Loading...
HomeMy WebLinkAboutSCI Infrastructure CP1201 Contract # 12-08 CONTRACT Contract No. 12-08 THIS AGREEMENT AND CONTRACT, made and entered into, in triplicate, at Auburn, Washington, this ote day of , 2012, by and between the CITY OF AUBURN, WASHINGTON, a muni pal c4poration, and, SCI Infrastructure, LLC, 2825 South 154a' Street, Seattle, WA 98188, hereinafter called the CONTRACTOR. WITNESSETH: That, in consideration of the terms and conditions contained in the Contract Documents entitled "CP1201, 2012 LOCAL STREET PAVEMENT RECONSTRUCTION PROJECT,"which are by this reference incorporated herein and made a part of this Contract, the parties hereto covenant and agree as follows: I. The CONTRACTOR shall do all work and furnish all tools, materials and equipment for Project CP1201, 2012 LOCAL STREET PAVEMENT RECONSTRUCTION PROJECT — constructing approximately 3,100 linear feet of street, storm drainage, and water main improvements, including excavation of existing roadway pavement and subgrade, new asphalt concrete roadway pavement overlay, cement concrete curb and gutter, driveway reconstruction, sidewalk reconstruction, storm drainage collection and conveyance, water main and residential service replacement, and other items necessary to complete the Work for a unit bid price of one million two hundred thousand eight hundred eighty-one dollars ($1,200,881.00) and Washington State Sales Tax of thirty thousand two hundred eighty-six dollars and eighty-six cents ($30,286.86) for a total contract value of one million two hundred thirty-one thousand one hundred sixty-seven dollars and eighty six cents ($1,231,167.86) in accordance with and as described in the Contract Documents which are by this reference incorporated herein and made a part hereof, and shall perform any alterations in or additions to the work provided under this Contract and every part thereof. This Contract shall be executed by the Contractor and returned to the City within 7 calendar days after the receipt of the dated notification of award and the Contract time shall commence within 5 working days after execution of the Contract by the City and so designated on the Notice to Proceed. Physical completion shall be within 75 working days of the date on the Notice to Proceed. If said work is not completed within the time specified, the CONTRACTOR agrees to pay liquidated damages to the CITY OF AUBURN, as specified in Section 1-08.9 (Liquidated Damages) of the Standard Specifications. The CONTRACTOR shall provide and bear the expense of all equipment, work and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this Contract and every part thereof, except such as are mentioned in the Contract Documents to be furnished by the CITY OF AUBURN. I.I. The CITY OF AUBURN hereby promises and agrees with the CONTRACTOR to employ, and does employ the CONTRACTOR to provide the materials and to do and cause to be done the above described work and to complete and finish the same according to the Contract Documents and the terms and conditions herein contained and hereby contracts to pay for the same according to said Contract Documents and the aforesaid proposal hereto attached, at the time and in the manner and upon the conditions provided for in this Contract. c/- CITY OF AUBURN CONTRACT CHANGE ORDER AGREEMENT NO. 2 Q�6'(�. Contract No.,Project No. and Project Title: Contract#12-08, CP1201, 2012 Local `�Zo CF Street Pavement Reconstruction ` Contractor Name and Address: SCI Infrastructure, LLC 2825 South 154th Street Seattle, WA 98188 The Contractor is hereby directed to make the changes to the Contract as described herein. This document and all attachments are a supplement to the contract All work, materials,measurements and unit bid prices for the type of construction involved shall be in accordance with the contract documents of the above named project unless stated otherwise in this change order Summary of Proposed Changes: 1 Contract time is extended by 3 days due the delay while waiting for Puget Sound Energy to relocate gas services on 22nd St SE and 27th St SE and Puget Sound Energy, Comcast, and Century Link to relocated a utility pole on the corner of 22nd St SE and M St SE. 2. Contract time is extended by 3 days due to the revised storm drainage design on J St SE per Change Order No. 1 requiring additional adjustments of the existing water service lines which were in conflict with the revised storm line location. 3. Contract time is extended by 4 days for the replacement of the additional 2-inch water service at 2852 F St SE and two 1.5-inch water services at 2812 and 2814 H St SE. The work for these additional water services is complete and paid for The Contract time is extended by 10 days. Sales Item Sch. Sec. No. Item Description Quantity Units Unit Price Total Price Tax (+/ ) (S) (+/ ) (Y/N) 1:'..�. . . .t ..A. _.m..4"•. .. _ :.tee}` ..1• .. •5. u. :'*" ? ry ,' `�.. :,' 'i ..;�L;'�[t. '{ .,.:.,. ,ja :.i n.•^-h:. .L t :; "''' Time E.tei7sioii oil No Clrnnges to Birl Ueins. Subtotal $ Washington State Sales Tax(9.5%)on applicable items $ TOTAL $ B'ase_ AmounY;" °Totals'incl.Ta`x, P: Total Cosf--this C/O:`.•`.° $' r. w ;$ 2:"I'otal'Cost'•Previous C/O -. .28,591.00; 1,,, 28,591.00, 3. Oii ihafCohtract Amount._ _., __ 'wf: _..`^ a! $ ."i1;200;88IWO?; "$ .11;23'1;167.86 4 -Revised Cohtract Amount' '$ 11229,472.00. ,. '$1,259,758.86 This change order constitutes full and complete compensation for all labor,equipment,materials, overhead,profit,any and all indirect costs,and time adjustment to perform the above described changes All other costs are non-compensible. All other terms and condition of the contract remain unchanged Contractor; Inspector- Project Manager- 1 Y 2 City Engineer- Date Date Approved by /Il•(rl'(lr, Date H.\Forms\ChangeOrder.xls III. The CONTRACTOR for himself, and for his heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all the covenants herein contained upon by part of the CONTRACTOR. IV It is farther provided that no liability shall attach to the CITY OF AUBURN, WASHINGTON by reason of entering into this Contract, except as expressly provided herein. IN WITNESS WHEREOF the parties hereto have caused this Contract to be executed the day and year first hereinabove written. Cl: WASHINGTON r By Peter B. Lewis,Mayor Countersigned: thiday of 2012 ATTEST Danielle E.Daskam,City Clerk APPRO AS TO FORM. DaVB.Y4eid7,tAt,orney SCI INFRASTRUCTURE, LLC By Authorized Official Signature C/T CITY.OFAUBURN CONTRACT CHANGE ORDER AGREEMENT NO. I Contract No.,Project No.and Project Title: Contract#12-08, CP1201,2012 Local Street Pavement Reconstruction c"9•+ '� Contractor Name and Address: SCI Infrastructure, LLC 2825 South 154th-Street Seattle,WA 98188 The Contractor is hereby directed to make the changes to the Contract as described herein This document and all attachments are a supplement to the contract All work,materials measurements,and unit bid prices for the type of construction involved shall be to accordance with the contract documents of the above named project unless stated otherwise to this change order Summary of Proposed Changes: 1 Install storm drainage line on J St SE per attached revised plan sheets to avoid conflict with Century Link duct banks on 2nd St SE. Cost to transport and restock the 12 inch diam.PVC storm pipe already onsite will be paid by lump sum as specified below. A price increase for the additional 12 inch dim.ductile iron storm pipe needed for this change order will be paid at the unit price specified below. All other work items will be paid at their respective unit bid prices. Contractor has been given verbal authorization to start the work on 10/8/12. The Contract time is extended by 1 days. Sales Item Sch. Sec.No. Item Description Quantity Units Unit Price Total Price Tax Restocking Fee for 12 inch Diam.PVC C01-1 A 7-04 Storm Pie 1 LS LS $ 1,200.00 N C01-2 A 7-04 Ductile Iron Pipe,Special Class 52,Storm 470 LF 91.70 $ 43,099.00 N Pie 12 inch Diam. 29 A 7-04 Solid Wall Polyvinyl Chloride(PVC) _470 LF 32.40 $ (15,228.00) N Storm Pi a SDR-35 12 inch Diam. 32 A 7-05 Catch Basin Type l 1 EA 895.00 $ 895.00 N 33 A 7-05 Catch Basin Type 2,48 inch Diam. I EA 1,575.00 $ 1,575.00 N- d? A 7-05 Catcli Basin Type-2,72 inch Diam. -1 EA 1 2-,950.-00 $ 2,950.00 - N-. Subtotal $ 28,591.00 Washington State Sales Tax(9.5%)on applicable items $ - - -- - - - TOTAL $ 28;591:00 28,591.00 '1`$rL ,.�Z$', I'001 Z. T taLCostPrevtons_C/O,.:,...,_;.E. '', '.;._.-. o- 9a _ .-. . =. 3. . . 881-00. $n23A187i8fi 4 _}2eviseil'',CoRtracC.lmo\tgf( """' $ A,'229,;472:00:' j1;259,'75$:$6`= This change order constitutes full and complete compensation for all labor,equipment,materials,overhead,profit,any and all indirect costs,and time adjustment to perform the above described changes All other costs are non-compenstble All other terms and condition of the contract remain unchanged. Contraeto - Inspector• De" Project Manager- o/ Dale City Engineer* O �1 Z °i Approved by -1 V LO1L Mayor,City o rn Date H:\Forms\FCO25.xls •l I i 1 W' SEE SHEET 26 FOR SEC 30, T 21 N R. 05 E, W.P. I I INTERSECTION DETAILS STREET NOTES: r , I END CONO 1 URB AND G TIER WI O1 INSTALL NEW CEMENT CONCRETE CURB AND GUTTER PER WSCOT MATCH EXIS NG w BEGIN CONC. CURB AND GUTTER I STANDARD,PLAN F-1012-00. LIMITS AS SHOWN EXCEPT THROUGH N r CB J P 2 I 4 _J f MATCH EXISTING T e I WHEEL CHAR RAMPS. 209 J A SE I 201 J Si SE JBS A19)+4054 34 Li F 2 3 G p O INSTALL NEW RESIDENTIAL DRNEWAY PER.CITY OF AUBURN SID DETAIL W J T 219 J ST SE 2t5 J Si SE - ] P RtM 80.}l TRAFFIC-O8 WITH WIDTH 'B'AS SPECIFIED. 3 2 Q J STA I>+3L84 10.00' L N W B MP - W8-1 iA. + ] IF ' BY•9T(It $C IN 3 INSTALL WHEELCHNR RAMP WITH DOMES PER IWERSEC70N DETAILS. = 1 MPH - W13-1P 2"SD, DI CL 52 1 B=10' REBID NPAL 2 Z LF 0 Of N J STA 17+38.08 9.96' L 1E='$i,QQ(128 NW 0 L__f B 1 Y RESID L 1 1 3 ] 4 INSTALL CEMENT CONCRETE SIDEWALK PER Cltt OF AUBURN STANDARD Lu -� L y J R N R 1 DETAIL TRAFIIC-24, LIMITS AS SHOWN WITH EXCEPTIONS THROUGH W L� 2 L52 OR1vEwars. D=10' RE9DENTUL 4 m 4 1 0 L}LR,$L=O.$o4 O INSTALL MONUMENT TYPE B MODIFIED CASE AND COVER PER CITY OF 9 3 .Bi 17+ 4 1 > I AUBURN STANDARD DETAIL TRAFFIC-21 AND TRAFFIC-22 + 10 _ - _ END,CONG.CURB ANO OCFE MATCH.EXISTING - - •-G 4 _ }t- -n y- { .A s 5 O REMOVE FASTING TREE AND STUMP %3e'�`-'Ur --i-•�' v� Y,t=� v;°. __ - �1 "�' ,.�F �3RE3'�:,w =°Ciia :S'�.it'.""i3-TS':: T,.:iY_'Go :fi:Y.:.Ti`afJ F::I' _ , 'f` 'x:'s ai:•,tA a•,f+ _" _ 1ti-'O h C._..u•.-:':._.'Ze.L_'...T._-�_m.._-:.-.r�.'.}Fv�:f.:L'ry GE.r'Sr:as__ci.:: �1�._'� - 1i-!F:_>�z�:.3�j- �_�t: _ -"53li.i... ^' " F - _ _ 5 :^_i S �-___-•-_N _ _ 18 1 1" +'` � - ,,.,'=•`.r_.':.-:�::tT,st�F:�;rs.t `">.:.1..�=':�„�'ut;a ?t, '. x,.u,r�ee�=«-'u 12';:r:�t`i`F.I.n::l r - -+T•j� `_I;g.=� CHANNELIZATION AND SIGNING NOTES: ,r Lc-... s R�r. _ O1 INSTALL STAN PLASTIC D SOLID WHITE CROSSWALK STRIPE PER CIE(OF Z', � �' � t " LN�'�~ C')T'Y AUBURN STANDARD DETAIL TRAFFIC-36 _ 4 A 4 27 - 3 7 N 14815.37 LASTIC 2O INSTALL P 24' SOLID WHITE STOP BAR PER CITY OF AUBURN y 0 1 �1 3 4 4 1fi+ t 3 E 129700]06 STANDARD DETAIL TRAFFIC-36. _ SIDEWALK 45 SY '2 8=14' I ENTl4L ,--- END CONIC CURB AND GURE 1 3) INSTALL EXISTING SIGNS) ON NEW POST PER COY OF AUBURN 1 8-13]2 TYPE 2 2 to 17 4. 3 MATCH EXISTING STANDARD DOTAL TRAFFIC-55. J L TA 1 +13 23 131 Ri J STOP BAR Y 4 4 ® INSTALL NEW SIGN(S) ON NEW POST PER Cltt OF AUBURN STANDARD B-1 ' RESIDENT 2 NO PARKING - R -4, 12' 1 DETAIL TRAFFIC-55. TA I + 44 1 1' Ri BEGIN CONIC. CURB AND GUTT 2 + I 3 STOP- _ MATCHIEXISTING RESIDENTIAL STREET NAMES ] 222 J Si SE I I 216 J ST SE "l 202 J ST SE 4 END CONIC CURB AN GUTTE L_______ I� MATCH EXISTING STORM NOTES: ❑ 1 INSTALL NEW STORM DRANAGE PIPE WITH TYPE, SIZE, LENGrH. SLOPE,AND LOCATION SPECIFIED Q INSTALL NEW STORM DRNNAGE STRUCTURE WITH TYPE. SIZE, AND 9500 9500 LOCATION SPECIFIED OFFSETS ME SHOWN TO THE CENTER OF U)' PPOPOS D GRADE STRUCTURE. W 0 CENT RUNE + ABANDON EXISTING STRUCTURE. REMOVE STRUCTURE AS REQUIRED SO EXISTING GROUND TO BE ABA CONED TO INSTALL NEW IMPROVEMENTS. SALVAGE FRAME AND GRATE TO 9000 = 1 - 9000 Cltt OF AUBURN MAINTENANCE AND OPERATONS HILL WIIH- 7% I ABANDON IXP S INSTALL DENSITY W FILL (COF) RE £ PIPE AS REQUIRED TO NEW W IMPROVEMENTS. 85 00 85 00 L Lc)- 6o 00 _ a000 _ z Q l 2 rk 14+903 1 (967' LT) APPROXIMAT LOCATION RIM 8751 OF EX 4" V 01 El.51. 8-C1374 PE 1 2 P Q ,,. IS EI (12' IN)9$al 12"SD STA. 16+9 62 (9-67' i), _ I _ IE 1'(12'' IN)g5.1}, 1 201 LE.SL= IM 66.36 t J SIX 1 +4054 (74 4'. LT)1. 75 ON ' It (1z' :our) 5.11 sCe9 b S N)8H' RIM 668 7500 W IF-1A 1372 WERE 1 O EX 2' gYBf(1 NW'oUT) 4'.SI 'IF 81 06 12' E 1N)E IST' JRIM 83.50+90J (10.1)' RT 8" D T 12 1 CC 52 1 O Soy. -IE 82.36 6' S IN)EX T IE (12' OUT) CB- 1375 TYPE IF 80 6E 12'W OUT)EXIT ]000 = 2 7000 .Q RIM 626 12'S OUT) 84.$5 65 GO 6100 FLOWLJNE Li. 8771 8743 8715 6686 8658 8630 PROP CL 87.92 8]64 8]36 8707 8679 8651 0 5 10 FLOWLINE RT 8770 8)42 B]14 8685 8657 8529 EXIST. CL 8]9] BJ 66 8729 87.11 86.81 8663 VERTICAL AL 0 10 26' 40' 15+00 16+00 17+00 �HOMZGWAL SCALE SUREDUTRIDESINII PLDNISE CALL BEFORE YOU DIG all No. Dals RevWm DRAmNroawB,swBwrBEaaTDRIBDrnoM FFJmo6LCTUI BY DATE 6,1- REVIEWED BV: °ATE' 2012 LOCAL STREET PAVEMENT PROJECT 1-514 Dmm 11 4(!32112 9F1/Ii NUMBER l2 r^' 'I^ m�a1aW,11ga con(armma,e4N 'k Pre! EMan CP1201 g , „ Lm ReHewa TMN 0.ram,z * RECONSTRUCTION PROJECT `3$ A}pwa] TMH 4rzsmu '. C}170F PUBLIC V✓ORKS!DEPARTMENT LrdLS—__— L l IL CONTRACT on 1arlagef NUMBER �5 DIa 8, 1 SCALE: 25 West Main Street J STREET'SE d� _. Auburn,Washington ������ STREET AND STORM PLAN AND PROFILE 12-08 8 cMw aW wP.a DNBNTx WASHINGTON SHEET 6 Wa AB ORAVIN IONAL 4 4�D��MLAAIAvenBUe�N.E.,SIa 100 &ST-LINE STA 14+50 to END- 29 Far 6z OS+pI V1S 0100+11 V1S'31NITIS f 9 133115 eo-zt 3IIcI0Hd'ONVNVI&AHMS(INV.133H1S a AnN 3S133H1S,f 1JYa1NOJ lOZ ldO 103r0Hd1 N0110f1H1SN003H X33 oed 1N3W3AVd 133NIS IV00I,ZL0Z N9 OIO OOA 3a0d39,NJ 3SY3k tl31MNIS311n1111031I 3W05 WAIOZwOH ,Ob .62 .Ol 0 3i MI1X 00 ra J11fr1 wot- 00SL- 00'09- - 0058- W06- OOS6- DOM I opm 0 06- OOS6- OOMI 38n1On8IS 30 a31N30 3111 01 NMOHS 3MV S13S330 '03JI03dS N011V001 OW HIS '3dAL HLIM 36n1Jna15 30WWO NHOIS M311 11V1SNl ❑Z "O UMAdS NOaVOOI ONV 'RO1S 'H1ON31 '3ZIS '3d HAM 3d1d 30VNNa0 rva01S M3N 1WLSN1 :MON M01S 99-3133Va1 11V130 caaO 15 NanenV d0 Alp 83d 1SOd M3N NO (S)NNS M3N 11V1SM O SS-Jlddtlal 1N13O a8VONV1S Nangl 30 ANO aid 1SOd M314 NO (S)NOIS DMIS1X3 11ViSNI O 9C-01AA"I WOO OaVONVIS NanonV d0 Alp a3d aba dO1S 311HM Onos.62 011SVId 11YISNI OZ 9£-311dVal nOS Z 0US 1 NWISNI aG AuJ aid 3dleus N,vmssOaO 3NHm Onos.sz Ousna 1W1sN :S310N ONINOIS ONV NOI1VLIl3NNtlH01 "6Z 13345 NO V was aid NOIHSN 033dS 1W1SN1 O9 'S VAM111O HOOOaNl SNO9d33X3 WM NMONS SV S11NIl'bZ-OWVa111V130 OWONVIS 1,109nv 30 k110 aid NIVM30S M380NOO IQK3311b15N1 O4 SIYAG NOIIa35a31N1 a3d S3N00 HAM dMVH U"0133HM 1W1SN1 O 0313133dS SV .8_ H101M HIM 90-3I31Va1 1WI30 O1S NanSnV 30 Alp 63d AVM3 NO WIN30IS38 M3N 1W1SM O SdNVII UWO 133HM HOp0aH1 1d30X3 NMOHS So, SAWn '00-Z1'Ol-d NVId OWONVIS 100SM aid a31A10 ONLY 9an3 3A83NOJ 1N31V35 M3N 1W1SN1 O �SUON 133US OY086 VM'eMeOae OOL M'3'N eN�tl LIM1009 . ®�Vr NOIJNIHSVM IwlBulyseM'wngny leans new Isom 9Z .ZL 114311LLNVd3O,S momomind * iO l:il0 eN .k �� :Aa rraxnaln I.1'9 00+41 I OO+C! I �( NMtltlOSY WwaW � >0 ' N0N13N0 I o 3MJ5 wm :te uMel9 S° ^lpy LtWJEW HYl Pw.1d.L =Sd 1��Q ZtWi£LY 18YL WWa!! '°�ul����'1' ij 1Y ztLU£zn rare IWHw wlwuuoalUJ 961m1=m 9cd41 31tl0 A9 N61L7^O�d3tl NOtaa3lNO1Sa3LAm3HJS airs ofNMra@ 00+Z1 00+11 I I ""m to to ZZ 9a 9.69 IL@@ 06 89 @Z 59 1962 "69 ,J 15IX3 OL to 66 to LZ 99 SS 88 to So Z l 0Y 68 'la 3NI,Md0W Z6"LS IZ"88 6688 LL 89 90 69 Y£"68 Z968 J ad ILLS 0099 8299 9588 So 29 Cl bB to 69 '113Nf1M011 z n du otcl - 3S 15 f ezz 3S 15 r 10C 1 Y xtbx391s S 35 15 r 9l[oil O ,91X.21 F d015 7HdM t 'b-La - *Wl d ON L Mo 3OIS3a y--8 m Y —_—C N 133aLS (100.M• I) 4'9@ 31 ! 3 01S3a 91-8 , CS+LI b1 s- m 4 . y;; a s ,5n _ry i c - 1s_!! ._5: l + v I ci I {4y_mii � m0 Nl la L 101 25 9 15 f +OT Z � b S O �i uN3a1s3a 'za-e o m1N3ol r-e hb11N30153a 9 I WIN 01 .01=9 ,0 =8 Z r Z I 35 15 f £O£ I I Il 3S -I 3S 1S? — I 3S 15 I LOC LZZ J — �bIAJ30193a Z=o dAt ILSIJ 9J Z —— IS f SIC 13d 1 nL£1J-90 L- L9L +Ct VS 3S IS LIE I I C LI —I r L 'N '3 'a 'N °02 Z' JJ M SO LZ 1 03S (3-0 N N.a31VM 10 ,fl SL• S(m0 N • t)sYfe 31 m /QE.O. Nt 3 . t) U)92 31 41 I (1 .49 6) ZS 9 +Zl tlJ5 f X 3 �, u) ZC� �� IQ 'n5 •ZI Z NOI1VJOl A- 1Vrvrk0addb 13d ILC 10-BO ,..(' I 0,Z X3 d D NOU1 01 31V111X06d N O, x t rmn' 3Nll 35 B En axnoan Nuslx3 � 2 30YaO 93 oaoaa - u' �, E' L, I I I z n du otcl - 3S 15 f ezz 3S 15 r 10C 1 Y xtbx391s S 35 15 r 9l[oil O ,91X.21 F d015 7HdM t 'b-La - *Wl d ON L Mo 3OIS3a y--8 m Y —_—C N 133aLS --I Y,6r ^ ! 3 01S3a 91-8 , CS+LI b1 I} I I I 3s is r zzt I I I I IL A L J S]IV130 N01103SH31N1 2103 9Z 133HS 33S G l 6 A L N a, S 6 F d015 I {1.I 'vx!P e#[•,r: p +Ia' m ___ u x N 133aLS --I s- m 4 . y;; a s ,5n _ry i c - 1s_!! ._5: l + v I I {4y_mii � m0 2 m � b S O �i uN3a1s3a 'za-e o m1N3ol r-e hb11N30153a 9 I WIN 01 .01=9 ,0 =8 Z Z I 35 15 f £O£ I I Il 3S -I 3S 1S? — I 3S 15 I LOC LZZ J — �bIAJ30193a Z=o dAt ILSIJ 9J Z —— IS f SIC L L-- L- L9L +Ct VS 3S IS LIE I I C LI —I r L 'N '3 'a 'N °02 JJ M SO LZ 1 03S (3-0 S]IV130 N01103SH31N1 2103 9Z 133HS 33S G 9Z 00 O 00 9z -000e -0o 06 -0096 -00 Got _° F d015 I 3S 15 r 6tC I m N 133aLS --I s- m 4 'JNUSI" Haim 't auno "31,103 NI939 l + v I I 9Z 00 O 00 9z -000e -0o 06 -0096 -00 Got _°