Chan e Order No. 1 to Contract 10-18 Se tember 27, 2010
Department: Attachments: Budget'Impact:
Pu61ic Works Bud et Status Sheet 8 Ma $0
Administrative Recommendation:
City Council approve Change OrderNo. 1 in the reduction amounf of ($126,632.00) to Contract 10-18
with Northwest Asphalt, Inc. for work on project CP1012, 2010 Arterial & Collector Pavement
Preservation.
Background Summary:
The 2010 Arterial 8 Collector Pavement Preservation project will rehabilitate and rebuild deficient •
pavement on 1.5 miles of arterial and collecfor streets throughout the City. This rehabilitation will be
accomplished by patching damaged pavement on 1 mile of City streets and rebuilding the travel lanes on
0.5 miles of I St NE (see attached map).
This project will also improve the pedestrian crossings at the intersection of 8t'' St NE and Pike St NE and
the intersection of 116"' Ave SE and SE 304th St as part of the City's Traffic Calming Program. These
crossing improvements will consist of replacing wheelchair ramps and refreshing or installing new
crosswalk markings. These crossing improvements will be funded by the 328 (Capital Improvement)
Fund.
The broken concrete panels on 1~ St NE between Auburn Way N and Auburn Ave will also be replaced
as part of this year's arterial and collector street pavement preservation program. However, this work will
be done under Project CP1002 - 2010 Local Street Pavement to take advantage of similar concrete work
already being done. This work will still be funded by the 105 (ArteriaUCollector Street Preservation) Fund.
As discussed at the Public Work Committee Meeting on July 6t', 2010, Change Order No. 1 will remove
Terrace Drive NW and Lea H'ill Rd from the project.
Additionally, Change Order No. 1 includes the installation of geotextile fabric below the pavement on the `
portions of I Street NE that are being reconstructed (see attached map). The geotextile fabric is needed
to help stabilize poor soils that have been encountered under the street during construction.
A contingency of $511 remains in the (105 ArteriaUCollector Preservation) fund.
W1004-3 - 04.9.1..CP1012
Reviewed by Council S Committees: Reviewed tiy Departrnents & Divisionsc
❑ Arts Commission COUNCIL COMMITTEES: ❑ Building ❑ M&O
❑ Airport ❑'Finance ❑ Cemetery ❑ Mayor
❑ Hearing Examiner ❑ Municipal Serv. ❑ Finance ❑ Parks
p Human Services ❑ Planning & CD ❑ Fire ❑ Planning
❑ Park Board ZPublic Works ❑ Legal p Police
❑ Planning Comm. ❑ Other 0 PubliaWorks ❑ Human Resources
Action:
Committee Approval: ❑Yes ❑No
Council Approval: . . ❑Yes ❑No Call for Public Hearing
Referred to Until
Tabled Untif / /
Councilmember: Wa ner Staff: Dowd
Meetin Date: Dctober 4, 2010 Item Number: V.C.2
AjJ$tJRN* MOM THAN YOU IMAGINED
BUDGET STATUS SHEET Project No: CP1012 Pro ect TIUe: 2010 ArteriaUCollector Street Pavement Preservatlon
Project Maoager. 8eth Wfckstrom
0 Initiation/ConsultantAgreement
Initiation Date: Auril 19. 2010 Q Pertnission to Advertise Date: September 27, 2010
Advertisement Date: June 8.2010 • 0 Contrae! Award
Award Date: Auaust 16. 2010 Q Change Order Approvat
0 CoMract Final Acceptanee
The "Future Years" column indicates tfie projeded amount to be requested in future budgets.
Funds Bud eted Funds Available
Funding Prior Xears 2009 2010 2011 Total
105Fund -AReriaVCollectorPavement Preservafion Fund 1,500,000 1,500,000
(Funds budgeted in 2010)
105 Fund - ArteriaUCollectorPavement Preservation Fund 105.000 105,000
(Carry-Forward,from the 2009 budget)
328 Fund - Capital Improvement Fund
(A Portion ot the 2010 Traffic Calming Budget. For pedestrian crossing 25,000 25,000
im rovements et 8th and Pike St NE and 116th Ave SE andSE 304th St.
Total 0 0 1,630,000 0. 1,630.000
Estimated Cost Funds Needed
Activiry Prior Years 2009 2010 2011 Total
C504A,- R St SE Utility Improyements 11,750 11,750
(to repair, the pa4ement an M St SE between Aubum Way N antl 17th St SE)
CP0907 - 2009 ArteriaUCoilector Sfreet PavemeM Patching
(for pavemern patehing that was done on A St SE beMreen 3rd St SE end 6th St SE 349,474 349,474
and on West Velley Hwy between 75th St NW and 29thSt NVh
2010 ArteriaUCollector Crackseal Project 62,620 82,820
CP1002 2010 Local Street Pavement Preservation
(to repair pavement on 1 et St NE between AuCum Wa N and Aubum Ave 165,000 165,000
CP1012 - 2010 ArterfaUCollector Street Pavement Preservation
Design Engineering • Gity Costs 6,000 61000
ConstrucUon Contract Bid 1,089,475 1,089,476
Proposed Change Order #1
(to remove 7errace Drive NW antl Lea Hill RoaC irom me project; end m instan (126,632) ~ (126,632)
geatextile fabrie on I St NE) ~
Project Contingency (2.6%) 21.762 21,762 -
Construction Engineering - City Costs 26,000 25,000
CP1012 Subtotaf 1,014,605 1,014,605
Total 0 0 1,623,449 0 1,623,449
105 ArteriaUCollector Street Bud et Status
Prior Years 2009 2010 2011 Total
"105 Funds Budgeted O 0 0 (1,605,000) 0 (1,605,000)
105.Funds Needed '0. 0 1,604,449 0 . 1,604,449
"106 Eund Project Contingen ( 0 0 557 0 551
105'Funds Required 0 0 0 0 0
328 Ca ital im rovement Street Bud et Status
Prior Years 2009 ` 2010 2011 Total
••328 Funds Budgeted O 0 0 (25,000) 0 (25,000)
328 Funds Needed 0 0 19,000 0 19,000
"328 Eund Project ConUngeocy O 0: 0 6,000 0 ` 6,000
328 Funds Required 0 0 0 0 0
in the Budget Status Sections indicates money the City has available.
W 1004-3A Pege 1 of 1
U, ~
~
M~ ••m•• ta zmrx en ?e- 284in
i I m 9 287th y7' ' t
'42nd 31'.NC. 9E 288th yT, <
zse
1 s' L- CC
.aPL-Nn!
q+.e
ae zw sr
se zuou, er
1 4-
js 2e2ne_er1_; ` !
y e 2e2ne sr s en s'r Np~
~ A
35u
a r I{`, t t
s zeetn er t r ~
m • . a~ pg _
~a E; ~ r a y~ 4 m.. AUBURN
A J~ ~ COLF
~ COURS6
9D1h 3! I7I 90tM1 Bf NE ~ Y 'l~
~ m
r
911~MM~M P
° Pedeatrian Crossing
~ 902nd PL 4 aueunN O o ~ Improvements
~ Ay lh -flT- ~o s~ 6t1 3WlL ~
m Street to be removed ~
° ~ o kUNICIPA "g 4 Street to be removed
from projectby I~.d ~
Change Order No.1. from proJect by
A/RPoR OI Change Order No.1.
r
N. "s
se sIan
Ieie OR
s s1n Blh ~ ^u UtA s • P18
86 ~
16l
mRf - Sth 16 ~~i _ e
71
x 5
meLn ~
, t, er e B, Pedestrian Crossing
Improvements
~ e .
~ t 6
8 a n
j ~ ~ ~ ~ ■ • sa 320en
~ am.r
~r Part of Project
~ CP1002 - 2010 Local ° o ~ ' • `
• y 31 17 PYR ~ FIRX it 4W ~ o
~ Street Pavement
z
PreservaUon AuBUwv N.. ~ m~■ ~~p~
Q 1,250' 2,5W' nd H(Qy rb Y~ Wt N ~ CR66N RIVBR
~
SCHOOL., m ar z° d a rh ~ m. CCOLLEC6
SCALE: 1 inCh = 2,5W feet
LT. V78I IK 8T
CSNET6RY ~
VICINITY MAP
CP1012 - 2010 Arterial and Collector Pavement Preservation
moomm Project Street (Pavement Patching)
W1004-35 M■■EM Project Street (Reconstruct Driving Lanes)
aaraa sqemes ix mio
Iamnan:H:ww7lcrio1z-m1oArtaW ercaenvr-eAeNvwaf .aI oa:#1 t47o-1o10NVId* 1481