HomeMy WebLinkAbout06-20-2012 MatrixAIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX
#
PROJECT DESCRIPTION
LEAD
Est. COST
REVIEW
EST.
STATUS
DATE
COMPL.
DATE
3
Hangar Rows 9 & 10
Steve Burke /AMG/
$250,000
7/18/2012
8/31/2012
Steve Burke reports this project is a week and a half
roof
Bob Jones
behind, goes out to bid week of 6/18/2012.
7
Noise Complaints
AMG
0
7/18/2012
NA
One over Thomas Jefferson High, it was a Helicopter at
1:30am, we suspect Police Activity.
9
Airport Security
AMG
TBD
7/18/2012
TBD
South Condo Gate (NW Hangars) Phone conversation
Update
included we need manuals; repairs are needed and
discussed airport management control access. Letter
sent.
ACHA Condo Gate: Phone call to Gene Vezzetti
(President): Has been advised of desire for airport
management to control all access point onto airport, he
is discussing it with the association. Does not see any
issues either way but will discuss with board members.
11
Airport Master Plan
Coleman /AMG
$225,000
7/18/2012
Feb 2014
Interviews scheduled for 6/19/2012.
Mid -Term Update
12
As of 6/15/2012
AMG
-0-
7/18/2012
NA
• Row 9/10 39/40 (98 %) +1
Occupancy Rates
• Row 2 Full (14) (100 %) no change
• Row 8 5/6 (83 %) +1
• Rows 3 -7 51/85 (60 %) no change
• Storage Units 8/12 Full (67 %) no change
• Tie down 34/100 full (34 %) +2
13
General Airport Event
Board Only
TBD
7/18/2012
NA
Event to showcase Auburn Airport, e.g. WWI —II
aircraft. Static display /food /sale vendors/ flights.
15
Aircraft Accident
AMG
TBD
7/18/2012
9/30/2012
39 pages of document created with guidance from
Emergency Plan and
FAA Advisory Circular.
Recover Plan
16
Update Airport Storm
Chris Anderson /RM
^'$38,000
7/18/2012
7/31/2012
Meeting with DOE, RM, City and Airport Staff
water "SWWPP" Plan
Reviewed the airport drainage system map.
Discussed about the sampling locations. The
Last Revision Date: 3/18/2012
AIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX
1 /
#
PROJECT
LEAD
Est. COST
REVIEW
COMPL.
conclusion of the discussion is to continue sampling
DESCRIPTION
DATE
DATE
at C1356, discontinue sampling at the 3011, Street
14
Fuel Dispenser
AMG
$10,000
7/18/2012
6/8/2012
location, and add a new sampling location at CB 124.
18
West Side Trees
AMG
$25,000
7/18/2012
TBD
Project on hold due to delay in grant funding.
19
506 Building Update
AMG
TBD
7/18/2012
9/20/2010
Building has been vacated by NAC. Tours given to
Regulations
GRCC, Airwork Las Vegas, Airtech, ATC. No
10
Aircraft Wash Rack
AMG
TBD
3/31/2012
Interest from GRCC due to size limitation. Airworlc
7
MAI Appraisal
AMG
0
12/31/2010
waiting on client base before expanding. ATC just
1
Airport Storm
Reid
$50,000
4/20/2011
expanded at Boeing Field, not currently looking to
Water Design
Middleton /AMG
move. AMG to meet with Wings Aloft 6/20/2012
Update
about possible satellite at Auburn. Two "For Lease"
signs have been installed, one street side, one airport
side.
20
Airport Brochure
AMG
TBD
7/18/2012
TBD
Contacting City Marketing to assist with brochure.
21
Wildlife Hazard
AMG
$75,000-
7/18/2012
TBD
Awaiting grant funding (state & federal)
Assessment
$100,000
22
2131 Building Update
AMG
N/A
7/18/2012
7/1/2012
Revised Agreement sent to prospect for final review,
included prospects requests.
1 /
#
PROJECT
LEAD
Est. COST
REVIEW
COMPL.
STATUS
DESCRIPTION
DATE
DATE
14
Fuel Dispenser
AMG
$10,000
7/18/2012
6/8/2012
Completed. Final cost was $8,000.
Replacement
2
Airport Rules and
AMG
0
9/20/2010
Completed
Regulations
10
Aircraft Wash Rack
AMG
TBD
3/31/2012
Completed
7
MAI Appraisal
AMG
0
12/31/2010
Completed
1
Airport Storm
Reid
$50,000
4/20/2011
Completed
Water Design
Middleton /AMG
Update
Last Revision Date: 3/18/2012
AIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX
4
Runway Lighting
Steve
$350,000
6/2/2011
Construction Completed.
Replacement
Burke /Reid
Middleton /AMG
5
Storm Water
Robert
0
4/8/2011
Project Completed
Retention Ponds
Lee /Storm
Water /Coleman
6
Airport Hangar
AMG
0
9/7/2011
Completed
Inspection
8
Drainage Mitigation
Tim Carlaw
Recent observation — no change since last report. No
standing water. Monitoring and will update as necessary
17
Repair of Storm
AMG
$25,000
11/11/2011
Completed
Water Catch Basins
Last Revision Date: 3/18/2012