HomeMy WebLinkAbout03-01-2010 ITEM V-C-21C
CITY OFA�
' y
�
BU
4W
� N4�C
WASHINGTON
AGENDA BILL APPROVAL FORM
Agenda Subject: Change Order No. 2 to Contract 09-,08
Date: February 23, 2010
Department: Attachments: Budget Impact:
Public Works Budget Status Sheet & Map $ 0
Administrative Recommendation:
City Council approve Change Order No. 2 in the amount of $59,260 to Contract d9 -Q8 with Global
Contractors, LLC for work on project C P 09 04, 2 0 0 9 Citywide Sidewalk Repair Project.
Background Summary:
The purpose of this project is to repair damaged sidewalks on approximately 7.3 miles of streets
throughout the City with an emphasis on fixing potential tripping hazards. This will mainly be
accomplished by removing and replacing damaged concrete sidewalk panels. Sidewalks located in the
white area (with a grey outline) shown on the attached map are part of the original project scope and.
have been comprehensively repaired as part of this project. Sidewalks located in the grey area (with a
black outline) shown on the attached map will be added to the project as part of Change Order #2. These
project areas were selected based an the severity of the sidewalks, citizen complaints, and coordination
with past SOS street improvements.
Tree roots that are damaging the sidewalk will be pruned. Trees will only be removed if root pruning
would be insufficient to properly fix the sidewalk ('If the treeis located too close to the sidewalk for
example). All tree removals will be coordinated with the adjacent property owner.
$210,700 is budgeted in the 328 Fund for sidewalk improvements in 2009. Approximately $3,000 of this
budget was spent on sidewalk repairs as part of the R Street SE Utility Improvement Project {Project
C504A). The remaining $207,700 will fund this project. A project budget contingency of $30,084 remains
in the 328 fund.
Approximately $45,000 from the
replacements.. ,
VV0301-,3
04,12,11 CP0904
0.
103 (Local Street) Fund will be utilized for wheelchair ramp
Reviewed by Council & Committees:
❑ Arts Commission
COUNCIL COMMITTEE&
❑ Airport
Finance
El Hearing Examiner
C:1 Municipal Serv,
Q Human Services
0 Planning & GD
❑ Park Board
0 Public Works
❑ Planning Comm.
Other
Reviewed bar Departments & Divisions:
p Building
D
M&O
❑ Cemetery
D
Mayor
p Finance
Q
Parks
El Fire
❑
Planning
❑ Legal
O
Police
� Public Works
Human Resources
Action:
Committee Approval: Yes No
Council Approval: DYes No Calk for Public Hearing
Referred to Until
Tabled Until
Councillmemberg, Wagner I Staffs. Dowdy
Meeting Date: March 1, 2010 1 Item Number:. V.C,2
AUBURN * MORE THAN YOU IMAGINED
[Project No: CP0904
Project Manager: beth Wickstrorn
Initiation Date: February 2,2009
Advertisement Date: September 2k 2009
Award Date: November 2. 2 009
BUDGET STATUS SHEET
Project Title: 2009 Citywide Sidewalk Improvements
0
Project Inaltiation
0
Permission to Advertise
0
Contract Award
328 Fund -Capital Improvement Fund
Change order Approval
0
Contract Final Acceptance
Date: February 23, 2009
The "Future Years" column ind icates the projected amount to be req ueted in future budgets.
Funds Budgeted (Funds Available)
Funding
Prior Years
2U09
2010
Future Years
Total
328 Fund -Capital Improvement Fund
"328 Funds Budgeted ()
175,000'
0
(207,700)
175,000
328 Fund - Capital Improvement Fund
0
10,700
80,01 2
0 (151,459) 0
10 ,00
(carry -forward from 2008)
328 Funds Required
0 0 121,354
59,260
01
59t260
328 Fund - Capital Improvement Fund
27,0$2
271,082
{remaining balance from Project C504A -
22,000
22,000
R St 5E Utility Improvement Project}
0
56,26'E
166,354
0
222,616
103 Fund - Local Street Fund
46,000
45.000
(tor wheelchair camps replacements)
Total
0
252,700
0
0
OWN FEEMENEW-1
252,700 1
Estimated Cost (Funds Needed)
Activity
Prior Years
2009
2010
Future Years
Total
Design Engineering -City Costs'
"328 Funds Budgeted ()
305
0
(207,700)
305
Construction Estimate
0
55,396
80,01 2
0 (151,459) 0
135,41 0
Change Order #2
328 Funds Required
0 0 121,354
59,260
01
59t260
Authorized Contingency (20%)
27,0$2
271,082
Construction Engineering - City Costs'
558
558
Total
0
56,26'E
166,354
0
222,616
*City staff costs ars charged against the Engineering Budget and not the Project Budget, and are not shown hers.
103 Local Street Budget Status
Prior Years 2009 2610 Future Years Tota!
"103 Funds Budgeted () 0 (45,,000)1 0 0 (45,000))001)
103 Funds Needed 0 45,000 0 45,000 1
103 Fund Project Contingency;) 0 45,000 0 0 0
103 Funds Required 0 D 45,0001 0 0
** ( # ) in the Budget Status sections indicates Money the pity has available.
W0301 m3A 1 of 1
328 Caital Improvement Budget
Status
Prior Years 2009 2410 Future Years
Total
"328 Funds Budgeted ()
0 (207, 700) 0
0
(207,700)
328 Funds Needed
0 56,261 121,354
0
177,616
*•328 Fund Protect Contingency (}
0 (151,459) 0
0
301084)
328 Funds Required
0 0 121,354
0
01
103 Local Street Budget Status
Prior Years 2009 2610 Future Years Tota!
"103 Funds Budgeted () 0 (45,,000)1 0 0 (45,000))001)
103 Funds Needed 0 45,000 0 45,000 1
103 Fund Project Contingency;) 0 45,000 0 0 0
103 Funds Required 0 D 45,0001 0 0
** ( # ) in the Budget Status sections indicates Money the pity has available.
W0301 m3A 1 of 1
i
■. ;a] {
r i r z
w �
f r+W
IN EOL'T
T Lb �r � �FU# ER
VETERAYS FIELD
ME 0 .N1 L 15 to ST N E ST NE
P ALIM AVE
+ ;?4 NE
4 t h T
mmmmmm"
3rd AUBURN
V2
I� F_ 9 y
i 1 f
n��
� T S 1100L STN F4
1 St 13T
EAS11' I
I In CP [.0 �
1 L
ST
- n E
r =' r 4tr �. !ma
4th T
i SE
i
14
al effT L 6th ST SF 71
6Lb S[ �
r
7h T
No 7th E
8th ST SE
8th ST SE rr �
y 2, L AYS
9LL 111111111111 GO VE
��
loco T N i _Z. tchA IT :r.,
CZ W, v -
E . I
4th i
w (
6&
Mel
ST Ad -
NE
� 2nd STfimr�
�
�
Sz
1st T
IrTy
7.
m�
O
INNNNNNNN
end
b-111111111
/mm%s
05
i F 1 T
iF
1
•�� T
1 L h r EI
1
13TH
E
1
14th
E
E.w
15th S -2
1 `!
ENNNNNNNNI
1
1
1 t h S14,1 �
�' 7th 'T E
�T�
�1
C � i I ath ST'
19Lh ST E
ENNNNNNNNI
{ 71 C'
0 t Yf
21 st
S F
ULJAR LJK _Z% 22nd T SE
=� 22nd sr �13F Zr�Rl)Lm
� t
■
N E
I\T 1;1
Ll
r
NCO
4th ST
➢URISINCON
NN
T Ak7
�
AUBURN 3 r 57 NEEINNNNNNNNNA
co 2nd
v
C H 0 0 L sAd'E z
STi
cx�
U)
ENNN" end
I"� c
4,
=RAMP REPLACEMENT LOCATION
�y�` f
l
f ENL �-
f•.
k� %
Y
r 4Ti I
-• ti•.t titi -
�1=41 .1 v
:,
}k f t
f 1 tL Y r k L
i Y h } r
¢ ■■'�4
-L 171 L
f Y f } : F.1•. • f f i. 1
S hY S f
}
ti1�tf r. stir •k %7. til• e h f y y Irk • tiy�r {s.
i - .1ti4fYf ti { i
.
T
o 20Lh ST 5
. .•�. h hYh h Th { 1� •�� f
1
JEj�
- TM U CKL 11o' 'NNNN'
JAM% J: Y{.. ti
T �
Tmm
f� Y 1 f f} ��� �-
Y
f
5NAf�CHNELTSI'
UA I Yo f C7
rte'," -F}'' f f ti { $ . ' {' �■■■■■...��� ' +-r ti {�. ti Y "-r f
• �Y h ff {f ti• ��
------ W
PAR
S }{r�ti T •. fT} S %-L
t•}•{t•x
t• { f Y ti} {' �.1� �4 tt {t
-� % T YT{T fffI T .
r •Ly4�¢�f r .
: fftiY¢ r
f
ff
rZ 4 L'h fh
■ 1 �f..
1 24 Lb—aT
4.
1
h�T 1E —mmmmma 111111111111111111111111111111116
2 CA fl L
E 7 #
S I' SE r- R r [Z8TR ST 5E — 4
�T /,A N1,0' S rA W U 11.m
h ST
r 2-7tli` W C21(h $T L 9111111 UlST RK 279- ST U
LTr
28 th 'T SLAPE
CITY
W-0 R I Drd E 6m 11-
t �.
.. N� I x ., t
_ xt•
4.
FI }• } f f� � f x
r
�1 e
r� f F L 1
ZD
�UBURAI
j I
� r�ii 3t E �� r =
E - -
GA Al E
1
FA RAI
'32ricl SIE
� r
3 rd
f.%% TUC
'Iell 3 z�d PT7
T V ` F1
6 ti }} f. y. . 1 . µ f
I } �r i f
IIF
' - %h-1'. y�. f '' h -
r i
} of �• �• %
%
I}
t 1 JJ•.•LJ� L� �r.ry y flax t
1 11-111114 f t y • Y � ::.f tib.. ti�f. Y'f � f .
�%x:.,
1D PL SEIN T
W
0
,-NNNNNN����
2009 Citywide Sidewalk Repair Project
PROJECT AREA: Sidewalks in these
%%,
areas will be repaired as part of this
project.
PFWt0d 0n+V1W2r2W9 L Ian: 11;�KOIWIM wide wr� Pep* (PWC I I -���
OPTIONAL PROJECT AREA: Sidewalks
in these areas will be repaired as part of
§1 this project as the budget allows.
850* 1t700 k
Scale:- I" = 11`7001