Loading...
HomeMy WebLinkAboutLincoln Construction Inc. 12-18 r CONTRACT Contract No. 12-18 THIS AGREEMENT AND CONTRACT, made and entered into, in triplicate, at Auburn, Washington, this " day of 20j�& by and between the CITY OF AUBURN, WASHINGTON, a municipal corporation, and Lincoln Construction Inc., hereinafter called the CONTRACTOR. WITNESSETH. That, in consideration of the terms and conditions contained in the Contract Documents entitled "CP1009, Auburn City Hall Remodel — Phase I," which are by this reference incorporated herein and made a part of this Contract, the parties hereto covenant and agree as follows: I. The CONTRACTOR shall do all work and furnish all tools, materials and equipment for Project CPI009, Auburn City Hall Remodel — Phase 1 — the construction of an approx. 11,000 s.£ tenant improvement, located on the second floor of the Auburn City Hall Building. Work includes demolition, new interior partitions, ceilings, floor coverings, mechanical and electrical upgrades, for a Schedule A unit bid price of $535,128.00, a Schedule B unit price of$17,634.00 and Washington State Sales Tax of $52.512.39 for a total of$605,274.39 in accordance with and as described in the Contract Documents which are by this reference incorporated herein and made a part hereof, and shall perform any alterations in or additions to the work provided under this Contract and every part thereof. This Contract shall be executed by the Contractor and returned to the City within 5 working days after the receipt of the dated notification of award and the Contract time shall commence within 5 working days after execution of the Contract by the City and so designated on the Notice to Proceed. Physical completion shall be within 86 calendar days of the date on the Notice to Proceed. If said work is not completed within the time specified, the CONTRACTOR agrees to pay liquidated damages to the CITY OF AUBURN, as specified in Section 1-08.9 (Liquidated Damages) of the Standard Specifications. The CONTRACTOR shall provide and bear the expense of all equipment, work and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this Contract and every part thereof, except such as are mentioned in the Contract Documents to be furnished by the CITY OF AUBURN. II. The CITY OF AUBURN hereby promises and agrees with the CONTRACTOR to employ, and does employ the CONTRACTOR to provide the materials and to do and cause to be dote the above described work and to complete and finish the same according to the Contract Documents and the terms and conditions herein contained and hereby contracts to pay for the same according to said Contract Documents and the aforesaid proposal hereto attached, at the time and in the manner and upon the conditions provided for in this Contract. III. The CONTRACTOR for himself, and for his heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all the covenants herein contained upon by part of the CONTRACTOR. IV It is further provided that no liability shall attach to the CITY OF AUBURN, WASHINGTON by reason of entering into this Contract, except as expressly provided herein. IN WITNESS WHEREOF the parties hereto have caused this Contract to be executed the day and year first hereitiabove written. CIT GTON By Peter B. Lewis, Mayor Countersigned: this day of fro\r�. ,20) ATTEST Danielle E.Daskam,City Clerk APPR FORM. aniel B.Hel*Zt, i Attorney j CONT'RACTO L w C C By' Authori rc Si nature CHANGE ORDER Distributed To: G701 ® Owner ® Contractor ® Architect ❑ Subcontractor ❑ Field ® Other PROJECT AUBURN CITY HALL REMODEL PHASE 1 CHANGE ORDER NO: 1 PROJECT NO.CP 1009 DATE December 26,2012 PROJECT NO. CID 1009 TO: LINCOLN CONSTRUCTIONJNC. CONTRACT DATE. October 2,2012 P 0. BOX 730 21323 MOUNTAIN HWY E. CONTRACT FOR: GENERAL CONSTRUCTION SPANAWAY,WA 98387 The contract is changed as follows: # COST' DESCRIPTION 1 3,506.00 EXPEDITED VAV BOXES 2 2,337.00 BACKGROUND SOUND SYSTEM DEMO 3 15,575.00 ELECTRICAL REVISIONS TO HR POWER/DATA PLAN 21,418.00 TOTAL 1 The original Contract Sum was $ 552,762.00 Net change by previously authorized Change Orders NONE $ 0.00 The Contract Sum prior to this Change Order was $ 552,762.00 The Contract Sum will be increased by this Change Order in the amount of $ 21,418.00 The new Contract Sum including this Change Order will be $ 574,180.00 The Contract Time will be unchanged by ( 0 )days. The date of Substantial Completion as of the date of this Change Order therefore is December 28,2012 Accepted By, LINCOLN CONSTRUCTION,INC.4 ir CITY OF AUBURN,AUBURN,WA J.DORBRITZ AIA,ARCHITECTURE CONTRACTOR OWNER ARCHI ECT / By: By: B u l2 Date Date I Date CAUTION:You should sign an Odginal Document,on which this text appears in RED,An Original Document assures that changes will not be obscured. TORGO SOF ARE www TarooSoAwarecom 01996-2012 ALL RIGHTS RESERVED Page 1 of 1 i LINCOLN CONSTRUCTION, INC. 21323 MT HIGI{WAY, PO 13OX 736 SPANAWAY,WA 98307 OFFICE 253 847.6414 FAX 253.047 0800 October 31,2011 J. Dorbritz AIA 800 fernwood Pacific Topanga, CA 90290 310-455-1837 Attn: Jan Dorbritz I Re: Auburn City Hall Remodel Phase I Project 1112-18 LCI #1177 Subject. Expediting the VAV Boxes Below are the costs associated with expediting the VAV Boxes as discussed. Lincoln Construction material $ - labor $ $ Evergreen Plumbing $ 3,180 Total Lincoln Construction Work $ Overhead on Prime Contractors Work 16% $ Small'rools 3% $ Safety 2% $ - I Total Subcontractors Work $ 3,180 Overhead on Subcontractors Work 6% $ "191 $ 3,371 Sub Total $ 3,371 B& 1 4% $ 135 3,506 Please issue a change order in the amount of$3,506.00 If you have any questions, please contact me a 253-847-6414 Sincerely f6EFJE1::,�J` l.� Y CA Isaac y NOV kY �,`ftl'i1�1 �(/V�1/ ��� GuY I Lincoln Construction LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.847.6414 FAX 253.847.6806 I I i November 16, 2012 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 Attn: Jan Dorbritz Re: Auburn City Hall Remodel Phase I Project#12-18 LCI#1177 I Subject: COP 4 RFI 8 Below are the costs associated with the removal of the background sound system as detailed in RFI 8 Lincoln Construction material $ labor $ METCO S 2,100 $ 2,100 Total Lincoln Construction Work $ Overhead on Prime Contractors Work 12% $ - Total Subcontractors Work $ 2,100 Overhead on Subcontractors Work 7% $ 147 $ 2,247 Sub Total $ 2,247 B & 1 4% $ 90 $ 2,337 Please issue a change order in the amount of$2,337 00 If you have any questions, please contact me @ 253-847-6414 Sin c rely L% Isaac Efah Lincoln Construction i Metco Electric,21804 Mtn.Hwy E,PMB 32,Spanaway,WA 98387 (253)846-2565 Auburn City Hall Remodel- Phase 1 Change Order Proposal: RFI 9 8 Scope:Per response of RFI it 8 Inclusions: Electrical labor Electrical permit Exclusions: Sales tax i Breakdown Labor cost: 26.5 hours @$70(cost)_$1,855 Material cost: $20 Profit&Overhead=12% $1,855+$20=$1,875 X 12%_$2,100 Price: $2,100 i Thank You, Brent Metcalf I i LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY, WA 98387 OFFICE 253 847.6414 FAX 253.847.6806 November 20, 2012 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 Attn: Jan Dorbritz Re: Auburn City Hall Remodel Phase I Project#12-18 LCI #1177 Subject: COP 6 HR Dept Changes Below are the costs associated with the changes to the HR Dept Lincoln Construction material $ - 4 hours labor $ 300 $ 300 METCO Electric $ 13,780 Mehrer Drywall $ 275 Washing Architectural Hardware $ 13(682) Total Lincoln Construction Work $ 300$ Overhead on Prime Contractors Work 12% $ 336 Total Subcontractors Work $ 13,682$ Overhead on Subcontractors Work 7% $ 14,640 $ 14,976 Sub Total $ 599 B& I 4% $ 15,575 Please issue a change order in the amount of$15,575.00 If you have any questions, please contact me @ 253-847-6414 4Since lyfah Lincoln Construction ,to, ..r Metro Electric,21804 Mtn. Hwy E, PMB 32,Spanaway,WA 98387 (253)846-2565 Auburn City Hall Remodel -Phase 1 Change Order Proposal: HR Department Scope:Changes far HR Department per Electrical Drawings E-2(dated Revision 10/22)and E-3(dated 11/21) Inclusions: Permit 4 hour5/$17 Material—Drawing E-2-Rework raceway and wiring for lighting in room 249 44 hours/$476 Material—Drawing E-3-Additional and changed work to the HR Department Power Plan 66 hours/$3,831 Material—Add two CATS data cables from jack locations as shown on E-3 HR Department only to existing rack in Room 227 Mount and terminate dual portjacks at each of these locations as shown-No rack provided in this change order proposal. No data work in Legal Department/Mayor&Council provided in this change order proposal. Exclusions: Sales tax Breakdown Labor cost: 114 hours @$70(cost)=$7,980 REVIEWED REVIE BY Material cost: $4,324 f'C V G VV LJ profit&Overhead a 12% appRpVk1� DEC 14 ON $7,980+$4,324=$12,304 X 12%=$13,780 Price: $13,7so DORBRITZ RJCHITECT$ Thank You, ,{ Brent Metcalf AV,/ �fi /� {� �����✓ "' ' �� �GECTI'lti�G AZ Jt �Gs �l Lincoln Construction From: Eric Mehrer <eric @mehrer.com> Sent: Tuesday, November 20, 2012 12:49 PM To: Lincoln Construction Subject: RE, Auburn City Hall 1 only have$275 00 worth of work at the HR We were able to make most of the changes to the walls before we did anything so there isn't much cost. Let me.know if you need anything else. G2✓�� F tra Eric Mehrer LF FU G'Fe„Associate ANC \4EHRER DRYWALL, INC. Tel: (206) 282-4288 Fax. (206) 285-2092 Cell (206) 255-1760 www.mehrer.com From: Lincoln Construction [mailto lincolnconstructionCalcomcast.net] Sent: Tuesday, November 20, 2012 11:05 AM To: Eric Mehrer Subject: Auburn City Hall Eric, I left you a voice mail this morning. I need you to revise your number for the work for the proposed mayor changes. I need the work for the HR dept broke out. You can just email the amount, & Will make a note on your quote if that helps. Need to get this to them today Thanks for your help Cheryl Russell Lincoln Construction 253-847-6414 1 CHANGE ORDER Distributed To: 6701 ® Owner ® Cent trier ® Architect ❑ Subcontractor ❑ Field ® Other PROJECT AUBURN CITY HALL REMODEL PHASE 1 CHANGE ORDER NO. 2 PROJECT NO.CP 1009 DATE February 21 2013 PROJECT NO CP 1009 TO: LINCOLN CONSTRUCTION,INC. CONTRACT DAl'E' October 2.2012 P.O.BOX 730 21323 MOUNTAIN HWY E CONTRACT FOR, GENERAL CONSTRUCTION SPANAW AY,WA 98387 The contract is changed as follows 4 COST _ DESCRIPTION . . 1 5,341.00 COP 5 Electrical Code Violations(20%) 2 4,620.00 COP 7 Break Room Ceiling 3 5,104.00 Cop 8 Primary Air to VAV 15 4 2.410.00 COP 10 Quick Response Sprinkler Heads 5 3,450.00 COP 16 Replace Motor RAF 1 6 2,643.00 COP 17 Existing Duct Cleaning 7 It 23.568.00 TOTAL The onglnal Contract Sum was $ 552,762.00 Net change by previously authorized Change Orders 1 $ 21,418 00 l he Contract Sum prior to lhls Change Order was $ ,574,180 00 The Contract Sum will be increased by this Change Order in the amount of $ 23.568.00 The new Contract Sum including this Change Order will be 8 597,748 00 The Contract Time will be increased by Thirty 1 30 )clays. The date of Substantial Completion as of the date of this Change Order therefore will tw January 28,2013 Accepted By: t LINCOLN CONSTRUCTION,INC CITY OF AUBURN,AUBURN,WA J DORBRITZ AIA,ARCHITECTURE CONTRACTO OWN Rd,I ARCHITE ! I By: By. :By. February 21,2013 Date I I Date Date "51 a:C nnl shr,.IC SIR:: i!,,91rril OccumenL m n!nrh thm Ib#av4e<.is in RED.Aa O,'virt,a Da.lment ass-vess that,!,an,jes wl:not TORGO SO WARE www 7,1.050flwa cwv CeS11 W12 ALL RIGHTS RESFR D Page 1 Of 1 LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.847.6414 FAX 253.847.6806 November 16, 2012 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 Attn: Jan Dorbritz Re: Auburn City Hall Remodel Phase I Project#12-18 LCI #1177 Subject: COP /, RFI 15 (metco#6) Below are the costs associated with electrical revisions due to code violations as detailed in RFI 15 Lincoln Construction material $ labor $ METCO $ 4,800 $ 4,800 Total Lincoln Construction Work $ Overhead on Prime Contractors Work 12% $ - Total Subcontractors Work $ 4,800 Overhead on Subcontractors Work 7% $ 336 $ 5,136 Sub Total $ 5,136 B& I 4% $ 205 $ 5,341 Please issue a change order in the amount of$5,341 00 If you have any questions, please contact me @ 253-847-6414 Sin c rely � Isaac Efah Lincoln Construction Construction Metco Electric, 21804 Mtn. Hwy E, PMB 32, Spanaway, WA 98387 (253)846-2565 Auburn City Hall Remodel- Phase 1 Change Order Proposal: RFI 415 Scope: Per proposed solution of RFI 415 Inclusions: Electrical labor Electrical permit Exclusions: Sales tax Breakdown Labor cost: 60hours @$70(cost)_$4,200 Material cost: $86 Profit&Overhead=12% $4,200+$86=$4,286 X 12%=$4,800 Price: $4,800 Thank You, Brent Metcalf LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253-847 6414 FAX 253.847.6806 November 27, 2012 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 Attn: Jan Dorbritz Re: Auburn City Hall Remodel Phase I Project#12-18 LCI #1177 Subject: COP 7 Ceiling in Lunch Room 207 OPTION B Below are the costs associated with removal of the concealed slpine ceiling in lunch room 207 per the attached OPTION B Lincoln Construction dump $ 100 2 men 8 hrs ea labor $ 1,200 $ 1,300 Riel Ceiling $ 2,791 Total Lincoln Construction Work $ 1,300 Overhead on Prime Contractors Work 12% $ 156 $ 1,456 Total Subcontractors Work $ 2,791 Overhead on Subcontractors Work 7% $ 195 $ 2,986 Sub Total $ 4,442 B & I 4% $ 178 $ 4,620 Please issue a change order in the amount of$4,620.00 If you have any questions, please contact me @ 253-847-6414 Sincerely Isaac fah Lincoln Construction LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.847 6414 FAX 253.847.6806 November 27,2012 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 t1 I Attn: Jan Dorbritz E Re: '� burn City Hall Remodel Phase I Proj tt#12-18 LCI #1127 Subject: COP 7 Ceilin inLunch Room 207 OPTION A Below are the costs'nL associated with removal of the ncealed slpine ceiling in lunch room 2� per the attached OPTIO A Lincoln Construction m rial $ or $ Riel Ceiling $ 3,490 Total Lincoln Construction Wfp rk $ Overhead on Prime Contractors Work 12% $ Total Subcontractors ork $ 3,490 Overhead on Subc,ntractors Work 7% 244 $ 734 Sub Total $ 3,7 B & I 4% $ 149 $ 3,884 Please issue a change order in the amount of$3,884.00 If you have any questions, please contact me @ 253-847-6414 Sincer al y Isaac fah Lincoln Construction gc� License No.RIEHLCSOIODS Acoustical Tile Ceilings/Acoustical Wall Panels/FRP PO Box 4505 Federal Way, WA 98063 Phone(253)838-9086 Fax(253)838-9136 Cell(253)222-3836 E-Mail ed @riehlceilings corn COP #002 11/27/12 To: Lincoln Construction Attn: Bill Project: Auburn City Hall Remodel—Phase 1, City of Auburn, WA Bid Item: Section 095100 Acoustical Ceilings Addms: 1,2, and 3. Scope of work: Option:A Remove portions of Concealed Spline Ceiling in Lunch Room 207 as per site visit with Bill from Lincoln Construction. And re-install portions of Concealed Spline Ceiling System after overhead work is complete, re-using as much of the existing the as possible. New 12"x12"Concealed tiles will not match because this item has been dis-continued by manufacturer. Add: $3,490. Option:8 Entire existing Concealed Spline Ceiling in Lunch Room 207 to be removed by Lincoln. Rieh/Ceilings to furnish and install new 15116"grid and 2'x4'Second-Look Ceiling tile to match the rest of 2nd floor ceilings. Also frame grid and the around existing lights and diffusers. Add:$2,791. Exclusions: WSST, Hanger support wires for other trades. Sound batts/Insulation. Union Signatory/MBE Certified RCSI reserves the right to withdraw this proposal if not accepted within 30 days of receipt. LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.847.6414 FAX 253.847.6806 December 27, 2012 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310455-1837 Attn: Jan Dorbritz Re: Auburn City Hall Remodel Phase I Project#12-18 LCI #1177 Subject: COP 8 Primary Air to VAV-15 Below are the costs associated with the removal and replacement of the wood slat ceiling to accommodate the revisions to duct work at VAV 15 Per RFI 16 Lincoln Construction materials $ - 24 hrs labor $ 1,800 ceiling removal 24 hrs labor $ 1,800 replace ceiling $ 3,600 Phoenix Mechanical $ 818 Total Lincoln Construction Work $ 3,600 Overhead on Prime Contractors Work 12% $ 432 $ 4,032 Total Subcontractors Work $ 818 Overhead on Subcontractors Work 7% $ 57 $ 875 Sub Total $ 4,907 B & 1 4% $ 196 $ 5,104 Please issue a change order in the amount of$5,104.00 If you have any questions, please contact me @ 253-847-6414 Sincerely 11saEfah Lincoln Construction Phoenix Mechanical Inc. PROJECT I Auburn City Hall Renovation DATE. 12/27112 REVISION�� CHANGE ORDER PROPOSAL DESCRIPTION: Ductwork revisions to VAV Box 15 LOCATION: Auburn City Hall Second Floor West Wing RR 16 response LABOR Description Rate Hours Subtotal Field Labor $77.54 3.54 = $274.49 Shop Labor $77.54 3.08 = $238.82 Detailing $77.54 0.6 = $46.52 Coordination $77.54 0 = $0.00 As-Builts $77.54 0 = -$0.00 Refrigeration Mech. $125.00 0 = $0.00 Shipping $77.54 1 = $77.54 Total Hours 8.22 SUBTOTAL LABOR: $637.38 ALLOWANCE FOR LABOR BURDEN @ 0% $0.00 (includes labor tax,industrial insurance,employment Insurance,payroll portion of general liability) SUBTOTAL LABOR: $637.38 ALLOWANCE FOR SAFETY @.-_.______________.______... 0% $0.00 ALLOWANCE FORSMALLTOOLS 0% $0.00 TOTAL LABOR: $637:38 MATERIAL COST(See Attached Sheet For Breakdown) $ 93.13 TOTAL MATERIAL COST: EQUIPMENT Description $0.00 $0.00 $0.00 $0.00 TOTAL EQUIPMENT COST: $0.00 SUBTOTAL OF LABOR, MATERIAL,AND EQUIPMENT: $730.51 OVERHEAD&PROFIT ALLOWANCE @-------- 12% $87.66 GRAND TOTAL FOR PMI OWN FORCES: $818.17 SUB-CONTRACTOR WORK(see Attached) Duct Insulation(Mech. Maint) $311 85 $000 $0.00 $0.00 SUB-CONTRACTORS SUBTOTAL: $311.85 OVERHEAD& PROFIT ON SUBCONTRACTOR: 7% $21.83 TOTAL SUBCONTRACTOR COST: $333.68 COMPLETE CHANGE ORDER SUBTOTAL: $1,151.85 BOND FEE @------------ 0% $0.00 TOTAL DUE THIS PROPOSAL: $1,151.85 TIME EXTENSION IN WORKING DAY'S: This change order is based solely on direct cost elements such as labor,material, and normal mark ups and does not include any amount for changes necessitated by unforeseen conditions or conditions unknown to the contractor art this time. Right is expressly reserved to make claim for any and all of these related items of compensable cost overrun prior to final settlement of this contract. LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.847.6414 FAX 253.847.6806 January 8, 2013 J. DOrbritzAIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 Attn: Jan Dorbritz Re: Auburn City Hall Remodel Phase I Project#12-18 LCI#1177 Subject: COP 10 Fire Sprinkler revision per code Below are the costs associated with changing the sprinklers from standard response to quick response per NFPA 13 Lincoln Construction materials $ labor $ Fox Fire Protection $ 2,166 Total Lincoln Construction Work $ Overhead on Prime Contractors Work 12% $ Total Subcontractors Work $ 2,166 Overhead on Subcontractors Work 7% $ 152 $ 2,318 Sub Total $ 2,318 B & I 4% $ 93 $ 2,410 Please issue a change order in the amount of$2,410.00 If you have any questions, please contact me @ 253-847-6414 Sincerely Isaa Efah Lincoln Construction State Certificate#391-05-6481 117/2013 CHANGE REQUEST TO: Lincoln Construction ATTN: Cheryl Russell EMAIL- Lincoln Construction<Iincolnconstruction@comcast.net> PROJECT: Auburn City Hall Head Replacement Auburn,WA SPECIFICATION SECTION: Fire Sprinklers PRICE: $ 2,166.00 INCLUDES: 1)Labor and material to Change standard Response Sprinklers to Quick Response Sprinklers as Required per NFPA 13 2)Scissor Lift 3)2nd Floor Foyer 4)Normal Working Hours 5)Heads to Match Newly installed Sprinklers(Base Project) EXCLUDES: 1)Bid,Payment,and Performance Bonds 2)Demolition or Abatement of Any Kind 3)Painting,Patch,Prep,and Pipe Identification 4)Access and/or Access Hatches 5)Firestopping 6)Sales Tax Estimate is based an adequate pipe and water supply being available. Adequate heat and insulation are by owner. Estimate is valid for thirty days. Oneyearwarra M 7:!ianty after date of substantial comple Ion. /1101kw Robert P. McGee President LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.847.6414 FAX 253.847.6806 January 31, 2013 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 Attn: Jan Dorbritz Re: Auburn City Hall Remodel Phase I Project#12-18 LCI #1177 Subject: COP 16 RFI 17 Below are the costs associated with replacing Motor RAF 1 as per RFI 17 Lincoln Construction material $ - labor $ - Phoenix Mechanical $ 3,100 Total Lincoln Construction Work $ Overhead on Prime Contractors Work 12% $ - Total Subcontractors Work $ 3,100 Overhead on Subcontractors Work 7% $ 217 $ 3,317 Sub Total $ 3,317 B & 1 4% $ 133 $ 3,450 Please issue a change order in the amount of$3,450.00 If you have any questions, please contact me @ 253-847-6414 Sincerely Isaac Efah Lincoln Construction Phoenix Mechanical Inc. PROJECT: -AuburnCi ' ,Hall Renovation— DATE: 01/31N3', REVISION #1 CHANGE ORDER PROPOSAL jRFI17 DESCRIPTION: lReplk& Motbriat RA .71 .. LOCATION: jAuburn CI -Hall Mech..ROOM,RFl 11.response` " LABOR Description Rate Hours Subtotal Field Labor '•'� �'�$77:54 0 Shop Labor ' ,--,;$77,54 "0 = --;x-40,00 Detailing ',$77:54 .0 $0A0; Coordination -..$77;54 ' 0 As-Builts `. '$77,54 0 = _ :$0.00' Refrigeration Mech. :$125:00 0 = , �� 0.00, Shipping $77•.54 0 = - '$0.00; Total Hours '." 0 SUBTOTAL LABOR: ALLOWANCE FOR LABOR BURDEN @ 0% (includes labor tax,Industrial Insurance,employment Insurance,payroll portion of general liability) SUBTOTAL LABOR: :$0.00 ALLOWANCE FOR SAFETY@----------------- 0% - - - •$0.00 ALLOWANCE FOR SMALL TOOLS @-------------- 0% :;SO.00 TOTAL LABOR: MATERIAL COST(See Attached Sheet For Breakdown) $ TOTAL MATERIAL COST: $0.00 EQUIPMENT Description $0.00 $0.00 $0.00 $0.00 TOTAL EQUIPMENT COST. $0:00 SUBTOTAL OF LABOR, MATERIAL,AND EQUIPMENT: $0:00 OVERHEAD&PROFIT ALLOWANCE @------ 12% - $0.00 GRAND TOTAL FOR PMI OWN FORCES: $0.00 SUB-CONTRACTOR WORK(See Attached) Johnson Controls $3,100.00 $0.00 $0.00 $0.00 SUB-CONTRACTORS SUBTOTAL: =$3100.00 OVERHEAD&PROFIT ON SUBCONTRACTOR: 0% ", $0.00 TOTAL SUBCONTRACTOR COST: COMPLETE CHANGE ORDER SUBTOTAL: :,$3;100.00 BOND FEE @---------- 0% "$0:00 TOTAL DUE THIS PROPOSAL: $3;100.00 TIME EXTENSION IN WORKING DAY'S: _ , ,:.,•�.'.: _ - _ - .,gyre�:;�;; .: .... '•'S`.i- "' -:.1. _-- �.• ,_ .: -.gi`''n~[.: J::'I - ' {_ •! . -. _ .• .. This change'order is based�solgty on;diiecf-co'st•elem6" Su"* labor;_rriateiial;'arid'normaI mark-;, ups and does not include any amount.for change§necessitated by unforeseen conditions or conditions unknown tothe'contractor_art this'time._Right is expresslyreserved to make claim for any and'all of---ese;related ifems of com ensable cost overrun-prior to final settlement of this-contrdct,;. t Johnson Controls,Inc Controls Group 2274529h nrive SE.Suite too Johnson Fax Bothell,WA 98021 Controls 425.398.6935 Fax:425 398 6955 Auburn City Hall—Change Order#3 TO: Phoenix Mechanical DATE: January 29, 2013 PROJECT: Auburn City Hall We are pleased to provide a quote for installation: SCOPE: • Scope: Labor to replace existing Return Fan Motor with new motor supplied by JCI . Also includes removal of existing motor from site and proper disposal . ALL FOR THE NET SUM OF: $3,100 This proposal is hereby accepted and Johnson Controls is authorized to proceed with the work,subject, however to credit approval by Johnson Controls,Inc., Milwaukee, Wl. This Proposal is valid until:3/20/2013. Phoenix Mechanical JOHNSON CONTROLS, INC. Signature: Signature: Name: Name: Avish Bhalani Title: Title: Account Executive AC Motor - Frontpage Print Product Features Motor No. 256TTGN6531 Catalog E506 Edited By MARKETING LOAD Model 256TTGN6531BD Effective Date 07/64/2007 Description 20,1800,EPFC,256T,3/60/230/460 NPSeq 0 Product Line MED IHP(250/320 Channel MAR Status Active Auth BOMIRT Y.Y Stock Class S Source Location LB Nameplate Data Hertz 60 Volts 230/460 Hertz 50 Volts 190/380 HP 20 HP 15 KW 14.9 FL Amps 48/24.1 KW 11.2 FL Amps 44/22 FL PF(Cos) 84(0.84) FL PF(Cos) 83.5(0.835) FL Eff 93 SFAmps 54/27 FL Eff 92.5 SF Amps 49.5/24.6 Eff.75% Eff.75 SF 1.15 RPM 1775 SF 1.15 RPM 1475 Assembly Mtg F1 ONLY NP Frame 256T Motor Type TGS NEMA Design B Phase L3 Insulation Class F3 Duty CONTINUOUS Max Amb(C') 40 Enclosure EPFC Full Load Rise 65 IP Code 54 IC Code 41 KVA Code G PE Bearing 309 OPE Bearing 210 UL NONE CSA N CC Number CO003A RoHS N CE N Protector NOT Prot.Number Lead Case. 11-8 INCH Wdg.RTDs NONE Thermostats TSTATS(N/C) Hazardous Loc EXP PROOF CL I GR C&D CL II GR F&G T3B Thermistors NONE Stack Length 6.75 Max KVAR Elevation 3300 Motor Image Protector Code CrAmps Inverter Duty Motor Information Inverter Type NONE Inverter Load CONSTANT Inv.Spd Range NONE 10:1 Max Safe RPM 3500 Rtr W K 3 No Load Amps Hertz HP RPM Torque Volts Amps 0 D D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 D D 0 0 0 RI R2 Xt x2 XM 0.0 0.0 0.0 0.0 0.6 Additional Mechanical Parameters Frame Material CAST IRON Severe Duty PREMIUM Mir.Orientation HORIZONTAL SEVERE DUTY Mount Type RIGID Application GENERAL DE Bracket STANDARD PURPOSE ODE Bracket STANDARD Shaft Type T Shaft Material STANDARD DE Spl.Shaft NONE Shaft Diameter ODE Spl.Shaft NONE Shipping Wt. 409 Mech.Features STANDARD Final Asm.Drg. Brg.RTDS NONE Nameplate Drg. Nameplate Conn Drg. Nameplate Logo Nameplate Type STAINLESS STEEL STANDARD NONE NONE Lubrication Brake Prov. Encoder Prov. DE Erg Type BALL Brake Mfg. NONE Encoder Mfg. NONE ODE Erg Type BALL Brake Series NONE Encoder Model NONE Drive Method DIRECT Brake Torque NONE Encoder PPR NONE Outline Drg. B-SS203001- Packaging N Pallet Quantity -1 1225 C/Box Type STANDARD Paint BLUE EPDXY Carton Label Additional Electrical Parameters Electrical Type SQ CAGE INV Poles 4 Base Winding K2564164 RATED Start Method LINE OR Ins.System STANDARD Wdg.Iterate NONE INVERTER NEMA PREMIUM Rotation REV Wdg.Group 1 Efficiency Heater Volts NONE Heater Watts Wdg.Subgrp Conn Ding A-EE7308AD Conn Dlag2 Test Card Shipped Conn NA Standard Order Variables StdPck N StdVlt N/A StdRot REV SldMnt F1 ONLY Customer Concerns No Results Found! Special Instructions **STAMP BLANK LINES WITH FOLLOWING** 1. FAN NOT GUARDED. Name Plate 2. WITH OVERHEAT PROTECTIVE DEVICE 3. SEVERE DUTY ***STAMP 14130 UL PLATE*** CL I GR C&D CL I1 GR F&G&T3B Carton Label Assembly Test/Prep Paint/Pack Engineering 1. FINISH MOTOR/F-195(BLUE EPDXY). 2.ASSEMBLE PER B-90992 210/320 FINAL Everyone AUDIT. 3, SHORT COMMERCIAL TEST SENT WITH EACH MOTOR. Oracle Revisions(LAST 5 REVISIONS) 001 02/25/2009 RBCPOPROD-US (BO)CN39382 CHGD NAMEPLATE. GEK 0 07/06/2008 DATACONVERSION N/A 2005 Regal Beloit Corpora[ICn,All Rights Reserved MARATI-ION ELECTRIC Hazardous Loc Mtr, 3 Ph,TEFC,20 HP,T36 -Hazardous Lo... Page 1 of 2 GRAINGSR, S'Gn In 10 Eme1&'9n Up Itle.v NstemeRR ehler Nas IR CWt I t. Call Illo'p calz'o9 I Lim a Branch l can eanlalnsi to)Irma 11171 PRODUCTS I RESOURCES I SERVICES I WORLDWIDE I REPAIR PARTS I Enter keynord or part number Motors)Definit.Purpose Motors>Hazardous Location Motors CI,alOfrlel9 AISO74 a'flelt MARATHON ELECTRIC Hazardous Loc Mtr, 3 Ph, TEFC, 20 HP, T313 --- i[1`f l4 iY tall Was aR6vleH I Reagall Reviews I Read a!I Ask&Ansver islurp This FrodoG� Hazardous Location Meet,3 Phase,Totally Enclosed Fan Cooled,20 HP,Nameplate RPM W75,2301460 V,60150 Hz,Full Load Amps 4801 241,Servlm Factor 1.15,NEMA Frame 2587,Bas.Mounting,Single-SeYed ISE)&DvJble-Shielded(OSE)Ball GP EIb aPh TEFC,20 HP, Beatlngs,Therm alPmlecll.n7-stais,Ambien140 C,Insulafron Class F,CWiCCW ROIaddn,Shag Ole 1-518 In,5haR LengN4(n, 1765 rpm.2567 Length Less Shag 21-1/4 In,Cast Iron,Nondnal Efficiency 93.0,Hazardous LOCatlon Class 10,012 F,G [AaM. DAYTON 6KNG9 r;'mm,eninea C. 2u>,W1 Grainger item# Price: $2,121m Pnce(ea.) $3,644.00 pry Brand MARATHON ELECTRIC _ MIT Model# 256TTGN6531 UNSPSC# 26101612 Ship Qty. 1 Sell Oty-MNI Call) 1 408.0 OP Me,a Ph,TEFC,20 HP, Ship Welghl Clan.) 408.0 rpm,256T Availability Ready to Ship MG Glzegmd.R. 6AJ04 Catalog Page No. 26 Pre, 61,242.60 Ccunhy of Origin USA EGlargo Image Dry' (eaunlry a50dON la,.6100 to change) Qty.: D Add Grainger TdpleGuardO repair&replacement coverage for,$52900 each. GP Mtr.a Ph,CDP,20 HP, f770,pm.256T Pir'e apm.n m:T na reza aeuq.:e eenlnars"nac Brand DAYTON Man eon l gel It?Use yeD,ZIP code to eshrnat.avalal G,a'ager nen a. 9G2c> Pf 61,3IXi W Uy —, ZlPmdo '- ay; Tech Adddivml compllare. Required OpGeml Alternate Repast Specs Inlorme60n aRetwoune A1505 Accessories Aoessodez Pmdualz Parts P Item Hazardous Location Elora, floor Type 3Phase Endosma Toby EndaSN Fan Cooed lIP 2a NamapMe Rpf.l V26 fl=p So Frame 2507 SOT GP in" Ph,OOP,20 HP, Frame Poll,Vart n 0 Emed;m,2567 Roltage 23046 W &ard: y.9G Full L. 2]/7460 G,a'n9er Ilan 0. 1X7%2 Phase Lead Amps 4aQd.1 Phase a PI 61,60500 6e so li aenlln9 ease o Olr eann9z Cas Rama hl Protection T5.1 Thiel Thermal eetor tan 715 Sere o.,Lo, 1.15 Llox Ambient nt Te , GbH 1G egrcer Ef a Amelenl Temp. 40(Hg�ees C atl e Ta o sh;Nl U Lon 4 Length Less Shaft 211 14 O'e"T Lenart 2514- Lead Length 0 Insulation Class F RPTI per g 14004&10 nominal osy 93.0% us Edr'Ir FG'.u'Y Prem ElndenryGreup (11)Lum Standar lI1J ,I dtE1Candos Gas slanmma Blua.a lEDaq,eva canned(LR47644) Customer.Also Bought l to75 littp:/fmv",.graiiige,r.com/Grainger/wwg/search.shtuil?searchQtiery=256TTGN6531&op=... 01/3112013 Metco Electric, 21804 Mtn. Hwy E, PMB 32,Spanaway,WA 98387 (253)846-2565 Auburn City Hall Remodel- Phase 1 Change Order Proposal: Replace Return Fan Motor Scope: Labor to replace existing Return Fan Motor with new motor supplied by others.Also includes removal of existing motor from site and proper disposal. Inclusions: Electrical labor Electrical permit Exclusions: Supply Motor and necessary hardware for installation of new motor. Sales tax Breakdown Labor cost: 10 hours @$70(cost)_$700 Material cost: $14.29 Profit&Overhead=12% $700+$14.29=$714.29 X 12%_$800 Price: $800 Thank You, Brent Metcalf LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.847.6414 FAX 253 847.6806 January 31, 2013 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 Attn: Jan Dorbritz Re: Auburn City Hall Remodel Phase I Project#12-18 LCI#1177 Subject. COP 17 Duct Cleaning 2nd Floor Below are the costs associated with duct cleaning on the 2nd floor Lincoln Construction material $ - labor $ - Phoenix Mechanical $ 2,375 Total Lincoln Construction Work $ Overhead on Prime Contractors Work 12% $ - Total Subcontractors Work $ 2,375 Overhead on Subcontractors Work 7% $ 166 $ 2,541 Sub Total $ 2,541 B & I 4% $ 102 $ 2,643 Please Issue a change order in the amount of$2,643.00 If you have any questions, please contact me @ 253-847-6414 Since ely Isaac fah Lincoln Construction Phoenix Mechanical Inc. PROJECT:l Auburn City Hall Renovation DATE: 01/31/13 REVISION CHANGE ORDER PROPOSAL DESCRIPTION: Duct Cleaning Existing Ductwork on 2nd Floor LOCATION: lAuburn City Hall Second Floor Level LABOR Description Rate Hours Subtotal Field Labor $77.54 0 = $0,00 Shop Labor $77.54 0 = ".$0.00 Detailing $77.54 0 = $0.00 Coordination $77.54 0 = - $0.,0,0 As-Builts $77.54 0 = , $0.00 Refrigeration Mech. $125.00 0 = $0.00 Shipping $77.54 0 = $0.00 Total Hours 0 SUBTOTAL LABOR: $0.00 ALLOWANCE FOR LABOR BURDEN @ 0% $0.00 (includes labortax,industrial Insurance,employment insurance,payroll portion of general liability) SUBTOTAL LABOR: $0.00 ------ 0% $0.00--- - ALLOWANCE FOR SAFETY @--------------_ ALLOWANCE FOR SMALLTOOLS @----------------------- 0% $0.00 TOTAL LABOR: $0.00 MATERIAL COST(See Attached Sheet For Breakdown) $ - TOTAL MATERIAL COST: $0.00 EQUIPMENT Description $0.00 $0.00 $0.00 $000 TOTAL EQUIPMENT COST: $0.00 SUBTOTAL OF LABOR,MATERIAL,AND EQUIPMENT: $0.00 OVERHEAD&PROFIT ALLOWANCE @-------- 12% $0.00 GRAND TOTAL FOR PMI OWN FORCES: .$0.00 SUB-CONTRACTOR WORK(See Attached) Duct Cleaning (Mech. Maint. $2,220.00 $0.00 $0.00 $0.00 SUB-CONTRACTORS SUBTOTAL: $2,220.00 OVERHEAD&PROFIT ON SUBCONTRACTOR: 7% $155.40 TOTAL SUBCONTRACTOR COST: $2,375.40 COMPLETE CHANGE ORDER SUBTOTAL: $2;375.40 BOND FEE @------------ 0% $0.00 TOTAL DUE THIS PROPOSAL: $2,375.40 TIME EXTENSION IN WORKING DAY'S: DO This change order is based solely on direct cost elements such as labor,material, and normal mark ups and does not include any amount for changes necessitated by unforeseen conditions or conditions unknown to the contractor art this time. Right is expressly reserved to make claim for any and all of these related items of corn ensable cost overrun prior to final settlement of this contract. Estimate MECHANICAL MAINTENANCE, INC. 1401 MARVIN RD NE#307-214 OLYMPIA,WA 98516 Name/Address Phoenix Mechanical Inc Patrick Olson Date Estimate No. Project 01/31/13 1011 ubum City Hal... Item Description Quantity Cost Total Ductcleaning Clean all exisitng duct on 2nd floor to include all 1 2,220.00 2,220.00 supply, return, and exhaust IF ANY QUESTIONS, PLEASE CALL!I 360-456-4284 Total $2,220.00 I% CHANGE ORDER Distributed To: 6701 ® Owner ® Contractor ®, Architect ❑ Subcontractor ❑ Field ® Other PROJECT AUBURN CITY HALL REMODEL PHASE 1 CHANGE ORDER NO: 3 PROJECT NO.CP 1009 f DATE. March 25,2013 PROJECT NO: CP 1009 TO LINCOLN CONSTRUCTION,INC. CONTRACT DATE, October 2,2012 P.O.BOX 730 21323 MOUNTAIN HWY E. CONTRACT FOR: GENERAL CONSTRUCTION SPANAWAY,WA 98387 The contract is changed as follows: # COST -DESCRIPTIONS 1 158,691.00 COP 20 Mayor's Office Revisions 158,691.00 TOTAL 11 The original Contract Sum was $ 552,762.00 Net change by previously authorized Change Orders 1,2 $ 44,986.00 The Contract Sum prior to this Change Order was $ 597,748.00 The Contract Sum will be increased by this Change Order in the amount of $ 158,691.00 The new Contract Sum including this Change Order will be $ 756,439.00 The Contract Time will be increased by. .. . . Sixty ( 60 )days The date of Substantial Completion as of the date of this Change Order therefore will be March 28,2013 Accepted By: LLINCOLN CONSTRUCTION&4C CITY OF AUBURN,AUBURN;WA J.DORBRITZ AIA,ARCHITECTURE OW I ARCHITECT L� By BY' By Jan WP Dorbritz l 3 17 3 March 25,2013 Date Date I I Date CAUTION You should sign an Original Dxument on which this text appears in RED An Original Document assures that changes will not be obscured, TORGO SOFTWARE w.wJ rooSofvsmcm 01996-2012 ALL RIGHTS RESERVED Page 1 of 1 LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.847.6414 FAX 253.847.6806 February 4,2013 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-058-1837 Attn: Jan Dorbritz Re: Auburn City Hall Remodel Phase I [REVREDD 207 M Project#12-18 LCI#1177 Subject: COP 20 Mayors Office Revisions Please see below and attached the costs for the revisions to the Mayors office per the revised drawings Lincoln Construction material $ 837 I 24.5 labor $ 1,838 General Conditions $ 12,000 $ 14,674 Subcontractors per the attached $ 127,245 Total Lincoln Construction Work $ 14,674 Overhead on Prime Contractors Work 12% $ 1,761 $ 16,435 Total Subcontractors Work $ 127,245 Overhead on Subcontractors Work 7% $ 8,907 $ 136,152 Sub Total $ 152,587 B& I 4% $ 6,103 $ 158,691 Please issue a change order in the amount of$158,691.00 If you have any questions, please contact me @ 253-847-6414 Sincerely Isaac Ffah Lincoln Construction LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.847.6414 FAX 253.847.6806 February 7, 2013 Attn: Steve Burke City of Auburn 25 West Main Street Auburn,WA 98001 CC: J. Dorbritz AIA Ref: Auburn City Hall Remodel-Phase 1 Subject: Proposal for Auburn City Hall Remodel 2"Floor Revision dated 11/1/12 Thank you for the opportunely to provide you a construction budget estimate for the above reference project. Based on the review of the construction plans by J. Dorbrilz AIA,our proposal is based on the following Revisions' 1 0112812013 2. 01/03/2013 3. 12/27/2012 4. 12120/2012 5. 12/10/2012 6. Architectural 2""Floor plan A-102=r1,dated November 1, 2012 7 Reflected Ceiling plan A-102-T1, dated November 2,2012 8. Specification manual for revision, not available. Our scope of work is as follows: 1. Mobilization, Demobilization and General Conditions $12,000.00 2. Rough Carpentry $ 2,674.00 3. Casework $17,579.00 4. Door Frames, Doors& Finish Hardware $ 7,198.00 5. Metal Studs and Gypsum Drywall $14,753.00 6. Ceramic floor and wall Tiles $ 4,500.00 7. Acoustical Ceiling S 2,12200 S. SOT Floor Room 227 $ (542.00) 9 Painting $ 2,743.00 10. Plumbing Rough-In $21,600.00 11 Plumbing Fixtures: Shower Pan, Lav,WC, &2 Sinks $ 4,120.00 12. Heating and Ventilation—HVAC $14,577.00 13. Electrical Lighting $25,665.00 14. Data/Security Alarm $12,930.00 Our proposal excludes the followings' 1 Any work not quantified in the bid proposal 2. Engineering and Surveying 3. Building Permits, Any City and County Inspection and Fees 4. Washington sales taxes(WSST) If you need additional information, please contact us at 253-847-6414. Sincerely, Isaac Efah Project Manager/Estimator W A S 11 ' :l 6 1 e e ,.r c n:r L C f u a r.t l'i'l'.'M11:4 GU PROJECT " `' ""' QUOTATION Lincoln Construction Date: 1/26/13 Attn: Cheryl .JOB' 12-10115 Quoted by- Russ Auburn City Hall/ Mayors TI changes Change Proposal #01 /REV 4 The purpose of this proposal is to provide cost to change doors and hardware per Mayors TI changes. Delete 3 3 sided frames at 274,275,277 ($489) Delete 1 ea. Hollow Metal 51-1, SL2, R5, R6, R13 ($985) Delete 3 Flush doors at 274,275,277 ($630) Delete 3 hardware sets for 274,275 and 277 ($771) TOTAL DELETIONS ($2875) ADD 13 sided frames,3-SLi, 1-R2,4-R7 $1592 ADD 13 Type A,2 Type B and 1 Type C doors Less glass $3161 ADD 16 Hardware sets met 3 hinges, 1 locksel less core, 1 wall stop and 3 silencers $2064 ADD Labor charges for Installing new frames,borrowed[Iles and hardware $3256 TOTAL ADDS$10,073 Total value add per this proposal 7 198 I NOTE: This material HAS NOT been Incorporated Into the project. We will proceed once written authorization Is received. I/We agree to purchase the Items as described above. 6y; _ Date: Written authorization to proceed is required before any action can be taken on this order Prices guaranteed for 30 days from date of quotation. Unless otherwise noted,prices are FOB point of origin,freight prepaid to jobsae,and exclude sales lax Modified or special order items are not returnable. All returns require preauthorization TERMS:NET 30 days/No Retention 4409 S. Orchard Tacoma, WA 96466 Ph. (253) 471-9150 Fax (253) 471-9171 WAN1091h07 Feb. 4. 2013 12,23PM Access Winvo'; s Glass No. 7620 P. I Quote/Confirmation .. ,w,' Dd{NS �, 6319 112th Street E LASS LF.-C. Puyallup,WA 96373 Phone: 253.770.6787 Cbrllrucrri ri Re5rden7k7! F:xt 253-770-8788 mike o�acceswindowsaBd9lzss.w_i7 __ 1 F1eme: Auburn City Nell '_ _ r7.ats'; 21412013 ' I � L d:ess nted: Itzmr. Lincoln Construction --.:.ildlil=ct _ I Address:PO BOY 730 Issac It rn Spanawa ,WA98387 r-iu 253-0471,4 i4 - -_ i Cartad: 253-897-c00u ��-,_ TOTAL Y QT :; ', t..r.- . .':i=• : ...::.,_.._._.. ._ - —_- =°.�_._ - 1 - Provide 1 Agailte`AcconC series shower ecclo: ,:e. Includes 114"tempered glass w fh expos,d�polished Brushed Fickle hardware color, and Clear,P-516,or Rain Obscure tom ereel g3&sS, Includes handle lhru glass. Includes installation,clean up,and haul owrj!.. ny debris. $ 884,40 j t�o'2s: P(asosi9n and P.xback ro 253J70.8788. Pon _4 SUay�b7Ai- Is MAO $ - printN,,rafe _ s;fAL $ 884,40 !! t f ac7l:iPA4.{rtPNl If%4nYq:rs7uns;,?2ase call 153.770.87C7 Thank Yc>1F�it—�– If S �.� P1C=DtIE UPON "'UMP EMN $ 884.40 ®NC 7Auburn P- 5 MEIRFR DRYWALL,INC. Lj SEATTLE Date: 1/201.3 2657 201h Avenue West ryl seatlle,%VA 98199 coln Construction _ I'LL: (206)28ZM1289 urn City Hall FAX, (208)285-2092 c Mehrer _ Te lephone: (206)206)282 _ E-Mail: ertc @m`r.o_°m We propose to furnish and install material for the additional work as follows; I SCOPE OF WORK: .__ Revlslons par new plans mated 1-3-13 Add apro(190'of new wall type B in NW area Add telling in ayors vr bathroom Add Furring to wall in conference room to male trat hl Rework framing at area s here layout ' than Ed after framing was done. Deduct Fli GVda at one side of WT-A to mak e all walls 6"above ACT ceiling.(framing to remain as is) Material Increace for drywall delivered after 1/1 due to schedule delay's. INCLUDES: See ottaclied breakdown. i TOTAL ADDITIONAL WORK: S iM1,753,00 1 We will proceed with this wort(upon your direction. 2. This amount will be billed upon completion. 3. Change 4. This proposal` need to be issued opted, shall constitute titute an addition torourlcontract.oour billing. By. M-EHRE R DRYWALL, INC. WA: tACHRED'324RT Oft: 780-058-82 Gri�LE DGre�ssoclate `-- Date: ��— Accepted 13Y _ --_ -- _— CABINETMAKERS5 INC. Comnmrcial Fixtures 11,120 59'Avenue Bast PuYallup VA1 98373-4352 Phonc(253)848-3541 Fare(253)848-8047 January 29,2013 t.mYCOLN CONBTRDCTION,INC. PO BOX 730 SPANAN'AY WA 98387-0730 1 Al-FN: Dan Lincoln RE: Auburn City Hall Remodel We are pleased to quote you the folloAing sunns for furnishing and installing our standard flush-overlay style plastic-laminate clad cabinets and countertops, per revised architectural dralvings dated 1/28/13. ',S Bi_d: Altermte Bid: Material: $ 2,889.00 $ 6,303.00 Labor: $ 6,748.00 $ 6,387.00 Install: S ,I 8a.00 S 2.530, Subtotal: $10,022.00 $15,220.00 OH 5%: $ Fol.00 S 761 00 Subtotal: $10,523.00 $ 15,981.00 Mlllo%: fi 1.os2.00 $ I gg&00 Total: - 11.ws.o0 7.59C1,0o We have excluded painting/staining/finishing, wood wall caps, standing or running trim, finished Vase material (ie: rubber, etc.), any work with existing cabinets (ie: installation, etc.), and taxes. if there are any questions,please call. We look forward to working with you on this project. Very truly yours CABINUMAKE16, INC. C\ �} Jade Dunlap Estimator P. 1 I' M. I. KELLER ENTERPRISES 11 C06 Pacific Avenue i"7 �— TAOOMA WASHINGTON 984;4 (253)53'1 !GW` (253)537.7881 • Fax(253)531.9741 WBF Cei-tMc tlon Number W21`2240368t CenCaclors#MJKELE-03102 ! sT.f Oar:A..,E CI,IN STAT2 IM 2ie CC9E Jna1 CCAIIC'1 ARCHITECT pAIEpF?'J.", JOB GNOAE !C n�T6p65Q hereby to lumish material and labul.e.;a,plele In accor6ance+vim spccltics8ons below,for the sum oi: i dollars (S ) Galm.r,l>c.n.^b�azlJbnt' --• - Al mcmaLlLgumamced to boe3 spen4ed.A:I w�.k locecon.p:ced l^t,.uberntYO avnweao nur,-n:+.-�a1r•91a�M EVoc�.a,YeAera6niaabASeakan cf--'^rc���txbx 6'<nr,va Imu�I,Tg a;:r,;mssMI Eo OvttNM on1Y uponwrY.en c,Ann,an:nll.aw.'^?s ema Ce9a e:ea andaSa/aR,e esOma'e allagrxmenl;eomiAOnl upa,str>=e,enr.sau or Nc:e:Ths propoSE!n`zy:o ocLl .A,�w v,.rod(Nmula Ivry Fro,laneric a;.dotherlace s:.Y l.�.u-ece.0u' wilhdlcwn by us it not zcce,1!0 rlhin days. noH?rs vtai:Y UYC:dtrywakmons Compensaim lrucra,n. _ '- I�- 1Ve heresy submit specillc at(ons and estlm atcs i+.,: - - -_ ._-.._---------------- __ I � U_-------- r a --------- - - i -- ---- -- ------- ---- I I�' �?LLC��IS �E".}f �CQ}ID�Q�•Thea':a.ea'ices,so:,::��:,:sE-.:cone Si4:labre _ __ , ccv ua s�-c^ry me axhereC/acreR�.Ywarca,..�.FSE lodx:e..us::»',� - PLY„ti"TI A'il`ji.niJ:,lS gfillade�0/0 ! paootcc_e,ly.ea, _ ..—_—_ Si4^.a:�fE_ _ �ielr2 ceiQurge & S�eunCtiee, �r4c. PO Box 4505 Federal Way,WA 98063 COP 4001 Office 253-838-9086 Fax.253-838-9136 Add for additional footage and ceiling layout per Cell:253-222-3836 Revised Plan Sheet A-302-T1 Dated: 11-2-12. Hourly Break Down COP Cost Breakdown Hourly Wage $35.66 Project Name: Auburn City Hall Pension $5.50 Contractoi. Lincoln Construction Health/Security $6.91 L&I $0.44 SSI $1.50 Fed $4.58 Med. $0.52 i Unit Material Labor Description: Quantity Type T e Unit$ Cost Quantity Unit$ Cost Ceiling Grid i 16 reg. $55.11 $881.76 12' main runner (USG) 132 If 0.59 $77.88 4'cross tee's (USG) 264 If 0.58 $153.12 10'wall angle(USG) 418 If 0.64 $267.52 12 ga hanger wire 76 pcs. 0.52 $39.52 USG Radar 42742(ceiling tile) 496 sq ft 0.79 $391.84 Total Material $1,013.04 Labor Total $881.76 Total Cost Total Cost 12%mark 12%mark $121.56 $105.81 i I Total w, 12%mark up -total w, 12%mark up $1,134.60 $987'57 I Total Material&Labor: $2,122.17 Auburn City Hall ub-Contractor, Rubenstein's Contract Carpet CHANGE ORDER PROPOSAL IDate 01/21113 ASI I RFI/CCD!PCO#: COPE OF RANGE: Changes to Phase 1 issued 0113/13. Replaces previous Phase 1 change MTL IMTL JMTL JMTL LABOR LABOR (LABOR DATE MATERIAL DESCRIPTION QUANTITY UNIT PRICE UNIT COST HOURS UNIT PRICE COST CPT -71 1$15.94 Isy $(1,131.74) 1$3.75 $(266.25) VCT 1 190 $8.25 sf 174251M $1.25 $112.50 $' $- S- $- S- $- S- S- I $ S- $ $- S- g_ S- g_ $- 5- S- g_ g- S- S' g_ S- s- g- OTAL 1$(389.24) D $ 153.75 TOTAL MATERIALS&LABOR: S 542.99 . n rn•ruv u ysano J360-749- 17-4, :5 Fax 360-749-1275 Re: Auburn CAY Hall/Floor 2 Remodel-Phase I Section t . 99000 Labow and as r i ` 29 919300" Re-Mobilization 'ee if needed $050. 00 If you llavc any questions please cal1, Bruce 1360-749-12795 (."'cold'Construction Jason Robson <jason @ the robsonco.com> �:r Prom, Thursday,January 31, 2013 217 PM Sent;. 'Lincoln Construction' RE.Auburn City Hall The R0 _ _ c9 SCOPE LETTER FAX PROPOSAL TO Lincoln Construction PROJECT COP- Auburn City Hall BID DATE: 1/31/2013 BID TIME: n/a propose to provide the labor and material for the Plumbing Portion of the project as p specifications, and information provided as follows: Rough In Base Bid (Exc)usive of WSST): $21,600.00 Fixtures w/ Labor Add to Base, 4$ ,120.00 Our Base Bid Includes (as shown on drawings): Piping-Water in Copper and Waste in Cast Permit Core Drilling Pipe insulation Our Proposal Excludes Cut and Patch (concrete/asphalt removal & replacement, concrete saw cutting, dewatering, housekeeping pads, heat trace, asbestos, painting, fire stopping, access doors, roofing, site restoration & structural modifications). Fire protection systems & sprinklers. Cable Locate (for core drilling - X ray) Fixtures - Lav, Tank WC, Shower,2- Sinks. Phoenix Mechanical Inc. PROJECTJ Auburn City Hall Renovation DATE: 12/17/12 REVISION CHANGE ORDER PROPOSAL DESCRIPTION: jMechanioal Revislotis To East WIfi LOCATION: jAub1ITI City Hall Second Floor East Wing LABOR Descriptlon Rate Hours Subtotal Field Labor $77.54 _ 51.16 = 33,966.95 Shop Labor $77.54 8.93 = $692.43 Detailing $77 54 1.81 = $140.35 Coordination $77.54 4 = $310.16 As-Suilts $77.54 0 = $0.00 Refrigeration Mech. $125.00 0 = $0.00 Shipping $77.54 3 Total Hours 68.9 SUBTOTAL LABOR: $5,342.61 ALLOWANCE FOR LABOR BURDEN @ 0% $0.00 (includes labor tax,Industrial Insurance,employment Insurance,payroll portion of general liability) SUBTOTAL LABOR: $5,3A2i51 ALLOWANCE FOR SAFETY @-------------------------------- 0% $0,00 i ALLOWANCE FOR SfAALL TOOLS Qa--- ----------•-------- O% $0.00 TOTAL LABOR: $5,342.61 MATERIAL COST(Soo Attached Sheet For Breakdown) $ 921.84 TOTAL MATERIAL COST: $921.84 EQUIPMENT Description Exhaust Faris 2 &GRD'S(3) Dorse) $288.00 $0.00 $0.00 $0.00 TOTAL EQUIPMENT COST: $28800 SUBTOTAL OF LABOR,MATERIAL,AND EQUIPMENT: $6,552.35 i OVERHEAD&PROFIT ALLOWANCE @-•-----• 12% $78628 GRAND TOTAL FOR PMI OWN FORCES: $7,338.63 i SUBCONTRACTOR WORK(see AUachad) Controis&VAV Box(JCI) _ $5,360.00 Test&Balance (Air lest) $350.00 Duct Insulation(Meth. Mainl $1,045.00 $0.00 SUB-CONTRACTORS SUBTOTAL: " $6,764.00 OVERHEAD&PROFIT ON SUBCONTRACTOR: 7% $4131,48 TOTAL SUBCONTRACTOR COST, $7;2.7.48 COMPLETE CHANGE ORDER SUBTOTAL: $14;676.11 BOND FEE @------------ 0% $0,00 TOTAL DUE THIS PROPOSAL: $14,576.91 TIME EXTENSION IN WORKING DAY'S: 30 This change order is based solely on direct cost elements such as labor,material,and normal mark Ups and does not Include any amount for changes,necessitated by unforeseen conditions or 1 conditions unkhown to the contractor art this time. Right is expressly reserved to make claim for any and all of these related Items of com p onsable cost overrun prior to final settlement of this contract. i AIRTEST Co., Inc. NEBB Certification #3000 Change Order Proposal Date: December 13, 2012 Company: Phoenix Mechanical Attention: Patrick Olson i Project Name: Auburn City Hail Della-1 12110/2012 Protect Description: TAB one new VAV unit and two new exhaust fans Cost to Perform Specified Services: $ 350 Comments: i Thank you, Brent K.Wyman Vice-President Please sign this proposal and Include it In your purchaselrhange order. Accepted By: Dale: P.O. Box 86 • Issaquah,Washington 98027• (425)313-0172 Fax(425)313-5735 Estimate MECHANICAL MAINTENANCE, INC. 1401 MARVIN RD NE #307-214 OLYMPIA, WA98516 Name/Address I Inc Phoenix Mechanical CITY HALL Patrick Olson Date Estimate No. Project i 12-M-3-1-12- 6-ng Odr-i A... ----------- Item Description Quantity Cost Total HVAC ductnally Wrap ductwork with R standard 100 8.20 820.00 o 'insulation. insulation i day plus matorals) Extras patching and repairing damaged insulated areas on 1 225.00, 225.00 2nd floor upon Inspection. —---------- IF ANY QUESTIONS, PLEASE CALLS!! 360-456-4284 Total $1,045.00 ---------- ------- Johnson controls.Inc. Controls Group t;. Johnson 221452u Drive SE,5wte100 Bothell,WA 96921 Tel 42 425.398.6935 Controls fax 425.3986955 Auburn City Hall—Change Order#1 TO: Phoenix Mechanical DATE: December 17,2012 PROJECT: Auburn City Hall We are pleased to provide a quote for the following equipment and install of the CDC controls per plan issued on 1211112012: SCOPE: Provide VAV-20 as shown on the plans(VAV installed by MC) • 2 now 7_one Dampers(dampers installed by MC) Actuators and controls for new zone dampers and VAV-20 provided and installed by JCI ALL FOR THE NET SUM OF: $5,369 This proposal is hereby accepted and Johnson Controls is authorized to proceed with the work;subject,howover to credit approval by Johnson Controls, Inc., Milwaukee, IM. This Proposal Is valid until: 1/20/2013. Phoenix Mechanical JOHNSON CONTROLS,INC. i Signature: Signature: Name: Name: Avfsh Shalani Title: Title: Account Executive I Metco Electric, 21804 Mtn.Hwy E, PMR 32,Spanaway,WA 98387 (253846-2565 Auburn City Hall Remodel-Phase 1 Change Order Proposal: Mayor and Council Members DATA System Scope:Add DATA System for Mayor arid Council Members per Electrical Drawings E-3. Install a pair of cables to 26 DATA Drops and terminate and trim both ends. Install 52 DATA jacks and 26 wall plates. Provide, install,and terminate new DATA Rack and five 24 port patch panels. Terminate 52 cables from Mayor's side and 40 cables from HR side to the patch panels. Test all cables with a DATA tester to assure accuracy of wiring and assurance of cable quality Exclusions: Ethernet switches and Neat Patch provided,installed,and terminated by owner Sales tax Inclusions: 1 Hour/$300 Cost—Electrical Permit 65 Hours/$3,016 Material—Pull cable and terminate to 26 DATA Drops/52 DATA Ports 24 Hours/$1,229 Material—Install DATA Rack and five 24 Port Patch Panels and terminate 92 cables 2 Hours/$0 Material—Relocate the duplex receptacle that is behind new rack. 8 Hours/$0 Material—Test all cables. Breakdown Labor cost: 100 hours @ $70(cost)_$7,000 Material cost: $4,545 Profit&Overhead=12% $7,000+$4,545=$11,545 X 12%_$12,930 i Price: $12,930 Thank You, Brent Metcalf C17 Metco Electric,21804 Mtn.Hwy E, PMB 32,Spanaway,WA 98387 (253)846-2565 Auburn City Hall Remodel-Phase 1 Change Order Proposal: Mayor and Council Members Scope: Electrical changes for Mayor and Council Members per Electrical Drawings E-2 and E-3 Exclusions: Sales tax Inclusions: 1 Hour/$500 Cost—Electrical Permit 32 hours/$80 Material—Drawing E-2- Rework raceway for lighting that were already done before design changed. 8 houts/$20 Material—Drawing E-3-Rework raceway for power that were already done before design changed, 85 Hours/$1,926 Material—Drawing E-2-Additional work for the lighting plan *-5 Troffers Lights *+25 Recessed Can Lights *+9 Switch locations(18 rocker switches) 144 Hours/$7,490 Material—Drawing E-3—Additional work for the power plan *+53 Receptacle locations(104 receptacles,3 GFI receptacles) *-20 FurnitUre System Power 1-Box *+2 Data drop rough-ins only *+1 VAV box power *+1 Power/Data Floor Box 1+2 Card Readers *+2 Garbage Disposal outlets with dedicated circuits *+2 Microwave outlets with dedicated circuits *+1 Dishwasher outlet with dedicated circuit *+2 Printer outlets with dedicated circuits *+2 Refrigerator outlet with dedicated circuit *+2 Exhaust Fans Breakdown: Labor cost: 270 hours @$70(cost)=$18,900 Material cost: $4,016 Profit&Overhead= 12% $18,900+$4,016 =$22,916 X 12%_$25,665 Price: $25,665 Thank You, Brent Metcalf CHANGE ORDER Distributed TO: G701 ® Owner ® Contractor ® Architect ❑ Subcontractor ❑ Field ® Other PROJECT AUBURN CITY HALL REMODEL PHASE 1 CHANGE ORDER NO: 4 PROJECT NO.CP 1009 DATE: March 29,2013 PROJECT NO: CP 1009 TO: LINCOLN CONSTRUCTION, INC. CONTRACT DATE: October 2,2012 P.O.BOX 730 21323 MOUNTAIN HWY. E. CONTRACT FOR: GENERAL CONSTRUCTION SPANAW AY,WA 98387 The contract is changed as follows: # COST ,bESCRIPTION' 1 779.00 COP18 Power for add.Gard readers/panic buttons 2 5,329.00 COP 19 Add.relights at Mayor/Council area 3 2,003.00 COP 21 Fire sprink.revs.at Mayor/Council area 4 2,104.00 COP 22 Revs.at conference room 250 5 7,561.00 COP 23 Power,data,HDMI to(5)flat screen TVs 6 4,978.00 COP 24 Chair rail 7 2,754.00 COP 25 Ceramic tile upgrade 8 1,002.00 COP 27 Comcast cable from basement to TVs 9 256.00 COP 28 CAT6 cable for future video cams in lobby 10 835.00 COP 29 Add.acoustical insulation at Mayor/Council area 11 1,637.00 COP 31 Add.ceiling tile 7 grid delay cost 29,238.00 TOTAL The original Contract Sum was $ 552,762.00 Net change by previously authorized Change Orders 1,2,3 $ 203,677.00 The Contract Sum prior to this Change Order was $ 756,439.00 The Contract Sum will be increased by this Change Order in the amount of $ 29,238.00 The new Contract Sum including this Change Order will be $ 785,677 00 The Contract Time will be increased by . Fifteen ( 15 )days. The date of Substantial Completion as of the date of this Change Order therefore will be April 15,2013 Accepted By: LLINCOLN CONSTRUCTION,INC CITY OF AUBURN,AUBURN,WA J.DORBRITZ AIA,ARCHITECTURE CONTRACTOR QVJXER I ARCHIT By gy_ I y: an H.P Dorbritz / / J March 29,2013 Date Date Date CAUTION.You should sign an Original Document,on which this text appears in RED.An Original Document assures that changes will not be obscured. TORGO SOFTWARE w TU005 ft---can Of996-2012 ALL RIGHTS RESERVED Pagel of 1 LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.647 6414 FAX 253.847.6806 February 4, 2013 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 Attn: Jan Dorbritz ftwh@d M 9§13 Re: Auburn City Hall Remodel Phase I Project#12-18 LCI #1177 Subject: [COP 19:Relites Below are the costs associated with reframing wall for 11 relites to include painting subcontractor's costs Lincoln Construction material $ labor $ Metro Glass $ 355 WAH $ 1,632 Mehrer Drywall $ 589 The Paintsmyth S 2,213 S 4,789 Total Lincoln Construction Work $ Overhead on Prime Contractors Work 12% $ Total Subcontractors Work $ 4,789 Overhead on Subcontractors Work 7% $ 335 $ 5,124 Sub Total $ 5,124 B & 1 4% $ 205 $ 5,329 4C Please issue a change order in the amount of$5,329.00 If you have any questions, please contact me @ 253-847-6414 Sincerely, � �7C.L:✓� �vt?i Isaac Efah Lincoln Construction R,5! 1 lli­ Dam. 1 71012 1"n aa. Nuburn City Hall Rey r.oc9,Pr VMS C.,.,_:luction Inc C_:r 11 11 2P �'A' S.Z z l )57) PO So '07 1--A 55387-0730 161! 5=5014 So 012 SW 1 05, 22XV,1 zz- 4;5)254-4326 se to make the folto offs _Dz Or Mayor's office e.)o Ow-y 6 c scd 'I Cites at approyirr­_ :12y ,A , q any 7_ a e peat pqaays ey*a. DN,nal Proposal NY Die r ina invo is and Earnis 7jns, a! s-2 Ic this Change --1 2 is for PROPOSEZ W :me orc-1 nel Mon: a ymcmw va nant us to -_c.-. _ n7 No Wra work. Many Man scion 5354.88 8,198.00 2"t Ny 5 clays. If condit -.z �IlE-_,e 'De i5 voc. Ume extension of !cas no, Data Tent F7 'VOPMA The above picec sr.1 pyAhn 4 -s of thl COry My 4wad so swaWww'Md are hereby accepted. All WOM a ba 2e c- uncer -'ej:I1 original contract unleSE y- 5-- Rage 1 of �zbL3r..�Lx ctor cost M. C I i ; ,ty HaR -jo Revisions to qss COTFMIAGTM R COSTS Bur de POUIS 7' 1 -M braW: :L ZF 14 ------ zo C, 5107.48 COSTS -------------- :y COSTS i e uffernelt(per ins oi Icn- 2 5.73 5%portion of F- 4%portion of 7,2,3.&1 e d-4 36 FOR SUnONTRAM--- .00 7— 3NSUPtONTRACTO:3—. 3ULL- porflon of 7 up to S, for, V—t�1',!Perim.of Tin .:;I driven—'all"Ity p. 1� driven liability Inw.-:,e, —-----—-------- j� of 1 !hr I j 11 z 08 11�JjaS a a�Q—KI�7117,` as age 01 Nass 0.ipife goal W A 4 If I H G 1 0 1: ARCHITECTUPAL >i Ar n '9 PROJECT QUOTATION Lincoln Construction Date 2/6/13 Attn: Cheryl JOB: 12-10115 Quoted by Russ Auburn City Hall/ Mayors TI changes Change Proposal #5 The purpose of this proposal is to provide cost to add borrowed Ides per Mayors TI changes. ADD 8ea Borrowed lite frames $1232 ADD Labor charges for installing new borrowed fifes $400 TOTAL ADDS$1632 NOTE: This material HAS NOT been incorporated into the project. We will proceed once written authorization is received. I/We agree to purchase the items as described above. Br Date: Written authorization to proceed is required before any action can be taken on this order. Prices guaranteed for 30 days from date of quotation. Unless otherwise noted,prices are FOB point of origin,freight prepaid to jobsite,and exclude sales tax Modified or special order Items are not returnable. All returns require preauthorization. TERMS: NET 30 days/No Retention 4409 S. Orchard Tacoma, WA 98466 Ph. (253) 471-9150 Fax (253) 471 -9171 WAH109/1/07 _ s;•1]^ -=crx i-..n._—_-°__4"—..,i'�,,`�.tv:= " :c:Y::____ ��e?rat' :`l rig, _ .�a4,}a1]-_c:.,..� r`-.ay i'"1]';;;✓'o _..^a•-J '=+1`I � 3 t:. .� ,�`. ,V 11. �,. 4t_._._:�7 :-yly:2':�� ^`-?S. .x./s"6_"•X� ,�f C ..:Sy,�i vy:- _,t�`_,�_,c�--_{'_.v.:.ia�::�.::.;-�:li'- I i'�uttt� t AVVP -7 11f D�='°: 2J�)�2013 2057 20P!Au-'I:.� rVr, 93199 , { ' ; Lincoln Construction TEL' (21]8):1? -�238 1 Jeuacnyn: AuiL'_! GitV H811 --- r i Frn a; Eric I','I-ohrer __.--.-- fF—is;i: EfIG,���_RrF.f GOfP. E..v_:._..e-.....r.�w_....n-:...,. +�..,.-_.v+.._�..+.+.a..rcv�-ywv__....._..�—=.a"c..-svv-..-....+.._..:._.......,_ ...s.........e-......,.-.v......._ xi i - 4�re for ;q� .i ;:SCrFti p;� ?3 Yii� IkE `3Kf: pP6?2n564��i1l�i.. R BEj:. 9 — k x;CQPE OF S`df2f?:: 1 Ratramz eral!vinery reliies v+r-.r=vdderi nit �—_ _.—_—.___.--_--_�—..— --___---___.___--`__'-•____.__--_ t I dCI-UGES: w3 3itcC!IE'�h1 E2 �C:/;t. 9 7CT:-::L.ADD17in.NALV,FC)R1 I t 9 )l'Je will proCeEd with tN5 :°:O(?: u,pni, your direction. i f2. This amount vAl be bi!601 upon cornpleLior. i S. Chal)y=Orders nerd is bN iasued if your c•,-nlpany r=qu!ros them for your nit, constitute an sddi,icn in our corer_"'- ' ( 4. This proposal, If accepted, hail I ` r,y. v3�1 \q ` � r:C'- 3' lTh t�fuVL> l4YlfYLi.�) ll' NI-nilm" ME-O Gruel X5506::2 Le i E t Data: Ac -pted 5y__ l0b JICIi 2jjt1201 3 1!:ii,AM cl m I mv ph d5 S S 4 L ES FRA ME PLAN 12 i a INTERIOR.FRAMING: 8, HR t0c JN2-5.00 13 61:5 7, REFR-NME WALL FOR SUBTOTAL 6. PLAN i4 I UNIT(s) AVVP-7 FRAME R ELITES Cos—,. riduded in P.,.an tutal Man days' , Labor costs Fr DA (IG b.RFENTER EMOR MATERIAL ERiAL SALES T A- COST AVVP-7 FRAN4E RELI-f ES O',-ERHEAD PROFIT-N-ClRrCT COSTS 7 plofit ;-'I -AN 12 SALES PRICI- ,Aly%F-7 FRAME RB 1TES' The Fintsm �, LLC P O. Box 2465 Longview, WA 98632 thepaintsmyth@comeast.net 360-749-1275/360-703-1467FAX March 18, 2013 Change Request TO: Lincoln Construction, Inc. RE: Auburn City Hall Remodel Phase 1 1) Add Eight (11) HM Windows $ 2,213.00 *Need sample of chair rail to provide finished sample for approval Thank You, Bruce Huhta The PaintSmyth, LLC LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.847.6414 FAX 253.847.6806 I February 1, 2013 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 �IAttn: Jan Dorbritz Re: Auburn City Hall Remodel Phase Project#12-18 LCI #1177 Subject: fCOP 18JChanges for card readers & panic buttons Below are the costs associated with adding a dedicated circuit and receptacles for card readers & panic buttons Lincoln Construction material $ labor $ METCO $ 700 Total Lincoln Construction Work $ Overhead on Prime Contractors Work 12% $ Total Subcontractors Work $ 700 Overhead on Subcontractors Work 7% $ 49 $ 749 Sub Total $ 749 B & 1 4% $ 30 $ 779 Please issue a change order in the amount of 779.00 If you have any questions, please contact me @ 253-847-6414 Sinc rely V ac E h coln Construction � CIS 1 Metco Electric, 21804 Mtn. Hwy E, PMB 32, Spanaway, WA 98387 (253)846-2565 Auburn City Hall Remodel-Phase 1 Change Order Proposal: Card Readers and Panic Buttons Scope:Changes for Card Readers and Panic Buttons Add one dedicated 20A circuit in the Electrical Room to 3 duplex receptacles(2 receptacles are for the Card Readers and 1 receptacle are for the Remote Controlled Panic Buttons. Add two receptacles in ceiling above front reception doors one for HR and one for Mayor. No Panic Button rough-in. Circuits for these two receptacles come from nearby receptacle circuits. Devices and remaining wiring is by others. Exclusions: Sales tax Inclusions: Electrical Permit Breakdown: Labor cost: 8 hours @ $70(cost)_$560 Material cost: $65 Profit&Overhead= 12% $560+$60=$625 X 12%=$700 Price: $700 Thank You, Brent Metcalf LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253 847 6414 FAX 253.847 6806 February 4, 2013 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 Attn: Jan Dorbritz Re: Auburn City Hall Remodel Phase I Project#12-18 LCI #1177 Subject: EC0 P"d9'Relite Below are the costs associated with reframing wall for 11 relites Lincoln Construction material $ - labor $ - Metro Glass $ 355 WAH $ 1,632 Mehrer Drywall $ 589 $ 2,576 Total Lincoln Construction Work $ Overhead on Prime Contractors Work 12% $ - Total Subcontractors Work $ 2,576 Overhead on Subcontractors Work 7% $ 180 $ 2,756 Sub Total $ 2,756 B & 1 4% $ 110 $ 2,867 Please issue a change order in the amount of$2,867 00 If you have any questions, please contact me @ 253-847-6414 Since ely Isaac Efah Lincoln Construction C_ -)rder Cam 4 u0sc:Force: ALburn My Hall Ranks! P, i 2"52. C.-nst.-Uction Inc If.-om! V j,.ts_ so SW 70, 1120102 -Ott Eys kv(SeTow 1130� ),AW387-0730 - "Ince; 221, YI-3414 Fax: ;.0- 54-' '-5 v5)44-4-28 sz :m :xVlayor's office 2 ij -.31k.-; v�wrgn c a*& 11 ites atapproxir n,feiw 125 vc,ka lat sib KOK Am nvwNxy 'nWP 71 W_:veket -­:tj ozoripal plaposal hor overAija as yx and Eyr:jsion5. C- s, _- s o Gc=c u :L this Change DSE: 01 4 one ww"s nwar !Mon, 7 'M"W& -Mmamus 1-- 0 Request is for PR'.": , GZT- Mrs wok. S35488 v 58,198.00 j s o us v gnz zr6 days. If condiv.). s jha -e �1-. 3e jsvo,:. Oa'.' sent -az The above price_EtA of this it.',its so swoon nd are hwMy accepted All wak a K _,.tt c . umer sarte Ta:,.rc c3r�Wvn as—s: ad n original contract unless I:`ib tai`._)<'a ctor COs{ .W .:J _-•is_ve'3_ flZi i`Jii G-'•' .lF'i�irY - --- :yL-:=='__''•-` Halt :c -__ Reiavons,o essr,.eve e_c:_:.:_c_a:: t ra3v COSTS C:.]Y2m8C1 finCIPLlQS SU69Y_L.l) __ ___ G __- � ___ �_ _L..e _.�_✓_J___-- i I _ � .. SUPQrV19fO0 � .•, I _vNZ(NTE Z°,6 of Meg is f:°c�• _—_ c ?'_s_'_ (if apotieabla,ISam4r;- ----- S __ �.j ... ,:•'__—.U7 COSTS _ _ •� .. I costs cts c Sifemi�^^} .. C !e uiPment(Perim -::toora(NTE S%of ta,8 t1 ,a.,t�: _.� _____ _ _____._•, -_ __—__— + '°/POrtiona 12,3.f4.: !:7':C69<.. 544.35 FOBSUSCONTF'AC':,�F .>;;GF —_: ==7,4,_'-,8Aj I ' I - - _i JN SUBCONTAAC•f04'v j SUF-- porllon of 7 up to 5',I.;% 1pr z+;., _ie porficn or Tin m:ca_;"-. "�•_"� -_ ..ca tlr.lidbiliry i68ttaz?� .___ .'.:a divan llabidiFY frr3we;:::a'.0�^...��__�• -_�a,_,_.__. _—�.. _.__— _ __ � i . Via.Lr U�5 - C�——'_eu*ro tac;. _- _ `398 d,__ Na±s dance 'WA 5n114 Gie ❑ A c[III T L C Tit H A I. )SARD VARE CO PROJECT ° QUOTATION Lincoln Construction Date: 2/6/13 Attn: Cheryl JOB: 1 2-1011 5 Quoted by Russ Auburn City Hall/ Mayors TI changes Change Proposal #5 The purpose of this proposal is to provide cost to add borrowed lites per Mayors TI changes. ADD Bea Borrowed lite frames $1232 ADD Labor charges for installing new borrowed lites $400 TOTAL ADDS 91632 NOTE: This material HAS NOT been incorporated into the project. We will proceed once written authorization is received. I/We agree to purchase the items as described above. BY' Date: Written authorization to proceed is required before any action can be taken on this order Prices guaranteed for 30 days from date of quotation Unless otherwise noted,prices are FOB point of origin,freight prepaid to jobsite,and exclude sales tax Modified or special order items are not returnable. All returns require preauthorizatlon TERMS: NET 30 days/No Retention 4409 S. Orchard Tacoma, WA 98466 Ph. (253) 471-9150 Fax (253) 471 -9171 wAR109rv07 _�_m.. .-;[' ..__ ._ _.:_v_i .'-:n:—.. _rr.-.:-•per.:._.— _� ... n in,.�,.rrt' ,1 `i.V: - ��3.:�n J''i9 +_"-"�:k.c - -,hy .,,.--- -'z•",5 5t� \'v 1a .,5 _ -�CPi!vT.. ra-y-��.i'= - 1�'iL;': a=..Y`: _ - �i�i��- - ;v_9��y1 c_ ..11:-.�`-i-: _ -.,:,�—.,..,a..,L;L:b-ds�wr..._'J�n�•�:• "� h�.k.S�;.�'rsS=:4"ii'S'is>.v ..x-.:.',.:..,-;...a_.�..__.�_•�.•;_b.,..-,:. �.._..___� i 1 f (x ,EA",ILE T�: Cheryl co;m.-Daily r col Constmc io't ? 1 — — EL tznei .Aii i' 'i?1 City Nud `s Frorn lr'c!,f_hrer _._--------__—. i p3;cr;t: --- iN-iiaei:—egc�?_nra�.com t �» > 52"p`SiiY;?iY3ii co, r.e t)rCie)ts - q 1 OF WORK: iS Reirarna'.valiwd'nar2 rali!es:v_i�>'dderi EitC?z'v't N.-.=:rai";it: t t Vie wa1 proceed tw0i this .;orl: - on your direction. 2 l is mount kvill b2 f+il ae upon cornfaatic"i. f our ccm _ti requires them fcr your^di'rt CF:arvge O:dars nnFd 10 ,6 . igsued if} Y +} i h15 propo5sl, if accepted, Shell constitut e 0n'LdGlPpn t0 6 - C�r�:r'n_c`.. I B I By Di;>:P - -F, eSl"93-,Y'. A L i.v : 6010,,u 21412G,a 11-1.4 AM Tir-.c r�Of"i c r flo base bid FR O ME PI AN 12 i YNII 60"'13 H 11 NTERIOR FRAMING 7, REFPkAE VVALL FOR R --.00 - 1,C)o 529,00, 656"<�1 PLAN I- AW"-I FRAME RELITES G-c-st-lrdudcd in p!an tot9l er D ;'L a bo csis ICARPENTER LABOR $5215.00 1.115 bLb.OG: M T F_RIAL SALES TAX TOTAL COST 521 00 AWP-7 FPPjel,E REUT ES OVtP�,FrAu P-ROFIT-INDIRECT cus rS i ovefhnad C.r,,t 2a.lp PIA!�12 GAILESPRICE AiNP-1 LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 96387 OFFICE 253.847.6414 FAX 253.847.6806 February 6, 2013 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 Attn Jan Dorbrtz Re Auburn City Hall Remodel Phase I Project#12-18 LCI #1177 Subject: tCOP_217Fire Sprinkler revisions Below are the costs associated with the fire sprinkler revisions per the revised drawings. Lincoln Construction material $ labor $ Fox Fire Protection $ 1,800 Total Lincoln Construction Work $ Overhead on Prime Contractors Work 12% $ Total Subcontractors Work $ 1,800 Overhead on Subcontractors Work 7% $ 126 $ 1,926 Sub Total $ 1,926 B & 1 4% $ 77 $ 2,003 a� Please issue a change order in the amount of$2,003 00 If you have any questions, please contact me @ 253-847-6414 Sincer ly Isaac Efah Lincoln Construction Isaac Efah From: Lincoln Construction <lincolnconstruction @ comcast.net> Sent: Monday, November 19, 2012 3:24 PM To: Efah,Isaac Subject: FW Phase 1 - changes — —.. From: Fox Fire Prevention [mailto•info @foxfireprevention.com] Sent: Monday, November 19, 2012 3:07 PM To: Lincoln Construction; robert(Woxfireprevention.com Cc: issac.lincolnconstruction@comcast.net Subject: Re: Phase 1 - changes As per Robert McGee, the change for revisions(fire sprinkler)will be$1,800.00 to accommodate the revisions. Thank you, Sue Vanden Bos Bookkeeper Fox Fire Prevention, INC. P O Box 594 Port Orchard,WA 98366-0594 360 871-1985 fax: 360 871-2262 infoCcDfoxfireprevention com From: Lincoln Construction Sent: Friday,.November-02, 2012 9:48 AM 1. To: Cabinetmakers ;•:Fox Fire•Prevention ;-Insulation Contractors ; mehrer Eric METCO ; Phoenix Mecha ical;; RC Building Soecialties-;`Riel Ceilings ;=Rob_son ; Rube steins. Cc; Bill-Markham Subject: FW: Phase 1 -changes - Please seethe attached proposed changes to the project. Please prepare your costs for this change,showing any credits for deleted work and costs for additional work. Mark up on the project is 12%on your work,7%on any work done by your subs. Let us know if you have any questions Cheryl Russell Lincoln Construction 253-847-6414 From: Jan Dorbritz [mailto:dorbritz @verizon.net] Sent: Friday, November 02, 2012 7:45 AM To: 'Ray Moses'; 'Frank Erwin'; 'Brent McGraw' Cc: 'Steven Burke'; 'Lincoln Construction' Subject: Phase 1 - changes All, 1 LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.847 6414 FAX 253.847.6806 February 8, 2013 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 Q @wb @d MM Attn* Jan Dorbritz Re: Auburn City Hall Remodel Phase I Project#12-18 LCI #1177 Subject: S:COP.22)Rework Conference Room 250 Below are the costs associated with re-working conference room 250 Lincoln Construction material $ - 2 hrs labor $ 150 $ 150 Mehrer Drywall $ 711 The Paintsmyth $ 497 WAH $ 358 METCO $ 168 $ 1,734 Total Lincoln Construction Work $ 150 Overhead on Prime Contractors Work 12% $ 18 $ 168 Total Subcontractors Work $ 1,734 Overhead on Subcontractors Work 7% $ 121 $ 1,855 Sub Total $ 2,023 B & 1 4% $ 81 $ 2,104 Please issue a change order in the amount of$2,104 00 If you have any questions, please contact me @ 253-847-6414 Sincerely I Isaac Efah Lincoln Construction ® . D A D ® d e ®NC Number: AWP -6 ME,HRER DRYWALL, INC. Date: 113112013 []X SEATTLE To: Cheryl 2657 20th Avenue West Seattle,WA 98199 Company: Lincoln Construction TEL (206)282A288 Job Name: Auburn City Hall FAX; (206)285-2092 FAX: From: Eric Mehrer Telephone: (206) 282-4288 E-Mail: erlc @mehrer.com We propose to furnish and install material for the additional work as follows: SCOPE OF WORK: Reframe door opening at conference room 250 back to orri inal layout INCLUDES: See attached breakdown. TOTAL ADDITIONAL WORK: S 711.00 1 We will proceed with this work upon your direction. 2. This amount will be billed upon completion. 3. Change orders need to be issued if your company requires them for your billing. 4. This proposal, if accepted, shall constitute an addition to our contract. By MEHRER DRYWALL, INC. WA: MEHRED'324RT OR: 780-058-82 /E%riicc MMehrer, LEED Green Associate Accepted By: Date. 01��:58 AM Jo 1 Total Estimate Report Total t Prod i Ti.n. Labor Malarial I Othor I cost ire, 1 WM Div. C-P. .'t W.t unit oe�.riplmn I Quantity Ht t par do. 1 doM cost I no. no. t ----——---------— AWP --"base- -bi-d-- REWORK DOOR Estimate Re ort -- '----'-' ) — — Ci!Y Hall PLAN_11 1 U------s Job 600`18 Aubu-rn 7- 7— --------------- 1 INTERIOR FRAMING 65 625! 525 00' 525�00; ii REFRAM- E-OPENING- I. 108F6 TLS, 108.000i_ .108.00! 9 ALS ----— 00, 525.001 108 ;SUBTOTAL -- PLAN 11 1 UNF(G) _I �--z-REWoR K DOOR Costs included-in-planuota-I q Labor costs Per DA: Man days! - -- 525.00! [CARPENTER LABUR $525.001"__" -- ;MATERIAL SALES TAX I 0 PLAN I i TOTAL COS T 633 00' 09 525.00: 108.00i 6REWORKDOOR 7 7%! Cost 44.31 Overh ad ------ 5 ojo Cost 1 33.87 ---------- 1Profit FI) 8 PLAN 11 SALES PRICE 1 Page 1 The r I9tsmok l LC P O. Box 2465 Longview,WA 98632 thepaintsmyth@comcast.net 3 60-749-1275/360-703-3467FAX March 18, 2013 Change Request TO: Lincoln Construction, Inc. RE: Auburn City Hall Remodel Phase 1 1) Add One (1) Door & Frame $ 497.00 *Need sample of chair rail to provide finished sample for approval Thank You, Bruce Huhta The PaintSmyth, LLC W .A 5 1;1 N G r 0 r; A R'It IFE,C1 UKAL "A 40 by A A tU PROJECT QUOTATION Lincoln Construction Date. 2/1/13 SOB: 12-10115 Attn: Cheryl Quoted by Russ Auburn City Hall T I Change Proposal #04 The purpose of this proposal is to add an electric strike to opening 250B. 1 each HES 1006 electric strike ADD $358 NOTE: This material HAS been incorporated into the project as directed. Please provide your change order as soon as possible. I/We agree to purchase the items as described above. Bay, Date: Written authorization to proceed is required before any action can be taken on this order Prices guaranteed for 30 days from date of quotation. Unless otherwise noted,prices are FOB point of origin,freight prepaid to lobsite,and exclude sales tax Modified or special order items are not returnable All returns require preauthorization TERMS. NET 30 days/No Retention 4409 S. Orchard Tacoma, WA 98466 Ph. (253) 471-9150 Fax (Z53) 471-9171 WAH109 11/07 Metco Electric,21804 Mtn, Hwy E, PMB 32,Spanaway,WA 98387 (253)846-2565 Auburn City Hall Remodel- Phase 1 Change Order Proposal: Add one Card Reader Scope: Add one Card Reader for door 2508 in the HR Conference Room. Add rough-in box in wall w/ mud ring, and stub''YV conduit to ceiling space. All wiring is by others. Exclusions: Sales tax Inclusions: Electrical Permit Breakdown: Labor cost: 2 hours @$70(cost)_$140 Material cost: $10 Profit&Overhead= 12% $140+$10=$150X 12%=$168 Price: $168 Thank You, Brent Metcalf LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.847.6414 FAX 253.847.6806 March 4, 2013 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 Attn: Jan Dorbritz Re: Auburn City Hall Remodel Phase I Project#12-18 LCI #1177 Subject: !�COPP. 231Flat Screen N's Below are the costs associated with the work for the installation of the Flat Screen N's Lincoln Construction material $ 134 24hrs labor $ 1,800 $ 1,934 METCO $ 4,770 Total Lincoln Construction Work $ 1,934$ 232 Overhead on Prime Contractors Work 12% $ 2,166 Total Subcontractors Work $ 4,770 Overhead on Subcontractors Work 7% $ 334$ 5,104 Sub Total $ 7'270 B & 1 4% $ 291 $ 7,561 Please issue a change order in the amount of$7,561 00 If you have any questions, please contact me @ 253-847-6414 St cce"rely t Isaac EPah J Lincoln Construction Y(A-'� S�Ltt1 5 ��At Suee•gF � � IN More saving. More doin( lore savina. E ;�� ,,..tt _•� 1715 3 0!52ND ST FEDERAL. WAY,WA 98003 §-!1�Fr a €.i�'+e@mil 253-661-9200 1715 3 3521,10 ST FEDERAL WAY,W'A 98003 4703 00003 82317 02/28/13 06,38 Ali 253-661-9200 CASHIER MEGAN - MMC20S8 4703 00005 90997 OJ/04/13 06 49 AM 81421(4 10037PREII-10 KG HEM FIR CASHIER MEGAN - MMC20_8 703 30 25 60N 814631010228 2X12-8 HF <A, 9.22N 814631010228 2X12-B HF -A> 2)(12-8ff 42/BTR KD HEM FIR 2X12-8FT 42ATR KD HEM FIR 876504000644 1/2 RID SHTG <A> 2@9.22 18 44N 15/32 OR 1/2 4X8 RID SHTG-DF 4/5PLY 604603004535 2X4-8 PT/CS <A> 5 57N 2020.77 41 54N 2X4-3FT PT CONSTRUCTION SELECT 046677415693 300W HAL <A> 7.67N j 750298153253 2X4-96 STUD <A> 2.52N PLC 300W TO 130V HA.LCIJ BULB 2PK 2X4-36" PREMIUM KD WHITEWOOD STUD 0443153)3660 FRAM ANCHOR <k- 764666156524 12l) CID SN1B <A>. 2.98N A35Z 18GA ZMAX GALV STEEL ANGLE 120 3-1/8" COATED SINKER'1 LB 290.30 1.8011 734364505313 1LI. SCREW •A' 5.3711 8X 2 3/8 118. PH SELFDRILL BLK.PHOS SUBTOTAL 60.23 734364502565 1LB SCREW A, 5.37N SALES TAX 0.00 6X 1 5/8 iLB PH SELFDRILL BLK.PHOS TAX EXEMPT 092097352070 HAMMER SET A, 12.97N TOTAL $60.23 HAMMER SET 1/03, 25 F'K XXXXXXXXXXXX3408 HOME DEPOT 60.23 SUBTOTAL 79 82 AUTH CODE 1'!04696/1033486 TA SALES TAX 0 00 P.0 If/JOB NAME: 1177 TAX EXEMPT TOTAL $79 82 XYXXXXXXX)%X3408 HOME DEPOT 79 82 l E 3'e f EEIi iii" I I`�9Ii I �!)nl€u1EIE�! AUTH CODE fi23771l5032E86 TA P 0 0/JOB NAME: 1177 aEJ Esu f.!uE 1 4703 03 9099 03/61/20 3 4956 { II ff ! RCY 11) POLICY DEFINITIONS �� POLICY IO DAYS POLICY EXPIRES ON A 1. 90_ 06/02/2013 1 E THE HOME 01-POT RESERVES THE RIGHT 10 4703 03 82317 02/28 2013 3111 LIMIT / DENY RETURNS PLEASE SEE THE REI URN POLICY GEFTNITIGMS RETURrI POLICY IN STORES FOR POLICY ID DAYS POLICY EXPIRES ON DETAILS S A 1 90 05/29/2013 BUY ONLINE PICK-UP IN STORE THE HOME DEPOT RESERVES THE RIGHT TO AVAILABLE NOW ON HOMEEPOT.COM. LIMIT / DENY RETURNS PLEASE SEE THE CONVENIENT, EASY AND MOST ORDERS RETURN POLICY SIGN IN STORES FOR READY 114 LESS THAN 2 HOURS! DETAILS. rwwxwxxewrxw ewxr.wxxxx wxxx xxwxxcwxxxxxxa BUY ONLINE PICK-UP IN STORE EIVT ER FOR A CHANCE AVAILABLE NOW ON HOMEOEPOT.COM. TO H1T N A *5 , 000 CONVENIENT, EASY AND MOST ORDERS HOME_ CARD''! GIFT I xxxxxxR ADYxINIESSxTHANx2xHODURSIxxxxxw Share Your Opinion With Us! Complete EIVI-ER FOR A CHANCE tha brhaf •>u-vey about your store visit T O VII N A $5 , GO O and enter for a chance to win at: HObi E'- ID_P [ GS FT www.homedepot coni opinion Share Yoi.Ir Opinion W'i tYl Ust Crnnpl ere COMPAR''-F A SU O PS N20N EN the brief purvey about your store visit UNA BREVE and enter for a chance to win at ENCUE'STA PARA LA OPORT UNSD A D DE G A N AR _ xww.homedepot.ccm/op!nl on U_ er- 2D - COMPARTULI SUB RFVESON EN 186986 :L82286 — EIJCLJES-FA PARA LA OPORT F'asswc�rd IJRIIDAD DE GANAR _ 1;31`.'54 182_283 u=.e1'- ID = Entries roust te: entered by 04/03/2013. 11_;9626. 164926 Entrants Irlu>t be 18 or older to enter See complete rules on website. No 1 6.9.23 I:,urchase necessary Entries must be entered by 03/30/2013. Entrants Inuit be 18 cr older to enter. See complete rules on webslte No Ft. Metco Electric,21804 Mtn. Hwy E, PM13 32,Spanaway, WA 98387 (253)846-2565 Auburn City Hall Remodel-Phase 1 Change Order Proposal: TV Monitors Scope:Add power outlets and DATA outlets for 5 TV monitors. Install one single gang duplex receptacles in the wall in each of the 5 locations with 2 dedicated circuits for the 4 monitors in the Mayor side and one dedicated circuit for the 1 monitor on the HR side. 5 locations total. 3 dedicated circuits'total. Add 10 DATA circuits to 5 TV monitor locations with 2 DATA cables at each. Install one 2-gang deep j-box with a 1" EMT riser to ceiling space. Install 2-gang Decora plate w/1 dual port and 1 blank insert for future Audio/Video cables Upsized'1W conduit to 1"conduit for future use to ceiling space below to access floor box Exclusions: Sales tax Inclusions: 24 hours/$230 Material—power outlets and dedicated circuits 24 hours/$670 Material—DATA Breakdown: Labor cost: 48 hours @ $70(cost) _$3,360 Material cost: $900 Profit&Overhead= 12% $3,360+$900=$4,260 X 12%=$4,770 Price: $4,770 Thank You, Brent Metcalf LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.847.6414 FAX 253 847.6806 March 19, 2013 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310.455-1837 Attn. Jan Dorbritz Re: Auburn City Hall Remodel Phase I Project#12-18 LCI #1177 Subject ICOP 24;Chair Rail Below are the costs associated with the addition of the chair rail Lincoln Construction material $ 1,947 install backing&Chair rail 24hrs labor $ 1,800 $ 3,747 The Paintsmyth $ 1,179 Total Lincoln Construction Work $ 3,147 Overhead on Prime Contractors Work 12% $ 378 $ 3,525 Total Subcontractors Work $ 1,179 Overhead on Subcontractors Work 7% $ 83 $ 1,262 Sub Total $ 4,786 B & 1 4% $ 191 $ 4,978 Please issue a change order in the amount of$4,978.00 If you have any questions, please contact me @ 253-847-6414 Sincerely Isaac Efaf'iJ Lincoln Construction fr6, 22 2013 2.03P! Skagit A, ciiii:: Ural Millwork 9391 P. 1 _ } P.O.Box 2297 1 Mount Vernon, W.49BZ73 Telephone(360)336-9587 Fax(360)336.5490 www.s kagi tart h.co r.� TO:Lincoln COnStl-ftctlon Arc Aecl:NA. ATT:Issac Date:02/2012013 FAX:253-847-6808 Eid Date: JOE: Anbarn City Hall --- I Draw hags: zMched We propose w furnish the"V,7ac work'in accordance to 1t3e plans �.-d specifications mentioned above for the folor✓-w--: Chair rail per attached: $1,87 i.i'S �OB SAM Terms: COD IMPORTANT: WE ARE A -E'�L YERLAL SUPPLIF A.`QD 0 R iNSTALLATION AS A SERVICE TO OUR CUSTOMERS- INSTAL:LA r IO_i A-IN �-IANIIFACT I CHARGES ARE DID SE£.<',�&TELX. FOR ALL ITri xiS =I�� '-O -DESTNATION A PURCHASE ORDER IS ?'�I'OUIRED. TERMS I% 1EN SAYS / NET 30. WASHINGTON SALES TA_�_ NOT INCLUDED. UPON i'-riteECT AWARD, SKAGIT ARCHITECTURAL 1�IILLV=C-f<s'WILL SUBINIIT L'dTVOICE ?OI ,OP DRAWINGS, MOBILIZATION AND N`ai` ?tIALS DEPOSIT. BID as CONTINGENT UPON PRODUCT AVAILABILTE Y CONTAC'T EMAIL:craig.,'( :_- itarch.com Respectfiillysu=iaedbySkagit�-z:icaa.-al Millwork.rnc. °-�— S r;J Y -- "Title 4 11..,li a All n � v�'?rleeia. f l p jl:re MO 1715 S 3'S211ID ST FEDERAL WAY,WA 98003 253-661-9200 4703 00003 7E277 02/26/13 06 39 AM CASHIER BETHANY - BSWI842 814631010099 2XC :[O MF A, 2X6-LOFT V2/BTR KD HEM FIR 10®5.72 57.20N 814631010037 2X4-10 HF <A, 3.80N 2)(4-1OFT PREMIUM KD HEM FIR 0920972151(;0 TEKS LATHE <A, TRS LATHE 8)(1-5/8" 'HP PT, 120 PCS 255.24 10.48N SUBTOTAL 71 48 SALES TAX 0 00 1AX EXEMPT' TOTAL $71.48 Y,XXXXXXK)X;4X3408 HOME DEPOT 71.48 RUTH CODE 026321/7032413 TA P 0 VJOB NAME: 1177 r y Ii nuq im Blur [oernilplliuu �rl f � � l�iAr aft 41`'I fu511� f I Err illli llr�ill�il!I . 4773 U3 76277 02/26/2013 0141 RETURN F'CILICY DEFINITIONS POLICY ID DAYS POLICY EXPIRES ON A 1 90 05/27/2013 THE H)ME DEPOT RESERVES THE RIGHT TO LIMIT / DENY RETURNS, PLEASE SEE THE RETURN POLICY SIGN IN STORES FOR DETAILS. BUY ONLINE PICK-UP IN STORE AVAILABLE NOW ON HOME DEPOT.COM. CONJENi NT, EASY AND MOST ORDERS READY IN LESS THAN 2 HOURS! ).kYX Ili*k*J'ik%i);kk x Xx%X%x%xt kA'NY;%X't}AkY ENTER FOR A CHANCE TO WIN A $5, OOO H01,,1E_ DE-POT GIFT CARD1 Share Your Opinion Hiih Us! Complete the brTaf .r:urvey about your store visit and enter for a chance to win at www.homEdepot con/opinion COMPARTA SU OPINION EN UNA BREVE ENCUES'TA PARA LA OPORT i IJNSIJAD DE GANAR _ Ue=.ar ID : 1:57546 152846 Pas_sw<)r-d : 1312 6 152843 Entrie> must be entered by 03/28/2013 Entrants must be 18 or oldar to enter See complete rules on website. No purchase necessary. The PimtsmAh, hie P O Box 2465 Longview, WA 98632 thepaintsmyth @comcast.net 3 60-749-1275/3 60-703-3467FAX March 18, 2013 Change Request TO: Lincoln Construction, Inc. RE: Auburn City Hall Remodel Phase 1 1) Add 20OLF of Chair Rail $ 1,179.00 "Need sample of chair rail to provide finished sample for approval Thank You, Bruce Huhta The PaintSmyth, LLC LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.847.6414 FAX 253.847.6806 March 4, 2013 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 Attn: Jan Dorbritz Re: Auburn City Hall Remodel Phase I Project#12-18 LCI #1177 Subject: CC-OPr25�Tile Changes Below are the costs associated with the tile changes in the Mayors per the detail sent 2/27/13 Lincoln Construction material labor $ MJ Keller Enterprises $ 2,475 Total Lincoln Construction Work 12% $ Overhead on Prime Contractors Work $ $ 2,475 Total Subcontractors Work 7% $ 173 Overhead on Subcontractors Work $ 2,648 $ 2,648 Sub Total B & I 4% $ 106 $ 2,754 -� Please issue a change order in the amount of$2,754 00 If you have any questions, please contact me @ 253-847-6414 Sincerely Isaac Efah Lincoln Construction P. II M.J. KE I LER ENTERPRISES i Ooh Pacific Avenue TACOMA,WASHINGTON 98444 4 (253)537-8666- (253)537-7889 - Fax(253)531-9749 WBE Certification Number W2F22403681 Contractors#MJKELE°03102 PHONE DATE it Paocos.:c sue�frfTEO l� A — 3 rr l°B N'AM? n f7 _ I �l JOBIOCATION lY.STAT=�d JP CODE -� w •'"� "-I f J09PHONE I ' cgOHITECT OATEOFPWS 1 =_ hereby to Vnish material and later-complete in accordance'xi:h specificatiors b=low,for the sum of: I� co!ials ($ it i I Rirnateriel is guzrPnteedro bee spec'iad.All work to be cAmple:ec,aswcr,manlike Awronxed li rr=nnar�x.,.'dey to sfarldard path,,.ay tt rmw a deviation ham spEG•:=tbs below s;sevu,o f�ro'v,nca,NecoSfs Wit be eveCCtedorey upon writtenorders,andvillbe-ne, McNla -.vga cvar=nd aocve the esnmete.All2greamints conogentueonsa.3a,exdene,or NOTE:T h,propo°-.al may t0 'I c::ay�cey°rd arrana0l.pvinrto firs,lomedd end oCrerrlecx°;."/n.��r.Jm our .I withdrawn° us ix nci accEptad wE>ti1n data wcrkars era 4:!ty mrered tY Workmen s Galnpa--iatim Insurance. ' 4Va hereby submit speciiicafio.-ts and estimates �'a:' ' �� ��,�-�`•�� ��. iM.-{�->�G'--�- L� -- --- - it tn ------------ , r I 1� tf, rt7a ( CE1Z-�M fL TILE Ar. , p 2 47S' I, I II w t( Signature 4F- ..e u1 j 6UTs ee5L5s?zCory aAare hereby acoup!W.You are authorized to do cm_VXcc sped. II P[yn>?n:veil�a rratla aS ONlned a�iwa. Signature Cate 1'; catM otacrepteve. LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.847.fi414 FAX 253.847.6806 March 8, 2013 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 Attn: Jan Dorbritz Re: Auburn City Hall Remodel Phase I Project#12-18 LCI#1177 Subject: t COP.i2"Add Comcast Coax Cable Below are the costs associated with adding Comcast plenum rated coax cable from basement Comcast board to MDF room, 2nd floor, Mayor's side of building Lincoln Construction material $ labor $ METCO $ 900 Total Lincoln Construction Work $ Overhead on Prime Contractors Work 12% $ $ 900 Total Subcontractors Work 7% $ 63 Overhead on Subcontractors Work $ 963 $ 963 Sub Total g & I 4% $ 39 $ 1,002 Please issue a change order in the amount of$1,002.00 If you have any questions, please contact me @ 253-847-6414 m Lincoln Construction Metco Electric, 21804 Mtn. Hwy E, PMB 32,Spanaway,WA 98387 (253)846-2565 Auburn City Hall Remodel -Phase 1 Change Order Proposal: Add Comcast Coax cable Scope: Add Comcast Plenum Rated Coax Cable from Basement Comcast Board to MDF Room, 2nd Floor Mayor Side of Building. Exclusions: Sales tax Inclusions: 6 hours/$454 Material Breakdown: Labor cost: 5 hours @ $70(co5t)_$350 Material cost: $454 Profit&Overhead= 12% $350+$454=$800 X 12%_ $900 Price: $900 Thank You, Brent Metcalf 3/8/13 LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.847 6414 FAX 253.847 G806 March 8, 2013 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 Attn: Jan Dorbritz Re Auburn City Hall Remodel Phase I Project#12-18 LCI #1177 Subject: 0_C2P�28)Add CAT 6 Cable Below are the costs associated with adding future security camera CAT6 cable to center of main lobby. 20' of CAT6 cable coiled up above wood slat ceiling pulled back & terminated at the patch panel in electrical room Lincoln Construction material $ labor $ METCO $ 230 Total Lincoln Construction Work $ Overhead on Prime Contractors Work 12% $ Total Subcontractors Work $ 230 Overhead on Subcontractors Work 7% $ 16 $ 246 $ 246 Sub Total $ 10 B & I 4% $ 256 t)k Please issue a change order in the amount of$256.00 If you have any questions, please contact me @ 253-847-6414 S'n erely Isaac I- ncoln Construction l� Metco Electric, 21804 Mtn. Hwy E, PMB 32,Spanaway,WA 98387 (253)846-2565 Auburn City Hall Remodel-Phase 1 Change Order Proposal: Add Security Camera CAT6 Cable Scope: Add future security camera CAT6 cable to center of main lobby 20' of CAT6 cable coiled up above wood slat ceiling pulled back and terminated at the patch panel in the Electrical Room. Exclusions: Sales tax Inclusions: 2 hours/$65 Material Breakdown: Laborcost: 2 hours @ $70(cost) =$140 Material cost: $66 Profit&Overhead=12% $140+$66=$206 X 12%=$900 Price: $230 Thank You, Brent Metcalf LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98387 OFFICE 253.847.6414 FAX 253 847.6806 March 8, 2013 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 Attn' Jan Dorbritz Re: Auburn City Hall Remodel Phase I Project#12-18 LCI #1177 Subject: GOP 29)lnsul2tions revisions Below is the cost associated with the revisions to the insualtion per Delta 1 drawing and email notes Lincoln Construction material $ labor $ Insulation Contractors $ 750 Total Lincoln Construction Work $ Overhead on Prime Contractors Work 12% $ - Total Subcontractors Work $ 750 Overhead on Subcontractors Work 7% $ 53 $ 803 Sub Total $ 803 B & I 4% $ 32 $ 835 Please issue a change order in the amount of$835.00 If you have any questions, please contact me @ 253-847-6414 Si/nfce Ty �J Isaac El Lincoln Construction 1 22706-58`" Place So. Phone: (253) 395-1895 Fax: (253) 395-1896 Kent, WA 98032 INSULCI 117 KS C. O. Proposal Date: March os, 2013 Prepared for:Lincoln Const. Estimator: Gregory Schaefer Attention: Estimating Dept Email: gschaerer @iconmsul com Phone: Fax: Project: Auburn City Hall CO reference: Delta 1 drawings plus email notes Inclusions: added acoustic halt at newly designated sound walls revised sound wall to s" above ceiling height,plus lay-on acoustic batt to extend a'either side of acoustic partitions 1. R-11 unfaced fiberglass batt at designated acoustic walls and lay-on-t•'wide 2' to either side of new partitions designated to receive sound batt. Total Add C.O. cost: $ 750.00 Notes: Exclusions: • Firestopping/Draftstopping. • Mechanical duct or pipe insulations. • Faced insulations. • Vapor barriers/retarders. • Rock wool. We have not included sales tax in our proposal Price quoted valid for 30 days Commercial Insulation LINCOLN CONSTRUCTION, INC. 21323 MT HIGHWAY, PO BOX 730 SPANAWAY,WA 98337 OFFICE 253.847.6414 FAX 253.847.6806 March 20, 2013 J. Dorbritz AIA 800 Fernwood Pacific Topanga, CA 90290 310-455-1837 Attn: Jan Dorbritz Re: Auburn City Hall Remodel Phase I Project#12-18 LCI #1177 Subject CC— -:3JMaterial Price Increase Below are the costs associated with the increase of the acoustical materials because of the project delay. Lincoln Construction material $ - labor $ - Riehl Ceilings $ 1,471 Total Lincoln Construction Work $ Overhead on Prime Contractors Work 12% $ - Total Subcontractors Work $ 1,471 Overhead on Subcontractors Work 7% $ 103 $ 1,574 Sub Total $ 1,574 B & 1 4% $ 63 $ 1,637 Please issue a change order in the amount of$1,637 00 If you have any questions, please contact me @ 253-847-6414 Sincerely Isaac Efah Lincoln Construction WA License#RIEHLCSOIODS / Ore License# 197253 Acoustical Tile Ceilings/Acoustical Wall Panels/FRP PO Box 4505 Federal Way, WA 98063 Phone(253)838-9086 Fax(253)838-9136 Cell(253)222-3836 E-Mail ed @riehlceilings.com Change Order Request #001 3120113 To: Lincoln Construction Attn: Cheryl Russell Project: Auburn City Hall Remodel Phase 1 City of Auburn Sid Item: Specification Section 095100 Acoustical Ceilings Change Order Description: Material Increases due to project delays. Change Order#001: $1,471. Total this request(change order#001): Add: $1,471. Accepted by: Dated: NATIONWIDE STRENGTH LOCAL COMMITMENT 2/1/2013 Ed, In regards to the pricing for Auburn City Hall I bid that job based on the fact that we would be doing the work at the end of 2012. We have since had a 10% increase on January 1 2013. I can hold the pricing on the grid till 6/30/2013 but I will have a 5% increase on tile at the end of March. Increase will take effect 4/1/2013. Please let me know if you have any questions. Thanks, Jason Calapp Branch Manager Tacoma/Bremerton Northwest Region Tacoma/Bremerton jcalapp@lwsupply.com 253-926-3881 phone 253-926-3981 fax 253-606-1654 mobile Project: Auburn City Hall Bid Section: Plan Sheets: Bid Date: Plans Dated: Addenda: _ Alternates: /r / �"'J C, `r' ^T'�"'-��Material�Lis[—�'='�."t''�'��Glcula[ed/AmtTi�r--"",••�U'n'it's�' O/llni[�EiFUTO1aI�CO's[,�:.i _ Grid Total: 10,512 Sq.ft. Main Runner(divide sq.ft.by 4) 2,840 lineal ft $ 0.540 $ 1,534 4'Cross Tee(divide sq.fL by 2) 5,680 Lineal ft. 0.442 2,511 2'Cross Tee(divide sq.ft.by 4) 150 Lineal ft. 0.442 66 Wall Angle 2,742 Lineal ft. 0.480 1,316 Spreader bars 580 Lineal ft. 0.530 307 Primary Wires(2'x 4'grid,divide sq.ft.x 7.5) 1,400 Each 0.550 770 Primary Wires(2'x 2'grid,divide sq.ft.x 6.0) Each 0.450 - Struts 32 1.250 40 Seismic Wires(divide sq.ft.x 30) 128 Each 0.500 64 Expansion Clips Each 2.700 - Wires @ expansion joints Each 0.500 - Tile type C-1 (2x4) USG#2742 9,850 Sq.ft. 0.795 7,831 Tile type C-2 (2x4) Sq.ft. - Tile type C-4(2x4) Sq.fL - Tile type 4 Sq.ft. - Flex Mold 90 Lineal ft. 2.50 225 U-mold(probably coloumbia) Lineal ft. - Light wires Each - Misc. 50 Material Subtotal $ 14,714