LESS THAN 5,000 SQUARE FEET THAT WILL REMAIN UNWORKED FOR MORE THAN TWO (2) DAYS SHALL BE STABILIZED IMMEDIATELY. 2/16/2010 Design Standards Page 3-21 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) Appendix B (continued) FIRE SPRINKLER SYSTEMS NOTES SPRINKLER SYSTEMS SHALL MEET CITY OF AUBURN STANDARD 7.01.5.2 AND THE FOLLOWING REQUIREMENTS: 1. PROPOSED FIRE LINE TO BE SIZED BY A FIRE PROTECTION ENGINEER. 2. BACKFLOW PROTECTION IS REQUIRED ON FIRE SPRINKLER LINES 3. A SEPARATE DETAILED PLAN OF THE UNDERGROUND FIRE SPRINKLER SUPPLY LINE SHALL BE APPROVED BY THE FIRE MARSHALL AND INSTALLED BY A WASHINGTON STATE CERTIFIED LEVEL “U” CONTRACTOR IN ACCORDANCE WITH WAC 212-80-010. 4. A POST INDICATOR VALVE SHALL BE INSTALLED ON THE FIRE SPRINKLER SUPPLY LINE TO ISOLATE THE SYSTEM FROM THE CITY’S WATER SYSTEM WHEN REQUIRED FOR REPAIR. 5. BLOCKING, PIPING, AND RODDING DETAILS SHALL BE PROVIDED WITHIN THE SUBMITTAL. 6. APPROVAL OF THE CIVIL PLANS DOES NOT APPROVE THE INSTALLATION OF THE SPRINKLER SYSTEM SUPPLY PIPING. CROSS CONNECTION CONTROL NOTES CROSS CONNECTION CONTROL SHALL MEET THE FOLLOWING REQUIREMENTS: 1. ALL BACKFLOW PREVENTION ASSEMBLIES SHALL BE INSTALLED IN A MANNER THAT WILL ALLOW PROPER OPERATION, AND IN-LINE TESTING AND MAINTENANCE.. 2. A BACKFLOW ASSEMBLY PLUMBING PERMIT IS REQUIRED FOR ALL ASSEMBLIES INSTALLED WITHIN THE CITY OF AUBURN, AND/OR THE CITY’S WATER DISTRIBUTION SYSTEM. 3. BACKFLOW ASSEMBLIES MUST BE ON THE CURRENT WASHINGTON STATE DEPARTMENT OF HEALTH – BACKFLOW ASSEMBLIES APPROVED FOR INSTALLATION LIST. 4. BACKFLOW ASSEMBLIES MUST BE TESTED BY A STATE CERTIFIED BACKFLOW ASSEMBLY TESTER, AND INSPECTED AND APPROVED BY A CITY OF AUBURN CROSS CONNECTION CONTROL SPECIALIST. 5. PRIOR TO INSTALLATION, SUBMIT TO THE DEVELOPMENT REVIEW ENGINEER FOUR (4) SETS OF BACKFLOW PREVENTION ASSEMBLY PLANS, INCLUDING THE CONNECTION POINT TO THE CITY MAIN FOR REVIEW AND APPROVAL. 2/16/2010 Design Standards Page 3-22 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) 2/16/2010 Design Standards Page 3-23 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 3 (2-10) Appendix B (continued) SIGNAL CONSTRUCTION NOTES 1. THE LOCATION OF ALL CONDUIT, JUNCTION BOXES, AND CABINETS SHOWN ON THIS PLAN ARE FOR GRAPHIC PRESENTATION ONLY AND FINAL LOCATION SHALL BE DETERMINED BY THE ENGINEER. 2. ALL TRAFFIC SIGNAL AND PEDESTRIAN HEADS AND PUSH BUTTONS SHALL BE SECURELY AND COMPLETELY COVERED WHILE SIGNAL IS NOT IN OPERATION. 3. ALL CONDUCTORS FOR SIGNAL HEADS, LOOPS, PEDESTRIAN HEADS, PUSH BUTTONS AND STREETLIGHTS SHALL BE LABELED IN EACH JUNCTION BOX. Chapter 4 – Report Preparation Requirements 4.00 Preface This chapter describes how technical engineering reports should be laid out to meet City requirements and provide a format that is easy to follow and understand. Reports need to meet these basic standards in order to move through the review process in an efficient manner. 4.01 General Requirements The following general requirements shall be met for all technical engineering reports being submitted for review and approval: A. All reports and calculations shall be prepared, stamped, signed, and dated by a Washington State licensed professional civil engineer. B. All reports and calculations shall be neat, uncluttered, legible, and in conformance with the requirements herein. C. All engineering reports shall be bound with the civil engineer’s stamp clearly visible. D. Reports shall reference City Standards as necessary. 4.02 Report Types The following are basic types of reports submitted as supporting project information. Depending on the complexity or simplicity of the project and its location, the amount of detail, and the number and types of reports required will be subject to change. The examples given are the typical reports required for a standard project, there may be other reports required that are specific to a particular project. A. Geo-Technical Reports See Section 4.03.1 B. Stormwater Site Plans See SWMM Volume 1 Ch. 4 C. Critical Area Report See Section 4.03.3 D. Traffic Impact Analysis See Section 4.02.4 4.03 Report Requirements 4.03.1 Geo-Technical Reports The geo-technical report format shall include the following applicable items: A. Title page including project name and address. B. General information, which includes existing site conditions. C. Site history including any prior grading. 2/16/2010 Design Standards Page 4-01 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 4 (2-10) D. Subsurface soil information and conditions including groundwater elevations. E. Soil log information and locations of explorations. F. Soil characteristics including suitability for fill and compaction requirements. G. Slope stability analysis. H. Seismic hazards. I. Site plan showing the topography and proposed structures and paving. J. Grading information including depth of cuts and recommended slopes. K. Recommendations on temporary erosion and sediment control. L. Conclusions and recommendations for foundations. M. Appendix with test pit and boring logs. N. Information on infiltration rates for use in designing retention ponds and infiltration trenches. O. California Bearing Ratio (CBR) information for pavement design. 4.03.2 Stormwater Site Plans Stormwater Site Plans shall contain the information as noted in the City of Auburn Surface Water Management Manual (SWMM) Volume I Chapter 4. The City of Auburn SWMM has replaced the standards formerly listed here. 4.03.3 Critical Area Report A. Title Page including project name, contact information, description of the proposal, and identification of all local, state, and other wetland related permits required for the permit. B. State accuracy of the report. C. Documentation of field work. D. Description of methodologies used in study. E. Identify and characterize of all critical areas, wetlands, water bodies, buffers, etc. on or adjacent (within 300 feet of the project boundaries) to the proposed project area. F. Provide wetland rating, required buffers based on a professional survey. G. A description of proposed actions including estimate acreages of impacts to wetland and buffers. H. An assessment of probable cumulative impacts to the wetlands and buffers. I. Mitigation measures proposed. J. Scaled site plan. 2/16/2010 Design Standards Page 4-02 REF. H:\DEVELOPMENT\Manuals\Des ign Standards\Chapter 4 (2-10) 2/16/2010 Design Standards Page 4-03 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 4 (2-10) 4.03.4 Traffic Impact Analysis A. Title Page including project name and address. B. Executive Summary. C. Table of Contents. D. Introduction consisting of a description of the project, location, site plans with access to city streets, circulation network, land use and zoning, phasing plan, project developer and contact person, reference other studies. E. Traffic Analysis to include assumptions, existing and projected traffic volumes, project trip generations, trip distribution, level of service (LOS), and warrant analysis. F. Appendix with all calculations. 4.03.5 Winterization Report See Section 5.01.4 to the Engineering Design Standards and Construction Stormwater Pollution Prevention Plan of the Surface Water Management Manual, Volume 2, Chapter 2. 4.03.6 Other Reports Other reports may be required on a site-specific basis. The specific information required in these reports shall be determined during the SEPA process or by the department requiring the report. These reports shall include the following basic items: A. Title page including project name and address. B. General information, which includes existing site conditions. C. Site plan showing the topography and proposed structures and paving. D. Conclusions and recommendations. E. Appendix with collected field information. Chapter 5 – TESC, Clearing and Grading 5.00 Preface The design of temporary erosion and sediment control (TESC) clearing and grading plans shall conform to the requirements herein. Compliance with these standards does not alleviate the design engineer from using sound professional engineering practices. The design criteria contained herein are the minimum acceptable under standard conditions. Special conditions may require more stringent requirements that will be addressed during the plan review process. The purpose of these requirements is to provide the design criteria necessary to preserve the City of Auburn’s water courses; minimize surface and ground water quality degradation; control sedimentation in creeks, streams, rivers, ponds, lakes, and other water bodies; protect adjacent and downstream property owners from increased runoff rates which could cause erosion and flooding; and ensure the safety and stability of City of Auburn’s roads and rights-of-way. 5.01 TESC Design Criteria 5.01.1 Temporary Erosion and Sediment Control (TESC) TESC design requirements shall meet design criteria requirements as identified in Volume II of the City of Auburn Surface Water Management Manual (SWMM), and follow City of Auburn grading requirements. All TESC measures regardless of design and implementation must meet the latest Nephelometric Turbidity Units (NTU) test requirements. The City will conduct tests and if the applicable limits are not met, the project will be halted until such time as it is brought into compliance. 5.01.2 Temporary Detention Systems The detention shall be defined as the active storage available a minimum of one foot (1’) above the seasonal high ground water. 5.01.3 Winterization Plan Any project with exposed soil meeting the requirements of the SWMM Volume 2, Chapter 2 shall prepare a winterization plan. The plan shall follow the Construction Stormwater Pollution Prevention Plan (SWPPP) of the Surface Water Management Manual, and contain the following information: A. Purpose is to be clearly stated. B. Property location. C. Property description. D. Contacts – including name, title, organization, and phone number of person or persons responsible for maintaining the project site. E. Temporary Erosion and Sediment Control (TESC) plan for the wet season. 2/16/2010 Design Standards Page 5-01 REF. H\DEVELOPMENT\Design Standards\Chapter 5 (2-10) F. Inspection and monitoring schedule including the contact information for the third party monitor to be used to complete all required inspections and reports. G. Maintenance and repair responsibility clearly identified. H. Identification of stockpile(s) of TESC materials and their location(s). I. An Exhibit A – legal description. J. An Exhibit B – vicinity map. K. Inspection Report Form. L. BMP’s (Best Management Practices) to be employed (site specific). 5.02 Land Clearing 5.02.1 Purpose The following section establishes the requirements for land clearing. These requirements do not supersede nor are they intended to be inconsistent with any landscaping requirement established by the Zoning Ordinance or other City action. A land clearing permit shall be required except for the following situations: A. Situations where the land clearing is included in the grading or building permit. B. The removal of dead or diseased trees, shrubs, or ground cover. C. Clearing associated with continuous agricultural uses, excluding timber cutting not otherwise exempted. D. Clearing not to exceed 6,999 square feet within individual lots, for the purpose of the construction of a single-family home or duplex, provided a building permit has been issued by the city prior to commencing the clearing activities and construction of the structure starts within ninety days of commencing the clearing activities. A permit will be required if said clearing is proposed in any critical area or within its buffer. E. The removal of up to six trees per lot within any 12-month period, or for lots greater than one acre, up to six trees per acre within any 12-month period, with fractional acres of one-half acre or more considered to be a whole acre. F. The removal of trees and ground cover in emergency situations involving immediate danger to life or property. G. Routine landscape maintenance and minor repair. H. Removal of trees and vegetation consistent with an approved surface mining permit. I. Removal of a tree from property zoned residential that endangers a permanent structure by being closer to the structure than the distance from the base of the tree to its top, regardless of whether the tree is located on the same property as the structure. Land Clearing permits will typically be required in situations where a significant amount of trees and vegetation are proposed for removal in a manner that will not trigger the grading permit requirements. (See Section 2.01.1) 5.02.2 Plan/Permit Requirements The following information shall be provided prior to the approval of a land clearing permit: 2/16/2010 Design Standards Page 5-02 REF. H\DEVELOPMENT\Design Standards\Chapter 5 (2-10) A. A statement as to the purpose for clearing and the subsequent use of the property. B. The method of work including details justifying how the work will be performed without triggering the requirements for a grading permit. C. A cover sheet and site plan (See Chapter 3) showing the vegetation to be removed and the location and type of all existing significant trees. D. If the clearing is to include the removal of ground cover, a TESC plan may be required. E. A plan showing existing trees six inches (6”) in diameter and larger for evergreens and four inches (4”) in diameter or larger for deciduous. The plan shall indicate if a tree is to either be retained or removed. F. The area to be cleared or disturbed in square feet. 5.02.3 General Requirements A. Clearing shall not unreasonably create or contribute to erosion, landslides, flooding, siltation, or other pollution as determined by the City. B. Clearing shall contain reasonable provisions for the preservation of natural features, vegetation, sensitive areas, and drainage courses. C. Clearing shall be conducted so as to expose the smallest area of soil for the least amount of time. D. A licensed and bonded contractor shall perform the clearing of any tree that is within striking distance of a structure, overhead power/utility lines, public right-of-way, roads or that has the potential to cause damage to other trees. E. A right-of-way use permit shall be required when the public right-of-way is used to clear, stockpile, or load products and/or debris resulting from clearing. 5.03 Grading 5.03.1 Purpose The following section establishes the requirements for grading. These requirements do not supersede nor are they intended to be inconsistent with any landscaping requirement established by the Zoning Ordinance or other City action. A grading permit shall be required except for the following situations: A. Removal of dead or diseased trees, shrubs, or ground cover. B. Clearing and grading associated with continuous agricultural uses, excluding timber cutting not not otherwise exempted. C. Clearing and grading not to exceed 6,999 square feet of area within individual lots, for the purpose of the construction of a single-family home or duplex, provided a building permit has been issued by the city prior to commencing the clearing and grading activities and construction of the structure starts within 90 days of commencing clearing and grading activities. A permit will be required if said grading is proposed in any critical area or within its buffer. D. The removal of up to six trees per lot within any 12-month period, or for lots greater than one acre, up to six trees per acre within any 12-month period, with fractional acres of one-half acre or more considered to be a whole acre. 2/16/2010 Design Standards Page 5-03 REF. H\DEVELOPMENT\Design Standards\Chapter 5 (2-10) E. Clearing and grading for the construction and maintenance of public facilities as approved by the city engineer to include water, sanitary sewer, streets, highways, storm drainage and related facilities. F. Removal of trees, shrubs, and ground cover in emergency situations involving immediate danger to life or property. G. Routine landscape maintenance and minor repair. H. Removal of trees and vegetation consistent with an approved surface mining permit. I. Removal of a tree from property zoned residential that endangers a permanent structure by being closer to the structure than the distance from the base of the tree to its top, regardless of whether the tree is located on the same property as the structure. J. Upon approval of the city engineer or his/her designee, excavations of less than five feet in vertical depth and/or fills less than eight inches of vertical depth on any portion of a site and involving the deposit or displacement of not more than a total of 500 cubic yards of material during any 24-month period. K. Upon approval of the city engineer or his/her designee, the temporary stockpiling of less than 500 cubic yards, combined, of topsoils, crushed rock, sawdust, mulch, bark, chips, or similar materials on a lot, tract, or parcel of land for a period not ot exceed 12 months; provided, that the stockpile has adequate coverage to prevent erosion. L. Upon approval of the city engineer or his/her designee, the broadcasting of less than 500 cubic yards of topsoil, peat, sawdust, mulch, bark, chips, or solid nutrients used for landscaping or soil conditioning on a lot, tract or parcel of land during any 24-month period, provided the finished depth does not increase the grade from the existing grade by more than eight inches. M. Upon approval of the city engineer or his/her designee, the temporary stockpiling of organic or inorganic materials used in an approved construction project, provided the use, location, duration, and extent of the stockpile was disclosed through the environmental or development review process, In no case shall a temporary stockpile remain beyond a 24-month period. N. The creation of impervious surfaces which have a surface area less than 2,000 square feet. O. Emergency temporary sandbagging, diking ditching, filling or similar work during or after periods of extreme weather conditions when done to protect life or property, provided such measures do not adversely impact adjacent properties or public facilities. 5.03.2 Excavations A. Cut slopes shall generally be constructed no steeper than two horizontal to one vertical (2:1). The City may approve steeper slopes after a geotechnical analysis is performed justifying a steeper slope. Upon City approval, a steeper slope may also be used in the following cases: a. A slope of one-and-a-half horizontal to one vertical (1.5:1) may be used if no structure is to be supported, the slope is less than eight feet (8’) in height, and the slope can be adequately protected against erosion. b. A slope of one horizontal to one vertical (1:1) may be used for cuts into stable bedrock. B. Cut slopes shall be stabilized by terracing, cat tracking, jute mat, grass sod, hydroseeding, or by other planting or surfacing materials acceptable to the City. 2/16/2010 Design Standards Page 5-04 REF. H\DEVELOPMENT\Design Standards\Chapter 5 (2-10) C. The City may also require geotechnical analysis for the following: a. Slopes with sub-surface or surface water flows. b. In areas of questionable soils conditions. c. Where the length of the slope requires terracing. d. In other situations where slope stability could be in question. 5.03.3 Fills A. Fill slopes shall generally be constructed no steeper than two horizontal to one vertical (2:1). The City may approve steeper slopes after a geotechnical analysis is performed justifying a steeper slope. Temporary fills for preloading of building pads may use a slope one and one half horizontal to one vertical (1.5:1). B. Fill slopes shall be stabilized by terracing, cat tracking, jute mat, grass sod, hydroseeding, or by other planting or surfacing materials acceptable to the City. C. The City may also require geotechnical analysis for the following: a. Slopes with surface water flows. b. In areas of questionable soils conditions. c. Where the length of the slope requires terracing. d. In other situations where slope stability could be in question. D. A minimum horizontal setback of five feet (5') shall be provided between the bottom of any fill placement and the top of the bank of any defined drainage channel. E. When filling a site, particular care should be taken to prevent impeding the existing upstream surface drainage flow. 5.03.3.1 Preparation for Fill Prior to any fill being placed, all vegetation, topsoil and other unsuitable material shall be removed unless dictated otherwise by the geotechnical engineer. Where fill is being placed on existing slopes of greater than five horizontal to one vertical (5:1), a geotechnical analysis shall be performed. 5.03.3.2 Compaction Fill material shall be placed in lifts of no more than twelve inches (12”) and compacted to ninety percent (90%) or greater of the maximum dry density as determined by ASTM D1557 Modified Proctor or as directed by the geotechnical engineer. 5.03.4 Slope Easement Slope easements adjacent to the right-of-way for maintenance of cut or fill slopes and drainage facilities may be required. Easement shall be from the catch point plus a minimum of five feet (5’), as determined by the City. 5.04 Retaining Walls Retaining walls can vary with design and must be approved by the City. Retaining walls in locations where the possibility exists for pedestrians to walk near the top edge of the wall may require protective fencing. Retaining walls with a vertical difference of three feet (3’) or 2/16/2010 Design Standards Page 5-05 REF. H\DEVELOPMENT\Design Standards\Chapter 5 (2-10) greater along pedestrian corridors and areas where maintenance personnel will be required to access will require a handrail for safety of pedestrian traffic. 5.04.1 Rockeries See Standard Detail GENERAL-04 Rockeries may be used for containment of cut slopes or fill embankment up to a maximum height of eight feet (8’) as shown in the referenced Standard Detail GENERAL-04. Rockeries over four feet (4’) in height or in areas of questionable soil stability will require an engineered design. The engineered design may include a soils investigation and report by a geotechnical engineer and structural calculations to support the rockery design. 5.04.1.1 Size Size Categories include: Two-man rocks (200 -600 pounds) 18” -28” average diameter. Three-man rocks (600 -2000 pounds) 28” -36” average diameter. Four man rocks (2001 -4000 pounds) 36” -48” average diameter. 5.04.1.2 Material The rock material shall be as rectangular as possible. No stone shall be used that does not extend through the wall. The quarried rock shall be hard, sound, durable, and free from weathered portions, seams, cracks, and other defects. The rock density shall be a minimum of 160 pounds per cubic foot, measured accordingly to WSDOT test method 107 (Bulk Specific Gravity -S.S.D. basis). 5.04.1.3 Underdrains Underdrains are required for all retaining walls over four feet (4’) in height (i.e., concrete walls, MSE walls, soil nail walls, block retaining walls, etc.). A minimum six-inch (6”) diameter perforated or slotted drainpipe shall be placed in a shallow excavated trench located along the inside edge of the keyway. The pipe shall be bedded on and surrounded by “Gravel Backfill for Drains” (WSDOT/APWA 9-03.12(4)) to a minimum height of eighteen inches (18”) above the bottom of the pipe. A filter fabric shall surround the gravel backfill and shall have a minimum of one foot (1’) overlap along the top surface of the gravel. The perforated pipe shall be connected to a storm drain system or to an acceptable outfall. 5.04.2 Block Retaining Walls Block Block retaining walls, (e.g., Keystone, Allan Block, Ecology Block) may be used for containment of cut slopes or fill embankment. Block retaining walls over four feet (4’) in height or in areas of questionable soil stability will require an engineered design. The engineered design may include a soils investigation and report by a geotechnical engineer and structural calculations to support the block wall design. 5.04.2.1 Material Blocks used for retaining walls shall be in good condition and structurally sound; cracked and/or broken blocks should be returned to the manufacturer. Unless designed as a gravity wall (ecology blocks), block walls over four feet (4’) in height shall employ geo-grid type material to increase the structural stability of the wall. 5.04.2.2 Underdrains (See Section 5.04.1.3) 2/16/2010 Design Standards Page 5-06 REF. H\DEVELOPMENT\Design Standards\Chapter 5 (2-10) 5.04.3 Reinforced Concrete Walls Reinforced concrete walls or cast-in-place concrete walls may be used for containment of cut slopes or fill embankment. Concrete retaining walls over four feet (4’) in height or in areas of questionable soil stability will require an engineered design. The engineered design may include a soils investigation and report by a geotechnical engineer and structural calculations to support the concrete wall design. 5.04.3.1 Material A minimum 3,000-psi structural reinforced concrete shall be used in the design of concrete retaining walls. 5.04.3.2 Underdrains (See Section 5.01.4.3) 5.04.4 Mechanically Stabilized Earth Walls (MSE Walls) MSE walls may be used in conjunction with other retaining walls or as a stand-alone application when constructing fill slopes. MSE walls will require an engineered design. The engineered design shall include a soils investigation and report by a geotechnical engineer and structural calculations to support the MSE wall design. 5.04.4.1 Material MSE walls shall employ well-draining structural soil compacted to the geotechnical engineer’s specifications. 5.04.4.2 Underdrains (See Section 5.01.4.3) 2/16/2010 Design Standards Page 5-07 REF. H\DEVELOPMENT\Design Standards\Chapter 5 (2-10) 2/16/2010 Design Standards Page 5-08 REF. H\DEVELOPMENT\Design Standards\Chapter 5 (2-10) 5.05 Construction Sequence 5.05.1 Requirements A construction sequence is intended to ensure that the timing and installation of storm drainage and erosion control measures are in place prior to activities that may cause erosion to occur. The following elements should be included in a construction sequence: A. Attendance at a pre-construction meeting with City of Auburn officials. B. Establishment of clearing and grading limits. C. Construction of temporary construction entrance. D. Construction of perimeter ditches, filter fabric fences, and other erosion control devices as shown. E. Construction of storm drainage control (applicant to be specific) facilities including emergency overflow as applicable. F. Construction of ditches and swales as necessary to direct all surface water to the storm drainage control (be specific) facilities as clearing and grading progress. Prevention of uncontrolled surface water being allowed to leave the site at any time during the grading operations. G. Establishment of at what point grading activities can begin, which is usually only after all perimeter drainage and erosion control measures are in place. H. For sites with a final development plan, the following shall also be addressed when applicable: 1. Installation of on-site permanent storm drainage, sanitary sewer, and water facilities. 2. Site paving. 3. Indicate at what point building construction may begin. 4. A description of how to transition from the temporary to permanent storm facilities. 5. The possibilities of any phased construction. 6. Any off-site public or private improvements including the general timing and duration. 7. The removal of all TESC measures at project completion upon City approval. I. The TESC plan sheet shall also include a construction sequence element which clearly identifies the timing and methodology required to: 1. Contain areas of active earthwork to prevent uncontrolled discharge of storm drainage 2. 2. Minimize erosion and the extent and time soils are exposed on-site. 3. Address seasonal variations in weather conditions (the period of greatest concern is October 1 through April 30). A separate winterization may be required. 4. Prevent tracking of sediment onto City streets. 5. Protect permanent on-site and off-site storm drainage systems. Chapter 6 -Storm Drainage 6.00 Preface The purpose of these requirements is to provide the design criteria necessary to preserve the City of Auburn’s water courses; to minimize surface and ground water quality degradation; to control the sedimentation in creeks, streams, rivers, ponds, lakes, and other water bodies; to protect adjacent and downstream property owners from increased runoff rates which could cause erosion and flooding; to ensure the safety of City of Auburn’s roads and rights-of-way; and to decrease drainage-related damage to both public and private property. The standards also are required to control runoff from development, redevelopment and construction sites to comply with the Western Washington Phase II Municipal Stormwater Permit issued by the State of Washington Department of Ecology. Compliance with these standards does not alleviate the design engineer from using sound professional engineering practices. The design criteria contained herein are the minimum acceptable under standard conditions. Special conditions may require more stringent requirements that will be addressed during the plan review process. The City’s Comprehensive Drainage Plan establishes drainage basins and design parameters used to estimate future line hydraulic capacities. Anyone proposing to extend or modify the City’s storm drainage system should contact the Public Works Department for information on line sizes and locations. Developer constructed public storm drainage improvements shall be installed by means of a Facility Extension Agreement (FAC) between the developer and the City. The Public Works Department can provide information on this agreement as well as applicable permit and connection fee estimates. 6.01 Requirements All requests for developing a storm drainage system must comply with the City of Auburn Surface Water Management Manual (SWMM). The City of Auburn SWMM has replaced the standards formerly listed here. 02/16/2010............................................. Design Standards ...................................... ..........Page 6-1 REF. H\DEVELOPMENT\Design Standards\Chapter 6 (02-10) 8/9/2004 Design Standards Page 7-03 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 7 (8-04) 7.01.2 Water Services See Standard Details WATER-06, -13 Through -17 The City owns and shall maintain the service line to the meter, the meter and setter, the meter tailpiece, and the meter box. The property owner owns and shall maintain the tailpiece connection fitting, service line, and other facilities such as pressure reducing valves, pumps, or backflow prevention assemblies behind the meter. For fire sprinkler connections, City ownership and maintenance responsibilities cease at the edge of the public right-of-way or public water utility easement. 7.01.2.1 Domestic Services Domestic Services are defined as any service that connects directly to plumbing within a structure and is used for drinking, cooking, washing, and other standard uses of potable water. Domestic services shall meet the following requirements: A. Installation of corporation stops, water services, and meters shall be per City of Auburn Standard Details. The City may, at the City's option, install services from public water mains to the meter in existing right-of-ways and easements. The developer/contractor will install and/or replace all applicable services when installing new water mains required for the project. The City will furnish and install the meter for services of two inches (2”) and smaller. B. Water services and meters of three inches (3”) and larger will be purchased and installed by the developer/contractor under City observation. Where vaults are required, the meter shall be equipped with a remote read device that records water use in cubic feet. The remote read device shall be located near the hatch opening in a weather-tight enclosure. C. Water meters shall be located in a level unobstructed area as close to the City main as possible with the distance not to exceed fifty feet (50’). D. Residential sites should have water meters placed in landscape strips within the right-of-way. If no unpaved areas exist in the right-of-way, water meters may be placed outside the right-of-way in unpaved areas within a public water utility easement. E. Commercial and industrial sites should have meters located near driveway entrances within the right-of-way or within public water utility easements in landscape islands located near access driveways when placement in right-ofway is not practical. F. Domestic water meter sizing calculations shall be per the most recent adopted Uniform Plumbing Code and will be provided by the Developer when requested. The length of the service between the meter and the structure should not exceed one hundred fifty feet (150’). G. When installing multiple services to a public main, a minimum spacing of two feet (2’) shall be used between corporation stops and a minimum spacing of ten feet (10’) shall be used between tapping tees. H. Domestic services shall protect the City’s water system from contamination by installing backflow prevention assemblies required by and in accordance with Washington State Law (WAC 246.290.490 or subsequent revisions), Auburn City Code (ACC), and the City of Auburn ”Cross Connection Control Program Manual.” Prior to installation, four (4) sets of backflow prevention assembly plans, including the connection point to the City main, shall be submitted to City for approval by the City’s Cross Connection Specialist. 8/9/2004 Design Standards Page 7-04 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 7 (8-04) 7.01.2.2 Other Services Irrigation and other non-domestic services must meet all the above requirements as well as the following: A. Backflow prevention assemblies shall be installed on all non-domestic services. Double Check Valve Assemblies (DCVA) shall be used for “low hazard” services and Reduced Pressure Backflow Assemblies (RPBA) shall be used for “high hazard” services. (For lists of low and high hazard services contact the City of Auburn’s Cross Connection Specialist.) Assemblies installed shall be on the current Washington State Department of Health (DOH) Approved List. Backflow prevention shall be installed within one hundred feet (100’) of the City water main and inspected by the City. These assemblies shall be installed as required by and in accordance with Washington State Law (WAC 246.290.490 or subsequent revisions), Auburn City Code (ACC), and the City of Auburn ”Cross Connection Control Program Program Manual.” Prior to installation, four (4) sets of backflow prevention assembly plans, including the connection point to the City main, shall be submitted to the City for approval by the Cross Connection Specialist. B. An Irrigation meter shall be installed in cases where water is used for landscape purposes and will not enter the sanitary sewer system. C. A sewer deduct meter, if applicable, shall be installed between the domestic water meter and the point of connection for an approved industrial use. D. For fire sprinkler service line requirements, see Section 7.01.5.2. 7.01.3 Water Valves Water valves shall meet the following requirements: 7.01.3.1 Water Valve Sizing A. Water valves for twelve-inch (12”) diameter and smaller water mains shall be of the resilient wedge gate variety. When water mains exceed twelve inches (12”) in diameter, butterfly valves shall be used. 7.01.3.2 Water Valve Location See Standard Details WATER-18 Through -18b A. Water valves shall be installed along the water mains at a maximum spacing of four hundred feet (400') and at the intersection of lateral lines. B. Water valves shall be located in clusters when possible and shall be located so that each leg of the main line system can be isolated separately. C. When extending public water mains, a water valve may be required near the end of lines where future extensions are projected. D. Water valves should not be placed within the wheel path of vehicle traffic. E. An all-weather maintenance road shall be provided within the public water utility easement to allow access to valves and other appurtenances located outside of the paved roadway. 8/9/2004 Design Standards Page 7-05 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 7 (8-04) 7.01.4 Pressure Reducing Stations See Standard Details WATER-10 Through -12b Pressure Reducing Station installation may be required to maintain adequate pressure in the water system between pressure zones. Contact the City Water Utility Engineer for specific requirements when applicable. 7.01.5 Fire Systems 7.01.5.1 Fire Hydrant Assemblies See Standard Detail WATER-07 & -08 Fire Hydrant Assemblies shall meet the following requirements: A. Fire hydrant assemblies shall conform to the standard details listed above. B. Fire hydrant assembly service lines shall be installed at right angles to eightinch (8") minimum diameter supply mains. C. Fire hydrant assemblies shall stand plumb, be set such that the lowest outlet is a minimum of twenty-one inches (21") above finish grade, and have a clear, level area around the hydrant with a radius of no less than sixty inches (60”). D. Fire hydrant assemblies shall be located located no closer than fifty feet (50’) to the surrounding structures. E. Fire hydrant assemblies shall be provided with two 2-1/2” National Standard Thread (NST) hose ports and one 4-1/2” NST by 5” hose port with a Storz adapter and cap. F. The pumper port shall face the street or fire access road and be readily accessible to any fire vehicle for fire fighting and pumping operations. G. The service line from the supply main to the fire hydrant assembly shall be six inches (6") in diameter unless the line extends over fifty feet (50’) in length, in which case pipe eight inches (8”) in diameter shall be used. H. Fire hydrant assemblies shall be installed with a maximum spacing of six hundred feet (600') along streets in single-family zones and three hundred feet (300') in all other zones. I. Buildings, other than single-family residences, located with portions of the building more than one hundred fifty feet (150’) in vehicular travel from a fire hydrant assembly or with building fire flow over 2500 gpm shall require on-site fire hydrant assemblies. These hydrants shall be served by a public water main that loops around the building, or complex of buildings, and reconnects back to a distribution supply main. 7.01.5.2 Fire Sprinkler Systems Fire Sprinkler Systems shall meet the following requirements: A. Fire sprinkler systems shall be required in commercial/industrial and multifamily buildings according to the current fire code regulations. Sprinkler systems may also be required in single-family residences when the length of the private access road exceeds one hundred fifty feet (150’). B. Fire sprinkler supply lines for commercial buildings, unless designed by a Fire Protection Engineer, shall be the same diameter as the supplying water main. C. Fire sprinkler supply lines shall be separated from the public water main by a valve located at the point of connection. 8/9/2004 Design Standards Page 7-06 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 7 (8-04) D. The design of fire sprinkler supply lines for single-family/duplex shall be in accordance with City of Auburn Standard Detail No. WATER-09. E. A backflow prevention assembly shall be installed on all fire sprinkler lines as required by and in accordance with Washington State Law (WAC 246.290.490 or subsequent revisions), Auburn City Code (ACC), and the City of Auburn ”Cross Connection Control Program Manual.” When the distance from the point of connection at the main to the fire sprinkler riser assembly is less than one hundred feet (100’), the backflow prevention assembly may be part of the sprinkler riser assembly and placed within the building’s riser room. Prior to installation, four (4) sets of backflow prevention assembly plans, including the connection point to the City main, shall be submitted to City for approval by the City’s Cross Connection Specialist. F. A Washington State Certified Level “U” contractor shall install underground fire sprinkler supply lines in accordance with WAC 212-80-010. Prior to installation, four (4) sets of underground fire sprinkler supply line plans shall be submitted to the City for approval by the Fire Marshal. Both a State Certified Level “U” contractor and a Fire Protection Engineer shall stamp these plans. A letter from a state certified sprinkler system designer stating “FOR DESIGN PURPOSES ONLY” may be attached in lieu of a stamp from the Fire Protection Engineer. G. A post indicator valve (PIV) shall be installed on the fire sprinkler supply line between the public water main and the building. PIV’s shall be located in such a manner as to be easily visible to Fire Department personnel. A wall-mounted PIV may be installed when the exterior wall of the building is of noncombustible construction. A detail containing this information shall be included with the submitted plans. H. Fire Department Connections (FDC’s) shall be placed within fifty feet (50’) of a fire hydrant assembly or as directed by the Fire Marshal. I. Fire sprinkler supply lines will require the installation of detector check meters. 7.01.5.3 Fire Flows New developments or redevelopment of existing sites are required to meet the minimum City fire flow requirements listed below. The developer shall provide information to the City to define the building specific fire flow requirements. If the building specific fire flow requirements are greater than the minimums listed below, facilities shall be designed to meet the greater requirement. The minimum fire flow requirements are as follows: 1) Single Family Residential 1,500 GPM @2 Hours 2) Industrial/Commercial/Multi-Family 2,500 GPM @3 Hours Developers are responsible for installing all facilities necessary to serve their property, complying with development standards, and providing the required fire flow established by the Fire Marshal. If off-site water system improvements are necessary to meet these requirements, the Developer shall be responsible for said said improvements. The change of use of existing structures or areas may also require the installation of new facilities. Chapter 10 – Streets 10.00 Preface The intent of this chapter is to encourage the uniform development of an integrated and accessible public street system that will support present and future multimodal transportation. Through the implementation of these standards, streets are built as transportation facilities as well as public space, contributing positively to the character of an area. These standards help create an efficient multimodal transportation system with minimal environmental impact to the community. The design of Streets within the City of Auburn shall conform to the standards provided herein. The latest additions of the American Association of State Highway and Transportation Officials (AASHTO) and the State of Washington Department of Transportation (WSDOT) standards shall be utilized by the City Engineer when the design standards, standard specifications, or standard drawings are not covered by the scope of the City’s standards. The design criteria used to estimate future street usage are established in the City’s Transportation Plan. Anyone proposing to extend or modify the City’s street system should contact the City of Auburn for information. Developers needing to construct street improvements shall enter into a Facility Extension Agreement (FAC). The City of Auburn can provide the information on this agreement as well as applicable permit fee estimates. It is provided, however, that notwithstanding any provisions to the contrary, all streets located within the Downtown Urban Center Zone boundaries as depicted on the Comprehensive Zoning Map, other than that area west of the BNSF Railroad right-of-way, shall be subject to the “Downtown Auburn Sidewalk Design Guidelines” (Guidelines). Should any conflict exist between the Guidelines and the design criteria, Chapter 10, of this document, the Guidelines shall control in those portions of the Downtown Urban Center Zone described above. 10.01 Street Classification All streets in the City of Auburn have been classified using the Federal Functional Classification system. A complete listing of all roads by classification is available from the Department of Public Works. The following section contains descriptions of the street classifications used in the City. Table 10-1 contains information relating to each streets design requirements for widths, radii, typical speed limits, and other information. This section also contains references to Standard Details that show a typical cross-section for each street. These cross-sections contain information on street layouts and widths of various street elements. 10.01.1 Arterials Arterials are the highest level of City Street classification. They fall under the following two categories: 12/21/2009 .................................... ........ Design Standards.............................................. Page 10-1 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.01.1.1 Principal Arterial See Standard Detail TRAFFIC-27 Principal Arterials are designed to move traffic between locations within the region and to access the freeways. Design emphasis should be placed on providing movement of inter-city through-traffic rather than intra-city traffic. Direct access to commercial and industrial land uses is permitted. Principal Arterials are typically constructed to accommodate five (5) lanes of traffic with an operating speed of thirty-five to forty-five miles per hour (35-45 mph). The design year ADT is greater than 15,000 vehicles per day. 10.01.1.2 Minor Arterial See Standard Detail TRAFFIC-28 Minor Arterials should interconnect with and augment principal arterials and provide service to trips of moderate length at a somewhat lower level of travel mobility than principal arterials. The minor arterial street system includes all arterials not classified as a principal or collector and consists of facilities that place more emphasis on land access than the higher system system and offers a lower level of traffic mobility. Minor Arterials are typically constructed to accommodate four to five (4-5) lanes of traffic with an operating speed of thirty to thirty-five miles per hour (30-35 mph). They may serve secondary traffic generators such as community business centers, athletic fields, neighborhood shopping centers, major parks, multifamily residential areas, medical centers, large church complexes, hospitals, and traffic from neighborhood to neighborhood within the City. The design year ADT is 10,000 to 20,000 vehicles per day. 10.01.2 Collectors Collectors are a step below Arterials in the City classification system. They fall under the following three categories: 10.01.2.1 Residential Collector See Standard Detail TRAFFIC-29 Residential Collector Arterials are used to connect intra-community streets, residential neighborhoods, commercial areas, industrial areas, and community centers to minor and principal arterials. Residential Collectors are typically constructed to accommodate two (2) travel lanes and a two-way left-turn lane or two (2) travel lanes and bike lanes with an operating speed of thirty miles per hour (30 mph). The design year ADT is 2,500 to 10,000 vehicles per day. 10.01.2.2 Non-Residential Collector See Standard Detail TRAFFIC-30 Non-Residential Connector Arterials provide intra-community access connecting nonresidential properties with activity centers and recreational facilities. Non-Residential Collector arterials are typically constructed to accommodate two (2) lanes and a center two-way left-turn lane, with an operating speed of thirty miles per hour (30 mph). They may serve neighborhood traffic generators such as one store or a small group of stores, elementary schools, churches, clubhouses, small hospitals or clinics, areas of small multifamily developments, as well as other commercial/industrial parcels. The design year ADT is 2,500 to 5,000 vehicles per day. 12/21/2009 ............................................ Design Standards.............................................. Page 10-2 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.01.2.3 Rural Collector See Standard Detail TRAFFIC-31 Rural Collectors are routes that (regardless of traffic volume) the majority of travel distances are shorter than on arterial routes and residential neighborhoods to activity centers. Rural Collectors provide access to all levels of arterials, are typically constructed to accommodate two (2) lanes with gravel shoulders on both sides, and provide an operating speed of thirty to forty miles per hour (30-40 mph). The gravel shoulder may be reduced on one side to provide a wider shoulder on the other for equestrian access, with permission from the City Engineer. The design year ADT is 1,000 to 5,000 vehicles per day. 10.01.3 Local Streets Local Streets are the most common streets classified in the City. This classification can be broken up into four categories as follows: 10.01.3.1 Local Residential See Standard Detail TRAFFIC-32 Local Residential streets provide access to abutting residential parcels. They offer the lowest level of mobility among all street classifications. The street is designed to conduct traffic between dwelling units and higher order streets. As the lowest order street in the hierarchy, the access street usually carries no through traffic and includes short streets, cul-de-sacs, and courts. Service to through traffic movement is discouraged and the street usually contains no transit bus routes. Local Residential streets are typically constructed to accommodate two (2) lanes of traffic, on-street parking (one side only, the other side shall be signed “No Parking”), and an operating speed of twenty-five miles per hour (25 mph). The design ADT is 200 to 1,200 vehicles per day. 10.01.3.2 Local Non-Residential See Standard Detail TRAFFIC-33 Local Non-Residential streets provide direct access to higher order classification streets and serve primarily industrial/manufacturing land uses. They offer lower level of mobility and accommodate heavy vehicle traffic. Service to through movement is discouraged. Local Non-Residential streets are typically constructed to accommodate two (2) lanes of traffic with an operating speed of twenty-five miles per hours (25 mph). The design year ADT is 400 to 1,200 vehicles per day. 10.01.3.3 Rural Residential See Standard Detail TRAFFIC-34 The Rural Residential streets primarily provide access to the adjacent land and distribute traffic to and from the principal or minor arterials and local access streets. The travel distance is relatively shorter as compared to Rural Collectors. Rural Residential streets are typically constructed to accommodate two (2) lanes of traffic with gravel shoulders on both sides and an operating speed of twenty-five miles per hour (25 mph). The design year ADT is 100 to 1,000 vehicles per day. 10.01.3.4 Private Street Community street requirements are usually best served by public streets, owned and maintained by the City. Private streets may be appropriate for some local accesses in very limited usage. Private streets shall provide a direct access to City streets and 12/21/2009 ............................................ Design Standards......................................... ..... Page 10-3 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) shall be limited to those streets accessing properties within a planned area or properties immediately adjacent. Private streets shall not be used by residents to travel from one public street to another. The design of a private street shall be such that it will discourage any through traffic of non-residents. A private street will not be allowed if it will result in land locking present of planned parcels. Private streets shall be in conformance with the street standards that most closely reflects their intended use, with a minimum of thirty-four feet (34’) of pavement width or twenty-eight feet (28’) of pavement width with a marked fire lane on one side. Private street networks shall be configured to deter speeding. Traffic calming measures may also be required to deter speeding. Private streets shall be located within permanently established tracts or easements. A capable, legally responsible owner or homeowners’ association shall be established to maintain private streets. A plat or short plat with private streets requires an executed recorded Private Street Maintenance Agreement and a Storm Water Easement and Maintenance Agreement that obligate the future property owners to maintain the infrastructure indefinitely. 10.01.4 Alleys Alleys afford a secondary means of vehicular access to abutting property and are not intended for general traffic circulation. Dead-end alleys are generally unacceptable; however, where dead-end alleys are determined suitable by the City Engineer, for short term or temporary applications, they shall be provided with adequate turnaround facilities at the dead-end. All new alleys shall be private. Alleys shall incorporate the design criteria used in designing local streets with the following exceptions: A. All new alleys shall have a minimum width of twenty feet (20’) of asphalt pavement. B. Developments that generate four (4) or greater PM peak hour trips and have direct access to existing alleys are required to pave the alley to a width of twenty feet (20’) along the frontage of the property and between the nearest property line and the public street that provides the City preferred travel path. If adequate right-of-way does not exist to provide the required twenty feet (20’) of pavement adjacent to the property, the appropriate dedication of right-ofway shall be required. Such dedication shall be equally apportioned from both sides of the alley, when feasible, as determined by the City Engineer. If adequate right-of-way does not exist to provide the required twenty feet (20’) of pavement along the alley between the nearest property line and public street, the alley shall be paved to the width of the existing right-of-way. C. The pavement section for alleys located in non-single family zones shall be consistent with a local non-residential street standard. D. Curb and gutter, sidewalk, lighting, and landscaping are not required along alleys. E. Alleys may be paved with either a crown at centerline with asphalt wedge curbs on both sides to control drainage or be sloped to one side with an asphalt wedge curb on one side to control drainage. When necessary, storm drainage conveyance systems shall be installed along the alley to address storm drainage runoff from the paved surface. F. Alleys shall connect to City streets via a commercial driveway apron. 12/21/2009 ............................................ Design Standards.............................................. Page 10-4 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) Alleys serving alley loaded lots shall include provisions for unimpeded vehicular circulation along the alley, and provisions for adequate sight distances along both the alley at driveways and at intersections with public streets. 10.01.5 Private Access Roads on Access Tracts or Easements (Shared Driveways) Access roads provided on access tracts or easements, also known as shared driveways, provide access for up to four (4) residential units in short plats and up to six (6) residential units in long plats on panhandle/flag lots and rear lots that do not have direct access to public street frontage. They will be private roads that shall be maintained by the property owners who use them to access their property. All access roads shall meet the following general standards: 1. Access roads shall be limited to six hundred feet (600’) in length. 2. The width of the access tract/easement shall match the required pavement width, including the width of any pedestrian improvements, and the area needed for private drainage facilities. If the access is also acting as a joint utility easement or tract, the width must accommodate the public utility requirements. 3. The connection of an access road to the public street shall be by a commercial driveway apron. The connection of individual lots to the access road shall be by either a residential or commercial driveway apron commensurate with the use of the property. 4. Access roads shall meet the geometric design standards for local residential streets. 5. Access roads shall be signed as private drives inclusive of all addresses being served off the access road. New and/or existing access roads serving two (2) residential units shall meet the following additional standards: 6. The minimum pavement width shall be twenty-four feet (24’). The pavement width may be reduces to twenty feet (20’) if the new residential unit using the access road has a residential fire sprinkler system installed or a fire hydrant exists within four hundred and fifty feet (450’) of the residences measured as the fire vehicle lays its hose. Existing access roads serving three (3) or more residential units when only one additional residential unit is being created or developed shall meet the following additional standards: 7. The minimum pavement width shall be twenty-four feet (24’) and be marked as a fire lane per ACC 15.36A. The pavement width may be reduced to twenty feet (20’) if the new residential unit using the access road has a residential fire sprinkler system installed or a fire hydrant exists within four hundred and fifty feet (450’) of the residences measured as the fire vehicle lays its hose. 8. An additional five foot (5’) wide pedestrian pathway along one side of the paved access road separated by a four-inch (4”) wide painted line. 9. Access roads exceeding one hundred and fifty feet (150’) in length shall also include an adequate turnaround at the end of the road. 12/21/2009 ............................ ................ Design Standards.............................................. Page 10-5 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) New access roads serving three (3) to six (6) residential units shall meet the following additional standards: 10. Access roads seventy-five feet (75’) or less in length shall have a minimum pavement width of twenty feet (20’) and shall be marked as a fire lane per ACC 15.36A. 11. Access roads exceeding seventy-five feet (75’) in length shall have a minimum pavement width of thirty-four feet (34’). The pavement width may be reduced to twenty-four feet (24’) if one side of the access road is marked as a fire lane per ACC 15.36A. 12. Access roads exceeding one hundred and fifty feet (150’) in length shall also include an adequate turnaround at the end of the road. 13. An additional five foot (5’) wide sidewalk and cement concrete traffic curb per F-10.12-00 is required on both sides of the access road. The material for the sidewalk shall be consistent with the surrounding neighborhood sidewalk. New access roads serving non-residential properties shall meet the following additional standards: 14. The minimum pavement width shall be twenty-four feet (24’) for access roads servicing commercial properties and thirty feet (30’) for access roads serving industrial properties. 15. The access road will be marking as a fire lane per ACC 15.36A. 16. Access roads exceeding one hundred and fifty feet (150’) in length shall also include an adequate turnaround at the end of the road. 10.01.6 Half-Streets A Half-Street could be comprised of any one of the above mentioned street classifications. Half-Streets require, at a minimum, the construction from one side of the street, including the curb and gutter, storm drainage, sidewalk, lighting, conduits, and landscape strip, to the street centerline. Half-Streets will need to be constructed when a proposed new development or redevelopment of a property is located on a public street that is not currently built to City standards. Half-Street construction may also be required for property that abuts future streets proposed in the City’s Comprehensive Plan. When Half-Street construction is required on an existing paved street, the design of the Half-Street shall be consistent with the existing street conditions. This could require construction of more than half the street for safety and drainage reasons. When Half-Street construction is required on unpaved streets or unimproved areas, a minimum of twenty-four feet (24’) of pavement will be required. In these cases, the street should be designed to provide drainage for the constructed portion of the street. Provisions shall be made to allow for extension of the storm drainage system to the undeveloped portion of the street for future construction. The construction of a Half-Street may require the dedication of additional right-of-way. If a Half-Street does not connect at both ends to other streets, construction of a cul-de-sac will be required. Where Half-Streets are connected to existing streets, transition tapers will be required when edges of pavement do not match. The following formula provides the information necessary to determine the length of the tapers for a specific situation: For street design speeds of less than forty miles per hour (40mph) 12/21/2009 ............................................ Design Standards.............................................. Page 10-6 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) W = the width of the pavement offset = L S = the design speed in mph L = the length of the taper For street design speeds of greater than or equal to forty miles per hour (40 mph) W = the width of the pavement offset WS = L S = the design speed in mph L = the length of the taper All required utilities located within the portion of the street being built, shall be installed during construction. Half-Street construction may also require the upgrading of existing utilities if said upgrading was necessary for the proposed development. The unfinished side of the Half-Street shall be finished with temporary curbing, shoulders, clear zones, guardrail, slope treatments, and drainage accommodations to assure proper drainage, bank stability, and traffic safety. When Half-Streets connect to an intersection, the nearest corner of the intersection on the side being improved shall be designed and constructed for the full build-out of the street. The intersection design and construction shall include adequate improvements improvements to insure safe use by pedestrians, bicycles, and vehicles. WS2 60 12/21/2009 ............................................ Design Standards.............................................. Page 10-7 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.02 Street Geometry For in-depth design information on the following criteria, please reference the AASHTO Manual “A Policy on Geometric Design of Highways & Streets,” latest adopted edition. 10.02.1 Minimum Horizontal Curve Radius Horizontal curves shall be designed to provide the minimum radii required for vehicles to safely negotiate a turn without leaving their driving lane and shall in no case violate minimum sight distance requirements. Minimum radii are established by the design speed of the street on which the curve is located and are listed in Table 10-1. On arterials and rural collectors these radii may be reduced by superelevating the road cross-section. 10.02.2 Tangents Between Reverse Curves Sections of straight roadway must be designed between curves to avoid quick left-right transitions that could potentially lead to loss of vehicular control. The length of these straight sections should be a minimum of one hundred fifty feet (150’) for arterials and collectors and one hundred feet (100’) for local residential streets. Where reversing curves are superelevated, tangents between curves shall be of sufficient length to accommodate transitions into and out of the superelevated sections. 10.02.3 Superelevations The process of superelevating a street provides a constant cross slope from one edge of the roadway to the other. This allows vehicles to travel around a turn at a higher speed than would be possible if the road were a normal crown cross section. Superelevations are allowed only on arterials and rural collectors. The maximum superelevation rate allowed for these streets is eight percent (8%) and requires a design speed of thirty-five miles per hour (35 mph) or greater. 10.02.4 Vertical Grades Vertical Grades, the amount of slope of a street in the direction of travel, is limited to a maximum of six percent (6%) for Arterials and eight percent (8%) for all other streets. All street sections shall maintain a minimum of one-half percent (0.5%) vertical grade. Vertical grades may be increased up up to ten percent (10%) for non-arterials upon approval of the City Engineer. The City Engineer shall consider the public benefit of any deviation request including the classification of the roadway, traffic circulations, traffic congestion, emergency access, adjacent property access, length of grade, impact to public utilities, or any operational or safety factors. Deviations to the vertical street grade of a classified roadway shall generally not be granted unless it can be demonstrated that the public benefits significantly outweigh any potential detriments. If approved, grades between eight percent (8%) and ten percent (10%) may trigger the additional following design considerations: • Increased travel lane widths • Enhanced Paving Section • Incorporation of Separated Multi-use trail • Incorporation of Median Islands • Enhanced Intersection/Signal Improvements 12/21/2009 ............................................ Design Standards.............................................. Page 10-8 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.02.5 Vertical Curves Vertical curves are required where a change in vertical alignment equals or exceeds a one percent (1%) algebraic grade difference. Crest vertical curves shall be designed to provide the required minimum stopping sight distance for the streets design speed as listed in Table 10-2 of Section 10-03. Sag vertical curve lengths shall be designed to provide headlight sight distance equal to or greater than the design speed stopping sight distance. All vertical curves must be symmetrical, parabolic, and meet AASHTO standards. The following formula provides the information necessary to calculate minimum lengths for sag vertical curves. A = algebraic grade difference, %; L = ⎟⎠⎞ ⎜⎝⎛ + − A 2S 400 3.5S S = stopping sight distance, ft; L = length of sag vertical curve, ft 10.02.6 Cross Slopes City streets shall be crowned in the middle to provide drainage to the gutter line or roadside ditches. The cross slopes created by this crown shall be two percent (2%) for local streets and three percent (3%) for collectors, arterials, and roads with vertical grades of greater than six percent (6%). Collectors and arterials shall have steeper cross slopes since the higher speeds associated with these roads require that water drain more quickly from the roadway to avoid hydroplaning. 10.02.7 Posted and Design Speed For design purposes, the “Posted Speed” for any given street segment shall be as designated in Table 10-1 or the existing signed speed limit, whichever is greater. For design purposes, the “Design Speed” for any given street segment shall be ten miles per hour (10 mph) greater than the Posted Speed for arterials and five miles per hour (5 mph) greater than Posted Speed for non-arterials as designated in Table 10-1. 10.02.8 Right of Way The required right-of-way will depend upon the width of the street and other improvements. Excluding cul-de-sacs, the typical requirement is for the right-of-way to extend a minimum of ten feet (10’) behind the curb line on each side of the street. Additional right-of-of-way may be required for bike/pedestrian trails and/or storm facilities, for example. Right-of-way requirements may be variable within a street corridor due to intersections, turn lanes, bus loading zones, and other street features. Right-of-way shall be conveyed to the City on a recorded plat or by a right-of-way dedication or separate instrument. The minimum right-of-way requirements for the various street classifications are listed in Table 10-1. 10.02.9 Roadway Width (Travel Way) The roadway width or travel way consists of inside through lanes and/or curb lanes, center turn lanes and/or bike lanes (where required), and curb and gutter. Special cases may also require acceleration and deceleration lanes and right and left turn pockets. Total roadway width is measured from the face of curb to the face of curb. 12/21/2009 ............................................ Design Standards...................................... ........ Page 10-9 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.02.9.1 Inside Through Lanes and Curb Lanes The street classification and the amount of existing and projected traffic will determine the number of lanes required for a street. Curb lanes or outside lanes on all streets excluding residential collectors and local and rural residential streets shall be a minimum of fourteen feet (14’) wide. Streets will be widened to include inside through lanes based on street classifications and/or projected traffic volumes. The minimum width for inside through lanes shall be eleven feet (11’). 10.02.9.2 Center Turn Lanes Center turn lanes will be required on principal and minor arterials. They may also be required on collectors depending upon the nature of the roadway and the number of left turn movement opportunities along the corridor. Center turn lanes shall be a minimum of eleven feet (11’) wide. 10.02.9.3 Other Lanes Acceleration and deceleration lanes may be required for sites located on arterials where heavy volumes and/or heavy truck movements into and out of the the site would impact the speed and safety of the arterial. Left turn and right turn pockets may be required at intersections with large numbers of left and/or right turns. Left turn pockets shall be a minimum of eleven feet (11’) wide with right turn pockets a minimum of fourteen feet (14’) wide. 10.02.9.4 Road Edge All urban roads within the City of Auburn shall be designed using concrete curb and gutter (WSDOT Plan F-10.12-00, Traffic Curb & Gutter). Rural roads within the City may be designed with a gravel shoulder (minimum of 2⅝” Crushed Surfacing Top Coarse (CSTC) over eight inches (8”) of “gravel base”; eight feet (8’) wide for rural collectors and three feet (3’) wide for rural residential) and a ditch for drainage. Rural roads shall also meet AASHTO standards for a clear zone between the edge of pavement and any obstructions. 10.02.9.5 On-Street Parking On-Street parking requirements shall be as designated in Table 10-1. For Local Residential streets where parking is allowed on one side only, the City shall require the parking to be placed on the side of the street that can accommodate the most parking. Parking is not allowed at any of the following locations: 1. Within 20 feet of an uncontrolled intersection measured from the point of tangency on the entering curb radius. 2. Within 30 feet of a stop, yield or signal controlled intersection measured from the point of tangency on the entering curb radius. 3. Within any intersection. For “T” intersections, the no parking limits shall apply to both sides of the through street (top of the “T”). See Figure 10-0. 4. In front of or within 15 feet of each side of a fire hydrant. 5. In front of or within 5 feet of each side of a driveway. 6. Where mid-block crosswalks are installed, no parking shall be allowed on either side of the street within 50 feet in advance of the nearest edge of the crosswalk 12/21/2009 ............................................ Design Standards........................ .................... Page 10-10 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) and within 20 feet past the furthest edge of the crosswalk. In no case shall the advance parking restriction for crosswalks be less than the minimum stopping sight distance of the roadway. Additional parking restriction may be required depending upon roadway geometrics, adjacent land use, and the proximity to bridges and railroads. 10.02.9.6 Intersection Curb Radii The minimum right-of-way requirements for the various curb radii shall be as designated in Table 10-1. At intersections with two different street classifications, the highest classification for curb radii shall be used except at intersections with residential streets where the lowest order street. 10.02.10 Street Layout An efficient transportation system seeks to spread vehicle movements over a series of planned streets. The goal of the system is to encourage connectivity while preventing unacceptably high traffic volumes on any one street. Ample alternatives should exist to accommodate access for emergency vehicles. For these reasons the City will continue to plan a series of arterials and collectors designed to national standards to provide efficient service to the community. Ample alternatives should also exist to accommodate non-motorized transportation on arterials, collectors and local roads within and between subdivisions. 10.02.10.1 Local Residential Streets The internal local residential street network for a subdivision should be designed to discourage regional through traffic and non-residential traffic from penetrating the subdivision or adjacent subdivisions. Local residential streets shall not exceed one thousand three hundred feet (1,300’) in length between intersections and shall not serve more than 75 dwelling units. Residential subdivisions should be planned in a manner that minimizes the number of local street accesses to arterials and collectors. Residential subdivisions with greater than 75 lots shall have a minimum of two accesses to either an arterial or collector. Residential subdivisions developments with less than 75 lots shall have at least one access to an arterial or collector. Residential subdivisions with between 25 and 75 lots shall also provide a second emergency vehicle access route to an arterial or collector. 10.02.10.2 Other Streets New streets and/or new street systems, other than local residential streets serving residential subdivisions, shall be configured in conformance with the City’s comprehensive plan guidelines and policies. Where the comprehensive plan lacks clear guidance to address a particular situation, the City may require traffic studies and other supporting analysis to help define the configuration and nature of the planned street system. 10.02.10.3 Cul-de-sacs Where possible, streets shall be planned, designed and constructed to connect to future developments. All dead-end streets shall end in either a temporary or permanent cul-de-sac. Permanent dead-end streets or cul-de-sacs will only be allowed where a through street to connect adjacent properties and/or other streets is not needed or possible. Dead-end streets shall not be more than six hundred feet (600’) in length as measured from the center of the nearest intersection, unless the city determines that due to topography or existing development patterns there are no 12/21/2009 ............................................ Design Standards............................................ Page 10-11 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) feasible alternatives and emergency services can be effectively provided. Dead end streets ending in permanent cul-de-sacs shall serve a maximum of 25 dwelling units. When applicable, non-motorized paths shall be provided at the end of the street to shorten walking distances to an adjacent arterial or public facilities including, but not limited to, schools or parks. Existing stub-end streets that are greater than eight hundred feet (800’) in length shall be linked to other streets whenever the opportunity arises, unless it can be demonstrated that such connections would lead to a substantial rerouting of through traffic onto the street. Dead-end streets longer than eight hundred feet (800’) as measured from the center of the nearest intersection shall not be allowed to serve substantial new development. 10.02.10.3.1 Temporary Cul-de-sacs Temporary cul-de-sacs may be provided only when there is a plan for extending the street. Temporary cul-de-sacs shall have a paved surface with a diameter of sixty-five feet (65’). A sign shall be posted at the back of the temporary cul-de-sac stating that the road is planned to be extended in the future and to contact the City of Auburn Public Works Department for further information. 10.02.10.3.2 Permanent Cul-de-sacs Permanent cul-de-sacs shall have a paved surface with a diameter of seventy-five feet (75’) unless otherwise directed by the City. Permanent cul-de-sacs right-of-way shall have diameter of ninety feet (90’) unless otherwise directed by the City. 10.02.10.4 Traffic Volumes Projected trip generation shall be calculated based on the current edition of the Institute of Transportation Engineers (ITE) Trip Generation Manual. Stub end streets shall not be linked to a new street if the connection is likely to result in traffic volumes that will exceed acceptable volumes for the road’s classification. These volumes are defined in Table 10-1 of these standards. Consideration may also be given to the character and nature of the neighborhoods proposed to be connected. 10.02.11 Figure 10-0 -T-Intersection Parking Restrictions 12/21/2009 ............................................ Design Standards............................................ Page 10-12 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.03 Sight Distance Sight distance is defined as the length of roadway ahead that is visible to the driver. All roads, intersections, and access pointes should be designed to provide sight distance of sufficient length that drivers can control the operation of their vehicles to avoid striking an unexpected object in the traveled way. 10.03.1 Sight Distance Design The requirements for stopping sight distance and intersection sight distance listed in this section were taken from AASHTO’s “A Policy on Geometric Design of Highways and Streets” manual as a quick reference guide and are for passenger cars on level roadways. Deviations from City design standards may require additional sight distance study and documentation. Sight distance design calculations will also be required for design grades not listed in the tables below. 10.03.1.1 Stopping Sight Distance Stopping sight distance is the distance required at every point along a roadway for a vehicle traveling at or near the road’s design speed to come to a stop before reaching a stationary object in its path. Table 10-2 contains the minimum design values that shall be used for stopping sight distance. In calculating stopping sight distance, the driver’s eye is assumed to be three and a half feet (3.5’) above the roadway and the height of the object to be seen by the driver is assumed to be two feet (2’) above the roadway. 10.03.1.2 Intersection Sight Distance Intersection sight distance is the clear sight distance necessary for a driver entering a controlled or uncontrolled intersection to proceed safely without impeding traffic. Table 10-2A contains the minimum design values that shall be used for intersection sight distance. The City Engineer may require the use of single unit of combination trucks as the design vehicle for minor road approaches with five percent (5%) or greater heavy vehicle volumes. 10.03.1.2.1 Major Road and Minor Road For the purposes of intersection sight distance analysis, the Minor Road shall be defined by any of the following criteria: 1. The controlled approaches of a Two-Way Stop Controlled Intersection. 2. The roadway with lower classification, lower design speed of lower traffic volumes. 3. For uncontrolled intersections of similar classification, design speed and volume roadways, the City Engineer shall designate the minor roadway. 4. Minor Roads include driveways, alleys, access tracts or any other location accessing a public road. 10.03.1.2.2 Sight Triangles Intersection, driveway, and access point sight distances are analyzed using the applicable sight triangles per Figures 10-1 and 10-2. These sight triangles shall be provided on site plans including landscaping and other potential sight obstructions for all projects where intersections, driveways or access points are being installed 12/21/2009 ............................................ Design Standards............................................ Page 10-13 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) or modified. Additionally, the City Engineer may require supporting documentation for vertical sight distance profile analysis on street grades over three percent (3%). 10.03.1.2.2.1 Measurements Horizontal: Horizontal legs of the sight distance triangles on the major road are measured along the roadway centerline. Major road vertex points are placed at the midpoint of the traveled lane closest to the approach being analyzed. Minor road vertex points are placed in accordance with following applicable sections for uncontrolled and controlled intersections. Vertical: In calculating vertical sight distance at intersections the driver’s eye is assumed to be three and a half feet (3.5’) above the roadway surface and the object to be seen is three and a half feet (3.5’) above the surface of the intersecting road. 10.03.1.2.2.2 Restrictions The area within the sight distance triangle must be free from any sightobscuring objects from between three feet (3’) and eight feet (8’) above the ground. Sight-obscuring objects include but are not limited to: buildings, parked vehicles, signs, fences, and landscaping. 10.03.1.2.2.3 Right-of-Way Requirements The sight distance triangle shall be located completely within the City right-ofway. The City will require a right-of-way dedication as a condition of development approval to ensure the sight distance triangle is contained completely within the City right-of-way. If the City Engineer determines that this is not practical a “Sight Distance Easement” shall be required. 10.03.1.2.3 Uncontrolled Intersections For uncontrolled intersections (intersections without signals, stop signs or yield signs) the sight distance triangle dimensions are determined by applying the applicable distances listed in Table 10-2A to the respective legs of the sight distance triangle as shown on Figure 10-1. 10.03.1.2.4 Two Way Stop Controlled Intersections In calculating intersection sight distance for Two Way Stop Controlled intersections the vertex (decision point) of the sight triangle on the minor road shall be measured fourteen and a half feet (14.5’) back from the nearest edge of the traveled roadway. Where parking is allowed on the major road this distance shall be measured from the far edge of the parking lane. Left turns from the minor road: Using Figure 10-2 sight triangles for traffic approaching from both the left and right should be provided using the value in Table 10-2A that corresponds to the major road design speed. Right turns from the minor road: Using Figure 10.2 a sight distance triangle for traffic approaching from the left should be provided using the value in Table 10-2A that corresponds to the major street design speed. 10.03.1.2.5 All Way Stop Controlled Intersections At All Way Stop Controlled intersections, the first stopped vehicle on one approach should be visible to the drivers of the first stopped vehicles on each of the other approaches. 12/21/2009 ................................... ......... Design Standards............................................ Page 10-14 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.03.1.2.6 Signalized Intersections At signalized intersections the first stopped vehicle on one approach should be visible to the drivers of the first stopped vehicles on each of the other approaches. Left-turning vehicles should have sufficient sight distance to complete left turns. Additionally, if right turns on a red signal are permitted from any approach then the appropriate sight triangle should be provided to accommodate right turns on that approach. 10.03.1.3 Decision Sight Distance Decision sight distance is used in cases where the driver is required to detect unexpected or confusing situations and then make appropriate changes in their driving style or method. This could mean changing lanes, slowing down, or coming to a complete stop. Decision sight distance will need to be addressed when designing roads with tight turns and unexpected driveway and street connections. When decision sight distance requirements are applicable, the guidelines presented in the latest edition of AASHTO shall be used. used. 10.03.1.4 Passing Sight Distance Passing sight distance should be addressed when designing two (2) lane roads where vehicle speeds can differ by a considerable amount depending on the driver. When passing sight distance requirements are applicable, the guidelines presented in the latest edition of AASHTO shall be used. 12/21/2009 ............................................ Design Standards............................................ Page 10-15 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.03.2 Table 10-2 Stopping Sight Distance Stopping Sight Distance (ft) Downgrades* (Equation 10-2) Upgrades* (Equation 10-2) Design Speed (MPH) Level Roads (Equatio n 10-1) 3% 6% 8% 10 % 3% 6% 8% 10% 15 80 80 82 84 86 75 74 73 72 20 115 116 120 124 128 109 107 105 104 25 155 158 165 170 176 147 143 141 139 30 200 205 215 223 232 200 184 181 178 35 250 257 271 282 294 237 229 225 220 40 305 315 333 347 363 289 278 272 267 45 360 378 400 418 438 344 331 324 317 50 425 446 474 495 520 405 388 379 370 55 495 520 553 579 609 469 450 438 428 60 570 598 638 669 705 538 515 501 489 Equation 10-1: (Grades < 3%) a d Vt V 2 = 1.47 +1.075 Equation 10-2 (Grades ≥ 3%) ⎟ ⎟⎠ ⎞ ⎜ ⎜⎝ ⎛ ± ⎟⎠⎞ ⎜⎝⎛ = + a G d Vt V32.2 30 1.47 2 d = stopping sight distance, ft. V = design speed, mph a = deceleration rate of 11.2ft/s2 t = brake reaction time, 2.5s G = percent grade divided by 100 Data for this table was taken from the 5th edition of AASHTO’s “A Policy on Geometric Design of Highways and Streets” manual, Exhibit 3-1 Stopping Sight Sight Distance and Exhibit 3-2 Stopping Sight Distance on Grades. *Use Equation 10-2 above to calculate appropriate stopping sight distances for grades not shown. 12/21/2009 ............................................ Design Standards............................................ Page 10-16 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.03.3 Table 10-2A Intersection Sight Distance Intersection Sight Distance, (ft) Uncontrolled Intersections* Use Figure 10-1 Two Way Stop Controlled Intersections** Use Figure 10-2 (Equation 10-3) Design Speed (mph) Dimensions “a” and “b” Dimension “a” for Left Turns (Table10-2C) Dimension “a” for Right Turns (Table 10-2D) 15 70 170 145 20 90 225 195 25 115 280 240 30 140 335 290 35 165 390 335 40 195 445 385 45 220 500 430 50 245 555 480 55 285 610 530 60 325 665 575 Equation 10-3: major g ISD = 1.47V t ISD = intersection sight distance (length of the leg of sight distance triangle along the major road) (ft) major V = design speed of major road (mph) g t = time gap for minor road vehicle to enter the major road(s) Data for this table was taken from the 5th edition of AASHTO’s “A Policy on Geometric Design of Highways and Streets” manual’s Exhibit 9-51 Length of Sight Triangle Leg-No Intersection Control, Exhibit 9-55 Design Intersection Sight Distance-Left Turn from Stop, and Exhibit 9-58 Design Intersection Sight Distance-Right Turn from Stop and Crossing Maneuver. * Where grade along an uncontrolled intersection approach exceeds 3%, the leg of the clear sight triangle along that approach should be adjusted by multiplying the sight distance listed in this table by the appropriate adjustment factor in Table 10-2B. ** Intersection sight distance shown is for a stopped passenger car to turn onto a two-lane road with no median and grades of three percent (3%) or less. For other conditions, the time gap ( ) will need to be adjusted per Tables 10-2C /10-2D and the sight distance recalculated. g t *** Refer to the latest edition of the AASHTO manual for sight distance requirements on major street left turns and at yield controlled intersections. 12/21/2009 ............................................ Design Standards............................................ Page 10-17 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.03.4 Table 10-2B Uncontrolled Intersection Sight Distance Adjustment Factors Adjustment Factors Approach Design Speed (mph) Grade (%) 15 20 25 30 35 40 45 50 55 60 -10 1.1 1.1 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 -8 1.1 1.1 1.1 1.1 1.1 1.2 1.2 1.2 1.2 1.2 -6 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.2 1.2 1.2 -5 1.0 1.0 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 -4 1.0 1.0 1.0 1.1 1.1 1.1 1.1 1.1 1.1 1.1 -3 to 3 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 4 1.0 1.0 1.0 1.0 1.0 0.9 0.9 0.9 0.9 0.9 5 1.0 1.0 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 6 1.0 1.0 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 8 1.0 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 10 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 Note: Apply adjustment factor to sight distance measurement for each approach. Data for this table was taken from AASHTO Exhibit 9-53. 10.03.5 Table 10-2C Time Gap for Left Turns Design Vehicle Time gap( g ) (seconds) at design speed of major road t Passenger Car 7.5 Single Unit Truck 9.5 Combination Truck 11.5 Note: Time gaps are for a stopped vehicle to turn left onto a two-lane roadway with no median and grades 3 percent or less. Table 10-2A values require adjustments as follows: For Multilane roads: For left turns onto two-way highways with more than two lanes add 0.5 seconds for passenger cars and 0.7 seconds for trucks for each additional lane, from the left, in excess of one, to be crossed by the turning vehicle. For minor road approach grades: If the approach grade is an upgrade that exceed 3 percent; add 0.2 seconds for each percent grade for left turns 12/21/2009 ............................................ Design Standards............................................ Page 10-18 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.03.6 Table 10-2D Time Gap for Right Turns Design Vehicle Time gap( ) (seconds) at design speed of major road g t Passenger Car 6.5 Single Unit Truck 8.5 Combination Truck 10.5 Note: Time gaps are for a stopped vehicle to turn right onto or cross a two-lane roadway with no median and grades 3 percent or less. Table 10-2A values require adjustments as follows: For Multilane roads: For crossing a major road with more than two lanes add 0.5 seconds for passenger cars and 0.7 seconds for trucks for each additional lane to be crossed and for narrow medians that cannot store the design vehicle. For minor road approach grades: If the approach grade is an upgrade that exceed 3 percent; add 0.1 seconds for each percent grade for left turns 12/21/2009 ............................................ Design Standards............................................ Page 10-19 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.03.7 Figure 10-1 Intersection Sight Triangles for Uncontrolled Intersections 12/21/2009 ............................................ Design Standards............................................ Page 10-20 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.03.8 Figure 10-2 Intersection Sight Triangles for Two-Way Stop Controlled Intersections 12/21/2009 ............................................ Design Standards.................................... ........ Page 10-21 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.04 Street Access Points All access points to and from City streets, including intersections and driveways, shall be approved by the City prior to construction. These access points shall meet all the requirements contained throughout this chapter for sight distance, spacing, and other safety considerations. The following section contains design criteria on all access points including street intersections and driveways. These criteria are minimum values and may need to be modified according to safety factors, traffic volumes (existing and/or projected), topography, design speed, design vehicle requirements, drainage, and other conditions, both existing and projected. 10.04.1 Public Street Intersections Public Street Intersections are intersections where two (2) or more City streets intersect. These intersections shall be designed using the following criteria: 10.04.1.1 Intersection Spacing Public street intersections shall meet the minimum centerline spacing requirements as shown in Table 10-3. 10.04.1.2 Horizontal Approach Angle The horizontal approach angle of public street intersections shall be between 85° and 95° at the centerlines of intersecting streets. 10.04.1.3 Intersection Approach Offsets Public Street intersections shall be aligned so that opposing single left turn lanes and through lanes are not offset more than four feet (4’) as measured from the lane centerline approach tangent. 10.04.1.4 Curb and Right-of-Way Radius A minimum curb radius is required at intersection corners for vehicles to safely execute a right turn at a reasonable rate of speed without crossing lanes or encroaching onto the adjacent curb. At intersections of differing street classification, the higher classification street curb radius requirements shall be used. The exception to this rule is for local residential streets where the minimum radii listed in Table 10-1 shall be used. The right-of-way radius is the additional radius required to install sidewalks, landscape strips, and other roadway appurtenances. Additional right-right-ofway may be required near intersections to accommodate auxiliary traffic lanes and equipment for existing or future traffic signals and street lights. These minimum values and listed in Table 10-1. 10.04.1.5 Landing Approach The landing approach is a defined segment of the street before the intersection and is measured back from the point of tangency of the curb radius on each approach to the intersection. The requirements for minimum landing approach length and maximum landing approach grade are listed in Table 10-1. 12/21/2009 .................... ........................ Design Standards.........................................Page 10-22 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.04.1.6 Street Crowns Public street intersections shall be designed to drain away from the higher classification street. Grades shall match at the center of intersections for equal classification streets. At intersections of differing classification streets the crown shall be carried through the intersection for the higher classification. 10.04.2 Private Street Intersections Private street intersections are those intersections where a private street intersects a City street. These intersections shall be designed in the same manner as public street intersections, except that the private streets will be stop-controlled. 10.04.3 Table 10-3 Minimum Intersection Spacing from Centerline to Centerline (ft) PRINCIPAL ARTERIAL MINOR ARTERIAL RESIDENTIAL & NONRESIDENTIAL COLLECTORS RURAL COLLECTOR LOCAL STREETS 5001 5001 250 250 125 LOCAL STREETS 1320 1320 500 500 250 RURAL COLLECTOR 2640 1320 500 500 250 RESIDENTIAL & NONRESIDENTIAL COLLECTORS 2640 2640 1320 1320 5001 MINOR ARTERIAL 2640 2640 2640 1320 5001 PRINCIPAL ARTERIAL Notes: 1. Local streets shall generally not be allowed to access directly onto arterials. 2. Refer to section 10.03 for intersection sight distance requirements. 3. Refer to section 10.05 for intersection pedestrian accessibility requirements. 12/21/2009 .................. .......................... Design Standards.........................................Page 10-23 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.04.4 Driveways See Standard Detail TRAFFIC-07 through TRAFFIC-11 Driveways can be broken into the following classifications: A. Residential Driveways – Driveways to single family residences. B. Commercial/Industrial Driveways – Driveways to all properties except single family residential. C. Temporary Driveways – Driveways to property allowed prior to and during construction only. D. Emergency Driveways – Driveways required by the fire department to provide an alternative emergency-only access to the property. E. Signalized Driveways – For special circumstances when no other option is available, the City may allow signalized access to a public street from a private access. In such situations, dedication to the City of any right-of-way necessary for maintaining and operating the intersection will be required. Additional mitigation measures may be required to ensure safe and efficient access to the public street. The private leg of the intersection within the right-of-way shall be designed to the applicable public street standard as determined by the City. 10.04.4.1 Driveway Locations Most properties shall be limited to one driveway access to a City street (or alley). Multiple driveway accesses to a street (or alley) shall only be allowed when the City determines that the second access does not create a safety concern or impede traffic flow. To address safety or to mitigate impacts of traffic flow, the City may require two or more contiguous non-single family properties to share a single driveway, and/or require the driveway to be located on the lowest classification of street (or alley) when a property has frontage on two or more streets (or alleys). Driveway accesses within the “Functional Intersection Boundary” shall be either prohibited or restricted in conformance with Section 10.04.4.1.1 below. The City may also impose driveway restrictions at other locations when a safety hazard is identified or to mitigate impacts of traffic flow along a classified street. Such restrictions shall be incorporated into the design of the driveway in conformance with the provisions of Section 10.04.4.5 in a manner that strives to maintain existing access turning movements to other properties in the vicinity. Redeveloped properties are not guaranteed that their existing driveways will be retained. Redeveloped properties that meet the requirements for half street improvements, have more than one access point, or do not meet current City standards may be required to eliminate, relocate or modify existing driveway access/accesses. Except for Local Residential Streets the spacing of driveways and their separation from intersections shall meet the minimum “Functional Intersection Boundary” distances of this Chapter. 12/21/2009 ............................................ Design Standards....................... ..................Page 10-24 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.04.4.1.1 Function Intersection Boundary See Table 10-4 and Figure 10-3 The functional intersection boundary is the portion of the street leading up to the intersection required to allow vehicle movements and storage. This is the area within which drivers identify the situation, change lanes, come to a stop, and wait before proceeding through the intersection. Driveways shall be either prohibited or restricted within the functional intersection boundary in accordance with Table 10-4 and Figure 10-3.The functional length of an intersection is measured from the point of curvature/point of tangency (PC/PT) of the curb return. Driveway restrictions include prohibiting either all left turn movements, left turns out of, or left turns into the subject driveway. 10.04.4.1.2 Table 10-4 *Distance Requirements for Functional Intersection Boundaries Speed mph Speed ft/sec Reaction Time (sec) Decision Distance (ft) ”d1” Lane Change Distance (ft) ”d2” Braking Distance (ft) ”d3” Storage Length (ft) ”d4” Functional Intersection Boundary Length d1+d2+d3+d4 (ft) 25 mph 37 1 37 25 60 50 222 30 mph 44 1 44 40 86 50 270 35 mph 51 1 51 60 118 100 329 40 mph 59 1 59 85 154 100 398 45 mph 66 1 66 105 194 100 465 50 mph 73 1 73 140 240 100 553 10.04.4.1.3 Figure 10-3 Functional Length Diagram of an Intersection with Right and/or Left-Turn Lane 12/21/2009 ............................................ Design Standards.........................................Page 10-25 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.04.4.1.4 Figure 10-4 Functional Intersection Boundary Restricted Access Diagram 12/21/2009 ............................................ Design Standards.........................................Pag e 10-26 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.04.4.2 Driveway Lay Out See Standard Detail TRAFFIC-11 Driveways shall be designed in such a manner as to allow for efficient and safe ingress and egress from the City streets. Driveways and on-site parking, other than that for single-family residences on unclassified roads or alleys, shall be designed such that vehicle-backing maneuvers will not occur onto the street. A properly designed driveway shall allow the largest typical vehicle that will use the driveway (i.e. tractor-trailers at large warehouses, delivery trucks at mini marts) to enter and exit the site without encroaching into opposing traffic. Driveways for adjacent properties should be separated by a minimum of ten feet (10’) for residential and fifty feet (50’) for commercial/industrial. This distance should be measured from the outside edge of the driveway apron. When this separation is not obtainable, a single driveway centered on the property line may be required. When designing site layout and driveway access, internal circulation shall shall be such that on-site traffic will not backup the driveway impeding vehicles in the public street. The City may require sites with internal traffic congestion to design driveways with long throat lengths to provide extra storage to avoid impacting City streets. 10.04.4.3 Driveway Alignment (Horizontal and Vertical) The angle of driveway throats to the City streets shall not be less than eighty-five degrees (85°) unless a “pork chop” or other access control device is allowed to be utilized per Section 10.15. The vertical grade behind the driveway shall not exceed five percent (5%) for a distance of 12 feet (12’) beyond back of sidewalk or right of way line. Driveways shall be designed to preclude vehicles from dragging when entering or exiting the site. Driveways shall meet all sight distance requirements per Section 10.03. 10.04.4.4 Driveway Widths 10.04.4.4.1 Residential See Standard Detail TRAFFIC-07 & 08 Residential driveways shall be used when serving four (4) or fewer living units. Driveway widths widths shall be a minimum of ten feet (10’) and a maximum of twenty-four feet (24’). Residential driveways shall be constructed using a minimum thickness of six inches (6”) of non-reinforced concrete. 10.04.4.4.2 Commercial/Industrial See Standard Detail TRAFFIC-09 & 10 Commercial and industrial driveway widths shall be based on the number of lanes used on the driveway and the type of use. Commercial driveways shall be constructed using a minimum thickness of eight inches (8”) of reinforced concrete The three categories described below will be determined based on the vehicles expected to use the site. A. Light commercial/industrial driveways should be used for sites where the average vehicle use will range from passenger vehicles to small size delivery trucks. Examples include mini marts, strip malls, fastfood restraints, triplexes, and small apartment buildings. Driveways will have one entering lane and up to two exiting lanes with the lane widths restricted to a maximum of twelve feet (12’). 12/21/2009 ............................................ Design Standards........................... ..............Page 10-27 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) B. Medium commercial/industrial driveways should be used for sites where the average vehicle use will range from medium to high volumes of passenger vehicles to multiple medium delivery trucks per day and the occasional large tractor/trailer delivery truck. Examples included supermarkets, large outlet stores, shopping malls, large apartment buildings, and busy retail stores located on arterials. Driveways will have one entering lane and up to two exiting lanes with the lane widths restricted to a maximum of fourteen feet (14’). C. Heavy commercial/industrial driveways should be used for sites where high volumes of medium to large tractor/trailer trucks enter and exit every day. Examples include manufacturing and storage warehouses. Driveways will have one entering lane and one exiting lane with the lane widths restricted to a maximum of sixteen feet (16’). Driveway uses discussed above may be subject to change based on the street classification on which they are located. For example: a site use that may normally fall under the light commercial/industrial classification may be upgraded to a medium commercial/industrial classification if it is located on a principal or minor arterial to facilitate moving vehicles off the right-of-way in a more efficient manor. 10.04.4.5 Restricted Access Driveways Restricted Access Driveways are used to restrict turning movements out of or into driveways. Turning restrictions at driveway locations shall be by one of the following methods as deemed appropriate by the City. A. Median Islands (Per Section 10.15.1) B. Traffic (“C”) Curbs (Per Section 10.15.2) C. Pork Chops (Per Section 10.15.3) D. Signing (Per Section 10.15.4) E. Pavement Markings (Per Section 10.15.5) 12/21/2009 ............................................ Design Standards.........................................Page 10-28 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.05 Sidewalks Sidewalk requirements vary by street classification and corridor/area specific standards as determined by the City. Sidewalks are required along both sides of all street classifications except for rural streets. 10.05.1 Sidewalk Widths See Standard Details TRAFFIC-23 & 24 Sidewalks shall be a minimum of five feet (5’) in width for all local residential and residential collector streets. Sidewalks shall be a minimum of ten feet (10’) in width for all principal arterials, minor arterials, non-residential collectors, and local non-residential streets. Non-standard widths of sidewalk greater than the standards identified above may be required to maintain continuity on existing corridors. All sidewalks shall have a minimum of five feet (5ft) of unobstructed width. 10.05.1.1 Downtown Auburn Sidewalk widths in the Downtown Urban Center Zone shall be a minimum of ten feet (10’) in width as measured from face of curb to face of building or Right-of-way. All sidewalks in the downtown zone shall maintain a minimum walking zone of five feet (5’) in width, free of all obstructions including utilities, signage, street trees, furniture or other elements, permanent or temporary. 10.05.2 Structural Section See Standard Details TRAFFIC-23 & 24 Sidewalks shall be a minimum of four inches (4”) thick concrete over two inches (2”) of Crushed Surface Top Course (CSTC). At driveway crossings the sidewalk section shall match that required for the driveway. When sidewalks are installed at the back of the curb, a thickened edge shall be provided as shown in City of Auburn Standard Details TRAFFIC 23 & 24. 10.05.3 Meandering Sidewalks The City Engineer may approve meandering sidewalks along a corridor when the sidewalk, landscaping, lighting, signing, right-of-way, and other surface features are integrated into the design of the improvements. Additional right-of-way (or an easement) may be required to accommodate the meander of the sidewalk and other surface features. 10.05.4 Accessibility All sidewalks shall be designed according to the Americans with Disabilities Act (ADA) guidelines. Cross slopes shall not exceed two percent (2%). Sidewalk grade shall not exceed the grade of the adjacent street centerline. 10.05.4.1 Curb Ramps See Standard Details TRAFFIC-25 & 26 Curb ramps shall be provided at all intersections and pedestrian crossings having vertical curb sections. Every curb ramp shall have at least one receiving ramp. In special conditions, curb ramps shall also be provided to enable passage across curbed radius return access points. All curb ramps shall have detectable warning patterns formed with manufactured truncated domes painted yellow. 12/21/2009 ............................................ Design Standards.........................................Page 10-29 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.06 Bikeways The City of Auburn bikeway standards are designed to ensure that bikeways are constructed in a manner that provides a safe and convenient network of interconnected routes for bicycling. Bikeways are any road, street path or way which in some manner is specifically designated for the exclusive use of bicycles or are to be shared with other transportation modes. Bikeway facilities shall be incorporated into development and transportation projects in accordance with the Future Trail and Bicycle Network plan adopted by the City of Auburn Comprehensive Transportation Plan. Bikeways shall be designed in accordance with AASHTO’s “Guide for the Development of Bicycle Facilities 1999,” the latest adopted edition of FHWA’s Manual on Uniform Traffic Control Devices (MUTCD), this section, and applicable City of Auburn standard details. 10.06.1 Bikeway Classifications The City of Auburn’s Future Trail and Bicycle Network consists of various classification bikeways. Typically, these bikeways are shared with other transportation modes, although they may be provided exclusively for bicycle use. Bikeways are categorized as follows: 10.06.1.1 Class I Bikeway Class I Bikeways are facilities shared with other non-motorized modes and are physically separated from motorized vehicle roadways. For the purposes of this section, Class I Bikeway design standards are for bicycle facilities that generally parallel a roadway with minimal crossflow by motor vehicles. It is designed and built primarily for use by bicycles, but may also be used by pedestrians, joggers, skaters, wheelchair users (both non-motorized and motorized), equestrians, and other nonmotorized users. When required, Class I Bikeways shall be designed for two-way traffic and meet the following minimum design criteria: 10.06.1.1.1 Width Standard Class I Bikeways shall include a fourteen foot (14’) paved section in accordance with Section 10.06.1.1.2. Minimum ten foot (10’) paved width. 10.06.1.1.2 Structural Section Minimum pavement section of six inches (6”) 6”) of gravel base, two inches (2”) of Crushed Surface Top Course (CSTC), and two inches (2”) of Class “B” asphalt concrete pavement. When the California Bearing Ratio (CBR) of the existing soil is less that five (5), an additional six inches (6”) of gravel base shall be required. When the trail is also utilized as a service road, the Class “B” asphalt concrete pavement section shall be increased to three inches (3”). 10.06.1.1.3 Geometrics Class I Bikeways shall closely conform to the grades of the adjacent street and meet the geometric design standards of AASHTO’s “Guide for the Development of Bicycle Facilities 1999”. 10.06.1.1.4 Buffer Class I Bikeways shall have a minimum five foot (5’) landscape buffer located between the bikeway and any adjacent street. 12/21/2009 ............................................ Design Standards.........................................Page 10-30 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.06.1.1.5 Driveway Crossings Where Class I Bikeways are intersected by driveways appropriate signing and pavement markings shall be provided consistent with MUTCD requirements for midblock crossings. 10.06.1.1.6 Ownership Class I Bikeways that are part of the City’s Future Trails and Bicycle Network shall be public and shall be located within the public right-of-way, tracts or easements. 10.06.1.2 Class II Bikeway Class II Bikeways, or “Bike Lanes,” are incorporated within the street right-of-way. Bike lanes are established on streets in corridors where there is a current of anticipated bicycle demand and where it would be unsafe for bicyclists to ride in travel lanes. Bike lanes shall be provided in accordance with the Future Trail and Bicycle Network plan pursuant to the City of Auburn Comprehensive Transportation Plan. Bike lanes are exclusive one-way bicycle facilities delineated by pavement markings and signing. Bicycle traffic is carried in the same direction as the adjacent motorized vehicle traffic. When required, bike lanes shall meet the following minimum design criteria: 10.06.1.2.1 Width Minimum six foot (6’) paved width as measured from nearest edge of the travel way to face of curb, edge of pavement, or edge of parking lane. 10.06.1.2.2 Structural Section Bike lanes shall have the same pavement cross-section as the adjacent street. 10.06.1.2.3 Geometrics Class II Bikeways, as part of the street section, shall follow the same geometric design standards. 10.06.1.3 Class III Bikeway Class III Bikeways, or “Shared Lane,” are facilities shared by bicyclists and motorized vehicles. Class III Bikeways will be utilized, in accordance with the Future Trail and Bicycle Network plan, on existing streets as interim bike corridors until a Class I or Class II facility can be provided. Class III Bikeways may or may not be delineated with shared use pavement markings and signage. Generally, lower-speed/lowervolume streets are adequate for bicycle travel, so additional signing and pavement markings for bicycle use are unnecessary. When required, Class III Bikeways shall meet the following minimum design criteria. 10.06.1.3.1 Width Minimum fourteen foot (14’) paved width as measured from laneline to face of curb, edge of pavement, or edge of parking lane. 10.06.1.3.2 Structural Section Class III Bikeways shall have the same pavement cross-section as the adjacent street. 10.06.1.3.3 Geometrics Class III Bikeways, as part of the street section, shall follow the same geometric design standards. 12/21/2009 ............................................ Design Standards.........................................Page 10-31 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.06.1.4 Class IV Bikeway Class IV Bikeways consist of all improved roadways unless otherwise designated as Class I, Class II, or Class III Bikeways. 10.06.2 Bikeways at Railroad Crossings Railroad-Bikeway grade crossings shall be designed as near perpendicular as possible. If rail crossing is less than forty-five degrees (45°), an additional paved shoulder of sufficient width shall be provided to permit the bicyclist to cross the track at a safer angle. Where this is not possible and train speeds are low, compressible flangeway fillers will be required. When not under City control the railroad owner shall be responsible for bicycle crossings. 10.06.3 Bikeways at Roundabouts Class I Bikeways at roundabouts shall be combined with the adjacent sidewalk, if applicable; to create a single shared use crossing through the roundabout zone. Class II and Class III Bikeways shall be terminated a minimum of sixty-five feet (65’) in advance of roundabouts using appropriate signing and striping with transitions to the adjacent pedestrian facilities which shall be enhanced through the roundabout zone, consistent with a Class I Bikeway, to accommodate the shared use with bicycles. 10.06.4 Bikeways at Signalized Intersections Class I Bikeway crossings at signalized intersections shall be combined with the adjacent sidewalk, if applicable, to create a single shared facility utilizing the protected pedestrian crossing at traffic signals. Class II and Class III Bikeways shall be provided an optional transition to the adjacent pedestrian facilities a minimum of fifty feet (50’) in advance of traffic signals using appropriate signing and striping. The adjacent pedestrian facility shall be enhanced to Class I Bikeway standards in advance of the transition point to accommodate the shared use through the intersection. 10.06.5 Bikeways at Unsignalized Intersections Class I Bikeway crossings at unsignalized intersections shall be combined with the adjacent sidewalk, if applicable, to create a single shared use crossing. Class II Bikeways shall be delineated in accordance with City of Auburn standard details and MUTCD bike lane requirements for intersections. 10.06.6 Bikeway Pavement Markings, Signing, and Striping Pavement markings, signing, and striping for bikeways shall be designed in accordance with City of Auburn standard details and Manual of Uniform Traffic Control Devices (MUTCD) requirements. 12/21/2009 ............................................ Design Standards.........................................Page 10-32 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.07 Pavement Design This section of the Standards has been prepared for engineers to use in the design of pavement sections for City streets. The use of the following information will ensure that paved transportation corridors are adequately built or improved in a uniform and consistent manner. The information contained in Table 10-5 has been established to minimize the structural failures in streets, due to traffic loadings and/or existing soils conditions. Engineers will be allowed to do their own pavement designs in accordance with the current AASHTO design procedure and the minimum City requirements supplied in Section 10.07.3. The pavement design information contained herein was established for a complete range of street and traffic conditions excluding principal arterials. It has been simplified so that extensive data and computer analysis is not necessary for developing pavement designs for most projects. A separate design study will be required for principal arterials and streets where the daily average traffic count is expected to exceed 15,000 vehicles per day and streets where unusually heavy truck and bus traffic is expected or encountered, such as freight routes and bus routes. Freight routes are defined in the “City of Auburn Comprehensive Transportation Plan”. Studies should be performed along the freight route to determine the vehicle mix and volumes. Pavement sections for freight routes are not defined in the following tables and need to be designed to accommodate anticipated volumes. 10.07.1 Design Requirements 10.07.1.1 Street Classification The classification of a particular street, (i.e. Residential Collector), can be obtained from the City of Auburn. The classification of a street will be required to determine the volume and mix of vehicles for which it is designed. In some cases where a street has yet to be designated a specific classification, street pavement should be designed based on the anticipated traffic volume. An anticipated daily traffic count can be obtained from the City of of Auburn for the street in question or a similar street that functions in the same manner. The City may, however, require the applicant to obtain additional traffic information, as warranted. 10.07.1.2 Street Subgrade For the purpose of pavement design, the California Bearing Ratio (hereafter referred to as CBR) will be used to classify the type of existing subgrade soils. CBR’s are used because most independent testing laboratories and geotechnical firms have the ability to provide CBR data. The scope of this section does not cover existing subgrade with a CBR less than “3”. When the CBR is less than “3”, a Geotechnical Design is required. The subgrade under the proposed street shall have its CBR evaluated by an independent testing laboratory or geotechnical firm. The existing subgrade shall then be classified as determined in the soils classification section (Section 10.07.3). The proposed roadway shall have a minimum of one CBR test for every 1,000 feet of road and/or for every obvious change in subgrade material (minimum of two (2) tests per street). 12/21/2009 .................................... ........ Design Standards.........................................Page 10-33 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) Prior to placing any street base material, the subgrade shall be rolled and compacted to a minimum of 95% of the maximum density as determined by ASTM D-1557 (Modified Proctor). Any sections of a roadway that exhibit “pumping” shall be removed to a depth where the pumping ceases and replaced with granular imported material that can be compacted to the required 95% of the maximum density as determined by ASTM-1557 without pumping, or as directed by a Geotechnical Engineer licensed in the State of Washington. If the existing subgrade is classified as a poor subgrade, then a geotextile fabric may be required on the subgrade prior to placing any subbase or base materials. The geotextile fabric shall be a woven, permeable fabric produced for placement in road bases. Other requirements for subgrade grading, including slopes and retaining wall, are covered in Chapter 5. 10.07.1.3 Street Pavement Sections Street pavement section requirements can be determined by using the pavement design chart in Section 10.07.2. The CBR obtained from the testing or geotechnical firm, the type and class of road from the City of Auburn, will assist in determining the appropriate chart column. A civil engineer licensed in the State of Washington may also design street pavement sections. However, the minimum allowable thickness of asphalt will be a two inch (2”) leveling course with a two inch (2”) overlay of class “B” asphalt. The maximum allowable thickness for a single lift of asphalt shall be two inches (2”) for Class “B” and four inches (4”) for Class “E”. Section 10.07.3 provides additional information on pavement design requirements. 12/21/2009 ..................... ....................... Design Standards.........................................Page 10-34 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.07.2 Pavement Section Design Chart The following chart contains the minimum allowed pavement design base on traffic volumes and CBR’s unless otherwise designed by a licensed civil engineer. Due to high traffic volumes and/or the large amount of truck and bus trips, Principal Arterials, bus routes, and/or freight routes, as designated by the City, are not included and shall be designed on a case-by-case basis. Poor Soils (CBR 3-5) Medium Soils (CBR 6-10) Good Soils (CBR 11-20) Excellent Soils (CBR >20) Private Streets Alleys Access Roads 2” CL “B” 5” CL “E” 12” Gravel Base 2” CL “B” 2” CL “E” 8” Gravel Base 2” CL “B” 2” CL “E” 6” Gravel Base 2” CL “B” 2” CL “E” 4” Gravel Base Local Residential Rural Residential 2” CL “B” 5” CL “E” 12” Gravel Base 2” CL “B” 2” CL “E” 8” Gravel Base 2” CL “B” 2” CL “E” 6” Gravel Base 2” CL “B” 2” CL “E” 4” Gravel Base Local Non-Residential 2” CL “B” 5” CL “E” 12” Gravel Base 2” CL “B” 4” CL “E” 8” Gravel Base 2” CL “B” 3” CL “E” 6” Gravel Base 2” CL “B” 2” CL “E” 4” Gravel Base Residential Collectors Rural Collectors 2” CL “B” 5” CL “E” 12” Gravel Base 2” CL “B” 4” CL “E” 10” Gravel Base 2” CL “B” 3” CL “E” 8” Gravel Base 2” CL “B” 2” CL “E” 6” Gravel Base Non-Residential Collectors 2” CL “B” 6” CL “E” 12” Gravel Base 2” CL “B” 5” CL “E” 10” Gravel Base 2” CL “B” 4” CL “E” 8” Gravel Base 2” CL “B” 3” CL “E” 6” Gravel Base Minor Arterials 2” CL “B” 8” CL “E” 12” Gravel Base 2” CL “B” 7” CL “E” 10” Gravel Base 2” CL “B” 6” CL “E” 8” Gravel Base 2” CL “B” 5” CL “E” 6” Gravel Base 12/21/2009 ............................................ Design Standards.........................................Page 10-35 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.07.3 Requirements for Engineered Pavement Sections Engineered pavement designs should follow the latest “AASHTO Guide for Design of Pavement Structures” for flexible pavements and be based on the following criteria: 10.07.3.1 Traffic Requirements For projects where a traffic analysis report was not required, to determine the amount of traffic for which a street should be designed, contact the City to obtain the most recent street classification and traffic counts. Traffic counts are done assuming there is a 50/50 split in the direction of traffic. One hundred percent of the 50/50 split must be assumed in the design lane, regardless of the number of lanes in each direction. (Additional traffic information may be required.) The existing traffic levels shall then be inflated to match the projected traffic at the end of the roadways design life (in most cases a twenty-year design life will be used). The rate of growth is one and a half percent (1.5%) for residential streets and three and a half percent (3.5%) for commercial/industrial streets and arterials streets. The one and a half percent (1.5%) growth can be waived in closed subdivisions with City approval. 10.07.3.2 Pavement Minimums For designers, the minimum allowable thicknesses of pavement sections are as follows: CL.“B” CL.“E” Gravel Base Minor Arterials 2” 5” 6” Residential/Rural Collectors 2” 2” 6” Residential Streets 2” 2” 4” Local Non-Residential 2” 2” 4” Class E asphalt may be replaced with crushed rock at a ratio of two to three (every two inches (2”) of asphalt may be replaced with three inches (3”) of crushed rock). At no time however shall asphalt be placed in less than a two inch (2”) thick lift. Geo-textile fabric may be required between the subgrade and the gravel base where soil conditions are poor. 10.07.3.3 Soils Classifications Prior to designing the pavement thickness, the soils condition of the area in which the road or street is to be built shall be evaluated and classified into one of the following four different categories in this this Section. These classifications and the tested soil properties shall then be used in the pavement design. 10.07.3.3.1 Poor Soils These soils are relatively soft and plastic when wet and may contain appreciable amounts of clays and silts. These soils would be classified as SC, ML, CL, OL, MH, CH, or as OH as per the Unified Soils Classification System. The CBR values for these materials range from 3 to 5. 12/21/2009 ............................................ Design Standards.........................................Page 10-36 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.07.3.3.2 Medium Soils These soils are relatively firm when wet and may contain some amounts of silt. These soils would be classified as SP, SM, or SC as per Unified Soils Classification System. The CBR value would range from 6 to 10. 10.07.3.3.3 Good Soils These soils retain a substantial amount of their load-bearing capacity when wet. These soils would be classified as GM, GC, SW, or SM as per the Unified Soils Classification System. The CBR value for these materials may range from 10 to 20. 10.07.3.3.4 Excellent Soils These soils are basically unaffected by moisture or frost. These soils would be classified as GW, GP, GM, GC, SW, or SM as per the Unified Soils Classification System. The CBR value for these materials would be greater than 20. 10.07.3.3.5 Unified Soils Classification Symbols GW: Well graded or gravel-sand mixtures with little or no fines. GP: Poorly graded gravels or gravel-sand mixtures with little or no fines. GM: Silty gravels or gravel-sand mixtures. GC: Clayey gravels or gravel-sand-sand-clay mixtures. SW: Well graded sands or gravelly sands with little or no fines. SP: Poorly graded sands or gravelly sand mixtures with little or no fines. SM: Silty sands or sand silt mixture. SC: Clayey sands or sand-clay mixtures. ML: Inorganic silts and very fine sands, rock flour, silty or clayey fine sands or clayey silty that are slightly plastic. CL: Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays, lean clays. OL: Organic silts and organic silt clays of low plasticity. MH: Inorganic silts, micaceous or diatomaceous fine sand or silty soils, elastic silts. CH: Inorganic clays of high plasticity, fat clays. OH: Organic clays of medium to high plasticity and organic silts. 10.07.3.4 Report Submittal The applicant must submit a roadway analysis report to the City of Auburn, including a narrative of the site conditions, the pavement sections, and applicable background information for review and approval. The report must detail data on how the design was achieved including information on the subgrade soils. (Note: The soils classification in Section 10.07.3.3 is not a substitute for tests to support soil capacity.) 12/21/2009 ............................................ Design Standards.........................................Page 10-37 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.07.4 Materials Specifications The following material requirements are referenced from the City of Auburn’s Engineering Construction Standards Manual and WSDOT Standard Specifications and are subject to change. For the most current definitions, please reference the Construction Standards Manual. 10.07.4.1 Gravel Base Gravel base shall be bank run gravel, defined as naturally occurring material having characteristics such that when compacted in place on the roadway, it will provide a course having greater supporting value than the subgrade on which it is placed. It shall be from a pit approved by the City Engineer and shall be specified in Division 9-03.10 of the WSDOT Standard Specifications. 10.07.4.2 Crushed Rock Crushed rock use in City street construction will fall under the following two classifications: A. Crushed Surfacing Top Course (CSTC) B. Crushed Surfacing Base Course (CSBC) CSTC and CSBC shall be in accordance with Section 9-03.9(3) of the WSDOT Standard Specifications. 10.07.4.3 Asphalt Concrete Pavement Asphalt use in City street construction will typically fall under the following two classifications: A. HMA Class “E” B. HMA Class “B” Asphalt Concrete Pavement shall be in accordance with WSDOT Standard Specifications and the City’s Engineering Construction Standards Manual. 10.08 Landscaping 10.08.1 General Landscaping Requirements An area devoted to landscaping is included within the right-of-way of all street classifications. This landscape strip is an integral part of the roadway cross-section. It serves several important functions, including improving pedestrian safety by providing a buffer between traffic and the sidewalk; providing the perception of a narrower travel corridor, thereby slowing traffic; improving air quality; and improving the aesthetic appearance of the street. The applicant shall design and install the landscape strip in accordance with these design standards. The proposed design shall be reviewed and approved by the City. Landscape strips are required for local residential streets and residential collector streets. The minimum width required for landscape strips is five feet (5’). Landscape strips shall be located between the back of the curb and the sidewalk. The applicant shall provide for and plant street trees within the landscape strip in accordance with these design standards. 12/21/2009 ............................................ Design Standards.........................................Page 10-38 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) Street trees are required for principal arterials, minor arterials, non-residential collectors, and local non-residential streets. Street trees shall be placed within the sidewalk in tree pits with tree grates and spaced in accordance with the standards identified in Section 10.08.5.1. 10.08.2 Landscape Strip Components Landscape strips contain several components. These include soil, the plants themselves, structural items such as root barriers and tree grates, and may include street furnishings such as luminaries, traffic signs, bus stops or shelters, benches, and mail boxes. 10.08.3 Landscape Strip Dimensions The roadway sections designate either five-foot (5’) or five and half-foot (5½’) wide landscape strips. 10.08.4 Plant Layers It is recommended that a multi-layer planting be used in the landscape strip. For instance, grass or a ground cover should be used at the ground level, low-growing shrubs may comprise the next layer, and trees form the upper or canopy level. Within this general framework are many choices, outlined in the Plant Selection section below. In summary, the landscape strip will contain the following layers: 1. Ground Cover(s) or Grass—Required 2. Shrubs with a mature height of three feet (3’) or less—Optional 3. Trees—Required 10.08.5 Trees 10.08.5.1 Placement and Spacing Trees shall be placed so that they do not obstruct the view of any street intersection, driveway, or visibility of any traffic control device or sign. Sight distance triangles shall be used to analyze visibility at street intersections. Trees shall be centered in the landscape strip. When a landscape strip is not required, trees shall be placed in tree pits with tree grates within the sidewalk per City of Auburn Standard Detail TRAFFIC-64. Trees will be spaced as follows, except where special site conditions require variation for safety or other reasons: Tree Size Height Recommended Spacing Landscape Strip Widths Small To 25 Feet 15 -20 Feet Apart 5 Feet Medium 25 -50 Feet 20 – 30 Feet Apart 5.5 -8 Feet Large 50 – 70 Feet 30 – 50 Feet Apart 8 – 12 Feet Very Large 70 Feet + 50 Feet or Greater 12 Feet + Nearby features such as buildings or overhead wires will also affect where trees should be located. Minimum size for street trees shall be a two inch (2”) caliper, measured two feet (2’) above the root ball. 12/21/2009 ............................................ Design Standards.........................................Page 10-39 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) Planting Next to a Building: Where a building is placed close to the sidewalk, the mature size of a tree should be considered when selecting species. Trees with a pyramidal, columnar, or oval shaped canopy are preferable; a tree with a round head is generally unsuitable in this situation. Overhead Wires: When trees must be planted under utility lines, species with a maximum height of twenty-five feet (25’) should be selected. Street Lighting: Trees should generally be at least twenty feet (20’) from light standards. Planting locations should be coordinated with locations of lighting standards. Clearance: Trees shall be pruned as they grow to provide at least seven feet (7’) vertical clearance above sidewalks and fourteen feet (14’) of vertical clearance above roadway surfaces. 10.08.5.2 Tree Canopy Shape Tree canopy shapes are an important factor in the selection of street trees. The setting will often dictate which canopy shapes are most appropriate. This in turn will aid in the selection of the most suitable species. The guidance offered below includes information about which tree canopy shapes work best under different conditions. Table 10-4 offers information about tree species and their canopy shapes. 10.08.5.2.1 V-Shaped Trees V-shaped (sometimes also called “vase shaped”) trees have canopies that are narrow toward the bottom and broad at the top. The American Elm is a classic street tree with this shape. V-shaped trees may have arching branches that form a canopy over both street and sidewalk. They generally do not cause problems with overhead power lines or traffic. 10.08.5.2.2 Pyramidal Trees Pyramidal or cone-shaped trees are typically broad at the base of the canopy and are somewhat pointed at the top. European Beech is one tree that becomes pyramidal with age. Planted close together, pyramidal trees can screen unwanted views or create vistas. Lower branches sometimes droop with age and may have to be limbed up in later years to provide the needed clearance. 10.08.5.2.3 Round Trees These are generally wide spreading trees that need more space than other shapes. The Red Sunset Maple is one example of a round tree. 10.08.5.2.4 Oval Trees An oval tree is a good choice around buildings and adjacent to traffic. Oval trees, like the Raywood Ash, are taller than they are wide and cause little interference with traffic. 10.08.5.2.5 Columnar Trees Columnar trees are useful in locations where there is little available room between the street and buildings, awnings, or other features. Branches of columnar trees tend to grow up rather than out. Many branch lower than other types of trees without causing problems with traffic or pedestrians. 12/21/2009 ............................................ Design Standards........................ .................Page 10-40 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.08.5.3 Root Direction Devices All street trees planted within a five foot (5’) wide landscape strip shall use a root direction device to deflect tree roots downward into the soil. These devices are used to eliminate damage to sidewalks as the tree roots extend beyond the original planting pit. The root barrier should be placed along two sides of the tree, parallel to the sidewalk and to the curb line. Under specific circumstances, wider strips that contain utilities may also need root barriers to reduce conflicts. Plan submissions should indicate the location of root barriers and provide a specification sheet on the product to be used. 10.08.5.4 Tree Planting Wells and Grates In highly urbanized settings such as downtown, it may be necessary to install street trees into an existing street and sidewalk setting. Where high levels of pedestrian traffic is expected, it may be necessary to place trees into a paved area rather than a landscape strip. In these situations planting wells and grates may be necessary. The desirable size for a tree planting well is thirty-six square feet (36 sq.ft.) or greater. A minimum of twenty-five square feet (25 sq.ft.) should be provided. Where trees are within a heavily traveled pedestrian area, their roots can be easily damaged. In these areas tree grates or other means such as pavers in sand will be required to protect the health of the tree. Where tree wells or grates are necessary, provide planting details, specifications, and product sheets for proposed tree-planting wells and tree grates. See Standard Details TRAFFIC-14. 10.08.6 Plant Selection There are innumerable plant choices for each layer of the landscape strip. Selection is based on: • Size of the landscape strip • Canopy shape of trees • Size and type of leaves • Root shape • Site environmental conditions, such as the amount of sunlight available or moisture in the soil; and • Aesthetic qualities desired. Needled evergreens, such as firs or spruces, shall NOT be used in landscape strips, unless the strips are very very wide. Broad-leaved evergreens such as magnolias are acceptable. 10.08.7 Plant Selection Table Table 10-5 provides several acceptable species of ground covers, shrubs less than 3 feet (3’) high, and a variety of flowering or standard street trees. Many other plants are appropriate; alternative selections may be proposed if desired. Alternative plant choices will be evaluated and approved by the City. 12/21/2009 ............................................ Design Standards.........................................Page 10-41 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) Column Headings: A short description of several of the column headings follows: Size: Small To 25 Feet Medium 25 to 50 Feet Large 50 to 70 Feet Sun: Sun Needs full sun Sun/Shade Takes sun to part shade; needs at least ½ day of sun Shade Shade to part shade. Protect from full sun, especially in afternoon H20 Req. (Requirement): Low Drought tolerant after 1st year Mod Moderate water need. May need supplemental watering during dry season. High Requires irrigation Canopy Shape: “V” V-shaped Trees (sometimes also called “vase shaped trees”) Pyramid Pyramidal trees or cone shaped trees Round Round trees Oval Oval trees Col. Columnar trees 12/21/2009 ............................................ Design Standards.........................................Page 10-42 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) TABLE 10-5 (TREES) Botanical Name Common Name Size Sun H2O Req. Min. Landscape Strip Width Canopy Shape Remarks Acer campestre Hedge Maple Small/Med Sun/Shade Mod 5-8 Feet Round. Tough urban plant. Any well-drained soil. Yellow fall color. Broad crown. May need to be limbed up when young. Acer ginnala Amur Maple Small Sun/Shade Low 5-8 Feet “V” Spectacular scarlet fall color. Fast growing. Tolerant of many soils, pollution, salt and drought. Acer platanoides ‘Armstrong’ ‘Columnare’ ‘Schwedleri’ Norway Maple Large Med Med Large Sun Mod 8-12 Feet 5-8 Feet 5-8 Feet 8-12 Feet Oval Col. Round. Oval Very adaptable to soil and climate condition. Difficult to grow grass under. Many cultivars w/varying heights & shapes. Acer rubrum ‘Red Sunset’ ‘Oct. Glory’ Others available Red Maple Med/Large Sun Mod 5-8 Feet Oval Very adaptable: will grow in swamps or on rocky slopes. Needs shade over root area when used as a street tree. Carpinus betulus ’Columaris’ European Hornbeam Small/Med Sun/Shade Mod 5-8 Feet Col. Elegant appearance: needs no pruning. Pest & disease free. Cercidyphyllum japonicum Katsura Tree Med Sun Mod 5-8 Feet Round Beautiful tree w/delicate texture, red tinged leaves, good fall color. Shape varies; can be multi-stemmed. Transplant B&B, early spring. Rich, moist, well-drained soil. Cercis canadensis Eastern Redbud Small Sun/Shade Mod 5-8 Feet Round. Reddish-purple flowers, early spring. Spreading habit w/flat top. Transplants best when small. Effective in clusters. Fraxinus oxycarpa ’Golden Desert’ Golden Desert Ash Med Sun Mod 5-8 Feet Oval Small, narrow leaves give a tidy, fernlike appearance. Gold twigs, attractive in winter. Red to purple fall color. Ginkgo biloba Ginkgo Large Sun Mod 5-8 Feet Col. to Oval Distinctive fan-shaped leaf. Light green foliage in spring; bright yellow in fall. Plant male trees only. Slow growing. Tolerates wide variety of soil conditions. Liquidambar styraciflua Sweetgum Large Sun Mod 5-8 Feet Col. to Oval Dense canopy of 5-lobed, star shaped leaves. Yellow to red fall color. Pointed, woody fruit can be a nuisance. Pyrus calleryana and varieties Callery Pear (Flowering Pear) Med Sun Low 5-8 Feet Pyramid to Oval Dark green glossy leaves in summer, scarlet in fall. Heavy clusters of white flowers in spring. May need corrective pruning when young. Varieties ‘Aristocrat’, ‘Chanticleer’, ‘Redspire’ have a variety of canopy shapes. Quercus rubra Red Oak Large/Very Large Sun High 8-12 Feet Round Easy to transplant. Needs fertile, welldrained soil, plenty of water. Tolerates pollution. High branching and fairly open shade make it a good choice for big lawns and blvds. Dark red, or orange fall color. Fast growing. Tilia cordata ‘Greenspire’ Littleleaf Liden Med Sun/Shade Mod 5-8 Feet Oval/Pyramid Formal look. Upright branching. Needs well-drained, fertile soil. Tolerant of urban conditions. Easy to transplant. Fragrant yellowish flowers in clusters in June. Zelkova serrata ’Village Green’ Zelkova Med Sun Mod 8-12 Feet ‘V’ Graceful vase-shaped tree resembling the elm. Fair tolerance of soils, best in moist deep loam. Leaves light green in spring, yellow to russet in fail. 12/21/2009 ............................................ Design Standards.........................................Page 10-43 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) TABLE 10-5 (GROUND COVER/LOW SHRUBS) Botanical Name Common Name Size Spacing Sun. Min. Landscape Strip Width Flowers Remarks Arctostaphylos una-ursi Kinnikinnick Bearberry Small Sun/Shade 5-8 Feet ♦ Useful on slope, poor or dry soils. Slow to establish; must address early weed problems. C. dammeri Bearberry Cotoneaster 3”-6” Sun/Shade 5-8 Feet ♦ Fast growing, roots freely. Hedera helix English Ivy 6”-12” 12”-18” Sun/Shade 5-8 Feet Vigorous, should be within a contained area. Will climb vertical surfaces. H. h. ‘Baltica’ Baltic Ivy 6”-12” 12”-18” Sun/Shade 5-8 Feet Smaller leaf than English Ivy; not as aggressive. Hypericum calycinum St. Johns Wort to 12” 18” Sun/Shade 5-8 Feet ♦ Tolerant of poor soils, some drought. Competes well with trees. Must be in confined space or overtakes other plants. Showy yellow flowers. Vinca minor Periwinkle 6” 12”-18” Shade 5-8 Feet ♦ Needs regular watering. 10.08.8 Planting Methods and Maintenance Good horticultural practice should be employed in the preparation of the soil and planting pits. This will include: 1. Conserving topsoil and replacing it on the site. 2. Performing soil tests. 3. Providing corrective soil preparation as necessary. 10.08.9 Establishment Period The developer will be responsible for maintaining the trees and plants in the landscape strip in a healthy condition for one (1) year after acceptance of the project. Because landscape strips do not usually include irrigation, maintenance will include providing water during dry periods. Weeds, diseases, and insect pests must also be controlled. 10.08.10 Deviations from the Landscape Strip Standards Site conditions may occasionally make adhering to the landscape strip standards difficult. Deviations from the standards may be requested. The following paragraphs list circumstances that may be appropriate conditions for requesting a departure from the design standards: Root Direction Device: The root direction device may be omitted if the planting strip is very wide or if the variety of tree to be planted is known to to cause no sidewalk upheaval. Grass or Ground Cover: Where it is extremely difficult to maintain grass or ground cover in a landscape strip, heavy stone aggregate such as a washed river rock may be an acceptable substitute. Lightweight rock such as lava rock is not acceptable. Paving over the landscape strip will rarely be acceptable. 12/21/2009 ............................... ............. Design Standards.........................................Page 10-44 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.09 Mailboxes See Standard Details TRAFFIC-16 thru TRAFFIC-19 Locating and installing mailboxes in connection with the construction or reconstruction of a City street shall follow AASHTO and Post Office guidelines. 10.09.1 Mailbox Locations Mailboxes shall be located a minimum of two feet (2’) back from the face of curb on streets which have a curb. For streets without a curb, setbacks shall be determined using ASSHTO standards. When locating mailboxes, access, sight distance, and landscaping requirements shall be taken into account. Final locations shall be detailed on the civil plans and approved by the serving Post Office and the City. When mailboxes are located in the sidewalk, individually or in clusters, sidewalks shall be widened to provide a minimum five feet (5’) of clearance around the mailboxes. Widening of the sidewalk may require the dedication of additional right-of way. 10.09.2 Mailbox Installation The owners or residents served by mailboxes will install and thereafter maintain their own individual, clustered, or separated mailboxes as instructed by the U.S. Postal Service. Mailbox installation shall follow City of Auburn Standard Details TRAFFIC-16, TRAFFIC-17, TRAFFIC-18, and TRAFFIC-19. 10.10 Illumination 10.10.1 General The City desires to have safe and uniform lighting standards for streets to allow safe comfortable use by all users. The City has approved standard lighting infrastructure for reliability and ease of parts inventory and maintenance. Roadway lighting is required along all City owned streets except classified Rural Collectors and Rural Residential. Street lighting design shall be in conformance with the design criteria in the most recent edition of the IES Lighting Handbook (Illuminating Engineering Society of North America) and applicable WSDOT and City of Auburn Construction Standards. 10.10.2 Design The City of Auburn prefers staggered lighting on all Principal and Minor Arterials. Single sided lighting may be acceptable if approved by the City. Local Residential streets will have a choice between a standard light and an ornamental alternative. Table 10-6 has been included as a general guideline for determining illumination sizing and location requirements. Project specific lighting calculations shall be provided to insure minimum illumination levels will be met. Light level calculations shall be done ignoring any existing substandard luminares (PSE lights on wood poles, etc.). All poles and bracket arms shall be designed for the street lighting luminaire with a minimum weight of fifty pounds (50 lb.) and to withstand pressures caused by wind loads of ninety miles per hour (90 mph) with a gust factor of 1.3. Special consideration shall be given for light levels at crosswalks, curves, conflict points and street ends and shall be designed to meet the minimum light level of 0.2 foot candle. Roadway lighting levels also are impacted by the type of pavement surfacing and special consideration shall be given for surfaces like concrete roadways. 12/21/2009 ............................................ Design Standards.........................................Page 10-45 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 12/21/2009 ............................................ Design Standards.........................................Page 10-46 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) When pedestrian lighting is used the street light design shall be done independent from the influence of the pedestrian lighting. Pedestrian light spacing shall not exceed five times the mounting height. When pedestrian lighting is installed, sidewalk lighting shall be designed for two foot (2’) candles. All illumination plans shall include a lighting schedule. Each luminaire shall be numbered such that the circuit number, the mounting height, davit length and wattage are clearly indicated. For Boulevard streets, streets with median islands, double arm street lights in the median may be allowed meeting all applicable design criteria of these standards. In addition, access accommodations allowing for light maintenance vehicles to park outside the travel way must be incorporated into the median island design. The locations of street lights shall take into consideration any obstacles which may screen or impede lighting levels such as street trees and awnings. Street trees shall be located a minimum of twenty feet (20’) from all streetlights. 10.10.3 Table 10-6 Lighting Schedule The following Light Spacing is based on the roadway classifications for a typical straight roadway section with a staggered lighting configuration. Wider road sections, curves, intersections, cul-de-sacs and single sided lighting configurations must use a calculated design meeting the criteria on Table 10-6 with the exception of the Spacing criteria. TABLE 10-6 Street Classification Street Width (feet) Lamp Wattage Average Maintained Light Level (footcandle) Required Uniformity Ratio Minimum Light Level (footcandle) Luminaire Mounting Height (feet) Light Pattern Davit Arm Length (feet) Spacing (feet) Principal Arterial 61 400 1.4 3 To 1 0.2 35 40 M-C III 12 190 Minor Arterial 50/61 250 0.9 3 To 1 0.2 35 M-C III 10 190 Non-Residential Collector 44 250 0.9 3 To 1 0.2 35 M-C III 6 200 Residential Collector 34 150 0.6 3 To 1 0.2 30 M-C III 6 175 Local Non-Residential 34 150 0.6 3 To 1 0.2 35 M-C III 6 160 Rural Collector* Local Residential 28 100 0.4 6 To 1 0.1 30 M-C III 8 185 Local Residential Ornamental Alternative 28 100 0.4 6 To 1 0.1 12 M-C III N/A 140 *Illuminate Signalized Intersections only. For downtown pedestrian lighting requirements, contact the City of Auburn. 10.10.4 Light Standard Foundations See Standard Detail TRAFFIC-49, TRAFFIC-61 & TRAFFIC-63 All light poles shall be placed on a foundation. Foundations for light standards shall conform to Standard Detail TRAFFIC-49, or TRAFFIC-61 and TRAFFIC-63 for the Downtown light standards. Light pole foundations adjacent to sidewalks shall include a four inch (4”) concrete pad and conform to Standard Detail TRAFFIC-48. 10.10.5 Service Cabinet See Standard Detail TRAFFIC-51 All new luminaires shall be connected on an electrical circuit that is connected to a power source through a service cabinet. Service cabinets shall conform to Standard Detail TRAFFIC-51 and shall be metered with a photocell installed for luminaire control. The service cabinet shall be within fifty feet (50’) of the Puget Sound Energy (PSE) point of service connection. Service cabinets should be installed behind the sidewalk when possible at locations that do not impede maintenance access. The cabinet should be located in the center of the system so so there are a near equal number of lights being served on separate circuits from each side of the cabinet. The number of luminaires per service will be based upon the type of luminaire and the capacity of the service. Testing may be required to determine if additional luminaires may be added to an existing service. 10.10.6 Service Cabinet Foundations See Standard Detail TRAFFIC-51 The Service Cabinet foundation shall conform to Standard Detail TRAFFIC-51. 10.10.7 Conduit Street light conduit shall be Schedule 40 PVC-ASTM D1785. All conduits for street crossings shall be Schedule 80 PVC-ASTM D1785. All conduits installed under sidewalk and driveway areas shall be Schedule 40 PVC-ASTM D1785. Conduit type shall not change within a run. Conduits installed under paved roadway, not crossing the roadway, shall be Schedule 80 PVC-ASTM D1785. Conduits shall have a minimum of twenty-four inches (24”) of cover. The City requires that street light conduit be extended through a property’s frontage for future expansion of the lighting system. 10.10.8 Junction Boxes See Standard Detail TRAFFIC-50 A. Street Junction boxes shall conform to Standard Detail TRAFFIC-50. Junction boxes shall be of the type specified on the plans and shall conform to the requirements of WSDOT Standard J-40.10-01. All junction boxes shall be locking. B. Type 1 junction boxes shall be located adjacent to the sidewalk within the landscaping strip, if provided, or adjacent to the back of sidewalk if a landscape strip does not exist, or within the shoulder of a non-curbed roadway. 10.10.9 Light Standards A. STANDARD LUMINARE See Standard Detail TRAFFIC-49 Lighting standards shall be tapered aluminum, davit-style units, with five feet nine inch (5’9”) radius per Section 9-29.6(1)A (Lighting Standards and Davit Arms, of the City of Auburn Engineering Construction Standards), and shall 12/21/2009 ............................................ Design Standards............................................ Page 10-47 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) be installed in conformance with City of Auburn Standard Detail TRAFFIC-48 and TRAFFIC-49. B. DOWNTOWN STREET LIGHTING LUMINARE See Standard Detail TRAFFIC-63 Light standards located within the Downtown Urban Center as depicted on the Comprehensive Zoning Map shall be a 40 foot Concrete Ameron MBR. C. DOWNTOWN PEDESTRIAN LUMINARE See Standard Detail TRAFFIC-61 & 61a Pedestrian light standards located within the Downtown Urban Center as depicted on the Comprehensive Zoning Map shall be 18 ft concrete Ameron VBR. D. LOCAL RESIDENTIAL ORNAMENTAL ALTERNATIVE LUMINARE See Standard Detail TRAFFIC-62 The Local Residential Ornamental Alternative light standard shall conform to Standard Detail TRAFFIC-62 and shall be Holophane Wadsworth series fluted shaft with seventeen-inch (17”) diameter base (W12F4/17CA/BK or DG) and may be used in residential plats in place of the standard luminare. E. ANCHOR BASES Anchor bases per Section 9-29.6(2) (Anchor Bases, of the City of Auburn Engineering Construction Standards) shall conform to the Standard Detail TRAFFIC-49, TRAFFIC-61, TRAFFIC-62, or TRAFFIC-63. 10.10.10 Light Standard Handholes See Standard Detail TRAFFIC-49 Light Standards handholes shall be four inches by six inches (4”x 6”) nominal non-flush type in accordance with Standard Detail TRAFFIC-49. 10.10.11 Photoelectric Controls Photocells installed on the service cabinet shall be “SST” Series model “SST-IES” or approved equal in conformance with Section 9-29.11(2) (Photoelectric Controls) of the City of Auburn Engineering Construction Standards. A bypass switch shall be required inside the service cabinet, clearly marked PE Bypass. One photocell will be required per service cabinet. 12/21/2009 ............................................ Design Standards............................................ Page 10-48 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.10.12 Luminaires A. Luminaires shall meet the general requirements of Section 9-29 (Illumination, Signals, Electrical) of the City of Auburn Engineering Construction Standards with the following modifications: 1. Clear burning high-pressure sodium light sources of the ratings shown in the lighting schedule shall be used. 2. Street and Pedestrian Luminaires shall operate on 240 Volt AC and all luminares shall be full cuttoff. B. All luminaires and circuits shall conform to Table 10-7 below: TABLE 10-7 Wattage Max. LuminairesPer Circuit 100 14 150 12 250 8 400 7 C. All luminaires shall be provided with markers for positive identification of light source and wattage per Section 9-29.10 (Luminaires) of the City of Auburn Engineering Construction Standards. A maximum of five percent (5%) voltage drop across each circuit will be permitted. Voltage drop calculations will be required for all non-standard illumination systems. 10.11 Survey Monuments Standard Details TRAFFIC-20 thru TRAFFIC-22 Survey monuments shall be placed or replaced in accordance with good practice in land surveying. Monuments are required along the centerline of improvement of all new or reconstructed streets. Monuments shall be placed at intersections, P.C. (points of curvature), and P.T. (points of tangency). All existing survey monuments that are disturbed, lost, or destroyed during construction shall be replaced by a registered land surveyor registered in the State of Washington at the expense of the responsible builder or developer. 10.12 Guardrail Evaluation of embankments for guardrail installations shall be in accordance with Chapter 710 of the WSDOT Design Manual. Guardrail installations shall conform to WSDOT/APWA Plan C-1, Beam Guardrail Type 1. End anchors shall conform to WSDOT/APWA Plan C-6, Beam Guardrail Anchor Type 1. 12/21/2009 ....................... ..................... Design Standards............................................ Page 10-49 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.13 Bollards Standard Detail TRAFFIC-06 When necessary to deny vehicle access to an easement, tract, or trail (except for maintenance or emergency vehicles) the point of access shall be closed by a line of bollards. These shall include one or more fixed bollards on each side of the traveled way and removable, locking bollards across the traveled way. Spacing shall provide one bollard on centerline of the trail and other bollards at a maximum spacing of three feet (3’) to preclude vehicular access. Bollard design shall be in conformance with Standard Detail TRAFFIC-06. Fire access roads shall not be blocked in this manner without the concurrence of the Fire Marshal. Bollards shall be ten feet (10’) from the paved edge of roadway. 10.14 Transit Stops This section provides the minimum design standards to be used in the design of bus transit facilities in the City of Auburn. Bus facilities shall be designed, located and installed in cooperation with appropriate operating transit agency. When determined appropriate by the City Engineer, or if comments are made by a transit service agency, an applicant for new or expanded development is encouraged to consult with King County METRO, or Pierce Transit to determine the practicality of how the site can be served by transit oriented improvements such as bus pullouts, bus stops, or other appurtenances. 10.14.1 Bus Pullout Requirements Bus pullout lanes may be required where bus queuing or staging is required by the transit agencies operations and at the discretion of the City Engineer. The following are guidelines that would indicate pullouts would be appropriate: A. Traffic and passenger boarding and debarking conditions warrant. B. Traffic flow would be greatly hindered due to in lane stopping. C. The posted speed limit is in excess of thirty miles per hour (30 mph). 10.14.2 Locations for Bus Pullouts Bus pullout locations shall meet the following requirements: A. Placement of bus pullouts shall be on the far side of signalized intersections and non-signalized intersections immediately following the intersection. Distance between pullouts should not be less than one thousand feet (1000’). B. If far side pullouts are not possible, nearside pullouts will be evaluated. Mid-block pullouts are discouraged. If a situation arises where a mid-block bus pullout is the only option, pullouts should be constructed on both sides of a two-way street in a complementary pair. C. Maintaining adequate separation between access points, intersections, and bus pullouts can increase the safety and efficiency of both the roadway and the transit service. 12/21/2009 ............................................ Design Standards............................................ Page 10-50 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) D. When locating a bus pullout consideration shall be given to existing access points and where passengers have safe and direct access to sidewalks, crosswalks, ramps, or other pedestrian facilities. Consideration shall also be given to trip attractors, and activity centers. E. Bus pullouts must meet sight distance requirements. See Section 10.03. 10.14.3 Design of Bus Pullouts Bus Pullouts shall be designed in accordance with the applicable operating transit agency’s guidelines. Designs must follow applicable guidelines for facilities used by the physically challenged (Americans with Disabilities Act). The King County Metro Transit Planning Office or Pierce County Transit should be contacted for specific design questions. 10.14.4 Bus Stop Requirements Bus stops are located, designed and installed as part of a cooperative effort between the City and the operating transit agency. Bus stops are managed as part of a right of way use permit granted by the City to the operating transit agency. In general bus stop location and design decisions should follow the facility design guidelines of the operating transit agency. The King County Metro Transit Planning Office or Pierce County Transit should be contacted for specific design questions. 10.14.5 Locations for Bus Stops In general bus stop location and design decisions should follow the facility design guidelines of the operating transit agency. The following are guidelines that indicate where bus stops are appropriate: A. Projected or existing passenger boarding and debarking demand warrant a stop. B. Traffic characteristics and street design make the location safe to stop a transit vehicle. C. The location meets the facility guidelines and fleet specifications of the operating transit agency. D. The stop is required to be accessible to the physically challenged (Americans with Disabilities Act). 10.14.6 Bus Stops Features In general bus stop location and design decisions should follow the facility design guidelines of the operating transit agency. The following are some guidelines that would indicate what type of treatment would be appropriate by type of bus stop. A. Shelters should be installed at bus stops with an existing or estimated 25 or more boardings per day. B. Benches should be installed at bus stops with an existing or estimated 15 or more boardings per day. C. Trash receptacles should be installed and maintained by the operating transit agency at all bus shelters. A sign should be placed indicating that the shelter stop is maintained by the operating transit agency and giving specific contact information to report problems with the stop including a phone number. D. At all bus stops experiencing 15 or more boardings per day trash receptacles may be placed by the City or adopt a spot group and should be maintained by the City or the adopt a stop group. 12/21/2009 ............................................ Design Standards............................................ Page 10-51 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) E. Information schedules and schedule holders shall be placed at all inbound stops (stops where buses are headed toward a major Central Business District), at all transfer points and at heavily used outbound stops. F. Additional bus stop lighting should be provided at locations where lighting levels are determined to be less than 3 foot candles. G. The stop should be accessible to the physically challenged (meeting the requirements of the Americans with Disabilities Act). 10.15 Traffic Control Devices Traffic Control devices are all signs, signals, markings and other devices used to regulate, warn, or guide traffic. All traffic control devices shall meet the requirements of FHWA’s latest adopted version of the Manual on Uniform Traffic Control Devices (MUTCD) and the standards herein. 10.15.1 Median Islands Median Islands are raised barriers constructed between opposing lanes of travel. Median Islands are generally restricted to classified roadways and may be required in order to: 1. Control access along a corridor, or 2. Provide a traffic calming element. 10.15.1.1 Median Island Design Median Islands shall be designed using the same geometric criteria as the street on which they will be constructed. Medians shall also meet the following requirements: A. Median Ends: Median ends shall be flared at intersections and at breaks to allow for transitioning traffic, ease of street sweeping and shall include signage in accordance with MUTCD requirements. B. Width: Median islands shall be a minimum curb to curb width of eight feet (8’) when landscaped and a minimum of four feet (4’) in width when paved. C. Shy Distance: One foot (1’) minimum shy distance shall be maintained from face of median curbs to edge of travel lanes. D. Landscaping/Paving: Landscaping in medians shall conform to the requirements of Section 10.08. Median paving shall be stamped asphalt with colors and patterns approved by the City. E. Irrigation: Landscaped medians shall include irrigation systems. F. Illumination: Street lights on streets with median islands eight feet (8’) in width and greater shall be located in the medians using dual arm posts and shall meet the minimum light level requirements of Section 10.10. G. Maintenance Access: Median islands eight feet (8’) in width and greater shall provide a paved maintenance staging area fifty feet (50’) in length with mountable curbs. Median islands smaller than eight feet (8’) in width shall include one fifty foot (50’) break in the median per block. 12/21/2009 ............................................ Design Standards....................... ..................... Page 10-52 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.15.2 Traffic “C” Curbs Traffic “C” Curbs are barrier curbs used for the restriction of turning movements and to aid in the channelizing of traffic, Traffic “C” curbs may be required in order to control access along a corridor within the restricted zones of any functional intersection boundary as defined in Section 10.04. 10.15.2.1 Traffic “C” Curb Design Traffic “C” Curb layout shall be designed using the geometric criteria for channelization. An approved list of barrier curb products can be obtained from the Public Works Department. Use of any Traffic “C” Curb products not on the approved list must be approved by the City Engineer and meet the following requirements: A. Shall be a National Cooperative Highway Research Program (NCHRP 350) approved product. B. Shall be constructed of all-weather, shatter and crumble resistant materials. C. Shall not restrict the flow of street surface drainage. D. Shall include MUTCD compliant reflective markings and vertical channelizing devices. 10.15.3 “Pork Chop” Islands “Pork Chop” Islands are barrier islands used to restrict turning movements at driveways. They may be required at any driveway where left turns are restricted and Median Islands or Traffic “C” Curb installation is not feasible. When required, Pork Chops shall be accompanied by appropriate turn restriction signing and pavement markings. 10.15.4 Signing All signing shall be per the “Manual on Uniform Traffic Control Devices” (MUTCD) and City of Auburn Engineering Construction Standards. Developments shall be responsible for providing and installing all traffic control signs, including but not limited to street name signs, regulatory signs, warning signs, barricades, and bicycle/pedestrian signs as required. 10.15.5 Pavement Markings See Standard Detail TRAFFIC-35 Pavement markings, raised markers, or striping shall be used to delineate channelization, lane endings, crosswalks, and longitudinal lines to regulate, warn or guide traffic. The City shall approve all channelization plans and crosswalk locations. 10.15.5.1 Crosswalks See Standard Details TRAFFIC-36 thru TRAFFIC-38 & TRAFFIC-58 Crosswalks shall be installed at all intersections controlled by traffic signals and other areas approved by the City. Crosswalks shall be a piano key design consisting of white thermoplastic material. The position of the crossbars should be spaced in such a way as to allow the majority of wheel traffic to pass in the unpainted space. 10.15.5.2 Left-turn Channelization See Standard Detail TRAFFIC-40 & 42 Left-turn channelization shall include a minimum of one hundred fifty feet (150’) of fullwidth lane to include storage and a reverse curve ninety feet (90’) in length for posted speed up to forty-five miles per hour (45 mph). The reverse curve may be included in the taper distance. The standard width of a left-turn lane will be eleven feet (11’). Left-turn arrows per Standard Detail TRAFFIC-35 shall be installed twenty-five feet 12/21/2009 ............................................ Design Standards............................................ Page 10-53 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) (25’) behind the stop bar. Additional storage may be required for long vehicles or anticipated left-turn queues longer than the minimum storage. If storage length exceeds one hundred fifty feet (150’), auxiliary turn arrows will be installed at one hundred foot (100’) intervals. Deviation requests from the minimum left turn lane storage requirements will need a traffic study submittal and approval by the City Engineer. 10.15.5.3 Left-turn Lane at End of Two-way Left-turn Lane See Standard Detail TRAFFIC 39 Left-turn lane at the end of two-way left-turn lanes shall conform to Standard Detail TRAFFIC-39. 10.15.5.4 Lane Division See Standard Detail TRAFFIC-43 All pavement markings used to separate or channelize traffic shall conform to Standard Detail TRAFFIC-43. 10.15.5.5 Painted Islands Painted islands will be allowed on a case-by-case basis with approval from the City Engineer. Pavement markings for painted islands shall meet the MUTCD requirements. 10.15.5.6 Two-way Left-turn Lanes See Standard Detail TRAFFIC-40 & -41 The installation of two-way left-turn lanes on City streets will be determined by the City based on street classifications and left turn requirements. The minimum width of a two-way left-turn lane shall be eleven feet (11’). The delineation lines shall be SBY (Single Broken Yellow) and a SSY (Single Solid Yellow) along the opposing lanes per the MUTCD. Two-way traffic arrows shall be spaced every one hundred fifty feet (150’) along this lane. The designer should pay special attention to the beginning and endings of this type of lane and use clearly defined tapers or islands to maintain traffic safety. 10.15.6 Construction Area Temporary Traffic Control The contractor shall be responsible to provide and maintain all signs, barriers, warning lights, striping, and flag control required for maintaining public safety in construction areas. Traffic control shall be maintained at all times when construction is in progress on all streets, and access points in the construction area. Construction activities will not be allowed in the public right of way without an approved traffic control plan. 10.16 Roadway Barricades Standard Detail TRAFFIC-05 Temporary and permanent barricades shall conform to the standards described in Section 6C-8 of the Manual on Uniform Traffic Control Devices (MUTCD) and Standard Detail TRAFFIC-05. A. Type I or Type II barricades may be used when traffic is maintained through an area being constructed/reconstructed. B. Type III barricades may be used when streets are closed to traffic. Type III barricades may extend completely across the street (as a fence). Where provision must be made for access of equipment and authorized vehicles, the Type III barricades may be provided with movable sections that can be closed when work is not in progress, or with indirect openings that will discourage public entry. Where job 12/21/2009 ............................................ Design Standards............................................ Page 10-54 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) site access is provided through the Type III barricades, the developer or contractor shall assure proper closure at the end of each working day. C. In the general case, Type III barricades shall be installed to close arterials or other through streets hazardous to traffic. They shall also be used to close off lanes where tapers are not sufficiently delineated. D. Type III barricades shall be used at the end of a local access street terminating abruptly without cul-de-sac bulb or on temporarily stubbed off streets. Each such barricade shall be used together with an end-of-road marker. 10.17 Traffic Impact Analysis The City of Auburn has established guidelines for Traffic Impact Analysis that are herein adopted by reference. These guidelines are used to identify capacity and safety concerns, to assist in the evaluation of site design as it relates to traffic engineering issues, and to identify appropriate solutions and mitigation. To adequately assess a development’s traffic impact, the City Engineer may require a Traffic Impact Analysis. The requirement for a Traffic Impact Analysis will be based on the size of the development proposed, existing street and intersection conditions, traffic volumes, accident history, safety considerations, community concerns, and other pertinent factors relating to traffic impacts attributable to the development. 10.17.1 When Traffic Impact Analyses are Required The following is a list of some specific conditions that may dictate the requirement for preparing a Traffic Impact Analysis. • The development generates more than 30 PM peak hour trips on a corridor. • The development may potentially affect the implementation of the street system as outlined in the Comprehensive Transportation Plan and Six Year Transportation Improvement Program (TIP), or of any other documented transportation project. • The development proposes a rezone of the subject property. • The original Traffic Impact Analysis for a future development is outdated due to changes in traffic volumes in the vicinity of the proposed project or approved pipeline projects or a change in the proposed land use’s trip generation and/or distribution. • The development could potentially affect safety or requires an analysis to assist in designing appropriate access. 12/21/2009 ............................................ Design Standards............................................ Page 10-55 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.17.2 Elements of a Traffic Impact Analysis Each development traffic review is different and, as such, each traffic study should be cooperatively designed to address the city’s specific concerns. Traffic impact analyses are therefore required to be scoped by and with the City Engineer. They may include all or some of the following elements: • Corridor Level of Service analyses, • Intersection Level of Service analyses, • Access point level of service analyses, • Critical gap analyses, • Horizontal and vertical sight distance analyses, • Roundabout analyses, • Traffic signal warrant analyses, • Stop control warrant analyses, • Turn lane warrant analyses, • Access management design, • Other analyses and information as required by the City Engineer. 10.17.3 Special Uses Special event land uses which do not exhibit typical trip generation characteristics may require unique analysis, including but not limited to weekend and off-peak scenarios, and AM versus PM time frames. Examples of such uses would be concert stadiums, racetracks or uses which exhibit substantial traffic peaking associated with special events that are scheduled on a periodic basis. The traffic analysis for such uses may include a traffic management plan to control traffic impacts associated with the special events. 10.17.4 Mitigation Identification In order to protect the public from potentially adverse impacts of the proposal, to fulfill an identified need for public services within the impacted area related to the development, or both, the Traffic Impact Analysis shall identify methods of mitigating on-site and off-site deficiencies for present and proposed phases of the development. The analysis shall make recommendations for improvements necessary for safe and efficient traffic flow and bicycle, pedestrian, and transit movement and access proportional to the identified impacts. Build-out Year, Long-Range Forecast Year, and project phasing impacts shall be considered. All or some of the following items are to be included in the mitigation identification: • Methods for mitigating on-site impacts and mitigation recommendations, • Methods for mitigating off-site impacts and mitigation recommendations, • Discussion of whether on-site and off-site improvements are justified, reasonably related to, and proportional to the impacts of the proposed development, • Any requirements or mitigation measures associated with the Area Circulation Plan. 12/21/2009 ............................................ Design Standards............................................ Page 10-56 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 12/21/2009 ............................................ Design Standards............................................ Page 10-57 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) 10.17.5 Recommendations The Traffic Impact Analysis report shall clearly state the mitigation measures recommended by the analysis and shall summarize how the recommended mitigations are proportional to the identified impacts. The recommended street and highway mitigation measures shall be explained in sufficient detail in the analysis to allow them to be understood and evaluated. The recommendation shall also include the following: • Clear statements of the applicant’s recommended mitigation measures. • Scaled drawings depicting recommended mitigation improvements and their relationship to existing and proposed conditions if drawings are needed. 10.17.6 Area Circulation Plan Area Circulation Plans are plans which support the development of a multi-modal transportation network with safe, efficient and pleasant routes for pedestrians, bicyclists, transit users, and motor vehicle occupants. The plan recognizes the link between land use and transportation planning and promotes land use and development patterns that encourage walking, bicycling, and transit use. The goal of an Area Circulation Plan is to "provide a transportation system that will facilitate the safe and efficient movement of people and goods throughout the community while supporting the designated Land Uses in the Comprehensive Plan.” This goal applies to all aspects of circulation including: vehicular, mass transit, bicycle, and pedestrian. In order for the City of Auburn to successfully meet the vision set forth in the Comprehensive Plan, the Area Circulation Plan will need to address a variety of transportation modes to facilitate the convenient and efficient movement of people in and near new development. Area Circulation Plans are required for all new development of general commercial and industrial property. They also may be required for land uses which do not exhibit typical trip generation characteristics that require unique analysis, including but not limited to weekend and off-peak scenarios, and AM versus PM time frames. The Area Circulation Plan shall include sufficient information to adequately assess the functionality of the proposed development and its impact on surrounding properties and circulation systems, including but not limited to: • Mapping details, such as site boundaries and dimensions, site acreage, vicinity map, north arrow, scale, title block, etc.; • Access to the site and interior site circulation; • Proposed lot layout; • Other items which may impact adjacent property, such as general parking arrangement, delivery truck/dock locations, medians or traffic control devices, median breaks, and other information as deemed necessary by the City Engineer and Planning Director. Any development or subdivision of the property shall generally be consistent with the Area Circulation Plan as approved or amended. No plat, building permit, or certificate of occupancy shall be issued for the property unless all construction and development generally conforms to the Area Circulation Plan. 10.18 Table 10-1 Summary Matrix of Minimum Street Design Requirements CLASSIFICATION SECTION PRINCIPAL ARTERIAL MINOR ARTERIAL RESIDENTIAL COLLECTOR NON-RESIDENTIAL COLLECTOR RURAL COLLECTOR LOCAL RESIDENTIAL LOCAL NON-RESIDENTIAL RURAL RESIDENTIAL Roadway Section Standard Detail No. TRAFFIC-27 TRAFFIC-28 TRAFFIC-29 TRAFFIC-30 TRAFFIC-31 TRAFFIC-32 TRAFFIC-33 TRAFFIC-34 Average Daily Traffic (ADT) 10.01 Over 15,000 10,000 – 15,000 2,500 – 10,000 2,500 – 5,000 1,000 – 5,000 Up to 1,200 Up to 1,200 Up to 1,000 RIGHT-OF-WAY Width (ft) 10.02.9 876 71/826 556 65 60 50 55 50 Intersection Radii-Min. (ft) 10.02.9 39.5 29.5 19.5 24.5 17 9 24.5 7 TRAVELWAY Roadway Width (ft) 10.02.9 616 50/616 346 44 28 28 34 24 Curb/Gutter 10.02.9.4 Y Y Y Y N Y Y N Number Of Lanes 10.01 5 4/5* 2/3* 3 2 2 2 2 Inside Through Lane Width (ft) 10.02.9.1 11 11 N/A N/A N/A 10 N/A N/A Curb Lane Width (ft) 10.02.9.1 14 14 11.5 16 14 10 17 12 Center Turn Lane Width (ft) 10.02.9.2 11 11 11 12 N/A N/A N/A N/A Bikeway Class/Width (ft) 5 10.06 Cl. 1 /10 Cl. 1 /10 Cl. 2 /6 N/A Cl. 3 N/A N/A N/A Intersection Curb Radii (ft)1 10.02.9.6 50 40 30 35 30 20 35 20 Parking Allowed 10.02.9.5 N N N N N Y, one-side N Y/two-sides4 ROADSIDE Shoulder Width (ft) 10.02.9.4 N/A N/A N/A N/A 8 N/A N/A 3 Sidewalk Width (ft) 10.05.1 10 10 5 10 0 5 10 0 Street Trees with Grates 10.08 Y Y N/A Y N/A N/A Y N/A Landscape Strip Width (ft) 10.08.1 5 w/Cl. 1 trail5 5 w/Cl. 1 trail 5 5 N/A N/A 5.5 N/A N/A Illumination 10.10 Y Y Y Y Only at Intersections Y Y Only at Intersections INTERSECTION Min/Max Horizontal Approach Angle 10.04.1.2 90° ± 5° 90° ± 5° 90° ± 5° 90° ± 5° 90° ± 5° 90° ± 5° 90° ± 5° 90° ± 5° Minimum Landing Approach Length (ft) 10.04.1.5 30 30 20 20 20 20 20 20 Maximum Landing Approach Grade (%) 10.04.1.5 3 3 5 5 5 5 5 5 GEOMETRIC DESIGN CRITERIA Posted Speed (mph) 2 10.02.7 45 40 35 35 30 30 30 40 35 30 25 30 25 Design Speed (mph) 2 10.02.7 55 50 45 45 40 35 35 45 40 35 30 35 30 Min. Horizontal Curve Radius (ft)2, 8 (For Standard Cross Section) 10.02.1 9720 8150 4930 1121 821 544 544 1125 821 544 333 510 333 Min. Tangent Between Reverse Curves (ft) 2 10.02.2 150 150 150 150 150 100 150 100 Maximum Rate of Superelevation, e (%) 10.02.3 8 8 0 0 8 0 0 0 Max. Vertical Grade (%)2, 3,7 10.02.4 6 6 8 8 8 8 8 8 Cross Slope (%) 10.02.6 3 3 3 3 3 2 2 2 DRAINAGE Closed System 6.00 Y Y Y Y Only at Driveways Y Y Only at Driveways Open System 6.00 Y Y * Minor Arterials may be designed as either a four (4) lane road (two lanes in either direction) or a five (5) lane road (two lanes in either direction and a center turn lane) based on the Comprehensive Plan designation. Residential Collectors may be designed as either a two (2) (one lane in either direction) or three (3) (one lane in either direction and a center turn lane) lane road based on the configuration of access points to the collector system. 1 At intersections with two different street classifications, use the highest classification for curb radii. 2 Table values are for standard cross sections with a relatively level grade grade and are for reference only. For accurate design values reference the AASHTO Manual “A Policy on Geometric Design of Highways & Streets.” 3 Vertical curves will be required when the algebraic grade difference is more than 1%. 4 Parking shall be located where space is available, outside of the required three-foot (3’) shoulder. 5 The construction of separated bikeways shall be required in conjunction with street projects when designated by the Comprehensive Plan. 6 Required pavement and right-of-way widths may be greater then that shown to accommodate medians and/or bike lanes as required to meet Comprehensive Plan designations or to address traffic calming. See Section 10.06. 7 Vertical grades may be increased to 10% for non-arterial streets upon approval of the City Engineer. 8 Minimum radii are for streets designed using the recommended cross slopes listed above. Minimum street radii for Arterials and rural Collectors may be reduced by superelevating the street section per the requirements above. 12/21/09 ........................................................................................................................................................... ......................Design Standards ................................................................................................................................................... Page 10-58 REF. H\DEVELOPMENT\Design Standards\Chapter 10 (01-10) Chapter 12 – City Telecommunication Utility 12.00 Preface The design of City Telecommunications facilities located within City right-of-way shall be in conformance with these standards. Compliance with these standards does not alleviate the design engineer from using sound professional engineering practices. The design criteria contained herein are the minimum acceptable under standard conditions. Special conditions may require more stringent requirements that will be addressed during the plan review process. City telecommunications facilities shall be included in the Facility Extension Agreement (FAC) between the developer and the City when the Agreement includes street improvements per ACC 12.64. 12.01 Design Criteria The City has established the following minimum requirements to ensure the efficient construction of City telecommunication utilities with the least impact to City transportation and other utility infrastructure. The design of City telecommunications facilities shall also meet the requirements of Section 9.01.2, Public and Private Utilities Located Underground Within City Right-of-Way with the exception that a construction permit is not required if this work is completed as part of a Facility Extension Agreement. City telecommunications facilities may be required in conjunction with street improvements on all roadways classified as Arterial or Collector. Such facilities, when required, shall be extended the full length of the street improvement. When feasible, placement of the facilities shall accommodate connection with other existing or future telecommunication facilities within the corridor. 12.01.1 Conduits City telecommunication conduits shall be 3-inch PVC Schedule 40 and shall have a minimum of 24 inches of cover and, except for street crossings, shall be located under the sidewalk per Standard Detail TRAFFIC-54. If no sidewalk is included in the scope of the required street improvements, the conduit will be installed in the most feasible location within the street construction limits as directed by the City. Roadway crossings shall be minimized and sweeps shall be long sweep 90 degree bends. Trace wire shall be placed within the conduit. Conduits shall be placed a minimum of 5 feet from other utilities. 12.01.2 Splice Vaults and Pull Boxes When required, splice vaults and pull boxes shall be per the standard details GENERAL-05, -05a, -06 and -06a respectively. Splice vaults shall be placed every 1,500 feet. Pull boxes shall be placed every 500 feet and at all arterial and collector intersections. 10/8/2007 Design Standards Page 12-01 REF. H:\DEVELOPMENT\Manuals\Design Standards\Chapter 12 (10-07)