HomeMy WebLinkAboutMatrixAIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX
#
PROJECT
LEAD
Est. COST
REVIEW
EST.
STATUS
DESCRIPTION
DATE
COMPL.
DATE
3
Hangar Rows 9 &
Steve
$200,000
10/19/2011
TBD
Steve Burke to contact references provided for the seal
10 roof
Burke /AMG /Robert
coating system discussed and make report at AAB
Jones
meeting on outcome.
6
Airport Hangar
AMG
0
09/21/2011
9/15/2011
All inspections completed.
Inspection
7
Noise Complaints
AMG
0
10/19/2011
Ms. Roberts at City Hall called to advise AMG of a citizen
complaint received by Adam Smith office regarding
helicopter noise. AMG has not received a call as of
09/19/2011
9
Condo Gate Review
AMG
TBD
TBD
TBD
Received report. Pricing is over the initial estimate.
AMG researching other companies.
10
Aircraft Wash Rack
Chris
TBD
10/19/2011
TBD
City utilities came out to the airport and sited the sewer
Anderson /AMG
connection located at the 506 (flight school building). It
is located at the north east corner of the building.
11
Airport Master Plan
Coleman /AMG
TBD
10/19/2011
TBD
Appointment with State personnel was held August 11,
Mid -Term Update
2011. Appointment with FAA delayed due to furlough.
Update planned for June 2012 funding. There are items
which can be completed before hand which qualify for
reimbursement from State and Federal grants.
12
Occupancy Rates as
AMG
-0-
10/19/2011
NA
• Row 9/10 35/40 (88 % occupied)
of August 31, 2011
• Row 2 14/14 (100% occupied)
• Row 8 6/6 (100% occupied)
• Rows 3 -7 56/85 (66% occupied) Note 2
additional rented in September 2011
Last Revision Date: 9/19/2011
AIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX
COMPLETED
#
PROJECT
LEAD
Est. COST
REVIEW
COMPL.
• Storage Units 11/12 (92% occupied)
DESCRIPTION
DATE
DATE
• Tie down 39/100 (39% occupied)
COMPLETED
#
PROJECT
LEAD
Est. COST
REVIEW
COMPL.
STATUS
DESCRIPTION
DATE
DATE
2
Airport Rules and
AMG
0
10/20/2010
9/20/2010
Second committee review (finance) for council approval on
Regulations
9/20/2010
7
MIA Appraisal
AMG
0
10/20/2010
12/31/2010
MAI appraisal for raw and improved land leases at the
Auburn Airport for implementation 1/1/2011
1
Airport Storm
Reid
$50,000
4/20/2011
Completed
Water Design
Middleton /AMG
Update
4
Runway Lighting
Steve
$350,000
7/20/2011
6/2/2011
Construction Completed. Waiting on Punch List and FAA
Replacement
Burke /Reid
inspection.
Middleton /AMG
5
Storm Water
Robert
0
4/8/2011
Project Completed
Retention Ponds
Lee /Storm
Water /Coleman
8
Drainage Mitigation
Tim Carlaw
TBD
TBD
TBD
Recent observation — no change since last report. No
standing water. Monitoring and will update as necessary
Last Revision Date: 9/19/2011
AIRPORT ADVISORY COMMITTEE PROJECT — GOAL MATRIX
AMG Airport Maintenance and Improvements
• Crack Sealing of runway asphalt — completed 13,800 linear feet of cracks
• Crack Sealing of runway to taxiway asphalt — completed approx. 5,000 linear feet of cracks
• Crack Sealing of run -up areas of RW 16 & RW 34 — completed approx. 2,500 linear feet of cracks
• Crack Sealing of hangar rows 9 and 10 taxiway area — completed approx. 3212 linear feet of cracks
• Completed Condo Hangar inspections
• Cleaned, prepped, repainted traffic pattern segmented circle with high gloss white paint
• Serviced all electric motors (14) for roll -up doors on hangar row 2 hangars
• Repaired airport office roof and applied complete hot tar covering
• Installed signs on each entry gate to identify each location
• Replaced all aircraft visitor parking tie -down ropes
• Continuing to install netting in open hangars to stop birds from nesting
• Removed all the dead plants /bushes at the north end hangar area. Clean up landscape
• Weekly landscape maintenance service outside the fenced area of the airport
• Mow the entire airport. Mowing farther to the west as dry weather allowed
• Cleaned out storm water catch basins of debris
• Sprayed all grass and weeds growing in cracks then burned to remove
Last Revision Date: 9/19/2011
AIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX
In process
1. Fuel Dispenser replacement
2. Storm water catch basin repairs
3. Crack sealing between hangar rows 2 -8 and tie -down areas
4. Working on aircraft wash rack solution
5. Working on additional office space for the airport
6. Working on aircraft accident emergency plan and recovery plan
7. Working on Flight school lease options (lease expires 3/2012)
Last Revision Date: 9/19/2011