Loading...
HomeMy WebLinkAboutSkyCorp Ltd. Contract 11-21CONTRACT Contract No. 11 -21 THIS AGREEMENT AND CONTRACT, made and entered into, in triplicate, at Auburn, Washington, this Q9`''- day of%iable411 e01 -4 2011, by and between the CITY OF AUBURN, WASHINGTON, a municipal corporation, and Skycorp Ltd., 526 North West Avenue, Suite 11, Arlington, WA 98223, hereinafter called the CONTRACTOR. WITNESSETH: That, in consideration of the terms and conditions contained in the Contract Documents entitled "MS1110, Jacobsen Tree Farm and Fields Residential Buildings Demolition," which are by this reference incorporated herein and made a part of this Contract, the parties hereto covenant and agree as follows: 1. The CONTRACTOR shall do all work and furnish all tools, materials and equipment for Project MS1110, Jacobsen Tree Farm and Fields Residential Buildings Demolition — the demolition and disposal of structures and site improvements on three residential properties, removal and disposal of hazardous materials from the properties, severance of existing utilities serving the properties, including decommissioning septic tanks, site restoration, and erosion control for a unit bid price of seventy -five thousand six hundred ninety -eight dollars ($75,698.00) and Washington State Sales Tax of seven thousand one hundred ninety -one dollars and thirty-one cents ($7,191.31) for a total contract value of eighty -two thousand eight hundred eighty -nine dollars and thirty-one cents ($82,889.31) in accordance with and as described in the Contract Documents which are by this reference incorporated herein and made a part hereof, and shall perform any alterations in or additions to the work provided under this Contract and every part thereof. This Contract shall be executed by the Contractor and returned to the City within 7 calendar days after the receipt of the dated notification of award and the Contract time shall commence within 5 working days after execution of the Contract by the City and so designated on the Notice to Proceed. Physical completion shall be within 30 working days of the date on the Notice to Proceed. If said work is not completed within the time specified, the CONTRACTOR agrees to pay liquidated damages to the CITY OF AUBURN, as specified in Section 1 -08.9 (Liquidated Damages) of the Standard Specifications. The CONTRACTOR shall provide and bear the expense of all equipment, work and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this Contract and every part thereof, except such as are mentioned in the Contract Documents to be furnished by the CITY OF AUBURN. I1. The CITY OF AUBURN hereby promises and agrees with the CONTRACTOR to employ, and does employ the CONTRACTOR to provide the materials and to do and cause to be done the above described work and to complete and finish the same according to the Contract Documents and the terms and conditions herein contained and hereby contracts to pay for the same according to said Contract Documents and the aforesaid proposal hereto attached, at the time and in the manner and upon the conditions provided for in this Contract. 4 MN III. The CONTRACTOR for himself, and for his heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all the covenants herein contained upon by part of the CONTRACTOR. IV. It is further provided that no liability shall attach to the CITY OF AUBURN, WASHINGTON by reason of entering into this Contract, except as expressly provided herein. IN WITNESS WHEREOF the parties hereto have caused this Contract to be executed the day and year first hereinabove written. Countersigned: thisc g day of , 2011 ATTEST: g_LaJc____ Danielle E. Daskam, City Clerk APPROVED AS TO FORM: Daniel B. Heid, City Attorney By By CITY OF _ BURN WASHINGTON Peter B. Lewis, Mayor SKYCORP LTD. 4/ Authorized Official Signatu CITY OF AUBURN CONTRACT CHANGE ORDER AGREEMENT NO. 1 Contract No., Project No. and Project Title: 11 -21, MS1110, Jacobsen Tree Farm & Contractor Name and Address: Fields Residential Buildings Demolition Skycorp Ltd. 526 North West Avenue, Suite 11 Arlington, WA 98223 The Contractor is hereby directed to make the changes to the Contract as described herein. This document and all attachments are a supplement to the contract. All work, materials and measurements for the type of construction involved shall be in accordance with the contract documents of the above named project unless stated otherwise in this change order. Summary of Proposed Changes: 1. The Technical Special Provisions, Part 2, Section 2- 02.3(5) Removal of Structures and Other Improvements, is supplemented with the following: "The Contractor shall decommission the existing dug type well approximately 3' -2" in diameter by approximately 23' -4" deep, located at address 32882 56th Ave SE, Auburn, including meeting the Department of Ecology Notice of Intent requirements." The Contract time is extended by 5 days. Item Sch. Sec. No. Item Description Quantity ( +/ -) Units Unit Price ($) Total Price ( +/ -) $ - 3. Ori:inal Contract Amount $ 155,360.00 emova o Rest entia tructures an. ite 4. Revised Contract Amount $ 159,060.00 $ 174,170.50 Improvements - 32882 56th Ave SE - 6 A 2 -02 Decommissioning water well 1 LS 3,700.00 $ 3,700.00 Subtotal $ 3,700.00 Washington State Sales Tax (9.5 %) on applicable items $ 351.50 TOTAL $. 4,051.50 This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any and all indirect costs, and time adjustment to perform the above described changes. All other costs are non- compensible. Contractor: Inspector: Project Manager: City Engineer: Approved by: H: \Forms \FCO25.xls 3// Z //� 1,// date Base Amount Total incl. Tax 1. Total Cost this C/O $ 3,700.00 $ 4,051.50 2. Total Cost Previous C/O $ - $ - 3. Ori:inal Contract Amount $ 155,360.00 $ 170,119.00 4. Revised Contract Amount $ 159,060.00 $ 174,170.50 This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any and all indirect costs, and time adjustment to perform the above described changes. All other costs are non- compensible. Contractor: Inspector: Project Manager: City Engineer: Approved by: H: \Forms \FCO25.xls 3// Z //� 1,// date CITY OF AUBURN CONTRACT CHANGE ORDER AGREEMENT NO. 2 Contract No., Project No. and Project Title: 11 -21, MS1110, Jacobsen Tree Farm & Fields Residential Buildings Demolition This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any and all indirect costs, and time adjustment to perform the above described changes. All other costs are non - compensible. Contractor: Inspector: Project Manager: City Engineer: Approved by: H: \Forms \ChangeOrder.xls Z/z 3/t2 . Mayor, City of Auburn Base Amount Totals incl.Tax 1. Total Cost this C/O $ 14,970.00 $ 16,392.15 2. Total Cost Previous C/O $ 3,700.00 $ 4,051.50 3. Ori:inal Contract Amount $ 155,360.00 $ 170,119.00 4. Revised Contract Amount $ 174,030.00 $190,562.65 This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any and all indirect costs, and time adjustment to perform the above described changes. All other costs are non - compensible. Contractor: Inspector: Project Manager: City Engineer: Approved by: H: \Forms \ChangeOrder.xls Z/z 3/t2 . Mayor, City of Auburn `�11 ",-� \U CITY OF AUBURN CONTRACT CHANGE ORDER AGREEMENT NO. 2 Contract No.,Project No. and Project Title. 11-21, MS 1 10, Jacobsen Tree Farm & Fields Residential Buildings Demolition Contractor Name and Address: Skycorp Ltd, 526 North West Avenue, Suite I I Arlington,WA 98223 I The Contractor is hereby directed to make the changes to the Contract as described herein. This document and all aaachments are a supplement to the contract. All work,materials and measurements for the type or construction involved shall be in accordance with the contract documents of the above named project unless stated otherwise in this change order. Summary of Proposed Changes: I The Technical Special Provisions,Part 2,Section 2-02.3(5)Removal ofS6arctures and Other Improvements, is supplemented with the following: King County Tax 4 Sewer or Septic Address 12305 SE 316th Street, 0921059018 Sewer Auburn, WA 98092 The lump sum contract price for"Removal of Residential Structures and Site Improvements- 12305 SE 316th Street"shall be full compensation for all labor,equipment,and materials necessary to complete the work identified in Section 2-02.3(5)for 12305 SE 316th Street, except furnishing gravel base, which will be paid under a separate contract item. The lump sum contract price for"Removal of Residential Structures and Site Improvements 12305 SE 316th Street" does not include well decommissioning. The lump sum contract price for"Removal or Asbestos and Hazardous Materials- 12305 SE 316th Street"shall be full compensation for all labor,equipment,and materials necessary to complete the work described in Section 2.023(6) for 12305 SE 316th Street. 2. The Special Provisions, Appendix B Asbestos Survey& Lead-Based Paint Screening,is supplemented with the attached Regulated Building Material Survey for 12305 SE 316th Street dated 10/24/2011 The Contract time is extended by 25 days. — I Item Sch. Sec. No. Item Description Quantity Units Unit Price Total Price CO-2 A 1-09 Mobilization- 12305 SE 316th Street I LS 700.00 $ 700.00 Removal of Residential Structures and Site CO-2-1 A 2-02 Improvements- 12305 SE 316th Street I LS 11400.00 $ 11,400.00 Removal of Asbestos and Hazardous CO-2-2 A 1 2-02 IMaterials- 12305 SE 316th Street I LS 2870.00 $ 2,870.00 Subtotal $ 14,970.00 Washington State Sales Tax(9.5%)on applicable items $ 1,422.15 TOTAL $ 16,392.15 H:\Forms\ChangeOrder.xls CITY OF AUBURN��� Qua CONTRACT CHANGE ORDER AGREEMENT NO. 4 °D��4' ai 11 -21, MS1110, Jacobsen Tree Farm & 16) 4 :0 ' Fields Residential Buildings Demolition '� "e Contract No., Project No. and Project Title: Contractor Name and Address: Skycorp Ltd. 526 North West Avenue, Suite 11 Arlington, WA 98223 The Contractor is hereby directed to make the changes to the Contract as described herein. This document and all attachments are a supplement to the contract. All work, materials and measurements for the type of construction involved shall be in accordance with the contract documents of the above named project unless stated otherwise in this change order. Summary of Proposed Changes: l . The Technical Special Provisions, Part 2, Section 2- 02.3(5) Removal of Structures and Other Improvements , is supplemented with the following: "The Contractor shall remove concrete flat work located at address 12305 SE 316th Street, Auburn, including approximately 858 square feet of detached garage flat work, approximately 1,400 square feet of barn flat work, and approximately 800 square feet of house garage and driveway approach flat work." The Contract time is extended by 2 days. Item Sch. Sec. No. Item Description Quantity ( +/ -) Units Unit Price ($) Total Price ( +1 -) $ 26,137.65 3. Ori l final Contract Amount $ 155,360.00 Removal of Flat Wor - 12305 SE 316t 4. Revised Contract Amount $ 182,44 la: 0 199772.5855 CO -4 A 2 -02 Street 1 LS 3,210.90 $ 3,210.90 Subtotal $ 3,210.90 Washington State Sales Tax (9.5 %) on applicable items $ 305.04 TOTAL $ 3,515.94 This change order constitutes full and complete compensation for all labor, equ I ment, materials, o ead, profit, any and all indirect costs, and time adjustment to perform the above described changes. I other cost are n ' • s mpensible. Contractor: Inspector: Project Manager: City Engineer: Approved by: H: \Forms \ChangeOrder.xls b Apo q1/1 /t ate r±Iate may r, City of Auburn Date Date Base Amount Total incl. Tax 1. Total Cost this C/O $ 3,210.90 $ 3,515.94 2. Total Cost Previous C/O $ 23,870.00 $ 26,137.65 3. Ori l final Contract Amount $ 155,360.00 $ 170,119.00 4. Revised Contract Amount $ 182,44 la: 0 199772.5855 This change order constitutes full and complete compensation for all labor, equ I ment, materials, o ead, profit, any and all indirect costs, and time adjustment to perform the above described changes. I other cost are n ' • s mpensible. Contractor: Inspector: Project Manager: City Engineer: Approved by: H: \Forms \ChangeOrder.xls b Apo q1/1 /t ate r±Iate may r, City of Auburn Date Date CITY OF AUBURN CONTRACT CHANGE ORDER AGREEMENT NO. 3 Contract No., Project No. and Project Title: 11 -21, MS 1110, Jacobsen Tree Farm & Contractor Name and Address: Fields Residential Buildings Demolition Skycorp Ltd. 526 North West Avenue, Suite 11 Arlington, WA 98223 The Contractor is hereby directed to make the changes to the Contract as described herein This document and all attachments are a supplement to the contract All work, materials and measurements for the type of construction involved shall be in accordance with the contract documents of the above named project unless stated otherwise in this change order Summary of Proposed Changes: 1 The Technical Special Provisions, Part 2, Section 2- 02.3(5) Removal of Structures and Other Improvements, is supplemented with the following: "The Contractor shall decommission the existing water well located at address 12305 SE 316th Street, Auburn, including meeting the Department of Ecology Notice of Intent requirements. No well logs are available The existing water well is assumed to be 6- inches in diameter, with a depth 200 feet or under " The Contract time is extended by 3 days. Item Sch. Sec. No. Item Description Quantity ( +/ -) Units Unit Price (5) Total Price ( +1 -) $ 20 443.65 3. Ori_inal Contract Amount $ 155,360.00 emova o ' esi • entia tructures an ite 4. Revised Contract Amount $ 179,2 0.00 196256 65 Improvements - 12305 SE 316th Street - CO-3 A 2 -02 Decommissioning water well 1 LS 5,200.00 $ 5,200.00 Subtotal $ 5,200.00 Washington State Sales Tax (9.5 %) on applicable items $ 494 00 TOTAL $ 5,694.00 This change order constitutes full and complete compensation for all labor. e indirect costs, and time adjustment to perform the above described changes Contractor: Inspector: Project Manager: City Engineer: Approved by: H \Forms \ChangeOrder xls .t 1 ipment, matenals, o/• rhead. profit. any and all ll other costs . e n compensible /i/&/2»2 41,25' fate ty ofAuburn ]ate / Date Base Amount Total incl. Tax 1. Total Cost this C/O $ 5,200.00 $ 5,694.00 2. Total Cost All Previous C/O $ 18,670.00 $ 20 443.65 3. Ori_inal Contract Amount $ 155,360.00 $ 170,119.00 4. Revised Contract Amount $ 179,2 0.00 196256 65 This change order constitutes full and complete compensation for all labor. e indirect costs, and time adjustment to perform the above described changes Contractor: Inspector: Project Manager: City Engineer: Approved by: H \Forms \ChangeOrder xls .t 1 ipment, matenals, o/• rhead. profit. any and all ll other costs . e n compensible /i/&/2»2 41,25' fate ty ofAuburn ]ate / Date