Agenda Subject: Date: October 25, 2010
Final Pa Estimate No. 7 to Gontract 09-08
Department: Attachments: Budget Stafus Sheet, Budget Impact:
Public Works Final Pa Estimate No. 7 and Ma $ 0
Administrative Recommendation:
City Gouncil approve Final Pay Estimate No. 7#o Contract No. 09-08 in the amount of $4,597.68, for a
total contract price of $230,859.03, with Global Contractors, LLC and accept construction of Project Na
CP0904,_2009_Ci ide Sidewalk Re air Pro'ect.
Background Summary:
This project repaired damaged sidewalks on approximately 6%2 miles of streets throughout the City (see
attached map) with an emphasis on fixing potential tripping hazards. This was mainly accomplished by
removing and replacing damaged concrete sidewalk panels: Project areas were selected based on the
severity of the damaged sidewalks, citizen complaints, and coordination with past local street (SOS)
improvements.
This project also installed ADA compliant wheelchair ramps:on certain streets that were repaired by the
2009 Save Our Street Program; as required by the Americans with Disabilities Act. The specific ramp
replacement locations are shown on the attached map. These ramp replacements were funded by the
103 (Local Street) fund.
A project budget contingency of $14,457 remains in the 328 (Capital Improvement) fund.
A project budget contingency of $6;981 remains in the 103 (Local Street Preservation) fund.
W1101-5
04.12.1 CP0904
Reviewed byCouncil & Committees: Reviewed by Departments & Divisions:
❑ Arts Commission COUNCIL COMMITTEES: ❑ Building ❑ M&O
❑ Airport ❑ Finance ❑ Cemetery ❑ Mayor
❑ Hearing Examiner ❑ Municipal Serv. ❑ Finance ❑ Parks
❑ Human Services ❑ Planning & CD 0 Fire ❑ Planning
❑ Park Board ~Public Works ❑ Legal ❑ Police
❑ Planning Comm. ❑ Other 0 Public Works ❑ Human Resources
Action:
CommitteeApproval: ❑Yes. ❑No
Council Approval: ❑Yes ONo Call for Public Hearing
Referred to Until
Tabled Until
Councilmember: Wa ner Staff:. Dowd
Meetin" Date: : November 1, 2010 Item Number: V.C.3
MBURN* MORE THAN YOU 1NtAGINED
BUDGET STATUS SHEET
ProjectNo: CP0904 Project Ttie: 2009 Citywide Sidewalk Improvements Project Manager. Seth Wickstrom
0 Project Initiation
Initiation Date: Februarv 2. 2009 0 Pertnission to Advertise Date: October25, 2010
Advertisement Date: Seotember 24, 2009 0 Contract Award ' .
Award Date: November 2. 2009 0 Change Order-Approval
Q Contract Final Acceptance
The "Future Years" column indicates the projected amount to be requested in future budgets.
Funds Bud eted Funds Available
Funding PriorYears 2009 2010 Future Years. Total
328 Fund - Capital Improvement Fund 56,261 56;261
328 Fund - Capital Improvement Fund
151,900 151,900
(carry-forward from 2009)
103 Fund - LocalsStreet Fund
(for wheelchair ramps replacements) . 45,000 45,000
Total 0 56,261 196,900 0 253,161
Estimated Cost Funds Needed
Activity Prior Years 2009 2010 Future Years Total
, Design Engineering - City Costs' 305 305
Construction Contract Bid 55,398 80,012 135,410
Change Order #2 59,260 59,260
Line Items Changes 36,189 36;189
Construction Engineering - City Costs' 558 558
Total 0 56,261 175,462 0 231,723
"City staff costs are charged against the Engineering Budget and not the Projed Budget, and are not shown here.
328 Ca ital Im rovement Budget Status
PriorYears 2009 `2010 ' Future Years. Total
, ""328 Funds Budgeted O 0 (56,261) (151,900) 0 (208,161)
328 Funds Needed 0 56,261 137,443 0 4.93,704
"328 Fund Project Contingency O. 0 D 14,457 0 14,457
328 Funds Required 0 0 0 0 0
103 Local $treet Bud et Sfatus
PriofYears 2009 2010 Future Years Total
*'103 Funds'Budgeted ( ) 0 0 (45,000) 0 (45,000) _
103 Funds Needed Q 0 38,019 0_ .38,019
-'•103 Fund ProJect Contingency O 0 0. 6,981 06,981)
103 Funds Required 0: 0 0 0. 0
in the Budget Status Sedions indicates Money the City has available.
W 1101-5A 1 of 1
- CITY OF AUBURN CO. NO. 09-08
CP0904 . 2009 Citywide Sidewalk Repair Project
PAY ESTIMATE #7 & FINAL SCHEDULE A: Street Improvements
ITEM ~ ESTIMATE TOTAL PERIOD UNIT PERCENT EST. NO. IITEM DESCRIPTION QUANTITY QUANTITY.': QUANTITY TypE UNIT COST ; TOTAL COST PERIOD COST QTY.
1 Minor Changes 1 1.00 0.48 Eq. Adj. 5000 $ 4;997:91 2,412.48 _ 100%
2 , Mobilization ' 1 1 CS 500 $ ~ 500.00 $ - 100%
3 Traffic Controi Labor (Min. Bid $33'per hour) 800 _ 32~ HR 33 $ 1,058.00 $ 5%
4 Traffic Control Supervisor 1 1 ~ LS 2500 $ 2;500.00 $ - • 100% '
5 Removal of Tree!(Diameter.Less Than or Equal to 2:5 Feet) 16 17 EA 190 S 3,080.00 $ - 106%
6 Removal,of Tree,(Diameter Greater 7han 2.5 Feet) 41 41 EA 1501$ 6;150.00 - 100°k
7 Removai.:of Stump 6 6 EA 250 $ 1;500.00 $ - 100%
8 Removai:of Concrete Sidewalkand Driveway ' . 2080 2329.54 SY 16 $ 37,272.64 $ - 112% ,
9 Removal of Concrete Curb and Gutter 500 1038.6 tF 25 $~25,965.00 $ 208%
10 - Crushed Surfacing Top Course . 100 0 TON 20 - $ - 0%
- 11 Commercial HMA 15 12.14 12.14 TON 180 $ 2,185.20 $ 2,185.20 81%
12 L.andscape Restoration 1 3.29 Eq:.Adj: 10000 32,882.12 - 329%
13 Cement Concrete Traffic Curb and Gutter 500 911.1 LF 25 $ 22,777:50 - 182%
14 Residentlal Driveway Apron 70 107.5 SY 45 $ 4,837.50 $ - 154%
15 Industrial and Commerciat Driveway Apron 55 134 SY 45 $ 6,030.00 $ - 244%
16 Cement Concrete Sidewalk 1085 1368.47 SY 27 $ 36,948.69 $ - 126%
17 Cement Concrete Sidewaik (VVth 2ft x 2ft Score Finish) 440 441.81 SY 36 15,905.16 $ - 100%
18 Sidewalk Ramp Detectable Waming,Retrofit 195 195 . SF 56.41 $ 10,999.95 $ - 10096
' C0-2 Cement Concrete Sidewalk 600 424.76 SY 36 $ 15,291.36 - 7196
CO-2 Increase quantitiesi61 #'s 5,6,7;8,9,13,14,15,17 -
. . SCHEDULE TOTAL $ 4,597.68
. : '
OCi' 2 1
Period Pates . 4. . .
Begin:- JuL 21, 2009 . . , ' .
. End: Aug: 20, 2010
W1101-SB
h:lproj1pe1CP0904 PE.xis . . . 1 of 3: 9130J2010 at 3:06 PM
CO. NO. 09-08 CITY OF AUBURN
2009 City.wide Sidewalk Repair Project PROJECT SUMMARY
PAY ESTIMATE #7 & FINAL.
r:
Original Contract Contract Change .
Amount Orders Total Payment This Period Percent/Contract
SCHEDULE A: Street Improvements
Contract $ 135,409.95 $ 59,260.00 $ 230,859.03 4,597.68 119°k
. No Tax Applicable
Retainage (-5%) $ (11,542.95) $ (229.88)
SCHEDULE TOTAL $ 135,409.95 $ 59,260.00 $ 219,316.08 $ 4,367.80
TOTAL.CONTRACT AMOUNT TO DATE (including,Sates Tax) $ 230;859.03
TOTAL PAYMENT'TO CONTRACTOR $ 219,316:08 $ 4,367.80
PAYMENT DUE CONTRACTOR: $ 4,367.80
, Period!Dates • , . ~ '
Begirc Jul: 21, 2009 .
End: Aug. 20, 20,10
W1101-5B -
h:lprojlpe1CP0904'PEAs 2 of 3 ~ 9/30/2010:at 3:06 PM
CITY OF.AUBURN CO. NO. 09-08
CP0904 2009 Citywide Sidewalk Repair Project
' PAY'ESTIMATE # 7 & FINAL
CONTRACTOR:. Global Contractor, LLC
'8705 Cany,on Road,East, Suite A '
Puyallup, WA 98371'
Phone: (253)539-8399
The undersigned has reviewed and approved this final pay estimate. I agree that it is a true and correct statement
showing all monies due me from the City of Aubum under this contract; that I have carefully examined the final pay estimate
estimate and understand it and that I hereby release the City of Auburn from any, and all claims of whatsoever
nature which I. may have, arising out of this,contract, which are not set forth in this estimate.
PAYMENT DUE TO CONTRACTOR = $ 4,367.80 Signatures:
Contractor Date
,
Inspector Date
Project Manager Date 1Ul c-~ 1 10
City Engineer Date
W1101-5B
h:lprojlpe\CP0904 PE.xls 3 of 3 9/30/2010 at 3:06 PM
E z
ST z
z 4th
P ~
Lh T NE FULMER s~ J~ ~
TL° ~ VETER4N5 F/ELD A UB URN ~ 3rd ST NE
y G~~ e N8 MEMORIAL ew sr ~.e 5 NE 3T' ~T NE F" ~ W V] 2R
5t ST NE paRK AvE pARX x w ~ HIGH ~ Z
w z Ng x ~ 2nd CT NE x
¢ w 4t1i sT z F ~NE
S z
rd ° AUBURNE Q S,, V N SCHOOL lst
H/GH ~ X z m zn 1 St
nd S EAS S
"
N SCHOOL > lst 3T NE z z m Z
lst C/)
AS S E-~ W w W W w W W
~V7 U] Uj ) ~ C/D ~
2n r~i~ Ul C/ u~i m vi rwn cwn ~ m ~ rn
~ W ~
O r~"» 2n 5 E- z ~ 2 n d ~ s E^ E- E.- F' ~ Z
3r C/] V] C/] ~ V] ~ 3rd
a CR~SS 4th ~ ST v S~' S SE Y Ll C` Q ~
MN w No~ R~SS' 4th W ST ~ x-- SE x
B~ ` Bth ST ~ BURLINGTON W NORTHERN
6th S ~
7Lh ~ ST E,
i ~ 7th SE momm-
8th ST SE x ~
~ et~ ST F ~ sth ~ SE LES RAMP REPLACEMENT LOCATION
sthln
N F ~ z COVE F
loth sT u v' PARK v'
Ilth SE W
0
F
N 12th ST E
13TH SE
14th
sE U 14
15th SE X a m
F
16th SE v' 13th1&~fi
17th ST
~ C PL 18th 5
q ryL~ 18lh S'F ~ ~ .
T ~ ~Q~ 19th 5 LE
~
E S, MUCKLES
21a1Nv ' SE rEn zorx C rE'
21st ~ n
~
T 0UTy o w>` E~,~" 5e
~eo.a ox se ~ -2nd c~m ~sxauc,FNqssr~ _
~ 22nd ST CASINO
~ 22nd ST SE n 23
~I 23rd ST SE M W 23rd ST SE ~ m
0
24t ST 23rd ul ST SE f,
~ ze~n y~, I SE ~ J o
25th _ ST = SE 24th ST SE
25th ST SE POPIAR
6th T SE CEDAR
2eth
2 sr SE ~
N n~ s ~ _ ~ ~ F +e I ~ . . -
~ 7th ST SE e LANPARKES ~
` a en s,
sc s,
28th T SE 8lh ST
~S s, sc y~ sc ~8~>r
a _
~ CITY D
29th ST S I~I a~ ° amce .
Z ~ ~
ILLJI
C ~ 30thE- yy SE A UB URN
~ CAME
31st ST SF
i
32n S FARM
i
33c STUCK RIVE DRIVE
~ a 4 v~ 3A~~~ a
Z
35Lh.
X
z o ~ 362H sx .
L37th ST SET E . . . • ; _ . .
2009 Citywide Sidewalk Repair Project
a PRO]ECT AREA: Sidewalks in these
areas were repaired as part of this o aso, 1700'
project.
W 11 O 1- 5 C Scale: 1" = 1,700'
WIKBO On: 10(6/1010 laatlm: M:~VRO7V609M NW9 Qywke 9EeMaARep16 ~~o~FYW V! (PNC 11-1-0010)WdpArq