CONTRACT CHANGE ORDER AGREEMENT NO._4
Contract No.,Project No.and Project Title: Contract#11-25,CPI 121,2011 Local
Street Pavement Reconstruction-Phase 2
Contractor Name and Address: Johansen Excavating,Inc.
28215 112th Street East
Buckley, WA 98321
The Contractor is hereby directed to make the changes to the Contract as described herein This document and all attachments are a
supplement to the contract All work,materials,measurements and unit bid prices for the type of construcnon involved shall be in accordance
with the contract documents of the above named project unless stated otherwise in this change order.
Summary of Proposed Changes:
1 Replace damaged 8-inch clay sewer pipe on sewer easement between G St NW and H St NW just north of West
Main St(approximatly 30 feet of pipe going south from manhole 708-85). New pipe shall be 8-inch SDR35
Replace cleanouts and side sewer tees and pipe as required. Restore surface as directed by the Engineer.
Contractor has been give verbal authorization to start the work on 6/28/12.
2. Replace damaged side sewer tee at 1301 67th St SE Unit 19 Restore pavement after installation. Contractor has
been given verbal authorization to start the work on 7/16/12.
The Contract time is extended by 0 days.
Sales
Item Sch. Sec.No. Item Description Quantity Units Unit Price Total Price Tax
(+/-) ($) (+/-) (V/N)
C04-1 D 7 Sewer Pipe Repair on Eastment North of West LS LS $ 3,853.71 $ 3,853 71 Y
Main St between H St NW and G St NW
C04-2 D 7 Side Sewer Tee Repair at 1301 67th St SE Unit 19 LS LS $ 7,163.90 $ 7,163.90 Y
Subtotal $ 11,017.61
Washington State Sales Tax(9.5%)on applicable items $ 1,046.67
TOTAL _$_ 12,064.28
Base Amount I Total incl.Tax
1..Total'Cost,this'C/O: $ 11 017.61 - $ 17064.28
2. .,Tota1"Cost Previous'C70ii,"""'" ""' " """ $ 142436.26 $ 153871.77.
3. Original Contract'Amount " $ 1,274,531.25 $" 1 301,474.44
4: Revised Confraot'Amotint.,.: :, $ 1,427,983.12. $. 1,467,410.49.
This change order constitutes full and complete compensation for all labor,equipment,materia ,overhead,profit.any and all indirect costs,
and time adjustment to perform the above described clianges All other costs are -c pe le All other terms and conditions of the
contract remain unchanged.
Contractor, f 20/Z
Inspector- _ S lo;2 Dam
Project Manager- $ -23- 2 Dam
City Engineer S Z Daie
Approved by
Ma , fry oJAuburn °am
H:1Forms\C han geOrder.xl s