Loading...
HomeMy WebLinkAboutITEM V-C-1 * * • CITY OF * AGENDA BILL APPROVAL FORM WASHINGTON Agenda Subject: Award Contract 10-25 Date: August 30, 2010 Department: Attachments: Budget Status Sheet; Budget Impact: Publie Works Bid Tab Summa & Ma $0 Administrative Recommendation: City Council award Small Works Contract 10-25, Project Number GP1017, 2010 Arterial and Collector CracR Seal Project, to Doolittle Construction, Inc. on their low bid of $63,850.00. Background Summary: This project will seal cracks in the pavement on approximately 6 miles of arterial and collector streets with rubberized asphalt to help preserve the existing pavement. The attached map shows the specifie streets that will be crack sealed as part of this project. Construction for this project is anticipated to begin in September 2010 and be completed in October 20101 weather permitting.. A budget contingency of $92,906 remains in the 105 (ArteriaUCollector Street Preservation) fund for 2010 for this project and the 2010 Arterial/Collector Sfreet Pavement Preservation Project (Project CP1012). W0907-3 - 04.9.1 CP1017 Reviewed. by Council & Committees: Revlewed by Departrnents & Divisions: ❑ Arts Commission COUNCIL COMMIITEES: ❑ Building ❑ M&O ❑ .Airport ❑ Finance ❑ Cemetery ❑ Mayor ❑ Hearing Examiner ❑ Muniapal Serv. ❑ Finance ❑ Parks ❑ Human Services 0 Planning & CD ❑ Fire ❑ Planning ❑ Paiic BoarcJ SPublic Works ❑ Legal ❑ Police ❑ Planning Comm. El Other 0 Public Works ❑ Human Resources Action: Committee Approval: ❑Yes ❑No Council Approval: DYes ONo Call for Public Hearing RefeRed to - Until - / J Tabled Until Councilmember: Wa ner Staff: Dowd Meetin Date: Se tem6er 7, 2010 Item Number: V.C.1 ALj$jJRN * MORE THAN YOU IMAGINED BUDGET STATUS SHEET ProJecf No: CP1017 Project Title: 2010 ARerisi 8 Coltector 3treet Crack 3eal Project. Project Manager. Seth YYlckstrom 0 InitiattoNConsuitant Agreement Initiation Date: Auaust 2, 2010 Q Permission to Advertlse Date: August 30, 2010 Solicitation Date: Auaust 12. 2010 Qi Contract Award Award Date: 0 Change O[der Approval 0 Contrad Final Acceptance The "Future Years" column indicates the projeded amount to be requested in future budgets. Funds Bud eted Funds Available Funding Prior Years 2009 _ 2010 2011 Total 105 Fund - ArteriaUColiector Pavement Preservation Fund 1,500,000 1,500,000 (Funds budgeted in 2010) 105 Fund - ArteriaUCollector Pavement Preservation Fund (Garty-Forward from the'2009 budget) 105,000 105,000 326 Fund - Capital Improvement Fund (A Portlon oi the 2010 TraMe Catming Budget. For pedestrian crossing 25,000 25,000 im iovementa et 8th and Pike St NE and 118th Ave SE and SE 304th Total 0 0 1,630,000 0 1,630,000 Estimated Cost Funds Needed qctivity Prior Years 2009 2010 2011 Total C504A - R St SE' Util_ity Improvements 11,750 11,750 (to repair thepayement on M St SE belween Aubum Way N end 17th St SE) CP0907 - 2009 ArteriaUCallector Street Pavement Patching (tor pavement patching that was done on A St SE between 3ra St SE and 6th St SE 349,474 349,474 arM on West Vailey Hwy tielween 15th St NW and 29th St NVI) CP1017 • 2010 ArterlaUColleclor Craekseal ProJeet Design Engineering 2,000 2,000 ConstrucUon Conhacf BId 63,850 63,850 Authorized Corrtingency (YO%) 12,770 12,770 Construcdon Engineering 4,000 4,000 Subtota/- 2010 ArterlaUCollector Craekses/ ProJeci Subtotal 82 820 82,820 CP1002 - 2010 LocBt StreetPavemerrt Preservation 165,000 230,000 (to repair pavement ari t st St NE beMreen Aiibum Way N and Aubum Ave) ` CP1012 - 2010 ArteriaUColleUOr Street Pavement Preservation 922,250 822,250 Total 0 0 1,531,094 0 1.596,094 105 ArberiaUCollector Street Bud et Status Prior Years 2009 2010 2011 Total •'105 Funds Budgeted O 0 0 (1.605,000) 0 (1,605,000) 105 Funds Needed 0 0 1,512,094 0 1,512,094 "106 Fund Proeet ConUn eney O 0 0 92,906 0 92,906 106 Funds Required 0 0. 0 0 0 328 Ca ital lm rovement Street Bud et Status Prior Years 2009 2010, - 2011 Total "328 Funds Budgated O 0 _ 0 (25,000) 0 (25,000) 328 Funds Needed 0 0 19,000 0 19,000 •"328 Fund Pro ect ConUn en 0 0 6,000 0 6,000 328 Funds Required 0 0 0 0 0 in the Budget Stetus Sections indicetes money the City has available. W0907-3A Page 1 of 1 BID'TABULATION BID TOTALS SUMMARY - Project Name: CP1017, 2010 Arterial and Collector Crack Seal, Contract 10-25 Prepared by: City of Aubum . Bid Date: 8/26l10 ENGINEER'S ESTIMATE: $ 78,200.00 AVERAGE BASIC BID AMOUNT: $ 79,898.76 BASIC BID SPREAD AMOUNT: $ 28,014.00 Basic BID-Amount Spread Spread %a LOW BIDDER: , Doolittle Construction, lnc $ 63,850.00 -$14,350.00 -18.35% Second: Bidder: Stanley Patrick Striping Co. $ 77,496.00 -$704.00 -0:90% Basic BID (Tax Not Applicable) Doolittle Constriaction, Inc $ 63,850:00 - Stanley Patrick Striping, Co. $ 77,496:00 . Higrade Bark, Topsoil and Rot $'86,385.04 AA Asphalting, Inc $ 91,864.00 / W0907-3B 8/30/20101(923 AM) . h:\proj\bidtabs\CP1017 BT.xls 1 1-WhE J Y!'RL ~ o ~ yn y 6 ~ OB 4dMA 87. i . ~J R SYDIA 8r _ ' 4 a N` n' ~ G1h`-1 r AUBURN ~ ~ . ~ COLF 4 S COURSE ~ g aou ar • .'.~i . ~ bYRY1 ~ . f. ~r qe ~ AUBUR ~ 9 A + YUNlClPA ~ i uur. a " ~ emn • ~ ~ A/RPoR y AtK ` ' ~+l+y~ ~ • 6 pay tae row e~ C ei 3 s ~iein er of b ~ IA ry' b e R B6 ' 920f. ! ~ ~ ~ • ~ ' . n. ' verr roro ~ 9 ~ ~ t y ~ AUBURN C CR6BN RIVBR . . t3 LtiYYUN?Y y~ SYNOOL ~ s E w COLLfC6 $YT. VlBN C6Y6T6RY ~ C ~ . , yy ~ C j w ee e. ~^'roro er~tc RTY !SS ' sureauui ` ~oie sr~ p~w[ ~ ~ u ~ o c.8. er P 13TH . ec°n° na ~ ~ BOVtm/~dY BWG ~ 1!N !L'. a _1= I I IOW 9t ' 1!t! ~ I r taa ~v[ R AvIR . Si r ~ ~ , YUC6l78COf' ~ , ~p. YN ~~a V[ • ~ ~•fu GMNo Y9d ~ P81~ 8I !6 ' b $ p 1500' 3 000' z„a a P,,M affth - SCALE: 1" = 3,000' ~ 3 . . . ~ : . . . . ~ . IARY . G ~ VICINITY MAP PROJECT CP1017 - 2010 ARTERIAL AND COLLECTOR CRACK SEAL PROJECT W0907-3C Project Street Pwtte,: 7:7/10 LocetlwG H:PRO]CP1017-2010 MerWI&Co0ec0orCrackSa PWCCWnA2M6NtlaEe RNC3NA MAP 1 of 1