Loading...
HomeMy WebLinkAboutHoffman Construction, Inc 12-03CITY OF AUBURN CONTRACT CHANGE ORDER AGREEMENT NO. 1 Contract No., Project No. and Project Title: 12 -03, C412C, Auburn Environmental Parking (AEP) Lot Improvements Contractor Name and Address: Hoffman Construction, Inc PO Box 845 Enumclaw, WA 98022 The Contractor is hereby directed to make the changes to the Contract as described herein This document and all attachments are a supplement to the contract All work, materials and measurements for the type of construction involved shall be in accordance with the contract documents of the above named project unless stated otherwise in this change order Summary of Proposed Changes: 1 During the construction of the parking lot improvement, unsuitable subgrade was found in a few areas Over excavation is needed and filled with ballast to a suitable subgrade Dirt shoulder was ripped up during the boardwalk and parking lot construction, gravel shoulder is needed to stabilize the shoulder and reduce mud tracking 2. During the construction of the shoulder improvement, unsuitable subgrade was found in a few areas Over excavation is needed and additional gravel filled to a suitable subgrade Additional 3/8" gravel needed to match grade between the boardwalk's headwall and the compacted gravel ramp 3 After a week of the compacted gravel pedestrian trail ramp being in place Due to heavy rain and foot traffic the compacted gravel does not seem to hold up Gravel begins to come loose and does not meet ADA guidelines Pervious concrete was replaced for a more stable /harden surface 4 The concrete strip that connects the boardwalk to the existing asphalt sidewalk on Main St does not match grade in some areas and could be a tripping hazard Repair needed to provide the smooth transition The Contract time is extended by 0 days Item Sch. Sec. No. Item Description Quantity ( +1 -) Units Unit Price (5) Total Price ( +1 -) Gravel shoulder and over excavate due to C01 -1 ■ unsuitable parking lot subgrade 1 LS 4,651 99 4,651 99 Over excavate due to unsuitable subgrade of C01 -2 ■ gravel shoulder and added 3/8" gravel path 1 LS 3,135 57 3,135 57 C01 -3 _- 4" Pervious concrete pedestrian trail ramp 1 LS 10,684 67 10,684 67 Repair concrete & asphalt at boardwalk trail CO1 -4 - access to West Main St 1 LS 1,000 00 1,000 00 Subtotal $ 19,472 23 Washington State Sales Tax (9.5 %) on applicable items $ 1,849 86 TOTAL $ 21,322 09 H \Forms \FCO25 xis CITY OF AUBURN CONTRACT CHANGE ORDER AGREEMENT NO. 1 Contract No., Project No. and Project Title: 12 -03, C412C, Auburn Environmental Parking (AEP) Lot Improvements This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any and all indirect costs, and time adjustment to perform the above described changes All other costs are non- compensible Contractor: Inspector: Project Manager: City Engineer: Approved by: H 1Forms\FCO25 xis dlo KA; lFr� 5 43aS` Amoijri !;3 Aotal;iricl °Tax 17 ,Totaii:Cosl tliisLC/Qu' :'' - ;}_- .% "' -. • l' 19`i472'2 I, 'c :w£ 2' 5322 09 2:L,Total?Cost-,Pr vioits- C /.Q -'- ,, >; , =c <<,; - }-- r$_y: _ Y 3'.:o-I,i:inal�Coritia t- in ili '�F::=.:', ; y as A Q° �_� - - - - -S- �� _:� „ �$ °;- �£�v2'1;225:�Q; �$��.2 ;24`'[8 '', . _ � � a��i �p�_ ��"' =: -�` 4 Revis�d oiitraettA otlt `"` =t: ',.`$''';.,:; ' _.,�4(r;97 :23� '�° `1 Y _$;:�z�44';50:3:47; This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any and all indirect costs, and time adjustment to perform the above described changes All other costs are non- compensible Contractor: Inspector: Project Manager: City Engineer: Approved by: H 1Forms\FCO25 xis dlo KA; lFr�