HomeMy WebLinkAbout07-18-2012 Matrix AIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX # PROJECT DESCRIPTION LEAD Est.COST REVIEW EST STATUS DATE COMPL. DATE 3 Hangar Rows 9& 10 Steve Burke/AMG/ $250,000 OS/15/2012 8/31/2012 Steve Burke'reported this project was a week and a half roof Bob lones behind,going out to bid week of 6/18/2012. Talked to Steve on 7/10/12,bid is out this week, 14 day window, Steve reports he has contacted both companfes. Both will bid the project,timing of work is last two weeks of August. Bids are due 7/25/12. 7 Noise Complaints AMG 0 OS/15/2012 NA No changes since last report 9 Airport Security AMG TBD OS/15/2012 TBD AMG has sent letters to ACHA and ACF3 as a formal Update follow up to previous phone calls. No responses from either as of.this date. 11 Airport Master Plan Coleman/AMG $225,000 08/15/2012 Feb 2014 Century West has been selected as first choice for the Mid-Term Update Master Plan Update.�Matt Rodgers expects to have scope of work to us by 7/13/12. Discussions with FAA include sending a copy of scope to them for their review. Once scope has been decided,then fee scliedule can be produced and a second review of fee schedule will be performed by Mead&Hunt. FAA reports Auburn Airport is Scheduled for August Grant cycle 12 As of 7/13/2012 AMG -0- 08/15/2012 NA • Row 9/10 40/40(100%) +2 Occupancy Rates . Row 2 Full (14) (100%) no change • Row 8 4/6 (67%)-I • Rows 3-7 55/85 (65%)+4 • Storage Units 8/12 Fuil (67%)no change • Tie down 37/70 full 53% +3 13 General Airport Event Board Only TBD OS/15/2012 NA Event to showcase Auburn Airport, e.g. WW 1 —II aircraft. Static dis la /food/sale vendors/fli ts. 15 Aircraft Accident and AMG TBD 08/15/2012 9/30/2012 39 pages of document created with'guidance&om Emergency Plan FAA Adviso Circular. Last Revision Date: 3/18/2012 AIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX Recover Plan 16 Update Airport Storm Chris Anderson/RM �$38,000 08/15/2012 8/31/2012 RM continuing work on SWPPP and best practices water"SWWPP" Plan documents. AMG�has discussed with RM to include best,practices for businesses on airport and land lease properties so.theyknow their requirements under the Industrial Permit. Businesses on airport and land lease pmperties will sign off they will follow these best ractices. 18 West Side Trees AMG $25,000 08/15/2012 TBD Pro ect on hold due to.dela in ant fwtdin . 19 506 Building Update AMG TBD 08/15/2012 Building has been vacated by NAC. AMG to meet with Wings Aloft a second time on 7/5/2012 about possible satellite at Aubum. Proposal received 7/12/12. AMG continuin marketin of buildin . 20 Airport Brochure AMG TBD _ OS/15/2012 TBD Contactin Ci Marketin to assist with brochure. 21 Wildlife Hazard AMG S75,000- OS/15/2012 78D Projecf on hold,awaiting grant funding (state& Assessment $300,000 federal 22 2131 Building Update AMG N/A 08/15/2012 9/1/2012 Third revised agreement sent to pmspect for review Prospect is concerned with sharing water and sewer with airport wash rack. Three options have been resented to ros ect for review. COMPLETED # PROJECT LEAD Est.COST REVIEW COMPL. STATUS DESCRIPTION DATE DATE 14 Fuel Dispenser AMG $10,000 6/8/2012 Completed. Final cost was $8,000. Replacement 2 Airport Rules and AMG 0 9/20/2010 Completed Regulations 10 Aircreft Wash Rack AMG TBD 3/31/2012 Completed 7 MAI Appraisal AMG 0 12/31/2030 Completed 1 Airport Storm Reid $50;000 4/20/2011 Completed Last Revision Date: 3/18/2012 AIRPORT ADVISORY COMMITTEE PROJECT - GOAL MATRIX Water Design Middleton/AMG Update 4 Ruoway Ltghtfng Steve $350,0� 6/2/2011 Construction Completed. Replacement Burke/Reid Mtddleton/AMG 5 Storm Water Robert 0 4/S/2011 Project Completed Retention Ponds Lee/Storm Water/Coleman 6 Airport Hangar AMG 0 9/7/2011 Completed Inspection 8 Drainage Mitigation Tim Ca�law Recent observation—no change since last report. No standing water Monitoring and wtll update as necessary 17 Repairof5torm AMG $25,000 11/11/2011 Completed Water Catch Basins Last Revision Oate:3/18/2012