Loading...
HomeMy WebLinkAboutPacific Groundwater Group _ .. . , ,�3 ��- y AGREEXENT' FOR PROFESSIONAL 8ERVICES THIS AGREEMENT made and entered into by and between the CITY OP AIIeIIRN, a municipal corporation of the State of Washington, hereinafter referred. to as "CITY" and w'1th PaciLic Groundwatez Gronp, Iac., whose address is 2377 Eastlake Avenue East, Seattle, Washinqtoa, 98102, hereinafter referred to as "CONSIILTANT". in consideration. of the covenants and conditions of this Aqreement, the parties hereby agree as follows: 1. SCOP& OF WORR. - This agreement is to provide hydrogeological services and consulCing relating to municipal water supply and water rights as described in Exhibit "A" Scope of Work. All work under this aqreement will be described and authorized on a task basis. Each task will be authorized by letter from the CITY. Task authorization will include an estimated schedule and a budget for tAe task. Work which would exceed the authorized amount for a specific task will require additional authori2ation from the CITY prior to beinq performed. The estimated authorizations for work to be performed under this Agreement during 1995 is seventy-seven thousand dollars and no cents ($77,000. 00) . A sample task authorization is shown as Exhibit "B°. ---------------•-••--------------- 1lgreement for Profeasiaml Services � Va9e 7 of 16 MS 700 � Mey 8. 1995 � . 6��� ��' ,,.�`� ; . . z. TERM• This Agreement shall continue until terminated by both parties as described in item 8 of this Agreement. 3. COMPENSATION. Compensatzon shall be based on the CONSULTANTS :hourly billing rates as shown on Exhibit "C" Iiourly Billinq Rates. Hourly billing rates include the total compensation paid to the CONSULTANT to cover salaries, benefits, overhead, costs and profits of the CONSULTANT. The CONSULTANT proposes to use subconsultants to assist in performing work under this contract. Whenever subconsultants are used the CONSULTANT shall provide for CZTY review and approval a supplemental hourly billing rate schedule which includes hourly billing rates for all subconsultants prior to their work under this agreement. Labor and expenses of the CONSULTANT and any subconsultant are to be cataqorized and included with all invoices. The CONSULTANT shall maintain proper accountinq records related to compensation and provide copies to the CITY upon request documenting all labor and expenses associated with this agreement. 4 . RESPONSIBILITY OF -CONSOLTANT. The CONSULTANT shall be responsible for the professional quality, technical accuracy, timely completion and the coordination of all studies, analysis, designs, dravings, specifications, reports and other services performed by the CONSULTANT under this Agreement. The CONSULTANT shall, without -------------------°---------•---- .�yreement for Frofessiaial Serviees CaBe 2 of 16 MS 700 � � May�.B. 1995 . . additional compensation, correct or revise any errors, omissions or other deficiencies in its plans, designs, drawings, specifications, reports and other services required. Tha CONSULTANT shall perform its services to conform to generally accepted professional hydrogeologic and engineering standards and the program requirements of the CITY. Any approval by the CITY under this aqreement shall not in any way relieve the CONSULTANT of responsibility for the technical accuracy and adeguacy of its services. Except as otherwise provided herein, neither the CITY'S reyiew, approval or acceptance of, nor payment for, any of the services shall be construed to operate as a waiver of any riqhts under this agreement or of any cause of action arising out of the , performance of this aqreement to the full extent of the lav. 5. INDEMNIFICATION/HbLD HARMLESS. The CONSULTANT agrees to defend, indemnify and hold harmless the CITY, its elected and appointed officials, employees and agents from any and all claims, demands and/or causes of action of any kind or character whatsoever arising out of or relatinq to the CONSULTANT, its employees, subcontractors or aqents for any and all claims by any persons for alleged. personal injury, death. or damage to their persons or property to the extent caused by the negligent acts, errors or omission of the CONSULTANT, its employees, agents, subcontractors or representatives and arising out of its performance of this Agreement. In the event that any --------•-------------------------- � llyreenent tor Vrofessiarel Serviees Page 3 of 76 ��115 700 . �Y Sr ��' suit or claim for damage is brought against the CITY caused by the negligent acts, errors or omission of the CONSULTANT, its employees, agents; subcontractors or representatives and arising out of its performance of this Aqreement, the CONSULTANT shall defend the CITY at its sole cost and expense; provided that the CITY retains the right. to participate in said suit if any principle of governmental or public laws is involved; and if final judgment be rendered aqainst the CITY and/or its officers, aqents or employees or any of them, or jointly against the CITY and the CONSIILTANT and their respective ofPicers, aqents, subcontractors, employees or any of them, the CoNSULTANT aqrees to fully satisfy the same to the extent of the CONSULTANTS negliqence and the CONSULTANT shall reimburse the CITY for any cost and expense which the CITY has incurred as a result of such claim or suit to the extent of the CONSULTANTS negligence. The provisions of this section shall surVive the expiration or termination of this Aqreement. 6. INDEPENDENT CONTRACTOR/ASSIGNMENT. The parties agree and understand that the CONSULTANT is an � independent contractor and not the agent or employee of the CITY and that no liability shall attach to the CITY by reason of entering into this Agreement except as otherwise provided herein. The parties agree that ttiis Agreemerit may not be assiqned in whole or in part without the written consent of the CITY. ---------------------------------° � � A9n�t for Professionel Serviees Paye � of 76 MS 700 May 8, 1995 �- 7, INSIIRANCE. CONSULTANT shall procure and maintain for the duration of this Agreement, comprehensive general liability insurance aqainst claims for injuries to persons or damaqe to property which may arise from or in conjunction with services provided to the CITY by the CONSULTANT, its aqents, employees or subcontractors, under this Aqreement. The CONSULTANT .agrees to provide comprehensive general liability insurance and shall maintain liability limits of no ' less then oNE MILLION DOLLARS (SS>000, 000) combined sinqle limit per occurrence for bodily injury, personal injury and property damage. The general liabil3ty coverage shall also provide that the CITY, its officers, employees and agents are to be covered as additional insureds as respects: Liability arising out of the services or responsibilities performed by or under obligation of the CONSULTANT under the terms of this Agreement, by the CONSULTANT, its employees, aqents and subcontractors. The general liability coverages shall provide that the CONSULTANT' S insurance coverage shall be primary insurance as respects the CITY, its officials, employees and agents. Any insurance or self insurance maintained by the CITY, its officials, employees or aqents shall be excess to the CONSULTANT'S insurance and shall not contribute with it. Each insurance policy required by this section of the Agreement shall be endorsed to state that coverage shall not be suspended, . Agreement foeProfessiaiel Serviees. , Dage S�of 16 NS 700 May �8, 7995 � . voided, cancelled, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail return receipt requested has been given to the CITY. The CONSULTANT aqrees to provide copies of the certificates of insurance to the CITY specifying the coverage required by this section at the time that this Agreement takes effect. The CITY reserves the riqht to require that complete, certified copies of all required insurance policies be submitted to the CITY at any time. 8. NONDISCRIMINATION. The CONSULTANT ,may not discriminate regarding any services or activities to which this Agreement may apply directly or throuqh contractual, hirinq, or other arrangements on the qrounds of race, color, creed, religion, national origin, sex, age, or where there is the presence of any sensory, mental . or physical handicap. 9. OANERSHIP OF RECORDS AND DOCUMENTS. The CONSULTANT aqrees that any and all drawings, computer discs, documents, records, books, specifications, reports, estimates, summaries and such other information and matezials as the CONSULTANT may have accumulated, prepared or obtained as part of providing services under the terms of this Agreement by the CONSULTANT, shall belong to and shall remain the property of the CITY OF AUBURN. In addition, the CONSULTANT agrees to maintain all books and records relating to its operation and conceminq this Agreement for a period of three (3) years following the date � 1lyreement. for Vrofessional Serviees �Page 6 of� 16- ' MS 700 " Mey 8, 1995 that this Aqreement is expired or otherwise terminated. The CONSULTANT further agrees that the CITY may inspect any and all documents held by the CONSULTANT and relatinq to this Aqreement upon good cause at any reasonable time within the three (3) year period. The CONSULTANT also agrees to provide to the CITY, at the CITY'S request, the originals of all drawinqs, documents, and items specified in this Section and information compiled in . providing services to the CITY under the terms of this Aqreement. Reuse of any of the drawinqs, computer discs, documents, records, _ tiooks, specifications, reports, estimates, summaries and such other information and. materials on extensions of this project ar any other project without the written permission of the CONSULTANT shall be at the CITY'S sole risk and the CITY agrees to defend, indemnify and hold harmless the CoNSULTANT from all claims, damage and expenses including attorney's fees arisinq out of such unauthorized reuse of the CONSLJLTANTS drawings, computer discs, documents, records, books, specifications, reports, estimates, summaries and such ottier information and materials by the CITY or others acting through the CSTY. 10. TERMINATZON OF AGREEMENT. � This Agreement may. be terminated by either party upon twenty (20) days written notice to the other party, and based upon any cause. In the event of termination due to the fault of other(s) than the CONSULTANT, the CONSULTANT shall be paid by the CSTY for services performed to tYie date of te�mination. ------••----•---•------------------ �greexnt for Professional Serviees . . Vape 7 of 76 MS 700 Mey 8, 7995� . . Upon receipt of a termination notice under the above paraqraph, the CONSULTANT shall (1) promptly discontinue all services affected (unless the notice directs otherwise) , and (2) deliver to the CITY all data, drawings, specifications, reports, estimates;, summaries, and such other. information and materials as the CONSULTANT may have accumulated, prepared or obtained in performing this Aqreement, whether completed or in process. 11. GENERAL PROVISIONS il.i. This Agreement shall be governed by the laws, � requlations and ordinances of the City of Auburn, the State of Washinqton, Kinq County, and where applicable, Federal laws. 11.2. All claims, disputes and other matters in question arising out of, or relatinq to, this Agreement or the breach hereof, except with respect to claims which have been waived, will be decided by a court of competent jurisdiction in King County, washinqton. Pending final decision of a dispute hereunder, the CONSULTANT and the CITY shall proceed diligently with the performance of the services and obligations herein. 11. 3. The CITY and the CONSULTANT respectively bind themselves, their partners, successors, assiqns, and leqal representatives to the other party to this Agreement with respect to all covenants to this Agreement. 11.4. This Aqreement represents the entire and integrated Agreement between the CITY and the CONSULTANT and supersedes all prior neqotiations, representations or agreements either oral or � Agreenent for�Professional Serviees � Page 8 Of ib MS 700 ' Mey 8, 1995 written. This Agieement may be amended only by written instrument siqned by both the CITY and the CONSULTANT. 11.5. Should it become necessary to enforce any term or obYigation of this Aqreement, then all costs of enforcement including reasonable attorneys fees and expenses and court costs shall be paid to the substantially preva_iling party. 11.6. The CONSULTANT aqrees to comply with all local, state and fe3eral laws applicable to its performance under this Agreeraent. ------------------------•----•----- Agreanent for Vrofessional Services Vage 9 of 16� �M5 700 , � Nay e, tqvs CITY OF AIISIIRN ��. �.J3a� CHARLES A. BOOTH MAYOR ATTEST: _,� //►t .�,c�����/ / .( , Rob1n ohlhueter, CYt�1r� ROVED AS' TO FORM: � -_ .: Michael J. Reynolds, Citp .Attorney Pacific Groundwater Group $�'� /-''� TITLE: VIC - ���l4e�l 1lgreeneet.for irefessionel Serviees - . Vage 10 of 76 NS 700 � � May 8, 1995� - _ . . STATE OF WASHINGTON ) )ss. COUNTY. OF KING ) On this ��� day of�� , 19R S, before me, the undersi�gned, a Notary Publi in and for the State of Washinqton, per"sonally appeared �yytu,y� _ .U_ ' , to me known to be the � � `� p,�eg -- - - , of Pacific Groundwater Group, the corporation who executed the within arid foreqoing instrument, and ackaowledged said instrument to be the free and voluntary act and deed of said corporation for the uses and purposes therein mentioned, and on oath stated that he/she is authorized to execute said instrument on behalf of said corporation. IN WITNESS WHEREOF, I have hereunto set my hand and affixed � my official seal the date herei bove set forth. ,����,���u.,,��� � � .�,•. �:F; aE9 •,., v l Y-� - � , , ,.. ...... ;; .��,'��oN�p,yQ�' �''. NOTARY PUBLIC in. and i the State of �� �'f'_F' Fa�. : Washington, residing at lu.��1�- = U �° No*g� �'�� MY COl�lISSION expires: �' y � : s••y � e•'�v' : .� �;.,ov�a�,:�,. �. �i R �.....r.. 5 �� ������.�'F'W P���� --°---------------------------•--- A9reeinenf for P�ofessional Services � . Vaee 11 of ib MS 700 May 8, 1995 STATE OF WASHINGTON) ) ss. COUNTY OF KING ) On this �tO�day of , 19�, before me undersigned, a Notary Pdblic in a d for the state of Washinqton, duly commissioned and sworn, per onally appeared Charles A. Booth and Robin Wohlhueter, to me known to be the Mayor and City Clerk, zespectively, of the City of Auburn, a municipal corporation, and the corporation that; executed the foreqoinq instrument, and acknowledqed the said instrumant to be the .free and voluntary act and deed oP said corporation, for the uses and purposes therein mentioned, and on oath stated that they are authorized to execute the said instrument and that tlie seal affixed is the corporate seal of said corporation. WITNESS my hand and offici seal hereto affixed the day and year first above written. ` Y �J��p�.INEF����ii� �a�� ri-� _ �.•'�PQ, �as�oN�eF,9'•.� NOTARY PUBLIC IN AND F THE ST TE OF � .od`� Fke��py WASHINGTON, RESIDING AT � ,r'o niorqq�. �,;�: = tAi '�'� `D: = MY COMMISSION EXPIRES ( �L 7 ' a.=�pUBL1� ? . !9�F ER g��•��2��• •�''•�;�WASN��;.�•'�,, --------------------------------•-- Ayreement for Frofessional Services _ Vage 12 of 16 MS �700 . . � NaY 8. 7995 . . EXHIHIT "A" SCOPE OF WORR WATER RESOURCES The Scope. of Work covered by the Agreement is qenerally described. as hydrogeological services relating to municipal water supply. Potential tasks in tYiis Agreement may include but are not limited to the following: 1. Hydro.geoloqic Characterization 2. Wellhead Protection Delineation 3. Wellfiead `Protection Contaminant Source Identification and Rankinq 4. Water Source Level Monitorinq 5. Well and Aquifer Yield Analysis 6. Water Resource Coordination 7. Coal Creek Sprinqs Evaluation Agreemmt.for irofessional Seryiees - . � 'Paoe 13�of 16 .MS 700 May 8. 7995 � EXHIBIT •'g'• TASR AOTHORIZATION SAMPLE , 1995 Mp�RK UTTING PACIFIC GROUNDWATER. GROUP 2377 :EASTI;AKE AVENUE EAST SEATTLE, WA 98102 RE: Service Authorization Dear Mr. Uttinq: Pursuant to our Aqreement dated , 1995, this letter is your . authorization to perform work tasks as follows: Task i. Water Resource Coordination a) Attend Meetings with City and 'SKCRWA b) Interface witH outside agencies such as Ecoloqy & Muckleshoots c) Supplemental Well 6 and 7 Planning/Acquisition � d) Reporting Task 2. Hydroqeoloqic Characteriaation a) Scopin,q, Development and Modification b) Database Development c) Data Input d) Existing Data Analysis Task 3. Aater Level Honitorinq a) Assess City Needs b) Select Preferred System c) Install Monitoring System d) Teach System Operation Schedule of completion, is hereby set as: Task 1_ Ongoing through December 31, 1995 Task 2. Ongoing through December 31, 1995 Task 3 . September 30, 1995 . Agreement �for Professionet Services � - , Page 14 of 16 MS 700 May 8: 1995 . . Summa.ry of aut�orizationa this letter: Task� Descrintion Scheduled Comoletion Budaet 1 Water Rights December 31, 1995 5 27,400 Coordination 2. Hydrogeologic December 31, 1995 S 40, 100 Characterization 3. Monitoring September 30, 1995 5 9,300 Total This Letter- S 76.800 Bummasy of authorizations to date: L� DescriDtion Scheduled Comnletion Budaet 1 Water Rights December :31, 1995 $ 27,400 Coordination 2. Sydro:geologic December 31y 1995 S 40,:100 Characterization ' 3.. Monitorinq September 30, 1995 S 9, 300 Total Authorized To Date S 76.800 We believe you will find this authorization satisfactory, and we are prepared to assist in any manner you may suggest, as your work progresses. Sincerely, Dwight L. Holobaugh, .P.E. Utilities Engineer Department of Public Works CJT/bd cc: Public Works Committee Members Dennis R. Dowdy, P.E. , City Enqineer -----•----•--------------------°-- Apreement-for Professional Services 7ape.15 of 16 MS 700 May B, 1995 � EXHIBIT "C" HODRLY HILLING RATE �mpiovee Classification Hourlv Billina Rate Principal $85.00 Technical 565.00 Field 555.00 Support S40.00 REF. H: \MS\MS700-8\E95-440 --------°------------------------- .Ilgreement�for Vrofessional Secvices � � � � Page 16�of.16-� MS�700 � � . May B, 1995 - . ./ A314_ 9 t aA/ //. / CITY OF AUBURN KING COUNTY, WASHINGTON AMENDMENT NO I TO AGREEMENT FOR PROFESSIONAL SERVICES Between the CITY OF AUBURN and Pacific Groundwater Group, Inc PROJECT NO MS 700 AMENDMENT NO 1 TO AGREEMENT FOR PROFESSIONAL SERVICES This amendment is for the purpose of adjusting the schedule of billing rates to be used dunng 1996 for consultant and sub-consultant costs associated with this project The adjusted rates are attached to this amendment as Exhibit"A" There is no change to the scope of work to be performed under the existing agreement PROJECT NO MS 700 AGREEMENT FOR PROFESSIONAL SERVICES AMENDMENT NO 1 MARCH 12, 1996 PAGE 2 OF 2 CITY OF AUBURN Charles A. Booth, MAYOR ATTEST e6t0/44)d—Olejieej Robin Wohlhueter, City Clerk APPROVED AS TO FORM Michael J R olds, City Attorney STATE OF WASHINGTON) )ss. COUNTY OF KING ) On this dm; day of , 19,4 before me, the undersigned, a Notary Public m and for the State t f Washington, duly commissioned and sworn, personally appeared CHARLES A BOOTH and ROBIN WOHLHUETER, to me known to be the person who signed as MAYOR and CITY CLERK of the CITY OF AUBURN the municipal corporation that executed the within and foregoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said corporation for the uses and purposes therein mentioned, and on oath stated that he was duly elected, qualified and acting as said officer of the corporation, that he was authorized to execute said instrument and that the seal affixed, if any, is the corporate seal of said corporation WITNESS my hand and official seal hereto affixed the day and year in this certificate above written. tossilmes, E % L . C/ �4 9N. NOTARY -yt- • 0)i : 05, ••0BER2y.•'�C9 . Gtvtrc//e- UQS q A✓\ •` NOTARY PUBLIC IN AND FOR STATE OF ,��'•.���WAS�. WASHINGTON RESIDING AT Gu� MY APPOINTMENT EXPIRES /d-2 AGREEMENT FOR PROFESSIONAL SERVICES AMENDMENT NO. 1 MARCH 12, 1996 PAGE 3 OF 3 Pacific Groundwater Group, Inc 2377 Eastlake Avenue East Seattle, Washington 98102 PHONE# 329-0141 FAX# 329-6968 BY TITLE c fr<s STATE OF WASHINGTON) )ss COUNTY OF Kit& ) On this a a day of lea , 19Sc before me, the undersigned, a Notary Public in and for the State of Washington, duly commissioned and sworn, personally appeared G- U+-{ , to me known to be the ems, , of Pacific Groundwater Group, Inc., the corporation that executed the within and foregoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said corporation for the uses and purposes therein mentioned, and on oath stated that he/she is authorized to execute said instrument on behalf of said corporation Witness my hand and official seal hereto affixed the day and year first above written PUT • : AOTAR is(C.1S s��;i1131'iA d :'+ �I4OTARY PUBLIC IN AND FOR THE STATE OF #e (5,11,, 9UBL\G O WASHINGTON, RESIDING AT C < - ' cJ `It OA- WptSHWI�— MY COMMISSION EXPIRES CJT/bd REF H•1MS\MS700-25\E96-222 AGREEMENT FOR PROFESSIONAL SERVICES AMENDMENT NO 1 MARCH 12 1996 PAGE 4 OF 4 Pacific Groundwater Group Port Townsend Office. 511 Root Street,Suite 200 111 Port Townsend, WA 98368 ••••••• 360.385.6959 FAX 385.6952 JU9506 01 Exhibit "A" �� March 6, 1996 City of Auburn Public Works Department 25 West Main Street Auburn, WA 98001 Attn Dwight Hollobaugh Chris Thorn Re Revised Rates 1996 Contract Water Resource Protection Dear Dwight and Chris, This letter presents a summary of the vanous billing rates to be applied to our work for 1996 This summary includes all subcontractors currently working on the project and those anticipated to be included later in the year These rates were included in the cost estimate spreadsheets included with our scope of work/cost estimate authonzed by your letter of January 16 1996 We also include the subcontractor mark up rates discussed and agreed upon for last year's work These markup rates will be applied to our work for 1996 The following rates will be applied Pacific Groundwater Group Principal Hydrogeologist $90/hr Technical (Hydrogeologist, Geologist or Chemist) $70/hr Field (Hydrogeologist Geologist) $60 to $70/hr GIS/CAD $60/hr Support $40/hr Mileage $0 40/mi Technical Subcontractor/Direct Cost Mark-up 6% Well Drilling Subcontractor Mark-up 10% Non Technical Subcontractor Mark-up 15% Main Office.2377 Eastlake Ave.E. Seattle, Washington 98102 206.329.0141 FAX 329.6968 Auburn JU9506.02 March 6 1996 Parametrix Senior Engineer/Hydrogeologist $95/hr Project Engineer/Hydrogeologist $90/hr Engineer/Hydrogeologist $75/hr Technician $60/hr Editor $60/hr Graphics/CAD Staff $50/hr Clerical I Word Processing $45/hr CAD Computer $15/hr Graphics Computer $10/hr Mileage $0 /mi Technical Subcontractor/Direct Cost Mark-up a-31 6% /614'1 Non Technical Subcontractor Mark-up 15% Stenstrom Associates Technical Staff $85/hr Plots $25/ea Mileage $0. mi Technical Subcontractor/Direct Cost Mark-up c 3f 6% Montgomery Water Group Principal $90/hr Sr Staff $75/hr Staff $66/hr CAD Technician $50/hr Word Processing/ Clerical $35/hr Mileage $0.32/mi AUTOCAD/ GIS Computer $10/hr Computer $5/hr Technical Subcontractor/ Direct Cost Mark-up 6% Carolyn Browne Associates (possible future subcontract for this project) Professional Staff $75/hr Technical Subcontractor/Direct Cost Mark up 6% s Groundwater Page 2 Group • Auburn JU9506.02 March 6 1996 We trust this summary provides you with the information you need We would appreciate the incorporation of these rates into a contract amendment Please call us for any additional information you may require Thank you Sincerely, Pacific Groundwater Group Mark Utting Principal Hydrogeologist cc Mike Warfel (PMX) Mark Stenstrom (Stenstrom Associates) Bob Montgomery (MWG) Carolyn Browne (CBA) c Groundwater Page 3 �� Group till ft3 /6- 9 CITY OF AUBURN DEC 24law KING COUNTY WASHINGTON CI�YOFAUgU CITY CLERKS OFFCE AMENDMENT NO 2 TO AGREEMENT AG-C 15 FOR PROFESSIONAL SERVICES Between CITY OF AUBURN and Pacific Groundwater Group, Inc. PROJECT NO PR 630 AMENDMENT NO 2 TO AGREEMENT FOR PROFESSIONAL SERVICES AG-C 15 1 CONTRACT TERM. The term of the Agreement for Professional Services is extended to April 30, 1998. 2. SCOPE OF WORK. This amendment is for the purpose of adding the installation of a groundwater monitoring well and the monitoring of that well in order to establish the ground water elevation in the vicinity of`M' Street SE and the Rail crossing/SR 18 crossing. The well will be placed within an existing City of Auburn Public Utilities easement. 3 COMPENSATION The rates shall be those established in Amendment No 1 Executed on "- e�e , tSSs (date). CITY OF AUBURN &ties&lac c Charles A. Booth, Mayor ATTEST D 2 elle E. Daskam, City Clerk APPROVED AS TO FORM Michael J Reynolds, City Attorney Amendment No. 4 for Professional Engineering Services CCA inc Page 2 of 4 Pacific Groundwater Group, Inc. Authorized signature Mark G. Utting Please print or type name TITLE. Vice President STATE OF WASHINGTON) )ss. County of , JEFFESoJ ) I certify that I know or have satisfactory evidence that Mark G. Utting is the person who appeared before me, and said person acknowledged that he/she signed this instrument, on oath stated that he/she was authorized to execute the instrument and acknowledged it as the Vice President of Pacific Groundwater Group , a corporation, to be the free and voluntary act of such party for the uses and purposes mentioned in this instrument. Dated /2//D/g7 N St 4. GJ'fi';ssion •t•,. , cc� JA641 STY4N�K a Notary Public in and for the State of Washington *, °Nom yelp * ; residing at ('H MA,4 M S app ,,PUBUC My appointment expires Kin iq 9 itaCt Amendment No. 4 for Professional Engineering Services CCA Inc Page 3 of 4 3 STATE OF WASHINGTON) )ss. County of King ) I certify that I know or have satisfactory evidence that Charles A. Booth and Danielle E. Daskam were the persons who appeared before me, and said persons acknowledged that they signed this instrument, on oath stated that they were authorized to execute the instrument and acknowledged it as the MAYOR and CITY CLERK of the CITY OF AUBURN to be the free and voluntary act of such,,,,pparties for the uses and purposes mentioned in this instrument. Dated //2 72-9-7 /aan ra. A ,fhe// ;.• s 1„ Notary Public in and for the State of Washington :o vy My appointment expires /4 - 1- 9 7 ■ i 3 0 Pu:.J" n C . OVER p. ,'•` ,FWAr `f` REF H:\FORMS\FE054A(R 11/97) Amendment No. 4 for Professional Engineering Services CCA inc Page 4 of 4 ,t 111 - , .r.__ f\i‘-c A- 3 4, 9 CITY OF AUBURN KING COUNTY, WASHINGTON ,1AN C� J 1998 C17) OF ERkS OFF/CE AMENDMENT NO 3 TO AGREEMENT AG C 15 FOR PROFESSIONAL SERVICES Between CITY OF AUBURN and PACIFIC GROUNDWATER GROUP PROJECT NO MS 700 IXti `• .t. AMENDMENT NO 3 TO AGREEMENT FOR PROFESSIONAL SERVICES This Amendment No. 3 to the existing Agreement for Professional Services for the City of Auburn Water Resources Program (MS 700), entered into the 8th day of May 1995 by the City of Auburn, King County, Washington, hereinafter called the CITY and Pacific Groundwater Group, Seattle, Washington, hereinafter called the CONSULTANT WHEREAS, the CITY and the CONSULTANT signed an Agreement for Professional Services related to hydrogeological services and consulting related to municipal water supply and water rights, WHEREAS, the initial scope of work required each task to be authorized by letter from the CITY and each authorization letter included schedule and budget for the authorized tasks, WHEREAS, several authorization letters have been issued by the CITY as shown in Exhibit 'D WHEREAS, the CITY has requested a change in the format for additional task authorizations in order to use periodical amendments rather than authorization letters, and the CONSULTANT has accepted, WHEREAS, a new Amendment is required to authorize work for the second half on 1997 as presented in the CONSULTANT letter dated December 11, 1997 re: Scope of Work and Estimated Costs, Second Half of 1997 (with follow through into the First Part of 1998), Water Resources Protection Program, Auburn, Washington, (Exhibit `E"), WHEREAS, the CITY 1997 water budget includes all the tasks in the CONSULTANT scope letter NOW THEREFORE, the AGREEMENT Executed on May 8, 1995 is revised as follows: 1 SCOPE OF WORK. Delete paragraph one of Item 1 `SCOPE OF WORK' in the AGREEMENT and replace with the following: `This agreement is to provide hydrogeological services and consulting related to municipal water supply and water rights as described as shown on attached Exhibit A Scope of Work. An amendment to the AGREEMENT is expected approximately twice a year, revising the scope of work, and authorizing new task and compensation. All additional task authorizations shall be based on amendments rather than letters of authorization, and such amendments shall occur at or about every six (6) months. 2. TERM. Delete paragraph I of Item 2 `TERM" in the Contract and replace with the following: `The term of the AGREEMENT is extended to December 31, 1999 or until terminated by both parties as described in Item 10 `TERMINATION OF AGREEMENT' in the AGREEMENT Amendment No. 3 for Professional Engineering Services Pacific Groundwater Group Inc. Page 2 of 5 `Compensation shall be based on the CONSULTANT'S hourly billing rates as shown in Exhibit `B' Hourly Billing Rates. At the end of paragraph 1 add the following: A summary of Authorizations to Date is shown in `Exhibit C' Authorization Summary This summary is to be revised with each new Amendment to the AGREEMENT The total compensation for July 1997 through April of 1998 is based on time and materials expended on the job and shall not exceed $61 1,474 in general concordance with the distribution included for the period July 1997 through April 1998 in `Exhibit C Authorization Summary 4 AMENDMENT NO I TO AGREEMENT FOR PROFESSIONAL SERVICES. AMENDMENT NO. 3 TO AGREEMENT FOR PROFESSIONAL SERVICES' updates AMENDMENT NO. 1 TO AGREEMENT FOR PROFESSIONAL SERVICES,"dated March 12, 1996, as shown in `Exhibit F 5 AMENDMENT N0. 2 TO AGREEMENT FOR PROFESSIONAL SERVICES. AMENDMENT NO. 3 TO AGREEMENT FOR PROFESSIONAL SERVICES' incorporates AMENDMENT NO. 2 TO AGREEMENT FOR PROFESSIONAL SERVICES," dated December 18, 1997 as shown in `Exhibit G." Amendment No. 3 for Professional Engineering Services Pacific Groundwater Group Inc. Page 3 of 5 r rQ f- ■ CITY OF AUBURN &titl. a LthQ Charles A. Booth, Mayor Date: /— '7" 785 ATTEST 9 {I l uc�c � 1�c -•'t_/ Danielle E. Daskam, CITY Clerk 1• • • OVEVS TQ FORM. Michael J Reynolds, CCIITY Attorney STATE OF WASHINGTON ) )ss. COUNTY OF KING ) On this 614---day of 1991, before me, the undersigned, a Notary Public in and for the State of W ington, y commissioned and sworn,personally appeared CHARLES A. BOOTH and DANIELLE E. DASKAM, to me known to be the person who signed as MAYOR and CITY CLERK of the CITY OF AUBURN, the municipal corporation that executed the within and foregoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said corporation for the uses and purposes therein mentioned, and on oath stated that he was duly elected, qualified and acting as said officer of the corporation, that he was authorized to execute said instrument and that the seal affixed, if any is the corporate seal of said corporation. WITNESS my hand and official seal hereto affixed the day and year in this certificate above written. 9)NOTARY 'N. • —t- NOTARY PUBLIC IN AND FOR THE STAT O to O PUZL10 n 2 WASHINGTON, RESIDING AT Cu7 Nv.•`� MY APPOINTMENT EXPIRES /0 '9— f Or WAS •'•I•n,,,,,,, Amendment No. 3 for Professional Engineering Services Pacific Groundwater Group Inc. Page 4 of 5 rr l• C Pacific Groundwater Group, Inc. BY Authorized signature Mark G. Utting Vice President _ STATE OF WASHINGTON) )ss. County of King ) I certify that I know or have satisfactory evidence that Mark G. Utting is the person who appeared before me, and said person acknowledged that he/she signed this Instrument, on oath stated that he/she was authorized to execute the instrument and acknowledged it as the Vice President of Pacific Groundwater Group, a corporation, to be the free and voluntary act of such party for the uses and purposes mentioned in this instrument. Dated Ia/a9�R� ,, \p1E Q, �g510N EI e99� • II c 14. S- I o NOTARY N� _ Notary Public im��and for the State of Washington -*- - residing at /'ie-rzC— (Q N� Id PUBLIC PUBLIC ryoo`.��` My appointment expires ///Q�a, 'e.OF'WAS e.•' ,,, , ,, Amendment No. 3 for Professional Engineering Services Pacific Groundwater Group Inc. Page 5 of 5 EXHIBIT "A" SCOPE OF WORK Potential tasks in this Agreement may include but are not limited to the following: Task 97-1 Water rights/Management/On-Call Work: a) Attend meetings on a scheduled and as-needed basis. b) Plan, execute, and track project budgets and expenditures; and prepare required accounting documents and other management products as required by the CITY including monthly progress reports. c) Address water rights issues as needed. d) Additional work not included in the other tasks listed below as directed by the CITY Task 97-2 Hydrogeologic Characterization: a) Continue the hydrogeologic characterization process. b) Continue development of computerized databases. c) Drill additional characterization wells. d) Collect additional chemical and isotope data. e) Conduct water level surveys. t) Conduct geophysical assessment. g) Improve the recharge analysis. h) Perform aquifer testing. i) Develop an improved computer model. j) Respond to input from the Muckleshoot Indian Tribe. k) Prepare an update memo for the 1996 Hydrogeologic Characterization Report. Task 97-3 Monitoring: a) Expand and improve the electronic water level monitoring system. b) Install four river flow monitoring stations on the Green and White rivers. c) Install shallow-aquifer wells at each stream gauge site. d) Download and analyze stream flow and water level data. e) Prepare water level reports on an annual and as-needed basis. Task 97-4 Lake Tapps Upland Study a) Develop a more detailed understanding of the Lake Tapps Upland. b) Prepare additional hydrogeologic cross sections. c) Produce new water-table contour maps. d) Conduct additional flow analyses. e) Reassess recharge from Lake Tapps. f) Collect,analyze,and interpret water samples for stable and non-stable isotopes. Task 97-5 Resource Protection: a) Complete contaminant inventory b) Develop contaminant database module. c) Prepare a contingency/spill prevention plan. d) Prepare Department of Health deliverables. Amendment No. 3 for Professional Engineering Services Pacific Groundwater Group Inc. Exhibit A Page 1 of 3 Task 97-6 Supply Test Wells: a) Drill up to three supply test wells. b) Drill one deep mud-rotary boring to bedrock. c) Conduct pumping tests as needed. d) Complete test borings as monitoring wells as needed. e) Drill shallow monitoring wells near deep supply well borings,as needed. Task 97-7 Coal Creek Springs Improvement: a) Drill up to eight shallow test wells in the lowland plain containing the collector system. b) Drill up to three deeper wells in the upslope region of the collector systems. c) Dig backhoe test pits as needed to obtain more representative samples. d) Conduct infiltration and other hydrologic testing as needed. e) Develop a simplified MODFLOW model of the area to assess four possible third collector configurations. f) Prepare reports as needed on improved concepts and source reliability g) Develop design plans for a third collector and a revised overflow manhole structure. h) Repair the plugged portion of the upper collector system. Task 97-8 Production Wells 7 and 6: a) Complete Production Well 7 b) Conduct pumping tests on Well 7 c) Work with the CITY(as needed) in the installation of the well pump and pump house for Well 7 d) Assist with site selection for Well 6. e) Develop drilling specifications for Well 6. f) Assist with selection of a drilling contractor. g) Log Well 6 during chilling. h) Recommend well screen design. i) Conduct pumping tests on Well 6. j) Work with the CITY(as needed)in the installation of the well pump and pump house for Well 6. Task 97-9 Public Participation: a) Assist the CITY in development of a public newsletter and other informational tools,as needed. b) Develop and conduct children s educational programs. c) Conduct other public participation work as directed by the CITY Task 97-10 Testing and Evaluation of Wells 5B and 5C. a) Coordinate pumping tests for new CITY Wells 5B and 5C. b) Develop pumping test programs as appropriate. c) Analyze and recommend operation of the four CITY upland wells(5, 5A, 5B,and 5C). d) Prepare pumping test report(s)as needed. Amendment No. 3 for Professional Engineering Services Pacific Groundwater Group Inc. Exhibit A Page 2 of 3 Yi 4 Task 97-11 West Hills Springs Improvement: - a) Plan work for facility improvements. b) •Conduct test drilling and hydrological analysis of the facility c) Develop preliminary design improvements. d) Conduct additional work as requested by the CITY Task 97-12 PR630 Monitoring Well("NI"St SE and RR crossing/SR18): a) Install a groundwater monitoryin well to establish ground water elevation. Amendment No. 3 for Professional Engineering Services Pacific Groundwater Group Inc. Exhibit A Page 3 of 3 r) EXHIBIT"B" BILLING RATES The following rates will be applied: Pacific Groundwater Group Principal Hydrogeologist $90/hr Technical(Hydrogeologist, Geologist,or Chemist) $70 to$80/hr Field(Hydrogeologist, Geologist) $60 to$70/hr GIS/CAD $60/hr Support $40/hr Mileage $0.40/mi Technical Subcontractor/Direct Cost Mark-up 6% Well Drilling Subcontractor Mark-up 10% Non-Technical Subcontractor Mark-up 15% Parametric Senior Engineer/Hydrogeologist $95/hr Project Engineer/Hydrogeologist $90/hr Engineer/Hydrogeologist $75/hr Technician $60/hr Editor $60/hr Graphics/CAD Staff $50/hr Clerical/Word Processing $45/hr CAD Computer $15/hr Graphics Computer Sl0/hr Mileage $0.32/mi Technical Subcontractor/Direct Cost Mark-up 6% Non-Technical Subcontractor Mark-up 15% Montgomery Water Group Principal $90/hr Sr. Staff $75/hr Staff $66/hr CAD Technician $50/hr Word Processing/Clerical $35/hr Mileage $032/mi AUTOCAD/GIS Computer $10/hr Computer $5/hr Technical Subcontractor/Direct Cost Mark-up 6% Amendment No. 3 for Professional Engineering Services Pacific Groundwater Group Inc. Exhibit B Page 1 of 2 .) Carolyn Browne Associates Professional Staff $75/hr Technical Subcontractor/Direct Cost Mark-up 6% Amendment No. 3 for Professional Engineering Services Pacific Groundwater Group Inc. Exhibit B Page 2 of 2 it PR 603A Scenic Drive Phase 2 Events needing completion before 4/17/98: SEPA issued. Easement for Outfall secured. Council permission to advertise granted. 4/17/98 Friday Plans& Specs completed. 4/20-22/98 Mon-Wed Sign Plans& Specs Plans& Specs to Printing 4/29/98 Wednesday Invitation to Bid to Caroline by 1pm. 5/1/98 Friday Advertising 5/5/98 Tuesday Plans & Specs available to Bidders 5/20/98 Wednesday Bid Opening 10:00 am 5/25/98 Monday DPW Committee approve Award 6/1/98 Monday Council Award of Contract 6/9/98 Monday Notice to Proceed 6/15-19/98 Week Preconstruction Conference 6/22-26/98 Week Contractor Mobilization 6/29/98 Monday Contractor First Day of Work EB 120997 ?i EXHIBIT `C" AUTHORIZATION SUMMARY AUTHORIZED BY PREVIOUS AGRTEEMENTS AND LETTERS: AUTHORIZATIONS FOR 1995 Authorization of May 8, 1995 Task 1 Water Rights Coordination $ 27 400 Task 2 Hydrogeologic Characterization $ 40,100 Task 3 Monitoring $ 9,300 Sub-Total $ 76,800 Total Authorized to Date $ 76,800 Authorization of July 6, 1995 Task 4 Coal Creek Springs Monitoring $ 35,500 Sub-Total $ 35,500 Total Authorized to Date $ 112,300 TOTAL AUTHORIZED THROUGH 1995 $ 112,300 Amendment No. 3 for Professional Engineering Services Pacific Groundwater Group Inc. Exhibit C Page 1 of 4 EXHIBIT C (CONTINUED) AUTHORIZATIONS FOR 1996 Authorization of January 16, 1996 Task 96-1 Water Rights/Management On-Call Work $ 44 490 Task 96-2 Hydrogeologic Characterization $141,375 Task 96-3 Water Level Monitoring $ 92,850 Task 96-4 Tacoma Point Interference $ 52,940 Task 96-5 Resource Protection $ 25 035 Task 96-6 Well 6 $ 62,385 Sub-Total $ 419,075 Total Authorized to Date $ 531,375 Authorization of March 20, 1996 Task 96-7 Coal Creek Springs Improvements $ 7,500 Sub-Total $ 7,500 Total Authorized to Date $ 538,875 Authorization of July 23, 1996 Task 96-1 Water Rights/Management On-Call Work $ 35 178 Task 96-2 Hydrogeologic Characterization $228,478 Task 96-3 Water Level Monitoring $ 83,905 Task 96-4 Tacoma Point Interference ($ 21,421) Task 96-5 Resource Protection $ 79 878 Task 96-6 Test Wells (Well 6A) $ 45,498 Task 96-7 Coal Creek Springs Improvements $ 50,365 Task 96-8 Production Well 7 $ 48,420 Task 96-9 Public Participation $ 21,514 Task 96-10 Well 5B and 5C (Lakeland) Evaluation $ 42,050 Sub-Total $ 613,865 Total Authorized Through 1996 $1,152,740 Amendment No. 3 for Professional Engineering Services Pacific Groundwater Group Inc. Exhibit C Page 2 of 4 EXHIBIT C (CONTINUED) AUTHORIZATIONS FOR 1997 Authorized By Letter of May 12, 1997 (Corrected by letter of June 12, 1997) Task 97 1 Water Rights/Management On-Call Work $ 41,080 Task 97 2 Hydrogeologic Characterization $169,958 Task 97 3 Water Level Monitoring $105,293 Task 97-4 Lake Tapps Upland Analysis $ 23,900 Task 97 5 Resource Protection $ 68,095 Task 97-6 Test Wells $257,828 Task 97 7 Coal Creek Springs Improvements $135,915 Task 97-8 Production Wells $ 31,365 Task 97-9 Public Participation $ 8,219 Task 97-10 Well 5B and 5C (Lakeland)Evaluation $ 44,290 Task 97-11 West Hills Springs Improvements $ 4,039 Sub-Total $ 889,982 Total Authorized to Date $2,042,722 Meeting of July 17, 1997, between C. Bendt, C. Every, and M. lilting (verbal agreement on budget reduction because of City's double authorization of$7,500 within Task 96-7 in letters of March 20, 1996, and July 23, 1996) Task 97 7 Coal Creek Springs Improvements ($ 7,500) Sub-Total ($ 7,500) Total Authorized to Date $2,035,222 Amendment No. 3 for Professional Engineering Services Pacific Groundwater Group Inc. Exhibit C Page 3 of 4 I EXHIBIT C (CONTINUED) AUTHORIZATIONS FOR 1997 (Continued) Authorized by Amendment No. 3 for the Period July 1997 through April 1998 Task 97 1 Water Rights/Management On-Call Work $ 70,520 Task 97 2 Hydrogeologic Characterization $123,397 Task 97 3 Water Level Monitoring $ 91,072 Task 97-4 Lake Tapps Upland Analysis $ 27,080 Task 97 5 Resource Protection $ 1,325 Task 97-6 Test Wells $ 83,582 Task 97 7 Coal Creek Springs Improvements $ 48,280 Task 97-8 Production Wells $103,725 Task 97-9 Public Participation $ 8,102 Task 97 10 Well 5B and 5C (Lakeland) Evaluation $ 48,620 Task 97 11 West Hills Springs Improvements ($4,039) Task 97 12 PR 630 Monitoring $ 9,810 Sub-Total $611,474 Total Authorized Through April of 1998 $2,646,696 Amendment No. 3 for Professional Engineering Services Pacific Groundwater Group Inc. Exhibit C Page 4 of 4 i 1 EXHIBIT "D" PRIOR AUTHORIZATION LETTERS t a cItYOp -HXRLES A. BOOTH, MAYOR 411:71b: ENGINEERING DIVISION rank A. Currie, Director of Public Works Auburn 25 West Main, Auburn WA 98001-49c lis R. Dowdy City Engineer (206) 931 3010 47n7 1 unhinge June 12, 1997 MARK TEEING PACIFIC GROUNDWATER GROUP 511 ROOT STREET SUITE 200 PORT TOWNSEND WA 98368 RE. Service Authorization Letter Dated May 12, 1997 - MS 700 Dear Mark: In the City's service authorization letter dated May 12, 1997 the total authorized through June 30 1997 was $1 ,999 722. Please note that this amount should be $2,042,722. We were not including the money being used for Coal Creek Springs when we initially calculated the total. I hope this hasn't caused any confusion with your accounting. Sincerely r/ Chris Thorn Water Quality Programs Coordinator Department of Public Works C T/bd REF H:\MS\MS700-58\E97 556 CHARLES.A. BOOTH MAYOR ��� ENGINEERING DIVISION Frank A. Currie, Director of Public Works 25 West Main, Auburn WA 98001-4995 nnis R. Dowdy City Engineer (206) 931 3010 Shinst May 12, 1997 MARK UTTING PACIFIC GROUNDWATER GROUP 511 ROOT STREET SUITE 200 PORT TOWNSEND WA 98368 RE. Service Authorization for the Water Resources Protection Project MS 700 First and Second Quarter 1997 Dear Mark: Per our Agreement for Professional Services, and pursuant to your letter dated January 9 1997 in which you outline and explain the proposed elements of the scope of work for the Water Resource Protection Program for 1997 the City is authorizing Pacific Groundwater Group to perform the following tasks anticipated within the period January 1 1997 to June 30 1997 Task # Description Fees 97 1 Water Rights/Management/On-Call $ 41 080 97 2 Hydrogeologic Characterization $169 958 97 3 Water Level Monitoring $105,293 97-4 Lake Tapps Upland Analysis $ 23,900 97 5 Resource Protection $ 68 095 97-6 Test Wells $257 828 97 7 Coal Creek Springs Improvements $135,915 97-8 Production Wells $ 31 365 97-9 Public Participation $ 8,219 97 10 Well 58 and 5C (Lakeland) Evaluation $ 44,290 97 11 West Hills Springs Improvements $ 4.039 Total for Current Period: $889 982 Total Authorized through December 1996. $1 109 740 Total Authorized through June 30, 1997 $1 999 722 Mark Utting 'May 14 1997 Page 2 of 2 Expected deliverables include the following: Task 97 1 Attendance at meetings and timely responses to inquiries. Task 97 2 Characterization update including new database, new wells isotope report, geophysics, and improved recharge analysis Task 97 3 Monitoring Report. Staff Training. New data loggers, equipment of new aquifer monitoring sites, and river gauging equipment installed. Task 97-4 Interim report. Task 97 5 Report on inventory of contaminant sources. Task 97-6 Test Well Report. Task 97 7 Improvement analysis and facility design. Task 97-8 Final report on Production Well #7 Task 97-9 Spring newsletter production and distribution. Task 97 10 Well 5B and 5C testing report. Task 97,11 Preliminary evaluation memo. Summary of authorization: The total amount authorized for the first half of 1997 is hereby set as $889 982. Schedule of completion is hereby set as: All task authorized for the duration of January 1 1997 to June 30 1997 Additional authorization is required for the second half of 1997 We believe you will find this authorization satisfactory and we are prepared to assist in any manner you may suggest, as your work progresses. If you have any questions, please call me at (253) 804-5061 Sincerely Dwight L. Holobaugh, P E. Utilities Engineer Department of Public Works DLH/CTE/bd REF H:\MS\MS700-49\E97-440 • I{ tRL ES A BOOTH hi AYQR {� �� ENGINEERING Dlt No- r-tni+ Curni. D+re‘tor of PubICL Works I 25 West Main Auburn \ \ 98001 4995 ^ris R Do«i1ti Cw, Engineer (-06) 931 3010 .444[5:404,.. July 23 1996 MARK UTTING PACIFIC GOUNDWATER GROUP 511 ROOT STREET SUITE 200 PORT TOWNSEND WA 98368 RE Service Authorization for the Water Resources Protection Project MS 700 Dear Mark Per our Agreement for Professional Services, and pursuant to your letter dated July 17 1.996 in which you outline and explain the proposed elements of the scope of work for the Water Resource Protection Program in 1996 the City is authorizing Pacific Groundwater'.Group to perform the following tasks anticipated within the second half of 1996 Task # Description Fees 96 1 Water rights/Management/On Call Work S 35 178 96 2 Hydrogeologic Characterization $228 478 96 3 Water Level Monitoring S 83 905 96-4 Tacoma Point Well Interference (S 21 421 ) 96 5 Resource Protection S 79 878 96 6 Test Wells (Well 6A) S 45 498 96 7 GCS Improvements S 50 365 96 8 Production Well 7 S 48 420 96 9 Public Participation S 21 514 96 10 Well 58 and 5C (Lakeland) evaluation S 42 050 Total Fees $613,865 Schedule of completion is hereby set as Tasks 96 1 through 96 6 (Ongoing) December 1996 Expected Deliverables include the following Task 96 2 Characterization Report / Database December 1996 Task 96 3 Monitoring Report Staff training October 1996 Mark Utting July 23 1996 Page 2 of 2 Task 96-4 Interim Report October 1996 Task 96-4 Final Report/Recommendations December 1996 Task 96-6 Test Well 617 Report October 1996 Task 96 7 Preliminary Report November 1996 Task 96 10 Final Report November 1996 Summary of authorization. The total amount authorized for second half of 1996 is hereby set at $613,865 Please note that we have reduced the amount requested for Task 96 3 by $93 615 corresponding to the construction of additional GW/SW monitoring stations We believe these can be designed in 1996 and constructed in 1997 We believe you will find this authorization satisfactory and we are prepared to assist in any manner you may suggest as your work progresses If you have any questions please call me at 804 5062 or Nass Diallo at 804 5061 Sincerely Dwight L Holobaugh, P E Utilities Engineer Department of Public Works DLHIND/bd cc Caroline Bergt Contract Administrator Nass Diallo utilities Planning Engineer REF H IMSIMS700 29\E96 703 , K F <<; >` t f.5, \ BOOTH MAYOR } • , ENGINEERING DI\ ISIOn n), \ Currie Director of Public Works . r; 0,pi• 25 West Main Auburn WA 98001 49L nos R Dowdy City Engineer (206) 911 1010 March 20 1996 \"Aillept MARK UTTING PRINCIPAL HYDROGEOLOGIST PACIFIC GROUNDWATER GROUP 511 ROOT STREET SUITE 200 PORT TOWNSEND WA 98368 RE Coal Creek Springs (CCS) Slide/Rehabilitation Investigation Dear Mark: This correspondence is to confirm prior discussion and direction for investigative and rehab options engineering for the recent landslide at CCS. During the rain event of early February 1996, the water system source from CCS experienced high levels of turbidity Subsequent to turn ofl'of the CCS source, we determined a landslide had occurred in the•general area, as shown on the enclosed Exhibit A. On or about Feb 12, 1996, the City verbally requested that PGG investigate the slide and provide rehabilitation options for our consideration. We hereby define the scope of work, estimated fee, and schedule as follows: ITEM FEE ESTIMATE A. Investigate effect of the slide, define the event area of Impact, 312,500 setting out probable near term concerns, and prepare a written report on the source. B Develop two recommended design concepts for immediate 37 500 rehabilitation along with implementation schedules and construction cost estimates to bring CCS back to prior slide performance. C Investigate cause of the slide and develop two long-term $7,500 recommended design concepts to assure source use continuation during similar future events, along with implementation schedules and construction cost estimates. Mark Utting ;March 20, 1996 Page 2 of 2 D A milestone schedule is set as follows: A. Investigation report: May 17 1996 B. Rehab concepts: June 14, 1996 C. Source reliability concepts: July 12, 1996 NOTES 1 The City will provide survey effort as necessary 2. The PGG effort shall be by amendment to our existing contract which defines chargeable T & M rates, as well as contract conditions. 3 The work effort must recognize FEMA areas of eligibility and cause separation of costs between City and FEMA responsibilities. Coordinate through Tim Carlaw Storm Engineer City of Auburn. PGG is authorized to proceed with the work for Task A, and formal contract amendment for this and all other task is to follow within 30 days. The maximum fee pending completion of the formal contract amendment is $7,500 Per a telephone conversation between you and me, at 2 PM, this date, PGG accepts the not-to- exceed maximum fee amounts and proposed schedule. Should you have questions, please contact us at your earliest convenience. Sincerely Dwight L. Holobaugh, P.E. Utilities Engineer Department of Public Works DLH/bd Enclosure cc: FEMA Mayor Booth REF H:\ENGINEER\E96\E96-253 1 \BEES 4 'BOOTH MAYOR , - >"'`- E\GI\EERI\G DI\ ISM\ ink \ Currie Director of Public works i Nest \lain Auburn NIA nnis R City Engineer (-06) 931 3010 January 16 1996 khinteP MARK UTTING PACIFIC GOUNDWATER GROUP 511 ROOT STREET SUITE 200 PORT TOWNSEND WA 98368 RE. Service Authorization for the Water Resources Protection Project MS 700 Dear Mark: Per our Agreement for Professional Services, and pursuant to our meeting on January 4 1996 in which We discussed the scope of work for the Water Resource Protection Program in 1996 the City is authorizing Pacific Groundwater Group to perform the following tasks anticipated within the first half of 1996 Task # Description Fees 96-1 Water rights/Management/On-Call Work $ 44 490 96-2 Hydrogeologic Characterization $141 375 96-3 Water Level Monitoring $ 92,850 96-4 Tacoma Point Well Interference $ 52 940 96-5 Resource Protection $ 25 035 96-6 Well 6 $ 62,385 Total Fees $419 075 Schedule of completion is hereby set as. Tasks 96-1 through 96-7 Ongoing through July 31 1996 Expected Deliverables include the following: Task 96-2 Preliminary Characterization Report February 1996 Task 96-3 Equipment Operational February 1996 Task 96-4 Interim Report March 1996 Task 96-4 Final Report June 1996 Task 96-6 Design Complete June 1996 Mark Utting January 16, 1996 Page 2 of 2 Summary of the authorizations to date. Total Authorized through December 31 1995 $112,300 Authorization this letter $419,075 Total $531,375 The contract amendment related to the mark-up for sub-consultants will be drafted and sent to you for review and signature in the next few days. We believe you will find this authorization satisfactory and we are prepared to assist in any manner you may suggest, as your work progresses. If you have any questions, please call me at 804-5062 or Nass Diallo at 804-5061 Sincerely Dwight L. Holo&augh, P E. Utilities Engineer Department of Public Works DLH/ND/bd cc: Caroline Bergt, Contract Administrator REF H:\MS\MS700-24\E96-42 I \RIAS -\ BOOTH MAYOR \ ENGINFERING DI\ ISIO\ 7;•.i; in -\ Currie Director of Public Works ' "�' 25 best Main Auburn \V .\ 98001 4' its R Dowth City Engineer z r06) 931 3010 tante July 6 1995 MARK UTTING PACIFIC GOUNDWATER GROUP 511 ROOT STREET SUITE 200 PORT TOWNSEND WA 98368 RE. Service Authorization for the Second Phase of Work MS 700 Dear Mark: Pursuant to our Agreement dated May 16 1995 this letter is your authorization to perform work tasks as follows: Task 4. Coal Creek Springs Monitoring it a) Data Collection b) Gauge Design and Installation c) On-going Monitoring d) Assess Spring Yield e) Report Schedule of completion is hereby set as Task 4 Ongoing through December 31 1995 Summary of authorizations this letter Task# Description Scheduled Completion Budget 4 Coal Creek December 31 1995 $35 500 Springs Monitoring Total This Letter $ 35,500 Mark Utting July 6, 1995 Page 2 of 2 Summary of authorizations to date: Task# Description Scheduled Completion Budget 1 Water Rights December 31 1995 $ 27 400 Coordination 2. Hydrogeologic December 31 1995 $ 40 100 Characterization 3. Monitoring September 30 1995 $ 9 300 4 Coal Creek December 31 1995 $ 35 500 Springs Monitoring Total Authorized To Date $112,300 We believe you will find this authorization satisfactory and we are prepared to assist in any manner you may suggest, as your work progresses: /Sincerely Dwight L. Holob gh, P E. Utilities Engineer Department of Public Works DLH/CJT/bd REF H:1MS\MS700-111E95-652 :Co -�-- rd \hl f � \ f3C}Uttt \t \ I OR ' �+,• l \C l%k I •kE\c tr' \ Currie 13rr�_eor 01 f uhli� Vtcrks "•.` `; 3 14r5t \t rite Nut Lr.i K the■%tt\ ( its E nginLer May 16 1995 —� MARK UTTING PACIFIC GOUNDWATER GROUP 511 R001 STREET SUITE 200 PORT TOWNSEND WA 98368 RE Se. rice Authorization for the First Phase of Work MS 700 D=ar Nark our Agreement dated May 16 1995 this letter is your author,z_ ion. ,c dertorrr ,vork tasks as follows Task 1 Water Resource Coordination a) nt.ena Meetings with City and SKCRWA b. Interface with Outside agencies such as Ecology & Muckleshcots c) S ioplementat Well 6 and 7 Planning/Acquisition d) Reporting Task 2 Hydrogeologtc Characterization a, Scoping Development and Modification c) Database Development C1 Da.a Input c. Existing Data Analysis Task 3 Water Level Monitoring a) Assess C,ty Needs b) Select Preferred System c) Install Monitoring System c) Teach System Operation Schedule of completion is hereby set as Task 1 Ongoing through December 31 1995 Task 2 Ongoing through December 31 1995 Task 3 September 30 1995 a3=1:1& Mark Utting May 16 1995 Page 2 of 2 Summary of authorizations this letter Task# Description Scheduled Completion Budget 1 Water Rights December 31 1995 $ 27 400 Coordination 2. Hydrogeologic December 31 1995 $ 40 100 Characterization 3 Monitoring September 30 1995 $ 9 300 Total This Letter $ 76,800 Summary of authorizations to date Task# Description Scheduled Completion Budget 1 Water Rights December 31 1995 $ 27 400 Coordination 2. Hydrogeologic December 31 1995 $ 40 100 Characterization 3. Monitoring September 30 1995 $ 9 300 Total Authorized To Date $ 76,800 We believe you will find this authorization satisfactory and we are prepared to assist in any manner you may suggest, as your work progresses Sincerely Dwight L. Holobaugh, P E. Utilities Engineer Department of Public Works DLH/bd Enclosure REF H:\MS\MS700-9\E95-486 EXHIBIT"E" CONSULTANT'S LETTER OF DECEMBER 11, 1997 Pacific Groundwater Group Port Townsend Office: 511 Root Street,Suite 200 Port Townsend,WA 98368 360.385.6959 FAX 385 6952 JU9506 01 December 11 1997 City of Auburn Public Works Department 25 West Main Street Auburn, WA 98001 Attn. Dwight Holobaugh Carl Every Re: Scope of Work and Estimated Costs Second Half of 1997 (with follow through into the First Part of 1998) Water Resource Protection Program Auburn, Washington Dear Dwight and Carl, This letter describes our scope of work and requested costs for the second half of 1997 The requested costs are associated with completing the 1997 scope of work previously submitted. The City authorized the general scope of work for the entire year and the specific scope of work and associated costs for the first half of the year in a letter dated May 12, 1997 This current request presents modification to the year's scope of work based on changes in the project that have developed, along with the associated costs needed to complete this work. The revised scope and associated costs for the second half of 1997 are to be included in Amendment No. 3 to the contract between the City of Auburn and Pacific Groundwater Group. This letter serves as the basis for the City to authorize the work through Amendment No.3 The authorization period outlined in this letter begins with July 1 1997 and ends with April 30, 1998 Previous authorization requests have been based on first and second halves of calendar years. Because of confusion over whether the authorizations covered the period during which the work was conducted or the period during which the invoice for the work was received, processed and paid by the City an overlap period is included in this authorization request to cover both understandings of the authorization period. In this way all parties will be in compliance with contract authorizations. This authorization request letter also covers a period to allow for project delays which may occur into 1998 The inclusion of an overlap period and an extension of the 1997 work through April 1998 represents no additional or duplicated costs to the City All our work is invoiced on a time-and-materials basis in accordance with Pacific Groundwater Group s contract with the City The apparent differences in the City's understanding of the authorization period and Pacific Groundwater Group s understanding of the period of authorization do not Main Office.2377 Eastlake Ave.E. Seattle, Washington 98102 206.329.0141 FAX 329.6968 Auburn 1119506.01 December 1I, 1997 represent any double billing for any work. With each new authorization given by the City a new project total cost is generated. The sum of our invoices cannot exceed this amount. This total cost never' represents duplicated authorization of any task. It may on some occasions, represent a change in the period during which the City authonzes completion of the work. It is our intent to complete as much of the work outlined in this letter as possible by the end of 1997 There are many factors, however that may delay the completion of the work into the beginning of 1998. These factors include: reviews of draft reports by the City conflicts in schedules of well drillers and other subcontractors, developments and changes in approach that unfold as previously-collected data are analyzed, input from Ecology or the Muckleshoot Tribe that changes the direction or delays aspects of the project, and changes in scheduling desired by the City Thus, some `spill over" of the work into 1998 may occur For this reason we request authorization to complete the work through April of 1998. It was previously believed that the authorization request must cover the period during which the City could process, approve and pay for work, and not the period during which the work was conducted. It is now understood, based on discussions with Caroline Bergt, that the City can pay for work after the contract period has passed, as long as the work was completed during the authorization period. This understanding will be followed in this and all future authorization requests. Specifically this request letter pertains to work to be completed by April 30, 1998, but not necessarily invoiced until May or possibly June, if subcontractors delay their invoices to Pacific Groundwater Group. With this letter we request an additional budget authorization of$611,474 for work to be completed during the period July 1 1997 through April 30, 1998 Authorization of this work would bring the anticipated costs for 1997 work (which includes the spill over period through April 1998) to $1,501 456, as summarized in Table 1 These costs do not include subcontracting costs that will be made directly to the City for Production Well 6, and the third collector or other improvements at Coal Creek Springs. This authorization would bring the contract total to $2,646,696 The 1997 scope of work, broken down into tasks and subtasks, is presented in Attachment A. Details of each task are described below ' On July 17 1997 Pacific Groundwater Group attended a meeting with the City to review the City's understanding that we had been authorized for$7,500 more than indicated by our records for the sum of total authorizations. Pacific Groundwater Group requested a reduction in the City's total to reflect the City's apparent duplicated authorization within one task. This reduction will be reflected in Amendment No.2 of the Pacific Groundwater Group contract with the City All future amendments will include a contract total, thereby avoiding misunderstandings of the total amount authorized. MPacific Groundwater Page 2 Group Auburn N9506.01 December 11, 1997 1997 SCOPE OF WORK BY TASK Task 97 1 Water rights /Management/On-Call Work: Pacific Groundwater Group personnel and other team members will attend meetings on a scheduled and as-needed basis. We will also plan, execute, and track project budgets and expenditures; and prepare required accounting documents and other management products as required by the City including regular status reports. We will address water rights issues as they develop. Work associated with water rights could include, but not be limited to, analyses, meetings, and presentations pertaining to- • interference to the City s existing wells or springs, • protests to Ecology about interference to City sources caused by other water users, • assessments of impacts to other water users from City sources, • additions to the City's water supply system, and • other work as required by the City Additional work not included in the other tasks listed below would be included in this task, as directed by the City This work includes, but is not limited to, test drilling at the Auburn Cemetery and working with the City's attorney in the Bonney Lake suit. Task 97-2 -Hydrogeologic Characterization. Pacific Groundwater Group will continue the hydrogeologic characterization process during 1997 Tasks will include: • working on the computerized database, • drilling additional characterization wells, • collecting additional chemical and isotope data, • conducting water level surveys, • assessing geophysical characteristics of the area, • improving the recharge analysis, • conducting aquifer tests, • computer modeling, • responding to input from the Mucldeshoot Indian Tribe, and • preparing a memo that updates the 1996 Hydrogeologic Characterization Report. Each of these subtasks is described below Database The database developed with Microsoft® Access® will be improved, updated, and installed at the City It currently has four modules to enter and analyze: (I) City of Auburn water quality data, (2) well logs filed with the Department of Ecology (3) water level and pumping data collected over time by the City and (4) electronic data collected iffPacific Groundwater Page 3 S Group i Auburn JU9506.01 December II, 1997 from wells, springs, and eventually rivers, by the City's new data acquisition system. The database will be updated to Windows 95/NT when the City updates its computer system this summer A module specific to the City s resource protection program will be developed along with other future modules as directed by the City Characterization Wells Two test borings are planned to explore the region between the City s Production Well 1 and the White River and the northern portion of the distal delta. These borings will be placed at areas likely to yield information on the presence and properties of low-permeability aquitards lying between the White and Green rivers and the Vashon recessional deltaic aquifer tapped by the City's wells. These wells are planned to be about 500 feet in depth and will be drilled by the cable tool method. The borings will be converted to dual-completion observation wells following the design and format of test/observation wells completed in 1996 Geochemical and Isotope Data Initial water samples from several City wells have been analyzed for basic geochemical parameters along with stable and radio-isotopes. Additional samples will be collected, analyzed, and evaluated to better define groundwater flow paths. Samples will be collected from various points within the regional flow system, including valley and upland wells. Water Level Surveys A series of water levels have been collected from selected wells in the valley and the Lake Tapps Upland as part of the 1996 program. A spring survey will be completed to help indicate seasonal flow path variations. An additional set of water levels will be collected from the Enumclaw Upland. Well owners who participated in the autumn survey 1996 will be re-contacted and their wells will be measured again during April. After logs for wells in the Enumclaw Upland are reviewed and representative wells are selected for the spring survey owners will be contacted, and permission for use will be requested. The collected water levels will be entered into the database and water table contour maps generated to replace some of those presented in the 1996 Characterization Report. Geophysics Identification and characterization of aquitards in the White River area may be possible using surface geophysics. Northwest Geophysical Associates (NGA) will be contacted and a preliminary feasibility study conducted to recommend a suitable method and estimate its potential for success. Appropriate geophysical methods may include time- domain electromagnetism, seismic refraction/reflection, or other methods. Data from wells drilled in the White River area will be used to calibrate the appropriate method selected by NGA. If Pacific Groundwater Group, the City or NGA deems that a geophysical survey is unlikely to yield usable results, geophysics will not be used. Improved Recharge Analysis The 1996 Characterization Report indicated the USGS recharge analyses and its input data were not up-to-date. Recharge will be reevaluated using the most current possible data. Work anticipated for the improved recharge analysis will include: compilation and processing of land use data from aerial photographs, vacttrc Groundwater Page 4 Group Auburn JU9506.01 December 11, 1997 digitization of hard copy soil maps to the necessary scale, and analyses of direct runoff, and calculation of groundwater recharge. GIS and statistical methods will be the pnmary tools used to reassess recharge. Aquifer Testing Extensive aquifer testing is planned for 1997 A separate test will be conducted using each of the City's valley wells as the pumping center and the remaining wells as observation wells. At least four tests are planned during the spring, with possibly one or more additional tests conducted during autumn. These multi-day tests will entail pumping selected City wells at known and constant rates as water levels are measured at key wells and rivers. Analyses of the aquifer test data are expected to increase the understanding of the properties of the aquifer better define the relationship of the shallow aquifer deep aquifers, and the rivers; and to help the understanding of the roles of the Green and White rivers in groundwater recharge. Computer Modeling Development of the ongoing computer model of the regional water system will continue. As data are developed during the characterization process, the model will be improved. The current three-layer preliminary model will be modified into a more sophisticated eight- to 10-layer transient, finite-difference model developed using the USGS computer code MODFLOW Responding to Tribal Input The Muckleshoot Indian Tribe has suggested that work in addition to that outlined in the 1996 Characterization Report may be desired. We will review their requests and develop work plans as appropriate. Small additional tasks may be conducted under Task 97 1 Larger tasks will be submitted to the City for approval for additional funds. Characterization Update Memo ARer data collected during 1997 are analyzed, a memo will be produced outlining changes and modifications to our understanding of the hydrogeology of the project area. The memo may contain revised geologic cross sections, revised groundwater contour and flow maps, updated recharge values, updated hydraulic parameters, an explanation of improved understanding of river-aquifer relationships, and more. Figures for this memo will be in the format consistent with the 1996 Hydrogeologic Characterization Report. Task 97-3 - Monitoring: The monitoring program will continue. Data loggers installed during 1996 will be removed and returned to the manufacturer for updated computer chip replacement. Wells which are not being monitored at that time will be considered for inclusion in the monitoring program. Data loggers and transducers will be-ordered and installed. The report documenting the installation of monitoring equipment, including photos and other support information, will be finalized. Pacific Groundwater Page 5 Group Auburn R19506.01 December I I, 1997 Following review by the Muckleshoot Indian Tribe of the recommendation report for stream gauging sites on the White and Green rivers, four river flow monitoring stations will be installed. A total of five shallow wells will be installed: one at each of the new stream gauge sites and one at the existing USGS White River gauge site at A Street. These wells will allow comparison of water level changes in the shallow aquifer with those in the rivers. These wells are anticipated to be 30 to 50 feet deep and will be drilled by the cable-tool or air rotary method. Wells will be completed similar to those Installed during 1996 Data from all stations will initially be downloaded and analyzed on a monthly basis. `Bugs' in the system will be identified and corrected. Annual reports will be prepared after bugs are corrected and the data are deemed representative. A monitoring well to assist the City in the design of an underpass at M Street and 4th will be installed and water levels will be measured over a period of up to five months. The well will be approximately 35 feet in depth and completed in a manner similar to other shallow monitoring wells completed earlier Task 97-4 - Lake Tapps Upland Study Our understanding of the Lake Tapps Upland will be refined and developed by incorporating new information into our previous analyses. Additional hydrogeologic cross sections will be produced using wells which were not available for use in the Characterization Report. Several sections will be oriented north-south to assess the aquifers in the Coal Creek Springs area, as well as near the Tacoma Point wells. New water table contour maps will be generated using all available data and additional flow analyses, including simplified modeling, where appropriate. Potential interference to City sources (wells and springs) from other water purveyors will be quantified. Recharge from Lake Tapps will be reassessed. Puget Power will be contacted, and all data that they can or will provide will be assessed to improve the water budget analysis. This improved water budget analysis will be used to better quantify leakage from the lake if possible. If the improved water budget cannot adequately quantify leakage from Lake Tapps, a field program will be developed to provide the needed data. The field program may include collection of water samples for chemical and radio-isotope analyses water, installation of gauging stations, measurement of evaporation, or other activities. Task 97-5 - Resource Protection. A contaminant inventory will be completed. The inventory will include known and suspected generators, storers, transporters, and users of materials that could potentially or Pacific M Groundwater Page 6 Group Auburn JU9506.01 December 11, 1997 have actually contaminated groundwater A database module will be developed to store and analyze the inventory data. The database module will be designed to be compatible with Autocad® which the City uses for its geographical information system (GIS). The database will identify potential contaminants by general location, address, and well capture zones. A contingency/spill prevention plan will be developed. A water resource protection plan will be developed, if requested. The plan will pre-select pumping schemes that could be employed if one or more sources were removed temporarily or long-term from the supply system. If directed, a water resource protection committee will be formed. The committee will assist the City with various public involvement issues. Initial public education programs will be developed and presentations will be made, if authorized by the City All the activities of the water resource protection team will be presented in a water resources protection plan which will be begun during 1997 The deliverables required by the Department of Health will be prepared. These deliverables include the well capture zone maps and contaminant inventory The deliverables will be modified as new information becomes available. Input to support new City ordinances regarding resource protection will be given, as needed Task 97-6 Supply Test Wells: Three supply test wells will be drilled during 1997 One of the wells is planned to explore beneath the deep deltaic aquifer to depths of up to 1,300 feet. The purpose of these explorations is to locate and characterize yield and water quality within the deltaic aquifer explore for deeper aquifers and to identify the bottom of the deltaic aquifer and underlying units. These wells will be drilled by the cable tool method to depths of about 400 feet using smaller casing telescoped within larger casing. Drilling below about 400 feet will be by the mud-rotary method. After test drilling has reached completion depths, pumping tests will be conducted on promising zones, if warranted. The 80-slot test screen used in previous test wells will be reused if appropriate; otherwise, a new test screen will be purchased. Aquifer test parameters will be calculated from the pumping test data. Water samples will be collected to assess possible iron, manganese, or other contaminant problems. All borings will be finished as dual completions similar to those installed during 1996 A separate, 20- to 40-feet-deep well may be completed adjacent to the deep well if drilling indicates a very shallow aquifer is present. MIPacific Groundwater Page 7 Group Auburn N9506.01 December I1, 1997 Task 97-7 Coal Creek Springs Improvement: The Coal Creek Springs improvement project will be continued during 1997 Eight shallow test wells will be drilled in the lowland plain containing the collector system. If the City chooses to do so, three deeper wells will be installed in the upslope region of the collector systems. Several backhoe test pits will be dug to obtain larger more representative samples from the area where a third collector may be developed. The wells will be sampled along with the collector system for geochemical and isotope analysis. An infiltration test will be conducted with City assistance to help identify shallow flow paths to the collector system. The data will be analyzed and possible options, including a third collector system, will be reviewed. The analysis will include a simplified MODFLOW model of the area with simulations of four possible third collector configurations. Reports will be prepared on improvement concepts and source reliability Parametrix, Inc. will design the third collector, along with a revised overflow manhole structure. The new structure will allow for separate operation of each collector giving the City more management options during periods of turbid flow The design will also allow measurement of flow in each collector as well as overflow discharge. After review and approval by the City the new collector will be installed. Contractor costs for construction of the third collector or overflow structure are not included in Attachment A. Parametrix will also repair the plugged portion of the upper collector system. They will prepare a preliminary design, hire a contractor then dig up and replace the plugged 15- inch line. The repair will be conducted at a time approved by the City Task 97-8 Production Wells 7 and 6: Production Well 7 will be completed. The pumping test will be conducted, the data analyzed, and a report prepared. Pacific Groundwater Group will also work with the City as needed in the installation of the well pump and pump house. Production Well 6 will be installed during 1997 Pacific Groundwater Group will assist with site selection by providing hydrogeologic input as needed. Drilling specifications will then be developed. Pacific Groundwater Group will assist the City in selecting a drilling contractor We will log the well during drilling, work with City inspectors, design a well screen, conduct a 72-hour constant-rate test and conduct a 4- to 5-hour step-rate pumping test. The well design and testing program are anticipated to be similar to that of Well 7 Task 97 9 Public Participation. Team members will help the City develop a newsletter and other informational tools, as needed. A public participation program will also be developed, if directed by the City this MIPacific Groundwater Page 8 S Gmup • Auburn N9506.01 December 11, 1997 program will focus on reducing citizen concern about water rates, the sale of water to non-City customers, water conservation, and other factors necessary to successfully complete the water resources program. Subtasks possible for this work include: • establishing focus groups to better understand citizen knowledge and concerns, • meeting with business groups to better understand the role that the business community plays, • conducting telephone baseline surveys, • preparing news letters to be included with utility bills, and • making public presentations to expand citizen understanding. Quarterly meetings will be held if directed by the City to maintain communication between the City the consultant team, and others. Task 97-10 Testing and Evaluation of Wells 5B and 5C Pacific Groundwater Group will coordinate pumping tests for new City Production Wells 5B and 5C Video logs made during 1996 will be reviewed, and a multi-rate step-test and constant-rate test will be conducted for each well, if possible. The step tests will involve pumping each well at four or five rates in order to evaluate well loss and efficiency The total time for each step test will 8 hours or less. The constant-rate tests will be conducted to evaluate aquifer properties and boundaries. Pumping will continue at each well for approximately 2 weeks, followed by up to 2 weeks for water level recovery Wells 5 and 5A will be monitored during the test as observation wells. Each new well which is not pumped will also be monitored during the constant-rate test. A pump subcontractor will be hired to install and remove the test pumping equipment, as well as to operate the equipment during the test. Because of these wells are relatively deep (more than 700 feet) and relatively small in diameter (10 and 8 inches), and because pumping rates will be relatively high, a special-design test pump will be required. Because no subcontractor is likely to have such a test pump in stock and because its reuse by a subcontractor is not likely the City will purchase half of the pump with the option to purchase the remainder at cost, in lieu of pump rental. Following the pumping tests, the data will be analyzed and recommendations for operation of the four City upland wells (5 5A, 5B, and 5C) will be made in a test pumping report. Task 97-11 - West Hills Springs Improvement Improvements to West Hills Springs will be made in 1998. Exploration work originally planned for 1997 has been postponed. Costs, previously approved in 1997 will be balanced out by a credit for this task MPacific Groeundwater Page 9 Group Auburn JU9506.01 December II, 1997 TOTALS The costs for Tasks 97 1 through I1 are included in Table 1. The table shows the estimated costs for July 1, 1997 through April 1998, as well as the anticipated total for the entire period. The hours and costs associated with each task are included in Attachment A. We trust this summary provides you with the information you need. Please call us for any additional information you may require. Thanks again. Sincerely Pacific Groundwater Group Mark Utting Principal Hydrogeologist Attch: Table I Cost estimate spreadsheet Attachment A Pacific Groundwater Page 10 = croup Table 1 Summary of Costs for 1997 Actual Total Total Work Proposed Total Expenditure Work Now Requested for Task In Jan 9,1997 letter for Authorized through through June 1997 Planned for Second Half of'97 Jan'97 Dec'97 Jan'97 thru June'97 (Billed In August'97) Jan'97-Dec'97 (with completion as (with completion as late as Apr'98) late as Apr'98) Task 97 1: Water Rights/Management/On-Call Work $82,160 $41,080 74,081.59 $111,600 $70,520 Task 97-2: Hydroge0logic Characterization $339,915 $169,958 123,138.70 $293,356 $123,398 Task 97 3:Water Level Monitoring $210,585 $105,293 94,330.31 $206,175 $100,982 Task 97-4: L. Tapps Upland Analysis $47,800 $23,900 7,994.39 $50,980 $27,080 Task 97-5: Resource Protection $136,190 $68,095 22,005.50 $69,420 $1,325 Task 97-6: Supply Test Wells $343,770 $257,828 60,487 44 $341,410 $83,582 Task 97-7' Coal Creek Springs Improvement $135,915 $135,915 107,732.16 $184,195 $48,280 Task 97-8: Production Wells $62,730 $31,365 60,387.07 $135,090 $103,725 Task 97-9: Public Participation $32,874 $8,219 11,146.53 $16,320 $8,102 Task 97 10: Well 5B and 5C Evaluation $44,290 $44,290 27189.70 $92,910 $48,620 Task 97 11 West Hill Springs Improvements $40,390 $4,039 0.00 $0 -$4,039 Totals $1,476,619 $889,982 $588,493.39 $1 501 456 $811,474 AUBURN GROUNDWATER CONSULTING ATTACHMENT A Task 97-1. Water Rights/Management/On-Call Work Version: December 11, 1997 ESTIMATED DAYS OTHER COSTS Subtak TOTAL Support Field Toduvoal Pnndpd Labor Dow Subcontract Cost TASK 1 310 1 840 1 360 $ T:0 Cost Cost Coal Total COST 8 h day 12 hr day 8 h day 8 h day (lean) (Coat) (ten) (Cost) Amrity ID SubrakDeorymn Mactinga 15 16 $19910 to.a. 11,000 PMR 13. O 515410 Analysis ID 10 5I2, 312,300 Rorab S 3 ID SI1,600 avoa.e.. 1500 311,100 Project Management 12 5 60 119,840 549,840 Caney Field Work 5 S 14100 Holt 14,000 510,400 TOTAL HOUR ESTMATES 17 40 101 155 SUBTOTAL DOLLARS $5,440 W.4100 172,770 1100460 11,500 19,000 $111,060 SUBCONTRACT HANDLING CHARGE 6% 1340 COMRSGINCY ESTIMATED TOTAL COST 5111,600 PROIECE 519506 'Tanplae vnna¢D vnba Si 1995 1 AUBURN.GROUNDWATER CONSULTING ATTACHMENT A Task 97u2 Hydrogeologlc Characterization Version December 11 1997 ESTIMATED DAYS OTHER COSTS sahtaakTOTAL Support Frcld/Ol3 Techmeal Aannpa] Weer Deed Sabo:mem Curt TASK 0 320 1 140 S 560 S 720 Co e! Coat Coat Total COST 8 hs day 12 hr day 8 hr day_ 8 hr day. (Rem) (Coe) (ltnn) (fort) As-Welty] Subt♦ak Dewaiptian CHARACTERIZATION Detainee Win 95174T Upgrade Well Logf Wamr Quabty Modals 1.0 1 56.320 36,120 Won 952NTIJpgade Wort LreellOau Loam Module S 1 33,510 53,530 Ten Syafam 4 1 32.960 Mileege 125 32,933 Input Well Log Data into Dutabus 10 1 1 54,480 54.433 (mutt Dela Logger Deis into[3atat ess 4 1 32,950 51,460 Cbmeterieetloa Wells 30 3 $18960 Mileage 090a ora. 070,000 589,860 Celled Chemie■t Isotope Data MJeag tews.rrG. Water Level Sarvey 40 10 10 346,400 5.16,400 Ants:es 0geophysics 3 12,160 Wags Kew 31,840 5,1,000 Improve eeb■rge edysis 10 15 5 120,400 520,100 AQUIIMR TES-0/710 Aguilar Teals 15 2 09,840 Mileag 5500 31.000 511.340 Amen Test Aemllysis 15 4 311.280 311.2E0 Aquifer Test Report 6 10 4 110,400 Repro 1200 310,600 Candace hydro testing 6 2 04,800 Weep 1200 $3,100 Coattail Modeling Amlyradata 15 5 517,000 318000 Modeling 30 S 531,600 521,600 Tribal laput pia plan 5 1 33.020 $3,320 Renew Kw with T br/Conatynt 4 1 03.120 Repro/Mileage $500 53,620 Charecter(smlae updatdreviwe memo 10 10 10 316,000 Reptordelieery 51,000 317,000 TOTAL.DAY ESTIMATES 26 S0 209 63 343 gib Lu[AL DOLLARS 58,320 542.000 $117,040 545,360 6012,720 33.425 $72,841 5288,936 SUBCONTRACT HANDLING CHARGE 6% 34370 CONTINGENCY ESTIMATED TOTAL COST S293,356 pROiECT: 1J9506 Template version:December 8,1995 1 -;r AUBURN GROUNDWATER CONSULTING ATTACHMENT A Task 97-3 Water Level Monitoring Version December 11,1997 ESTIMATED DAYS OTHER COSTS Subtask TOTAL Support Feld Technical Pnnopal Labor Qnttx Subcontract Cost TASK S 370 5 840 S 560 S 720 Cast Cost Cost Total COST B hr day 12 hr dig 81u day S1 r day (item) (Coat) (item) (Coat) Actirity ID Subtaak Description COMPLETE GREEN RIVER GAUGING Rngitt 1 Way Negotratioa 3 1 52.400 52,400 Deign Reality 0.5 5360 5340 ConuruR Feu'lity 0 5 5360 Mileage $150 Mont Watts G ¶30.000 $34510 COMPLETE WHITE RIVER GAUGING Raght oCWay Negatialiort1Pernits 3 1 52.400 52,400 Deign Facility 0.5 $360 5360 Construct Fac2ity 0.5 5360 Mt7e2ge $150 Mon Wafer 530.000 510,510 Water Level Data CoBedee Start Collecting/Reviewing aura 2 1 $1,840 51,$40 Cams System Data DvatdoedMonthly 12 2 1 511,920 511,920 Ptsptry end Issue Quarterly Reports 8 2 $5,9X1 Mileage 550 15,970 Install M61 Wen Monitoring Equipment 15 2 50.840 Mileage Loggers,a itsp $35.000 544,840 Hokkaido 55.000 55,000 Shallow Aquifer WeUs Select Sites and Design 6 1 54,080 54,080 Bid and Sdect Contractor 2 1 51,840 51,540 Instal/rim gauge siteweb 12 3 MAD M9etge 5400 Driller 5110110 522,280 Install shsge rive gauges 4 2 ¶3,680 MateegoEquip $500 Mont.Water Or 515000 519,180 575 $75 PR 630 Well Site check.outtutility heck 0.5 0.25 5600 Mileag S50 $650 Well Installatlo 2 0.25 51,860 Mileag 5150 Hokkaid 54,000 56,010 Well Sunny 0.25 5210 ASSUMS CITY SURVEY $210 Prepare well log%ureipla 0.5 0.5 5.580 5580 Maawr water level(58} 1 0.5 $920 Mileag $750 51,070 Prepare summary report 1 0.25 5740 Mieage 5150 5890 it:IFAL DAY F511MATES 0.5 15.25 59 18.75 45 SUBTOTAL COLLARS 5160 512,810 533,040 513,140 558,150 51.825 5132,000 5192,975 SUBCONTRACT HANDLING CHARGE 10% 513,200 CONTINGENCY ESTIMATED TOTAL COST 5206,175 PROJECT.JU9106 Template version December 8,1995 t AUBURN GROUNDWATER CONSULTING ATTACHMENT A Task 97-4 Lake Tapps Upland Study Version December 11 1997 ESTIMATED DAYS OTHER COSTS Subtonic TLTTAL Support Fidd Technical Pondpai Libor Area Svbenmred Cat TASK S 320 5 840 S 560 S 720 Cost Cost Cos Total COST Shr day {2 hr day S hr day Stir 6$y (Stem) (Coat) (1torn) (Cost) Activity ID Subtask Carapeon Additional Field Wort 5 2 1 56,040 MQeag 5400 56,440 Additional eharaderiaslian work 10 5 59,2200 S9,200 lntafeaence Modeling/strelysiarlealog msesarnealt 15 5 512,000 Slf„000 Chemical/Isotope sstnpfmg/analysa 5 1 A.520 Lab Analysis 5$000 511420 Report Amon 8 5 5$080 Reproduction $600 58,680 Meetings 2 2 92.7.60 Mileage 5100 S1,660 Doll Mon,Well ear Tac.Pt.Well Mtlage [Tiller TOTAL DAY ESTIMATES 5 42 19 66 SUBTOTAL TAL DOLLARS 54.200 523.520 513,680 541,400 51.10 5$000 550,500 SUBCONTRACT HANDLING CHARGE 6% 5 CONTINGENCY ESTIMATED TOTAL COST S50,98a PROTECT.JU9506 Template version:December 8,1995 1. , , AUBURN GROUNDWATER CONSULTING ATTACHMENT A •Task;97-5 Resource Protection Version December 11 199T r ESTIMATED DAYS OTHER COSTS Subtask Toted, Support Add Technical Principal Lobar Direct Subcontract Colt TASK S 320 S 810 S 360 S 720 Cat Cost Coat Total COST Slvday 1217 day Shrday Shrday (Item) (Coss) (item) (Cott) Adirity ID Subtask Description Ddmrmmon Study 4 6 2 $6,080 56,080 Contamination Inventory 6 2 S4,8130 P1 OC $23000 829.800 Coming i ISpIS Pteu.Plea 1 1 51280 PhE{ 114,000 813,280 Resotnee Protection Committee Mtleege PSAC Resource Protection Hen 4 8 5 59380 Repro $200 PIA{ 56.000 515,560 Wen reconstruction Mileage Holdcedo It TA MYES72MAThS 8 21 tO 39 SUBTOTAL EOLDOLLARS 52.560 511,760 $7200 821,320 5200 $45,003 S66,720 SUBCONTRACT HANDLING CHARG E 674 S2,700 CONTINGENCY ESTIMATED TOTAL COST 569,420 PROJECT Jr/9306 Template version:Do:embxr 8,1995 AUBURN GROUNDWATER CONSULTING ATTACHMENT A Task.97-6 Supply Test Wells Version December 11,1997 ESTIMATED DAYS OTHER COSTS Subtask Tow, Support Field Teduti e1 Principal Labor Died Saboontract Cost TASK S 320 S 840 S 560 S 720 Col Cost Cost Total COST 8brkey 12 bulgy 8hrday Shrday (Tian) (Coil) (!tan) (Cost) AaM1y ID•Subtask Daaipt on 0e+nte0 Water Resafras Drill!Test Wd11W-8 b0 5 3 i1B-360 Wag il.000 Hol amdo 530,000 169,360 Hanoi 19Q000 590.000 Geaphystca SS,602 55,000 DtilUTat Wed TW-9 40 5 3 S3$360 IMilmgu SI,000 Hokkaido 130.000 $69560 Hansen Gonphysia 15.000 55,000 Dd1/Test via 1W-II Wags 51,003 Hokkaido Si,000 DraTest Web TW-t0 30 3 3 130,160 Mileage 51,000 Hokk aido 530.000 561,160 Ana:b9p Data 15 5 512,000 512,000 Prepare Report on all 1981 Test Wks 12 3 5$A0 Repro Mal 5250 59,130 TOTAL DAY ESTIMATES 110 42 17 169 SUBTOTAL DOLLARS 592,400 523,520 11240 3128,160 14,250 5190,000 5!22,410 SUBCONTRACT HANDLING CHARGE 10% 519,003 CONTINGENCY ESTIMATED TOTAL COST _ $341,410 PROTECT:TU9506 Template version:December 8,1996 AUBURN GROUNDWATER CONSULTING Task 97 7 ,Caal:Creek Springs Improvement ATTACHMENT A Version December 11 1997 ESTIMATED DAYS OTHER COSTS soma Tt3TAL Support Fistd Technical Principe/ [.4645 Carta Subcontract Cost TASK 5 320 1 840 $ 360 1 720 Cart Coot Cod Tani COST 8 Iv day 12 lir day 0 hr day 8 be day (Item) (Cwt) (It cm) (Coat) tAri ity 11) Selena4 Description Will development 6 I 13,760 Mileage 6270 Cm-Ada Dr 515,500 41,510 }Wan[anti 1 1 51,360 MBaage $150 11.7[0 T6R pita 2 $1,440 M0eag $50 Backhot 51,500 4,990 Third CogeCwv enalyns 8 8 510,240 PMX 515,000 525,240 15 tat tepeir 2 2 51460 Mleage 175 PMX/contract 530,000 132,635 bnpRwctnoni=mini row 2 3 $4,720 Miing 5200 14.920 SappGmenta!UM dna* 3 5 $5,280 Mdeag 1200 ?MX 510,000 515,400 Stipplemental lire installation 2 2 52,560 Mileage 6150 PMX 540,000 142,710 Dew logger madanion 3 1 53,520 Milng $200 Data Ioggsrs $6,000 59,720 Foul report 5 5 16,400 Repro/Poo- 1500 56,900 On{eg work 10 10 512,800 Mdage 5500 113,300 "TUTAL DAY ESTIMATES _. 7 37 2 116 PSUBT01ALDCLLARS 5100 $20,720 530.240 136,040 $2.273 $018,000 S177,119 SUBCONTRACT NNASIOUNG CHARGE 6% 57,080 CONRNCPNCY ESTIMATED TOTAL COST $184,195 PROIELT SU9506 Templets vernoen December 8,1995 1 ,e" AUSLRN.GROUNDWATER CONSULTING ATTACHMENT A Task 974 'Pr 'oduction Wells 7 and 6 Version`December 11,1997 ESTIMATED DAYS OTHER COSTS %hank • 1•A1, Support Field Taauval Principal Labor Direct Suboontrad Cat TASK S 320 5 840 $ 560 S 720 Cost Cost Cost Total COST glt4• 121v•, Sta 8he— tem Cast) tem} (Cost) A axvityr ID Subtask Desatption t md=Wry 7 engly7p 3 2 54,240 $4,740 Prepare Well I report 5 $ S 9$000 Repro/Mail 5100 KIN Design Well&Span 4 2 SEL680 33,630 Said Cony, I I $1,0 Mi1ege 51S 31.723 Cn0 and Tat Wen 6 60 5 5 $56,8D0 Weep 5800 Sail lab 5750 553,330 Analyze Den 5 2 54,240 Video long 51,000 55,240 Prepare Weil 6 report 5 5 5 12t028 R,,to'Mt 1 Vol 58,100 Input on pump installation 1 4 33,440 Mire IMO $),540 Bacteria Treatment fit W-7 5 4 5 510,040 NE/age 5400 Lob testing 32,000 512,444 AquaFrmd 327,000 317,000 TOTAL DAY ESTIMATES 10 65 33 31 141 SUBTOTAL DOLLARS 53,206 554.600 510.600 522,320 393,730 31,345 530,750 $133,015 SUBCONTRACT HANDLING CHARGE 101. 53,075 CONTINGENCY ESTIMATED TOTAL COST $135,090 PROIECr.1139506 Template version December 8,1993 V r AUBURN GROUNDWATER CONSULTING ATTACHMENT A Task 97 9 Public Participation Version December 11,1997 ESTIMATED DAYS OTHER COSTS Subtark 7CTAL Support Fidd Tedvutml Pnnapal labor Urns Subcontract Cast TASK 5 320 5 840 5 560 $ 720 Cost Cost Cut Total COST t3Tvday 12hrday Shrday 8brday (Ilan) (Cost) (Stem) (Cast) Actw!ty ID Subtffit Description Nem Late. 4 $2,850 C Brume 512.000 $14,880 Meet wl Business Groups Analyze end Maki ReesnnmendaLOns I $720 $720 'TOTAL DAY ESTIMATES $ 5 SUBTOTAL DOLLARS 53.600 13,600 51 ZOQ0 $15,600 SUBCONTRACT RANI:LING CHARGE 6°h 5720 CONTINGENCY ESTIMATED TOTAL COST 516,320 PROJECT JU9305 Template veralon:December Et,1995 1, AUBURN GROUNDWATER CONSULTING ATTACHMENT A Task 97 10. WeII 5B and 5C Testing Version December 11, 1997 I ESTIMATED DAYS OTHER COSTS Submtk 1L71AL Support Ftdd Tadvowl Removed Lobar Cued Seboonewl Cost TASK S 320 0 810 S 360 T 720 Cost Cwt Coat Total Cos T 8 hr day 12 hr day 8 hr day 8hrday (ltan) (Cos) Om) (Cost) rAccmty ID Subtask Doc:roma Caocdtml Tast Setup 1 4 2 64,320 64,310 Install add ego:smell 3 Cam'320 hblcgo 5330 Video Ioggn8 52000 64.170 Field feeling 6 1 15.760 Holioada $63000 $81,740 Gem onalyss 4 1 T7,960 Sormdo- 5300 13,440 Report S I 13.320 33}I0 Me lings 1 1 61,180 S1,280 , TOTAL DAY ESTIMATES 10 14 6 30 - SU13PUr,u,DOLLARS 5$400 57,840 54320 $20,540 5851 563,000 656,410 SUBCONTRACT HANDLING CHARGE 10% 56300 CONING ENCY J ESTIMATED TOTAL COST 692,910 pnorEcr.,U9306 Tanplate taste±17Qaaba 0.1995 4 ' Al18U0tN GROUNDWATER CONSULTING Task 97-1.1. West Hill Springs Improvements ATTACHMENT A Version•'December It 1997 ESTIMATED DAYS OTHER COSTS Subtmk TOTAL Support Field Technical Ponape! Labor Dirt Subcontract Cast TASK $ 320 $ 840 S 360 $ 710 Cost Cost Cost Teti COST Iv day I2hrday 81.0 day 8heday (Item) Mom) atom) (Coat) Activity ID Subtmk Dmaiption Fdd exploration Wage der Deogn improvements PMOC Sded connector PhO{ trite implements MLlew PRCC Mocarts Waage PMIX Ncrrs COSTS FOR SPRING IMPROVEMENT SUBCONTRACTOR NOT INCLUDED TOTAL DAY ESTIMATES SUBTOTAL DOLLARS SU8CQt4TRACT HANDLING CHARGE trA. CONnNGFNCY ESTIMATED TOTAL COST PROJECT:JU9305 Templateveriaa Decanter 8.1945 1 1 EXHIBIT"F" CONTRACT AMENDMENT NO 1 • CITY OF AUBURN 0,F.� 4 " > >,) KING COUNTY, WASHINGTON AMENDMENT NO I TO AGREEMENT FOR PROFESSIONAL SERVICES Between the CITY OF AUBURN and Pacific Groundwater Group, Inc PROTECT NO MS 700 AMENDMENT NO 1 TO AGREEMENT FOR PROFESSIONAL SERVICES This amendment is for the purpose of adjusting the schedule of billing rates to be used dunng 1996 for consultant and sub-consultant costs associated with this project The adjusted rates are attached to this amendment as Exhibit A There is no change to the scope of work to be performed under the existing agreement PROJECT NO MS 700 AGREEMENT FOR PROFESSIONAL SERVICES AMENDMENT NO 1 MARCH 12 1996 PAGE 2 OF 2 f CITY OF AUBURN Q... �«i� � X3.4 Charles A. Booth, MAYOR ATTEST ftj/iMZ1az&v'Wer, City Clerk APPROVED AS TO FORM. 0 Ala 1 Lb S Michael I Re olds, City Attorney STATE OF WASHINGTON) )ss. COUNTY OF KING ) On this c day of , 1e_pL before me, the undersigned, a Notary Public in and for the State; f Washington, duly commissioned and sworn, personally appeared CHARLES A. BOOTH and ROBIN WOIB.HUETER, to me known to be the person who signed as MAYOR and CITY CLERK of the CITY OF AUBURN, the municipal corporation that executed the within-and foregoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said corporation for the uses and purposes therein mentioned, and on oath stated that he was duly elected, qualified and acting as said officer of the corporation,that he was authorized to execute said instrument and that the seal affixed, if any is the corporate seal of said corporation. WITNESS my hand and official seal hereto affixed the day and year in this certificate above written. • ,- •. tt . CI! ...11 e - ' 6- NOTARY 9I .V „ —¢— v Tha.il //e. C ..2)4s, .r ■ 7...(12% 0 PUBLIC ,p z: NOTARY PUBLIC IN AND FOR T STATE OF 't roeER is." j WASHINGTON, RESIDING AT �2 tee p WASN`C.•`• �'''''''''''''''` MY APPOINTMENT EXPIRES /d-1.s% 7 AGREEMENT FOR PROFESSIONAL SERVICES AMENDMENT NO. 1 MARCH 12. 1996 PAGE 3 OF 3 Pacific Groundwater Group Inc 1. 2377 Eastlake Avenue'East Seattle Washington 98102 PHONE# 329 0141 FAX 0 329 6968 sr'+ TITLE c r STATE OF WASHINGTON) )3s COUNTY OF kING } ,.mod f °�-�" �t I9q before me the undersigned a On this a a day of ,,.� � Notary Public in and for the State of Washington duly commissioned and sworn, personalty appeared 1'1,:2-.-k U+± v r., , to me known to be the y .c-.t. or a , of Pacific Groundwater Group, Inc. the corporation that executed the within andyforegoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said corporation for the uses and purposes therein mentioned and on oath stated that he/she is authorized to execute saidhnstrumenton behalf of said corporation Witness my hand and official seal hereto affixed the day and year first above written '`������111► f"? it 'c;r.ls ti T 'Ltl,�� S.,4131-1A. r NOTARY PUBLIC IN AND FOR THE STATE OF e ,; r-bCL s WASHINGTON, RESIDING AT C ^• 7 _ r +t4 lit, 7^ : .`'tom r MY COMMISSION EXPIRES ci - Co- c4 1 Sit' F t ��4s `� CTT/bd REF H\MS\MS700-25'E96-222 AGREEMENT FOR PROFESSIONAL SERVICES AMENDMENT NO I MARCH 12, 1996 PAGE 4 OF 4 NV • 57!Root 5tre t Siuk.20Q Puri Towtisend WA 0368 360.3854959 FAX 385,6062 M9506 01 Exhibit "A" r� March 6, 19% City of Auburn Public Works Department 25 West Main Street Auburn, WA 98001 Attn Dwight Hollobaugh Chris Thorn Re Revised Rates 1996 Contract Water Resource Protection Dear Dwight and Chris, This letter presents a summary of the various billing rates to be applied to our work for 1996 This summary includes all subcontractors currently working on the project and those anticipated to be included later in the year These rates were included in the cost estimate spreadsheets included with our scope of work/cost estimate authorized by your letter of January 16 1996 We also include the subcontractor mark up rates discussed and agreed upon for Iast year's work These markup rates will be applied to our work for 1996 The following rates will be applied Pacific Groardwater Group Principal Hydrogeolopst $90/hr Technical (Hydrogeologist, Geologist or Chemist) $70/hr Field(Hydrogeologist, Geologist) $60 to $70/hr GIS/CAD S60/hr Support $40/hr Mileage $0 40/nu Technical Subcontractor/Direct Cost Mark up 6% Well Drilling Subcontractor Mark up 10% Non Technical Subcontractor Mark up 15% Main Office 2377 Eastlake Ave E W3snrgeca.a8102 206.329.0141 F,S329.6065 r. mourn 1I1 7506.02 • r March 6 1996 Parametrix Senior Engineer/Hydrogeologist $95/hr Project Engineer/ Hydrogeologist $90/hr Engineer/Hydrogeologist $75/hr Technician $60/hr Editor S60/hr Graphics/CAD Staff $50/hr CIerical/ Word Processing $45/hr CAD Computer $15/hr Graphics Computer $I0/hr Mileage S(1, @into 1„r Technical Subcontractor/Direct Cost Mark up 0.31 6% Non-Technical Subcontractor Mark up 15% Stenstrom Associates Technical Staff $85/hr Plots $25/ea Mileage $Qitmi Technical Subcontractor/Direct Cost Mark up Q s r 6% r 14 Montgomery Water Group Principal $90/hr Sr Staff$75/hr Staff $66/hr CAD Technician $5Ofhr Word Processing/ Clerical S35/hr Mileage $0 32Jrni AtITOCAB/ G1:S Computer $10/hr Computer $5/hr Technical Subcontractor/Direct Cost Mark up 6% Carolyn Browne Associates (possible future subcontract for this project) Professional Staff $75/hr Technical Subcontractor/Direct Cost Mark up 6% six &vvrattnaeti itv Page nuwrn SU9sa6 aZ March 6 19% We trust this summary provides you with the information you need We would appreciate the incorporation of these rates Into a. contract amendment Please call us for any additional Information you may require Thank you Sincerely, Pacific Groundwater Group Mark Uttsng Principal Hydrogeologist cc Mike Warfel (PhtX) Mark Stenstrom(Stenstrom Associates) Bob Montgomery(MWG) Carolyn Browne(CBA) ~Mc ter Page 3 TOTAL P ge 1J• • EXHIBIT"G" CONTRACT AMENDMENT NO 2 1; q 4 i • 6 6 CITY OF AUBURN KING COUNTY, WASHINGTON AMENDMENT NO 2 TO AGREEMENT AG C I5 FOR PROFESSIONAL SERVICES Between CITY OF AUBURN and Pacific Groundwater Group Inc PROJECT NO PR 630 1. 1 AMENDMENT NO 2 TO AGREEMENT FOR PROFESSIONAL SERVICES AG-C-IS I CONTRACT TERM. The term of the Agreement for Professional Services is extended to April 30, 1998. 2. SCOPE OF WORK. This amendment is for the purpose of adding the installation of a groundwater monitoring well and the monitoring of that well in order to establish the ground water elevation in the vicinity of`M' Street SE and the Rail crossing/SR 18 crossing. The well will be placed within an existing City of Auburn Public Utilities easement. 3 COMPENSATION The rates shall be those established in Amendment No I Executed on -1=e Ca-4,••. r l`6 t4`l + (date). CITY OF AUBURN &Aide A li;oc,Ig Charles A. Booth, Mayor ATTEST 16 Drelle E. Daskam, City Clerk APPROVED AS TO FORM. ii I• 1 t I Michael J Reynolds, City Attorney Amendment No. 4 for Professional Engineering Services CCA inc Page 2 of 4 ii, r Pacific Groundwater Group, Inc. BY Authorized signature Mark G. Utting Please print or type name TITLE Vice President STATE OF WASHINGTON) )ss. County of - JcrFc.c's,.ti ) I certify that I know or have satisfactory evidence that Mark G. Utting is the person who appeared before me, and said person acknowledged that he/she signed this instrument, on oath stated that he/she was authorized to execute the instrument and acknowledged it as the Vice President of Pacific Groundwater Group , a corporation, to be the free and voluntary act of such party for the uses and purposes mentioned in this instrument. Dated `QPN S14, A 1, ` i Jt '„„sicn Fa^ CC9 1'I NI C 1H `-.l4.i!IF I_ e. Notary Public in and for the State of Washington • * residing at - _ cf.?‘ My appointment expires 4/ :. r rr Amendment No. 4 for Professional Engineering Services CCA inc Page 3 of 4 .5�^ STATE OF WASHINGTON) )ss County of King ) I certify that I know or have satisfactory evidence that Charles A Booth and Danielle E Daskam were the persons who appeared before me, and said persons acknowledged that they signed this instrument, on oath stated that they were authonzed to execute the instrument and acknowledged it as the MAYOR and CITY CLERK of the CITY OF AUBURN to be the free and voluntary act of su h parties for the uses and purposes mentioned in this instrument Dated lfi /�17 .01,11tugi% 1.241/11VeCt -133)--81(1)-0 00 A .`��t�.••`' ai;'` T't��•• Notary Public in and for the.State of Washington 4• . �''� My appointment expires /D-9-6467 :0 NOTARY CR%0 PUBLIC A It Z' .Z�• b ERg.•..•c • OF � •.. .,,rt ffWAS ta••. REF H\FORMS\FE054A(R 11/97) Amendment No 4 for Professional Engineering Services CCA inc Page 4 of 4 p7 s 700 Joy 1 1998 C/ryCity OFF/C£ CITY OF AUBURN KING COUNTY WASHINGTON AMENDMENT NO 4 TO AGREEMENT AG-C 15 FOR PROFESSIONAL SERVICES Between CITY OF AUBURN and PACIFIC GROUNDWATER GROUP PROJECT NO MS 700 Pacific Groundwater Group 511 Root Street Suite 200 Port Townsend WA 98368 (360) 385-6959 phone (360) 385-6952 fax AMENDMENT NO. 4 TO AGREEMENT FOR PROFESSIONAL SERVICES This Amendment No. 4 to the existing Agreement for Professional Services for the City of Auburn Water Resources Program (MS 700), entered into the 8th day of May 1995, hereinafter called the AGREEMENT by the City of Auburn, King County Washington, hereinafter called the CITY and Pacific Groundwater Group, Seattle, Washington, hereinafter called the CONSULTANT ■ WHEREAS, the CITY and the CONSULTANT signed an AGREEMENT for Professional Services related to hydrogeological services and consulting related to municipal water supply and water rights, WHEREAS, Three (3) Amendments have been made to the original AGREEMENT WHEREAS, Amendment 3 to the AGREEMENT requires a new Amendment to authorize work for 1998, WHEREAS, the CONSULTANT presented a scope of work to the CITY in a letter dated May 7 1998, re: 1998 Scope of Work, Water Resources Protection Program, Auburn, Washington, NOW THEREFORE, the AGREEMENT Executed on May 8, 1995, is revised as follows: 1 SCOPE OF WORK. This Amendment is to provide additional hydrogeological services and consulting related to municipal water supply and water rights as described as shown on attached Exhibit A Scope of Work. 2. COMPENSATION. The total compensation for work completed under this Amendment between May 1, 1998 through June of 1999 is based on time and materials expended on the job, and shall not exceed $999,570, in general concordance with the distribution included for the period May 1998 through June 1999 in Exhibit B' Authorization Summary 3 SCHEDULE. The work included in this Amendment shall be completed by June 30, 1999 The CONSULTANT shall exert reasonable and diligent effort to complete all work where possible, by the end of the first quarter of 1999 (March 31 1999). Amendment No.4 for Professional Engineering Services Pacific Groundwater Group Inc. Page 2 of 4 f j CITY OF AUBURN A d pl Charles A. Booth, Mayor Date: .7'aZ 8 - ?Le ATTEST Danielle E. Daskam, CITY Clerk 1 p �FORM. Michael J Reynolds, City Attorney STATE OF WASHINGTON ) )ss. COUNTY OF KING ) Bpi On this 01-46 day of , 19?Kbefore me, the undersigned, a Notary Public in and for the State of Washington/duly commissioned and sworn, personally appeared CHARLES A. BOOTH and DANIELLE E. DASKAM, to me known to be the person who signed as MAYOR and CITY CLERK of the CITY OF AUBURN, the municipal corporation that executed the within and foregoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said corporation for the uses and purposes therein mentioned, and on oath stated that he was duly elected, qualified and acting as said officer of the corporation, that he was authorized to execute said instrument and that the seal affixed, if any is the corporate seal of said corporation. WITNESS my hand and official seal hereto affixed the day and year in this certificate above written. .••• A Bop�,. y . ,.Q' .rYc SIGN F,} .(e t /J ~. + A .4 ? SMALL. . NOTARY I Q' TA oC Pu UC 4, 2? NOTARY PUBLIC IN AND FOR THE STATE OF :74 TtiBER 9�0 e.' WASHINGTON, •RESIDING AT .eiir�� �o . ,tee,of ... N'd .•O ,,,,,,WAS`•••.• MY APPOINTMENT EXPIRES /0 - 2-99 Amendment No.4 for Professional Engineering Services Pacific Groundwater Group Inc. Page 3 of 4 I Pacific Groundwater Group, Inc. Authorized signature Mark G. Utting,Vice President STATE OF WASHINGTON) )ss. County of-King-Tefc-f. s4. . I certify that I know or have satisfactory evidence that Mark G. Utting is the. person who appeared before me, and said person acknowledged that°s he signed this instrument, on oath stated that(c)she was authorized to execute the instrument and acknowledged it as the Vice President of Pacific Groundwater Group , a corporation, to be the free and voluntary act of such party for the uses and purposes Den 'oned in this instrument.I1 r) Dated /_;�_l�Jj 6 f �y ,___rp 'T/01I�I/ Vickji rP`�NOTARyS ; VICKIE LOWRIE * ; Notary Pub ' in apd f the State of Was ' gton V residing at "T en P My appointment expires ( V• Amendment No.4 for Professional Engineering Services Pacific Groundwater Group Inc. Page 4 of 4 EXHIBIT "A" SCOPE OF WORK Potential tasks in this Agreement may include but are not limited to the following: Task 98-1 Water Rights/Management/On-Call Work: a) Assess interference to the City's existing wells or springs. b) Evaluate protests to Ecology about interference to City sources caused by other water users. c) Assess impacts to other water usersfrom City sources. d) Evaluate additions to the City's water supply system. e) Assist with the City's Bonney Lake and Lakeland Hills suits. 1) Attend meetings on a scheduled and as-needed basis. g) Plan,execute,and track project budgets and expenditures. h) Prepare accounting documents. i) Conduct in-house team meetings with the City Tribe,and/or regulatory agencies. j) Manage staff. k) Conduct additional work not included in the other tasks listed below as directed by the CITY Task 98-2 Hydrogeologic Characterization: a) Continue the hydrogeologic characterization process. b) Continue development of computerized databases. c) Collect additional chemical and isotope data. d) Revise the 1996 recharge analysis. e) Respond to input from the Muckleshoot Indian Tribe. f) Prepare a 1998 Hydrogeologic Characterization Report. Task 98-3 Monitoring: a) Expand and improve the electronic water level monitoring system. b) Develop rating curves for the Green and White rivers. c) Download and analyze stream flow and water level data. d) Prepare water level reports on an annual and as-needed basis. Task 98-4 Lake Tapps Upland Study• a) Develop a more detailed understanding of the Lake Tapps Upland. b) Install one characterization well up to 450 feet deep. c) Collect and analyze water samples collected during drilling for isotopic age dating. d) Prepare additional hydrogeologic cross sections. e) Conduct a pumping test at the new characterization well. f) Reassess recharge from Lake Tapps. Amendment No.4 for Professional Engineering Services Pacific Groundwater Group Inc. Exhibit A Page I of 3 i e. Task 98-5 Resource Protection: a) Update contaminant inventory b) Update contaminant database module. c) Complete a contingency/spill prevention plan. d) Update delineation of capture zones using 3-D model e) Prepare Department of Health deliverables. Task 98-6 Supply Test Well: a) Drill one test well to improve characterization of manganese concentrations in the aquifer. b) Conduct pumping tests as needed on test well Task 98-8 Production Wells 7 and 6: a) Complete Production Well 6. b) Conduct pumping and testing as needed for bacteriological evaluation and treatment of Wells 6 and 7 c) Work with the CITY(as needed)in the installation of the well pump and pump house for Well 7 d) Work with the CITY(as needed)in the installation of the well pump and pump house for Well 6. Task 98-15—White River Valley Flow Quantification: a) Drill and log three 8-inch diameter observation wells in the White River alluvial valley to a depth of up to 300 feet. b) Complete observation wells as 2-inch monitoring wells. c) Drill and log two 16-inch diameter test wells in the White River alluvial valley to a depth of up to 200 feet. d) Design and install well screens in the two test wells. e) Conduct 72-hour pumping tests in each test well. f) Measure water levels in all wells within the test well area and prepare water table contour maps. g) Analyze pumping test data for hydraulic parameters. h) Quantify flow within the valley and the relationship between aquifer and river flows. Task 98-16—Flow Modeling and Maximum Aquifer Yield Quantification: a) Conduct senior review of conceptual model, model set up and model results. b) Set up model. c) Collect,compile and input model data. d) Develop and implement data management system. e) Calibrate model to historical hydraulic data. 0 Conduct analyses of pumping impacts and maximum possible aquifer yield. g) Assess impacts to rivers of various pumping alternatives. h) Develop and assess hydraulic effects of preliminary management options. i) Prepare and review model report. Amendment No.4 for Professional Engineering Services Pacific Groundwater Group Inc. Exhibit A Page 2 of 3 EXHIBIT "B" AUTHORIZATION SUMMARY AUTHORIZED BY PREVIOUS AGRTEEMENTS AND LETTERS: AUTHORIZATIONS FOR 1995 Authorization of May 8, 1995 Task 1 Water Rights Coordination $ 27 400 Task 2 Hydrogeologic Characterization $ 40,100 Task 3 Monitoring $ 9,300 Sub-Total $ 76,800 Total Authorized to Date $ 76,800 Authorization of July 6, 1995 Task 4 Coal Creek Springs Monitoring $ 35,500 Sub-Total $35,500 Total Authorized to Date $ 112,300 TOTAL AUTHORIZED THROUGH 1995 $ 112,300 Amendment No.4 for Professional Engineering Services Pacific Groundwater Group Inc. Exhibit B Page 1 of 4 AUTHORIZATIONS FOR 1996 Authorization of January 16, 1996 Task 96-1 Water Rights/Management On-Call Work $ 44 490 Task 96-2 Hydrogeologic Characterization $141,375 Task 96-3 Water Level Monitoring $ 92,850 Task 96-4 Tacoma Point Interference $ 52,940 Task 96-5 Resource Protection $ 25,035 Task 96-6 Well 6 $ 62,385 Sub-Total $ 419,075 Total Authorized to Date $ 531,375 Authorization of March 20, 1996 Task 96-7 Coal Creek Springs Improvements $ 7,500 Sub-Total $ 7,500 Total Authorized to Date $ 538,875 Authorization of July 23, 1996 Task 96-1 Water Rights/Management On-Call Work $ 35,178 Task 96-2 Hydrogeologic Characterization $228,478 Task 96-3 Water Level Monitoring $ 83,905 Task 96-4 Tacoma Point Interference ($ 21 421) Task 96-5 Resource Protection $ 79,878 Task 96-6 Test Wells (Well 6A) $ 45 498 Task 96-7 Coal Creek Springs Improvements $ 50,365 Task 96-8 Production Well 7 $ 48,420 Task 96-9 Public Participation $ 21,514 Task 96-10 Well 5B and 5C (Lakeland) Evaluation $ 42,050 Sub-Total $ 613,865 Total Authorized Through 1996 $1,152,740 Amendment No.4 for Professional Engineering Services Pacific Groundwater Group Inc. Exhibit B Page 2 of 4 AUTHORIZATIONS FOR 1997 Authorized By Letter of May 12, 1997 (Corrected by letter of June 12, 1997) Task 97 1 Water Rights/Management On-Call Work $ 41,080 Task 97 2 Hydrogeologic Characterization $169,958 Task 97 3 Water Level Monitoring $105,293 Task 97-4 Lake Tapps Upland Analysis $ 23,900 Task 97 5 Resource Protection $ 68,095 Task 97-6 Test Wells $257,828 Task 97 7 Coal Creek Springs Improvements $135,915 Task 97-8 Production Wells $ 31,365 Task 97-9 Public Participation $ 8,219 Task 97 10 Well 5B and 5C (Lakeland) Evaluation $ 44,290 Task 97 11 West Hills Springs Improvements $ 4,039 Sub-Total $ 889,982 Total Authorized to Date $2,042,722 Meeting of July 17, 1997, between CITY and CONSULTANT leading to budget reduction of $7,500 within Task 96-7 in letters of March 20, 1996, and July 23, 1996) Task 97 7 Coal Creek Springs Improvements ($ 7,500) Sub-Total ($ 7,500) Total Authorized to Date $2,035,222 Authorized by Amendment No. 3 for the Period July 1997 through April 1998 Task 97 1 Water Rights/ Management On-Call Work $ 70,520 Task 97 2 Hydrogeologic Characterization $123,397 Task 97 3 Water Level Monitoring $100,882 Task 97-4 Lake Tapps Upland Analysis $ 27,080 Task 97 5 Resource Protection $ 1,325 Task 97-6 Test Wells $ 83,582 Task 97 7 Coal Creek Springs Improvements $ 48,280 Task 97-8 Production Wells $103 725 Task 97-9 Public Participation $ 8,102 Task 97 10 Well 5B and 5C (Lakeland) Evaluation $ 48,620 Task 97 11 West Hills Springs Improvements ($4,039) Sub-Total $611,474 Total Authorized Through April of 1998 $2,646,696 Amendment No.4 for Professional Engineering Services Pacific Groundwater Group Inc. Exhibit B Page 3'of 4 Authorized by Amendment No. 4 for the Period May 1998 through June 1999 Task 98-1 Water Rights/Management On-Call Work $120,860 Task 98-2 Hydrogeologic Characterization $133,990 Task 98-3 Water Level Monitoring $ 76,790 Task 98-4 Lake Tapps Upland Analysis $ 74,680 Task 98-5 Resource Protection $ 49 720 Task 98-6 Test Wells $ 42,880 Task 98-8 Production Wells 6 and 7 $ 26,810 Task 98-15 White River Flow Quantification $299 780 Task 98-16 Flow Modeling and Aquifer Flow Quantification $174,060 Sub-Total $999,570 Total Authorized Through June of 1999 $3,646,266 Amendment No.4 for Professional Engineering Services Pacific Groundwater Group Inc. Exhibit B Page 4 of 4 ck3 IC, 9 1 CITY OF AUBURN ApR 9 1999 KING COUNTY WASHINGTON Cny ARK OFFN CE AMENDMENT NO 5 TO AGREEMENT NO AG-C-15 FOR PROFESSIONAL SERVICES Between CITY OF AUBURN And PACIFIC GROUNDWATER GROUP Pacific Groundwater Group 2377 Eastlake Ave. E. Seattle, WA 98102 Phone#- 206-329-0141 Fax #. 206-329-6968 C \• AMENDMENT NO 5 TO AGREEMENT FOR PROFESSIONAL SERVICES AG-C 15 1 CONTRACT TERM: The term of the Agreement for Professional Services is extended to March 31 2000 The general schedule shall be consistent with the schedule shown in Exhibit A. 2. SCOPE OF WORK. The scope of work shall be to provide hydrogeologic consulting services as shown in Exhibit B 3 COMPENSATION The amount of this amendment is $306,275 The total contract amount is increased to a total of$3,952,541 The cost breakdown for the tasks in this Amendment shall be generally consistent with Exhibit C. Executed on /4pn•/ 0204 /9 fl CITY OF AUBURN 1e A it. F& Charles A. Booth, Mayor ATTEST Danielle E. Daskam, City Clerk APPROVED AS TO FORM. Michael 7 Reynolds, City Attorney PACIFIC GROUNDWATER GROUP B1� Mark Utting, Presides ennt Pacific Groundwater Group Amendment No. 5 to Agreement No. AG-C-15 for Professional Consulting Services Pacific Groundwater Group April 13, 1999 Page 2 of 8 STATE OF WASHINGTON) )ss. County of King ) I certify that I know or have satisfactory evidence that VIA-6We- U.H is the person who appeared before me, and said person acknowledged that she signed this instrument, on oath stated that he/she was authorized to execute the instrument and acknowledged it as the president of Pacific Groundwater Group, a corporation, to be the free and voluntary act of such party for the uses and purpos entioned in this instrument. Dated `e-(q-ciq \s` cto" • 0% (fu ro (111e F B e O o NOTARY 9N Notary Public,1tn and for the State of Washington ° -* Zc residing at V t rC P Co . (P� yo PUBLIC My appointment expires a t ( V41BER ' .,, WASH,; ASH, STATE OF WASHINGTON) )ss. County of King ) I certify that I know or have satisfactory evidence that Charles A. Booth and Danielle E. Daskam were the persons who appeared before me, and said persons acknowledged that they signed this instrument, on oath stated that they were authorized to execute the instrument and acknowledged it as the MAYOR and CITY CLERK of the CITY OF AUBURN to be the free and voluntary act of such parties for the uses and purposes mentioned in this instrument. Dated q�04o;q�,'�i 1, ,,. goo fhe// Nor ARy 01-4417-salt,t..r ,4 `'� �2L i o PUBLJC „ >I Notary Public in and for the State of Washington '•;'F DER9.•(. A?,•' residing at ,tc-ne- do •�'•. ^WASH\�;. My appointment exp res /0- 9-9/9 , LRM/bd REF H:\PRO.t\C8038-6\E99-343 Amendment No. 5 to Agreement No. AG-C 15 for Professional Consulting Services Pacific Groundwater Group April 13, 1999 Page 3 of 8 1, EXHIBIT A GENERAL SCHEDULE Program Quartets from Authorization Task 1 2 3 4 Water Resources Program Development • Task 99-1 Coordination/Management '" r> a r Task 99-2: Hydrogeologic Characterization s=; < ; Task 99-15. White River Characterization >...:.; IA-2 Program Task 99-17 Production Well 6A faiNSIERIN Water Resources Program Implementation • Task 99-21 Water Level Monitoring R',k Amendment No. 5 to Agreement No. AG-C 15 for Professional Consulting Services Pacific Groundwater Group April 13, 1999 Page 4 of 8 EXHIBIT B SCOPE OF WORK The following scope of work (listed by City of Auburn Program and by task) shall be conducted: WATER RESOURCES PROGRAM Task 99-1 Coordination /Management: Pacific Groundwater shall: • Attend meetings on a scheduled and as-needed basis • Plan, execute, and track project budgets and expenditures • Prepare accounting documents • Conduct in-house team meetings with the City Tribe, and/or regulatory agencies • Manage staff • Perform other management and coordination work as required by the City Task 99-2 - Hydrogeologic Characterization: Pacific Groundwater Group shall: • Work with the USGS to assess potential errors in previous USGS recharge models • Compile and process additional land use data from aerial photographs • Digitize additional maps • Develop new groundwater recharge regression equations • Use GIS and statistical methods in the analysis Task 99-15 White River Valley Flow Quantification Pacific Groundwater Group shall: • Install three shallow monitoring wells in addition to those previously authorized • Install discharge pipe from the test wells to the White River • Conduct additional development, casing pullback, and other well installation activities as required • Extend planned installation of test wells to depths of 400 feet Amendment No. 5 to Agreement No. AG-C 15 for Professional Consulting Services Pacific Groundwater Group April 13, 1999 Page 5of8 EXHIBIT B- SCOPE OF WORK (continued) IA-2 PROGRAM Task 99-17—We116A Installation and Testing Pacific Groundwater Group shall. • Assist with site selection by providing hydrogeologic input as needed • Develop,drilling specifications and assist the City in selecting a drilling contractor • Coordinate with the City on project start up, attend a preconstruction meeting, and assist in obtaining Department of Health approval for the site • Collect samples obtained during drilling, prepare a geologic log, and assist in well screen design • Perform a video log of the well upon completion • Design a pumping test, coordinate with the well driller conduct a 4-hour step-test and a 3-day constant-rate pumping test, collect water level and discharge data, and collect and submit samples for water quality analyses during testing • Analyze data collected during the pumping test • Calculate well and aquifer parameters and recommend a design pumping rate and lift • Prepare a short report on the performance of the well summarizing well drilling and testing activities • Provide input on pump installation as needed for the IA2 process WATER RESOURCES PROGRAM IMPLEMENTATION Task 99-21 —Water Level Monitoring: Pacific Groundwater Group shall: • Assess which City wells should included in the monitoring program • Remove and reinstall data loggers and transducers as needed to fit the monitoring program • Update the report documenting the installation of monitoring equipment • Revise rating curves for the White and Green Rivers • Maintain four river gauge stations • Prepare an annual river flow report • Download data from all well stations on a bi-monthly basis • Identify and correct errors in the monitoring system • Prepare an annual report presenting water level data and an assessment of aquifer behavior LRM/bd REF HAPROAC8038-6WE99-343 Amendment No. 5 to Agreement No. AG-C-15 for Professional Consulting Services Pacific Groundwater Group April 13, 1999 Page 6 of 8 EXHIBIT C COMPENSATION Pacific Groundwater Group shall be compensated at the following rates for the level.of effort, at a not-to- exceed total of$306,275. The cost breakdown for each task shall be in general accordance with the cost estimate in the following table. WATER RESOURCES,PROGRAM'DEVELOPMENT Task 99-1:Coordlnatlon/Management ESTIMATED DAYS OTHER COSTS Subtaak TOTAL Support Field Technal Principal Labor Direct Subcontract Cost TASK $ 32D S 840 $ SID $ 720 Cost Cost Cost Total COST 8 hr day 12 hr day 8 hr day 8 hr day (Itam) (Cost) (hem) (Cost) SubMek Descstlon Meetings In 1999 10 10 $13,600 Mileage $1,500 MX $5,000 520,100 Reject 1999Pm)e Management 0 ID 72 680,160 180,160 TOTAL HOUR ESTIMATES 8 20 82 109 SUBTOTAL DOLLARS $1,920 $12,800 $59,040 613,760 $1,500 55,000 810.260 SUBCONTRACT HANDLING CHARGE 6% 5300 CONTINGENCY ESTIMATED TASK COST $80,660 Task 99-2:Hydrogeologlc Characterization ESTIMATED DAYS OTHER COSTS Subtaak TOTAL Support Fleld/GIS Technical Principal Labor Obect Subcontract Cost TASK $ 320 $ 840 $ 840 $ 720 Cost Cost Cost Total COST 8 hr day 12 hr day 8 hr day 6 hr day (itm) (Cosy (Ism) (Cost) SubGak DesalptIon RECHARGE ANALYSIS Aden data colledbn In 1999 10 10 1 $15,520 615,520 Add1 analysis N 1999 10 10 2 516,240 615,240 TOTAL DAY ESTIMATES 20 20 3 43 SUBTOTAL DOLLARS 518,800 $12,800 $2,180 811,760 $31,710 SUBCONTRACT HANDLING CHARGE 6% CONTINGENCY ESTIMATED TASK COST $31,760 Task 99-15:White River Valley Flow Quantification ESTIMATED DAYS OTHER COSTS Subtask TOTAL Support Field/GIS Technical Principal Labor Direct Subcontract Cost TASK $ 320 $ 840 $ 640 $ 720 Cost Cost Cost Total COST 8 hr day 12 hr day 8 hr day 8 hr day (Item) (Cost) (hem) (Cost) Subtask Doeriptbn AODmONAL 1998199 WORK 5 1 1 $5,580 Mileage $370 Hokkak a $27,500 633,430 TOTAL DAY ESTIMATES 5 1 1 7 SUBTOTAL DOLLARS $1,200 $640 $720 65,560 $370 $27,500 $33,410 SUBCONTRACT HANDLING CHARGE 6% $1,650 CONTINGENCY ESTIMATED TASK COST 535,080 .Amendment No. 5 for Professional Consulting Services Pacific Groundwater Group Page 7 of 8 G. - EXHIBIT C COMPENSATION (cont'd) IA-2 PROGRAM Task 99-17: Production Well BA ESTIMATED DAYS OTHER COSTS Subbak TOTAL Support Field Technical Principal Labor Direct Subcontract Cost TASK $ 320 $ 840 $ 640 $ 720 Cost Coat Cost Total COST 8 hr day 12 hr day 8 hr day a hr day (item) (Coal) - (Item) (Coat) Subtask ENiscrIptIon Reject spoon:011ons nd startup 5 2 $4,640 Mileage $45 $4,e$3 Drill Well 84 40 1 1 134,960 Mileage $1,600 Soil lab $750 $37,310 Conduct pumping test 10 1 1 19,760 Wee IaWI^ $1000 110,760 Maya data 6 2 14,640 ReprolMal $100 Lab Wrong $2,000 $8,740 Pepan Well BA report 5 5 5 $8,400 Mileage $45 $6.445 Input on pump brstallallon 1 4 13,520 $3,620 TOTAL DAY ESTIMATES 5 50 18 15 08 SUBTOTAL DOLLARS $1000 142,000 111,520 $10,800 185,920 $1,790 13750 $71,480 SUBCONTRACT HANDLING CHARGE 10% $375 CONTINGENCY ESTIMATED TASK COST $71,836 WATER RESOURCES PROGRAMIIMPLEMENTATION Task 99-21:Water Level Monitoring ESTIMATED DAYS OTHER COSTS Subtas% TOTAL Support Field Technical Principal Labor Direct Subcontract Cost TASK $ 320 $ 840 $ 640 $ 720 Cost Cost Cost Total COST 8 hr day 12 hr day 8 hr day 8 hr day (Item) (Cost) (Rem) (Coat) Subtmk DORIS. RIVER GAUGES 1999 Rating Nora 2 2 52,720 Mont WG $30,000 $32,720 1999 flow analysis 3 3 $4,080 $4,080 1999 Gauge mabrten nce 4 12,880 $2.580 Water Le el Gab Collectlo Collett 1999 System Data Download Quarterly 12 2 I $12,080 Mileage $1,000 $13,080 Prepare and Issue 1999 Report 15 2 $11,040 pnYdelN $200 $11,240 Aaseaiuoael Monlbdng Equipment In 1999 10 10 2 $16,240 place en $5,000 $21,240 TOTAL DAY ESTIMATES 22 32 14 68 SUBTOTAL DOLLARS $18,480 $20,480 $10,080 149,040 18,200 130, 00 5$3,240 SUBCONTRACT HANDLING CHARGE 6% $1,800 CONTINGENCY ESTIMATED TASK COST $87,040, AMENDMENT TOTAL 5306,276 Amendment No. 5 for Professional Consulting Services Pacific Groundwater Group Page 8 of 8 0- 3 (6 S do' CITY OF AUBURN `11),' 9 qef�9 KING COUNTY WASHINGTON �SO4 AMENDMENT NO. 6 TO AGREEMENT NO AG-C 15 FOR PROFESSIONAL SERVICES Between D 2 G ly7 CITY OF AUBURN 15 U D And JUL 2 11999 PACIFIC GROUNDWATER GROUP By Pacific Groundwater Group 2377 Eastlake Ave E Seattle WA 98102 206.329.0141 019* ,�v AMENDMENT NO 6 TO AG-C 15 AGREEMENT FOR PROFESSIONAL SERVICES 1 SCOPE OF WORK. The scope of work shall be to provide hydrogeologic consulting services as shown in Exhibit A 2. COMPENSATION The amount of this amendment is$10,480. The total contract amount is increased to a total of$4 449,381 The cost breakdown for the tasks in this Amendment shall be generally consistent with Exhibit B Executed on 7 /5-19 CITY OF AUBURN can Charles A. Booth, Mayor ATTEST l k l,GbKXeACtsl[l/e•--/ Danielle E. Daskam, City Clerk APPROVED AS TO FORM.g ft tchael J Reynolds, City Attorney PACIFIC GROUNDWATER GROUP BY. Mark Utting, President Amendment No.6 for Professional Consulting Services Pacific Groundwater Group Page 2 of 4 I, EXHIBIT A SCOPE OF WORK The following scope of work(listed by City of Auburn Program and by task) shall be conducted. WATER RESOURCES PROGRAM TASK 99-22—SUPPLEMENTAL WELL 4 AQUIFER TESTING The following work shall be conducted: Install Replacement Well WR-2A A well drilling contractor shall be hired to install a replacement well adjacent to the existing WR-2, to an estimated depth of 60 feet. The finished well shall be 2-inches in diameter,have a screen length of 30 feet, and be completed with a flush mount wellhead to accommodate lawn mowing at the park. Shift Data Loggers A data logger shall be installed in WR-2A. The data logger would be removed from some other part of the system where level measurements are redundant or less important. Setup Data Loggers and Retrieve Data Data loggers at Well 4,T-4, CW-2, WR 2 and the barometric station at the airport shall be reset to collect data on an hourly basis. After conclusion of the test,data shall be retrieved from these data loggers and the data collection interval reset to the standard six-hour interval. Assess Data Data collected from the test shall be appended to the Pacific Groundwater Group database and plotted on linear graphs. Water level changes shall be reviewed to search for the hydraulic signal of the cycling pumping. Non-pumping influences shall be removed, where possible. Ratios of water level changes and time lags shall be quantified for input to the computer model currently under development. Potential impacts to the White River from pumping shall be assessed and the pumping test previously conducted at Well 4 reviewed. Prepare Memo A short memo shall be prepared summarizing the well installation, testing, results and conclusions. The City shall receive a review draft. A final memo shall be issued incorporating the City's comments. Amendment No.6 for Professional Consulting Services Pacific Groundwater Group Page 3 of 4 J EXHIBIT B COMPENSATION Pacific Groundwater Group shall be compensated in general accordance with the following table. Rates of compensation shall be in accordance with the existing contract for AG-C 15. ESTIMATED DAYS OTHER COSTS Subtask TOTAL Sup Field Tech Princ Labor Direct Subcontract Cost TASK $ 320 $ 840 $ 560 $ 720 Cost Cost Cost Total COST 8 hr day 12 hr da 8 hr day 8 hr day (Item) (Cost) (Item) (Cost) Subtask Description Well Installation and Pumping Test Install WR-2A 2 0.5 0.5 $2,320 Mileage $30 Holt $5,800 $5,350 Shift dataloggers I $560 Mileage $15 $575 Setup dataloggers I $560 Mileage $15 $575 Accres data 2 I $1,840 $1,840 Prepare memo 2 I $1,840 $1,840 TOTAL DAYS 0 2 6.5 2.5 11 SUBTOTALS SO $1,680 $3,640 $1,800 $7,120 $60 $3,000 $10,180 SUBCONTRACT HANDLING CHARGE 10% $300 CONTINGENCY $0 ESTIMATED TOTAL COST $10,480 Amendment No. 6 for Professional Consulting Services Pacific Groundwater Group Page 4 of 4 ll CITY OF AUBURN ti:AR 1 ti 2000 KING COUNTY WASHINGTON B 4 �) , % 1100 AMENDMENT NO 7 TO AGREEMENT NO AG-C 15 �9irs'B�,9 FOR OFF,F PROFESSIONAL SERVICES Between CITY OF AUBURN And PACIFIC GROUNDWATER GROUP Pacific Groundwater Group 2377 Eastlake Avenue, E. Seattle, WA 98102 206-329-0141 and 360-385-6959 C );\ i� v AMENDMENT NO 7 TO AGREEMENT FOR PROFESSIONAL SERVICES AG C 15 1 CONTRACT TERM The term of the Agreement for Professional Services is extended to December 31, 2000 Phase I as described below shall be completed and delivered to the City by June 15, 2000 The remainder of the scope, Phase II shall be completed by the end of the contract term 2 SCOPE OF WORK The scope of work shall be completed in two phases in accordance with the contract terms and as described as follows Phase I Complete the development and calibration of the steady-state and transient 3 dimensional groundwater models The model shall consist an eight layer 3 D, transient groundwater flow model of the greater City of Auburn area (as described in the 1999 characterization report) The model shall be developed using MODFLOW, and shall be delivered to the City in data files that can be read by MODFLOW in the PC environment Complete one simulation using the model The City shall select one pumping regime for its wells and one set of boundary conditions for the simulation The simulation shall be conducted with one river stage selected for the White and Green Rivers Complete and deliver five copies of a draft modeling report The report shall document the development of the model, discuss calibration and sensitivity analyses including criteria for acceptability and model results Criteria for calibration shall follow ASTM D 5490 93 with the exception that Standard American Engineering units shall be used instead of SI units The report will contain figures limited to 11 x 17 inches in size The figures shall show details on model construction, which shall include contour maps of elevation of model units hydraulic conductivity, storativity, and conductance of the hydrostratigraphic units most relevant to the model Figures shall also be developed showing model results Model results shall include contours of groundwater elevations and flow directions in the valley aquifer system, groundwater flow rates in the valley aquifer system, ever reaches affected by pumping of the City valley wells and changes in groundwater flow to various river reaches of the White and Green Rivers caused by pumping of the City valley wells The model shall simulate groundwater flow to the rivers using average (constant head) water levels for each model node Amendment No 7 for Professional Consulting Services Pacific Groundwater Group Page 1 of 4 representing a river reach. Average water levels shall be used as the constant heads in the steady state and transient calibrations. Complete a Users Guide for model. The User's Guide shall include descriptions of the inputs required for the model, with specific emphasis on model inputs including wells and pumping rates relevant to the City's future use of the model to secure water rights. The input description shall include tables of recommended ranges for input values and locations the City would use in future simulations relevant to future water rights issues. The User's Guide shall also discuss model output with specific emphasis on issues relevant to securing water rights. The User's Guide shall discuss how the various input values and output values could be used to provide input to future non-hydrogeologic studies that may be needed to secure water rights for the City The discussion shall include identification of the locations of river reaches potentially affected by City pumping. Present results of Draft report and model to staff. An informal presentation of the model, model results and draft report shall be made to City staff. The presentation shall include a live demonstration of the model using a computer supplied by Pacific Groundwater Group and a projector supplied by the City The presentation shall include an overview of the calibration process, a visual and verbal description of the output of the model and a discussion of how the model could be used in the water rights process. Phase H. Revise the draft report to include the City s review comments for a Final Draft and make a presentation to the Public Works Committee in July 2000 or earlier on the findings and conclusions of the modeling effort. Submit 5 copies of the report to the City Submit a digital copy of the report and figures in PDF format for reproduction of additional copies of the report by the City Prepare no more than two response letters on behalf of the City to special interest groups and/or agency review comments on the model and report. 3 COMPENSATION- The amount of this amendment is $70,000 The total contract amount is adjusted to a total of$4,033,021 This amendment represents a not-to-exceed cost to complete the Phase I work by June 15 2000 Phase H shall not be authorized if the Phase I work is not completed by June 15 2000 Amendment No. 7 for Professional Consulting Services Pacific Groundwater Group Page 2 of 4 Executed on fi S "" c.2 7 °mod?) - CITY OF AUBURN elooisu v Charles A. Booth, Mayor ATTEST Danielle-E. Daskam;City Clerk APPROVED AS TO FORM. 4 Michael J Reynolds, City Attorney PACIFIC GROUNDWATER GROUP BY Mark Utting, President Pacific Groundwater Group Amendment No. 7 for Professional Consulting Services Pacific Groundwater Group Page 3 of 4 STATE OF WASHINGTON) )ss. County of King ) I certify that I know or have satisfactory evidence that is the person who appeared before me, and said person acknowledged that he/she signed this instrument, on oath stated that he/she was authorized to execute the instr+/ment and acknowledged it as the presi.ent of Pacific Groundwater Group, a corp ration, to be the free and voluntary act of such party fo the uses and purposes mentioned in thi instrument. Dated Notary Public i and for the State of Washington residing at My appoint nt expires STATE OF WASHINGTON) )ss. County of King ) I certify that I know or have satisfactory -vidence that Charles A Booth and Danielle E. Daskam were the persons who appeared before me, and said persons acknowledged that they signed this instrument, on oath stated that they were authorized to execute the 'nstrument and acknowledged it as the MAYOR and CITY CLERK of the CITY OF AUBURN '% be the free and voluntary act of such parties for the uses and purposes mentioned in this instru ent. Dated Notary Public in and for the State of Wa hington My appointment expires Amendment No. 7 for ProfessionalaConsulting Services Pacific Groundwater Group Page 4 of 4 Air q q%G real, 49 Ak c 2,110s, ` �? CITY OF AUBURN C3/ppnF °( " KING COUNTY WASHINGTON AMENDMENT NO 8 TO AGREEMENT NO AG-C 15 FOR PROFESSIONAL SERVICES Between CITY OF AUBURN And PACIFIC GROUNDWATER GROUP, INC. Pacific Groundwater Group, Inc. 2377 Eastlake Ave East Seattle, WA 98102 206-329-0141 and 360-385-6959 %.cfr Lf. \6' P All provisions in the basic agreement and all previous amendments remain in effect except as expressly modified by this supplement The changes to the agreement are descnbed as follows 1 CONTRACT TERM The term of the Agreement for Professional Services is unchanged from Amendment No 7 The Agreement shall be in force until December 31 2000 2 SCOPE OF WORK The scope of work is amended to include an additional groundwater modeling run, and an update to a portion of the Coal Creek Springs analysis using revised pumping rate and flow data supplied by the City This modeling and analysts is necessary to support the water resource protection program development 3 COMPENSATION The amount of this amendment is $5,000 This brings the Resource Protection Task authorization to $130 000 The total contract amount is increased to a total of$4 038 021 Executed on (� J ,ok d(.) CITY OF AUBURN QittouQuir) k— ' Charles A Booth, Mayor ATTEST t ka-4,10".----' anie e E Daskam City Clerk PROVED AS TO FORM I OIL Michael J Reynolds, City Attorney PACIFIC UNDWATER GROUP ...e- BY Mark lining President REF II:1WQPPROJECTSIPGGWEO54A#S.DOC Amendment No 8 for Agreement No AG-C 15 Pacific Groundwater Group Page 2 of 2 CITY OF AUBURN KING COUNTY, WASHINGTON AMENDMENT NO 8 TO AGREEMENT NO AG C 15 FOR PROFESSIONAL SERVICES Between CITY OF AUBURN And PACIFIC GROUNDWATER GROUP, INC Pacific Groundwater Group Inc 2377 Eastlake Ave East Seattle, WA 98102 206 329 0141 and 360 385 6959 1 1\o t ,� J • All provisions in the basic agreement and all previous amendments remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I CONTRACT TERM. The term of the Agreement for Professional Services is unchanged from Amendment No. 7 The Agreement shall be in force until December 31 2000 2. SCOPE OF WORK. The scope of work is amended to include an additional groundwater modeling run, and an update to a portion of the Coal Creek Springs analysis using revised pumping rate and flow data supplied by the City This modeling and analysis is necessary to support the water resource protection program development. 3 COMPENSATION The amount of this amendment is $5,000 This brings the Resource Protection Task authorization to $130,000 The total contract amount is increased to a total of$4,038,021 ' Executed on &r r 021-06 CITY OF AUBURN Y Charles A. Booth, Mayor ATTEST i<ad-tx-4- 1 ?-/kla.a•40---- Danielle E. Daskam, City Clerk • 'PROVED AS TO FORM. ^� ► J Michael J Reynolds, City Attorney P`ACI------GROI�NDWATER GROUP BY Mark Utting, President REF 11:\WQ\PROJECTS\PGOTE054AN8.DOC Amendment No. 8 for Agreement No. AG-C 15 Pacific Groundwater Group Page 2 of 2