HomeMy WebLinkAboutSkyCorp Ltd. Contract 11-21CONTRACT
Contract No. 11 -21
THIS AGREEMENT AND CONTRACT, made and entered into, in triplicate, at Auburn,
Washington, this Q9`''- day of%iable411 e01 -4 2011, by and between the CITY OF
AUBURN, WASHINGTON, a municipal corporation, and Skycorp Ltd., 526 North West
Avenue, Suite 11, Arlington, WA 98223, hereinafter called the CONTRACTOR.
WITNESSETH: That, in consideration of the terms and conditions contained in the Contract
Documents entitled "MS1110, Jacobsen Tree Farm and Fields Residential Buildings
Demolition," which are by this reference incorporated herein and made a part of this
Contract, the parties hereto covenant and agree as follows:
1. The CONTRACTOR shall do all work and furnish all tools, materials and equipment for
Project MS1110, Jacobsen Tree Farm and Fields Residential Buildings Demolition — the
demolition and disposal of structures and site improvements on three residential properties,
removal and disposal of hazardous materials from the properties, severance of existing
utilities serving the properties, including decommissioning septic tanks, site restoration, and
erosion control for a unit bid price of seventy -five thousand six hundred ninety -eight dollars
($75,698.00) and Washington State Sales Tax of seven thousand one hundred ninety -one
dollars and thirty-one cents ($7,191.31) for a total contract value of eighty -two thousand eight
hundred eighty -nine dollars and thirty-one cents ($82,889.31) in accordance with and as
described in the Contract Documents which are by this reference incorporated herein and
made a part hereof, and shall perform any alterations in or additions to the work provided
under this Contract and every part thereof.
This Contract shall be executed by the Contractor and returned to the City within 7 calendar
days after the receipt of the dated notification of award and the Contract time shall commence
within 5 working days after execution of the Contract by the City and so designated on the
Notice to Proceed. Physical completion shall be within 30 working days of the date on the
Notice to Proceed.
If said work is not completed within the time specified, the CONTRACTOR agrees to pay
liquidated damages to the CITY OF AUBURN, as specified in Section 1 -08.9 (Liquidated
Damages) of the Standard Specifications.
The CONTRACTOR shall provide and bear the expense of all equipment, work and labor of
any sort whatsoever that may be required for the transfer of materials and for constructing
and completing the work provided for in this Contract and every part thereof, except such as
are mentioned in the Contract Documents to be furnished by the CITY OF AUBURN.
I1. The CITY OF AUBURN hereby promises and agrees with the CONTRACTOR to
employ, and does employ the CONTRACTOR to provide the materials and to do and cause
to be done the above described work and to complete and finish the same according to the
Contract Documents and the terms and conditions herein contained and hereby contracts to
pay for the same according to said Contract Documents and the aforesaid proposal hereto
attached, at the time and in the manner and upon the conditions provided for in this Contract.
4 MN
III. The CONTRACTOR for himself, and for his heirs, executors, administrators, successors,
and assigns, does hereby agree to the full performance of all the covenants herein contained
upon by part of the CONTRACTOR.
IV. It is further provided that no liability shall attach to the CITY OF AUBURN,
WASHINGTON by reason of entering into this Contract, except as expressly provided
herein.
IN WITNESS WHEREOF the parties hereto have caused this Contract to be executed the day
and year first hereinabove written.
Countersigned:
thisc g day of , 2011
ATTEST:
g_LaJc____
Danielle E. Daskam, City Clerk
APPROVED AS TO FORM:
Daniel B. Heid, City Attorney
By
By
CITY OF _ BURN WASHINGTON
Peter B. Lewis, Mayor
SKYCORP LTD.
4/
Authorized Official Signatu
CITY OF AUBURN
CONTRACT CHANGE ORDER AGREEMENT NO. 1
Contract No., Project No. and Project Title: 11 -21, MS1110, Jacobsen Tree Farm &
Contractor Name and Address:
Fields Residential Buildings Demolition
Skycorp Ltd.
526 North West Avenue, Suite 11
Arlington, WA 98223
The Contractor is hereby directed to make the changes to the Contract as described herein. This document and
all attachments are a supplement to the contract. All work, materials and measurements for the type of
construction involved shall be in accordance with the contract documents of the above named project unless
stated otherwise in this change order.
Summary of Proposed Changes:
1. The Technical Special Provisions, Part 2, Section 2- 02.3(5) Removal of Structures and Other
Improvements, is supplemented with the following:
"The Contractor shall decommission the existing dug type well approximately 3' -2" in diameter by
approximately 23' -4" deep, located at address 32882 56th Ave SE, Auburn, including meeting the
Department of Ecology Notice of Intent requirements."
The Contract time is extended by
5 days.
Item
Sch.
Sec. No.
Item Description
Quantity
( +/ -)
Units
Unit Price
($)
Total Price
( +/ -)
$ -
3. Ori:inal Contract Amount
$ 155,360.00
emova o Rest entia tructures an. ite
4. Revised Contract Amount
$ 159,060.00
$ 174,170.50
Improvements - 32882 56th Ave SE -
6
A
2 -02
Decommissioning water well
1
LS
3,700.00
$ 3,700.00
Subtotal
$ 3,700.00
Washington State Sales Tax (9.5 %) on applicable items
$ 351.50
TOTAL
$. 4,051.50
This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any
and all indirect costs, and time adjustment to perform the above described changes. All other costs are non- compensible.
Contractor:
Inspector:
Project Manager:
City Engineer:
Approved by:
H: \Forms \FCO25.xls
3// Z
//� 1,// date
Base Amount
Total incl. Tax
1. Total Cost this C/O
$ 3,700.00
$ 4,051.50
2. Total Cost Previous C/O
$ -
$ -
3. Ori:inal Contract Amount
$ 155,360.00
$ 170,119.00
4. Revised Contract Amount
$ 159,060.00
$ 174,170.50
This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any
and all indirect costs, and time adjustment to perform the above described changes. All other costs are non- compensible.
Contractor:
Inspector:
Project Manager:
City Engineer:
Approved by:
H: \Forms \FCO25.xls
3// Z
//� 1,// date
CITY OF AUBURN
CONTRACT CHANGE ORDER AGREEMENT NO. 2
Contract No., Project No. and Project Title: 11 -21, MS1110, Jacobsen Tree Farm &
Fields Residential Buildings Demolition
This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any and all
indirect costs, and time adjustment to perform the above described changes. All other costs are non - compensible.
Contractor:
Inspector:
Project Manager:
City Engineer:
Approved by:
H: \Forms \ChangeOrder.xls
Z/z 3/t2 .
Mayor, City of Auburn
Base Amount
Totals incl.Tax
1. Total Cost this C/O
$ 14,970.00
$ 16,392.15
2. Total Cost Previous C/O
$ 3,700.00
$ 4,051.50
3. Ori:inal Contract Amount
$ 155,360.00
$ 170,119.00
4. Revised Contract Amount
$ 174,030.00
$190,562.65
This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any and all
indirect costs, and time adjustment to perform the above described changes. All other costs are non - compensible.
Contractor:
Inspector:
Project Manager:
City Engineer:
Approved by:
H: \Forms \ChangeOrder.xls
Z/z 3/t2 .
Mayor, City of Auburn
`�11 ",-� \U
CITY OF AUBURN
CONTRACT CHANGE ORDER AGREEMENT NO. 2
Contract No.,Project No. and Project Title. 11-21, MS 1 10, Jacobsen Tree Farm &
Fields Residential Buildings Demolition
Contractor Name and Address:
Skycorp Ltd,
526 North West Avenue, Suite I I
Arlington,WA 98223
I
The Contractor is hereby directed to make the changes to the Contract as described herein. This document and all aaachments
are a supplement to the contract. All work,materials and measurements for the type or construction involved shall be in
accordance with the contract documents of the above named project unless stated otherwise in this change order.
Summary of Proposed Changes:
I The Technical Special Provisions,Part 2,Section 2-02.3(5)Removal ofS6arctures and Other
Improvements, is supplemented with the following:
King County Tax 4 Sewer or Septic Address
12305 SE 316th Street,
0921059018 Sewer Auburn, WA 98092
The lump sum contract price for"Removal of Residential Structures and Site Improvements-
12305 SE 316th Street"shall be full compensation for all labor,equipment,and materials
necessary to complete the work identified in Section 2-02.3(5)for 12305 SE 316th Street,
except furnishing gravel base, which will be paid under a separate contract item. The lump sum
contract price for"Removal of Residential Structures and Site Improvements 12305 SE 316th
Street" does not include well decommissioning.
The lump sum contract price for"Removal or Asbestos and Hazardous Materials- 12305 SE
316th Street"shall be full compensation for all labor,equipment,and materials necessary to
complete the work described in Section 2.023(6) for 12305 SE 316th Street.
2. The Special Provisions, Appendix B Asbestos Survey& Lead-Based Paint Screening,is
supplemented with the attached Regulated Building Material Survey for 12305 SE 316th Street
dated 10/24/2011
The Contract time is extended by 25 days.
— I
Item Sch. Sec. No. Item Description Quantity Units Unit Price Total Price
CO-2 A 1-09 Mobilization- 12305 SE 316th Street I LS 700.00 $ 700.00
Removal of Residential Structures and Site
CO-2-1 A 2-02 Improvements- 12305 SE 316th Street I LS 11400.00 $ 11,400.00
Removal of Asbestos and Hazardous
CO-2-2 A 1 2-02 IMaterials- 12305 SE 316th Street I LS 2870.00 $ 2,870.00
Subtotal $ 14,970.00
Washington State Sales Tax(9.5%)on applicable items $ 1,422.15
TOTAL $ 16,392.15
H:\Forms\ChangeOrder.xls
CITY OF AUBURN��� Qua
CONTRACT CHANGE ORDER AGREEMENT NO. 4 °D��4' ai
11 -21, MS1110, Jacobsen Tree Farm & 16) 4 :0 '
Fields Residential Buildings Demolition '� "e
Contract No., Project No. and Project Title:
Contractor Name and Address: Skycorp Ltd.
526 North West Avenue, Suite 11
Arlington, WA 98223
The Contractor is hereby directed to make the changes to the Contract as described herein. This document and all attachments are
a supplement to the contract. All work, materials and measurements for the type of construction involved shall be in accordance
with the contract documents of the above named project unless stated otherwise in this change order.
Summary of Proposed Changes:
l . The Technical Special Provisions, Part 2, Section 2- 02.3(5) Removal of Structures and Other
Improvements , is supplemented with the following:
"The Contractor shall remove concrete flat work located at address 12305 SE 316th Street,
Auburn, including approximately 858 square feet of detached garage flat work, approximately
1,400 square feet of barn flat work, and approximately 800 square feet of house garage and
driveway approach flat work."
The Contract time is extended by
2 days.
Item
Sch.
Sec. No.
Item Description
Quantity
( +/ -)
Units
Unit Price
($)
Total Price
( +1 -)
$ 26,137.65
3. Ori l final Contract Amount
$ 155,360.00
Removal of Flat Wor - 12305 SE 316t
4. Revised Contract Amount
$ 182,44 la: 0
199772.5855
CO -4
A
2 -02
Street
1
LS
3,210.90
$ 3,210.90
Subtotal
$ 3,210.90
Washington State Sales Tax (9.5 %) on applicable items
$ 305.04
TOTAL
$ 3,515.94
This change order constitutes full and complete compensation for all labor, equ I ment, materials, o ead, profit, any and all
indirect costs, and time adjustment to perform the above described changes. I other cost are n ' • s mpensible.
Contractor:
Inspector:
Project Manager:
City Engineer:
Approved by:
H: \Forms \ChangeOrder.xls
b
Apo
q1/1 /t ate
r±Iate
may r, City of Auburn
Date
Date
Base Amount
Total incl. Tax
1. Total Cost this C/O
$ 3,210.90
$ 3,515.94
2. Total Cost Previous C/O
$ 23,870.00
$ 26,137.65
3. Ori l final Contract Amount
$ 155,360.00
$ 170,119.00
4. Revised Contract Amount
$ 182,44 la: 0
199772.5855
This change order constitutes full and complete compensation for all labor, equ I ment, materials, o ead, profit, any and all
indirect costs, and time adjustment to perform the above described changes. I other cost are n ' • s mpensible.
Contractor:
Inspector:
Project Manager:
City Engineer:
Approved by:
H: \Forms \ChangeOrder.xls
b
Apo
q1/1 /t ate
r±Iate
may r, City of Auburn
Date
Date
CITY OF AUBURN
CONTRACT CHANGE ORDER AGREEMENT NO. 3
Contract No., Project No. and Project Title: 11 -21, MS 1110, Jacobsen Tree Farm &
Contractor Name and Address:
Fields Residential Buildings Demolition
Skycorp Ltd.
526 North West Avenue, Suite 11
Arlington, WA 98223
The Contractor is hereby directed to make the changes to the Contract as described herein This document and all attachments are
a supplement to the contract All work, materials and measurements for the type of construction involved shall be in accordance
with the contract documents of the above named project unless stated otherwise in this change order
Summary of Proposed Changes:
1 The Technical Special Provisions, Part 2, Section 2- 02.3(5) Removal of Structures and Other
Improvements, is supplemented with the following:
"The Contractor shall decommission the existing water well located at address 12305 SE 316th
Street, Auburn, including meeting the Department of Ecology Notice of Intent requirements.
No well logs are available The existing water well is assumed to be 6- inches in diameter, with
a depth 200 feet or under "
The Contract time is extended by
3 days.
Item
Sch.
Sec. No.
Item Description
Quantity
( +/ -)
Units
Unit Price
(5)
Total Price
( +1 -)
$ 20 443.65
3. Ori_inal Contract Amount
$ 155,360.00
emova o ' esi • entia tructures an ite
4. Revised Contract Amount
$ 179,2 0.00
196256 65
Improvements - 12305 SE 316th Street -
CO-3
A
2 -02
Decommissioning water well
1
LS
5,200.00
$ 5,200.00
Subtotal
$ 5,200.00
Washington State Sales Tax (9.5 %) on applicable items
$ 494 00
TOTAL
$ 5,694.00
This change order constitutes full and complete compensation for all labor. e
indirect costs, and time adjustment to perform the above described changes
Contractor:
Inspector:
Project Manager:
City Engineer:
Approved by:
H \Forms \ChangeOrder xls
.t
1 ipment, matenals, o/• rhead. profit. any and all
ll other costs . e n compensible
/i/&/2»2
41,25'
fate
ty ofAuburn
]ate
/
Date
Base Amount
Total incl. Tax
1. Total Cost this C/O
$ 5,200.00
$ 5,694.00
2. Total Cost All Previous C/O
$ 18,670.00
$ 20 443.65
3. Ori_inal Contract Amount
$ 155,360.00
$ 170,119.00
4. Revised Contract Amount
$ 179,2 0.00
196256 65
This change order constitutes full and complete compensation for all labor. e
indirect costs, and time adjustment to perform the above described changes
Contractor:
Inspector:
Project Manager:
City Engineer:
Approved by:
H \Forms \ChangeOrder xls
.t
1 ipment, matenals, o/• rhead. profit. any and all
ll other costs . e n compensible
/i/&/2»2
41,25'
fate
ty ofAuburn
]ate
/
Date