HomeMy WebLinkAboutJohansen Excavating 11-08 Change Order # 6CITY OF AUBURN CONTRACT CHANGE ORDER AGREEMENT NO. 6 Contract No., Project No. and Project Title: 11 -08, CP1005, S Division St Promenade 0 Contractor Name and Address: Johansen Excavating, Inc 28215 112th Street East Buckley, WA 98321 0 The Contractor is hereby directed to make the changes to the Contract as described herein This document and all attachments are a supplement to the contract All work, materials and measurements for the type of construction involved shall be in accordance with the contract documents of the above named project unless stated otherwise in this change order Summary of Proposed Changes: 1. Change order #6 is a zero cost change order adding days to the Contract. 10 days are added to the contract as a result of the wet weather work identified in change order #5 Manuevering tents and working under rainy conditions during paver installation caused delays affecting the construction critical path The Contract time is extended by 10 days Item Sch. Sec. No. Item Description Quantity (+1-) Units Unit Price (5) Total Price (+1-) Sales Tax (Y/N) 1 _- $ 4,094,911.33 -_- $ $4,392,006.30 2 _- -_- $ Subtotal $ Washington State Sales Tax (9.5 %) on applicable items $ TOTAL This change order constitutes full and complete compensation for all labor, equipment, m terials, overhead, profit, any and all indirect costs, and time adjustment to perform the above described changes All otl r c s are non - compensible Contractor -- j Inspector: Project Manager: City Engineer: Approved by: H \Forms \ChangeOrder xls J Y(25 Z0i2 Date 91_ Y /20h ate Mayor Auburn Date Date 2 Base Amount Total incl Tax 1. Total Cost this C/O $ - $ - 2 Total Cost Previous C/O $ 297,068.37 $ 297,094 97 3 Original Contract Amount $ 4,054,501.80 $ 4,094,911.33 4. Revised Contract Amount $ 4,351,570 17 $4,392,006.30 This change order constitutes full and complete compensation for all labor, equipment, m terials, overhead, profit, any and all indirect costs, and time adjustment to perform the above described changes All otl r c s are non - compensible Contractor -- j Inspector: Project Manager: City Engineer: Approved by: H \Forms \ChangeOrder xls J Y(25 Z0i2 Date 91_ Y /20h ate Mayor Auburn Date Date 2