Re: South Division Street Promenade - Gateway Feature
Backqround
At the October 26, 2010 Downtown Redevelopment Committee, staff and the consuttant, KPG,
Inc. presented a gateway feature concept for the South Division Street Promenade project. This
feature could also potentially be replicated at other gateway points into Downtown Aubum.
The Committee provided the following direction to staff:
e Bring back options that incorporate public art or that incorporates an afistic element but
not a public art piece and the associated costs of each option.
o Bring back the potentiaf budget available for the inclusion of public art in the project. Discussion
Staff and the consultant met to,discuss the options and present a recommendation to the
Downtown Redevelopment Committee. The options are outlined as follows:
Options Estimaied Cost Project Accomplished Schedule Impact
1 Gateway designed by $100,000 Not a feasible option for Delay project design
public artist; full , this project and project sfart date;
integrated public art not really feasible for '
these circumstances
2 Banner Option - ,$30,OOU in'addition KPG, Inc. would Concurrent wifh
each gateway would to the gateway cost incorporate into construction; No -
be standard'¢ed for inclutled in the specfications that impact to timeline.
the poles and arch project budget contractor responsible but would have a would have muit le for connectin /fasten the
Rage 1 of 3 °
' ` t1UBURN * MORE THAN YOU fMAG1NED
unique design banners produced art pieces to the
attached'to the poles and then used when gateway. The gateway,
.
other gateway structure would be
arches are designed and
constructed specfications developed
by KPG (e.g. structural,
The $30,000 could foundation, poles,
be adjusted; this brackets, arch, lettering);,
amount is based on Parameters such as
12 banners. wind load, weight would.
be-given to artist to
. design the banners/art
piece. We could have KPG design both a
spread footing and
normal footing in their plans.
This option provides a
design for the gateway
stcucture that would be easily reusable at ofher '
locations within
downtown on future
projects as the design
would be done.
Artisf Designed Part - Artist design fee = KPG, Inc: would design
Design the lettering 10-15% of project the gateway structure
and template budget for the and develop the Gity would need the
background; this gateway + Design specifications (e.g. design parameters
option would be Proposal Solicitation structural, foundation, -and information from
replicated for each (3 artists x$1000 = poles, arch); artist would the aftt by the end
gateway $3000) design the background ofiNoVember: There
template and lettering #or Would be an impact
Total estimate = "Downtown Aubum° and to schedule with this
$10,500 in addition then tFiat design - option. to gateway costs „provided to contractor ($50,000 x 15% + for fabrication and $3,000) installation; thiswould
, outlined in the
~ specifications. We could `
have KPG design both a
spread footing and normal footing in their
plans.
This option provides a
. desi n for the atewa
Page 2 of 3
t1UBURN * MORE THAN YOU IMAGINED
structure that would be
easily reusable at other
= locations within
downtown on future
projects as-the design
would be done.
4 KPG, Inc. Designed No addfional cost We could have KPG In consuttation with Artistic Expression added; project design both a spread the Arts Commission
budget line included footing and normal creafe a custom
footing in their plans. gateway arch.
This option provides a No impact to timeline.
design for the gateway
structure that would be
easily reusable afi other
locations within
downtown on future
projects: as the design
would be done.
, StaffRecommendation
Since Option 1 is infeasible without delaying the project, Options 2-4 were evaluated and staff
recommends:
e An option that includes a public art element that would be part of the City's public art
collection; Option 2 with KPG, Inc. designing a background plate and more artistic lettering
for "Dowrrtown Aubum".
• An option that includes an artistic element but would not be part of the City's public art
collection, Staff recommends Option 4.
Review by the Arts: Commission with a reoommendation to the Downtown Redevelopment
Committee for action'would be part of any option.
Page 3 of 3 AUBURN * MORE THAN YOU TAAAGINED
South Division Street Promenade
Option 1: artist to Option 2: artist provided panel
provide artwork for pole linework/lettering (fabricated
panel by contractor)
I I ~ -77 I I
I , I
I I
I I I I
e~
~
! .4-~
~
_ - ~
~ W
rz: v
. ~
~ . 4 .
I'
Downtown Gateway Concept 11.04.2010 KPG