Loading...
HomeMy WebLinkAboutJohansen Excavating # 11-25 CITY OF AUBURN CONTRACT CHANGE ORDER AGREEMENT NO._4 Contract No.,Project No.and Project Title: Contract#11-25,CPI 121,2011 Local Street Pavement Reconstruction-Phase 2 Contractor Name and Address: Johansen Excavating,Inc. 28215 112th Street East Buckley, WA 98321 The Contractor is hereby directed to make the changes to the Contract as described herein This document and all attachments are a supplement to the contract All work,materials,measurements and unit bid prices for the type of construcnon involved shall be in accordance with the contract documents of the above named project unless stated otherwise in this change order. Summary of Proposed Changes: 1 Replace damaged 8-inch clay sewer pipe on sewer easement between G St NW and H St NW just north of West Main St(approximatly 30 feet of pipe going south from manhole 708-85). New pipe shall be 8-inch SDR35 Replace cleanouts and side sewer tees and pipe as required. Restore surface as directed by the Engineer. Contractor has been give verbal authorization to start the work on 6/28/12. 2. Replace damaged side sewer tee at 1301 67th St SE Unit 19 Restore pavement after installation. Contractor has been given verbal authorization to start the work on 7/16/12. The Contract time is extended by 0 days. Sales Item Sch. Sec.No. Item Description Quantity Units Unit Price Total Price Tax (+/-) ($) (+/-) (V/N) C04-1 D 7 Sewer Pipe Repair on Eastment North of West LS LS $ 3,853.71 $ 3,853 71 Y Main St between H St NW and G St NW C04-2 D 7 Side Sewer Tee Repair at 1301 67th St SE Unit 19 LS LS $ 7,163.90 $ 7,163.90 Y Subtotal $ 11,017.61 Washington State Sales Tax(9.5%)on applicable items $ 1,046.67 TOTAL _$_ 12,064.28 Base Amount I Total incl.Tax 1..Total'Cost,this'C/O: $ 11 017.61 - $ 17064.28 2. .,Tota1"Cost Previous'C70ii,"""'" ""' " """ $ 142436.26 $ 153871.77. 3. Original Contract'Amount " $ 1,274,531.25 $" 1 301,474.44 4: Revised Confraot'Amotint.,.: :, $ 1,427,983.12. $. 1,467,410.49. This change order constitutes full and complete compensation for all labor,equipment,materia ,overhead,profit.any and all indirect costs, and time adjustment to perform the above described clianges All other costs are -c pe le All other terms and conditions of the contract remain unchanged. Contractor, f 20/Z Inspector- _ S lo;2 Dam Project Manager- $ -23- 2 Dam City Engineer S Z Daie Approved by Ma , fry oJAuburn °am H:1Forms\C han geOrder.xl s