HomeMy WebLinkAbout05-15-2012 MatrixAIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX # PROJECT DESCRIPTION LEAD Est. COST REVIEW EST. STATUS DATE COMPL. DATE 3 Hangar Rows 9 & 10 Steve Burke /AMG/ $250,000 6/20/2012 8/31/2012 Schedule indicates bid has been advertised and is open roof Bob Jones 7 Noise Complaints AMG 0 6/20/2012 NA No reports since last report 9 Airport Security AMG TBD 6/20/2012 TBD Each association has been contacted informing them of Update the airports desire to have the airport control access. 11 Airport Master Plan Coleman /AMG $150,000 6/20/2012 Feb 2014 As of 5/11/12, two bids were submitted (W &H Pacific Mid -Term Update and Century West) 12 April Occupancy Rates AMG -0- 6/20/2012 NA • Row 9/10 38/40 (95 %) no change • Row 2 Full (14) (100 %) no change • Row 8 4/6 (67 %) no change • Rows 3 -7 51/85 (60 %) -1 • Storage Units 8/12 Full (67 %) no change • Tie down 32/100 full (32 %) +1 13 General Airport Event Board Only TBD 6/20/2012 NA Event to showcase Auburn Airport, e.g. WWI —II aircraft. Static display /food /sale vendors/ flights. 14 Fuel Dispenser AMG $10,000 6/20/2012 TBD Received bid from Small & Sons (Sound Pumps), Replacement $7500 installed. Replacement new technology filter system to come from Epic Aviation 15 Aircraft Accident AMG TBD 6/20/2012 6/30/2012 18 pages of document created with guidance from Emergency Plan and FAA Advisory Circular. Recover Plan 16 Update Airport Storm Chris Anderson /RM ^'$38,000 6/20/2012 7/31/2012 RM visited site end of April, work continues to water "SWWPP" Plan finish SWWPP 18 West Side Trees AMG $25,000 6/20/2012 8/31/2012 Trees on the west side of the airport in the wet land areas have grown to a height that penetrates the Runway Safety Area. These need to be cut down/removed. Project on hold due to delay in grant funding. Will pursue other alternatives. 19 506 Building Update AMG TBD 6/20/2012 Building has been vacated by NAC. Tours given to Last Revision Date: 3/18/2012 AIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX X113TUDiyawc # PROJECT LEAD Est. COST REVIEW COMPL. GRCC, Airwork Las Vegas, Airtech, ATC. No DESCRIPTION DATE DATE Interest from GRCC due to size limitation. Airworlc 2 Airport Rules and AMG 0 9/20/2010 waiting on client base before expanding. ATC just Regulations expanded at Boeing Field, not currently looking to 10 Aircraft Wash Rack AMG TBD 3/31/2012 move. Received lead from Airtech that Wings Aloft 7 MAI Appraisal AMG 0 12/31/2010 has changed ownership /management. AMG has 1 Airport Storm Reid $50,000 4/20/2011 contacted new owner to discuss moving /relocating Water Design Middleton /AMG to Auburn. Two "For Lease" signs have been Update installed, one street side, one airport side. (see 4 Runway Lighting Steve $350,000 6/2/2011 Pictures) 20 Airport Brochure AMG TBD 6/20/2012 Brochure updated with Mucldeshoot Casino Middleton /AMG information X113TUDiyawc # PROJECT LEAD Est. COST REVIEW COMPL. STATUS DESCRIPTION DATE DATE 2 Airport Rules and AMG 0 9/20/2010 Completed Regulations 10 Aircraft Wash Rack AMG TBD 3/31/2012 Completed 7 MAI Appraisal AMG 0 12/31/2010 Completed 1 Airport Storm Reid $50,000 4/20/2011 Completed Water Design Middleton /AMG Update 4 Runway Lighting Steve $350,000 6/2/2011 Construction Completed. Replacement Burke /Reid Middleton /AMG 5 Storm Water Robert 0 4/8/2011 Project Completed Retention Ponds Lee /Storm Water /Coleman 6 Airport Hangar AMG 0 9/7/2011 Completed Inspection 8 Drainage Mitigation Tim Carlaw Recent observation — no change since last report. No Last Revision Date: 3/18/2012 AIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX standing water. Monitoring and will update as necessary 17 Repair of Storm AMG $25,000 1111112011 Completed Water Catch Basins Last Revision Date: 3/18/2012