Loading...
HomeMy WebLinkAboutITEM V-C-1 * CI7Y OF AGENDA BILL APPROVAL FORIVI , WASHINGTON Agenda Subject: Date: May 11, 2010 Permission Procurement and Advertisement of Pro'ect No. CP1011 Department: Attachments: Budget Impact: Public:Works Bud et Status Sheet and Ma $ 600,000 Administrative Recommendation: Cify Council grant permission to procure the pressure reducing valve station and to advertise for bids for Pro ect.No. CP1011, Tacoma Pi eline B St..NW Intertie Pro'ect. Background Summary: The pu.rpose of this project is to construct a connection from Tacoma Public Utilities (TPU) 60- - inch Pipeline 5 at the existing tumout to the City's 16-inch transmission main located on the west side of B Sfreef NW. The project includes connecting to the existing 12-inch valve p,rovided by TPU, installation of a pressure reducing valVe (PRV) station, connection to and from a proposed TPU meter vault, and associated improvements for a sump pump, power, telephone and telemetry. Pre-procurement of the PRV station is required to meet the project schedule. The PRV station has been designed by GC Systems, who is the only company in the state with a complete PRV station package; and will be pre-procured by the City through one of GC Systems: local distributors. Advertisement for bids will occur in May or June of 2010, with construction anticipated to occur befinreen June and August of 2010. This.project is a portion of the larger Intertie Infrastructure Project which includes construction of a second intertie on Lea Hill. The Intertie Infrastructure Project has line item funding in the proposed 2011 Water Utility Budget and a budget amendment will be needed to bring a portion of these funds forward into 2010 for this project. Therefore, a budget amendment of $600,000 from the 430 (Water) fund is required this year to fund the project. W0517-2 04.11.1 CP1011 Reviewed by Council & Commitbees: Reviewed by,Departments 8 Divisions: ❑ Arts Commission COUNCIL COMMITfEES: ❑ Building ❑ M&O ❑ Rirport ❑ Finance ❑ Cemetery ❑ Mayor ❑ Nearing Examiner p Municipal Serv. ❑ Finance ❑ Parks ❑ Human Services p Planning & CD ❑ Fire ❑ Planning ❑ Park Board ZPublic Works ❑ Legal ❑ Police ❑ Planning Comm. ❑ Other ~ Public Works ❑ Human Resources Actionr Committee ApproVal: DYes ❑No Council.Approvali ❑Yes ❑No Call for Public Hearing Referred to Until Tabled' Until _f / Councilmember. Wa ner Staff: Dowd Meetin Date: : Ma 17, 2010 Item Number: V.C.1 AUBURN 'k MORE THAN YOU IMAGINED BUDGET STATUS SHEET Proect No: CP1011 Pro)ect TIUe: Tacoma Pipellne b B St NW Intertie Projeet Manager. Leah Dunsdon 0 Project Inltiation Initiation Date: Mav 17. 2010 @) Pertnision to Advertise Date: May 10; 2010 Advertisement Date: 0 Contract Award Award-Date: 0 Change OMer Approval Q Contract Final Acceptance The "Future Years" column indicates the projected amount to be requested in future budgets. Funds Bud eted Funds Available Funding Prior Years 2010 2011 Future Years Total 430 Fund " 0 1,090,000 1,090,000 Total 0 1,090,000 1,090,000. Estimated Cost Funds Nesded - qdvi{y Prior Years 2010 2011 FutureYears Total Design Engineering - City Costs 50,000 50,000 Design Engineering - Consultant Costs 15,000 15,000 Pre-Procurement of PRV System 70,000 70,000 ConstrucCion Estimate 240,000 240,000 Project Contingency (15%) 46,500 46,500 Construction Engineering - City Costs 38,500 38,500 Other - Tacoma Meter Connection 100,000 100,000 Other- Easement(s) Purchase _ 40,000 40,000 Tota) 600,000 0 600,000 430 Water Bud et Status Prior Years 2010 2011 Future Years Total "430 Funds Budgeted 0 ' (1,090,000) (1,090,000) 430 Funds Needed 600,000 0 600,000 •430 Fund Proect Contin en ( j 0 1,090,000 490,000 430 Funds Required 600,000 0 0 in the Buiiget Status Sedions indicates Money 4he City has available. The Tacoma Pipeline 5 B Street NW Intertie Project is a portion of the larger IMertie Infrastrudure Project These projects do not indude System Development Charges or Water Purchase Costs. W0517-2A H:\PROJ\CP1011-Tacoma Pipeline 5 D St Intertie\Budget\CP1011-BudgetStatusSheet.xls 4rrTn 5 ST NE w z ~ ~ 49th 3P NP; W aO Q O co (3 286TH Sl) 42nd ST P ROJ ECT a a LOCATION B PL NW ~ r E, ST ~ .a z ~ ~ 3 #h ST Nqr a n - ~ ~ 35th z ~ F m pa " ~ ri ~ ~ ~ z ~ 30th ST NVP 30th ST NE ISAA rv P. gA4,%vaA► P PARS O ~ AUBURN z ~ z z ti x U ~ ~ 6t~1 y N ~ R ~ ~ q MUNICI L ~ 24tlx ST s10 r n rvaa► p,aRx 0 23rd a A 22nd ST 0 o A ~ AIRPOR = 21st NE ~ 16th ST ' a 19th _ - w0517_2s Tacoma Pipeline 5 B St 9VW Intertie Project crnroF_ VICWRY MAP • . N sca.S r -W WASHINGTON