HomeMy WebLinkAbout20100204000186 STORM WATER EASEMENT AND MAINTENANCE AGREEMENT 090309ReAm Addii
CiV,fAubI
VV
N
N
On, CA,
NN
NNi
VV
NN III
25 West Main
Auburn, WA`WSI
ryry
ry
2010020
4000186
pGE
tr Eas
0 o
140 00
54
01X0 ca
u
e
a
w~
YP
Above Nis live reserved for mcordine substitution.
STORM WATER EASEMENT AND MAINTENANCE AGREEMENT
LEI 1`tV
PAC III
ReGrmce#(if appllcableT WA
GrmtorBOmowec Auburn Regional Medical Center, Inc.
Grnnbe/ASVigneeBaneLClary: City of After, tiy 4T
Legal Description STR: N6 Y S 13, T 21 V, R 09(1-1, W 1)g, 2,1
Assessor's i Parealton: 0492000340, 0305 I01
t5 EASEMENT AND AGREEMENT made and entered into this JTP day of
2009, by and between the City of Auburn, a municipal cooperation
of Ki g County, Washington, hereinafter reported to as "COY" and Auburn Regional
Medical Center, inc. hereinafter referred to AS "PROPERTY OWNER".
WHEREAS, PROPERTY OWNER has applied for certain permits with the CITY
for the construction of facilities for Auburn Regional Medical Center and Parking Garage
located soft. Division St., which curate impervious surface; and
WHEREAS, the PROPERTY OWNER will complete a stem system; and
WIIERII the PROPERTY OWNER and the CITY desire that the stain system
be maintained to provide adequate facilities for controlling both the quuntity and quality of
stem dramage; and
WTHIRF.AS, for maintenance of a storm System it is notessaty to have appropriate
right-of-way to bring in equipment to conduct maintenance functions; and
WHEREAS, maintenance requirement is a covenant mining with the land and
binding upon all heirs, succesems and assigns of both parties; and
into
roc,. A9III;aoeArr tin,or
11 : koo o:a,. nt w:t. ba.
Sumorater Easement and Maintettarde Agreement EXCISE TAX NOT REQUIRED
I ore Co Rube Me
\Dreparty
WIIEREAS, the patties desire that this Agreement he recurded in advise heirs,
successors and assigns of both parties as to the existence of this easement and agreement;
and
WHEREAS, an easements needed to bring in maintenance equipment; and
WHEREAS, the parties are both desirous of permitting inspection of the storm
system to make certain that it is functioning properly and for professes of determWng the
appropriate repairs.
NOW, THEREFORE, BASED UPON MUTUAL COVFNANTS TO BE
DERIVED THE PARTIES AGREE AS FOLLOWS:
Section 1, EASEMEN'T'
PROPERTY OWNER hereby provides a nonexclusive easement to the City for
access, inspection, and maintenance for the purposes of des Agreement and the attached
Smrm Water Pollution Prevention Plan, over, under and on that real estate described in
Exhibit "A" & "B" and on that portion of the property as showing on the approved Round
Drawings revised Rumored to construction records for the City of Auburn order Permit No.
PAC o8-0025, which record drawings are hereby incorpomed by reference as if set out in
full. Ihis easement shall be a burden m that real e date which is legally described and
attached as Exblblt "A" & "B" and incorporated herein by this reference, and shall be a
benefit to the City Stuart Drainage Utility System
Session 2, HEIRS, SUCCESSORS AND ASSIGNS
'I his Agreement shall he binding upon me heirs, successors and assigns of the
parties.
Section 3, MAINTENANCE
The PROPERTY OWNER agrees to maimain the storm system in accordance with
the ordinances and all applicable codes of the CITY and the Smnn Water Pollution
Prevention Maintenance and Operation Schedule attached res Exhibit "C' and incorporated
herein by this reference. The PROPERTY OWNER does hereby agree that the CITY may
enter onto the property of the PROPERTY OWNER via the easement described above to
inspect and pefotm necessary maintenance if, after the PROPERTY OWNER is given
notice to maintain, the PROPERTY OWNER foils to maintain. Further, the PROPERTY
OWNER agrees the CITY may enter onto the properly of PROPERTY OWNER via the
easement described above to perform emergency maintenance in the event of the stem
Sarmwater Easement
2 of17
system's failure "turn might result in adverse impacts(s) on public facilities or private
faclities of other property, owners. In From events the PROPERTY OWNER agrees to
reimburse the CITY for the costs inured by the CITY in maintaining the stairs system.
Should the CITY incur attorney's fees aM/or costs in summing the agreement and/or in
maintaining or collecting membranes fires, the PROPERTY OWNER agrees to pay
reasonable attorney's fees and all torts mcaned by the CITY.
Section 4, AC"O)VLEDGMENT OF OTHER ENFORCEMENT ACTIONS
PROPERTY OWNER acknowledgas that there may he liability for violations of
codes thin could result in additional fines andfor the possibility of incarceration in addition
or the fees for maintenanw should violations occur.
EXECUTED as of he date first written above.
CI9Y OF AUBURN
o w, Smrm DreiL~-.__- -
Carlnege Engineer Date
e
STATE OF WASHING ION )
Country of King )
I terrify that I know or have satisfactory evidence that Tim Carlow is the person who
appeared before an, and said person acknowledged that he signed this instrument, on oath
stated that he was authorized to execute the trutroment and acknowledged it as the
STORM DRAINAGE ENGINEER of THE CITY OF AUBURN to be the flee and
Yr6f1 G t_.
Notary Public in and for me Slam of wash ngton
Residing at - P~ ~w-F
My appointment expires. I r a
Stormwater Easement and Maintenance Agreement
3 ofr9
GRANTOR
AUHCRN REGIONAL MEDICAL CENTER, INC. a Washington corporation
By. .sow,---. J
Nabs, k$pPVL Lk
Title'. __FLft _tPM non{
Penn ✓
STATB OF 1l
)
jnrlwium✓f )as.
COUN'fYOY hjlliitiluh )
On timphiay of 11 b9009, before me personally appeamd':C YJG lf~dx~
to me known to be>AUBORN REshIONAL MEDICAL CEN'ITIC INC.,
which executed fie within and foregoing instrument, and acknowledged said instrument to be the
free and voluntary act and deed of said corporation, for the uses end purposes therein mentioned,
and on oath stated that he was mthutl;ed to execute said Inarement.
TN WITNESS WHEREOF, I have hereunw set my hand and affixed my official seal the
day and year flint above written.
Lm L X ON {
CpMagMN Tsl OF PleassVLVANW
and [ the Same of WaslgihyanfdMSy/t1iU
NOTARY RUBLI
C
rwrwaM
P
"
Ra d g t LJl ur✓ t 1. IO JP1L[]~YCF/259
°m'N 1wMrrvmcwro
:
Idy Commission ~pp '~U.L
.a i
E
~
N~cn.
Pr t dN e.
^
N e
e
Stormwnter Eaaemem and Maintenance Agreement
4 of 17
E7CHMff A
SM DESCRUMON
PARCEL A AND B OF THAT att OF AUBURN BOUNDARY TINE ADJUSTMENT RECORDED
UNDER RECORDING NUMBER 20080911900016, RECORDS OF KING COUNTY, LONG WITHIN
THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION Id TOWNSHIP 21
NORTH, RANGE 4 EAST, WN, IN THE CITY OF AUBURN. KING COUNTY, WASHINGTON.
I
t1fA7
P SORYSYINa mc.
- P. O. OS IW00`
W-OBe~
IOB NO. 2W8-086 ~ J
Sto mk ate Fa ement end Melnterenoo A&ccmcnt
5 of19
EXFDBIT B
SrM MAP
SaM M'W _
9tl
HD3M~f NW
r~ S 2Y 'eM W
I ~ I ~ a0 I I
PAPLL9.A r
~IP®1RY IA® A➢I16I~NP (®A (i-0W A
~I~ ~ INQ SNb1HOG'd; 'gIg
~'M{ m~ SB431'MY ~ 8g W'
' 159.x'
GRAPHIC SCALE w
l Inch = 60 It,
a HT HIH@8f NW A
fl2Mw
a ]9fl85 p~~xn
~~116aY®Y
SCAY$YIPfi 1PC.
+~'1 TA~CmON1ar0~~BB4W11
R6]MWW~-W64
_ _eu
JOB NO. 2008-086
Storm"atec Hasemem and Maimeaanca Agxwmeml
60f 11
EXHIBIT V
STORM WATER POLLUTION PREVENTION PLAN
For the
UHS Medical Office Building & Parking Garage
SERA NO.
SEP074025
FAC NO.
FAC084025
GRA NO.
GRA08.0028
Site Address:
The project is located in the Northeast Quarter of Section 13, Township 21
Range 4 East W.M., Division Street.
The lax parcel numbers are 0492000305 and 0492000340.
Introduction-
This storm drainage technical information report has been prepared to
address the City of Auburn 'a site development and storm drainage
requirements for the proposed Medical Once Building (MOB) located at
1st Street NW and Division Street. The site has an area of approximately
1.68 acres and is currently an office building and parking. The subject site
will be developed as an MOB and parking garage.
The subject site is flat. Stormwater runoff from the new construction will be
treated and released into the city stone drainage system.
According to the City of Auburn's Construction Standards for storm water
management, the city requires storm water quality control for all projects
located in the Auburn Downtown Plan area. We have proposed to collect
all of the storm water runoff from the landscaped, building and pavement
areas in a series of catch basins. This water will be conveyed by storm
drainage pipe to a storm water Catch Basin located at the intersection of
"A" Street NW and 2" Street NW. Here the storm water will be released
into the City of Auburn system.
Store ier Forefront and Maintenance Agreement
7of17
Plan Goal
The specific purpose for the storm water facility is to minimize pollution that
is typically associated with modern development. In general, pollution from
motor vehicles and pollution generated from erosion. Attached to this
narrative is a maintenance manual, which offers guidelines to the owner for
storm water facility maintenance.
Prevention BMP'S
The catch basins shall have stenciled on them 'DUMP NO WASTE -
DRAINS TO STREAM." The owner shall be responsible for sweeping the
lot, installing storm drainage stenciling and provide spill control procedures.
In case of spill call DOE at 1425-649-7000. The catch basins,
detention/wet pond, and control structures will be visually inspected for
accumulation of debris and silt and will be maintained as required by this
pollution prevention plan and attachments.
Maintenance Standards for Drainage Facilities
No. 5-Catch Basins
No. 6 - Debris Barriers
WQ -EcoStrom Plus
(Department of Ecology Storm Water Manual, August 2001).
Trea4nent BMP'S
A EcoStrom Plus has been installed to treat runoff for conventional
pollutants. The EcoStrom Plus was designed to treat 64% of the 2-year
storm event (water quality storm) for water quality treatment.
Based on section 13.48.230 of the Auburn City Code, no detention facilities
are required because this project is located in the Auburn Downtown Plan
area and there will be no increase in the amount of impervious surface as a
result of development.
The City of Auburn Utilities Section is to review and approve any changes
to this Storm Water Pollution Prevention Plan prior to changes in its
implementation. Additionally, any changes in ownership or person of
responsibility are to be reported to the City Utilities Sections.
Stormvater Easement and Mxlmerwnce Agreement
8of 17
Inspection I Maintenance:
Regular inspections of the drainage facilities should be carried out twice per
year, in the spring and fall. The responsible party should keep records of
these inspections available for review by the City . Additional inspections
may be required after severe seasonal storms.
Routine maintenance of the site will include mowing, care of landscaping
and the removal of trash and debris from the drainage system. The parking
lots and driveways should be kept clean and in repair. Events such as
major stones or heavy winds will require immediate inspections for
damages
To ensure proper water quality and treatment, the EcoSlrom Plus must be
properly maintained. Be careful to avoid introducing landscape fertilizer to
receiving waters or groundwater.
Catch Basins shall be cleaned when sump is 1/3' full of sediment or debris.
Person of Responsibility:
UHS of Delaware, INC
367 South Gulp Road
King of Prussia, PA 19406
(610) 769-3300
Design Engineer:
Rupert Engineering
1519 W Valley Hwy N Suite 101
Auburn, WA 98901
(253) 833-7776
Plan and I or Information Updates:
The City of Auburn Utilities Section is to review and approve any changes
to this Storm Water Pollution Prevention Plan prior to changes in its
implementation. Additionally, any changes in ownership or person of
responsibility are to be reported to the City Utilities Sections.
(Changes to ownership shall be reported to the City of Auburn's Utilities
Section.)
St IrFafement and M idenmme Agreement
9 ofv
INSPECTION/MAINTENANCE CHECKLIST
STRUCTURE
DATE OFINSPECTIONIMAINTENANCE `
Results/
Maintenance
Date
Inspection
All Catch Basins
Results
Maintenance
Done
_
EcoSIrom Plus
Inspection
Results
Maintenance
Dane
Inspection
Conveyance Pipes
Results
Maintenance
Done
Inspection
Results
Maintenance
Done
STRUCTURE
DATE OF INSPECTION/MAINTENANCE
Results/
Maintenance
Data
_
Inspection
Results
Maintenance
Done
Inspection
Results
Maintenance
Done
Inspection
Results
Maintenance
Done
Storm Woof Eaz reot rd M¢iotmmm/ga mt
Page 10of17
Maintenance Standards for Drainage Facilities
The facility -specific maintenance standards contained in this section are
intended to be conditions for determining if maintenance actions are required as
identified through inspection. They are not intended to be measures of the
facility's required condition at all times between inspections. In other words,
exceeding these conditions at any time between inspections and/or maintenance
does not automatically constitute a violation of these standards. However, based
upon inspection observations, the inspection and maintenance schedules shall
be adjusted to minimize the length of time that a facility is in a condition that
requires a maintenance action.
Storm Water E ent a,d Maintenance Ag ent
Pane l l of 17
No.5-Catch Basins
Maintenance
Defect
Conditions When Maintenance Is Needed
Results Expected When
Component
Maintenance is
performed
General
Trash &
Trash or debris which is lowered immediately
No Trash or debris
Debris
in frame of the catch basin opening or u
located immediately in
blockinglnletting capacity of fire basin by
feat of catch basin or on
more than lO%.
grate opening.
Trash or debris (in the basin) that exceetls We
No trash or debris in the
carte basin.
the bottom of basin to heed Of the lowest
pipe into or out Wine basin, but in no case
ass than a minimum of six inches clearance
from the debris surface to the invarf of the
lowest pipe.
Trash' Or debris in any inlet or outlet pipe
Inlet and outlet pipes free
blacking more than f9 of its height.
of trash or debris.
Dead animals", vage tiOn that Could
No dead animals or
, cause
parent, odors
complaints
vegetation
within
or dangerous gases (a g
thace.
cach basin.
the
Sediment
Be dmant
n the basin) that exceeds fin
No sediment in the catch
Ofr
percent he sump depth as measured from
basin
the bonom of basin to lheart the jawed
pipe into or out of the basin, di no case
lass than a minimum of O Inches clearance
from the sediment surface to the invert of the
lowest pipe.
Say True
Top slab has holes larger than 2 comedy
Top slab is free of holes
Damage to
Inches or blacks wider than 1141ncb
and cracks
Frame and/Or
Top Slab
make sue no material is running
ntist
.
~nto
basin)
Frame not sitting flush on top slab , l e.,
Frame is sitting flush on
n
ute flame
separation
the riser rings or p
slab
top slab. From a not
securely
from
ands lyordered
attach
attached
Fractures or
Maintenance parson judges that structure is
Basin raplawtl or
Cracks in
sound
Mora to design
Basin Wallsl
standards
Bottom
Grove fillet has separated or crackedwltler
Plpa is migration antl
than 112 men and longer than 1 form at the
wre Mbasin wall.
joint of any NIetroNlet pips or any evidence
of soil produce entering catch been through
2cks
Settlement/
If failure a basin has created a safety,
Basin raplawtl or
Misalignment
ordered or design problem,
repaired to design
standards.
Vegetation
Vegeeal growing sums, and blaIXlog
NO concurrent blocking
more than 10% of the basin opening.
Opening to basin.
Slorou Water Ea ement and Braun...... Agreement
Page 12 of 17
No.5-Catch Basins
Maintenance
Decent
Conditions When Maintenance is Needed
Reaulb Expessed Wbsn
Component
Maintenance is
laerlmmed
Vaga2ter, growing in inle0outlel pipe Lord
No vegetation or mot
that is more than six inches ten and less than
growth present
cornea apart.
six
Contamination
See Detention Fonds' (No 1).
No pollution present.
and pnwtinn
Catch Basin
Cover Net in
down is missing or only partially in place-
Catch basin cover is
Cwer
place
Any open catch basin requires maintenance
closed
looking
Mechanism cannot be opened by one
Mechanism opens with
Mechanism
maintenance person with singer tools Bolts
proper toots.
Not Working
Into flame have less than 112 inch of thread.
Cover Difficult
One maintenance person cannot remove lid
Cover can be removed by
to Remcve
after applying normal lihmg pressure.
one maintenance person.
(Intent is keep cover from sealing off access
to maintenance)
Ladder
Ladder Rungs
Ladder is unsafe due to missing rungs, not
Ladder meets design
uni
umly amaged to basin wan,
standards and allows
misalignment rust coacks, or sharp edges.
maintenance person seta
access
Metal Grates
Grote opening
Gems with opening open than 718 inch
Grate opening meeas
(If Applicable)
unsafe
design standards.
Trash and
Trash and debdsmat is blocking more than
Shooting of trash and
Debris
20% of grate surface pound capacity.
debits.
Damaged or
Grate missing or broken member(a)of the
Grata is in place and
Missing.
grate.
meets design standards.
Smmt Water Isemantand Maintenance AEreem.N
Page I3 of 17
No.6-Debris Barriers (e.g., Trash Racks)
MalMane nce
OMect
Condition When Maintenance is
Resins Battered! When
Components
Needed
Maintenance Is Per(wmed
General
Trash add
Trash or debits that is plugging more
Barger cleared to design flow
Debris
than 2091. of the openings in the barer.
carriers.
Meet
Bamageal
Bars are bent out of shape more than 3
Bars in place with no bends more
Missing
nature.
than 3141nch.
Bars.
Bars are missing or entire barrier
Bars in place according to design.
missing
Bars are loose and Meuaraising 50%
Bander replaced or impaired to
deterioration to any pad of barrier.
design standards.
nlelOutlet
Oebds banler missing or not attached to
Bursierflim s attached to pipe
Pipe
pipe
Smmr Water Protestant and Maintenance Agreement
Pagol4 ofl]
w=31®rwa° gales rckafaa2aa~aua~® prmgram
.rowdeuleronsesnet
Mtn /hull rovnleummrises netldmv rloadv/xwo-/emstunmt/eco5toc~n plus_ maintenance youg
n dial
Royal Omirolmtpncal Sysems, Inc
30622 Forest Blvd.
RO. Box 430
Stacy, MN 55079
651-462-2130
800-817-3240
The ecoSterm®plus is ahigh-efficiency surstrawater urination
system. To raper, controvert efficiency, periodic maxsenmce
must be performed m each trait.
Because each project site is diR mt each system will experfaud
tliffermt rates of sediment, heavy metal, and resulted business.
For than with heavy sediment loading, Our Blear stared be
checked after arry, amens event exceeding 1"M been in minfsli
intensity, o my radnfell eventW exceap of3". For tires with
light sedunent handing, the filler should be checked aRer any
smrm event eecreN'ag 2'per hour in ruinfall intensity or any our
event in excess of 3". Once a combined toed of 6" of rain has
faller on my site, reprec ess ofthe sediment imeding the Eymems
should be checked and maintained.
To develop m initial feel fm the loading at a spends sate, the
system should be checked no less frequently than at two, hour,
eight and 12 weeks following fee initial installation. TWa will
provide an initial waste for the loading, but events so& as
mmvmelt may also need to be considered. At a)pmjorso,Raw a[
Eavimmnenial Systems suggests cleaning due western three times
emually to ensure intended perfirmmce.
Shan Walor Easement and Mainenance A memenl
Pup, 15 of 17
Inspe-tlcra prooceliOUre
Remove the meet cusring and pvform aviaaal check. The water
el nodian should be at Or slightly below the invert elevation of the
downstream pipe. A clean filter is btlgbt red in color (sm photo
oa polar 2). if the by of me MW is not red, Royal Environments]
Systems recommends Gemting the plan. hunt a long rod through
w112^ sm odpipe and filtey the cyclonic separator, and into
thesamp. Attempt to reach We hotmm of We rtmeture and
obtlin a eel forihe emoumoPSedimmttbet haz mllec[etl.
The 2' sump is designed a collect and tent sediment thathaz
not settled in the upstream along teachers. The drop structure
and the stagnant plus sump should be vacuumed clean when
approximamly 12"ofsedimmthascollected. Cheokthe
drop structure for floating debris and remove any
accumulation. Ifneither structure requires cleaning, replace
the castings and cached: fltowing the schedede described
above.
Ciscer iprocd.jure
granted the meet casting. If free oils are percent on line water
surface, enter to the Free Oil Removal document for appropriate
procedures Use atypical vacuum truck. Thoroughly vacuum
water and any collated find particles off the top oftM falter, then
drop the 4" m 6'vacuum Mse into the 12" stantlpipe sII thewey
into the mat potato the hose within me 12" pipe and vawum
all line sediment and water out of the senators -approximately
1,000 gallons. Using a 75 Van mirdmum diecharges from awater
mnk, flush dawn the evCveamfthc Sit a. Foroingwateldown
from the cup will `back-flush"lire filter, but be careful not to
dam age the top surface of the filar or the student between Wicks
with the high-pressure water. A minimum c£350 to 900 gallon
of clean water is required to pmpaly back-flush She Most.
Storm WnarF omem and Mdneeoanm Agreement
Page 16 of 17
Note: Verihthat thet2"weAOw standpipe is wdl fastenedu
all times. Using avecunm entl high water flow to clean ou[Ne
vmp may have ateMenoy to disturb me overflow pipe. If the
pipe is not sealed smurely to the it Pon bypass ofuntimed water
ntaY occur.
Ret.l9 the structure
To perform correctly, the stro m emust be refilled with
clean water prior m f1 ishing. The water level must be
renuned to the invert elevation of the downstream pipe, thus
woun. g[hazthe flter is submerged. RefillthestrucNre
with clean water, interim; water over the later until the water
level is at the outlet pipe elevation. no rental W not damage
the top surface of fee filter or the without with excess water
pKSSUre. Iteplece the strce[ casting
Nah: The structure must be installed watertight, with zero
ex-fltra[iov allowed Each time the cysxm is checked and
demand, verify tout the water level is at or pear the invert of
the outlet pipe (some evaporation may ream over long
pmirda of dry weadta). At all times, the water elevation
must be above the top of the filter to maintain a submerged
sihmtion. Ifthe water level has dropped, any Icak mustbe
Sound and repaired to keep the Alter functioning as intended.
Proper OSIiA safety procedures should be followed at all
three to ensure workers'safety. It is the responsibility of
the contractor/owner to follow these procedures.
Storm Wear Fmement and Maintenance Agreement
Page 17 of 17