HomeMy WebLinkAboutITEM V-BMemorandum
' Engineering Division
To: Planning & Community Development Committee (PCDC)
Mayor Lewis
From: Pablo Para, Traffic Engineer
Chris Hankins, Transportation Planner
CC: Dennis Dowdy, Public Works Director
Dennis Selle, Assistant Public Works Director/City Engineer
Ingrid Gaub, Assistant City Engineer
Michelle Surdez, Senior Accountant
Date: July 12, 2010
Re: 2011-2016 Transportation Improvement Program
PURPOSE
At the July 12, 2010 Planning & Community Development Committee (PCDC) meeting,
staff will present an overview of the proposed updates to the 2011-2016 Transportation
Improvement Program (TIP).
BACKGROUND
Staff has started the process of amending the Six-Year Transportation Improvement
Program (TIP) as required by RCW 35.77.010. For Auburn, the primary importance of
the TIP is that, in most instances, projects must be included on the TIP to be eligible for
state and federal grant programs. Because the TIP is not revenue constrained, like
Auburn's Capital Facilities Plan (CFP), the City can include projects we would choose to
implement within the 6-year timeframe, if funding were available. The TIP then, by
definition, represents a more comprehensive plan list of projects deemed necessary to
ensure the efficient and safe operation of the City's transportation system now and into
the future.
PROPOSED CHANGES TO THE 2011-2016 TIP
Deletions: The following project was completed and will not be incorporated into the
2011-2016 TIP update:
TIP #2 (2010-2015 TIP) Citywide Intelligent Transportation Systems (ITS)
Phase 2
PCDC Page 1 7/8/2010
Additions: Below are the proposed new additions to the 2011-2016 TIP.
TIP #57 Lea Hill Pedestrian Improvements
This is a new project resulting from the City and Auburn School District working on a
comprehensive pedestrian improvement plan to make walking safer for school aged
children.
The project consists of constructing pedestrian improvements along the south side of SE
312th St east of the intersection with 124th Ave SE, intersection improvements at 116th
Ave SE & SE 304th St, paint bike lanes on 116th Ave SE between SE 312th St and SE
304th St and improve curb ramps adjacent to Rainier Ridge Middle School. The project
will benefit school age children attending Rainier Ridge Middle School, Lea Hill
Elementary, and Hazelwood Elementary School. It will also improve pedestrian
circulation in general on Lea Hill.
TIP# 2 Auburn Way South Corridor Improvements Phase I
This is a new project resulting from a grant application submitted to WSDOT for
Pedestrian Safety. WSDOT called for projects that would improve pedestrian safety in
high or fatal accident locations. Per accident history on Auburn Way South at or near
the casino, this project was selected as a candidate for funding through the grant
program.
This project consists of constructing pedestrian improvements along Auburn Way South
between Dogwood St SE and Fir St SE that are consistent with WSDOT's SR-164 Route
Development Plan. This project includes sidewalk improvements, access management, a
mid-block pedestrian crossing, construction of a u-turn wedge at Fir St SE and street
lighting.
NEXT STEPS
After receiving comments at the Public Works Committee meeting on July 12, 2010, staff
will continue updating the TIP. Once the draft TIP has been developed to the
satisfaction of the PCDC, a public hearing will be scheduled and held before the City
Council to provide an opportunity for community comment. Based on the results of the
public hearing and comments from the Auburn City Council the final version of the TIP
will be completed. This final version will then be adopted by the City Council and sent to
WSDOT and PSRC for acceptance. The following is a tentative schedule for adoption of
the revised TIP:
• July 12t", 2010 - First Review @ Planning & Community Development Committee
(PCDC)
■ July 19t", 2010 - Finance Committee review
■ August 9t", 2010 - Second Review @ PCDC Committee along with recommendation
to full City Council to set public hearing for September 7t", 2010
■ August 16t", 2010 - City Council Meeting to set the public hearing for September 7t",
2010
• Public hearing on September 7t", 2010 to adopt updated TIP
PCDC Page 2 7/8/2010
City of Auburn Transportation Improvement Program ,
U
UI"_'~}~~, ~ ~
~~r~~T~.l~,j
~
Transnrortauon-U Ii'm ~ 'ro~~i_kr_ _
I~ _
Program-r-
1,f -
~f0t 1- 2 0111- 61
Approved by Auburn City Council
September 7, 2010
City of Auburn
25 West Main Street
Auburn, WA 98001
(253)-931-3010
www.auburnwa.gov ,
City of Auburn Transportation Improvement Program
-71
,
~~~~~~~IMAGI~~~
~
Cover Photos: Top left is M ST SE at 8th St SE Improvements, bottom right is Biennial Sidewalk
Improvement Project. ii
City of Auburn Transportation Improvement Program
RESOLUTION NO. 4614
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, APPROVING THE 2011-2016 TRANSPORTATION IMPROVEMENT
PROGRAM OF THE CITY OF AUBURN PURSUANT TO R.C.W. CHAPTER 35.77 OF
THE LAWS OF THE STATE OF WASHINGTON
WHEREAS, RCW 35.77.010 requires that the legislative body of each City prepare and adopt a
comprehensive Transportation Improvement Program (TIP) for the ensuing- six years, but only after
conducting a public hearing; and
WHEREAS, a public hearing to review the 2011-2016 Transportation Improvement Program for
the City of Auburn was held on September 2010 at the hour of 7:30 p.m. in the Council Chambers of
the Auburn City Hall, pursuant to notice published in the legal newspaper of the City of Auburn on
August 24, 2010; and
WHEREAS, said amendment to the 201 1-2016 Transportation Improvement Plan of the City of
Auburn was approved by the City Council by motion duly made and carried in said hearing.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON,
HEREBYRESOLVES as follows:
Section 1. There is attached hereto and denominated as Exhibit "A," the terms of which are
incorporated herewith by reference as though fully set forth, a designation of the streets within the
corporate limits of the City of Auburn to be improved in the manner therein set forth during the year set
for the improvement of such street or streets.
Section 2. That the City Engineer of the City of Auburn is hereby directed to forward a certified
copy of this Resolution to the Washington State Department of Transportation for filing not more than
thirty (30) days after the adoption of this Resolution.
Section 3. That the Mayor is hereby authorized to implement such administrative procedures as
may be necessary to carry out the directions of this legislation.
Resolution 4614 iii
City of Auburn Transportation Improvement Program
Section 4. That this Resolution shall take effect and be in full force upon passage and signatures
hereon.
DATED this day of September 2010
CITY OF AUBURN
ATTEST:
Danielle E. Daskam,
City Clerk
APPROVED AS TO FORM:
Daniel B. Heid,
City Attorney
PETER B. LEWIS
MAYOR
iv Resolution 4614
City of Auburn Transportation Improvement Program
Transportation Improvement Program
2011-2016
Table of Contents
Executive Summary 1
Introduction 1
Projects & Financing Plan Summary 3
Transportation Fund Balances
14
Roadway Improvement Projects
A Street NW, Phase 1
15
Auburn Way Corridor Imp
16
I Street NE Corridor
17
M Street Grade Separation
18
South 277th Street
19
15th Street SW Reconstruction
20
A Street NW, Phase 2
21
D Street NW
22
F Street SE
23
M Street NE
24
BNSF Railyard Grade Crossing
25
West Valley Highway Imp
26
8th Street NE Widening
27
49th Street NE
28
124th Ave SE Con-idor Imp. Phase 3
29
124th Ave SE Corridor Imp. Phase 1
30
124th Ave SE Corridor Imp. Phase 2
31
SE 320th Street Corridor Imp
32
Downto\\n Promenade I»>p
33
Intersection Improvement Projects
Harvey Rd. & 8th Street NE Imp
35
8th Street NE & R Street NE
36
Auburn Way North & 1st Street NE
37
Auburn Way SoLlt}7 & M Street SE
38
C Street NW & West Main Street
39
F Street SE & 4th Street SE
40
Railroad Crossing Imp
41
Auburn Way South & Riverwalk Dr SE
42
Traffic Signal & Intelligent Transportation Systems Projects
South Auburn ITS Expansion
43
Traffic Signal Improvements
44
ITS Dynamic Message Signs
45
East Valley HWY ITS Expansion
46
v
City of Auburn Transportation Improvement Program
Transportation Improvement Program
2011-2016
Table of Contents (cont.)
Non-Motorized Projects
Auburn Way South Corridor Imp. Ph. I
47
Skinner Road/ 3rd Avenue Trail
48
BNSF/ East Valley HWY Ped. Underpass
49
Academy Drive Class 1 Trail
50
Citywide Pedestrian Crossing Program
51
Citywide Arterial Bicycle and Safety Imp
52
Citywide Sidewalk Improvements
53
A St NE Ped. Imp
54
Interurban Trailhead Imp
55
37th Street SE & R St SE Ped Connector
56
Lea Hill Pedestrian Improvements
57
Studies & Miscellaneous Projects
Metro Shuttles
59
41 st Street SE & A St SE Access Study
60
S277 1h St Wetland Mitigation
61
Traffic Calming Improvements
62
104th Ave SE & Green River Rd Study
63
Environmental Park Study
64
Downtown to Les GoN e Non-Motorized Study
65
S 316th Bike and Ped Studv
66
Kersey Way SE Studyy
67
Mary Olson Farm Imp
68
Auburn Transit Station Parking Garage
69
Roadway- Preservation Projects
Anntial Bridge Preservation Project
71
Annual Arterial Street Preser\ ation
72
Annual Arterial Crack Seal Program
73
Local Street Imp. Program (SOS)
74
Project Summary Spreadsheet ........................................................................Appendix A
2011-2016 TIP Project Nlap............................................................................. Appendix B
vi
City of Auburn Transportation Improvement Program
EXECUTIVE SUMMARY
The Transportation Improvement Program (TIP) is a 6-year plan (2011-2016) for transportation
improvements that supports the City of Auburns current and future growth. The TIP along with the
Comprehensive Transportation plan serve as source documents for the City of Auburn Capital Facilities
Plan which is a Comprehensive Plan element required by Washington's Growth Management Act. The
program may be revised at any time by a majority of the City Council after a public hearing. The 2011-
2016 TIP recognizes approximately $142 million worth of transportation improvements (including Non-
Motorized and roadway preservation) over the next six years.
INTRODUCTION
Purpose
The purpose of the TIP is to identify priority transportation projects and assure that the city has
advanced plans as a guide in carrying out a coordinated transportation program. There are always more
projects than available revenues. Therefore, a primary objective of the TIP is to integrate the two to
produce a comprehensive, realistic program for the orderly development and maintenance of our street
system. Projects are required to be included in the TIP in order to be ell Bible for state and federal grants.
Grant funding for projects listed may not yet be secured.
Statutory Requirements
Six Year Transportation Improvef»ew Program - RCW 35.77.010 requires that each city prepare and
adopt a comprehensive transportation improvement program for the ensuing six calendar years
consistent with its Comprehensive Transportation Plan. This six-year Transportation Improvement
Program (TIP) shall be filed with the Secretary of the Washington State Department of Transportation
(WSDOT) each year within 30 days of adoption.
Projects cif Regional Signijiccaice - RCW 35.77.010 also requires each city to specifically set forth those
projects and programs of re~(,iornal significance for inclusion in the transportation improvement program
for that re(yion. The 2011-2016 TIP includes 6 projects of regional significance:
TIP Project Number
Project Title
TIP 95
M Street Grade Separation
TIP # 6
S 2771 St Widening
TIP 913
South Auburn ITS Expansion
TIP #14
West Valle Highway Improvements
TIP 950
ITS Dynamic Message Signs
TIP #51
East Valley Highway ITS Expansion
Executive Summary & Introduction 1
City of Auburn Transportation Improvement Program
Methodology
Annual updates of the TIP begins with developing a revenue forecast to provide a reasonable estimate of
funding available to accomplish the transportation improvement needs. Since the desire to construct
transportation improvements typically exceeds the available forecast revenue, it is necessary to establish
some method of prioritizing the needs.
Transportation needs are identified by examining the latest information concerning safety and accident
history, growth trends, traffic studies and the City's adopted Comprehensive Transportation Plan. The
likelihood of receiving federal or state grants for various improvements, community interests and values
are also considered. All of these factors yield a prioritized list of transportation improvements.
Detailed project costs and funding sources are identified and provided for each project listed in the
proposed TIP. The prioritized list is then financially constrained in the first three years to reflect the
financial projections to yield the six-year Transportation Improvement Program. After completing all
reviews and compiling the document staff makes final recommendations to the Planning and
Community Development Committee and City Council for approv- al.
2 Executive Summary & Introduction
City of Auburn Transportation Improvement Program
Projects & Financing Plan Summary
2011 2012 2013 2014 2015 2016 Total
TIP# Roadway Improvement Protects
1 'A' Street NW, Phase 1
Capital Costs
7,368,500
7,368,500
Funding Sources:
Unrestricted Street Revenue
-
-
Gra nts
6,652,000
6,652,000
Traffic Impact Fees
216,500
216,500
Other (Development)
500,000 - -
500,000
3 Auburn Way Corridor Imp.
Capital Costs
- 818,700 3,000,000
3,818,700
Funding Sources:
Unrestricted Street Revenue
110,000 600,000 -
710,000
Grants
708,700 2,400,000 =
3,108,700
Other
- -
-
4
'I' Street NE Corridor
Capital Costs
460,000
1,020,000
4,280,000
5,760,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Gra nts
Traffic Impact Fees
-
-
Other (Other Agencies)
-
-
150,000
150,000
Other (Development)
460,000
1,020,000
4,130,000
5,610,000
5
'M' Street Grade Separation
Capital Costs
2,115,000
12,985,000
1,800,000
-
-
16,900,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Grants
615,000
5,385,000
6,000,000
REET2
-
-
TrafficImpact Fees
1,500,000
661,400
2,161,400
Traffic Mitigation Fees
-
-
-
-
Other (Other Agencies)
-
6,938,600
1,800,000
-
8,738,600
6
South 277th -Auburn Way North to Green River Bridge
Capital Costs
276,500
803,500
3,000,000
4,080,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Grants
1,500,000
1,500,000
Other (Development)
1,500,000
1,500,000
Other (Other Agencies)
276,500
803,500
-
1,080,000
7
15th St SW Reconstruction
Capital Costs
-
375,000
3,000,000
3,375,000
Funding Sources:
Unrestricted Street Revenue
75,000
500,000
575,000
Grants
300,000
2,500,000
2,800,000
Other
-
-
-
8
'A' Street NW, Phase 2
Capital Costs
75,000
1,200,000
1,250,000
2,525,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Gra nts
-
1,038,000
1 ,081 ,300
2,119,300
Traffic Impact Fees
75,000
162,000
168,700
405,700
Other
-
-
-
-
- -
9
'D' Street NW, 37th to 44th ($6 Mi
llion beyond 2016)
Capital Costs
200,000
200,000 400,000
Funding Sources:
Unrestricted Street Revenue
-
- -
Grants
160,000
160,000 320,000
Traffic Impact Fees
40,000
40,000 80,000
Projects & Financing Plan Summary 3
City of Auburn Transportation Improvement Program
2011 2012 2013
2014
2015 2016
Total
TIP# Roadway Improvement Projects (Cont.)
10
'F' Street SE, 4th to AWS
Capital Costs
200,000
1,000,000
1,200,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
Grants
-
780,000
780,000
Traffic Impact Fees -
200,000
220,000
420,000
11
'M' Street NE, E. Main to 4th
Capital Costs 50,000
275,000
1,000,000
1,325,000
Funding Sources:
Unrestricted Street Revenue -
-
-
-
Grants -
225,000
897,500
1,122,500
Traffic Impact Fees 50,000
50,000
102,500 -
202,500
12
Grade-Separated Crossing of BNSF Railyard ($31 Million beyond 2016)
Capital Costs
-
- 1,000,000
1,000,000
Funding Sources:
Unrestricted Street Revenue
-
-
Grants
-
-
Other (Development)
1,000,000
1,000,000
14
West Valley Hwy Improvements (SR-18 to West Main Street)
Capital Costs 4,535,000
-
4,535,000
Funding Sources:
Unrestricted Street Revenue 55,000
55,000
Grants 2,730,000
2,730,000
REET2 -
-
Traffic Mitigation Fees -
-
Traffic Impact Fees 530,000
530,000
Other (Storm Fund 432) 1,220,000
1,220,000
15 8th Street NE Widening (Pike Street to R Street NE)
Capital Costs 450,000 1,000,000 1,450,000
Funding Sources:
Unrestricted Street Revenue 90,000 200,000 290,000
Grants 360,000 800,000 1,160,000
Traffic Impact Fees - - -
16 49th Street NE from Auburn Way North to M Street NE
Capital Costs 850,000 2,500,000 3,350,000
Funding Sources:
Unrestricted Street Revenue - - -
Grants
Traffic Impact Fees - - -
Other (Development) 850,000 2,500,000 3,350,000
39 124th Ave SE Corridor Improvements Phase 3
Capital Costs
100,000 750,000 850,000
Funding Sources:
Unrestricted Street Revenue
- - -
Grants
85,000 650,000 735,000
Traffic Impact Fees
- - - 15,000 100,000 115,000
40 124th Ave SE Corridor Improvements Phase 1
Capital Costs
50,000 150,000 1,750,000 - - 1,950,000
Funding Sources:
Unrestricted Street Revenue
- - - -
Grants
- 125,000 1,565,000 1,690,000
Traffic Impact Fees
50,000 25,000 185,000 260,000
4 Projects & Financing Plan Summary
City of Auburn Transportation Improvement Program
2011 2012
2013 2014
2015
2016
Total
TIP# Roadway Improvement Projects (Cont.)
41 124th Ave SE Corridor Improvements Phase 2
Capital Costs
30,000 150,000
1,000,000
1,180,000
Funding Sources:
Unrestricted Street Revenue
- -
-
-
Grants
- 100,000
865,000
965,000
Traffic Impact Fees
30,000 50,000
135,000
-
215,000
42 SE 320th St Corridor Improvements
Capital Costs
- 30,000
60,000
580,000
670,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Grants
-
51,500
502,100
553,600
Traffic Impact Fees -
30,000
8,500
77,900
116,400
52 Downtown Promenade Improvements
Capital Costs 6,800,000
-
-
-
6,800,000
Funding Sources:
Unrestricted Street Revenue -
-
Grants 2,544,000
2,544,000
Other (GO Bonds) 4,256,000
4,256,000
Subtotal. Roadwav Improvement Proiects
Capital Costs
21,793,500
17,011,500
6,137,200
13,425,000
7,640,000
2,530,000
68,537,200
Funding Sources
Unrestricted Street Revenue
55,000
-
275,000
1,300,000
-
-
1,630,000
Grants
12,541,000
6,423,000
2,575,000
9,090,000
2,839,000
1,312,100
34,780,100
Traffic Impact Fees
2,371,500
873,400
223,700
515,000
521,000
217,900
4,722,500
Other (Other Agencies)
-
7,215,100
2,603,500
-
150,000
-
9,818,600
Other (Storm Fund 432)
1,220,000
-
-
-
-
1,220,000
Other (Development)
1,350,000
2,500,000
460,000
2,520,000
4,130,000
1,000,000
11,960,000
Other (GO Bonds)
4,256,000
-
-
-
-
-
4,256,000
Total Funding
21,793,500
17,011,500
6,137,200
13,425,000
7,640,000
2,530,000
68,537,200
Projects & Financing Plan Summary
City of Auburn Transportation Improvement Program
2011 2012 2013 2014 2015 2016 Total
TIP# Intersection Improvement Projects
17 Harvey Rd. & 8th St. NE Intersection Improvements ($996K beyo
nd 2016)
Capital Costs 88,000 87,500
87,000 86,500 86,000 86,000
521,000
Funding Sources:
Unrestricted Street Revenue - -
- - - 86,000
86,000
Grants
-
-
PWTF - -
- - -
-
Traffic Impact Fees 88,000 87,500
87,000 86,500 86,000
435,000
18 8th Street NE and R Street NE Traffic Signal
Capital Costs 1,000 -
- -
1,000
Funding Sources:
Unrestricted Street Revenue 1,000
1,000
Grants
-
Other -
-
19 Auburn Way North / 1st Street NE Signal Improvements
Capital Costs 20,000
580,000
600,000
Funding Sources:
Unrestricted Street Revenue 20,000
130,000
150,000
Grants -
450,000
450,000
Other
-
-
20 Auburn Way South and M Street SE Intersection Improvements
Capital Costs
75,000
Funding Sources:
Unrestricted Street Revenue
75,000
Grants
-
Traffic Mitigation Fees
21 C Street NW and West Main Street
Capital Costs
Funding Sources:
Unrestricted Street Revenue
Grants
Other
-
25 F St SE and 4th St SE Traffic Signal
Capital Costs
1,000
Funding Sources:
Unrestricted Street Revenue
1,000
Grants
-
Other
900,000
765,000
135,000
100,000
1,000,000
20,000
200,000
80,000
800,000
975,000
75,000
765,000
135,000
1,100,000
220,000
880,000
1,000
1,000
38 Railroad Crossing Safety Improvements
Capital Costs
150,000
850,000
1,000,000
Funding Sources:
Unrestricted Street Revenue
25,000
110,000
135,000
Grants
125,000
740,000
865,000
Other
-
-
-
-
-
43 Auburn Way South & Riverwalk Intersection Improvements
Capital Costs
150,000
2,250,000
2,400,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
Grants
125,000
1,951,000
2,076,000
Traffic Impact Fees - -
-
-
25,000
299,000
324,000
Subtotal, Intersection Imp. Projects:
Capital Costs 165,000 107,500
1,817,000
1,936,500
236,000
2,336,000
6,598,000
Funding Sources
Unrestricted Street Revenue
77,000 20,000 175,000
310,000
- 86,000
668,000
Grants
- - 1,420,000
1,540,000
125,000 1,951,000
5,036,000
Traffic Impact Fees
88,000 87,500 87,000
86,500
111,000 299,000
759,000
Traffic Mitigation Fees
- - 135,000
-
- -
135,000
Total Funding
165,000 107,500 1,817,000
1,936,500
236,000 2,336,000
6,598,000
6 Projects & Financing Plan Summary
City of Auburn Transportation Improvement Program
2011 2012 2013
2014
2015 2016
Total
TIP#
Traffic Signal and Intelligent Transportation System (ITS) Projects
13
South Auburn ITS Expansion
Capital Costs
1,000
1,000
Funding Sources:
Unrestricted Street Revenue
1,000
1,000
Grants
-
-
Traffic Mitigation Fees
Other
- - -
-
- -
-
34
Traffic Signal Improvements
Capital Costs
100,000 100,000 100,000
100,000
100,000 100,000
600,000
Funding Sources:
Unrestricted Cap. Imp. Funds
- - -
-
- -
-
Grants
- - -
-
- -
-
Other (REET 2 in Fund 328)
100,000 100,000 100,000
100,000
100,000 100,000
600,000
50
ITS Dynamic Message Signs ($880K beyond 2016)
Capital Costs
- - -
220,000
- 220,000
440,000
Funding Sources:
Unrestricted Street Revenue
30,000
30,000
60,000
Grants
190,000
190,000
380,000
Traffic Mitigation Fees
-
-
-
51
East Valley Highway ITS Expansion
Capital Costs
800,000
800,000
Funding Sources:
Unrestricted Street Revenue
-
-
Grants
692,000
692,000
Traffic Impact Fees
108,000
108,000
Subtotal, Traffic Signal & ITS Projects:
Capital Costs
101,000
100,000 100,000 1,120,000
100,000 320,000
1,841,000
Funding Sources
Unrestricted Street Revenue
1,000
- - 30,000
- 30,000
61,000
Grants
-
882,000
190,000
1,072,000
Traffic Impact Fees
-
- - 108,000
- -
108,000
Other (REET2 in Fund 328)
100,000
100,000 100,000 100,000
100,000 100,000
600,000
Total Funding
101,000
100,000 100,000 1,120,000
100,000 320,000
1,841,000
Projects & Financing Plan Summary 7
City of Auburn Transportation Improvement Program
2011 2012 2013 2014 2015 2016 Total
TIP# Non-Motorized Improvement Projects
2 Auburn Way South Corridor Improvements Phase 1
Capital Costs 160,000 680,830 840,830
Funding Sources:
Unrestricted Street Revenue 40,000 60,000 100,000
Grants 120,000 620,830 740,830
Other - - -
22 Skinner Road to 3rd Avenue (Auburn Pacific Trail Phase2)
Capital Costs 1,000
1,000
Funding Sources:
Unrestricted Street Revenue 1,000
1,000
Grants
Other (Other Agencies)
-
-
23 BNSF/E. Valley Highway Pedestrian Underpass ($5 Million beyond 2015)
Capital Costs
4,800,000
4,800,000
Funding Sources:
Unrestricted Street Revenue
-
-
Grants
4,550,000
4,550,000
Other (Other Agencies)
250,000
250,000
24 Academy Drive Multi-Use Trail
Capital Costs 10,000=-
150,000-- 425,000 425,000
1,010,000
Funding Sources:
Unrestricted Street Revenue 10,000
150,000 42,500 42,500
245,000
Grants -
- 382,500 382,500
765,000
Other
- -
-
30 Citywide Pedestrian Crossing Program
Capital Costs
100,000
100,000
100,000
300,000
Funding Sources:
Unrestricted Street Revenue
100,000
100,000
100,000
300,000
Grants
-
-
-
-
Other -
-
- -
- -
-
31 Citywide Arterial Bicycle and Safety Improv.
Capital Costs 100,000
100,000
100,000 100,000
100,000 100,000
600,000
Funding Sources:
Unrestricted Street Revenue 100,000
100,000
100,000 100,000
100,000 100,000
600,000
Grants -
-
- -
- -
-
Other
32 Citywide Sidewalk Improvements
Capital Costs 180,000
20,000 180,000 20,000 180,000 20,000
600,000
Funding Sources:
Unrestricted Cap. Imp. Funds 180,000
20,000 180,000 20,000 180,000 20,000
600,000
Grants -
- - - - -
-
Other (REET2 in Fund 328)
-
-
44 AST NE Pedestrian Improvements
Capital Costs
150,000
150,000
Funding Sources:
Unrestricted Street Revenue
-
-
Grants
150,000
150,000
Traffic Impact Fees
-
-
8 Projects & Financing Plan Summary
City of Auburn Transportation Improvement Program
2011 2012 2013
2014 2015 2016
Total
TIP# Non-Motorized Improvement Projects (Cont.)
45 Interurban Trailhead Improvements
Capital Costs
210,000
210,000
Funding Sources:
Unrestricted Street Revenue
-
-
Grants
185,000
185,000
Traffic Mitigation Fees -
25,000
25,000
53 37th St Se & R St SE Pedestrian Connector
Capital Costs 1,000
-
1,000
Funding Sources:
Unrestricted Street Revenue 1,000
1,000
Grants
Traffic Impact Fees -
-
57 Lea Hill Pedestrian Improvements
Capital Costs 57,080 296,820
353,900
Funding Sources:
Unrestricted Street Revenue - -
-
Grants 57,080 296,820
353,900
Traffic Impact Fees - -
-
Subtotal, Non-Motorized Projects:
Capital Costs 499,080 1,197,650 440,000 580,000 705,000 5,445,000 8,866,730
Funding Sources
Unrestricted Street Revenue
142,000
260,000
110,000
350,000
142,500
242,500
1,247,000
Grants
177,080
917,650
150,000
185,000
382,500
4,932,500
6,744,730
Traffic Mitigation Fees
-
-
-
25,000
-
-
25,000
Unrestricted Cap. Imp. Funds
180,000
20,000
180,000
20,000
180,000
20,000
600,000
Other (Other Agencies)
-
-
-
-
-
250,000
250,000
Total Funding
499,080
1,197,650
440,000
580,000
705,000
5,445,000
8,866,730
Projects & Financing Plan Summary 9
City of Auburn Transportation Improvement Program
2011
2012
2013
2014
2015
2016
Total
TIP# Studies and Miscellaneous Projects
26
METRO Shuttle: Auburn Community and Lakeland Shuttles
Capital Costs 220,000
220,000
220,000
220,000
220,000
220,000
1,320,000
Funding Sources:
Unrestricted Street Revenue 220,000
220,000
220,000
220,000
220,000
220,000
1,320,000
Grants -
-
-
-
-
-
-
Traffic Impact Fees
-
27
41st Street SE and A Street SE Access Management Study
Capital Costs 10,000
10,000
Funding Sources:
Unrestricted Street Revenue 10,000
10,000
Grants -
-
Traffic Impact Fees -
-
-
-
29
So. 277th, Wetland Mitigation
Capital Costs 25,000
25,000
25,000
75,000
Funding Sources:
Unrestricted Street Revenue 25,000
25,000
25,000
75,000
Grants -
-
-
-
Other -
-
-
-
-
-
-
33
Traffic Calming Improvements
Capital Costs 200,000
200,000
200,000
200,000
200,000
200,000
1,200,000
Funding Sources:
Unrestricted Cap. Imp. Funds -
-
-
-
-
-
-
Grants
-
REET2 -
-
-
-
-
-
Other (Redflex in Fund 328) 200,000
200,000
200,000
200,000
200,000
200,000
1,200,000
46
104th Ave SE & Green River Road Study
Capital Costs 3,000
-
-
-
-
-
3,000
Funding Sources:
Unrestricted Street Revenue 3,000
3,000
Grants -
-
Traffic Impact Fees
47 Environmental Park Roadway Improvements Study
Capital Costs 5,000
5,000
Funding Sources:
Unrestricted Street Revenue 5,000
5,000
Grants
-
Traffic Impact Fees
-
48 Downtown to Les Gove Non-Motorized Improvements Study
Capital Costs 8,000
8,000
Funding Sources:
Unrestricted Street Revenue 8,000
8,000
Grants -
-
Traffic Impact Fees
10 Projects & Financing Plan Summary
City of Auburn Transportation Improvement Program
2011 2012 2013 2014 2015 2016
Total
TIP# Studies and Miscellaneous Projects (Cont.)
49 S 316th St Bicycle & Pedestrian Improvement Study
Capital Costs 4,000
4,000
Funding Sources:
Unrestricted Street Revenue 4,000
4,000
Grants -
-
Traffic Impact Fees -
-
54 Kersey Way Study
Capital Costs 100,000
100,000
Funding Sources:
Unrestricted Street Revenue -
-
Grants -
-
Traffic Impact Fees 100,000
100,000
55 Mary Olson Farm Improvements
Capital Costs 1,000 -
1,000
Funding Sources:
Unrestricted Street Revenue
-
Grants
Other (341 Park Funds) 1,000
1,000
56 Transit Station Parking Structure
Capital Costs 7,700,000 23,900,000 31,600,000
Funding Sources:
Unrestricted Street Revenue - - -
Grants - - -
Other(Other Agencies) 7,700,000 23,900,000 31,600,000
Subtotal, Studies and Misc. Projects
Capital Costs
576,000
445,000
445,000
420,000 -
---8,120,000
24,320,000
34,326,000
Funding Sources
Unrestricted Street Revenue
275,000
245,000
245,000
220,000
220,000
220,000
1,425,000
Traffic Impact Fees
100,000
-
-
-
-
-
100,000
Other (Redflex in Fund 328)
200,000
200,000
200,000
200,000
200,000
200,000
1,200,000
Other (341 Park Funds)
1,000
-
-
-
-
-
1,000
Other (Other Agencies)
-
-
-
-
7,700,000
23,900,000
31,600,000
Total Funding
576,000
445,000
445,000
420,000
8,120,000
24,320,000
34,326,000
Projects & Financing Plan Summary 11
City of Auburn Transportation Improvement Program
TIP# Roadway Preservation Projects
28 Annual Bridge Preservation Project
2011 2012 2013 2014 2015 2016 Total
Capital Costs
50,000
50,000
50,000
50,000
50,000
50,000
300,000
Funding Sources:
Unrestricted Street Revenue
50,000
50,000
50,000
50,000
50,000
50,000
300,000
Grants
-
-
-
-
-
-
-
Traffic Impact Fees
-
-
-
-
-
-
-
35 Annual Arterial Street Preservation
Capital Costs
1,400,000
1,400,000
1,400,000
1,400,000
1,400,000
1,400,000
8,400,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
-
-
-
Grants
-
-
-
Arterial Street Fund 105
1,400,000
1,400,000
1,400,000
1,400,000
1,400,000
1,400,000
8,400,000
36 Annual Arterial Crackseal Program
Capital Costs
100,000
100,000
100,000
100,000
100,000
100,000
600,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
-
-
-
Grants
-
-
-
-
-
-
-
Arterial Street Fund 105
100,000
100,000
100,000
100,000
100,000
100,000
600,000
37 Local Street Preservation Program SOS
Capital Costs
2,200,000
2,200,000
2,200,000=-
2,200,000--
2,200,000
2,200,000
13,200,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
-
-
Grants
-
-
-
-
Local Street Fund 103
2,200,000
2,200,000
2,200,000
2,200;000
2,200,000
2,200,000
13,200,000
Subtotal, Preservation Projects
Capital Costs 3,750,000 3,750,000 3,750,000 3,750,000 3,750,000 3,750,000 22,500,000
Funding Sources
Unrestricted Street Revenue
50,000
50,000
50,000
50,000
50,000
50,000
300,000
Arterial Street Fund 105
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
9,000,000
Local Street Fund 103
2,200,000
2,200,000
2,200,000
2,200,000
2,200,000
2,200,000
13,200,000
Total Funding
3,750,000
3,750,000
3,750,000
3,750,000
3,750,000
3,750,000
22,500,000
SUMMARY:
CAPITAL COSTS
Roadway Projects
21,793,500
17,011,500
6,137,200
13,425,000
7,640,000
2,530,000
68,537,200
Intersection Projects
165,000
107,500
1,817,000
1,936,500
236,000
2,336,000
6,598,000
Signal & ITS Projects
101,000
100,000
100,000
1,120,000
100,000
320,000
1,841,000
Non Motorized Projects
499,080
1,197,650
440,000
580,000
705,000
5,445,000
8,866,730
Studies and Misc. Projects
576,000
445,000
445,000
420,000
8,120,000
24,320,000
34,326,000
Roadway Preservation Proj.
3,750,000
3,750,000
3,750,000
3,750,000
3,750,000
3,750,000
22,500,000
Total Costs
26,884,580
22,611,650
12,689,200
21,231,500
20,551,000
38,701,000
142,668,930
FUNDING SOURCES:
Unrestricted Street Revenue
600,000
575,000
855,000
2,260,000
412,500
628,500
5,331,000
Traffic Impact Fees
2,559,500
960,900
310,700
709,500
632,000
516,900
5,689,500
Traffic Mitigation Fees
-
-
135,000
25,000
-
-
160,000
Local Street Fund 103
2,200,000
2,200,000
2,200,000
2,200,000
2,200,000
2,200,000
13,200,000
Arterial Street Fund 105
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
9,000,000
Grants
12,718,080
7,340,650
4,145,000
11,697,000
3,346,500
8,385,600
47,632,830
Other (GO Bonds)
4,256,000
-
-
-
-
-
4,256,000
Other (Storm Fund 432)
1,220,000
1,220,000
Other (Parks Fund 341)
1,000
-
-
-
-
-
1,000
Unrestricted Cap. Imp. Funds
180,000
20,000
180,000
20,000
180,000
20,000
600,000
Other (Redflex in Fund 328)
200,000
200,000
200,000
200,000
200,000
200,000
1,200,000
Other (REET2 in Fund 328)
100,000
100,000
100,000
100,000
100,000
100,000
600,000
Other (Other Agencies)
-
7,215,100
2,603,500
-
7,850,000
24,150,000
41,668,600
Other (Development)
1,350,000
2,500,000
460,000
2,520,000
4,130,000
1,000,000
11,960,000
Total Funding
26,884,580
22,611,650
12,689,200
21,231,500
20,551,000
38,701,000
142,668,930
12 Projects & Financing Plan Summary
City of Auburn Transportation Improvement Program
2011-2016 Funding Allocation By Category
Signal & ITS
Projects,
$1,841,000
Intersection
Projects,
$6,598,000
Roadway Projects,
$68,537,200
Non Motorized
Projects,
$8,866,730
Studies and Misc.
Imp.,
$34,326,000
Roadway
Preservation Proj.,
$22,500,000
2011-2016 Project Funding Sources
Other (Redflex in Other (Other
Fund 328), Other (REET2 in Agencies),
$1,200,000 Fund 328), $41,668,600
Unrestricted Cap. $600,000 Other
(Development),
Imp. Funds, ~
$600,000 $11,960,000
Other (Parks Fund Unrestricted Street
341), $1,000
k1l", /A Revenue,
$5,331,000
Other (Storm Fund
432),
$1,220,000
Other (GO Bonds),
$4,256,000
Grants,
$47,632,830
f
Arterial Street
Fund 105,
$9,000,000
Traffic Impact
Fees,
$5,689,500
Traffic Mitigation
Fees,
$160,000
Local Street Fund
103,
$13,200,000
Projects & Financing Plan Summary 13
City of Auburn Transportation Improvement Program
Transportation Fund Balance Summary
2011
2012
2013
2014
2016
2016
Unrestricted Street Revenue
Beginning Fund Balance
592,000
527,000
487,000
177,000
(1,538,000)
(1,395,500)
Annual Revenue
535,000
535,000
545,000
545,000
555,000
555,000
Project Expenses
600,000
575,000
855,000
2,260,000
412,500
628,500
End of Year Fund Balance
527,000
487,000
177,000
(1,538,000)
(1,395,500)
(1,469,000)
Traffic Impact Fees
Beginning Fund Balance
2,680,500
921,000
760,100
1,249,400
1,339,900
1,507,900
Annual Revenue
800,000
800,000
800,000
800,000
800,000
800,000
Project Expenses
2,559,500
960,900
310,700
709,500
632,000
516,900
End of Year Fund Balance
921,000
760,100
1,249,400
1,339,900
1,507,900
1,791,000
Traffic Mitigation Fees
BeginningFund Balance
235,000
235,000
235,000
100,000
75,000
75,000
Annual Revenue
-
-
-
-
Project Expenses
-
-
135,000
25,000
-
-
End of Year Fund Balance
235,000
235,000
100,000
75,000
75,000
75,000
Local Street Fund 103
Beginning Fund Balance
-
-
-
-
-
-
Annual Revenue
2,200,000
2,200,000
2,200,000
2,200,000
2,200,000
2,200,000
Project Expenses
2,200,000
2,200,000
2,200,000
2,200,000
2,200,000
2,200,000
End of Year Fund Balance
-
-
-
-
-
-
Arterial Street Fund 106
Beginning Fund Balance
-
-
-
-
-
-
Annual Revenue
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
Project Expenses
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
End of Year Fund Balance
-
-
-
-
-
-
Grants
Annual Revenue
12,718,080
7,340,650
4,145,000
11,697,000
3,346,500
8,385,600
Project Expenses
12,718,080
7,340,650
4,145,000
11,697,000
3,346,500
8,385,600
Other (GO Bonds)
Annual Revenue
4,256,000
-
-
-
-
-
Project Expenses
4,256,000
-
-
-
-
Other (Storm Fund 432)
Annual Revenue
1,220,000
-
-
-
-
-
Project Expenses
1,220,000
-
-
-
-
-
Unrestricted Cap. Imp. Funds
Annual Revenue
180,000
20,000
180,000
20,000
180,000
20,000
Project Expenses
180,000
20,000
180,000
20,000
180,000
20,000
Other (Redflex in Fund 328)
Annual Revenue
200,000
200,000
200,000
200,000
200,000
200,000
Project Expenses
200,000
200,000
200,000
200,000
200,000
200,000
Other (REET2 in Fund 328)
Annual Revenue
100,000
100,000
100,000
100,000
100,000
100,000
Project Expenses
100,000
100,000
100,000
100,000
100,000
100,000
Other (Other Agencies)
Annual Revenue
-
7,215,100
2,603,500
-
7,850,000
24,150,000
Project Expenses
-
7,215,100
2,603,500
-
7,850,000
24,150,000
Other (Development)
Annual Revenue
1,350,000
2,500,000
460,000
2,520,000
4,130,000
1,000,000
Project Expenses
1,350,000
2,500,000
460,000
2,520,000
4,130,000
1,000,000
14 Projects & Financing Plan Summary
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: A Street NW, Phase 1 (3rd St. NW to 14th St. NW)
Project No: c207aO
Project Type: Capacity
Project Manager: Ingrid Gaub
TIP # 1
Description:
Construct a multi-lane arterial from 3rd St. NW to 14th St. NW. This project will improve mobility and is tied to corridor
development. It is consistent with the Comprehensive Plan and contributes to the completion of a north/south art
erial corridor.
The project length is approximately three-quarters of a mile. The City purchased ROW from the northern property owner. If the
property develops, some or a portion of those funds may be reimbursed to the City (total cost was $251,000).
Progress Summary:
Pre-design was completed prior to 2007. Final design will be completed in 2010 along with the environmental process.
Significant ROW purchase will begin in 2010. Construction is expected to be completed in 2011.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $25,830.
Budget: 2010 YTD Actual 2011
10 Budget
Budget Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources:' Prior to 2010 Estimate 2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue 277,457 - -
277,457
277,457
Grants (Fed, State, Local) 800,360 2,32° 000 6,652,000
9,780,360
9,780,360
Traffic Impact Fees 205,259 503216,500
925,059
925,059
Other Sources (Developer)* 500,000
500,000
500,000
Total Funding Sources: 1,283,076 2,831,300 7,368,500
11,482,876
11,482,876
Capital Expenditures:
Design 1,032,090 344,300 253,600
1,629,990
1,629,990
Right of Way 250,986 2,397,000 -
2,647,986
2,647,986
Construction 90,000 7,114,900
7,204,900
7,204,900
Total Expenditures: 1,283,076 2,831,300 7,368,500
11,482,876
11,482,876
Forecasted Project Cost:
Total
Expenditures
2013 2014 2015 2016
2011-2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
Grants (Fed,State, Local)
6,652,000
Traffic Impact Fees
216,500
Other Sources (Developer)'
500,000
Total Funding Sources:
7,368,500
Capital Expenditures:
Design
253,600
Right of Way
-
Construction
7,114, 900
Total Expenditures:
7,368,500
Grants / Other Sources: *Other funds include developer contributions, ROW dedications, and construction completed by others.
Other funds shown never go through the City. Approximately $3.2 Million of grants is still unsecured.
Roadway Improvement Projects 15
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: Auburn Way Corridor Imp. (4th Street NE to 4th Street SE) TIP # 3
Project No: c409aO
Project Type: Non-Capacity
Project Manager: TBD
Description:
This project is based on a pre-design study and is intended to improve pedestrian accessibility, appearance, and link the
downtown area along Auburn Way South between 4th St NE and 4th St SE. This project may include some pavement
repairs. However, an overlay was completed as part of the City's Arterial Pavement Preservation Program in
2007. Although
this was considered a temporary fix, the scope has been modified to account for the pavement work. The project length is
approximately a half mile.
Progress Summary:
The pavement portion has been minimized due to the work completed in 2007 under the Arterial Pavement P
reservation
Program.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2010 YTD Actual 2011
10 Budget
Budget Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate 2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue 78,251
78,251
788,251
Grants (Fed,State,Local) -
-
3,108,700
REST'
-
Traffic Impact Fees
Other Sources
Total Funding Sources: 78,251
78,251
3,896,951
Capital Expenditures:
Design 78,251
78,251
696,951
Right of H oV
-
200,000
constr L : tion
3,000,000
Total Expenditures: 78,251
78,251
3,896,951
Forecasted Project Cost:
Total
Expenditures
2013 2014 2015 2016
2011 -2016
Beyond 2016
Funding Sources:
UnrestrictedStreetRevenue 110,000 600,000
710,000
-
Grants (Feo State,Local) 708,700 2,400,000
3,108,700
REET - -
-
Traffic Imnact Fees
Other Sour_es
Total Funding Sources: 818,700 3,000,000
3,818,700
Capital Expenditures:
Design 618,700 -
618,700
Right of Way 200,000 -
200,000
Construction 3,000,000
3,000,000
Total Expenditures: 818,700 3,000,000
3,818,700
Grants / Other Sources: Grant funding is not secured.
16 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: I Street NE Corridor (40th St. NE to 52nd St. NE) TIP # 4
Project No: c415a0
Project Type: Capacity
Project Manager: TBD
Description:
The final alignment of the I Street Corridor is being analyzed as part of the Northeast Auburn Special Area Plan
Environmental Impact Study. A portion of the ROW and Construction will be developer funded.
The cross section will likely
be a 5-lane arterial per the city's Comprehensive Plan. The project length is approximately three-quarters of a mile. This
project may be split into two phases. Phase 1 would be 40th Street NE to 45th Street NE. Phase 2 would be 45th Street NE
to 52nd Street NE (S. 277th Street).
Progress Summary:
This project is development driven. The project has been delayed due to the delay of the nearby pending development.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $25,200.
Budget: 2010 YTD Actual--
2011 10 Budget
Budget Expenditures
Budget Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate 2011 Budget
2012 Budget Project Total
Cost
Unrestricted Street Revenue 11,827
11,827
11,827
Grants (Fed,State.LaaU -
-
-
Traffic Impact Fees
-
Other Sources (Port of Seattle)
150,000
Other Sources (Development)
5,610,000
Total Funding Sources: 11,827
11,827
5,771,827
Capital Expenditures:
Design In 95
10,957
470,957
Right,a
870
1,020,870
Constt action
4,280,000
Total Expenditures: 11,827
11,827
5,771,827
Forecasted Project Cost:
Total
Expenditures
2013 2014 2015
2016 2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
-
Grants (Fed State,Local)
Ti affic Impact Fees -
-
Other Sources (Putt of Seattle) - - 150,000
150,000
Other Sources (Development) 460,000 1,020,000 4,130,000
5,610,000
Total Funding Sources: 460,000 1,020,000 4,280,000
5,760,000
Capital Expenditures:
Design 460,000 - -
460,000
Right of Way - 1,020,000 -
1,020,000
Construction 4,280,000
4,280,000
Total Expenditures: 460,000 1,020,000 4,280,000
5,760,000
Grants / Other Sources:
Roadway Improvement Projects 17
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: M Street Grade Separation (3rd St SE to 8th St SE)
Project No: c201 a0
Project Type: Capacity
Project Manager: Jacob Sweeting
TIP # 5
Description:
Construction of a grade separated railroad crossing
of M Street SE at the BNS
F Stampede Pa
ss tracks.
Progress Summary:
The pre-design has been completed. 60% Design Drawings were
completed in 2010. Right of
way acquisition will occur in
2010 and construction is expected to start in 2011.
Design work includes the lengthy environmental process and
coordination with BNSF.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $21,827.
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources:
Prior to 2010
Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue
-
150,000
-
-
150,000
150,000
Grants (Fed, State, Local)
122,500
749,900
615,000
5,385,000
1,487,400
6,872,400
REET2
-
1,140,000
-
-
1,140,000
1,140,000
Traffic Impact Fees
893,321
1,547,700
1,500,000
661,400
3,941,021
4,602,421
Traffic Mitigation Fees
-
660,000
-
-
660,000
660,000
Other Sources (Other Agencies)*
40,679
194,400
6,938,600
235,079
8,973,679
Total Funding Sources:'
1,056,500
4,442,000
2,115,000
12,985,000
7,613,500
22,398,500
Capital Expenditures:
Design
1,056,500
1,124,000
248,000
-
2,428,500
2,428,500
Right of bliay
3,318,000
1,252,000
-
4,570,000
4,570,000
~nstiuction
615,000
12,985,000
615,000
15,400,000
Total Expenditures:
1,056,500
4,442,000
2,115,000
12,985,000
7,613,500
22,398,500
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
Grants (Fed State,Local)
6,000,000
REET2
-
Traffic Impact Fees
2,161,400
Traffic Mitigation Fees
-
-
O ther Sources (Other Agencies) `
1,800,000
8,738,600
Total Funding Sources:
1,800,000
16,900,000
Capital Expenditures:
Design
-
248,000
Right of Way
-
1,252,000
Construction
1,800,000
15, 400, 000
Total Expenditures:
1,800,000
16,900,000
Grants / Other Sources: 'Funding partners include Port of Seattle, Port of Tacoma, BNSF, PSE and more.
18 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: South 277th (Auburn Way North to Green River Bridge) TIP # 6
Project No: c222a0
Project Type: Capacity
Project Manager: TBD
Description:
Construction of a grade separated railroad crossing of M Street SE at the BNSF Stampede Pass tracks.
Progress Summary:
The majority of this roadway is currently in the City of Kent's jurisdiction. Because the property served from th
e roadway is in
the City of Auburn, the plan is to annex this portion of the roadway from Kent into the City of Auburn. The maj
ority of this
project is expected to be completed by adjacent developments.
Future Impact on Operating Budget:
The annual maintenance costs for this project is estimated to be $27,250.
Budget: 2010 YTD Actual 2011
10 Budget
Budget Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate 2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue 19,085
19,085
19,085
Grants (Fed,State, Local) -
-
1,500,000
Traffic Impact Fees
-
Other (Development Funds) * -
1,500,000
Other (Port of Seattle) 276,500
1,080,000
Total Funding Sources: 19,085 276,500
19,085
4,099,085
Capital Expenditures:
Design 18,510 276,500
18,510
498,510
Right Vi av 575 -
575
350,575
onstr 'ion
3,250,000
Total Expenditures: 19,085 276,500
19,085
4,099,085
Forecasted Project Cost:
Total
Expenditures
2013 2014 2015 2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestr ICted Street Revenue -
-
-
Grants (Feel State,Local) 1,500,000
1,500,000
Ti affic Impact Fees -
-
Other (Development Funds) * 1,500,000
1,500,000
Other (Port of Seattle) 803,500
1,080,000
Total Funding Sources: 803,500 3,000,000
4,080,000
Capital Expenditures:
Design 203,500 -
480,000
Right of Way 350,000 -
350,000
Construction 250,000 3,000,000
3,250,000
Total Expenditures: 803,500 3,000,000
4,080,000
Grants / Other Sources: *Developer funds or in kind services. -Port of Seattle Wetland Mitigation Funds. Grant funding is not secured.
Roadway Improvement Projects 19
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: 15th Street SW Reconstruction TIP # 7
Project No: cpxxxx
Project Type: Non-Capacity
Project Manager: TBD
Description:
This project was originally scoped to include pavement preservation
. The pavement preservat
ion component could still be
combined with this project, but is also eligible for the Arterial Pavement Preservation Program.
This project should look to
improve the railroad crossing grades as well as the vertical sight distance to the interurban trai
l to the west of the tracks. The
cost estimate listed below is planning level cost.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street m
aintenance.
Budget:
2010 YTD Actual
2011 10 Budget
Budget Expenditures
Budget Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate 2011 Budget
2012 Budget Project Total
Cost
Unrestricted Street Revenue -
575,000
Grants (Fed, State,Loca!)
2,800,000
PEET
-
Traffic Mitigation Funds
Other
Total Funding Sources:
3,375,000
Capital Expenditures:
Design -
- -
- -
375,000
Right o Hl 3a
COnStrLlCtlon -
3,000,000
Total Expenditures:
-
3,375,000
Forecasted Project Cost:
Total
Expenditures
2013
2014 2015
2016 2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue 75,000
500,000
575,000
-
Grants (Fed State,Local) 300,000
2,500,000
2,800,000
PEET -
-
-
Traffic Mitigation Funds
other
Total Funding Sources: 375,000
3,000,000
3,375,000
Capital Expenditures:
Design 375,000
-
375,000
Right of Way -
-
-
Construction
3,000,000
3,000,000
Total Expenditures: 375,000
3,000,000
3,375,000
Grants / Other Sources: Grant funding is unsecured.
20 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: A Street NW, Phase 2 (W. Main to 3rd St. NW)
Project No: cpxxxx
Project Type: Capacity
Project Manager: TBD
TIP # 8
Description:
Construct a multi-lane arterial from W. Main to 3rd St. NW. This project will connect A Street NW, Phase _1 to
the Sound
Transit Station and the Central Business District. This project may end up being funded in all or part by devel
opers. The
project length is one fifth of a mile.
Progress Summary:
The parking garage being constructed by the Auburn Regional Medical Center completed a portion of this project in 2009.
Design is anticipated to begin in 2010.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2010 YTD Actual
2011
10 Budget
Budget Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources:
Prior to 2010 Estimate 2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue
-
-
Grants (Fed, State, Local)
1,038,000
2,119, 300
REET
- -
-
-
-
Traffic Impact Fees
- 25,000 75,000
162,000
100,000
430,700
Other (Developer) '
150,000
150,000
150,000
Total Funding Sources:
150,000 25,000 75,000
1,200,000
250,000
2,700,000
Capital Expenditures:
Design
25,000 75,000
-
100,000
100,000
Rightof Way
- -
1,200,000
-
1,200,000
^onstr cation
150,000
150,000
1,400,000
Total Expenditures:
150,000 25,000 75,000
1,200,000
250,000
2,700,000
Forecasted Project Cost:
Total
Expenditures
2013 2014 2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
-
G ian is (Fed, State, Local)
1,081,300
2,119, 300
REET
-
-
Traffic Impact Fees
168,700
405,700
Other (Developer)"
Total Funding Sources:
1,250,000
2,525,000
Capital Expenditures:
Declgn
-
75,000
Rightci'H ay
-
1,200,000
Construction
1,250,000
1,250,000
Total Expenditures:
1,250,000
2,525,000
Grants / Other Sources: 'Anticipated developer contributions (cash or in kind services). Grant funding shown is unsecured.
Roadway Improvement Projects 21
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: D Street NW (37th St. NW to 44th St. NW) TIP # 9
Project No: cpxxxx
Project Type: Capacity
Project Manager: TBD
Description:
Construct a four-lane arterial per the city Comprehensive Plan. It will improve
north/south mobility. This proje
ct is tied to
potential future development and will complete a major north/south arterial cor
ridor from Ellingson Road SW (41 st Street SE)
to S. 277th Street. The D ST NW project length is approximately 0.42 miles.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $11,450.
Budget: 2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
Grants (Fed, State, Local)
4,320,000
REET
-
Traffic Impact Fees
2,080,000
Other
Total Funding Sources:
6,400,000
Capital Expenditures:
Design
1,150, 000
Right of Way
1,750,000
Ccnstiuction
3,500,000
Total Expenditures:
-
6,400,000
Forecasted Project Cost:
Total
Expenditures
2013 2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Giants (Fed, State, Local)
160,000
160,000
320,000
4,000,000
REET
-
-
-
-
Ti afficlmpact Fees
40,000
40,000
80,000
2,000,000
Other
Total Funding Sources:
200,000
200,000
400,000
6,000,000
Capital Expenditures:
Design
200,000
200,000
400,000
750,000
Right of Way
-
-
-
1,750,000
Constiuction
000
3,500000
Total Expenditures:
200,000
200,000
400,000
6,000,000
Grants / Other Sources: Grant Funding shown is unsecured.
22 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: F Street SE (4th St. SE to Auburn Way So.) TIP # 10
Project No: Cp0911
Project Type: Capacity
Project Manager: TBD
Description:
The F Street SE project includes pavement reconstruction, installation of curbs, gutters, an 8-foot wide sidewalk on both
sides, parking on one side, and a center turn-lane, as well as crash attenuation at the supports for the BNSF
railroad bridge.
This project improves mobility and safety along the corridor. The project length is approximately 0.3 miles.
Progress Summary:
Preliminary design and survey work was completed in 2009. Final design and construction are planned to be
completed
following construciton of the M Street grade separation project.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $4100.
Budget: 2010 YTD Actual-- 2011
10 Budget
Budget Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate 2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
Grants (Fed,State. Laai) - - - -
-
780,000
BEET -
-
-
Traffic Fees 7,620
7,620
427,620
other
Total Funding Sources: 7,620
7,620
1,207,620
Capital Expenditures:
Design -
7,620
207,620
Right o VI4a
-
60,000
Consti L,, on
940,000
Total Expenditures: 7,620
7,620
1,207,620
Forecasted Project Cost:
Total
Expenditures
2013 2014 2015 2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Stizet Revenue -
-
-
Grants (Fed State,Locall) 780,000
780,000
BEET - -
-
TrafficlmpectFees 200,000 220,000
420,000
Other
Total Funding Sources: 200,000 1,000,000
1,200,000
Capital Expenditures:
Design 200,000 -
200,000
Right of Way - 60,000
60,000
Construction 940,000
940,000
Total Expenditures: 200,000 1,000,000
1,200,000
Grants / Other Sources: Grant funding is unsecured.
Roadway Improvement Projects 23
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title:
M Street NE (E. Main St. to 4th St. NE)
Project No:
cpxxxx
Project Type:
Capacity
Project Manager:
TBD
TIP # 11
Description:
This project will construct a complete 4 lane street section on M St NE between E main St. and 4th St NE.
Progress Summary:
Pre-design will be done in 2011 to refine project scope, alignment
, and cost.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $1
,500.
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
Grants (Fed, State, Local)
1,122, 500
REET
-
-
-
Traffic Impact Fees
50,000
50,000
202,500
Other
Total Funding Sources:
50,000
50,000
1,325,000
Capital Expenditures:
Design
50,000
50,000
125,000
Right of Way
-
-
200,000
-onstrL,(_ "ion
1,000,000
Total Expenditures:
50,000
50,000
1,325,000
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
UnrestrictedStreet Revenue
-
-
-
-
Giants (F~ State,Local)
225,000
897,500
1,122,500
REET
-
-
-
Ti affic Impart Fees
50,000
102,500
202,500
Other
Total Funding Sources:
275,000
1,000,000
1,325,000
Capital Expenditures:
Design
75,000
-
125,000
Right of Way
200,000
-
200,000
Construction
1,000,000
1,000,000
Total Expenditures:
275,000
1,000,000
1,325,000
Grants / Other Sources:
Grant funding is unsecured.
24 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: Grade-Separated Crossing of BNSF Railyard TIP # 12
Project No: cpxxxx
Project Type: Capacity
Project Manager: TBD
Description:
This project consists of a grade-separated crossing of the BNSF Rai lyard, either from SR-18 to 6th Street SE or from 15th
Street SW to A Street SE. The first alternative would entail realigning the SR-1
8 eastbound ramp, grade separating the main
north/south line and the Stampede Pass line, and connecting to 6th Street SE.
The second alternative would provide a new
corridor from 15th Street SW to A Street SE in the vicinity of 12th Street SE and 17th Street SE, either via an overpass or
underpass of the BNSF Railyard. This project improves traffic flow significantly due to the potential development of the
BNSF yard as an intermodal freight facility.
Progress Summary:
Future Impact on Operating Budget:
Not scheduled for completion until after 2015.
Budget: 2010
YTD Actual 2011 10 Budget
Budget
Expenditures Budget Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate
2011 Budget 2012 Budget Project Total
Cost
Unrestricted Street Revenue -
Grants (Fed, State, Local)
REET
Traffic Impact Fees
-
Other
32, 000, 000
Total Funding Sources:
32,000,000
Capital Expenditures:
Design
3,500,000
Right of11'ay
4,000,000
Consr :'ion
24,500,000
Total Expenditures:
32,000,000
Forecasted Project Cost:
Total
Expenditures
2013 2014
2015 2016 2011-2016
Beyond 2016
Funding Sources:
Unrestricted Streat Revenue
-
-
Grants (Fed State,Locall)
REET
Traffic Impact Fees - -
- - -
-
Other (Developei)
1,000,000 1,000,000
31,000,000
Total Funding Sources:
1,000,000 1,000,000
31,000,000
Capital Expenditures:
Design
1,000,000 1,000,000
2,500,000
Right of Way
- -
4,000,000
Construction
24,500,000
Total Expenditures:
1,000,000 1,000,000
31,000,000
Grants / Other Sources:
Roadway Improvement Projects 25
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102)
Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: West Valley Hwy Improvements (SR-18 to West Main Street) TIP # 14
Project No: cp0916
Project Type: Capacity
Project Manager: Jacob Sweeting
Description:
This project will widen the roadway to accommodate an extension of the two way left turn lane, add curb & gutter,
storm drainage,
repair failing roadway surface; install sidewalk on one side of the roadway; install city standard street lighting, imp
rove bicycle
accomodations, and install a new traffic signal at the intersection of West Main Street and West Valley Highway.
This project will
improve the capacity, safety, and driving comfort of the corridor as well as reduce th
e amount of time maintenance staff spends
doing temporary repairs.
Progress Summary:
Design started in 2010 and construction is planned for 2011.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance:
Budget: 2010
YTD Actual 2011
10 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate
2011 Budget 2012 Budget Project Total
Cost
Unrestricted Street Revenue -
55,000
55,000
55,000
Grants (Fed,State,Local) 8,700 201 300
730 000
3,000,000
3,000,000
REET 2 - OOQ
95,000
95,000
Traffic Mitigation Fees `.000
-
75,000
75,000
Traffic Impact Fees 25,000
530,000
555,000
555,000
Other (Storm Fond
1,220,000
1,220,000
1,220,000
Total Funding Sources: 8,700 456,300
4,535,000
5,000,000
5,000,000
Capital Expenditures:
Design E,700 401 300
117,000
527,000
527,000
Right of VVai 55 000
55,000
55,000
Constriction -
4,418,000
4,418,000
4,418,000
Total Expenditures: 8,700 456,300
4,535,000
5,000,000
5,000,000
Forecasted Project Cost:
Total
Expenditures
2013 2014
2015 2016
2011-2016
Beyond 2016
Funding Sources:
Unrestricfed Street Revenue
55,000
-
u tan is t Fed, State, Local)
2,730,000
REET2
-
Traffic Mitigation Fees
-
Traffic Impact Fees
530,000
Other ( Stot m Fund)
1,220,000
Total Funding Sources:
4,535,000
Capital Expenditures:
Design
117,000
Right of Way
-
Construction
4,418,000
Total Expenditures:
4,535,000
Grants / Other Sources: TIB Grant (secured). Other funding source is Storm 432 Fund.
26 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: 8th Street NE Widening (Pike Street to R Street NE) TIP # 15
Project No: cpxxxx
Project Type: Capacity
Project Manager: TBD
Description:
Add eastbound lane to southside of 8th Street NE.
Currently the lane exists from M Street NE
and drops as a right turn only
lane at the intersection of 8th Street NE and Pike Street. This would extend the lane to R Street NE where it would then be a
right turn only lane onto R Street NE southbound.
This is a planning level cost estimate.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2010 YTD Actual
2011 10 Budget
Budget Expenditures
Budget Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources:
Prior to 2010 Estimate 2011 Budget
2012 Budget Project Total
Cost
Unrestricted Street Revenue
-
290,000
Grants (Fed, State, Local)
1,160, 000
REET'
-
Traffic Impact Fees
Other
Total Funding Sources:
1,450,000
Capital Expenditures:
Design
150,000
RightofM'av
300,000
Consr i~tion
1,000,000
Total Expenditures:
-
1,450,000
Forecasted Project Cost:
Total
Expenditures
2013 2014 2015
2016 2011 -2016
Beyond 2016
Funding Sources:
UnrestrlCtedStreetRevenue
90,000 200,000
290,000
-
Grants (Fed State,Local)
360,000 800,000
1,160,000
REET
- -
-
Traffic Impact Fees
Other
Total Funding Sources:
450,000 1,000,000
1,450,000
Capital Expenditures:
Design
150,000 -
150,000
Right of Way
300,000 -
300,000
Construction
1,000,000
1,000,000
Total Expenditures:
450,000 1,000,000
1,450,000
Grants / Other Sources: Grant funding is unsecured.
Roadway Improvement Projects 27
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title:
49th Street NE from Auburn Way North to M Street NE
Project No:
cpxxxx
Project Type:
Capacity
Project Manager:
TBD
TIP # 16
Description:
Construct east/west corridor from Auburn Way North to M Street NE. The existing 49th Street NE extends west
erly to B
Street NE. This project also includes a traffic signal at the intersection of Aub
urn Way North and 49th Street NE
. This
roadway was evaluated and recommended in the NE Special Planning Area.
It is anticipated that this will be co
nstructed by
future development. It is approximately 3/4 of a mile in length.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $27,050.
Budget: 2010
YTD Actual 2011
10 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate
2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
Grants (Fed, State, Local)
REET
Traffic Mitigation Funds
- -
-
Other (Development)*
850,000 2,500,000
850,000
3,350,000
Total Funding Sources:
850,000 2,500,000
850,000
3,350,000
Capital Expenditures:
Design
200,000 -
200,000
200,000
Fight of Way
650,000 -
650,000
650,000
~stn~ction
2,500,000
2,500,000
Total Expenditures:
850,000 2,500,000
850,000
3,350,000
Forecasted Project Cost:
Total
Expenditures
2013 2014
2015 2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
Grants (Fed, State, Local)
REET
Traffic ',,Wloation Funds
-
Other (Development)"
3,350,000
Total Funding Sources:
3,350,000
Capital Expenditures:
Design - -
- -
200,000
Right of H ay
650,000
Construction
2,500,000
Total Expenditures:
3,350,000
Grants / Other Sources:
Future development is expected to fund and construct this project.
28 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: 124th Ave SE Corridor Improvements Phase 3 TIP # 39
Project No: cpxxx
Project Type: Capacity
Project Manager: TBD
Description:
This project will fund the design, right of way aqcuisition, and construction of improve
ments to the signalized intersection of SE 320th St
and 124th Ave SE. Improvements include constructing bike lanes, sidewalks, dual so
uthbound left turn
lanesinto GRCC, and ITS. A
portion of this project is the main entrance to Green River Community College and wi
ll require additional on-site improvements by
GRCC.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
Grants (Fed, State, Local)
735,000
Traffic Impact Fees
115,000
Other
Total Funding Sources:
850,000
Capital Expenditures:
Design
-
Right of Wat
135,000
Construction
715,000
Total Expenditures:
-
850,000
Forecasted Project Cost:
Total
Expenditures
2013 2014
2015
2016
2011-2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Grants (Fed, State, Locall)
85,000
650,000
735,000
T affic Impact Fees
15,000
100,000
115,000
Other
Total Funding Sources:
100,000
750,000
850,000
Capital Expenditures:
Design - -
-
-
-
-
Right ofHiay
85,000
50,000
135,000
Constrt,~bon
15,000
700,000
715,000
Total Expenditures:
100,000
750,000
850,000
Grants / Other Sources: Grant Funding is unsecured.
Roadway Improvement Projects 29
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: 124th Ave SE Corridor Improvements Phase 1 TIP # 40
Project No: cpxxx
Project Type: Capacity
Project Manager: TBD
Description:
This project will fund the design, right of way acicuisition,
and construction of a 4-lane
section with bicy
cle and pedestrian facilities on
124th Ave SE between SE 318th St and SE 312th St.
Progress Summary:
Pre-design is planned for 2012.
Future Impact on Operating Budget:
This project will have no impact on the operating budget
for street maintenance.
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources:
Prior to 2010
Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue
-
-
Grants (Fed, State, Local)
-
1,690,000
Traffic Impact Fees
50,000
260,000
Other
Total Funding Sources:
50,000
1,950,000
Capital Expenditures:
Design
50,000
200,000
Right of Way
-
250,000
instruction
1, 500, 000
Total Expenditures:
50,000
-
1,950,000
Forecasted Project Cost:
Total
Expenditures
" 2013
2014
2015
2016
2011-2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Grants Fed,State,Local)
125,000
1,565,000
1,690,000
Traffic Impact Fees
25,000
185,000
260,000
Other
Total Funding Sources:
150,000
1,750,000
1,950,000
Capital Expenditures:
Design
150,000
-
200,000
Right of M/13y
-
250,000
250,000
Construction
1,500,000
1,500,000
Total Expenditures:
150,000
1,750,000
1,950,000
Grants / Other Sources: Grant funding is unsecured.
30 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: 124th Ave SE Corridor Improvements Phase 2 TIP # 41
Project No: cpxxx
Project Type: Capacity
Project Manager: TBD
Description:
This project will fund the design, right of way acicuisition, and construction of improvements to the signalized intersectio
n of SE 312th St
and 124th Ave SE. Improvements include adding bike lanes, dual westbound left turn
lanes, dual southbound thru lanes,, northbound
right turn pocket, ITS and pedestrian safety improvements.
Progress Summary:
Pre-design is scheduled for 2013.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2010
YTD Actual 2011
10 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate
2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
Grants (Fed, State, Local)
965,000
Traffic Impact Fees
215,000
Other
Total Funding Sources:
1,180,000
Capital Expenditures:
Desigr
80,000
Right of Wat
100,000
Construction
1,000,000
Total Expenditures:
-
1,180,000
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015 2016
2011-2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Grants (Fed, State, Local) -
100,000
865,000
965,000
TraffiolmpactFees 30,000
50,000
135,000
215,000
Other
Total Funding Sources: 30,000
150,000
1,000,000
1,180,000
Capital Expenditures:
Design 30,000
50,000
-
80,000
Right ofHI-,y -
100,000
-
100,000
Constrt,~ tion
1,000,000
1,000,000
Total Expenditures: 30,000
150,000
1,000,000
1,180,000
Grants / Other Sources: Grant funding is unsecured.
Roadway Improvement Projects 31
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title:
SE 320th St Corridor Improvements
Project No:
cpxxx
Project Type:
Capacity
Project Manager:
TBD
TIP # 42
Description:
This project will fund the design, right of way acicuisition, and construction of a 3 lane
roadway with bicycle and pedestrian facilities on
SE 320th St between 124th Ave SE and the western entrance to GRCC.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
Grants (Fed, State, Loceq
553,600
Traffic Impact Faes
116,400
PH'TFL
-
Other
Total Funding Sources:
670,000
Capital Expenditures:
Design
-
-
-
90,000
Right o Hl 3a
60,000
onstruction
520,000
Total Expenditures:
-
670,000
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
GrantsState,Local)
-
51,500
502,100
553,600
Tiaf6clmpactFees
30,000
8,500
77,900
116,400
°WTFL
-
-
-
-
Other
Total Funding Sources:
30,000
60,000
580,000
670,000
Capital Expenditures:
Design
30,000
60,000
-
90,000
Right of Way
-
-
60,000
60,000
Construction
520,000
520,000
Total Expenditures:
30,000
60,000
580,000
670,000
Grants / Other Sources: Grant funding is unsecured.
32 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
LOCAL REVITALIZATION FUND (330)
Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Capital Projects Fund
Project Title: Downtown Promenade Improvements
Project No: cp1005
Project Type: Non-Capacity
Project Manager: Ryan Vondrak/Elizabeth Chamberlain
TIP # 52
Description:
This project will fund the design, coordination, permitting and construction of Downtown Promenade improvements. Project includes
storm, sewer, water and roadway improvements of Division Street between Main St and 3rd St SW/SE.
Progress Summarv:
Design and construction will be completed in 2011.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
-
-
Grants (Federal)
456,000
2,544,000
3,000,000
3,000,000
REET
-
-
-
-
PWTFL
-
-
-
-
Other(GO Bonds),
744,000
4,256,000
5,000,000
5,000,000
Total Funding Sources:
1,200,000
6,800,000
8,000,000
8,000,000
Capital Expenditures:
Design
1,200,000
131,000
1,331,000
1,331,000
Right of Way
-
-
-
-
Construction
6,669,000
6,669,000
6,669,000
Total Expenditures:
1,200,000
6,800,000
8,000,000
8,000,000
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015
2016
2011-2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
Grants (Federal)
2,544,000
REET
-
PWTFL
-
Ofher(GO Bonds)
4,256,000
Total Funding Sources:
6,800,000
Capital Expenditures:
Design
131,000
Right o Way
-
Consh o,- Pion
6,669,000
Total Expenditures:
6,800,000
Grants / Other Sources: Grant Funding is Federal EDA Grant. Other Funding is LRF GO Bond revenue.
Roadway Improvement Projects 33
City of Auburn Transportation Improvement Program
~
.Y .
.
r -
RN
. ,
~'TtiA~N
t~ .
34 Roadway Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102)
Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: Harvey Rd. & 8th St. NE Intersection Improvements TIP # 17
Project No: cp0611
Project Type: Capacity
Project Manager: Jacob Sweeting
Description:
Add one eastbound through/right turn lane on 8th Street NE approaching Harve
y Road. Mod
ify traffic signals and traffic
channelization to accommodate the new lane. The additional lane will improve traffic delays and vehicle queui
ng at the
intersection of Harvey Road and 8th Street NE in all directions. This project will
reconstruct M Street NE from
4th Street NE to
8th Street NE, a segment of roadway approximately 0.3 miles in length with four travel lanes.
The reconstructi
on will fix the
existing poor pavement condition and fill in any gaps in the sidewalk network.
Progress Summary:
Project was completed in 2010. Ongoing budget is for PWTFL debt payments.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2010
YTD Actual
- 2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
1,082,000
Grants (Fed, State, Local) -
-
-
-
TrafficImpact Fees 199,509 91000
88,000
87,500
378,509
725,509
PWTF 1,506,873 -0 4JG
1,527,273
1,527,273
Other (430,431,432 Funds) 310,060
310,060
310,060
Total Funding Sources: 2,016,442 111,400
88,000
87,500
2,215,842
3,644,842
Capital Expenditures:
Design 3'6496 -
-
-
326,496
326,496
Right ofWia 186 419 10 000
196,479
196,479
C0n,fro, ion 1 50:, 461 15 400
-
-
1,518,867
1,518,867
Long reim Debt - FH TF 06 000
88,000
87,500
174,000
1,603,000
Total Expenditures: 2,016,442 111,400
88,000
87,500
2,215,842
3,644,842
Forecasted Project Cost:
Total
Expenditures
2013 2014
2015
2016
2011-2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
86,000
86,000
996,000
Grants )Fed, State, Local) - -
-
-
-
-
TrafficlmpactFees 87,000 86,500
86,000
435,000
PWTF - -
-
-
-
-
Total Funding Sources: 87,000 86,500
86,000
86,000
521,000
996,000
Capital Expenditures:
Des/,n - -
-
-
-
-
Right a- 'H ay
Construction - -
-
-
-
-
LongTermDebt - PWTF 87,000 86,500
86,000
86,000
521,000
996,000
Total Expenditures: 87,000 86,500
86,000
86,000
521,000
996,000
Grants/ Other Sources: Other funding is City Sewer, Water & Storm Funds
Intersection Improvement Projects 35
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: 8th Street and R Street NE Traffic Signal TIP # 18
Project No: cp0701
Project Type: Non-Capacity Intersection Improvement
Project Manager: Ryan Vondrak
Description:
This project includes the construction of a new traffic signal at the intersection of 8th Street NE and R Street NE. Intersection
improvements will include crosswalks and pedestrian signals. This project was selected on accident history, surrounding
land uses, and pedestrian flow patterns.
Progress Summary:
The design is anticipated to be started in 2007, with construction scheduled for 2010.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $6,600.
Budget: 2010 YTD Actual 2011
10 Budget
Budget Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate 2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue - 400,500 1,000
401,500
401,500
Grants (Federal) 142,700 107,300 -
250,000
250,000
REST' - -
-
-
Traffic Impact Fees
Other
Total Funding Sources: 142,700 507,800 1,000
651,500
651,500
Capital Expenditures:
Design 139,850 65,000 -
204,850
204,850
Right of H aV 2,850 - -
2,850
2,850
constrr:tion 442,800 1,000
443,800
443,800
Total Expenditures: 142,700 507,800 1,000
651,500
651,500
Forecasted Project Cost:
Total
Expenditures
2013 2014 2015 2016
2011 -2016
Beyond 2016
Funding Sources:
UnrestrictedStreetRevenue
1,000
-
Grants (Federal)
-
REET
Traffic Impact Fees
Other
Total Funding Sources:
1,000
Capital Expenditures:
Design
-
Right of Way
-
Construction
1,000
Total Expenditures:
1,000
Grants / Other Sources: Grant is Federal Intersection & Corridor Safety Grant.
36 Intersection Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: Auburn Way North / 1st Street NE Signal Improvements TIP # 19
Project No: cpxxxx
Project Type: Non-Capacity
Project Manager: TBD
Description:
This project will construct a new complete traffic sig
nal with controller cabinet and battery backup along with n
ecessary
intersection improvements.
Progress Summary:
Predesign will be completed in 2012. Final design a
nd construction is planned for 2013.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2010 YTD Actual
2011
10 Budget
Budget Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources:
Prior to 2010 Estimate 2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue
-
20,000
150,000
Grants (Fed, State, Local)
-
450,000
Traffic Impact Fees
-
Other
Total Funding Sources:
20,000
600,000
Capital Expenditures:
Design
- - -
20,000
100,000
Right o Hl 3a
-
50,000
Construction
450,000
Total Expenditures:
20,000
-
600,000
Forecasted Project Cost:
Total
Expenditures
2013 2014 2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
130,000
150,000
-
Gi~nWs (Fed, State, Local)
450,000
450,000
Ti off,: Impact Fees
-
-
Other
Total Funding Sources:
580,000
600,000
Capital Expenditures:
Design
80,000
100,000
Right of I'Vay
50,000
50,000
Construction
450,000
450,000
Total Expenditures:
580,000
600,000
Grants / Other Sources: Grant funding is unsecured.
Intersection Improvement Projects 37
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: Auburn Way South and M Street SE Intersection Imp. TIP # 20
Project No: cpxxxx
Project Type: Capacity
Project Manager: TBD
Description:
Construct a westbound to northbound right turn pocket at the intersection of Auburn Way South and M Street
SE. This
project would also improve the turning radius at this same corner allowing drivers to make a safe right turn on
red (after
stopping and yielding to oncoming vehicles). Currently the intersection geometry has necessitated the City pl
acing a legal
restriction on this movement.
Progress Summary:
Pre-design is anticipated to begin in 2011 and be completed in 2011. Construction will be completed when funding is
secured.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2010 YTD Actual 2011
10 Budget
Budget Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate 2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue - ?5 000 75 000
100,000
100,000
Grants (Fed, State,Loca!)
-
765,000
PEET
-
Traffic Mitigation Funds
135,000
Other
Total Funding Sources: 25,000 75,000
100,000
1,000,000
Capital Expenditures:
Design 25,000 75,000
100,000
100,000
Right o Hl 3a -
-
100,000
Construction
800,000
Total Expenditures: 25,000 75,000
100,000
1,000,000
Forecasted Project Cost:
Total
Expenditures
2013 2014 2015 2016
2011 -2016
Beyond 2016
Funding Sources:
UnrestrictedStreetRevenue -
75,000
-
Grants (FLState,Locaq 765,000
765,000
PEET -
-
Traffic Mitigation Funds 135,000
135,000
Other
Total Funding Sources: 900,000
975,000
Capital Expenditures:
Design -
75,000
Right of Way 100,000
100,000
Construction 800,000
800,000
Total Expenditures: 900,000
975,000
Grants / Other Sources: Grant funding is unsecured.
38 Intersection Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: C Street NW and West Main Street TIP # 21
Project No: cpxxxx
Project Type: Non Capacity
Project Manager: TBD
Description:
Reconstruct intersection at C Street NW and West Main Street. P
roject would include a new t
raffic signal and modifications
to the turning radii at each corner to help facilitate vehicular movements. The new traffic signal would allow for protected left
turn phasing for northbound and southbound left turn movements.
This would also provide ad
ditional safety related to the
railroad pre-emption.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street
maintenance.
Budget:
2010 YTD Actual
2011 10 Budget
Budget Expenditures
Budget Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate 2011 Budget
2012 Budget Project Total
Cost
Unrestricted Street Revenue -
220,000
Grants (Fed, State, Local)
880,000
REET'
-
Traffic Impact Fees
Other
Total Funding Sources:
1,100,000
Capital Expenditures:
Design
100,000
Rig htofM'av
550,000
Consr i~tion
450,000
Total Expenditures:
-
1,100,000
Forecasted Project Cost:
Total
Expenditures
2013
2014 2015
2016 2011 -2016
Beyond 2016
Funding Sources:
UnrestrlCtedStreetRevenue 20,000
200,000
220,000
-
Gra's (Fec) State,Local) 80,000
800,000
880,000
REET -
-
-
Traffic Impact Fees
Other
Total Funding Sources: 100,000
1,000,000
1,100,000
Capital Expenditures:
Design 100,000
-
100,000
Right of Way -
550,000
550,000
Construction
450,000
450,000
Total Expenditures: 100,000
1,000,000
1,100,000
Grants / Other Sources: Grant Funding is unsecured.
Intersection Improvement Projects 39
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: F St SE & 4th St SE Traffic Signal
Project No: cp0914
Project Type: Non-Capacity Intersection Improvement
Project Manager: Jacob Sweeting
TIP # 25
Description:
This project includes the construction of a new traffic signal at the intersection of 4th Street SE and F Street SE. Inters
ection
improvements will include crosswalks and pedestrian signals. This proje
ct was selected based on accident history, traffic volumes, and
pedestrian flow patterns.
Progress Summary:
Preliminary design will begin in 2009. Final design and construction will be completed in 2010.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $6,600.
Budget:
2010 YTD Actual 2011
10 Budget
Budget Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate 2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
- 10001
1,000
1,000
Grants (Fed, State,Loc6 4,155
3 2,545
396,700
396,700
PEET -
-
-
-
PH/TFL
Other
Total Funding Sources: 4,155
392,545 1,000
397,700
397,700
Capital Expenditures:
Design 4155
~5 845 -
60,000
60,000
Ri~iht o VI4e
- - -
-
-
Consti~iction
336,700 1,000
337,700
337,700
Total Expenditures: 4,155
392,545 1,000
397,700
397,700
Forecasted Project Cost:
Total
Expenditures
2013
2014 2015 2016
2011 -2016
Beyond 2016
Funding Sources:
UniestrictedStreetRevenue
1,000
-
Grants (Fed State,Local)
-
PEET
PWTFL
Other
Total Funding Sources:
1,000
Capital Expenditures:
Design
-
Right of Way
-
Construction
1,000
Total Expenditures:
1,000
Grants / Other Sources: Grant is Federal HSIP funded and does not require a city match.
40 Intersection Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: Railroad Crossing Safety Improvements
Project No: cpxxx
Project Type: Intersection Safety (Non-Capacity)
Project Manager: TBD
TIP # 38
Description:
This project will fund the design, coordination, permitting and construction of Quad gates at the West Main St, 3rd St NW, and 37th St
NW BNSF Railroad crossings.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimate
d to be $1,000.
Budget:
2010
YTD Actual 2011
10 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources:
Prior to 2010
Estimate
2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue
-
135,000
Grants (Fed, State, Local)
865,000
REET
-
Other
Total Funding Sources:
1,000,000
Capital Expenditures:
Desigr
150,000
Right of Way
Construction
850,000
Total Expenditures:
-
1,000,000
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015 2016
2011-2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
25,000
110,000
135,000
-
Grants (Fed, State, Local)
125,000
740,000
865,000
REET
-
-
-
Other
Total Funding Sources:
150,000
850,000
1,000,000
Capital Expenditures:
Design
150,000
-
150,000
Right o% VI'ay
-
-
-
Constrt,~ tion
850,000
850,000
Total Expenditures:
150,000
850,000
1,000,000
Grants / Other Sources: Grant funding is unsecured.
Intersection Improvement Projects 41
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: Auburn Way South & Riverwalk Intersection Improvements TIP # 43
Project No: cpxxx
Project Type: Capacity
Project Manager: TBD
Description:
This project will fund the design, right of way acicuisition and construction of intersect
ion capacity and safety improveme
nts at Auburn
Way South and Riverwalk Dr SE. This project will include creating eastbound/westbo
und dual left turn l
anes, auxiliary signal heads and
pedestrian safety enhancements.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
Grants (Fed, State, Local)
2,076,000
Traffic Impact Fees
324,000
PWTFL
-
Other
Total Funding Sources:
2,400,000
Capital Expenditures:
Design
150,000
Right of Way
200,000
^Onstruction
2,050,000
Total Expenditures:
-
2,400,000
Forecasted Project Cost:
Total
Expenditures
2013 2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Uniestr icted Street Revenue
-
-
-
-
GiantsState,Local)
125,000
1,951,000
2,076,000
Traffic lm pact Fees
25,000
299,000
324,000
PWTFL
-
-
-
Other
Total Funding Sources:
150,000
2,250,000
2,400,000
Capital Expenditures:
Design
150,000
-
150,000
Right of Way
-
200,000
200,000
Construction
2,050,000
2,050,000
Total Expenditures:
150,000
2,250,000
2,400,000
Grants / Other Sources: Grant funding is unsecured.
42 Intersection Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: South Auburn Intelligent Transportation System (ITS) Expansion TIP # 13
Project No: cp1004
Project Type: Capacity
Project Manager: Jacob Sweeting
Description:
The South Auburn ITS Expansion project includes connecting and providing new ITS infrastructure on 15th ST SW, C ST SW and A ST
SE. It also includes 6th ST SE, A ST SE and 41st ST SE, (Ellingson Road). This ITS expansion will
be accomplished through existing
conduits recently installed under capital improvement projects, and with wireless line of sight options.
With this extension and additional
equipment the project adds an additional 14 signals to the existing central signal system and brings back new cameras along three
heavily congested corridors.
Progress Summary:
Project will be designed and constructed in 2010.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5000.
In addition, staff time will be required upon completion of the
project to monitor the system.
Budget:
2010 YTD Actual
2011 10 Budget
Budget Expenditures
Budget Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate 2011 Budget
2012 Budget Project Total
Cost
Unrestricted Street Revenue -
1 000
1,000
1,000
Grants (Fed, State, Local)
693,400
693,400
693,400
FEET
-
-
Traffic Mitigation Fees
11U000
110,000
110,000
Other
Total Funding Sources:
803,400 1,000
804,400
804,400
Capital Expenditures:
Design
40 X00 -
40,500
40,500
Right O Hl 3a
- -
-
-
Construction
162,900 1,000
763,900
763,900
Total Expenditures:
803,400 1,000
804,400
804,400
Forecasted Project Cost:
Total
Expenditures
2013
2014 2015
2016 2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
1,000
-
G~~nts (Fed, State, Local)
-
REET
Traffic AitiaatonFees
Other
Total Funding Sources:
1,000
Capital Expenditures:
Design
Right of Way
-
Construction
1,000
Total Expenditures:
1,000
Grants / Other Sources: Grant Funding is CMAQ and requires a 13.5% city match.
Traffic Signal & Intelligent Transportation Systems Improvement Projects 43
City of Auburn Transportation Improvement Program
CAPITAL IMPROVEMENT FUND (328) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Capital Projects Fund
Project Title: Traffic Signal Improvements TIP #34
Project No: cpxxxx
Project Type: Non-Capacity (Annual)
Project Manager: Scott Nutter
Description:
The City analyzes accident data and identifies locations with higher than average rates. Typically these involve signal locations where
volumes have grown significantly requiring signal modifications. Signals that have accident patterns that are correctable are identified
and the modifications are implemented. Signals are also evaluated annually for potential capacity enhancements.
Progress Summary:
Future Impact on Operating Budget:
Budget
Adopted Budget
Budget Amendments
Adjusted Budget
Funding Sources:
Unrestricted Cap. Improv. Revenue
Grants (Fed,State Lo ai)
REET2
Other
Total Funding Sources:
Capital Expenditures:
Design
Right of Hl 3e
or stn rtior
Total Expenditures:
sted
Funding Sources:
Unrestricted Cap Improv. Revenue
Grants (--ed State,Local)
REET 2
Other
Total Funding Sources:
Capital Expenditures:
Design
Right of Way
Construction
Total Expenditures:
2010
udget
YTD Actual
Expenditures-
2011
Budget
10 Budget
Balance
(Previous 2 Yrs) 2010 YE
Prior to 2010 Estimate
2011 Budget
2012 Budget
2011 Year End
Project Total
Total Project
Cost
100.000
100,000
100,000
200,000
700,000
10,000
10,000
10,000
20,000
70,000
90,000
90,000
90,000
180,000
630,000
100,000
100,000
100,000
200,000
700,000
Total
Expenditures
2013
2014
2015
2016
2011 -2016
Beyond 2016
100,000
100,000
100,000
100,000
600,000
100,000
100,000
100,000
100,000
600,000
10,000
10,000
10,000
10,000
60,000
90,000
90,000
90,000
90,000
540,000
100,000
100,000
100,000
100,000
600,000
Grants / Other Sources:
44 Traffic Signal & Intelligent Transportation Systems Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: ITS Dynamic Message Signs
Project No: cpxxx
Project Type: Non-Capacity (ITS)
Project Manager: TBD
TIP # 50
Description:
This project will fund the design and construction of Dynamic Message signs at various locations throu
ghout the city. Dynamic message
signs are an important tool in ITS for informing roadway users. Priority locations for sign installations are based on the Comprehensive
Transportation Plans ITS map and include Auburn Way North, Auburn Way South, West Valley Highway, East Valley H
ighway and Lea
Hill Road.
Progress Summary:
The first phase of this project is scheduled to begin in 2014 or soo
ner if grant funding becomes available.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5000.
Budget:
2010 YTD Actual
2011
10 Budget
Budget Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate 2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
180,000
Grants (Fed, State, Local)
1,140, 000
REET'
-
PWTFL
Other
Total Funding Sources:
1,320,000
Capital Expenditures:
Design
120,000
Right of Way
-
or s r action
1,200,000
Total Expenditures:
-
1,320,000
Forecasted Project Cost:
Total
Expenditures
2013
2014 2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Un~estrictedStreetRevenue
30,000
30,000
60,000
120,000
Giant's (Fa,State, Locall)
190,000
190,000
380,000
760,000
REET
-
-
-
-
PWTFL
Other
Total Funding Sources:
220,000
220,000
440,000
880,000
Capital Expenditures:
Design
20,000
20,000
40,000
80,000
Right of Way
-
-
-
-
Construction
200,000
200,000
400,000
800,000
Total Expenditures:
220,000
220,000
440,000
880,000
Grants / Other Sources: Grant funding is unsecured.
Traffic Signal & Intelligent Transportation Systems Improvement Projects 45
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title:
East Valley Highway ITS Expansion
Project No:
cpxxx
Project Type:
Capacity
Project Manager:
TBD
TIP # 51
Description:
This project will fund the design, coordination, permitting and construction of ITS facilities from 41st St
SE to Lake Tapps Parkway.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5000.
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
Grants (Fed,State,LocaO -
-
-
692,000
PEET
-
Traffic Impact Fees
108,000
Other
Total Funding Sources:
800,000
Capital Expenditures:
Design
-
-
-
85,000
Right VI4e
-
-
-
-
-
^onstr e.tior
715,000
Total Expenditures:
-
800,000
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
-
-
Grants (Fed State,Local)
692,000
692,000
BEET
-
-
Traff(- Impact Fees
108,000
108,000
Other
Total Funding Sources:
800,000
800,000
Capital Expenditures:
Design
85,000
85,000
Right of Way
-
-
Construction
715,000
715,000
Total Expenditures:
800,000
800,000
Grants / Other Sources: Grant funding is unsecured.
46 Traffic Signal & Intelligent Transportation Systems Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: Auburn Way South Corridor Improvements Phase 1 TIP # 2
Project No: CPXXXX
Project Type: Non-Motorized
Project Manager: TBD
Description:
This project will construct pedestrian improvements along Auburn Way South between Dogwood St SE and Fir St SE th
at are consistent
with WSDOT's SR-164 Route Development Plan. This project includes sidewalk improvements, access management; -a
mid-block
pedestrian crossing, construction of a u-turn wedge at Fir St SE and street lighting.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2010
YTD Actual
2011
10 Budget
Budget
Expenditures----
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
41000
60,000
40,000
100,000
Grants (Fed, State, Local)
120,000
620,830
120,000
740,830
Traffic Impact Fees
-
-
-
-
REET2
Other Sources
Total Funding Sources:
160,000
680,830
160,000
840,830
Capital Expenditures:
Design
157,000
6,080
157,000
163,080
Right HI 3'v
3,000
-
3,000
3,000
Consr tion
674,750
674,750
Total Expenditures:
160,000
680,830
160,000
840,830
Forecasted Project Cost:
Total
Expenditures
2013 2014
2015
2016
2011-2016
Beyond 2016
Funding Sources:
UnrestricteclStreetRevenue
100,000
-
GrantS (Fed State,Locall)
740,830
Traffic impact Fees
-
REET2
Other Som-,s
Total Funding Sources:
840,830
Capital Expenditures:
Design
163,080
Right of Way
3,000
Construction
674,750
Total Expenditures:
840,830
Grants / Other Sources: Grant funding is unsecured. Other sources are city funds to be identified when grant funding is secured.
Non Motorized Improvement Projects 47
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: Skinner Road to 3rd Avenue (Auburn Pacific Trail Phase2) TIP # 22
Project No: c507BO
Project Type: Class 1 Trail / Sidewalk (Capacity)
Project Manager: Leah Dunsdon
Description:
This project will construct minor road widening and bicycle lane striping on Skinner Road and 3rd Avenue SE from Ellingson
Road SW to Pacific Park. Sidewalks will be constructed along th
e western side of Skinner Road where there are gaps in the
sidewalk network. The project length is approximately 1.2 miles.
The project will connect to the Phase 1 improvements
constructed in Auburn in 2007.
Progress Summary:
Phase 1 (portion in Auburn) was constructed in 2007. Phase 2 (portion in Pacific) will be constructed in 2010.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2010 YTD Actual 2011
10 Budget
Budget Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate 2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue 3,300
3,600 1,000
7,900
7,900
Grants (Fed,State,Local) 9,557
101,500 -
111,057
111,057
REET2 7,920
-
7,920
7,920
Traffic Impact Fees -
-
-
Other (City foPacific)
36,200
36,200
36,200
Total Funding Sources: 20,777
141,300 1,000
163,077
163,077
Capital Expenditures:
Design 20,777
10,000 -
30,777
30,777
Right of H4 3v
constr L : tion
131,300 1,000
132,300
132,300
Total Expenditures: 20,777
141,300 1,000
163,077
163,077
Forecasted Project Cost:
Total
Expenditures
2013
2014 2015 2016
2011 -2016
Beyond 2016
Funding Sources:
UnrestrictedStreetRevenue
1,000
-
Grants (Feo State,Locall)
-
REET2
Traffic Impact Fees
Other (City Bach lr!
Total Funding Sources:
1,000
Capital Expenditures:
Design
-
Right of Way
-
Construction
1,000
Total Expenditures:
1,000
Grants / Other Sources: Other is a reimbursable commitment of funds from City of Pacific.
48 Non Motorized Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: BNSF/E. Valley Highway Pedestrian Underpass TIP # 23
Project No: C229a0
Project Type: Class 1 Trail (Capacity)
Project Manager: TBD
Description:
Project to construct an undercrossing of the BNSF Railroad in conjunction with a pedestrian bridge to allow a sa
fe, direct,
attractive non-motorized access between neighborhoods in the City of Pacific
and schools in the City of Auburn.
Progress Summary:
The design is on hold. Funding source is most likely a federal earmark. Currently this project is on hold pending some
discussions with BNSF RR. They are in the process of planning for a third rail
which would significantly impact the design.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $240.
Budget: 2010
YTD Actual 2011
10 Budget -
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate
2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue 53,900
53,900
53,900
Grants (Fed, State, Local) 170,400
170,400
9,720,400
REET -
-
-
Traffic Impact Fees
-
Othei
250,000
Total Funding Sources: 224,300
224,300
10,024,300
Capital Expenditures:
Design 224,300
224,300
974,300
Right &H Vay
50,000
Constn~ction
9,000,000
Total Expenditures: 224,300
224,300
10,024,300
Forecasted Project Cost:
Total
Expenditures
2013 2014
2015 2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
-
-
Si~nts (Fed, State, Local)
4,550,000
4,550,000
5,000,000
REET
-
-
-
Traffic Impact Fees
-
-
Other(OtherAgencies)"
250,000
250,000
-
Total Funding Sources:
4,800,000
4,800,000
5,000,000
Capital Expenditures:
Design
750,000
750,000
-
Right cfHVay
50,000
50,000
-
Constructioo
4,000,000
4,000,000
5,000,000
Total Expenditures:
4,800,000
4,800,000
5,000,000
Grants/ Other Sources: 'KC Open Space Bond and High Speed Rail Safety Money.
Non Motorized Improvement Projects 49
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title:
Academy Drive Multi-Use Trail
Project No:
cpxxxx
Project Type:
Class 1 Trail (Capacity)
Project Manager:
TBD
TIP # 24
Description:
This project will use existing right-of-way to repair the damaged roadbed to a u
sable multi-use
trail on Academy Drive from
the Green River Road to Auburn Way South.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $1
,680.
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources:
Prior to 2010
Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue
-
245,000
Grants (Fed, State, Local)
765,000
REST'
-
Traffic Impact Fees
Other Sources
Total Funding Sources:
1,010,000
Capital Expenditures:
Design
160,000
Right of H43v
-
constr L : tion
850,000
Total Expenditures:
-
1,010,000
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
UnrestrictedStreetRevenue
10,000
150,000
42,500
42,500
245,000
-
Grants (Feo State,Local)
-
-
382,500
382,500
765,000
REET
-
-
-
Traffic Impact Fees
Other Soya-',
Total Funding Sources:
10,000
150,000
425,000
425,000
1,010,000
Capital Expenditures:
Design
10,000
150,000
-
-
160,000
Right of Way
-
-
-
-
-
Construction
425,000
425,000
850,000
Total Expenditures:
10,000
150,000
425,000
425,000
1,010,000
Grants / Other Sources: Grant Funding is unsecured
50 Non Motorized Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: Citywide Pedestrian Crossing Program
Project No: cpxxxx
Project Type: Non-Capacity (Bi-Annual)
Project Manager: Pablo Para
TIP # 30
Description:
This is a bi-ennual level of effort project used to fund small pedestrian safety studies and improvement projects. This project
provides for pedestrian safety studies and improvements at various locations citywide. Projects are prioritized
annually
based on safety issues and pedestrian demands.
Progress Summary:
Projects for 2010 are 3rd St NE & Auburn Ave Intersection improvements and 15th St SW Interurban Trail X-i
ng
Improvements.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street
maintenance.
Budget:
2010 YTD Actual
2011
10 Budget
Budget Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate 2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
100,000
100,000
100,000
400,000
Grants (Fed, State, Local)
-
-
-
-
REET'
Traffic Impact Fees
Other
Total Funding Sources:
100,000
100,000
100,000
400,000
Capital Expenditures:
Design
10,000
10,000
10,000
40,000
Right of M'av
-
-
-
-
Consr fiction
90,000
90,000
90,000
360,000
Total Expenditures:
100,000
100,000
100,000
400,000
Forecasted Project Cost:
Total
Expenditures
2013
2014 2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
100,000
100,000
300,000
-
Grants (Fed State,Local)
-
-
-
REET
Traffic Impact Fees
Other
Total Funding Sources:
100,000
100,000
300,000
Capital Expenditures:
Design
10,000
10,000
30,000
Right of Way
-
-
-
Construction
90,000
90,000
270,000
Total Expenditures:
100,000
100,000
300,000
Grants / Other Sources:
Non Motorized Improvement Projects 51
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: Citywide Arterial Bicycle & Safety Improvements TIP # 31
Project No: cpxxx
Project Type: Non-Capacity (Safety)
Project Manager: Various
Description:
This is an annual level of effort project focused on funding bicycle
and safety im
provements on classified roadways. Projects
are prioritized annually based upon field studies. Project was prev
iously called "Citywide Roadway Safety Infrastructure
Improvements.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street
maintenance.
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources:
Prior to 2010
Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue
19,300
100 000
100,000
119,300
619,300
Grants (Fed, State,Loca!)
-
-
-
-
PEET
Traffic Impart Feas
Other
Total Funding Sources:
19,300
100,000
100,000
119,300
619,300
Capital Expenditures:
Design
9 300
10,000
10,000
29,300
79,300
Right) Hl 3a
COnStrLlCtlen
-
90,000
90,000
90,000
540,000
Total Expenditures:
19,300
100,000
100,000
119,300
619,300
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
100,000
100,000
100,000
100,000
600,000
-
Grants (Fed State,Local)
-
-
-
-
-
PEET
Traffic Impact Fees
Other
Total Funding Sources:
100,000
100,000
100,000
100,000
600,000
Capital Expenditures:
Design
10,000
10,000
10,000
10,000
60,000
Right of Way
-
-
-
-
-
Construction
90,000
90,000
90,000
90,000
540,000
Total Expenditures:
100,000
100,000
100,000
100,000
600,000
Grants / Other Sources:
52 Non Motorized Improvement Projects
City of Auburn Transportation Improvement Program
CAPITAL IMPROVEMENT FUND (328)
Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Capital Projects Fund
Project Title: Citywide Sidewalk Improvements
Project No: varies
Project Type: Non-Capacity (Annual)
Project Manager: Seth Wickstrom
TIP #32
Description:
Project will fund sidewalk improvements to a variety of locations throughout the city. A sidewa
lk inventory was completed in
2004. Annual projects are selected based upon criteria such as: gap closure, safe walking rou
tes to schools,
completion of
downtown pedestrian corridor or "linkage", connectivity to transit services, ADA requirements, and "Save our Streets" (SOS)
project locations.
Progress Summary:
Future Impact on Operating Budget:
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Cap. Improv. Revenue -
180,000
20,000
180,000
600,000
Grants (Fed, State, Local)
-
-
-
-
REET 2
Other
Total Funding Sources:
180,000
20,000
180,000
600,000
Capital Expenditures:
Design
10,000
2,000
10,000
36,000
Right of Way
-
-
-
-
Cons r fiction
170,000
18,000
170,000
564,000
Total Expenditures:
180,000
20,000
180,000
600,000
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Cep Improv. Revenue 180,000
20,000
180,000
20,000
600,000
-
Giants (Fed State,Local) -
-
-
-
-
REET 2
Other
Total Funding Sources: 180,000
20,000
180,000
20,000
600,000
Capital Expenditures:
Design 10,000
2,000
10,000
2,000
36,000
Right of Way -
-
-
-
-
Construction 170,000
18,000
170,000
18,000
564,000
Total Expenditures: 180,000
20,000
180,000
20,000
600,000
Grants / Other Sources:
Non Motorized Improvement Projects 53
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title:
A ST NE Pedestrian Improvements
Project No:
cpxxxx
Project Type:
Sidewalk Improvements (Non-Capacity)
Project Manager:
TBD
TIP # 44
Description:
This project completes a pedestrian connection between Downtown Auburn and the 8th Street NE business district. This project will
improve a pedestrian crossing at 3rd Street NE, and construct sidewalks/access ramps along the A Street NE corridor.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimate
d to be $500.
Budget:
2010 YTD Actual 2011
10 Budget
Budget Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources:
Prior to 2010 Estimate 2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue
-
-
Grants (Fed, State, Local)
150,000
REST'
-
PWTFL
Other
Total Funding Sources:
150,000
Capital Expenditures:
Design
15,000
Right of Way
-
^Onstruction
135,000
Total Expenditures:
-
150,000
Forecasted Project Cost:
Total
Expenditures
2013 2014 2015 2016
2011 -2016
Beyond 2016
Funding Sources:
Uniestr icted Street Revenue
-
-
-
Giants (Fed State,Local)
150,000
150,000
REET
-
-
PWTFL
Other
Total Funding Sources:
150,000
150,000
Capital Expenditures:
Design
15,000
15,000
Right of Way
-
-
Construction
135,000
135,000
Total Expenditures:
150,000
150,000
Grants / Other Sources: Grant funding is unsecured.
54 Non Motorized Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: Interurban Trailhead Improvements
Project No: cpxxxx
Project Type: Class 1 Trail (Non-Capacity)
Project Manager: TBD
TIP # 45
Description:
This project provides funding for enhancements to existing trailheads and construction of new trailheads. Improvements include bike
racks, kiosks, parking and access.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2010
YTD Actual 2011
10 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate
2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
Grants (Fed, State, Local)
185,000
Traffic Mitigation Fees
25,000
PH'TFL
-
O'her
Total Funding Sources:
210,000
Capital Expenditures:
Design
- -
-
20,000
Right o Hl 3a
-
^or str rctfor
190,000
Total Expenditures:
-
210,000
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015 2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
-
-
Gr~nts (Fed, State, Local)
185,000
185,000
Traffic mitigation Fees
25,000
25,000
PWTFL
-
-
Other
Total Funding Sources:
210,000
210,000
Capital Expenditures:
Design
20,000
20,000
Right of Way
-
-
Construction
190,000
190,000
Total Expenditures:
210,000
210,000
Grants / Other Sources: Grant funding is unsecured.
Non Motorized Improvement Projects 55
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: 37th St SE & R ST SE Pedestrian Connector TIP # 53
Project No: cp0803
Project Type: Class 1 Trail (Capacity)
Project Manager: Leah Dunsdon
Description:
This project will construct a pedestrian connection between 37th ST SE
& R St providi
ng a link between south Auburn and the White
River Trail and Game Farm Park.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget
for street maintenance.
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources:
Prior to 2010
Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue
-
-
1,000
1,000
1,000
Grants (State)
21,327
102,973
-
124,300
124,300
Traffic Mitigation Fees
-
-
-
-
PWTFL
Other
Total Funding Sources:
21,327
102,973
1,000
125,300
125,300
Capital Expenditures:
Design
21,327
15,000
-
36,327
36,327
Right of Way
-
-
-
-
-
^onstruct10n
87,973
1,000
88,973
88,973
Total Expenditures:
21,327
102,973
1,000
125,300
125,300
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Uniestn,:'edStreetRevenue
1,000
-
Grants (State)
-
Traffic n-litigation Fees
PWTFL
Other
Total Funding Sources:
1,000
Capital Expenditures:
Design
Right of Way
-
Construction
1,000
Total Expenditures:
1,000
Grants / Other Sources: Grant funding is State Ped & Bike Safety Grant.
56 Non Motorized Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: Lea Hill Pedestrian Improvements
Project No: CPXXXX
Project Type: Non-Motorized
Project Manager: TBD
TIP # 57
Description:
This project will construct pedestrian improvements along the south side of SE 312th
St east of the intersection with 124th Ave SE,
intersection improvements at 116th Ave SE & SE 304th St, paint bike lanes on 116th
Ave SE between
SE 312th St and
SE 304th St and
improve curb ramps adjacent to Rainier Ridge Middle School
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
-
-
-
-
Grants (Fed, State, Local)
57,080
296,820
57,080
353,900
Traffic Impact Fees
-
-
-
-
REET2
Other
Total Funding Sources:
57,080
296,820
57,080
353,900
Capital Expenditures:
Design
57,080
-
57,080
57,080
Right HI 3'v
-
-
-
-
Consr tion
296,820
296,820
Total Expenditures:
57,080
296,820
57,080
353,900
Forecasted Project Cost:
Total
Expenditures
2013 2014
2015
2016
2011-2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
-
GrantS (Fed State,Local)
353,900
Traffic impact Fees
-
REET2
Other
Total Funding Sources:
353,900
Capital Expenditures:
Design
57,080
Right of Way
-
Construction
296,820
Total Expenditures:
353,900
Grants / Other Sources: Grant funding is unsecured.
Non Motorized Improvement Projects 57
City of Auburn Transportation Improvement Program
~
. . ' - - ~
RN
. ~
. T~~,~,N
oYC)(j NAGI N
~
58 Non-Motorized Improvement Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: METRO Shuttle: Auburn Community and Lakeland Shuttles TIP # 26
Project No: NA
Project Type: Other
Project Manager: TBD
Description:
Operation costs associated with two new Metro routes: a Commuter Shuttle from the Lakeland Hills nei
ghborhood to Au
burn Station and
a Community Shuttle linking residential neighborhoods with commercial
and service centers.
Progress Summary:
Lakeland Hill Service began in 2009. The community shuttle will b
egin service i
n 2010. Funding assistance w
ill be requested
through the Transit Now Partnership Program.
Future Impact on Operating Budget:
This project will have no impact on the operating budget
for street maintenance.
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources:
Prior to 2010
Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue
100,628
200,000
220,000
220,000
520,628
1,620,628
Grants (Fed,State,Local)
-
-
-
-
-
-
REET
Other (TBD)
Total Funding Sources:
100,628
200,000
220,000
220,000
520,628
1,620,628
Capital Expenditures:
Desian
-
-
-
-
-
-
Rioht H3
Operating osts
100,628
200,000
220,000
220,000
520,628
1,620,628
Total Expenditures:
100,628
200,000
220,000
220,000
520,628
1,620,628
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
UnresthCtedStleetRevenue
220,000
220,000
220,000
220,000
1,320,000
-
Grants (FeLSt~ta,Local)
-
-
-
-
-
REET
S±her iTEC:
Total Funding Sources:
220,000
220,000
220,000
220,000
1,320,000
Capital Expenditures:
Design
-
-
-
-
-
Right of Way
-
-
-
-
-
Operating Costs
220,000
220,000
220,000
220,000
1,320,000
Total Expenditures:
220,000
220,000
220,000
220,000
1,320,000
Grants / Other Sources:
Studies and Miscellaneous Projects 59
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: 41st Street SE and A Street SE Access Management Study TIP # 27
Project No: cpxxxx
Project Type: Safety (Non-Capacity)
Project Manager: TBD
Description:
Study the area from 37th Street SE to the White River on A Street SE including 41 st Street SE from D Street SE to C Street
SE. The study should review the safety and access needs of the traveling publ
ic and the adjacent properties.
Progress Summary:
Pre-design will be done to refine project scope, alignment, and cost.
Future Impact on Operating Budget:
This study will have no impact on the operating budget for street maintenance.
Budget: 2010
YTD Actual 2011
10 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate
2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
10,000
10,000
10,000
Grants (Fed, State, Local)
-
-
-
REET'
Traffic Mitigation Fees
Other
Total Funding Sources:
10,000
10,000
10,000
Capital Expenditures:
Design
10,000
10,000
10,000
Corstr :tior
Total Expenditures:
10,000
10,000
10,000
Forecasted Project Cost:
Total
Expenditures
2013 2014
2015 2016
2011 -2016
Beyond 2016
Funding Sources:
UnrestrictedStreetRevenue
10,000
-
Grants (F LState,Local)
-
REET
Traffic Imoa:'Fees
Other
Total Funding Sources:
10,000
Capital Expenditures:
Design
10,000
Right of Way
-
Construction
Total Expenditures:
10,000
Grants / Other Sources:
60 Studies and Miscellaneous Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title:
South 277th - Wetland Mitigation
Project No:
c41 0a0
Project Type:
Non-Capacity
Project Manager:
Leah Dunsdon
TIP # 29
Description:
Wetland mitigation for the 277th Street Grade Sepa
ration project.
Progress Summary:
This is a 10-year obligation, which began in 2004.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street
maintenance.
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources:
Prior to 2010
Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue
90,140
13 5 0
25,000
228,640
278,640
Grants (Fed, State, Local)
-
-
-
-
REET
Traffic Impact Fees
Other
Total Funding Sources:
90,140
113,500
25,000
25,000
228,640
278,640
Capital Expenditures:
Design
5% 394
95 000
15,000
15,000
167,394
197,394
Consti~iction
?74r
18,500
10,000
10,000
61,246
81,246
Total Expenditures:
90,140
113,500
25,000
25,000
228,640
278,640
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
25,000
75,000
-
Grants )Fed State,Local)
-
-
REET
Traffic Impact Fees
O,`her
Total Funding Sources:
25,000
75,000
Capital Expenditures:
Design
15,000
45,000
Right of Way
-
-
Construction
10,000
30,000
Total Expenditures:
25,000
75,000
Grants / Other Sources:
Studies and Miscellaneous Projects 61
City of Auburn Transportation Improvement Program
CAPITAL IMPROVEMENT FUND (328)
Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Capital Projects Fund
Project Title: Traffic Calming Improvements
Project No: cpxxxx
Project Type: Non-Capacity (Annual)
Project Manager: Pablo Para
TIP #33
Description:
The City's Neighborhood Traffic Calming Program was adopted by City C
ouncil in November of 2005.
Staff receives co
mplaints from
citizens and then gathers data to confirm that a speeding issue and/or cut through traffic issue is present. This money is for physical
improvements to the streets once all other options have been exhausted.
Physical im
provements may include items such as lighitng,
signing, striping, speed humps, speed tables, chicanes, traffic circles, and median treatments.
Progress Summary:
Future Impact on Operating Budget:
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous 2 Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Cap. Improv. Revenue -
Grants (Fed, State, Local)
REET 2
-
-
-
-
-
Other (Redflex)
225,000
200,000
200,000
425,000
1,425,000
Total Funding Sources:
225,000
200,000
200,000
425,000
1,425,000
Capital Expenditures:
Design
25,000
20,000
20,000
45,000
145,000
piyht of Way
-
-
-
-
-
onstrL~tion
200,000
180,000
180,000
380,000
1,280,000
Total Expenditures:
225,000
200,000
200,000
425,000
1,425,000
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Cap Improv. Revenue
-
-
Grants (FeLState,Local)
REET 2 -
-
-
-
-
Other (Reo'f1ex) 200,000
200,000
200,000
200,000
1,200,000
Total Funding Sources: 200,000
200,000
200,000
200,000
1,200,000
Capital Expenditures:
Design 20,000
20,000
20,000
20,000
120,000
Right of Way -
-
-
-
-
Construction 180,000
180,000
180,000
180,000
1,080,000
Total Expenditures: 200,000
200,000
200,000
200,000
1,200,000
Grants / Other Sources: Redflex money transferred from General Fund.
62 Studies and Miscellaneous Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: 104th Ave SE & Green River Road Study
Project No: cpxxxx
Project Type: Non-Capacity (Intersection Safety)
Project Manager: Seth Wickstrom
TIP # 46
Description:
This project will fund a pre-design study to determine the right of way, e
vironmental and construction requirements for i
ntersection safety
improvements. This safety project scope will include sight distance impr
ovements, constructing turn lanes, channelization, environmental
mitigation, signage and clear zone improvements.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2010
YTD Actual 2011
10 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate
2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
2,000
3,000
5,000
5,000
Grants (Fed, State, Local)
-
-
-
-
REET
PH'TFL
Other
Total Funding Sources:
2,000
3,000
5,000
5,000
Capital Expenditures:
Design
2000
3,000
5,000
5,000
Right o Hl 3a -
-
- -
-
-
^or strL,rtior
Total Expenditures:
2,000
3,000
5,000
5,000
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015 2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
3,000
-
Gi~nts State, Local)
-
REET
PWTFL
Other
Total Funding Sources:
3,000
Capital Expenditures:
Design
3,000
Right of Way
-
Construction
Total Expenditures:
3,000
Grants / Other Sources:
Studies and Miscellaneous Projects 63
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: Environmental Park Roadway Improvements Study TIP # 47
Project No: cpxxx
Project Type: Capacity
Project Manager: TBD
Description:
This project will fund a study to determine the feasibility, scope and cost of low impact roadway, bicycle and pedestrian
improvements in
the Environmental Park area. Included in this study scope is a connection between C
lay St NW and Western-St=NW:
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2010
YTD Actual 2011
10 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate
2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue
5,000
5,000
Grants (Fed,State,Loc6
PEET
PH/TFL
Other
Total Funding Sources:
5,000
5,000
5,000
Capital Expenditures:
Design
5,000
5,000
5,000
Right VI4e -
- -
-
-
^onstrurtior
Total Expenditures:
5,000
5,000
5,000
Forecasted Project Cost:
Total
Expenditures
2013 2014
2015 2016
2011 -2016
Beyond 2016
Funding Sources:
UniestriCtedStreetRevenue
5,000
-
Grants (Fed State,Local)
-
PEET
PWTFL
Other
Total Funding Sources:
5,000
Capital Expenditures:
Design
5,000
Right of Way
-
Construction
Total Expenditures:
5,000
Grants / Other Sources:
64 Studies and Miscellaneous Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: Downtown to Les Gove Non-Motorized Improvements Study TIP # 48
Project No: cpxxxx
Project Type: Bike Lanes,Sidewalks and Transit Improvement Study (Capacity)
Project Manager: TBD
Description:
This project provides funding to complete a study of the 2nd St SE & F St SE corridor
between Les Gove Park and Downtown Auburn.
Improvements may include pavement reconstruction, sidewalks, access ramps, signal
modifications and route signing.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2010
YTD Actual 2011
10 Budget
Budget
Expenditures Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate
2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
2,000
8,000
10,000
10,000
Grants (Fed, State, Local)
-
-
-
-
REET'
PWTFL
Other
Total Funding Sources:
2,000
8,000
10,000
10,000
Capital Expenditures:
Design
2,000
8,000
10,000
10,000
Right of Way
-
-
-
-
on s r us "ion
Total Expenditures:
2,000
8,000
10,000
10,000
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015 2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
8,000
-
Giant's State, Local)
-
REET
PWTFL
Other
Total Funding Sources:
8,000
Capital Expenditures:
Design
8,000
Right of Way
-
Construction
Total Expenditures:
8,000
Grants / Other Sources:
Studies and Miscellaneous Projects 65
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: S 316th St Bicycle & Pedestrian Improvement Study TIP # 49
Project No: cpxxxx
Project Type: Class 2 Bike Lanes / Sidewalks (Capacity)
Project Manager: TBD
Description:
This project provides funding for completing a study to add bicycle and pedestrian fac
ilities on S 316th
St from east of Evergreen
Heights Elementary to 51 st Ave S.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010
Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
1 000
4 000
5,000
5,000
Grants (Fed,State,Loc6
PEET
PH/TFL
Other
Total Funding Sources:
1,000
4,000
5,000
5,000
Capital Expenditures:
Design
1000
4,000
5,000
5,000
Right VI4e
-
-
-
-
-
^onstrurtior
Total Expenditures:
1,000
4,000
5,000
5,000
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
UniestriCtedStreetRevenue
4,000
-
Giants (Fed State,Local)
-
PEET
PWTFL
Other
Total Funding Sources:
4,000
Capital Expenditures:
Design
4,000
Right of Way
-
Construction
Total Expenditures:
4,000
Grants / Other Sources:
66 Studies and Miscellaneous Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title:
Kersey Way Study
Project No:
cpXXXX
Project Type:
Capacity
Project Manager:
TBD
TIP # 54
Description:
This project will study improvements to the Kersey Way SE corridor from the White River Bridge to the southern city limits. The
study will develop the scope and costs for horizontal/vertical geometric roadway improvements, roadside hazard mitigation, street
lighting and non-motorized trail construction. The project length is approximately two miles.
Progress Summary:
Pre-design will begin in 2011 to refine budget and scope.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $14,056.
Budget: 2010 YTD Actual 2011
10 Budget
Budget Expenditures---- Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate 2011 Budget 2012 Budget
Project Total
Cost
Unrestricted Street Revenue -
Grants (Fed, State, Local)
REET
-
Traffic Impact Fees 100,000
100,000
100,000
O het
Total Funding Sources: 100,000
100,000
100,000
Capital Expenditures:
Lpsign - - 100,000 -
100,000
100,000
Right of H'ai - - - -
-
-
Sonsn;s:ion
Total Expenditures: 100,000
100,000
100,000
Forecasted Project Cost:
Total
Expenditures
2013 2014 2015 2016
2011 -2016
Beyond 2016
Funding Sources:
bi-sS t rtPd Street Revenue
-
Grants IFed,State, Local) - - - -
-
-
REET
-
Traffic Impact Fees
100,000
Other (DP:Ploper)*
Total Funding Sources:
100,000
Capital Expenditures:
Design
100,000
Right of IA/ay
-
Construction
Total Expenditures:
100,000
Grants / Other Sources:
Studies and Miscellaneous Projects 67
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title:
Mary Olson Farm Improvements
Project No:
cp0815
Project Type:
Non-Capacity
Project Manager:
Leah Dunsdon
TIP # 55
Description:
This is a historical preservation project required as mitigation for S 277th Reconstructi
on Project.
Progress Summary:
Phase 1 of project was completed in 2009 and Phase 2 is schedu
led to be completed in 2010.
Future Impact on Operating Budget:
This project will have no impact on the operating budget
for street maintenance.
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources:
Prior to 2010
Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue
-
-
-
-
Grants (Federal)
54,749
46,363
101,112
101,112
REET
-
-
-
-
PWTFL
-
-
-
-
-
Other
25,973
10,000
1,000
36,973
36,973
Total Funding Sources:
80,722
56,363
1,000
138,085
138,085
Capital Expenditures:
Design
25,973
10,000
-
35,973
35,973
Right o,` H'av
Constio_*on
54,749
46,363
1,000
102,112
102,112
Total Expenditures:
80,722
56,363
1,000
138,085
138,085
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
UnresthCted Street Revenue
-
-
Giants (Federal)
BEET
PI,VTFL
-
Other
1,000
Total Funding Sources:
1,000
Capital Expenditures:
Design
-
Right of Way
-
Construction
1,000
Total Expenditures:
1,000
Grants / Other Sources: Federal grant is FHWA Mitigation Funds. Other Funds are 321 Municipal Parks funds, General Engineering funds or Parks funds
68 Studies and Miscellaneous Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: Auburn Transit Station Parking Garage
Project No: cpXXXX
Project Type: Non-Capacity
Project Manager: TBD
TIP # 56
Description:
This project will fund the design, right of way and construction of anew 600 car parki
ng garage at the Auburn Transit Station.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Budget: 2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources: Prior to 2010 Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Reven ,e _
Grants (Fedei-, 1) - -
-
-
-
-
REET
PH TFL
-
Other(Sound Transit)
31,600,000
Total Funding Sources:
31,600,000
Capital Expenditures:
Design
6,700,000
Right of H43e
1,000,000
Constiuction
23, 900, 000
Total Expenditures:
31,600,000
Forecasted Project Cost:
Total
Expenditures
2013 2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
-
Giant, (Federal)
BEET
PI~IiTFL - -
-
-
-
-
Other(Sound T1enSlt)
7,700,000
23,900,000
31,600,000
Total Funding Sources:
7,700,000
23,900,000
31,600,000
Capital Expenditures:
Design
6,700,000
-
6,700,000
Right of Way
1,000,000
-
1,000,000
Construction
23,900,000
23,900,000
Total Expenditures:
7,700,000
23,900,000
31,600,000
Grants / Other Sources:
Studies and Miscellaneous Projects 69
City of Auburn Transportation Improvement Program
~
~
w,
-
.
1Q
I~OI.N
70 Studies and Miscellaneous Projects
City of Auburn Transportation Improvement Program
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Fund
Project Title: Annual Bridge Preservation Project
Project No: Various
Project Type: Non-Capacity (Annual)
Project Manager: Seth Wickstrom
TIP # 28
Description:
This is an annual level of effort project used to fund bridge improvements as identified
by the city's ann
ual bridge inspection program.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget
for street maintenance.
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources:
Prior to 2010
Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue
-
50,000
50,000
50,000
100,000
350,000
Grants (Fed, State, Local)
-
-
-
-
-
REET'
Traffic Mitigation Fees
Other
Total Funding Sources:
50,000
50,000
50,000
100,000
350,000
Capital Expenditures:
Design
-
-
-
-
-
Right of Way
-
-
-
-
-
_-onsrL,ction
50,000
50,000
50,000
100,000
350,000
Total Expenditures:
50,000
50,000
50,000
100,000
350,000
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Un~estrictedStreetRevenue
50,000
50,000
50,000
50,000
300,000
-
Giants (Fed, State, Local)
-
-
-
-
-
REET
Traffic n-litigation Fees
Other
Total Funding Sources:
50,000
50,000
50,000
50,000
300,000
Capital Expenditures:
Design
-
-
-
-
-
Right of Way
-
-
-
-
-
Construction
50,000
50,000
50,000
50,000
300,000
Total Expenditures:
50,000
50,000
50,000
50,000
300,000
Grants / Other Sources:
Roadway Preservation Projects 71
City of Auburn Transportation Improvement Program
STREET FUND (105) Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Funds
Project Title: Annual Arterial Street Preservation
Project No: cpxxxx TIP #35
Project Type: Non-Capacity
Project Manager: Seth Wickstrom
Description: Implement regular pavement maintenance and/or rehabilitation of various classified streets citywide. These
projects may include overlays, rebuilds, spot repairs,
or a combination of these.
It is anticipated that this program will be
funded through bond proceeds that will be repaid by
the 1 % utility tax that was adopted by Council in 2008.
Progress Summary:
This program is being expanded from previous years. Prior years this program
provided approximately $675,000 from the
REET funding to go towards the purpose of preserving classified streets.
Future Impact on Operating Budget:
None
Budget:
2010
YTD Actual _
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous vrs) 2010 YE
2011 Year End
Total Project
Funding Sources:
Prior to 2010 Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue
Property Tax
-
-
-
-
Utility Tax
SCi+S CiCiCi
1 400,000
1,400,000
2,905,000
9,905,000
REET2
-
-
-
-
Bond Proceeds
Total Funding Sources:
1,505,000
1,400,000
1,400,000
2,905,000
9,905,000
Capital Expenditures:
Design
85 000
50,000
50,000
135,000
385,000
Right of I~hay
-
-
-
-
-
Constiuction
1,420 000
1,350,000
1,350,000
2,770,000
9,520,000
Total Expenditures:
1,505,000
1,400,000
1,400,000
2,905,000
9,905,000
Forecasted Project Cost:
Total
Expenditures
2013 2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
-
Property Tar
-
-
-
-
Utility Tax
14=10,000 1,400,000
1,400,000
1,400,000
8,400,000
REET2
-
-
-
-
Bond Proceeds
Total Funding Sources:
1,400,000 1,400,000
1,400,000
1,400,000
8,400,000
Capital Expenditures:
Design
50,000 50,000
50,000
50,000
300,000
Right of Way
- -
-
-
-
ConstrL"ction
1,350,000 1,350,000
1,350,000
1,350,000
8,100,000
Total Expenditures:
1,400,000 1,400,000
1,400,000
1,400,000
8,400,000
Grants / Other Sources:
72 Roadway Preservation Projects
City of Auburn Transportation Improvement Program
STREET FUND (105)
Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Funds
Project Title:
Annual Arterial Crack Seal Program
Project No:
cpXXXX
Project Type:
Non-Capacity
Project Manager:
Seth Wickstrom
TIP #36
Description:
Implement regular maintenance of various classified streets by sealing newly formed cracks. Sealing t
he cracks will prolong the life of
the pavement by stopping water from draining into the subbase of the road.
Progress Summary:
Future Impact on Operating Budget:
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs)
2010 YE
2011 Year End
Total Project
Funding Sources:
Prior to 2010
Estimate
2011 Budget
2012 Budget
Project Total
Cost
Unrestricted Street Revenue
-
-
-
-
Utility Tax
100 000
100 000
100,000
200,000
700,000
REET
-
-
-
Bond pra.e ds
Total Funding Sources:
100,000
100,000
100,000
200,000
700,000
Capital Expenditures:
Design
0 000
10,000
10,000
20,000
70,000
Rioht o Hl 3e
-
-
-
-
Con"IL, On
-
90.000
90,000
90,000
180,000
630,000
Total Expenditures:
100,000
100,000
100,000
200,000
700,000
Forecasted Project Cost:
Total
Expenditures
2013
2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
-
-
Utility Tax
100,000
100,000
100,000
100,000
600,000
REET
-
-
-
-
-
Bond proceeds
Total Funding Sources:
100,000
100,000
100,000
100,000
600,000
Capital Expenditures:
Design
10,000
10,000
10,000
10,000
60,000
Right o Hat
-
-
-
-
-
Constrortion
90,000
90,000
90,000
90,000
540,000
Total Expenditures:
100,000
100,000
100,000
100,000
600,000
Grants / Other Sources:
Roadway Preservation Projects 73
City of Auburn Transportation Improvement Program
LOCAL STREET FUND (103)
Capital Facilities Plan
Six Year Capital Facilities Plan, 2011-2016 Special Revenue Funds
Project Title:
Local Street Improvement Program
Project No:
Various
Project Type:
Non-Capacity
Project Manager:
Wlckstrom
TIP #37
Description:
This program was created after passage of Proposition
1 on the November'04 ballot,
setting the City's
property tax levy
limits and
creating a dedicated local street fund to be used solely
for local street improvements.
The program will
focus on the preservation of local
streets (unclassified streets) within the City of Auburn.
The work will include crack sealing, asphalt patching, pre-I eve lin
g, aspha It
overlays and roadway reconstruction. The property tax
levy lift may also be used to repay bonds should they be utilized
to fund this
program.
Progress Summary:
This program has successfully completed overlays
since 2005. In 2011 and 2012 the program
will focus on m
ajor street
reconstruction where street surfaces and the underlying base has failed.
Future Impact on Operating Budget:
None
Budget:
2010
YTD Actual
2011
10 Budget
Budget
Expenditures
Budget
Balance
Adopted Budget
Budget Amendments
Adjusted Budget
Activity:
(Previous Yrs) 2010 YE
2011 Year End
Total Project
Funding Sources:
Prior to 2010 Estimate
2011 Budget
2012 Budget
Project Total
Cost
Local Street Fund
- -
-
-
-
-
Property Tax
2,203,800
2,200,000
2,200,000
4,403,800
15,403,800
Utility Mitigation
-
-
-
-
-
Bond Proceeds
Other
Total Funding Sources:
2,203,800
2,200,000
2,200,000
4,403,800
15,403,800
Capital Expenditures:
Design
250,000
300,000
300,000
550,000
2,050,000
Right of Way
-
-
-
-
-
r'onstr n~ tion
1,953 800
1,900,000
1,900,000
3,853,800
13,353,800
Total Expenditures:
2,203,800
2,200,000
2,200,000
4,403,800
15,403,800
Forecasted Project Cost:
Total
Expenditures
2013 2014
2015
2016
2011 -2016
Beyond 2016
Funding Sources:
Local Street Fund
- -
-
-
-
-
Property Tax
2,200,000 2,200,000
2,200,000
2,200,000
13,200,000
Utility Mitigation
- -
-
-
-
Bond Proceeds
Other
Total Funding Sources:
2,200,000 2,200,000
2,200,000
2,200,000
13,200,000
Capital Expenditures:
Design
300,000 300,000
300,000
300,000
1,800,000
Right of Way
- -
-
-
-
Construction
1,900,000 1,900,000
1,900,000
1,900,000
11, 400, 000
Total Expenditures:
2,200,000 2,200,000
2,200,000
2,200,000
13,200,000
Grants / Other Sources:
74 Roadway Preservation Projects
L ~
. , , . - .r,e ~ , . . . . . . , , . . t~ i~ ~s ~ ia o• . .,....r-. , . . . . i
Czn, no n st Nw. Pnase 1 (3rd si Nw io atn st Nw, Ps a, 114,376
C409A0 3 Aubum Way Imp (4th St NE to 4th St SE) A'12 78.251 - - 818,700 3,000,000 - - - 3,896,951
C415A0 4 I St NE (40M S[ NE to 52nd St NE) NIA 11,827 - 360,000 1 A20,000 4280.000 - - 5771,827
C201A0 5 M StSE Grade Separation(E Main to AWS) PS 5,498,500 2,115,000 12,985,000 1,800,000 - - - - 22,398,500
C222A0 6 S 277th Street (AWN to Green River Bridge) A'11 15,085 - 276,500 803,500 3,000.000 - - - 4,099,085
cpxxxx 7 15th St SW Reconstruction (C St SW to UPRR) A'l 2 - - - 375,000 3,000,000 - - - 3,375,000
cpxxxx 8 A St NW, Phase 2(W Main to 3rd St NW) A'10 175,000 75.000 1200.000 1250,000 - - - - 2,700,000
cpxxxx 9 D St NW (37th St NW to 44th St NW) A'14 - - - - - 200,000 200,000 6.000,000 6,400,000
CP0911 10 F St SE (4th St SE [o AWS) A'13 7.620 - - 200,000 1.000.000 - 1,207,620
cpxxxx 11 M St NE (E Main St to 6th St NE) A'13 - 50,000 - - 275,000 1,000,000 - - 1,325,000
cpxxxx 12 GradeSeparated Crossing of BNSF Railyard NlA - - - - 1,00U.000 31,OOQOUD 32,000,000
CP0916 14 W Valiey Hwy (SR 18 to W Main St) S 465,000 4,535,000 - - - - - - 5,000,000
cpxxax 15 8th St NE (Pike St ta R S[ NE) A'12 - - - 450,000 1,000,00C - - 1,450.000
cpxnnx 16 49th St NE from Auburn Way North to M Sl NE NIA - 850,000 2,500,000 - - - - - 3,350,000
cpxxxx 39 124th Ava SE Corridor Imp Phase 3 A'14 - - 100,000 750 ,000 - 850,000 ,
cpxxax 40 124th Ave SE Corridor Imp Phase I A'11 - - 50,000 150,000 1,750,000 - - - 1,950,000
cpxxxx 41 124th Ave SE Corridor Imp Phase 2 A'l 2 - - - 30,000 150,000 1,000,000 - - 1,780,000
cpxxxx 42 SE 320th St Corridor Imp AY3 - - - - 30.000 60A00 580,000 - 670,000
epxxxx 52 Downtown Promenade Imp 5 I 2nn00i1 (nO - - g ppp ppp
Subtotal 17,569.659 21.791500 17.011,500 6.137,200 13425.000 7.640.6i)G _.5....;;Oa .,700o.0C,0 117 106,859
~
CP0611 17 HarveylBth Street Imp - Dr7t Servicr, NlA 127,842 RE.OnO ,7,S01, 5e.5"1U
CP0707 18 Bth StreeUR Street NE Treffic Signai S 650,500 7,000 - - - ;5 t cpxxzx 19 Auburn Way North/'I Street NE Signal Imp A'1'I - - 20.000 580,000 - 600,000
I cpxrzrza 20 Auburn Way South and M Street SE A'12 25,000 75,000 - 900,000 - - - 1,000,000 ,
cpaxxx 21 C Street NW and West Main Street A'l 2 - - 100,000 1,000,000 - 1,100,01)0
cpxxax 25 F Street SE 8 4M St SE Treffic Signal S 396,700 1,000 - - - - 397,700
cpxxxx 38 Railroad Cro ssing Safety Improvements A'12 - 1.70 .0: iC 650,U0C) - 1,00i1 nOr,
cpxxzx 43 Auburn Way South & Riverwalk Imp A'14 - - - - 150A00 2,250,000 2,400.000
Subtotal 3200,042 165,000 107.500 1.R17.000 1.93E.500 236.000 2,336,000 1,200.000 10.998,042
iL '
cpxxxx 13 South Auburn ITS Expansion S 80:: 1M1 1
Varies 34 TraHic Signal Imp NIA 100,000 100,000 100,000 10p,Oqn 10ii.00Pi 100,000 100,000 700.f100
cpxxxx 50 ITS Dynamic Message Signs A'13 - 220.000 22U,ilti(! 660,OOh 1,1bn.Dpf
cpxxxx 51 East Valley Hwy ITS Expansion A'13 - - - - 800,000 800.000
Subrotal 903,400 101,000 100.000 100.000 1,120,000 100.000 320.000 F60 .uuG 3.404.40G
-
cpxxzx 2 Auburn Way South Corridor hnprovements Phaee 1 A'10
C507B0 22 Skinner Rd to 3rd Ave (Auburn Pacific Trail Ph 2) S i)77
C229A0 23 BNSFIEast Valley Hwy. Ped Undorcrossing PS 300
cp:xxx 24 Academy Drive Multi Use Treil A'12 - - - 10.000 150,000 425,000 425,000 1,010,000
Varies 30 Citywide Pedestrian Crossing Progrem N/A 100.000 - 100A00 - 100,000 - 100,000 400,000
Varies 31 Citywide Arterial Bicycle 8 Safety Imp N/A 19,300 100.000 100,000 100,000 100,000 100,000 100.000 619,300
Varies 32 Citywide Sidewalk Improvoments NIA 190.000 20,000 180,000 20,OUG 18U,000 20,000 >0;.;10[! cpxxxx 44 A St. NE Pedestrian Improvements A'12 - - - 150,000 - - - 150.000
cpxxzx 45 Interurban Trailhead Improvements A'13 - - - - 210,000 - IU,000
cpxxxx 53 37th St SE & R St SE Pedostrian Connector S 124.300 1.000 - - - 125,300
r,pxxxx l Lea HIII Ped-tnan Improvements A''.0
Subta[al 629.977 492080 1.197.650 440.000 580,000 705.000 5,445,000 5,000,000 14.496.707
. . . . . , . . . . _ _ . _ . _
_ NA 26 Auburn Community and LakelanA Shuttles N/A 3i10,628 120 ,OG(, 2 oli.i,i1Cil(111 0(1(1 220,110n 220.1101) I '~l,liLB
cpxxxx 27 41 st St SE and A St SE Access Management Study N1A - 10,000 - - - - - 10,000
C410A 29 S 277th Street -Wetland Mitlgation N1A 203,640 25,000 25.000 25,000 - - - 278,64,j
Varies 33 Treffic Calming Improvements N!A 225,000 200,000 200,000 200,000 200,000 200.000 200.000 1,425,000
cpxxxx 46 104th Ave SE & Green River Study NIA 2,000 3.000 - - - - - 5,ii(i)
cpxxxx 47 Environmental Park Roadway Improvements Study NIA - 5,000 - - - - - 5,000
cpxxxa 48 Downtown to Les Gove Non-MOtorized Imp Study N/A 2.000 8.000 - - - cpxnxx 49 S. 316th St Bitycle & Pedestrian Imp 5[udy NlA 1,000 4,000 - - - - - 5.000
cpaxxx 54 Kersey Way Study NIA 100.000 I00,fi00
cpxzxx 55 Mary Olson Farm Improvements N/A 137,085 1,000 738,085
cpxxxx 56 Aubivn Transit S[ation Parkiny Garage N!A 11 ...i~.1,. ~ .
Subto:al 871.353 576.30C 445.000 445.000 420.000 0.120.000 24,320.000 - „5.197.353
.
cpxxzx 28 Annual Bridge Maintenance NlA . . . . 'U~.IG SqUUO Su ;!nn
Varies 35 Arterial Streets (105 Fund) N/A 1,505,000 1,400,000 1,400.000 1,400,000 1,400,000 1,400,000 1,400,000 9,905,000
Varies 36 Arterial Creck Seal (105 Fund) N!A 100,000 100,000 100,000 100.000 100.000 100,000 NJi).OOU 700,000
Varies 37 Local Streets - SOS (103 Fund) N/A 2,203,800 2.200,000 2200.000 2200,000 2,200,000 2,200,000 2,200A00 15 403,800
Suhtotol 3.858.800 3.750.000 3750.000 3,750.000 3750,000 3.750.000 3,750,OOU - 26.00E,800
TOTAL 21.033.231 26.854.580 22G11,650 12,689200 ~ 21,231.500 20.551,000 38.701.000 43_BE0,000 207.212,161
From I405 to Sr-18. add onc NB and SB yeneral purpose lane; from SR-18 to SR-161, add one NB HOT fane and one SB HOT lane, add direc[
N~A 80 SR-167 Eap:insion (1405-SR509) - WSDOT NBlSB HOVIHOT lane connection r.nmps between SR-167 8 1405, add NB and SB auxiliary lanes between SR516 and 5 277th Street: extend .
Sr 167 from SR-161 to SR-509.
Complete freeway interchange by adding eastbound SR-18 remp to southbound SR•167, adding northbound SR-167 ramp to WB SR-18 and
NIA 81 SR18 & SR-167 Interehange - WSDOT closing SR-t 8 access to West Valley Highway. 45,000,000
NIA 82 SR-164 Corridor Improvoments (SR-18 [o Academy Drive) - Construct corridor improvements consistent with WSDOT SR-164 Corridor Improvement Study. Project indudes intersection improvements, fii 000 00 ,
WSDOT roadway wideninq and roadside improvements.
NIA 63 SR-164 Aubum Bypass Road (SR-164 to SR-18) - WSDOT Construct Auburn bypass road connecting SR-164 and SR-18 east of R ST corridor. 65,000,000
N/A 84 Green River Class I Trail, (SR-18 to Northern City Limit) - King Construct Class I Trail along Green River frorri Sr-18 to Northem City limita 2,000.00i1
Coun
N!A BS 51st Ave S 8 S 316th St Signal - King County Construct new traffic signal at intarsection of 51st Ave 5 and S 316th St with turn lanes. 650,000
NIA 86 Stewart Road Widening (EVH to SR-167) - Pierce County Complete a five lane section roadway with new bridge over the white river and railroad grade separation from EVH to SR-167. t?.'SOO.nOr1
TOTAL 4.605.950.000
'Grant S
Status pS = Partaily Secured
A= Applied or will aoply
'10 = Year
AppendrX A
~
r.
City of Auburn 2011-2016 AL-,B L,R N
~ Transpartation Improvernent Program
, .
~
6
16 - _ ~
z r` 4 i 1 A~' ~'t -
J . , - , , s , . .eA l -
_ I
. ~ r-
~ t•
9
~
i
,~11 ~-T NE` jE DETjEE~
1~ u
I1 67,1
~ ; ; Z •'y 7 ! U~ ~ o-av~~ +S _ _ . F _ C _ r...
_F
; ~-%b -04
6~ ~ ~ + ` +
~ ~ = ; ~ f5THj7•fqiy _ ; ~ 4~ 55 : ; {r
~
-
-13T
t+Sr. ~ - ' SE 14$A15'}y.
- ~ ~S,l.iGl}6ST,
r z = ~I _ x ~ rr~, e r ~ -s r~ra-~~- { ~~1 C
. . i i . . . .
'7
G` .
J ~
l ~.,,.•.~;,+~3q ~
a IL f t ~ tf i~ y' 1 ! _ •w.~ 4-6
, - A4 )
1N ST
1 ~ r _ '
~
n = 5 .y
-~-I:f~( ~'rCA}Yy~ I ' ~ - - ' , E C ~4'.:-
_ ~ ,
1 f : 12
V `
►a zr -a • a_ ' * -
-
-
~'•„s.~` ~
7 a
'
RE HLIG = r,:
Cl~'J N~"~.F°f'9LVCM.~~-~,..+_' 1i0
r~3T 5E- ~ r i 1:~
I ~ V eT--,v), B C J I T
f' ~ ' 3 ? ~'1
y _ 7. • ~ ~ - ^ ~ , i
, : ~4 "~~s~= ~ ~ r • ~
53 _
1167:
~~tix ~
'1'~'
~ L 3
~ ~ X ~ ~'~K~ v ~ ~1'~• - _ s 1
~ •w~'. I ''.1 _ ' ~G = " = f °
r~ ~ , \~n~.V~~~l•. ,I Y ~ uc.i~R _ '
f 51
w
~ r ~ 1` .h _ •.+~,~ti~~~J~~.~ ti r .r . ~ ~
L
r fp~kti'I~ - ~
~
~ Intersecttors Impernem:ents RecommQnmed RegionaE Rro)ecc:; ~ Potential AnnexatFan Ar?a:
Parks
■ Ilon-Motanzed Improvemefi*.s Studie: and Mi:r Imvrovement:: .ippE'►t{12t 3
wat?r Feature
~ Roadway Impro%emsnC:. ~ Intelligenr Transportaeion System (ITSi Auburn City Jrrd's
i
Apperldi.t B