Loading...
HomeMy WebLinkAboutAgenda Modification r * CITYOF Interoffice Memorandum Engineering Divosion WASHINGTON To: Public Works Committee From: Dennis Dowdy, Public Works Director CC: Mayor - City Clerk Councilmembers Dennis Selle Assistant Director/City Engineer Ingrid Gaub, Assistant City Engineer Date: November 12, 2010 Re: Agenda Modification for the November 15, 2010 Public Works Committee Meeting This modification transmits the changes to the following agenda item: II. CONSENT C. PERMISSION TO AWARD CONTRAGT 10-23, PROJECT NUMBER CP0909, LAKELAND HILLS BOOSTER PUMP STATION IMPROVEMENTS PROJECT, TO BUNO CONSTRUCTION LLC ON THEIR LOW BID OF $1,811,472.50 PLUS WA STATE SALES TAX OF $172,089.89 FOR A TOTAL CONTRACT PRICE OF $1,983,562.39* (Vondrak) Page 1 of 1 &J$tjRN * MORE THAN YOU 1MAGINED * * CITY OF ~ AGENDA BELL APPROVAL FORM WASHINGTON Agenda Subject: Award Contract 10-23 Date: November 12, 2010 Department: Attachments: Budget Status Sheet, Budget Impact: Public 1Norics Bid Tab Summa & Ma $ 0 Administrative Recommendation: City Council award Contract 10-23, Project Number CP0909, Lakeland Hilis Booster Pump Station Improvements Project, to Buno Construction LLC on their low bid of $1,811,472.50 plus WA state sales tax of_$172,089.89_for a total contract rice of $1,983,562.39. Background Summary: The purpose of the Lakeland Hills Booster Pump Station Improvements project is to replace the existing water booster pump station in the Lakeland Hills water serVice area in ofder to meeffire flow demands and fo provide adeguate domestic water service, as identified in the 2001 Comprehensive Water Plan and the 2009 Comprehensive Water Plan: The existing Lakeland Hills Booster Pump Station Facility will be replaced with a new.facility that will provide approximately 500 gpm domestic supply, 3,125 gpm fire flow supply, and will include emergency power. Worlc will also indude the upsizing of water mains along 57'" Dr SE and Nathan Ave SE to facilitate the fire flow needs in the Lakeland Hilts service area and the installation of a side sewer connection off 57~' PI SE. Project construction is anticipated to begin in December 2010 and be completed by November 2011. A project budget contingency of $306,547 remains in the Water 430 fund. Reviewed by Council 8 Committees: Reviewed by Departments & Divisions: ❑ Arts Commission COUNCIL COMMIT'fEES: ❑ Building ❑ M&0 ❑ Airport ❑ Finance ❑ Cemetery ❑ Mayor ' ❑ Hearing Examiner ❑ Municipal Serv. ❑ Finance , O Parks ❑ Human Services ❑ PlanningS CD ❑ Fire ❑ Planning El Paric Boarcl SPublic Works ❑ Legal ❑ Police ❑ Planning Comm. ❑ Other ~ PubliCWorks ❑ Human Resources Action: Gommittee ApprovaL• OYes []No Counal Approval: OYes ❑No Call for Public Hearing Referred to Until Tabled Until Councilmember: Wa ner Staff: Dowd Meetin Date: : November 15, 2010 Item Number: - AUBURN * MORE THAN YOU 1MAGINED BUDGET STATUS SHEET Proect No: CP0909 Pro ec4 Title: Laketand Hills Booster Pum Station Im Project Manager: Ryan L Vondrak 0 Project Update Initiation Date: August 3, 2009 Q Permislon to Advertise Date: November 12, 2010 Advertisement Date: Odo6er 19, 2010 Q Contraet Award Award Date: Q Change Order Approval Q Contraet Final Acceptance The "Fufure Years" column indicates the projeded amount to be requested in future budgets. Funds Bud eted Funds Available Funding Priar Years 2009 2010 2011 Total 430 Fund - Water 148,442 2,832,000 0 2,980,442 - Total 0 148,442 2,832,000 0 2,980,442 Estimated Cost Funds Needed Activity Prior Years 2009 2010 2011 To4al Design Engineering - City Costs 26,322 26,000 52,322 Design Engineering - Consultant Costs 122,120 305,913 428,033 Construction' Contract Bid 200,000 1,783,562 1,983,562 . Authorized Contingency (5%) 10,000 89,178 99,178 ConstrucBon Engineering - City Costs • 7,500 52,500 60,000 Constructinn Engineering - Consuftant Costs 25,000 25,800 50,800 Total 0 148,442 574,413 1,951,041 2,673,895 430 Water.Bud ef Status " Prior Years 2009 2010 2011 Total "430 Eunds Budgeted 0 148.442 (2,832,000) 0 2,980.442 ( ) 430 Funds Needed 0 148,442 574,413 1,951,041 2,6731895 •aso Fund Proeet Contin enc ( 0 0 (2,257,587)1 0 306,547 - 430 Funds Re uired O O 1,951,041 0 in the Budget $tatus Sections indicates Money the City has available. - BID TABULATION BID TOTALS SUMMARY Project Name: CP0909, Lakeland Hilis Booster Pump Station Improvements, Contract 10-23 Prepared by: City of Auburn . Bid Date: 1119/10 ENG/NEER'S ESTIMATE: $ 2,151,287.85 AVERAGE BASIC BID AMOUNT: $ 2,128,042.90 BASIC BID SPREAD AMO.UNT: $ 581,689.50 Basic BID Amount Spread $ Spread % LOW BIDDER: Buno Construction $ 1,811,472.50 -$339,815.45 45.80°k Second Bidder: BOSS Gonstn.iction $ 1,922,981.00 -$228,306.95 -10.61% Basic BID (Tax not Included) Total BID (Tax Included) Buno Constcuction $ 19871,472.50 $ 1,983,562.39 BOSS Construction $ 1,922,981.00 $ 2,105,664.20 Prospect;Construction $ 1,960,731.05 $ 2;147,000:50 Pease & Sons, Inc $ 2,025,161.15 $ 2,217,551.46 McClure & Sons, Inc $ 2,040,118.00 $ 2,233,829.21 ACI (Award Construction, Inc) $ 2,114,798.10 $ 2;315,703.92 Rodarte Construction $ 2,142,032.50 $ 2,345,525.59 Hisey Construction, inc $ 2,152,884.00 $ 2,357,407.98 Gary Harper Construction $ 2,175,711.00 $ 2,382,403.55 Plats Plus; Inc _ $ 2,243,556.00 $ 2,456;693;82 R.L. Alia Company 2,322,786.95 $ 2,543,451.71 DPK, Inc $ 2,358;163.50 $ 2,583,284.03 - MKB Constructors $ 2,393,162.00 $ 2,620,512.39 I 1 / 12/2010 ,(8:56'AM) h:lproj\bidtabs\CP0909 BTxls.xls 6 - sirt+ ~ sE 4136 413708-0400 s 1374 / 37TN OR SE a,s~oa-o,eo \1 J 1 s7n+'~ ,,,o , s77rn vL sE 1= , 413e8e-oa2o ~ 1324 Not to Scale r137O4 0 - S/ry{ pR g I C2TY OF AUBURN I ~ ~ ~ 413704-0070 LAKELAND HILLS S ; 413704-0170 1722 RESERVOIR SITE '`j I ~ 413704-0180 ~ 1142 57TH PL SE G1STR - SE 31-21-5 413888-0310 1144 ~ 1326 , 37TN Pl SE ~ 37iH PL SE ~ m 3121005-9047 57M OR SE au~os-ooeo Lakelend Hills : s1aeee-~,. 41~~ ~ t~ r r 1120 ill 413888-0370 37iM DR SE ~ ; < sm, ~ s~ Booster Pump ; i smi ~ sE smi uR sE / Statlon Site ,~~413068-TRB!/i "l 415888-TRA ~ - V 700101-001D + . ~ 1340 700101-02Z0 OS2006-1006 S~ i ~ f,~l 1359 l 57IH DR SE ~ ~ 700101-0020 ~ 1231 - _ ~S71M Cr SE 700101-0210 % \ \ \*'6~~~ i ! % / `r 1341 \ 7001~~M 57TH OR SE ~ 7TH Cr SE 700101-0060 700101-0m ~ ,o> V 700107 ~070 1209 1221 / „Q \ -ozoo / 1203 srni cr se ~ '5mi cr se r t~, ~`°~o 7oo1o1 37TH CT SE 1345 57TH OR SE ~ 2~t,, C/ 700101-0050 1215 7001571FI Cf SE 1409 101-0100 \ WY 11~ ~ 70010~~ 190 srn+ cr . • • / . 7ootzs-oteo ` 7oo1oi-o11o 7oo1oi-oi~ ~+w ~ V 7ooizs-oieo i ~ i s srnH cr sF ~ wr ~ a7r►, cr sE 7oo,o,-ono ;;,~p w~nuw nv sE 1220 /700101-0120 571H CT SE 57TH1CT SE 700101-0180 ~70012~Ot70 1214 % SBDB ~M cr sE w►,ww nv se , ~ 700101-0150 700125-0150 700101 \ ~7~~,~ C ~ -0130 I ~ 571F1 ~ SE / ~ NA1WM1 AV SE „2s , : ~ ~~Aw ~ sm+ cr ~ ~;~oa°t~ / ~ 7oo,ze-ao,o i _ 5M LEGEND: \ ~ A4 sE ~ 7W126-oo20Project Constructlon 700101-0230 Wwswu80°i nv ~ ~ Llmlts ~ Existing 15' Access 70°'~;~°°3° ' and Utlllty Easement ~ ~ ~i Offsite Sewer 7W120-OM Improvements ~ nv sE Offsite Water ~ ~ 7oo aJ ' ~ lmprovements ~~"~'.2""; - - - Existing R.O.W. , 700125-0060 / w~ ny se / j 700+2e-0430 Exlsting ParCel Llne . _ . . crrYoF, CP0909 ~Lakeland Hills Booster Pump Station . Irroprovemen# Project WASHINGTON Pro3ect 1/lcinlty and Construction Limits Map