HomeMy WebLinkAbout11-17-2010
Airport Advisory Board
Agenda
November 17, 2010
8:00 a.m.
(City Hall Annex, Conference Room 1),
Introductions: Members and Guest
Attendance: Please Sign In
Call to Order: Chairman.Myers
Public Comments:
Approval of Minutes Approve October 20, 2010 AAB meeting minutes
Old Business:
4. NW Skyraiders
2. Noise and Airbome Complaint Form
New Business:
None
Review matrix for Aiiport projects:
Open discussion:
Adjoumment:
Next Meeting Date: December 15, 2010
8: 00 am
Location: City Hall Annex building
Conference Room 1, Second Floor
AIRORT ADVISORY COM;~MiITTEE PROJECT - GOAL MATRIX.
# PROJECT LEAD Est. COST REVIEW EST. STATUS
DESCRIPTION DATE COMPL.
DATE
1 Airport Storm Reid $50,000 12/15/2010 12/31/2010 , 90% complete on the information gathering, research,
Water Design Middleton/AMG - system inventory, and system mapping tasks. 90%
Update complete on the task of compiling the storm drainage data
table that will accompany the exhibit map. Survey crew is
finished picking up missing storm drainage information
that was not available through the archives of past
projects, or GIS records. This new survey information has
been compiled and is now ready to incorporate onto the
exhibit map and storm drainage data .table.
Scheduled work on this project for the next few weeks will
include updating the exhibit map and data table with the
recent survey information, putting together the letter
report for the information gathering phase of work,-and
moving°forward with the drainage problem identification
effort.
The work to date has been covered under task 1
(Information Gathering, Research, System Inventory, and
System Mapping) and task 2(Table of Elevations and
Meterial for Storm Drainage Sysiem Pipes and 5tructures),
as set up in the contraat. Task 1 is under budget and task
~ 2 is over budget, however, there is sufficient budget
~ between the sums of the 2 tasks to cover the work
remaining; as the distribution of budget between the tasks
is an estimate. In discussing'this with the City, it was -
acceptableto,shift budget between the two tasks.
Last Revision Date: 11/15/2010
AI'RORT ADVISORY COMMITTEE PROJECT- GOAL MATRIX
2 Hangar Rows 9& 10 Steve $200,000 12/15/2010 TBD 11/12/2010 received the final revised specs. A;review on
roof Bur:ke/AMG 11/15/2010 by Steve Burke to make sure they ar,e ok. Shelley '
increased the budget to $200,000'to coverthe contingency.
, 3 Runway Lighting Steve $350,000 12/15/2010 TBD A meefing with Reid Middleton, Totem Electric, AMG and
Replacement Burke/Reid Steve Burke was held on 11/5/2010 to discuss the starting
Middleton/AMG of'the project. Concern was expressed of trying to do this
during the shorter days and adverse weather. Another
meeting is schedule 11/17/2010 to discuss timing of the
project and an update to the availability of materials.
4 Storm Water Robert 0 12/15/2010 11/30/2010 A stop work order issued from the Ciry due to a de-
Retention Ponds Lee/Storm watering issue. Work resumed week.of November 8, ,
Water 2010. As of 11/15/2010 estimate the work is 2/3
completed. 5 Airport Mangar AMG 0 12/15/2010 12131/2010 City of Auburn legal to prepare letter and discuss available
Inspection options for non-compliance of inspection
6 Noise Complaints AMG 0 12/15/2010 No noise complaints since last report.
I
,
- ~