CONTRACT CHANGE ORDER AGREEMENT NO. 4
�c
Contract No., Project No. and Project Title: 10-23,CP0909, Lakeland Hills Booster f�7
Pump Station Improvements
Contractor Name and Address: Bono Construction, LLC
20219 99th Avenue SE
Snohomish, WA,98296
0
The Contractor is hereby directed to make the changes to the Contract as described herein. This document and all attachments arc
a supplement to the contract. All work,materials and measurements for the type of construction involved shall be in accordance
with the contract documents of the above maned project unless stated otherwise in this change order.
Summary of Proposed Changes:
1 The Contractor shall install a fire hydrant along Nathan Ave SE between 57th Ct SE and Evergreen
Way SE. Price includes all labor,equipment,and materials to install a complete fire hydrant assembly,
including but not limited to mobilization,traffic control labor,wet tap of existing 12 inch diameter
main,and installation of the ftre'hydrant assembly, including 6 inch diameter ductile iron pipe,
temporary pavement patch,saw cutting,concrete sidewalk replacement,asphalt trench patch,and
landscape restoration. Work shall conform to Section 7-14 of the Special Provisions. 2 working days
are also added to the Contract.
The Contract time is extended by 2 days.
r
Item Sch. Sec. No. Item Description Quantity Units Unit Price Total Price
(+/-) ($) (+/-)
704-1 A 7-14 JHydrant Assembly Complete I LS 1 18613.06 $ 18,613.06
Subtotal $ 18,613.06
Washington State Sales Tax(9.5%)on applicable items $ 1,768.24
TOTAL $ 20,381.30
Base Amount Total Incl.Tax
1. Total Cost this C/O $ 18,613.06 $ 20,381.30
2. Total Cost Previous C/O $ 14,535.61 $ 15,916.49
3. Original Contract Amount $ 1,811,472.50 $ 1,983,562.39
4. Revised Contract Amount $ 1,844,621 17 $ 2,019,860.18
This change order constitutes full and complete compensation for all labor,equipment,materials,overhead,profit,any and all
indirect costs,and time adjustment to perform the above described changes. All other costs arc non-compensible All other terms
and conditions of the contract remain unchanged
RECEIVED
f _D Contractor,
11 G l�
r Date`
t Inspector:
NOV- 2 202
to
2 Zu12 Project Manager-
CITY of Aubm City Engineer-
Date
Public W^� D
A d b _
',I!, WORks DEPARTMENT
Approved y Mayn , Auburn Date
H AForm s\G hangeOrder.xls
RECEIVED 0 Yry 011-
CITY OF AUBURN QF9'6BG
NOV - 9 2012 CONTRACT CHANGE ORDER AGREEMENT NO. 3 S'Oc9lj/
�CF
Contract No.,Project No.and Project Title: 10-23,CP0909, Lakeland Hills Booster 1Uj
city ofAubm Pump Station Improvements
FLbhc Wo&DcPVn Kw
Contractor Name and Address: Buno Construction, LLC
20219 99th Avenue SE
Snohomish, WA,98296
The Contractor is hereby directed to make the changes to the Contract as described herein. This document and all attachments are
a supplement to the contract. All work,materials and measurements for the type of construction involved shall be in accordance
with the contract documents of the above named project unless stated otherwise in this change order.
Summary of Proposed Changes:
I Added Contract days only due to delays in the owner supplyed SCADA Control Panel and delays in
critical material deliveries from suppliers which has affected the construction critical path.
The Contract time is extended by 55 days.
Sales
Item Sell. Sec. No. Item Description Quantity Units Unit Price Total Price Tax
$
Subtotal $
Washington State Sales Tax (9.5%)on applicable items $
TOTAL $
Base Amount Total Incl.Tax
1. Total Cost this C/O $ - $
2. Total Cost All Previous C/O $ 14,535.61 $ 15,916.49
3. Original Contract Amount $ 1,983,562.39
4. Revised Contract Amount $ 14,535.61 $ 1,999,478.88
This change order constitutes full and complete compensation for all labor,equipment,materials,overhead,profit,any and all
indirect costs,and time adjustment to perlirrm the above described changes. All other costs are non-compensible. All other terms
and conditions of the contract remain unchanged.
Contractor* d l{ b l
Inspector- . l 111 S a Z
are
Project Manager- /t /3 tZ
Date
City Engineer-
D=
Approved by //43112-
Mayor, Mtv of Auburn ' D""
H:\Forms\C ha ng eO rder.xl s
CITY OF AUBURN
CONTRACT CHANGE ORDER AGREEMENT NO. 2
Contract No., Project No. and Project Title: 10 -23, CP0909, Lakeland Hills Booster
Pump Station Improvements
Contractor Name and Address: Buno Construction, LLC
20219 99th Avenue SE
Snohomish, WA, 98296
The Contractor is hereby directed to make the changes to the Contract as described herein This document and all attachments
are a supplement to the contract All work, materials and measurements for the type of construction involved shall be in
accordance with the contract documents of the above named project unless stated otherwise in this change order
Summary of Proposed Changes:
1.
Added days to contract due to a delay in the owner supplyed SCADA Control Panel which affects the
construction critical path (35 days).
The Contract time is extended by
35 days.
Item
Sch.
Sec. No.
Item Description
Quantity
( +/ -)
Units
Unit Price
(5)
Total Price
(+1-)
Sales
Tax
(Y/N)
CCC
$ 1,811,472.50
$ 1,983,562.39
4 Revised Contract Amount
C
$1,999,478.88
CCC
Subtotal $
Washington State Sales Tax (9.5 %) on applicable items $
TOTAL
This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any and all
indirect costs, and time adjustment to perform the above described changes All other costs are non- compensible
Contractor:
Inspector:
Project Manager: I
/, ' Date
_
City Engineer: Zi} Z
/� Date
Approved by: —
Mayor, City of Auburn
�SLtt. €r— yIlgb L
Date
y/I 6 %iZ
7/ate
H \Forms \ChangeOrder xls
1► 4/27 /2
Date
11 j
Base Amount
Totals incl.Tax
1. Total Cost this C/O
$ -
$ -
2. Total Cost Previous C/O
$ 14,535.61
$ 15,916.49
3. Ori_inal Contract Amount
$ 1,811,472.50
$ 1,983,562.39
4 Revised Contract Amount
$1,999,478.88
This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any and all
indirect costs, and time adjustment to perform the above described changes All other costs are non- compensible
Contractor:
Inspector:
Project Manager: I
/, ' Date
_
City Engineer: Zi} Z
/� Date
Approved by: —
Mayor, City of Auburn
�SLtt. €r— yIlgb L
Date
y/I 6 %iZ
7/ate
H \Forms \ChangeOrder xls
1► 4/27 /2
Date
11 j