Loading...
HomeMy WebLinkAbout20090923000634 STORM WATER EASEMENT AND MAINTENANCE AGREMENT 091809Return Address: City of Auburn City Clerk 25 West Main Auburn, WA 98001 EXCISE TAX NOT REQUIRED KNtp Co, Rocot~ D Above this line reserved for recording information. STORM WATER EASEMENT AND MAINTENANCE AGREEMENT KCP09-0001 N1' Ei v,d(iiiT-lWES T 1! C- --i Z Reference # (if applicable): N/A Grantor/Borrower: Auburn School District No. 408 Grantee/Assignee/Beneficiary: City of Auburn Legal Description/STR: N NE'/. S 4, ,T2 T21 N, RSE 2 ~ Assessor's Tax ParcelID#: 0421059057 THIS EASEMENT AND AGREEMENT made and entered into this 17~day of 5e Pte-rn b{ ✓ , 2009, by and between the City of Auburn, a municipal corporation of King County, Washington, hereinafter referred to as "CITY" and Auburn School District hereinafter referred to as "PROPERTY OWNER". WHEREAS, PROPERTY OWNER has applied for certain permits with the CITY for the construction of facilities for Arthur Jacobsen Elementary School located at 29205132 "d Avenue SE, which create impervious surface; and WHEREAS, the PROPERTY OWNER will complete a storm system; and WHEREAS, the PROPERTY OWNER and the CITY desire that the storm system be maintained to provide adequate facilities for controlling both the quantity and quality of storm drainage; and WHEREAS, for maintenance of a storm system it is necessary to have appropriate right-of-way to bring in equipment to conduct maintenance functions; and WHEREAS, maintenance requirement is a covenant running with the land and binding upon all heirs, successors and assigns of both parties; and WHEREAS, the parties desire that this Agreement be recorded to advise heirs, successors and assigns of both parties as to the existence of this easement and agreement; and Storm Water Easement and Maintenance Agreement Page 1 of 21 WHEREAS, an easement is needed to bring in maintenance equipment; and WHEREAS, the parties are both desirous of permitting inspection of the storm system to make certain that it is functioning properly and for purposes of determining the appropriate repairs. NOW, THEREFORE, BASED UPON MUTUAL COVENANTS TO BE DERIVED THE PARTIES AGREE AS FOLLOWS: Section 1, EASEMENT PROPERTY OWNER hereby provides a non-exclusive easement to the City for access, inspection, and maintenance for the purposes of this Agreement and the attached Storm Water Pollution Prevention Plan, over, under and on that real estate described in Exhibit "A" & "B" and on that portion of the property as showing on the approved Record Drawings revised pursuant to construction records for the City of Auburn, which record drawings are hereby incorporated by reference as if set out in full. This easement shall be a burden to that real estate which is legally described and attached as Exhibit "A" & "B" and incorporated herein by this reference, and shall be a benefit to the City Storm Drainage Utility System. Section 2, HEIRS, SUCCESSORS AND ASSIGNS parties. This Agreement shall be binding upon the heirs, successors and assigns of the Section 3, MAINTENANCE The PROPERTY OWNER agrees to maintain the storm system in accordance with the ordinances and all applicable codes of the CITY and the Storm Water Pollution Prevention Maintenance and Operation Schedule attached as Exhibit "C" and incorporated herein by this reference. The PROPERTY OWNER does hereby agree that the CITY may enter onto the property of the PROPERTY OWNER via the easement described above to inspect and perform necessary maintenance if, after the PROPERTY OWNER is given notice to maintain, the PROPERTY OWNER fails to maintain. Further, the PROPERTY OWNER agrees the CITY may enter onto the property of PROPERTY OWNER via the easement described above to perform emergency maintenance in the event of the storm system's failure which might result in adverse impacts(s) on public facilities or private facilities of other property owners. In both events the PROPERTY OWNER agrees to reimburse the CITY for the costs incurred by the CITY in maintaining the storm system. Should the CITY incur attorney's fees and/or costs in enforcing the agreement and/or in maintaining or collecting maintenance fees, the PROPERTY OWNER agrees to pay reasonable attorney's fees and all costs incurred by the CITY. Storm Water Easement and Maintenance Agreement Page 2 of 21 Section 4, ACKNOWLEDGMENT OF OTHER ENFORCEMENT ACTIONS PROPERTY OWNER acknowledges that there may be liability for violations of codes that could result in additional fines and/or the possibility of incarceration in addition to the fees for maintenance should violations occur. EXECUTED as of the date first written above. CITY OF AUBURN ----Tim Carlaw, Storm Drainage Engineer to STATE OF WASHINGTON) )ss. COUNTY OF KING ) I certify that I know or have satisfactory evidence that Tim Carlaw is the person who appeared before me, and said person acknowledged that he signed this instrument, on oath stated that he was authorized to execute the instrument and acknowledged it as the STORM DRAINAGE ENGINEER of THE CITY OF AUBURN to be the free and voluntary act of such party for the uses and purposes mentioned in this instrument. Dated l i y .~~~pppNNN n / i i 4 s Z zzii Witt ~'4ry~ DF`W PS~`~ Notary Publi2-#n-m Residing at j My appointment e: /1 e: k l Storm Water Easement and Maintenance Agreement Page 3 of 21 AUBURN SCHOOL DISTRICT NO. 408, a municipal corporation of the State of Washington D. K. Herren Date Superintendent STATE OF WASHINGTON) ) ss COUNTY OF KING ) I certify that I know or have satisfactory evidence that Z~Znn 1 ib kjo ><}d r-(-m J is the person who appeared before me, and said person acknowledged that they signed this instrument, on oath stated that they were authorized to execute the instrument and acknowledged it as the Superintendent of the Auburn School District No. 408, a municipal corporation, to be the free and voluntary act of such party for the uses and purposes mentioned in this instrument. Dated q11-716 f kh-Au --Debbiy. L Lz4htrm Notary Public in and for he State of Washington Residing at `aTL2,a& VAV-Z* My appointment expires 0-19-.V6I1 KT/tlb REF. H:\Development\Projects\Aubum School Distrieftegal Documents\2009 Storm Water Easement and Maintenance Agreement Page 4 of 21 EXHIBIT 'A' THAT PORTION OF THE NORTH HALF OF THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 4, TOWNSHIP 21 NORTH, RANGE 5 EAST OF THE WILLAMETTE MERIDIAN, KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS BEGINNING AT THE NORTHWEST CORNER OF SAID NORTH HALF OF THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 4, TOWNSHIP 21 NORTH, RANGE 5 EAST OF THE WILLAMETTE MERIDIAN, THENCE SOUTH 870 36'42" EAST ALONG THE NORTH LINE OF SAID SUBDIVISION 1291 67 FEET TO THE WEST MARGIN OF 132ND AVENUE EAST (LOCATED 30 FEET WESTERLY OF THE EAST LINE OF SAID SECTION 4), THENCE SOUTH 010 29'46" WEST ALONG SAID WEST MARGIN 337 77 FEET TO A LINE PARALLEL WITH AND 337 73 FEET SOUTHERLY (WHEN MEASURED AT RIGHT ANGLES) OF SAID NORTH LINE OF SAID SUBDIVISION, THENCE NORTH 870 36'42" WEST ALONG SAID PARALLEL LINE 1292 14 FEET TO THE WEST LINE OF THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER OF SAID SECTION 4, THENCE NORTH 010 34'25" EAST ALONG SAID WEST LINE 337 76 FEET TO THE POINT OF BEGINNING EXCEPT THAT PORTION DEDICATED TO KING COUNTY FOR ROAD PURPOSES. SITUATE IN KING COUNTY, WASHINGTON THE BASIS OF BEARINGS AND THE SECTION BREAKDOWN USED FOR THIS DESCRIPTION IS RECORD OF SURVEY FILED IN BOOK 142 OF SURVEYS AT PAGE 12 UNDER RECORDING NUMBER 20001212900014, RECORDS OF KING COUNTY, WASHINGTON Storm Water Easement and Maintenance Agreement Page 5 of 21 EXHIBITS' MATCH LINE `A' Storm Water Easement and Maintenance Agreement Page 6 of 21 MATCH LINE 'A' MATCH LINE 'B' Storm Water Easement and Maintenance Agreement Page 7 of 21 MATCH LINE 'B' Storm Water Easement and Maintenance Agreement Page 8 of 21 EXHIBIT `C' STORMWATER POLLUTION PREVENTION MAINTENANCE and OPERATION SCHEDULE for Arthur Jacobsen Elementary School KCP09-0001 Site Address: The project is located in NE1/4 of Section 4 Township 21 North Range 5 East, W.M., 29205 132nd Avenue SE, Auburn, WA 98092. The tax parcel number is 0421059057. Introduction: This report has been prepared to address the City of Auburn's storm drainage and pollution prevention requirements for Arthur Jacobsen Elementary School located at 29205 132"d Avenue SE, Auburn, WA 98092. The site has an area of approximately 10.02 acres and was previously developed as a single-family residence with a shop-like out building that was demolished. The subject site consists of a new two-story elementary school building, portable classrooms, play structures, basketball courts, sports courts, pedestrian walkways, a bus drop-off area, and staff and visitor parking. According to the City of Auburn's Construction Standards for stormwater management, the City requires stormwater quantity and quality control to all proposed developments. The site is designed to collect all of the stormwater runoff from the landscaped, building, and pavement areas in a series of catch basins. This water is conveyed by storm drainage pipe to a stormwater combination wetpond detention facility located at the east end of the parcel along 132nd Avenue SE. Here the stormwater is released into a 12-inch storm drainage line running to the north approximately 460 feet. The storm system outfalls to a conveyance system on the west ditch line of 132nd Avenue SE. A wet vault is situated in combination with the detention vault to treat runoff from the 132nd Avenue SE improvements. This system discharges to a 12-inch storm drainage line that also connects to the conveyance system located in the ditch line of 132nd Avenue SE. Storm Water Easement and Maintenance Agreement Page 9 of 21 Plan Goal: The specific purpose for the stormwater facility is to minimize pollution that is typically associated with modern development; in general, pollution from motor vehicles and pollution generated from erosion. Attached to this narrative is a maintenance manual that offers guidelines to the owner for stormwater facility maintenance. Prevention BMPs: The catch basins shall have stenciled on them "DUMP NO WASTE - DRAINS TO STREAM." The owner shall be responsible for sweeping the lot, installing storm drainage stenciling, and providing spill control procedures. In case of spill, call the Department of Ecology at 1-425-649- 7000. The catch basins, detention/wetpond, and control structures will be visually inspected for accumulation of debris and silt and will be maintained as required by this Stormwater Pollution Prevention Plan and attachments. • Maintenance Standards for Drainage Facilities (from the Department of Ecology Stormwater Manual, August 2001) No. 1 - Detention Pond No. 4 - Control Structure/Flow Restrictor No. 5 - Catch Basins No. 6 - Debris Barriers No. 11 - Wetpond No. 12 -Wet Vault Treatment BMPs: A combination wetpond/detention pond and a wet vault have been installed to treat runoff for conventional pollutants. The wetpond and wet vault were designed to treat 64% of the 2-year storm event (water quality storm) for water quality treatment. In addition, the detention pond was designed to detain the volume created from releasing half the 2-year through 50-year historic durations and matches historic 2- and 10-year peaks. The City of Auburn Storm Drainage Utility section is to review and approve any changes to this Stormwater Pollution Prevention Plan prior to changes in its implementation. Additionally, any changes in ownership or person of responsibility are to be reported to the City of Auburn Storm Drainage Utility section. Storm Water Easement and Maintenance Agreement Page 10 of 21 Inspection/Maintenance: Regular inspections of the drainage facilities should be carried out twice per year, in the spring and fall. The responsible party should keep records of these inspections available for review by the City. Additional inspections may be required after severe storms. Routine maintenance of the site will include mowing, care of landscaping, and the removal of trash and debris from the drainage system. The parking lots and driveways should be kept clean and in repair. Events such as major storms or heavy winds will require immediate inspections for damages. To ensure proper water quality and treatment, the combination wetpond/detention pond and wet vault must be properly maintained. Be careful to avoid introducing landscape fertilizer to receiving waters or groundwater. If wetpond side slopes become eroded over 2 inches deep, stabilize by using appropriate erosion control measures (e.g., rock reinforcement, planting of grass, compaction). Catch basins shall be cleaned when sump is one-third of one foot full of sediment or debris. Person of Responsibility: Jeffrey L. Grose Executive Director of Capital Projects Auburn School District 915 Fourth Street NE Auburn, WA 98002 (253) 931-4826 Design Engineer: Doreen S. Gavin, PE, LEED® AP Vice President AHBL, Inc. 2215 N. 301h Street, Suite 300 Tacoma, WA 98403 (253) 383-2422 Storm Water Easement and Maintenance Agreement Page 1 1 of 21 Plan and/or Information Updates: The City of Auburn Storm Drainage Utility section is to review and approve any changes to this Stormwater Pollution Prevention Plan prior to changes in its implementation. Additionally, any changes in ownership or person of responsibility are to be reported to the City Storm Drainage Utility section. INSPECTION/MAINTENANCE CHECKLIST STRUCTURE Results/ .Maintenance Date Detention Pond Inspection Results Maintenance Done Flow Control Inspection Structure Results Maintenance Done All Catch Basins Inspection Results Maintenance Done Debris Barriers Inspection Results Maintenance Done Wetpond Inspection Results Maintenance Done Wet Vault Inspection Results Maintenance Done Storm Water Easement and Maintenance Agreement Page 12 of 21 Maintenance Standards for Drainage Facilities: The facility-specific maintenance standards contained in this section are intended to be conditions for determining if maintenance actions are required as identified through inspection. They are not intended to be measures of the facility's required condition at all times between inspections. In other words, exceeding these conditions at any time between inspections and/or maintenance does not automatically constitute a violation of these standards. However, based upon inspection observations, the inspection and maintenance schedules shall be adjusted to minimize the length of time that a facility is in a condition that requires a maintenance action. No.1- Detention Ponds General - c t trPrINdae~Mnl~llft ~i W1t4; 4 xE i5i T I F F 4 i q r , ,..:d Trash & Debris Any trash and debris which exceed 5 Trash and debris cleared from site. cubic feet per 1,000 square feet (this is about equal to the amount of trash it would take to fill up one standard size garbage can). In general, there should be no visual evidence of dumping. If less than threshold all trash and debris will be removed as part of next scheduled maintenance. Poisonous Any poisonous or nuisance No danger of poisonous vegetation Vegetation and vegetation which may constitute a where maintenance personnel or the noxious weeds hazard to maintenance personnel or public might normally be. (Coordinate the public. with local health department.) Any evidence of noxious weeds as Complete eradication of noxious weeds defined by State or local regulations. may not be possible. Compliance with State or local eradication policies (Apply requirements of adopted IPM required. policies for the use of herbicides). Contaminants Any evidence of oil, gasoline, No contaminants or pollutants present. and Pollution contaminants, or other pollutants. (Coordinate removal/cleanup with local water quality response agency). Rodent Holes Any evidence of rodent holes if Rodents destroyed and dam or berm facility is acting as a dam or berm, or repaired. (Coordinate with local health any evidence of water piping through department; coordinate with Ecology dam or berm via rodent holes. Dam Safety Office if pond exceeds 10 acre-feet.) Storm Water Easement and Maintenance Agreement Page 13 of 21 No.1- Detention Ponds 'art r FntFEgli#'YI~l8il fMlfe#t~lpCt,#;IB ft68itt4i a M l q~,.. ¢ s...(. ' ~yy ~,ARA u t i k i i Beaver Dams Dam results in change or function of Facility is returned to design function. the facility. (Coordinate trapping of beavers and removal of dams with appropriate permitting agencies.) Insects When insects such as wasps and Insects destroyed or removed from hornets interfere with maintenance site. activities. Apply insecticides in compliance with adopted IPM policies. Tree Growth Tree growth does not allow Trees do not hinder maintenance and Hazard maintenance access or interferes activities. Harvested trees should be Trees with maintenance activity (i.e., slope recycled into mulch or other beneficial mowing, silt removal, vaotoring, or uses (e.g., alders for firewood). equipment movements). If trees are not interfering with access or Remove hazard trees. maintenance, do not remove. If dead, diseased, or dying trees are identified. (Use a certified Arborist to determine health of tree or removal requirements.) Side Slopes Erosion Eroded damage over 2 inches deep Slopes should be stabilized using of Pond where cause of damage is still appropriate erosion control measure(s); present or where there is potential for e.g., rock reinforcement, planting of continued erosion. grass, compaction. Any erosion observed on a If erosion is occurring on compacted compacted berm embankment. berms, a licensed civil engineer should be consulted to resolve source of erosion. Storage Area Sediment Accumulated sediment that exceeds Sediment cleaned out to designed 10% of the designed pond depth pond shape and depth; pond reseeded unless otherwise specified or affects if necessary to control erosion. inletling or outletling condition of the facility. Liner (If Liner is visible and has more than Liner repaired or replaced. Liner is Applicable) three 1/4-inch holes in it. fully covered. Storm Water Easement and Maintenance Agreement Page 14 of 21 No.1- Detention Ponds 1 f l °^^*`.T'[ M~`^!^""..••'~'[~ r a^w~[RRW wiT fi7 { i FUR y i , : Pond Berms Settlements Any part of berm that has settled Dike is built back to the design (Dikes) 4 inches lower than the design elevation. elevation. If settlement is apparent, measure berm to determine amount of settlement. Settling can be an indication of more severe problems with the berm or outlet works. A licensed civil engineer should be consulted to determine the source of the settlement. Piping Discernable water flow through pond Piping eliminated. Erosion potential berm. Ongoing erosion with potential resolved. for erosion to continue. (Recommend a Goethechnical engineer be called in to inspect and evaluate condition and recommend repair of condition. Emergency Tree Growth Tree growth on emergency spillways Trees should be removed. If root Overflow/ creates blockage problems and may system is small (base less than 4 Spillway and cause failure of the berm due to inches), the root system may be left in Berms over uncontrolled overtopping. place. Otherwise, the roots should be 4 feet in removed and the berm restored. A height. Tree growth on berms over 4 feet in licensed civil engineer should be height may lead to piping through the consulted for proper berm/spillway berm which could lead to failure of restoration. the berm. Piping Discernable water flow through pond Piping eliminated. Erosion potential berm. Ongoing erosion with resolved. potential for erosion to continue. (Recommend a Goethechnioal engineer be called in to inspect and evaluate condition and recommend repair of condition. Emergency Overflow/ Emergency Only one layer of rock exists above Rocks and pad depth are restored to Overflow/ native soil in area five square feet or design standards. Spillway Spillway larger, or any exposure of native soil at the top of out flow path of spillway. (Riprap on inside slopes need not be replaced.) Erosion See "Side Slopes of Pond." Storm Water Easement and Maintenance Agreement Page 15 of 21 No. 4 - Control Structure/Flow Restrictor ~ ~ i 41 tY`~ejE ~tl ' {i t44 r . . , . nn General Trash and Material exceeds 25%0 of sump depth Control structure orifice is not blocked. Debris (Includes or 1 foot below orifice plate. All trash and debris removed. Sediment) Structural Structure is not securely attached to Structure securely attached to wall and Damage manhole wall. outlet pipe. Structure is not in upright position Structure in correct position. (allow up to 10% from plumb). Connections to outlet pipe are not Connections to outlet pipe are watertight and show signs of rust. watertight; structure repaired or replaced and works as designed. Any holes, other than designed Structure has no holes other than holes, in the structure. designed holes. Cleanout Damaged or Cleanout gate is not watertight or is Gate is watertight and works as Gate Missing missing. designed. One maintenance person cannot Gate moves up and down easily and is move up and down gate. watertight. Chain/rod leading to gate is missing Chain is in place and works as or damaged. designed. Gate is rusted over 50% of its surface Gate is repaired or replaced to meet area. design standards. Orifice Plate Damaged or Control device is not working properly Plate is in place and works as Missing due to missing, out of place, or bent designed. orifice plate. Obstructions Any trash, debris; sediment, or Plate is free of all obstructions and vegetation blocking the plate. works as designed. Overflow Pipe Obstructions Any trash or debris blocking (or Pipe is free of all obstructions and having the potential of blocking) the works as designed. overflow pipe. Manhole See "Closed See "Closed Detention Systems" See "Closed Detention Systems" Detention (No. 3). (No. 3). Systems" (No. 3). Catch Basin See "Catch See "Catch Basins" (No. 5). See "Catch Basins" (No. 5). Basins" (No. 5). Storm Water Easement and Maintenance Agreement Page 16 of 21 No. 5 -Catch Basins General fps! Mq en3 f LdSt ' ` ` ' 47 j y ~ y Trash & Debris Trash or debris which is located No Trash or debris located immediately immediately in front of the catch in front of catch basin or on grate basin opening or is blocking inletting opening. capacity of the basin by more than 10%. Trash or debris (in the basin) that No trash or debris in the catch basin. exceeds 60 percent of the sump depth as measured from the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of six inches clearance from the debris surface to the invert of the lowest pipe. Trash or debris in any inlet or outlet Inlet and outlet pipes free of trash or pipe blocking more than 1/3 of its debris. height. Dead animals or vegetation that No dead animals or vegetation present could generate odors that could within the catch basin. cause complaints or dangerous gases (e.g., methane). Sediment Sediment (in the basin) that exceeds No sediment in the catch basin. 60 percent of the sump depth as measured from the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of 6 inches clearance from the sediment surface to the invert of the lowest pipe. Structure Top slab has holes larger than 2 Top slab is free of holes and cracks. Damage to square inches or cracks wider than Frame and/or 1/4 inch. Top Slab (Intent is to make sure no material is running into basin).. Frame not sitting flush on top slab, Frame is sitting flush on the riser rings i.e., separations of more than 3/4 or top slab and firmly attached. inch of the frame from the top slab. Frame not securely attached Fractures or Maintenance person judges that Basin replaced or repaired to design Cracks in Basin structure is unsound. standards. Walls/ Bottom Grout fillet has separated or cracked Pipe is regrouted and secure at basin wider than 1/2 inch and longer than 1 wall. foot at the joint of any inletloutlet pipe or any evidence of soil particles entering catch basin through cracks. Storm Water Easement and Maintenance Agreement Page 17 of 21 No. 5 - Catch Basins 1ilfanrN[atreFl R SU Settlement/ If failure of basin has created a Basin replaced or repaired to design Misalignment safety, function, or design problem. standards. Vegetation Vegetation growing across and No vegetation blocking opening to blocking more than 10% of the basin basin. opening. Vegetation growing in inlet/outlet pipe No vegetation or root growth present. joints that is more than six inches tall and less than six inches apart. Contamination See "Detention Ponds" (No. 1). No pollution present. and Pollution Catch Basin Cover Not in Cover is missing or only partially in Catch basin cover is closed. Cover Place place. Any open catch basin requires maintenance. Locking Mechanism cannot be opened by one Mechanism opens with proper tools. Mechanism Not maintenance person with proper Working tools. Bolts into frame have less than 1/2 inch of thread. Cover Difficult One maintenance person cannot One maintenance person can remove to Remove remove lid after applying normal cover. lifting pressure. (Intent is keep cover from sealing off access to maintenance.) Ladder Ladder Rungs Ladder is unsafe due to missing Ladder meets design standards and Unsafe rungs, not securely attached to basin allows maintenance person safe wall, misalignment, rust, cracks, or access. sharp edges. Metal Grates Grate opening Grate with opening wider than 7/8 Grate opening meets design standards. (If Applicable) Unsafe inch. Trash and Trash and debris that is blocking Grate free of trash and debris. Debris more than 20% of grate surface inletting capacity. Damaged or Grate missing or broken member(s) Grate is in place and meets design Missing of the grate. standards. - Storm Water Easement and Maintenance Agreement Page 18 of 21 No. 6 - Debris Barriers (e.g., Trash Racks) 41 aNNfb h Y4terf MiaSttt t { #es~Fts { 3:: M O General Trash and Trash or debris that is plugging more Barrier cleared to design flow capacity. Debris than 20% of the openings in the barrier. Metal Damaged/ Bars are bent out of shape more than Bars in place with no bends more than Missing Bars. 3 inches. 3/4 inch. Bars are missing or entire barrier Bars in place according to design. missing. Bars are loose and rust is causing Barrier replaced or repaired to design 50% deterioration to any part of standards. barrier. Inlet/Outlet Pipe Debris barrier missing or not attached Barrier firmly attached to pipe. to pipe. Storm Water Easement and Maintenance Agreement Page 19 of 21 No. 11- Wetponds f r4dt#r MIeh IIIdpgA s ip "i! 4~ EM m Water level First cell is empty, does not hold Line the first cell to maintain at least 4 water. feet of water. Although the second cell may drain, the first cell must remain full to control turbulence of the incoming flow and reduce sediment resuspension. Trash and Accumulation that exceeds 1 CF per Trash and debris removed from pond. Debris 1000-SF of pond area. Inlet/Outlet Pipe Inlet/outlet pipe clogged with No clogging or blockage in the inlet and sediment and/or debris material. outlet piping. Sediment Sediment accumulations in pond Sediment removed from pond bottom. Accumulation in bottom that exceeds the depth of Pond Bottom sediment zone plus 6-inches, usually in the first cell. Oil Sheen on Prevalent and visible oil sheen. Oil removed from water using oil- Water absorbent pads or vector truck. Source of oil located and corrected. If chronic low levels of oil persist, plant wetland plants such as Juncus effusus (soft rush) that can uptake small concentrations of oil. Erosion Erosion of the pond's side slopes Slopes stabilized using proper erosion and/or scouring of the pond bottom, control measures and repair methods. that exceeds 6-inches, or where continued erosion is prevalent. Settlement of Any part of these components that Dike/berm is repaired to specifications. Pond has settled 4-inches or lower than the Dike/Berm design elevation, or inspector determines dike/berm is unsound. Internal Berm Berm dividing cells should be level. Berm surface is leveled so that water flows evenly over entire length of berm. Overflow Rock is missing and soil is exposed Rocks replaced to specifications. Spillway at top of spillway or outside slope. General Storm Water Easement and Maintenance Agreement Page 20 of 21 No. 12 -Wet Vaults General kH T; ~ ~y}k~~~ y{yy{/ (y ~jyy 8 Y'}~~FlKS+M1R {AE Nin^ PfNH1 ~n g 9 i,iMgY~^~ ~I W f. h ~4i d a ' t 139' d ~~F~~n y`FO'~i kfl. Trash/Debris Trash and debris accumulated in Remove trash and debris from vault. Accumulation vault, pipe or inlet/outlet (includes floatables and non-floatables). Sediment Sediment accumulation in vault Remove sediment from vault. Accumulation in bottom exceeds the depth of the Vault sediment zone plus 6-inches. Damaged Pipes Inlet/outlet piping damaged or Pipe repaired and/or replaced. broken and in need of repair. Access Cover Cover cannot be opened or Pipe repaired or replaced to proper Damaged/Not removed, especially by one person. working specifications. Working Ventilation Ventilation area blocked or plugged. Blocking material removed or cleared from ventilation area. A specified % of the vault surface area must provide ventilation to the vault interior (see design specifications). Vault Structure Maintenance/inspection personnel Vault replaced or repairs made so that Damage- determine that the vault is not vault meets design specifications and is Includes Cracks structurally sound. structurally sound. in Walls Bottom, Damage to Frame and/or Top Slab Cracks wider than 1/2-inch at the Vault repaired so that no cracks exist joint of any inlet/outlet pipe or wider than 1/4-inch at the joint of the evidence of soil particles entering inlet/outlet pipe. through the cracks. Baffles Baffles corroding, cracking, warping Baffles repaired or replaced to and/or showing signs of failure as specifications. determined by maintenance/inspection staff. Access Ladder Ladder is corroded or deteriorated, Ladder replaced or repaired to Damage not functioning properly, not specifications, and is safe to use as attached to structure wall, missing determined by inspection personnel. rungs, has cracks and/or Replace sign warning of confined space misaligned. Confined space entry requirements. Ladder and entry warning sign missing. notification complies with OSHA standards. Storm Water Easement and Maintenance Agreement Page 21 of 21