HomeMy WebLinkAbout4515 RESOLUTION NO. 4575
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AUBURN, WASHINGTON, AUTHORIZING TME' MAYOR AND CITY
CLERK,TO EXECUTE A LOCALAGENCYAGREEMENT BETWEEN
. _
THE CITY OF AUBURN AND WASHINGTON STATE DEPARTMENT
OF TRANSPORTATION RELATING TO PROJECTNO. CP0803, 37TH
STREET SE ! R STREET SE PEDESTRIAN CONNECTOR
IMPROVEMENTS
WHEREAS, the City of Aubum ("City") is completing the design and
construction of a non-motorized trail located within the unopened rigM-of-way �
between the end of 37t".Street SE and R StreetSE ("Project"); and
WHEREAS, the City has 6een awarded a State Pedestrian & Bicycle Safety
Program grant in the amount of $124,300 with no required local funding match for
the design and construction of the Project; and
WHEREAS, the Washington State Department of Transportation is a State
agency responsible for the administration of State Pedestrian & Bicycle Safety
Program funds fornon-motorized transportation projects; and
WHEREAS, it is in the best interest of the City to use grant monies to finance
capital improvements to the non-motorized transportation system; and
WHEREAS, the Washington State Departrnent of Transportation requires a
Local Agency Agreement to utilize these Pedestrian & Bicycle Safety Program
funds.
NOW, THEREFORE, THE CITY GOUNCIL OF THE CITY OF
AUBURN, WASHINGTON, HEREBY RESOLVES as follows:
Resolution No. 4515
August 21, 2009
Page 1
Section 1. The Mayor and City Clerk are hereby authorized to execute a
Local Agency Agreement between the City and Washington State Department of
Transportation, in substantial confortnity with the agreement attached hereto,
marked as Exhibit "A" and incorporated herein by this reference.
Section 2. The Mayor is hereby authorized to implement such
administrative procedures as may be necessary to carry out the directions of this
legislation.
Section 3. That this Resolution shall take effect and be in full force upon
passage and signatures hereon.
Dated and Signed this ��day of 2009.
CITY OF AUB
�
PE ER B. LEWIS
MAYOR
ATTEST:
C-/�frv�-�
Da ielle E. Daskam,
City Clerk
APP V D �T-O�FORM:
i .
Daniel B. Hei
City Attorney
Resolution No. 4515
August2l, 2009
Page 2
1 � . 8Ji111Al1 l.. tl .
,,�
'V/' ����
Agency and Address
Highways and Local Programs CityofAuburn
State Funding Agreement as we�c�s�eet
Work by Public Aubwn, WA 98001
Agencies
Agreement Number Maximum Amount Authodzed Locatiortand Description of Work(See also Exhibit"A�
$124,300.00 T�s project will design and construct a 10-foot wide
non-motorized trail on unopened 37th Street SE,
PaAicipating Percentage Project Number
starting 150 feet west and ending 175 feet east of
100% HLP-PB06(018) p�e Street SE.
This AGREEMENT is made and entered into this day of
tietween the STATE OF WASHINGTON, Department of TransportaGon,acting by and through the Secretary of Transportation,
hereinafter called ttte"STATE;and the above named organization,hereinafter called the"AGENCY'
WFIEREAS, the AGENCY is planning the work shown above,and in connedion therewith,the AGENCY has requested financial
assistance for the projed or program,and
WHEREAS,the AGENCY tias requested funds for the above shown project or program,which has been seleded by the
STATE for funding assistance.
�NOW THEREFORE,in consideretion of the terms,conditions,covenants,and perfortnances coMained herein,or attached end
incorporated anii made a part hereof, IT IS MUTUALLY AGREED AS FOLLOWS:
i � �
Type of Work EstimetedTotal Estimated�Agency Estimated
Project Funds Funds State Funds
� a.A en 17 000.00 0.00 17 000.00
b.Other
c. Other
d.State 1 000.00 1 000:00
e:Total PE Cost Estimate a+b+c+d 18 000.00 0.00 18 000.00
Rlght of Way f:,4 en
h.Other
i. State
':Total RM!Cost Estimate f �+i
Construction k.Contrad 99 300.00 99 300.00
I. Other
m.Other
n. OtFier
o.A en 6 500.00 6 500.00
. State 5 0.0 5 0.00
q.Total CN Cost Estimate k+l.m+nm 106,300.00 106,300.00
r.Total Pro ect Cost Estimate e ' 124 00.00 0.00 124 00.00
.Resolution No. 9515
Exhibit A
Page 1 of 2
DOT Fartn 140.087 EF �
Revieed Bl00 .
f
� IV
Generel Legal Relations
Tha AGENCY agrees to perform the above described woAc in accardance No Ilebility shall ettach to the AGENCY or the STATE by reason of
with Ne ProJed Application attached hereto�as'E#dbit A' and made a eMerin9 inW this AGREEMENT�eept es expressy provided harein.
part W Mis AGREEMENT. �
Plans, specHioatlons, and mst esGmetei shall be prepared by lhe � V
AGENCY` in acoordance with Me arrent State M Washington Standard Nondiserimination
SpeeiRCalions for Road, Bdtlge, end Municipal Construdfon and adopted The AGENCY agrees to wmpy wiM all applicable sta6e and federel laws,
design stendards, unlass othen�ise nMad. TheAGENCYwill incorporate Nles, and �reguleBons perteining to nomliscrimination and �agtees to
Me plens antl spedfleatlons IMO the AGENCY's pmjad and the2efter BqWre Ne same of all subcontractors providing services or parfortnina
advertise the�esuld��proJed for bitl�and,assuming bids are recelved and any work using Ponds provlded undar this AGREEMENT.
a coMraU Is ewarded,edminister the coMrad,or H the projed is of a sfze
which,tha AGEIJCY is euMorized to perform with its own forces under Ne �
laws of.Ne State of Washington, the AGENCY mey proeeed with ils own
Venue
All eroAC.�performed under this AGREEMENT shap compy with Ne �
applieable provisions of state law. For the convenienca ot tAe paNea to this AGREEMENT,.k is agreed that
, fl any delma andlor oausas of aetion which the AGENCY has��against the
STATE, growing out of thia AGREEMENT or the praject or program with
Payment which It is concemed, shall be brought only in the Superior Court for
Ttie STATE, In.�consideratfon of the faRh}ul performence of the work to ba � �
performed by Ne AGENCY, egreas to relmburde the AGENCY fo,r the VII �
�pereeMege cf the_actuel direct and releted indireG cost of the work shown Termination
�above, up to the�'MN(IMUM AMOUNT AUTHORIZED'. The aganry wlll
�comply�with Govemmentaf AaouMinp Auditi��and Finandal RepoNng The Secretary of Me Departrnent of Trarrsportation may tertninete this
Standards and epplieable atate law and laoa� regWatlona, policiea and � AGREEMENT if Ne fiinding bewmas unavellable or if the Seaetary
proceCuies. No paymerrt will be made for work done prior to exewtion of datertnines that R Is In the best interest of the STATE. �
this AGREEMENT.
PaRlal payme�rts shell be mada by the STATE, upon request of the ���
AGENCY,to caver cosb.ina,med. rnese paymerrcs are not to be more �Flnal RepoR and Final Inspeetion
frequeM than one. (1) per monN. It is�egreed that any such partiai yyy�in ninety (90) deys foilowing the completion oF the project and
paymeM�wAI not cons� egreemaM as to the approprlateness of:airy yubmission of tha finel biiling for the projed, a final report and/or flnal
item and�that,�at tha tlme af Ne final audR,�all required adJustrneMs wi�l be ��g��on a�all.Ee submitted to the Asaistant Seuetary for Highweys 8
�made�and�refleded�in e�.8nal payment The AGENCY agrees to submit a �ocal Progrems containing the tollowing infortnation:
�8nal bill.to the STATE within forry-flve (45)days after Ma AGENCY has
Ttie AGENCY egrees thet ell costs In axcess of the amount authorized antl Non-CaoRal Proieets
_ -
Ufe AGENCY's matching fueds slialPbe Me responsibility of the AGENCY. � q deserlptlon W Na project oi program.
��� - 2. A�summary of eGual costs of the projed or progfam..
Audit 3. An evaluetion of the proJed or program. This should address
� aspacta such as transportatlon andlor other beneflfs to Me public.
The AGEN¢Y�agreesthet en eudit mey ba contluGed by the S7A7E.
Ceoital Proleets
During the progress ot the work and Mr a pedod not lass�than Nree(3)
yeara from tha dete ot final peymant ta the AGENCY, tlie records and t. A flnal Inspedion is required.
accouMS perteining,to the work and accouMing thareof are to be kept �X
availebla for inspection endautlit by Me STATE antl copies of atl rewrcls, . SUPP181i180L
acoounb, �dowments, or other date paRaining to the project�will ba
fumished� upon request. �If any Iftigetion, daim, or audR�is commenced,
Ne rewrds�end�aaounb along with supporting dowmentatlon�sfiall.6e This agreament may be modifletl or supplemented only in writlng by both
retalned urrtll all Iltlgetlon, daim, or eudit flnding has been resolved even parties.
though sueh IRigetion, claim, or audit conUnues past ttie��thrao-year �
IN WITNESS WHEREOF,the paRies hereto have executed this AGREEMENT on the day and year last written below.
AGENCY STATE
By: - - BY�
. AssiStaM Secretary for Highways and Lopl Programs
Tiue: Mayor
SEP 8 2009
Date: / Date:
Reeolution No. 6515 � � -
E�chibit A
Page 2 af 2
DOT Form 140.087 EF
Revisetl e/00 �
AC�cY
�� Supplement- Highways and Local Programs
�// ��Tra�patambn State Funding Agreement
�e^� Supplement Number
Ci ofAubum
�ProjeG Number Agreement Number 1
FILP-PBQ6 018 LA-6301
This supplemental agreement is made and entered into
All provisions in the AGREEMENT,identified above remain in effect except as e�ressly modified by this supplemeM.
The changes to the agreement are described as follows: .
ProjeCt De3C�iption ❑ No Change
Name 37th Street SE/R Street SE Pedestrian Connector
Locetion From the end o£3'7th Street SE to R Street SE
Descriptfon of Work ❑No Change
�This�project wili construct a IO-foot wide non-motorized,paved vail through e�cisting unopened 37th Street�SE,-starting
approximately 150 feet west and ending approitimately 175 feet east of Pike Stree[SE. The trail will be approximately 325 feet in
leng[h.
Reason for Supplement
The original agreement authorized funds for the Aubum Way South Mid-Bbck Crosswalk project. In May 2008,the funds.wtre
rcprogrammed from the Aubum Way South Mid-Block.Crosswalk projec[to the 37th Street SE/R Street SE Pedestrian Connector
project. 'Chis supplemrnt revises the project description,description ofµ�ork,and estimate of funding[o reflect the reprogrammed
project.
Estlmate ot Fundin
T e of Work �'> z (s� ca� ��
yP Previous ( � EstlmatedTotal Estlmated EsUmateE
reemeMlSu Supplemerrt p�Qa Funtls en � Funds State F�iiitls .
pE a.Agency 4 12 4 . 0 17 0 0.00 0.00 1
b.Other Consultan[ � 8 500.00 -B.800.00 0.00
c.Other
tl.State 5,000.00 -0.D00.00 1.000.00 1 000.00
e.TataIPE Cost Estimate(a+b+ctd) 18 400.00 -400.00 tA 000.00 0.00 18 000.00
Right of Way �•A enc
g.OUter
h.Other
i.State
� - J.Totet R!W Cost Estimate(f+g+h+i)
Constructlon k.COntract 1 I '
I. Other Consultant 3 603.00 -3 603.00 0.00
m.Other �
n:Other �
o.Agency 6 500.00 6 500.00 � 6 500.00
p.Sta[e I 000.0 - 0 .0
p.Total CN Cost Estlm ta +Ifm+n+a«p) �p5 qpp,00 400.00 106 00.00 106 011.00
r. o Coat Estlmate '+q) 124 00.00 0.00 24 00.00 0. 0 - 12i 00.00 �
AGENCY � STATE
By: . --' BY ! �
Director, ighways end Local Programs �
Title: Mayor
Date: 9l�I�O�I Date: OCT � 3 2009
�DOT Form 140�OB7A EF
Ravlaetl B/02 �
I •
� Ylfashington State rra�wvormeton eamm�o
Department o! Transportation 310 Mapb Park Avenue S.E.
Pauia J.Ha�nmoed�P.E. P.O.Box 47300
Sepetary of Transponation O�yrnpla,WA 9850¢7300
364T6S7000
. m: �aoaea�es
www.wsaor.wa.prn
October 1s,2009 RECE FYE D
OCT 21.= ii1q9
�.��s��y LOCAL PROGftAMS
PubL'c works Director
Ciry of Auburn '
25 West Main Strcet.
Aubum, WA 98001�998
City of Anbarn
37°i St SE/R St SE ,
Pedeatrian Connector
FILP-PB06(O18)
Dear Mr. Dowdy:
Enclosed for yo�u informadon and file is a copy of Supplement Number 1 to Local
Ageney Agreement L.A-6301 for die su6ject project between the state and your agency.
This supplement uansfers funds from pE to CN as per your request. All costs exceeding
those shown on this agteement are the sole responsibility of your agency.
You msy proceod with the administration of this project in accordance with your
WSDOT approved Certification Acceptance agreement „
Sincerely, '
�=-��"7 ��`�
. David Kaiser
Federal Authorization Engineer
Highways&Local Pzograms Division
DKijg:ac .
6nclasure
cc: Ed Coiryers,Northwest Region Local Prograais F.ngineer,M5 NB82-1 Z 1
Resolution 4515 authorized fhe Mayor and City Clerk to execute a Iocal agency
agreementbetween the City of Aubum and Washington State Department of
Transportation (WSDO� related to Project No. CP0803, 37�' 8treet SE / R Street S_E
Pedestrian Connector Improvements. The drait agreemenf attached to the resolution
and marked as Exhibif"A"was a Highways and Local Frograms State Funding
Agreemenf. However, when the agreement was sent to WSDOT for execution, the City
was instructed to submit a Supplement No. 1 instead of the Highways and Cocal
Programs State Funding Agreement. The grant funds had previously been associated
with a different project; which already had a Highways and Local Programs State
Funding Agreement(LA-6301) in place for the previous p�oject. The grant was
reprogrammed to Project No. CP0803, and per direction from WSDOT, the funds were
obligated using Supplement No. 1 to Agreement NumberLA-6301.