HomeMy WebLinkAboutITEM III-1 MATRIXAIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX # PROJECT LEAD Est. COST REVIEW EST. STATUS DESCRIPTION DATE COMPL. DATE 3 Hangar Rows 9 & Steve $200,000 1/18/2012 TBD Request to move bid schedule before May 2012 to 10 roof Burke /AMG /Robert secure contractor. Bob Jones spoke with Steve Burke Jones regarding the process needed to make certain funds are budgeted. 7 Noise Complaints AMG 0 12/21/2011 No noise complaints since last report 9 Condo Gate Review AMG TBD 12/21/2011 TBD Dec 2012 meeting have statement of work available and if there is any grant monies available for security system. 10 Aircraft Wash Rack Chris TBD 12/21/2011 TBD Identify requirements. Email to come from Chris. Chris Anderson /AMG to work with Reid Middleton for scope of work. 11 Airport Master Plan Coleman /AMG TBD 1/18/2012 TBD Bill Thomas to come to the November meeting and Mid -Term Update make presentation on the outlook for the next 20 years. 12 Occupancy Rates AMG -0- 12/21/2011 NA • Row 9/10 36/40 (90 %) • Row 2 Full (14) (100 %) • Row 8 Full (6) (100 %) • Rows 3 -7 57/85 (67 %) • Storage Units 10/12 Full (83 %) • Tie down 38/100 full (38 %) 13 General Airport Board Only TBD 1/18/2012 NA Event to showcase Auburn Airport, e.g. WWI —II Event aircraft. Static display /food /sale vendors/ flights. 14 Fuel Dispenser AMG $10,000 12/21/2011 3/31/2011 Fuel station down to one operating station with two Replacement delivery hoses. Other station used to keep this station operable. Last Revision Date: 11/14/2011 AIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX 15 Aircraft Accident Emergency Plan and Recover Plan AMG TBD 12/21/2011 3/31/2012 Review current plan and revise as required. Add to that plan an Aircraft Recovery Plan. 16 Update Airport Chris Anderson TBD 12/21/2011 3/31/2012 Mr. Anderson will work the Reid Middleton and 2 Storm water AMG 0 10/20/2010 9/20/2010 update the plan for implantation at the airport. "SWWPP° Plan Documents given to Anderson and RM. 17 Repair of Storm AMG $25,000 10/20/2010 11/11/2011 The most deteriorated catch basins to be identified Water Catch Basins and repaired as required. Twenty (22) catch basin 1 Airport Storm Reid $50,000 4/20/2011 were repaired at cost of $23,794.35 (Note: 2 failing Water Design Middleton /AMG catch basins were repaired at the AFS shop which Update AFS Shop is paying for). COMPLETED # PROJECT LEAD Est. COST REVIEW COMPL. STATUS DESCRIPTION DATE DATE 2 Airport Rules and AMG 0 10/20/2010 9/20/2010 Second committee review (finance) for council approval on Regulations 9/20/2010 7 MIA Appraisal AMG 0 10/20/2010 12/31/2010 MAI appraisal for raw and improved land leases at the Auburn Airport for implementation 1/1/2011 1 Airport Storm Reid $50,000 4/20/2011 Completed Water Design Middleton /AMG Update 4 Runway Lighting Steve $350,000 7/20/2011 6/2/2011 Construction Completed. Waiting on Punch List and FAA Replacement Burke /Reid inspection. Middleton /AMG 5 Storm Water Robert 0 4/8/2011 Project Completed Retention Ponds Lee /Storm Water /Coleman 6 Airport Hangar AMG 0 9/7/2011 Completed Inspection 8 Drainage Mitigation Tim Carlaw TBD TBD TBD Recent observation — no change since last report. No standing water. Monitoring and will update as necessary Last Revision Date: 11/14/2011 AIRPORT ADVISORY COMMITTEE PROJECT — GOAL MATRIX AMG Airport Maintenance and Improvements • Crack Sealing of runway asphalt — completed 13,800 linear feet of cracks • Crack Sealing of runway to taxiway asphalt — completed approx. 5,000 linear feet of cracks • Crack Sealing of run -up areas of RW 16 & RW 34 — completed approx. 2,500 linear feet of cracks • Crack Sealing of hangar rows 9 and 10 taxiway area — completed approx. 3212 linear feet of cracks • Completed Condo Hangar inspections • Cleaned, prepped, repainted traffic pattern segmented circle with high gloss white paint • Serviced all electric motors (14) for roll -up doors on hangar row 2 hangars • Repaired airport office roof and applied complete hot tar covering • Installed signs on each entry gate to identify each location • Replaced all aircraft visitor parking tie -down ropes • Continuing to install netting in open hangars to stop birds from nesting • Removed all the dead plants /bushes at the north end hangar area. Clean up landscape • Weekly landscape maintenance service outside the fenced area of the airport • Mow the entire airport. Mowing farther to the west as dry weather allowed • Cleaned out storm water catch basins of debris • Sprayed all grass and weeds growing in cracks then burned to remove Last Revision Date: 11/14/2011 AIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX In process 1. Crack sealing between hangar rows 2 -8 and tie -down areas 2. Working on additional office space for the airport (on hold') 3. Working on Flight school lease options (lease expires 3/2012) 4. Waterline repair from meter to hangar row 2 (Completed') 5. Aircraft sale for non - payment of tie -down rent 6. Assisted with research of sewer connections proper billing and payment of connection fees. (Completed) 7. Installing bird netting in open hangars 8. Storm Water discharge testing area for DOE Last Revision Date: 11/14/2011