Loading...
HomeMy WebLinkAboutCP1118&CP1119 Request for ProposalsCity of Auburn Request for Proposals Project CP1118 — Auburn Way South Pedestrian Improvements, Dogwood St SE to Fir St SE and Project CP1119 — Auburn Way South Corridor Improvements, Fir St SE to Hemlock St SE The City of Auburn is soliciting Proposals from qualified consulting teams to provide professional services for the design, permitting, right of way acquisition, and potentially construction assistance for two projects located on Auburn Way South, Project CP1118 — Auburn Way South Pedestrian Improvements, Dogwood St SE to Fir St SE, and Project CP1119 — Auburn Way South Corridor Improvements, Fir St SE to Hemlock St SE. The City will select one consultant to provide professional services for both projects. It is the City's intent to enter into separate consultant agreements for each project and to have separate plans, estimates and specifications prepared for each project. It is likely the City will tie the construction bids. The projects involve road, signal, storm drainage, transit and pedestrian improvements to approximately 1/3 mile of Auburn Way South (SR -164), a state route and major arterial. Project CP1118 has a total project estimated cost of $940,830 with state, federal and local funding and Project CP1119 has a total project estimated cost of $3,033,000 with Transportation Improvement Board funds and a local match provided by the Muckleshoot Indian Tribe. The projects are anticipated to follow the same schedule, with design beginning in the Spring of 2012 and construction being completed in 2013. The lead consultant shall have: 1. Obtained WSDOT approval of at least two channelization plans within the last 5 years; and 2. Have experience with at least one roadway design on an arterial street with a total project cost of at least $3,000,000 within the last 3 years; and 3. Have experience on at least two projects involving property acquisition within the last 3 years; and 4. Have experience with TIB's Value Engineering requirements or a similar value engineering study within the last 5 years. Six (6) copies of the Proposal Package must be submitted on or before 4:00 pm, Tuesday, February 7, 2012, to the City of Auburn Public Works Department, 25 West Main, Auburn, WA 98001. Proposals shall be sent in a sealed enveloped and clearly marked: "Proposal — CP1118/CP1119 Auburn Way South Improvements Projects" in the lower left corner. Questions regarding this solicitation should be directed to Leah Dunsdon, Project Engineer, by email only at Idunsdon @auburnwa.gov. For specific instructions on information to include in Proposals, refer to the section below entitled Proposal Elements. Although the use of subconsultants is recognized as being necessary for a multidiscipline large scale project, the City's preference is for the lead consultant to have the majority of the work performed in- house. Additional information for the projects is available on the City's website, .auburnwa.gov/business/public works/capital Evaluation of the Proposals and ultimate consultant selection is identified in the section entitled Selection Process And Evaluation Criteria below. PROJECT DESCRIPTION Auburn Way South (SR 164) is a regionally significant route and provides important economic and transportation benefits. As such, the City obtained state Pedestrian & Bicycle Safety Program grant funds in the amount of $740,830 and federal grant funds in the amount of H:\PROJTP1119-AWS Fir to Hemlock \Consultants \Consultant Selection \RFP Documents \CP 1118 &CP 1119 Request for Proposals.doc January 11, 2012 1 $100,000 to provide improvements to the portion of Auburn Way South from Dogwood St SE to Fir St SE (CP1118). The state grant funds require a $100,000 local match, which will be provided by the City. The federal grant funds are anticipated to be used for design and right of way acquisition. The City, in partnership with the Muckleshoot Indian Tribe (MIT), obtained Transportation Improvements Board (TIB) grant funds in the amount of $2,426,400 to provide improvements to the portion of Auburn Way South from Fir St SE to Hemlock St SE (CP1119). The TIB grant funds require a local match of $606,600, which will be provided by MIT. The proposed improvements for Project CP1118 are as follows: 1. Street lighting, sidewalk improvements and ADA compliant ramps; and 2. Landscaped median island for access management with a designated mid -block crossing protected by pedestrian activated rectangular rapid flashing beacon warning lights; and 3. U -turn widened "wedge" at Fir St Se to facilitate eastbound u -turn movements; and 4. Upgrading the signal at Auburn Way South and Dogwood St SE to countdown pedestrian signal heads and ADA compliant push buttons; and 5. Storm drainage water quality and detention facilities if required per the City of Auburn's Surface Water Management Manual; and 6. Relocating existing utility poles to the back of sidewalk to mitigate roadside hazards. The proposed improvements for Project CP1119 are as follows: 1. Reconstruction of the roadway to a 5 -lane road section that consists of two through lanes in each direction and a center turn -lane with u- turn /transit pullouts at Hemlock St SE; and 2. Signing, striping, curb and gutter, 10 -foot wide sidewalks, street lighting, street trees and ITS improvements; and 3. It is anticipated that a new storm drainage main will need to be extended from the existing storm system near Elm St SE, or Dogwood St SE if necessary due to grade limitations, to serve the project. Modeling to determine the slope and pipe sizing of the new storm system will be completed by the consultant as part of the storm water report. Modeling to determine the design flows of the larger tributary basin will be completed by the City's on -call modeling consultant. 4. Storm drainage water quality and detention facilities per the City of Auburn's Surface Water Management Manual; and 5. A new traffic signal at the intersection of Hemlock St SE and Auburn Way South, including ADA compliant ramps, audible pedestrian push buttons and countdown signal heads. ANTICIPATED DELIVERABLES The design contract will include project management, geotechnical work, survey, right of way acquisition documents and negotiations per the Local Agency Guidelines (LAG) manual, environmental approvals and permitting, preparation of storm water reports per the City of Auburn's Surface Water Management Manual and WSDOT Runoff Manual, preparation of contract plans and specifications, engineering estimates, WSDOT channelization plans, a value engineering study for Project CP1119 only, an archaeology survey, and bidding /construction assistance. The project deliverables include: • A Project Schedule; • Contract documents, including Special Provisions, an Engineer's Cost Estimate and Contract Plans including the WSDOT channelization plans for 30 %, 70 %, 95 %, 99% and final documents; and H:\PROJTP1119-AWS Fir to Hemlock \Consultants \Consultant Selection \RFP Documents \CP 1118 &CP 1119 Request for Proposals.doc January 11, 2012 2 • Environmental technical information, survey, storm water reports, geotechnical investigations, channelization plans to meet WSDOT requirements, SEPA, NEPA, permitting, and public outreach. The City would like to have the design for this project started by April 2012, advertisement of the project in February 2013 and construction to occur between April and October of 2013. PROPOSAL ELEMENTS The Proposal shall cover both Project CP1118 and CP1119. Separate proposals for each project will not be accepted. Proposals are limited to twenty -two (22) double -sided pages (excluding cover and dividers) (minimum font size 10 arial), and should address the following items relative to the design and construction of arterial roadways, storm drainage facilities, traffic signals, street lighting systems, and other project elements: 1. The Project Team's experience with similar project designs. Please include the following information: project name, location, a brief description of the project, the firm's role in the project, project team member roles in the project, design costs, construction costs, and a reference. 2. The identity and qualifications of your proposed Project Team for the environmental permitting, geotechnical design, right -of -way plans, and design efforts. Include any sub - consultants proposed. 3. The Project Team's project specific approach. 4. The Project Team's anticipated Project Schedule. 5. Your firm's process /procedures for providing quality assurance /quality control throughout the life of the project. SELECTION PROCESS AND EVALUATION CRITERIA A committee of City personnel will evaluate and rate the proposals, giving equal consideration to these criteria: Project Team Experience for the Identified Efforts, Project Team Qualifications, Approach to the Project, Anticipated Project Schedule, and Quality Assurance / Quality Control Plan. Following the evaluation of the Proposals, the City may interview up to three (3) of the prospective consultants. Those firms selected for interview will have the opportunity to present their past experience in environmental evaluation and permitting, roadway and storm drainage design, property acquisition, and overall project approach. SELECTION SCHEDULE The City's proposed schedule for Consultant selection, subject to change, is as follows: Issue Request for Proposals January 12, 2012, January 19, 2012 Deadline for Submittal of Proposals February 2, 2012 @ 4:00 pm Preliminary Selection of Firms February 17, 2012 Notify Firms Chosen for Interviews (City Option) February 21, 2012 Consultant Interviews (City Option) February 27 -March 2, 2012 Final Selection of Design Firm Week of March 5, 2012 Execution of Consultant Agreement April, 2012 TERMS AND CONDITIONS The City of Auburn reserves the right to reject any and all Proposals and to waive irregularities and informalities in the submittal and evaluation process. This solicitation for Consultant Services does not obligate the City of Auburn to pay any costs incurred by respondents in the preparation and submission of a Proposal. This solicitation does not obligate the City of Auburn to accept or contract for any expressed or implied services. Furthermore, the City of Auburn H:\PROJTP1119-AWS Fir to Hemlock \Consultants \Consultant Selection \RFP Documents \CP 1118 &CP 1119 Request for Proposals.doc January 11, 2012 3 reserves the right to award the contract to the next most qualified Consultant if the selected Consultant does not execute a contract within thirty (30) days after the award of the proposal. Persons with disabilities may request this information be prepared and supplied in alternative forms by calling 253 - 931 -4013. The Recipient, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d -4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally - assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. Dates of publication in the Seattle Daily Journal of Commerce, January 12, 2012 and January 19, 2012. Dates of publication in the Seattle Times, January 12, 2012 and January 19, 2012. H:\PROJTP1119-AWS Fir to Hemlock \Consultants \Consultant Selection \RFP Documents \CP 1118 &CP 1119 Request for Proposals.doc January 11, 2012 4