HomeMy WebLinkAbout07-18-2012 Matrix AIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX
# PROJECT DESCRIPTION LEAD Est.COST REVIEW EST STATUS
DATE COMPL.
DATE
3 Hangar Rows 9& 10 Steve Burke/AMG/ $250,000 OS/15/2012 8/31/2012 Steve Burke'reported this project was a week and a half
roof Bob lones behind,going out to bid week of 6/18/2012. Talked to
Steve on 7/10/12,bid is out this week, 14 day window,
Steve reports he has contacted both companfes. Both
will bid the project,timing of work is last two weeks of
August. Bids are due 7/25/12.
7 Noise Complaints AMG 0 OS/15/2012 NA No changes since last report
9 Airport Security AMG TBD OS/15/2012 TBD AMG has sent letters to ACHA and ACF3 as a formal
Update follow up to previous phone calls. No responses from
either as of.this date.
11 Airport Master Plan Coleman/AMG $225,000 08/15/2012 Feb 2014 Century West has been selected as first choice for the
Mid-Term Update Master Plan Update.�Matt Rodgers expects to have
scope of work to us by 7/13/12. Discussions with FAA
include sending a copy of scope to them for their
review. Once scope has been decided,then fee
scliedule can be produced and a second review of fee
schedule will be performed by Mead&Hunt. FAA
reports Auburn Airport is Scheduled for August Grant
cycle
12 As of 7/13/2012 AMG -0- 08/15/2012 NA • Row 9/10 40/40(100%) +2
Occupancy Rates . Row 2 Full (14) (100%) no change
• Row 8 4/6 (67%)-I
• Rows 3-7 55/85 (65%)+4
• Storage Units 8/12 Fuil (67%)no change
• Tie down 37/70 full 53% +3
13 General Airport Event Board Only TBD OS/15/2012 NA Event to showcase Auburn Airport, e.g. WW 1 —II
aircraft. Static dis la /food/sale vendors/fli ts.
15 Aircraft Accident and AMG TBD 08/15/2012 9/30/2012 39 pages of document created with'guidance&om
Emergency Plan FAA Adviso Circular.
Last Revision Date: 3/18/2012
AIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX
Recover Plan
16 Update Airport Storm Chris Anderson/RM �$38,000 08/15/2012 8/31/2012 RM continuing work on SWPPP and best practices
water"SWWPP" Plan documents. AMG�has discussed with RM to include
best,practices for businesses on airport and land
lease properties so.theyknow their requirements
under the Industrial Permit. Businesses on airport
and land lease pmperties will sign off they will
follow these best ractices.
18 West Side Trees AMG $25,000 08/15/2012 TBD Pro ect on hold due to.dela in ant fwtdin .
19 506 Building Update AMG TBD 08/15/2012 Building has been vacated by NAC. AMG to meet
with Wings Aloft a second time on 7/5/2012 about
possible satellite at Aubum. Proposal received
7/12/12. AMG continuin marketin of buildin .
20 Airport Brochure AMG TBD _ OS/15/2012 TBD Contactin Ci Marketin to assist with brochure.
21 Wildlife Hazard AMG S75,000- OS/15/2012 78D Projecf on hold,awaiting grant funding (state&
Assessment $300,000 federal
22 2131 Building Update AMG N/A 08/15/2012 9/1/2012 Third revised agreement sent to pmspect for review
Prospect is concerned with sharing water and sewer
with airport wash rack. Three options have been
resented to ros ect for review.
COMPLETED
# PROJECT LEAD Est.COST REVIEW COMPL. STATUS
DESCRIPTION DATE DATE
14 Fuel Dispenser AMG $10,000 6/8/2012 Completed. Final cost was $8,000.
Replacement
2 Airport Rules and AMG 0 9/20/2010 Completed
Regulations
10 Aircreft Wash Rack AMG TBD 3/31/2012 Completed
7 MAI Appraisal AMG 0 12/31/2030 Completed
1 Airport Storm Reid $50;000 4/20/2011 Completed
Last Revision Date: 3/18/2012
AIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX
Water Design Middleton/AMG
Update
4 Ruoway Ltghtfng Steve $350,0� 6/2/2011 Construction Completed.
Replacement Burke/Reid
Mtddleton/AMG
5 Storm Water Robert 0 4/S/2011 Project Completed
Retention Ponds Lee/Storm
Water/Coleman
6 Airport Hangar AMG 0 9/7/2011 Completed
Inspection
8 Drainage Mitigation Tim Ca�law Recent observation—no change since last report. No
standing water Monitoring and wtll update as necessary
17 Repairof5torm AMG $25,000 11/11/2011 Completed
Water Catch Basins
Last Revision Oate:3/18/2012