CONTRACT CHANGE ORDER AGREEMENT NO. 6
Contract No., Project No. and Project Title: 11 -08, CP1005, S Division St Promenade
0
Contractor Name and Address: Johansen Excavating, Inc
28215 112th Street East
Buckley, WA 98321
0
The Contractor is hereby directed to make the changes to the Contract as described herein This document and all attachments are
a supplement to the contract All work, materials and measurements for the type of construction involved shall be in accordance
with the contract documents of the above named project unless stated otherwise in this change order
Summary of Proposed Changes:
1. Change order #6 is a zero cost change order adding days to the Contract. 10 days are added to the
contract as a result of the wet weather work identified in change order #5 Manuevering tents and
working under rainy conditions during paver installation caused delays affecting the construction
critical path
The Contract time is extended by
10 days
Item
Sch.
Sec. No.
Item Description
Quantity
(+1-)
Units
Unit Price
(5)
Total Price
(+1-)
Sales
Tax
(Y/N)
1
_-
$ 4,094,911.33
-_-
$
$4,392,006.30
2
_-
-_-
$
Subtotal $
Washington State Sales Tax (9.5 %) on applicable items $
TOTAL
This change order constitutes full and complete compensation for all labor, equipment, m terials, overhead, profit, any and all
indirect costs, and time adjustment to perform the above described changes All otl r c s are non - compensible
Contractor -- j
Inspector:
Project Manager:
City Engineer:
Approved by:
H \Forms \ChangeOrder xls
J
Y(25 Z0i2
Date
91_
Y /20h ate
Mayor Auburn
Date
Date
2
Base Amount
Total incl Tax
1. Total Cost this C/O
$ -
$ -
2 Total Cost Previous C/O
$ 297,068.37
$ 297,094 97
3 Original Contract Amount
$ 4,054,501.80
$ 4,094,911.33
4. Revised Contract Amount
$ 4,351,570 17
$4,392,006.30
This change order constitutes full and complete compensation for all labor, equipment, m terials, overhead, profit, any and all
indirect costs, and time adjustment to perform the above described changes All otl r c s are non - compensible
Contractor -- j
Inspector:
Project Manager:
City Engineer:
Approved by:
H \Forms \ChangeOrder xls
J
Y(25 Z0i2
Date
91_
Y /20h ate
Mayor Auburn
Date
Date
2