HomeMy WebLinkAboutScarsella Brothers C201A - 11-01 CONTRACT
Contract No. 11-01
THIS AGREEMENT AND CONTRACT made and entered into, in duplicate, at Auburn,
Washington, this I' 1' day of 2012, by and between the CITY OF AUBURN,
WASI-IINGTON, a municipal corporate , and Scarsella Brothers, Inc. PO Box 68697
Seattle, WA 98168-0697 hereinafter called the CONTRACTOR.
WITNESSETH That, in consideration of the terms and conditions contained in the Contract
Documents entitled `C201A, M Street SE Grade Separation (Underpass), which are by this
reference incorporated herein and made a part of this Contract, the parties hereto covenant
and agree as follows:
1. The CONTRACTOR shall do all work and furnish all tools, materials and equipment for
Project C201 A, M Street SE Grade Separation (Underpass) — the construction of grade
separating M Street SE from the BNSF Stampede Pass Rail line by lowering the roadway
raising the railroad tracks, constructing two side by side railroad bridges, retaining walls,
utility relocations, widening 1600 feet of M Street SE from 3rd Street SE to 8th Street SE,
lowering and reconstructing 350 feet of 6th Street SE and 350 feet of 4th Street SE, replacing
the traffic signal at 4th Street SE and M Street SE, replacing street lighting, installation of
two side by side 400 foot long 54 inch casings using trenchless construction methods, storm
pump station construction, survey construction staking and traffic control for a unit bid price
of eleven million two hundred twenty-one thousand six hundred thirty-one dollars and sixty-
three cents ($11,221,631 63) and Washington State Sales Tax of fifty-six thousand nine
hundred eleven dollars and ninety-seven cents ($56,911.97) for a total contract value of
eleven million two hundred seventy-eight thousand five hundred forty-three dollars and sixty
cents ($11,278,543.60) in accordance with and as described in the Contract Documents which
are by this reference incorporated herein and made a part hereof, and shall perform any
alterations in or additions to the work provided under this Contract and every part thereof.
This Contract shall be executed by the Contractor and returned to the City within 7 calendar
days after the receipt of the dated notification of award and the Contract time shall commence
within 5 working days after execution of the Contract by the City and so designated on the
Notice to Proceed. Physical completion shall be within 300 working days of the date on the
Notice to Proceed.
If said work is not completed within the time specified, the CONTRACTOR agrees to pay
liquidated damages to the CITY OF AUBURN, as specified in Section 1-08.9 (Liquidated
Damages) of the Standard Specifications.
The CONTRACTOR shall provide and bear the expense of all equipment, work and labor of
any sort whatsoever that may be required for the transfer of materials and for constructing
and completing the work provided for in this Contract and every part thereof, except such as
are mentioned in the Contract Documents to be furnished by the CITY OF AUBURN.
II. The CITY OF AUBURN hereby promises and agrees with the CONTRACTOR to
employ, and does employ the CONTRACTOR to provide the materials and to do and cause to
be done the above described work and to complete and finish the same according to the
Contract Documents and the terms and conditions herein contained and hereby contracts to
pay for the same according to said Contract Documents and the aforesaid proposal hereto
attached, at the time and in the manner and upon the conditions provided for in this Contract.
1' -)
Ill. The CONTRACTOR for himself, and for his heirs, executors, administrators, successors,
and assigns, does hereby agree to the full performance of all the covenants herein contained
upon by part of the CONTRACTOR.
IV It is further provided that no liability shall attach to the CITY OF AUBURN,
WASHINGTON by reason of entering into this Contract, except as expressly provided herein.
IN WITNESS WHEREOF the parties hereto have caused this Contract to be executed the day
and year first hereinabove written.
CITY OF AUBU• ► ASHINGTON
By
Peter B. Lewis, Mayor
Countersigned:
this /4-11-day of g 2012
ATTEST
4 ( i
D 'elle E. Daskam, City Clerk
APPROVED AS TO FORM.
/ I . �
Viel B. T►ty A omey
SCARSELLA BROTHERS, INC.
ASS .
thorized Ofcial Signature
Frank Scarsella, President
C 1
CITY OF AUBURN
CONTRACT CHANGE ORDER AGREEMENT NO. I
Contract No.,Project No.and Project Title: Contract#11-01, Project#C201
M Street Grade Separation (Underpass)
Contractor Name and Address:
Scarsella Brothers, Inc
P.O. Box 68697
Seattle,WA 98168-0397
The Contractor is hereby directed to make the changes to the Contract as described herein. This document and all attachments are a supplement
to the contract All work,materials and measurements for the type of construction involved shall be in accordance with the contract documents
of the above named project unless stated otherwise in this change order.
Summary of Proposed Changes:
1 Added quantity to Bid Item Number 66 up to 125%of plan quantity Add vertical sod nails to Wall LU6 The nails shall be placed on
the same frequency as defined in the existing contract plans and specifications,(see Plan Sheet RT-21,vertical nail detail).The nails
shall be measured and payment made per the contract Bid Item 66 Vertical Nails. The nails shall extend from the top of the shotcrete
fasma to 2 feet below the bottom of the shotcrete fasma at a minimum. Payment will be made based on field measurements of actual
vertical nails installed. All work shall conform to Section 6-15 of the Special Provisions
2. Create new Bid Item Number 66A for that portion of the vertical sod nails installed in excess of 125%of planned quantity The nails
shall be placed on the same frequency as defined in the existing contract plans and specifications,(see Plan Sheet RT 21,vertical nail
detad) The nails shall be measured per the contract Bid Item 66 Vertical Nails Payment shall be made per the new Bid Item 66A. The
nails shall extend from the top of the shotcrete fascia to 2 feet below the bottom of the shotcrete fascia at a minimum. Payment will be
made based on field measurements of actual vertical nails installed All work shall conform to section 6-15 of the Special Provisions
3. Added quantity to Bid Item Number 24 The Contractor shall excavate,place and compact 450 CY of roadway excavation for the
purpose of creating access to place the vertical soil nails in Wall LU6 Once the vertical sod nails are placed,the Contractor shall remove
and dispose of the 450 CY All work shall include haul and disposal of material at locations designated by the Engineer. All work shall
conform to Section 2-3 of the Special Provisions.
4. Added compensation for demobilization and mobilization for Pile Contractors The Contractor moved their sod nail drilling operation to
Wall LU6 based on exhausting sod nail work south of the new BNSF bridges due to issues related to existing SR 18 footers This
mobilization was not compensable. The Contractor was notified that vertical sod nails were to be installed on Wall LU6 on Thursday
evening October 4,2012. The Contractor had fully mobilized to the site and was in the process of installing horizontal sod nails. The tol
row of horizontal nails were completed by close of business 10/4/12 The Contractor will be required to demobilize sod nail equipment
from the site in order to allow installation of the berm to install the vertical soil nails
The Contract time is extended by 0 days.
Item Sch. Sec.No. Item Description Quantity Units
(+/-)_ Unit Price($) Total Price
66 A 6=15' Vertical Nails --1;325- SF 10.00 $- - -13,250:00
COI-66A A 6-15 Vertical Nails 224 SF 26.05 $ 5,835.20
24 _ A_ 2103: Roadway Excavation Includin 'Haul 900 CY 6.80 $ _ _ _6,120.00.
C014 A 1-04.4 De-Mob and Re-Mob LU6 1 LS 5,533.65 $ 5,533.65
Subtotal $ 30,738.85
Washington State Sales Tax(9.5%)on applicable items $
TOTALI $ 30,738.85
._$ SO'738i85 :' : ::.:v: 30'738.85'
$0 06:
i_07"" CoiaGaatAinouilt?i .`•'_ _ 'g,.;-31229'634:83 '278 543:60 3 ,;
4 aot
1:1:3 '282;45
This change order constitutes full and complete compensation for all labor,equipment,materials,overhead,profit,any and all indirect costs,and time
adjustment to perform the above described changes All other costs are non-compensible. All other terms and conditions of the contract remain
unchanged.
H:\Forms\FCO25.xls
(Revised 05/2012)
CITY OF AUBURN
CONTRACT CHANGE ORDER AGREEMENT NO. I
Contract No.,Project No.and Project Title: Contract#11-01, Project#C201A
M-Street Grade Separation(Underpass)
/ i f
Contractor: / {d 1�a ' L
DW
Inspector- t _ /D�Zb(�1,
Dw
Project Manager-
Resident Engineer. O/ZZ tl
D
City Engineer- {0 Z. S j2
o�m
Approved by:
Mayor,Ciliyof Auburn D..
H:%Fonns%FCO25.x1s
(Revised 0512012)
CYFY OF AUBURN
CONTRACT CIIANGE ORDER AGREEMENT NO. 2
Contract No. Project No.and Project"[Contract#11-01, Project#C201A
M Street Grade Separation(Underpass)
Contractor Name tmit Address.
Scarsella Brothers, Inc
P.O. Box 68697
Seattle,WA 98168-0397
The Common,is hercb}directed to male the changes to the Contract as described herein This document and all attachments are a
supplement to the contract All IOrk,nrmeriuls and measurements for the type of construction in\olred shall be in accordance with the
contract documents of the above named project unless stated other" e in this change order
Summary of Proposed Changes:
1 Delete Bid Item Number 72(Shall 24' Diameter)in total for soldier pile tie back al Is(LU4,LU5 RU-'and RU4) Change
was initiated because a W]2X53 pile ,I tit associated 2 PGA As through each pile is larger than a 14 inch Diameter shaft This
affects the rental alignment of W 12,53 steel I I-pda The vertical alignment oft he piles cannot be achieved within the shaft
diameter as indicated on the contract plans
2 Add 777 LF of item C042-72A(Shall 3b' Diameter)for soldier pile lie back walls t LU4_LI t5 RU'and RU4 i Chai_e wi
initialed because a W 12x53 pile with 2 VGA a,emblies through the pile wen requires a 30 inch minimum diameter shaft to
achieve plan vertical alignment
The Contract time is emended by 0 days
Item Sch. Sec.No. Item Description Quantity' thnih
(+/-) Unit Price(S) Total Price
72 A 6-16 Strait 24"Diameter -777 LF 8000 $ (62,16000)
CO#2-72A A 6-16 Shaft 30"Diameter 777 LF 12320 $ 95,726 40
Subtotal $ 33,56640
Washington State Sales Tax(9 5%)on applicable items $
FOTAL $ 33,56640
Buse Amount Total met "Fax
1. Total Cost,thls C/0..':,,," l i '$ 33,566 40 $ " '33,566A0
2. Total Cost PrevioueC/Ot. ':':',..x;" ". $, 30,738 85 $ 30,738.85
3, On"inahContract Amount _ $' .11,221",631;63' -$ 11,278,543.60
4 Revised Contract Amount'. 'c'!!''..""" .$' :...11,285,936.88"1$ " 11,342,848 85'
I lits change order consmums full and complete c ofict setion for all labor,equipniem,materials,no enccad,profit,anv and all indirect cods,
and nme adlusmienl to pet'ona the above desert bed chiniges 411 other costs are non-compensihle All other terns and conditions ofthe
contract mmom unchanged B �J
Contractor
Oa¢
Inspector- / //
um
Project Manager 7 9 /3
tia10
Resident Engineer 12/21/12
c, w��
Cite Luglncer- r l3
Dn¢
Approed by
r v r.Cip• ubur � o"°
H\Forms\FCO25 As
(Revised 05/2012)
.c� -
CITY OF AUBURN
CITY of AUBURN CITY CLERKS OFFICE
CONTRACT CHANGE ORDER AGREEMENT NO. 3 MAY _q 2013
Contract No.,Project No.and Project Title: Contract#11-01, Project#,C201A1
M Street Grade Separation(Underpass)
Contractor Name and address:
Scarsella Brothers, Inc
P.O Box 68697
Seattle,WA 98168-0397
The Contractor is herebx directed to make the changes to the Contract as described herein This document and all attachments are a supplement
to the contract All work,materials and measurements for the type of construction involved shall be in accordance with the contract documents
of the above named project unless stated otherwise in this change order
Summary of Proposed Changes:
1 The City gave verbal authorization to proceed with this work on 10/17/12
2 Add quantity to bid item number 24(Roadway Excavation Including Haul) the Contractor shall excavate,place and compact 500 CY
of roadway excavation for the purpose of creating access and a workmg pad to place the vertical sod nails in Wall RU2 between stations
17+80 to 18+13 Rt In addition,material shall be placed and compacted in the area where the existing soil nail fascia is to be removed
between stations 17+80 to 18+04 Once the vertical soil nails are placed,the Contractor shall remove and dispose of the 500 CY in
phases,facilitating the installation of the new horizontal encapsulated sod nails Work shall include haul and disposal of material at
locations designated by the Engineer All work shall conform to Section 2-3 of the Special Provisions
3 Add quantity to bid item number 61 (Prefabricated Drainage Mat) All work shall conform to Section 6-15 3(7)of the WSDOT Standard
Specifications
4 Install 11 new,40 foot long encapsulated soil nails to replace those previously installed on Wall RU2 The new nails to be placed
approximately mid way between and at the same elevation as those shown in the plans
5 Add Quantity to bid item 84(Shotcrete Facing) All work shall conform to Section 6-15 3(7)of the WSDOT Standard Specifications
6 Install vert cal sod nails to Wall RU2 between 17+80 to 18+13 Rt The nails shall be placed on the same frequency as defined in the
existing contract plans and specifications,(see plan sheet RT-21,vertical nail detail) The vertical soil nails between stations 17+80 to
18+04 are to be placed prior to installing the new 40 fool horizontal encapsulated sod nails The vertical soil nails between stations
18+04 to 18+13 are to be installed behind the previoulsly placed shotcrete fascia The nails shall be measured per the contract bid item
66 Vertical Nails Payment shall be made per the new bid item 66A The nails shall extend from the top of the shotcrete fascia to 2 feet
below the bottom of the shotcrete fascia at a minimum Payment will be made based on field measurements of actual vertical nails
installed All work shall conform to section 6-15 of the Special Provisions
7 Add Bid Item for the installation of additional welded wire fabric Due to the cohesionless soil properties encountered during the
installation of the soil nail wall,the plan thickness of shotcrete was exceeded This required additional welded wire reinforcement The
work to install the additional welded wire fabric shall conform to the applicable sections of Section 6-15 3(7)of the WSDOT Standard
Specifications The additional quantity shall be measured by the SF of area installed
8 Add Bid Item for the installation of grout behind Wall RU2 Due to cohensionless soil properties encountered during the installation of
the sod nail wall,voids formed during the construction process Grout was injected behind the wall to ensure all voids were filled The
work to install the grout shall conform to Section 9-20 3(4)of the WSDOT Standard Specifications The grout to be placed al the
direction of the engineer
9 Add 4 days of home office overhead for the 4 days of contract extension. (See CH-034 for tmm impact analysis)
10 Add 4 days of field office overhead for the 4 days of contract extension. (See CH-034 for time impact analysis)
The Contract time is extended by 4 days
H\Forms\FCO25.xls
(Revised 05/2012)
CITY OF AUBURN
CONTRACT CHANGE ORDER AGREEDIENT NO. 3
Contract No.,Project No.and Project Title: Contract#11-01, Project#C201A
M Street Grade Separation(Underpass)
Item Sch. Sec.No. Item Description Quantity Units
(+/-) Unit Price(S) Total Price
24 A 2-03 Road,cay Excavation Including I(an] 1000 CY 680 $ 6,800.00
61 A 6-15 Prefabricated Drainage Mat 7.9 SY 800 $ 6320
63 A 6-15 Sod Nail-Encapsulated I 1 Ea 1.65000 $ 18.150 00
84 A 6-18 Shotcrete Facing 120 SF 15.00 $ 1,80000
C093-66A A 6-15 Vertical Nails 739 SF 2605 $ 19.250.95
C093-IA A 6-15 Welded Wire Fabric 120 SF 2 53 $ 30360
C043-1B A 9-20 Griotme Behind Fall RU-_' LS 1 96157 $ 96157
C043-IC A 1-044 I lome Office Overhead 4 Day 363871 $ 14,55484
C093-ID A 1-044 Field Office Overhead q Day 1 229 71 S 4,918 84
Subtotal $ 66,803 00
Washington State Sales Tax(9.5%)on applicable items
TOTALI S 66,80300
Base Amount Total Incl.Tax
1. Total Cost this CIO $ 66,803 00 $ 66,803.00
2. Total Cost Previous C/O $ 64,305 25 $ 64,305.25
3. Original Contract Amount $ 11,221,631.63 1 $ 11,278,543.60
4. Revised Contract Amount $ 11,352,739.88 1 $ 11,409,651.85.
This change order constitutes full and complete compensation for all labor,equipment,materials,overhead,profit,any and all indirect costs,and time
adjustment to perform the above described changes All other costs are non-compenstble All other terms and conditions of the contract remain
unchanged
UNILATERALLY APPROVED
Contractor:
Dote
Inspector: O l0 �2-B ej
Dim
Project Manager: 5/7/3
Da¢
Resident Engineer:
D..City Engineer 3- 3
D.
Approred by:
Algror,Ci0•of Auburn ✓ D.
H'\Forms\FCO25.xls
(Revised 05/2012)
CH2M HILL
1100 112"Ave NE
Bellevue,WA 98004
�j P O Box 91500
C H GO V!H 1 LL Bellevue,WA 98009-2050
' Tel 425.453.5000
Fax 425.468 3100
January 14, 2013 CH-034
Robert Scarsella
Scarsella Bros
PO Box 68697
Seattle, WA 98168-0697
RE. Project#C201 A, M Street SE Grade Separation (Underpass)
Contract#11-01 —Protest#P014 Scarsella letter,
Change Order 3 dated November 29, 2012
Dear Mr Scarsella:
This letter is in response to your letter dated November 29, 2012, regarding Change Order No 3
Change order No. 3 addresses work associated with repairing the portion of Wall RU2 that failed on
September 21, 2012. Your letter states that you returned Change Order No 3 unsigned because it
fails to provide compensation for 13 days of critical path work,
The City has since re-evaluated Change Order No 3 and determined that 4 days of contract time is
warranted and would be added to the change order for critical path work associated with repairing the
failed section of Wall RU2. Below is a summary timeline, showing the events that took place to repair
Wall RU2:
October 17, 2012 The Contractor was provided instruction on how to proceed with remediation
of the sloughed section of Wall RU2 between stations 17+80 to 18+30, both
in the weekly meeting and in the form of a draft change order sent by email
(This work did not impact the critical path of the project).
October 29, 2012 Contractor began remediation work by adding soil to the earthen berm at the
failed shotcrete wall section of Wall RU2 Contractor also installed 6 Vertical
Nails at Wall RU2 (This work added 1 day to the critical path work of the
project)
October 30, 2012 Contractor installed 3 vertical nails at Wall RU2. (This work added 1/2 day to
the critical path work of the project.)
November 1, 2012 Contractor excavated for soil nail installation at the failed southern portion of
Wall RU2 and reinstalled 4 soil nails(Row#1, Southern Wall Section,
M17+80 to M18+03). (This work added 1 day to the critical path work of the
project.)
December 11, 2012 Contractor installed 5 soil nails at Wall RU2 (Row#3, Southern Section
18+10 Rt. and at the south end of Wall#RU2 tie-in at Wall #RU1 Pile#19 at
STA 17+79 Rt.) (This work added 1 day to the critical path work of the
project.)
December 14, 2012 Shotcrete placed in both the top and second rows in the remediation area
The remediation work was complete this day (This work added %day to the
critical path work of the project)
Based on the reconstructed timeline above, it took the Contractor a total of 4 working days to
complete work to repair the failed section of Wall RU2. The Contractor requested 14 days be
awarded to the project due to the remedial work on Wall RU2 The City asserts the Contractor is only
due that time actually required to perform the remedial work which took equipment and manpower
away from critical path work. The Cities assertion is further attested by the Contractors relaxed
timeline to complete the work.
The enclosed Change Order#3 has been revised to include adding 4 working days to the contract as
described above If this revised change order is acceptable, please review, sign and return to me. If
the revised change order is still unacceptable, then the City requests a meeting with Scarsella to
discuss.
Thank you,
Craig D Jackson PE
Resident Engineer
1-208-484-3057
CO 44 - Pg 1 of 7
CI'Il'OF AUBURN
CONTRACT CHANGE.ORDER AGREENIEN1'NO. 4
Contract Nn.,Project No.:and Contract#11-01, Project#C201A
Project'I'life; M Street Grade Separation(Underpass)
Contractor Name and Address:
Scarsella Brothers, Inc
P.O.Box 68697
Seattle,WA 98168-0397
The Contractors hereby directed to make the changes to the Contract as described herein This document and all anachments arc a
supplement to the contract All work,materials and measurements for the type of construction involved shall be in accordance wnh the
contract documents of the above named project unless stated otherwise in this change order
Summan of Proposal Changes:
1 Delete 736 25 LF from Bid Item Number 32,(Shoring or Extra Excavation Class B),per the attached revised Plan
Sheets STD-4 rv1, RR-1.rv1;RR-5 rv1,ST-8 rv1,STP-3.rv1
2 Add 183.33 SY to Bid Item Number 35,(Construction Geotextde for Underground Drainage),per the attached revised
Plan Sheets STD-4 rvl, RR-1 rv1,RR-5 N1,ST-8 rv1;STP-3 wl
3 Add 30 99 Tons to Bid Item Number 38,(Crushed Surfamng Base Course),per the attached revised Plan Sheets
STD4 rv1, RR-l.rvl,RR-5 N1,ST-8 N1,STP-3 rv1
4 Add 37.5 CY to Bid Item Number 93,(Gravel Backhll for Drain),per the attached revised Plan Sheets STD-4 N1,
RR-1.rv1;RR-5 Nl;ST-8 N1,STP-3 wl
5 Delete 28 LF from Brtl Item Number 96,(Solid Wall Polyvinyl Chloride(PVC)Storm Pipe,SDR-35,18 inch Drame.),
per the attached revised Plan Sheets STD4 rvl, RR-1.wl,RR-5 N1,ST-8 N1,STP-3 rv1
6 Delete 95 LF from Bid Item Number 101,(Reinforced Concrete Storm Sewer Pipe,Cl V,18 inch Dram),per the
attached revised Plan Sheets STD-4.rv1, RR-1.rv1;RR-5.rvl,ST-8 rv1,STP-3 rv1
7 Delete 123 LF from Bid Item Number 102,(Storm Sewer Television Inspection),per the attached revised Plan Sheets
STD-4 wl, RR-1.rv1,RR-5.rvl,ST-8 rv1;STP-3 N1
8 Delete 1 Each from Brtl Item Number 109,(Catch Basin Type 2,48 inch Dram),per the attached revised Plan Sheets
STD-4 rv1; RR-1 NI;RR-5.rv1;ST-8 rv1,STP-3.rv1.
9 Delete 7 CY from Brtl Item Number 119,(Gravel Borrow for Trench Backhll),per the attached revised Plan Sheets
STDA N1, RR-1 wl:RR-5.rv1;ST-8 wl,STP-3 rv1
10 Delete 29 11 CY from Brtl Item Number 121,(Controlled Density Fill(CDF)for Trench Backhll),per the attached
revised Plan Sheets STD-4 NI; RR-t.rvl;RR-5 wl,ST-8 rv1,STP-3 rv1
11 New Bid Item CO#4-1,(Structural Excavation Class B,Ind Haul),100 61 CY per the attached revised Plan Sheets
STD-4 rv1,RR-1 rv1,RR-5 rv1,ST-8 N1,STP-3 N1 This work shall consist of excavating 100 61 CY of Structural
Excavation Type B per section 7-01 and 2-09 of the Standard Specifications
12 Compensate Contractor for material costs for 28 Ft of Solid Wall Polyvinyl Chloride(PVC)Storm Pipe,SDR-35, 18
inch Dram (See Invoice No 0329948 Ferguson Waterworks)Small Qty can not be restocked
13 Compensate Contractor for material costs for 95 Ft of Reinforced Concrete Storm Sewer Pipe,Cl V,18 inch Dram
(See Quote No 5643 Granite Precasting and Concrete)Restocking fee
14 Compensate Contractor for material costs for 1 EA of Brtl Item Number 109(Catch Basin Type 2,48 inch Dram)
Cannot restock cored structures
The Contract time is extended by 0 days
H Tcoa\FCO25 Aa
(Revised a52)12)
CO #4 - Pg 2 of 7
CH-1 OF AUBURN
CONTRACT CHANGE ORDER AGREENIENT NO. 4
Contract No.,Project No.and Contract#11-01,Project#C201A
Project Title: M Street Grade Separation(Underpass)
Item Sch. See.No. Item Description Quantity Units
(+/-) Unit Price($) Total Price
Shoring or Extra Excavation
32 A 2-09 Class B -73625 LF 0.30 $ 220 88
Construcbon Geotextile for
35 A 2-12 Underground Drainage 18133 SY 300 $ 54999
Crushed Surfacing Base
38 A 4-04 Course CSBC 30.99 Ton 1500 $ 46485
93 A 7-01 Gravel Backfill for Drain 375 CY 25.75 $ 96563
Solid Wall Polyvinyl Chlonde
(PVC)Storm Pipe,SDR-35,
96 A 7-04 18 inch Diam. -28 LF 43.20 $ (1,209 60)
Reinforced Concrete Storm
Sewer Pipe,CI.V,18 inch
101 A 7-04 Diam -95 LF 60.50 $ (5,747 50)
form ewer Television
102 A 7-04 Inspection -123 LF 2.25 $ (27675)
Catch Basin Type 2,48 inch
109 A 7-05 Diam. -1 EA 2,25000 $ (2,26000)
Gravel Beam for Trench
119 A 7-08 lBackfill -7 CY 0.01 $ (0 07)
Controlled Density Fill(CDF)
121 A 7-08 for Trench Backfill -2911 CY 75.00 $ (2,183 25)
Structural Excavation Class
CO#4-1 A 2-03 B,Ind Haul 10061 CY 2860 $ 2,87745
Solid Wall Polyvinyl Chloride
(PVC)Storm Pipe,SDR-35,
95 A 7-04 18 inch Diam 28 Ft 1612 $ 451 36
Reinforced Concrete Storm
Sever Pipe,CL V, 18 inch
101 A 7-04 Diam 95 CY 2605 $ 2,47475
Catch Basin Type 2,48 inch
109 A 7-05 1 Diam (cored;no restock) 1 EA 51700 $ 51700
Subtotal $ 3,59702
Washington State Sales Tax(9.5%)on applicable items $
TOTAL $ (3,597 02)
1Yt•Total Costthis C/O :">�•`.:'7 "'s$=?sT :: 3597:02 :$r: ,��" �iv',�?a""7'.`. 3,597.02
2:�TOt21 COST Previous C/O ` . ; .$a..'u':"::127,979.88. $''8d.:�` "i.,h`".: f427,979.8B!
3.?On inal ContractAmo`untl. tn.-i'.'"'`,%$t_._11,221'631.63.t$? 2r _ .11,278,54360;
4."z ReviSedCOritr2cPArilotinC:t.::. `]` �$ :.1A;346,014.49;;5=,',„�1 F�,:
'Ibis change order constitutes full and complete compensation for all labor,equipment,ann"ods,"ahead,profit,any and till indirect costs.
anJ umc adrystincnuo pct fitmt the abmc dcaubcJ changes All other cuss are non-compenable I othe,tcmts and conJmons of,,re
wnvad remavt unchtwgoJ
Contractor-
Inspector-
Project Jlanager
Resident Engineer 6 j,(r /3
City Engineer 2-) .
Apprm"I by: (p z,Q •$
Mayor.CirP a ua.
H TormsTCO25 As
mevtsed 0520121
CO #4 - Pg 3 Df 7
�.� lvY�n.I. _,y $EL IB.TII N.ROS Ei\VV NOTES.
fY,^'WV��.=+W_C/Y —, "v ivY l�WwYV`IVY`/VwVWYV�Ym un
-- °•A.:_.. ; !�_YNSF RNIROPD--� -'--�'- a: L'-�'-=-- -
,_.__.___.44
' c
T— I '
T^ON _ h-_ '
---- ---r,-:-t- ---r -I - -
- __—F.a-a— I. - ... I I,• i F t I 7��:1 a ml � _�
aNM STREET SE. .... m
GRADE SEPA
eNSP reR RATION
AUBURN "m
j
CH2MHILL --_
CO b4 - Pg 4 of 7
207+30
210+00
l
207-0 200,0
a m 206"00 1 208 00
a_ouc+mRosc PARTVenT M STREET SE
ip< .....°..°""...' — — • '+.Y.` ?Rp�� i ..GRADE SEPARATION _-
_ AUBURN
'Y, e. �. a /.uWrn lYaanlrymn rt.c's 9NSF RR
f.ROSS SECTIONS
CH2MHILL •. . "r
CC k< - Pgs of v
SEC tB,T1t N,R OS E,W M. �-yL
ajE
„® am•,w�u,F �� ... I ,: ci RMrtci RMrt pWRi ON i
�`,S • 1 II�/�o ..`., a,..s.,:,,, it :, C^.::ti,{. i--
Im
W _
+au Ili 4— _!_— —..( - I_ I_—.,wi � pys% ir•'j
1
I ,,.
e�.00 w es.a (' eo:oo nr.00 —
_— M STREET SE ` --
--- „�•� „_•, !,v ouc woaxs NSPUla,Errt •••GRADE SEPARATIOR,m
AUBURN` ISWryM° �
wv.m ry® � STORY —
p ^ ��yCi.-. nf.lPi• PIhN ANN FIiOFItE
— CH2MHILL
CO #4 - Pg 7 of
r
P < I WMM
CBI TTO Bd ��.y-•�•.•/`.�., 'Y �_ __ _ �I
i- I_p--_1_�-�-� Ic woaas nE,wr•noa� �R nNNM STREET SE -
. .:uc;-"'S,O.1Q�V lJU i�l V GRADE SEPARATION -
__ S -,�..M___..— '.b,..T mod:'• ., ....w . .—_
.- .,.,r,:,��.•.a.c.,.,��– -_.__ •..^. � CH2MHILL ifPs
CO #4 - Pg 6 of 7
_ .a y
a— im'j
s �s u u cv f vw
as.o.
f IT I IT
�mm a ITT
IIC '`IT.x
C ml STORM PIPE SLEEVE UNDER WALL
o IT, n ,.s
�I. Imn�o.oxnm i -
jz M of w ' 6r; j--w—n Pm IT
aa. nm CITY OF AUBURN STORM DRAIN WALL DRAIN CLEANOUT
Y ( J ( STRUCTURE NUMBERS 51 LOCATIONI
I / l sy _.. , �J
INFILTRATION TRENCH SECTION
DNSF LINE 208-80 T0 2D9+55
BRIDGE DECK DRAIN x..� I
E—_ ••.'��•• (�T•IL.Uc SVORNS DE1.11 tur --Cl ua --VI :TREE SE v —
_� x~-^— •CIAV
BURN
V GRADE SEPARATION
ORII
'.% j• oETnlls
- ------- _ C11-121WHILL
CITY OF AUBURN T
CONTRACT CHANGE ORDER AGREEMENT NO._5_ Qpyop
c�T'/QP,9nUB�RA
Contract No.,Project No.and Project Title: Contract# 11-01 Project#C201A AAe�. u] orC/
M Street Grade Separation (Underpass) P n l•
Contractor Name and Address:
Scarsella Brothers, Inc
P.O. Box 68697
Seattle, WA 98168-0397
The Contractor is hereby directed to make the changes to the Contract as described herein. This document and all attachments are a supplement to
the contract All work,materials and measurements for the type of construction involved shall be in accordance with the contract documents of the
above named project unless stated otherwise in this change order.
Summary of Proposed Changes:
1 For the purpose of settlement of a dispute,parties agree to a lump sum payment for costs for the direct work to complete the
core drilling only of the existing abandoned SR18 bridge foundations.Contract time extended three days for this work.
2 For the purpose of settlement of a dispute,parties agree to a lump sum payment for half of the costs incurred to complete
contaminated soil testing and to prepare a soil characterization report.
3 The Contractor shall install additional reinforcement consisting of welded wire fabric due to overbreak in the shotcrete facing.
Work shall conform to the applicable sections of Section 6-15.3(7)of the WSDOT Standard Specifications
The Contract time is extended by 3 days.
Item Sch. Sec.No. Item Description Quantity Units
(+/-) Unit Price(S) Tolal Price
C05-16A A 2-02 Core Drilling Settlement 1 LS 13,101.20 $ 13,101.20
C05-28A A 2-03 Contaminated Soil Settlement 1 LS 8,280.16 $ 8,280.16
C05-84A A 6-15 Welded Wire Fabric 1 LS 20,33660 $ 20,336.60
Subtotal $ 41,717.96
Washington State Sales Tax(9.5%)on applicable items $ -
TOTAL $ 41,717.96
Base Amount Total incl.Tar -
1. Total Cost this C/O $ 41,717.96 $ 41,717.96
2. Total Cost Previous C/O $ 131,029.05. $ 131'029.05
3. Original Contract Amount $ 11.221.631.63 $ 11;278,543.60
4. Revised Contract Amount $ 11,394,378.64 $ 11,451,290.61
This change order constitutes full and complete compensation for all labor,equipment,materials,overhead,profit,any and all indirect costs,and time
adjustment to perform the above described changes. All other costs are non-conupensible. All other terms and conditions of the contract remain
unchanged
i
Cantraclor:L-�---� �
Doe
Inspector: 141: L3 7 oi3
=/
one
Project Manager: 5 a3 )3
nnm
Resident Engineer:
nee
City Engineer:
ma.
Approved by: I
Mnynr;Gilya. un o""
H\Form51FCO25 As
(Revised 05/2012)
CITY OF AUBURN
CONTRACT CHANGE ORDER AGRELMENT NO. 9
Contract No., Project No. and project 7 Contract # 11 -01 Project # C201A
M Street Grade Separation (Underpass)
Contractor Name and Address:
'rhe Cmnraetor is hereby di, eacd to mode the changes to (lie Contract as described heroin. Phis doeumnd and all attachments area supplement to the
contract All work materials nnJ nmaarrements for the typo of conshuction rooked shall be in accordance with lire contract documents ofthe above
named project unlesS stated otherwise in this change order
Summary of Proposed Changes:
For the purpose of settlement of several ongoing disputes, the parties agree to a lump sum payment of $275,000 as resolution of all
Protests and claims for the fallowing issues: 1) Erosnn Control Plan Redesign claim submitted by the Contractor on April 25. 2013 and
supplemented on May 24, 2013; 2) the RU2 Failure - Abandoned SRI Footing Removal a PGA Re- Sequencing claim submitted by the
Contractor on June 14, 2013 and, 3)the protest associated with the City's ongoing assessment of Liquidated Damn2es, which covers
Contractor protest letters dated August 28, 2013, September 6, 2013, September 23, 2013, September 27, 2013, and September 30, 2013_
The following shall also apply to this settlement.
A. The City will establish July 22, 2013 as the date of substantial completion of the contract.
13. 13) signing this change order. the Contractor agrees to the proposed changes and terms of both Change Order Nos. 3 and 6, which
were both previously unilaterally approved. Both Change Order Nos. 3 and 6 are associated with the Contractor's RU2 Failure -
Abandoned SRI Footing Removal $ PGA Re- Scquencing claim and are attached to this document for reference.
C. The Ciry, agrees to add back the liquidated damages deducted from Pay Estimate Nos. 17 and 18 .
D. 'Ihe parties agree that the lump sum payment includes all costs related to the protests and claims, including statutory payment act
interest rate of 1% per month on the liquidated damages deducted from Pay Estimate Nos. 17 and 18 and the request for attorneys fees
incurred that are associated with the protest associated with the Cas's ongoing assessment of Liquidated Damages, and if applicable,
mlourevs fees incurred for the Contractors Erosion Control Plan Redesign claim and RU2 Failure - Abandoned SR 18 Footing Removal
& PGA Re- Sequencing claim.
F,. The Cip'till pay for costs for the temporary stool pump through October 31, 2013. Any costs incurred far the temporap' pump after
October 31, 2013 twill be Four by the Contractor.
F. Roth parties agar to establish liquidated damages based on the contract value of stonmtmler pump station bid item. of $332, >6t0,
using the formula in Section 1 -08.9 (Liquidated Damages) of the WSDOT Standard Specifications which results in an amount of
$166.25 for any date after October 31, 2013 that the pump station is not complete. A complete pump station shall include having an
operable pump station, performing all local programming of the pump station, completing the pump station testing and startup
requirements, and completing all required training _'Ihc requested change to include a Geeem'e radio, antenna, and changing the PLC are
not required to be installed to make the pump station complete and will not factor in the formula for calculating liquidated damages of
the pump station. Operation of the permanent pump station shall be the responsibility of the Contractor until such time as all testing,
startup and training are complete. Once testing, startup and training arc complete to the City's satisfaction, the City will begin operation
of the pump station At the time the City lakes over operation of the pump station, the temporary' pump system may be removed.
2. The Contractor shall install a Geewave radio and antenna for SCADA communications and change out the Compact Logis LI PLC that
was installed at the station to a Compact Logis L32. All work shall conform to the attached and per Section 8 -33 of the Special
Plus isions. Contract time is cslended 20 days for this work.
The Contract time is extended by 20 days.
H'. \Forms\FCO25.xls
(Revised 05/2012)
5
t
CITY OF AUBURN
CONTRACT CHANGE ORDER AGREEMENT NO. 9
Contract No., Project No. and Project Contract # 11 -01 Project # C201A
M Street Grade Separation (Underpass)
Item
Scb.
Sec Nn.
liem Description
Quantity
Units
2:Total CostP,ievious'C /O` ': 3 =.:
#i$.,. '314;269 95
$;: "il F` ?'"�sa utt ,ln.. .r `. 314,269:95;
3: cOn Trial Contract Amount'
111;227,631
.t1,278,543i60t
( + / -)
?$.` ,.'(1';827,02286
Unit Price ($)
Total Price
Erosion Control Plan Claim,
RU2 /SR18 /PGA Sequencing
CO #9 -1A
A
N/A
Claim and Assessment of
1
LS
Liquidated Damages Protest
Settlement
275,000.00
$ 275,000.00
Pump Station Freewave
C049 -2A
A
8 -33
Radio and Antenna, and PLC
1
LS
Change Complete
16,121:28
$ 16,121.28
Subtotal
$ 291,121.28
$ -
Washington State Sales Tax (9.5 %) on applicable items
TOTAL
$ 291,121.28
This change order ewmitwrs full and complete euml:
adjustment to perform the above described changes -
Contractor:
Inspector:
(�' Project Manager:
i4/ Resident Engineer:
City Engineer:
Approved by:
-h \Forms \FCO25.xls
(Revised 05/2012)
L Total Cost this
4 29 101 iflfl
$k- t1 .w... "" . + ihi 6a- i291 ^121y26i
2:Total CostP,ievious'C /O` ': 3 =.:
#i$.,. '314;269 95
$;: "il F` ?'"�sa utt ,ln.. .r `. 314,269:95;
3: cOn Trial Contract Amount'
111;227,631
.t1,278,543i60t
4..Revlsed:GontractrAmoUnt- d. „x
?$.` ,.'(1';827,02286
This change order ewmitwrs full and complete euml:
adjustment to perform the above described changes -
Contractor:
Inspector:
(�' Project Manager:
i4/ Resident Engineer:
City Engineer:
Approved by:
-h \Forms \FCO25.xls
(Revised 05/2012)
Change order No. 9 attachments
CITY OF AUBURN
CONTRACT CIIANOh. 01ZDER AGIZEEDI IZN "P NO. 3
Contract No., Project No. and Project Title: Contract # 11 -01 Project # C201
M Street Grade Separation (Underpass)
Contractor Name and Address:
Scarsella Brothers, Inc
P.O. Box 68697
Seattle, WA 96168 -6397
The Contractor is hereby directed to make the changes to the Contract as described herein. This document and all attachments area supplement
to the contract. All work, materials and measurements for the type of construction involved shall be in accordance with the contract documents
of the above named project unless stated othcovise in this change order.
Summary ofproposed Changes:
I The City gave verbal authorization to proceed with Oa cork on )0./17/12.
2 Add quantity to bid item number 24 (Roadway Excavation Including Haul), The Contractor shall excavate, place and compact: 500 CY
of roadway excavation for the purpose of creating access and a working pad to place the vertical soil nails in Wall RU2 hehveen stations
17180 to 18 +13 St. In addition, material shall be placed and compacted in the area where the existing soil nail fascia is to be removed
between stations 17 +80 to 18 +04. Once the vertical soil nails are placed, the Contractor shall remove and dispose of the 500 CY in
phases, facilitating Plc installation of the new horizontal encapsulated soil nails. Work shall include haul and disposal of material at
locations designated by the Engineer All work shall conform to Section 2 -3 of the Special Provisions.
3 Add quantity to bid item number6l (Prefabricated Drainage hlat). All work shall conform to Section 6- 15.3(7) of the WSDOT Standard
Specifications.
4 histall 11 new 40 font long encapsulated soil nails to replace those previously installed on Wall RU2. The new nails to be placed
approximately nrid way between and at the same elevation as those shown us the plans.
5 Add Quantity to bid item 84 (Shotcrete Facing). All work shall conform to Scdion 6- 15.7(7) of the WSUOI' Standard Specifications.
6 Install vertical soil nails to Wall RU2 Isavloen 17 +80 to 18 +13 Rt. the nails shall be placed on the same frequency as defined in the
existing contract plans and specifications, (see plan sheet RT -21, vertical nail detail). The vertical soil nails between stations I7 +80 to
18+04 are to be placed prior to installing the new 40 foot horizontal encapsulated soil nails. I lie vertical soil nails between stations
18. N to 18 +13 are to be installed behind the previoulsly placed shotcrete fascia. "the nails shall be measured per the contract bid item
66 Venical Nails. Payment shall be made per the new bid item 66A. The nails shall extend train the top of the shotcrete fascia to 2 feet
below the bottom of the shotcrete fascia at a minimum. Payment will be made based on field measurements of actual vertical nails
installed_ All work shell conform to section 6-15 of the Special Provisions_
7 Add Bid Item for the installation of additional welded wire fahrie. Due to the cohesinnlns soil properties encountered during the
installation ofthc soil nail wall, the plan thickness of shotcrete was exceeded This required additional welded wire reinforcement. The
work to install the additional welded wire fabric shall conform to the applicable sections of Section 6- 15:3(7) of the WSDOT Standard
Specificatimss. The additional quantiry shall be measured by the SP of area installed.
B Add Bid Itcm for the installation ofgrout behind Wall RU2_ Due to cohensinnlew soil properties etrcountered during the installation of
the soil nail atoll, voids farmed during the construction process. Grout was injected behind the wall to ensure 311 voids were filled. The
work to install the grout shall conform to Section 9- 20.3(4) of the N'SDOT Standard Specifications. The gran to be placed at the
direction of the engineer.
9 Add 4 days of home office overhead for the 4 days ofcontmct extension. (See CI 1-034 for time impact analysis).
10 Add 4 days of field office overhead for the 4 days of contract cxtension. (Sec CH -034 for time impact analysis).
The Contract time is extended by 4 days.
H :1Porms1FCO25.x1s
(Revised 0512012)
CITY Or AUBURN
CON'ITtACI' Ct1ANGEURDER AGREENIENT NO. 3
Contract No., Project No. and Project'ritle:. Contract # 11 -01, Project # C201A
M. Street Grade Separation (Underpass)
Item
Sch.
Sec. No.
Item Description
"
Quantity
( + / -)
Units
Unit Price (S)
Total Price
- 24
A
2 -03 -
Roadway rxcavation preluding Haul
1000
CY
.6.80
S 6,800.00
61
A
-6.15
Prefabricated Drainage Mat
7.9
SY
.8.00
'S - - 63.20
63
A
'6.15
Soil Nail - Encapsulated
11
Ea
- 1,650.00
$ - - 18,150.00
84
A
6 -18
Shoterete Facing
120
SF
15.00
Y 1,800.00
CON3.66A
A
&15
Venical Nails
739
SF
26.05
S 19,250.95
CONS -IA
A
6-15
Welded Wire Fabric
120
SF
2.53
S 30160
CON3 -.iR
A
9 -20
Grouting Behind Wall RU -2
LS
1
'961.57
S 961.57
CO#3 -IC
1,
1 1 -04.4.
Home OlTee Overhead
4
Day
3,638.71
S 14,554.84
C003 -.1 D.
A
1 1- 04:4
Field Office Overhead
4
Day
1,229.71
S 4,918.84
Subtotal
Washington Stale Sales Tax (9.5%) on applicable items
TOTAL
S 66803.00
$ 66,80100
This change order constitutes full and complete compensation for all Gabor, equipment, materials, overhead, profit, any and all indirect costs, and time
adjustment to perform the above described changes. All other costs are non-compensible. All other terms and conditions of the contract remain
unchanged.
Contractor:
Inspector: .E6�
Project Manager: e
Resident Engineer: \
City Engineer: KN
Approved by:
Alapoy Cl{y
H:1Fotm;TCO25.xIs
(Revised 0512012)
UNILATERALLY APPROVED
,.Basc'Amount, •..
v' "- .-Tothtincl.Tax
1 ?.,,TotalDost this CIO
S- -- "'66,803.00'
5 - r 's ,. .2<.,. ::. 66,803.00'
2f,:Total Cost Previous C/O'
-'
S•. . -. - `84;305.25
S 64,305.25
-'
3'. Orl2inal Contract Amount
T, '41221.631I63J
8• ^� ':11278543:60'
41'Revised Contract Amount % '.'
r
S. L. 11,352;739.68
$ .'r -. ;. F,`.»:; :-: 11;409,651.M
This change order constitutes full and complete compensation for all Gabor, equipment, materials, overhead, profit, any and all indirect costs, and time
adjustment to perform the above described changes. All other costs are non-compensible. All other terms and conditions of the contract remain
unchanged.
Contractor:
Inspector: .E6�
Project Manager: e
Resident Engineer: \
City Engineer: KN
Approved by:
Alapoy Cl{y
H:1Fotm;TCO25.xIs
(Revised 0512012)
UNILATERALLY APPROVED
CITY OF AUBURN
CONTRACT CIIANGE ORDER AGREEMENT NO. 6
Contract No., Project No. said Project IContract # 11 -0i, Project # C201
M Street Grade Separation (Underpass)
Contractor Name and Address:
Scarsella Brothers, Inc
P.O. Box 68687
Seattle, WA 981168-0397
The Coalmcwr is hereby directed to make die changes to the Contmtl as described hemin. "This dmtimcni and all attachments arc s
snpplonenl Ip the contract. All work, materials and measurements for the type ofconslmetion involved shall be in xecoodance with the
maltais docamorms orthe above named pmjea unless stated ofl ise in this chauge order.
Summary of Proposed Changes:
1. Added 12 contract daysdoe to delays in setting die first toad of pule., for dm llNSF hridgc sInnsiac,which is on the
mnitnmtion critical path. The delays are attributed to DNSF requirmicids to install and stress [lie PGA's prior 10 selling [lie
girders and BNSF r sibednling (heir voik to act the ono, tailroad (rock to and Jmuniy 2013. This is a lime extension only and
no other eosipcnsnlion is being provided.
The Contract time is extended by 12 days.
Item
Sch.
See No.
Item Description
Oonnfity
( + / -)
Units
Unit Prtce(5)
Total Price
N!A
3" -.Original ContniclAmounit
4.,Rwlsed Contrenl Amount °'
i$. =-111(390;860.82
EPftc`?a °2d`'f ":11;447;772:79;
E
Subtotal
Washington State Sales Tax (9.5%) on applIcable items
TOTAL
E
E
$
This change ends constitutes fill ad euinpletesou,nii.d.afarnil labor, eaaipuseob trmtcnid,orerhand, ptold, any and all indircet oast,
and time adjustment to poromt (lie obovc dimenindclmrgas. All other costa a. can oasp.usibls. All ether terms and conditions of the
scnt.vt real. alehAnged.
Contractor:
Inspector:
Project Manager!
Resident Engineer!
City Engineer:
Approved by:
H:1FormsTCO25.xJs
(Revised 0512612)
UNILATERALLY APPROVED
7Base Ainaunlr
11oml incti.] a1 '°
' r ' cni+
Tabs cos hsvC/O
s
IE '�` "'�•9
E?�. -;x =.:.' .
FREE'
8. '
3" -.Original ContniclAmounit
4.,Rwlsed Contrenl Amount °'
i$. =-111(390;860.82
EPftc`?a °2d`'f ":11;447;772:79;
This change ends constitutes fill ad euinpletesou,nii.d.afarnil labor, eaaipuseob trmtcnid,orerhand, ptold, any and all indircet oast,
and time adjustment to poromt (lie obovc dimenindclmrgas. All other costa a. can oasp.usibls. All ether terms and conditions of the
scnt.vt real. alehAnged.
Contractor:
Inspector:
Project Manager!
Resident Engineer!
City Engineer:
Approved by:
H:1FormsTCO25.xJs
(Revised 0512612)
UNILATERALLY APPROVED
Heavy - Highway
Construction
u -
ti
October 3. 2013
City of Auburn
25 West Main Street
Auburn, WA 98001
Attention: Mr. Ryan Vondrak, P.E.
Project Manager
Reference: Contract No. 1101
Project No. 0201 A, M Street SE Grade Separation (Underpass)
Request for Reimbursement of Freewave Radio System Installation
Request for Extension of Contract Time
Dear Ryan:
An Equal
Opp01.111 in,
Employer
I'his letter is to provide it proposal for additional work for a Freewave Radio Systems.
Scarsella requests reimbursement for DBF Electric's work on installation of the Freewave Radio
System in the amount of S14,394.00, as quoted,' plus 12% WA DOT Overhead & Margin,
calculated to $1,727.28. The total amount being requested is $16,121.28.
Scarsella requests contract time to be extended 20 working days from the date of written
acceptance of the proposal, plus the amount of time required for the City to review and approve
shop drawings.
If you have any questions or need to discuss this further, please do not hesitate to give me a call.
Sincerelyrrsella
r > >�� Frank Sc
President
DBE Electric Letter Dated October 1. 2013
Y.O. Box 68697 Seattle, Washington 98168 -0697 • Tel: (253) 872 -7173 • Fax: (253) 395.1209
AK Lie. #34714 AZ Lie. #ROC249216 • CA Lie. #779354 • 1D Lie. #10394 - Unlimited -1-2
MT Lie. #146627 • ND Lic. #44607 • OR Lie. #96884 • Ul -Lie #7646917 -5551 • WA Lic. #SCARSBI183B8
=�
Electrical Contractor's Ucense: OBEELE19912PM
General Contractor's Ucense: OBEELE19127M
"W STREET GRADE SEPARATION
CITY OF AUBURN
October 1, 2013
Tamarah Knapp Hancock
Scarsella Brothers, Inc.
P.O. Box 68697
Seattle, WA 98168
Dear Tamarah:
Note below is our price to make changes as requested by Ryan Vondrak, Project Engineer for the City of
Auburn to provide and Install a Freewave radio system on the above- referenced project.
Our price includes all labor, materials, equipment, and allowable markup to provide the Freewave Radio
System as detailed in the Request for Change Order. Standard Exclusions as listed in the DBE - Scarsella
Brothers, Inc. Subcontract Agreement still apply.
Our price for the work as referenced is $ 14,394.00
This proposal is based on the usual cost elements such as labor, materials, and approved overhead /profit
and does not include any amount for interference, disruptions, rescheduling and change in the sequence of
work; delays and /or associated acceleration. DBE expressly reserves the right to submit charges for any of
these items should we be faced with performing our work under any of these conditions.
DBE requests an additional 5 working days added to the contract to perform the work described in this
change order. Lead time for materials is approximately two weeks from written acceptance of this change.
Submittal drawings will be provided within one week of receipt of a fully executed change order.
Therefore, atotal of 21 calendar days is requested forthis'change order proposal.
This proposal includes a 50% credit for return of the L3 panel to the supplier.
TRAFFIC SIGNALS & ILLUMINATION SYSTEMS
P.O. BOX 9169 ' COVINGTON, WA 98042. 253. 897 -9089' FAX 253. 804 -6066
An Equal Opportunity Employer — OBE Electric, Inc. is committe d to equal oPPOrtuniry in all areas of employment, and does not discriminate against
any individual on the basis of race, color, religion, sex age, national origin, marital status, handicap, or any other legal ly protected characteristic.
Electrical Contractor's License: DBEELE19912PM
General Contractor's License: DBEELEI9127M
Work which may be required to complete this change order which is the work of other trades is not a part of
this change proposal. This cost proposal supersedes all previously submitted cost proposals relating to this
same work or change request. This quote is valid for (30) calendar days from the above date and void
thereafter. All work affected by either the acceptance or rejection of this change is on hold pending
notification by Scarsella Brothers, Inc. to DBE Electric Inc.
We await your written approval and direction before proceeding with the referenced work.
Sinc rely,
M ry Guthmiller
President
TRAFFIC SIGNALS & ILLUMINATION SYSTEMS
P.O. BOX 9169 ' COVINGTON, WA 98042' 253. 887 -8089 -FAX 253404 -6066
An Equal Opportunity Employer —OBE Electric, Inc. is committed to equal opportunity In all areas of employment, anddoesnot discriminate against
any Individual on the basis of race, color, religion, sea age, national origin, marital status, handicap, or any other legally protected characteristic.
DBE ELECTRIC INC
PO BOX 9169
COVINGTON, WA. :98042
CHANGE ORDER REQUEST: W St. - Radio Equipment
MST GRAPE SEPARATION
UNIT DESCRIPTION LABOR MATERIAL EQUIPMENT
$ 8,440.00 $ 333.45
UNIT(Hr)
TOTAL(Hr)
UNIT
TOTAL
UNIT
TOTAL
1
RADIO EQUIPMENT,
$
669.10
$ 7,640.00.
$ 7,640.00
$
$
1
MATERIALS
$
0.00
$ 800.00
$ 800.00
$
333.45
16
SUPERINTENDANT SUPERVISION
1
16.00
SUBTOTAL
$
13,592.21
5
2 MAN CREW
2
10.00
TOTAL OF CHANGE REQUEST.
$
14,394.01
5
SERVICE TRUCK
1
5.00
5
HRS OF BUCKET TRUCK
I 1
5.00
$
$ 66.69
$ 333.45
$ 8,440.00 $ 333.45
36.00
HOURS MULTIPLIED BY BURDENED RATE
$64.09
$
2,307.24
MARKUP APPLIED TO LABOR :
29.00%
$
669.10
TOTAL MATERIAL
$
8,440.00
MARKUP APPLIED TO MATERIAL
21.00%
$
1,772.40
TOTAL EQUIPMENT
$
333.45
MARKUP APPLIED TO EQUIPMENT
21.00%
$
70.02
SUBTOTAL
$
13,592.21
USE TAX APPLIED TO MATERIAL AT
9.50%
$
801.80
TOTAL OF CHANGE REQUEST.
$
14,394.01
$ 8,440.00 $ 333.45
Contract No., Project No, and Project Title:
Contractor Name and Address:
Proposal Request it b
Proposal Request
11 -08, CP1005, S Division St Promenade
Scarsella Brothers Inc
PO Box 68697
Seattle, WA 98168 -0397
Please submit an itemized quotation for changes In the Contract Sum and /or Time incidental to proposed
modifications to the Contract Documents described herein.
This Is not a Change Order nor a direction to proceed with the work described herein.
A Freewave radio for SCADA communications needs to be included in the control panel and
lied. As part of the installation, the electrician will need to install an antenna and connect the
inn cable to the Freewave radio. FYI, L2 has done something similar at the City's 1326d'sin3et
Is project.
The PLC that was installed needs to be changed out to a Compact Logix L32, The PLC being
ntly provided has a USB serial port which will not talk to the radio. Please provide a cost to
co the existing Compact Logix L1 to a Compact Loglx L32. Can the L1 be restocked?
Project Manager:
DBE Electric, Inc.
Attn: Bryan LaTorre
Auburn, WA
By: Ben Johnson
Date: 913012013
Re: Auburn M- Street Duplex Stormwater Lift Station — Radio Equipment
Bryan, we are pleased to quote you for the following:
Cost:
Materials;
1,. Allen .Bradley .. .....1769
,632E P.rocessor...... .. .. ...
1 Allen Bradley
1769 -PB4 Power Supply
1 Allen Bradley
1769 -1016 Digital Input Card
1 Allen Bradley
1769 -OW8 Digital Output Card
1 Freewave
LRS455 -CE -E Radio
1 Antenex
Y4505 Antenna
1 Polyphaser
IS- B50LN -C2 Lightning Arrestor
30' Times Microwave
LMR40D -DB Antenna Cable
2 RF Industries
EZ- 400 -NMH -0 Antenna Cable Connector
50% Credit for Existing
Allen Bradley 1769- L24ER -QB1 B
Labor:
$ 7,640.00
Replace 1769- L24ER -QBIB with 1769 -1-32E, 1769 -PB4, 1769 -IQ116 and 1769 -OW8
Install LRS455 -CE -E and IS- B50LN -C2 in existing control panel
All labor will be completed under supervision of electrical contractor.
Please Call, if you have any questions on the above,
Thank You,
Ben Johnson
L2 Systems, LLC
Everett, WA (425) 258 -2402 Fax (425) 258 -2439
m
CI-EY OF AUBURN
CONTRACT CHANGE ORDFR AGREERIENT NO.
0 u,e)rr
Cl�C FRI(s nr -IRAN
Contract No., Project No. and Project -,Contract # 11 -01, Project # C201A KS Orf ICE
M Street Grade Separation (Underpass) JCT 1 p 2071
Contractor Name and Address:
Scarsella Brothers, Inc
P.O. Box 68697
Seattle, WA 98168 -0397
The Contractor is hereby dimclud to make the changes to the Contract as described herein. This document and all attachments are a
suppleinent to the contract. All work, maledalx and measuranents For the type of cnnstmclinn involved shall be in accordance with the
contract documents of the above named project unless stated ofl eta ise in this change mdei:
Summary of Proposed Changes
1. The Contractor shall apply an anti- gratiui coating to the .mirtarc ofthc retaining galls. Work shall conform to the attached
document.
2. For the purpose of settlement of a dispute, parties agree to a lump sum payment for half ut'the costs incured for the pile driving
subcontractor to rcambdi7c due to impacts associated with installation of HDPE pipe restraints.
3. For the purpose of settlement of a dispute, parties agree to payment for 15 days of the [ionic office and field office overhead
costs incurred and 4 days extension ofeontract time due to impacts associated with installation of HDPE pipe restraints.
The Contract time is extended by 4 days.
Item
Sell.
Sec. No.
Item Description
Quanlily
Units
2' Total Cos4:Pre "v'iousC /O. t- .'..'$`
- t,�7264,310`76s
t$ "a:� '`q4 ,: ,=2p26,L310.16,
3: "On' inal'ConGsct'Amoorit' ' = - -
-$ ;'41:221.631.63
$. ° ' " "t :'111 278,543.661
( + / -)
$ 11,535,901.58:
Unit Price (S)
Total Price
C048- 1A
A
N/A
Anti- Gratitti Wall Coating
1
LS
Complete
34,987.29
$ 34,987.29
HDPE Pipe Restraint impacts
CO #8 -2A
A
N/A
1
LS
Settlement
2,800.00
$ 21800.00
Home Office Overhead
CO #8 -2B
A
1 -04.4
25
LS
Settlement
3,639.00
$ 9,097.50
Field Office Overhead
CO #8 -2C
A
1 -04.4
Settlement
2.5
LS
1,230.00
$ 3,075.00
Subtotal
$ 49,959.79
$ -
Washington State Sales Tax (9.5 %) on applicable items
$ 49,959.79
TOTAL
I his change order eons[ itute� tit It and umiplete compensation car all labor, equipment, materials overhead. protil, any and all mdl ect costs.
and time adjustment to pertbnn the above described change, All other users c non -c7n—' i . nthe ncnns at nndilions 0 the
cnmlract remain unchanged. 7 / I
Contractor:
Project Manager:
Resident Engineer:
City Engineer:
A pot oycd by:
Cit.),
H: \Forms \FCO25.xls
(Revised 05/2012)
1011111,73
mm
'0 3
n „r
73
De,
JGgan'.
.Base Amount it-
': Total incl.—Tax,:. ". .
ti' Total Cost this C /O',` • -'.1,'.
$, - 49,95979
$ - '.':`49,959.79
2' Total Cos4:Pre "v'iousC /O. t- .'..'$`
- t,�7264,310`76s
t$ "a:� '`q4 ,: ,=2p26,L310.16,
3: "On' inal'ConGsct'Amoorit' ' = - -
-$ ;'41:221.631.63
$. ° ' " "t :'111 278,543.661
4. Revised Contract Amount -
$ 11,535,901.58:
$;„ 'ai`11,592,81355'
I his change order eons[ itute� tit It and umiplete compensation car all labor, equipment, materials overhead. protil, any and all mdl ect costs.
and time adjustment to pertbnn the above described change, All other users c non -c7n—' i . nthe ncnns at nndilions 0 the
cnmlract remain unchanged. 7 / I
Contractor:
Project Manager:
Resident Engineer:
City Engineer:
A pot oycd by:
Cit.),
H: \Forms \FCO25.xls
(Revised 05/2012)
1011111,73
mm
'0 3
n „r
73
De,
JGgan'.
/AMERICAN CONSTRUCTION & COATINGS, LLC
Industrial Painting 8 Abrasive Blasting Contractor' MBE / DBE Washington
ANTI - GRAFFITI BID
Project: M Street SE Grade Separation
Prime Contractor: Scarsella Brothers
Attn: John Smith
7/17/2013
Dear John,
Thank you for the opportunity to quote this project. We are pleased to provide you with this quote. We include
the following:
L Anti - Graffiti Coatings, Bid = $27.195.00
Qualifications:
1. We are certified as a DBE /MBE in Washington #D3M0614843.
2. Price based on 1455 sy of retaining wall surfaces to be coated.
3. Prime contractor to provide access and work platforms.
4. Prime contractor to provide man lifts.
5. Prime contractor to provide light plant for night work.
6. Sandblasting, pigmented sealer, anti - graffiti coating, etc. to be completed prior to bridge rail, pedestrian
rail, guardrail, fence, etc. being attached to the concrete surfaces. Protecting, masking and covering other
surfaces are considered extra work.
7. Prime Contractor to clean dirt, mud, hydro seeding, etc. from surfaces prior to our light sandblasting.
8. Does not include below grade work.
9. Includes sales tax on materials only.
10. We include General Liability Insurance limits of $6,000,000 aggregate /$5,000,000 per occurrence.
11. We include Pollution Insurance limits of $3,000,000 aggregate /$1,000,000 per occurrence.
12. Upon request we can provide many references from.
American, Apollo, Carey, Cascade Bridge, Collueio, Epic, Flatiron, Granite, Hisey, Holm 11, ICON,
IMCO, Kerr, Kiewit, Marshbank, McClure, Mowat, NW Cascade, NW Road, Pivetta, Prospect,
Ostrander, Redi -Bag, Sack, Scarcella, SCI, Selby, Skanska, Soto, Strider, Tapani, Triad, Tri State,
Venture, Ward, Weaver, Wildish, Wilder, etc.
If you have any questions please do not hesitate to reach me at office: (253) 770 -4093, cell: (253) 208 -0383,
fax: (253) 841 -4093, or Email: www.lihartso @coincast.net. Again thank you!
Sincerely yours,
American Construction & Coatings, LLC
Herb Hartso, Owner /Estimator
12506 Woodland Ave E., Puyallup, WA 98373 Phone: (253)770 -4093 Fax: (253)841 -4093
CITY OF
���JJJ
� 1 b U Il1`�I Nancy Backus, Mayor
WAS...111H II N GGTO��88N 25 West Main Street * Auburn WA 98001- 4998 * wwwauburnwa.gov * 253- 931 -3000
January 21, 2015
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
Bob Scarsella
Scarsella Brothers, Inc.
PO Box 686697
Seattle, WA 98168 -0697
RE: Contract No 11 -0 1
Project No. C201A, M Street SE Grade Separation
Contract Completion and Acceptance
Dear Mr. Scarsella:
All of your obligations in regard to this project have been met in accordance with Section 1 -08.5 of the
Standard Specifications. The total contract amount for this project, as shown on your Final Pay
Estimate is $12,068,463.38.
Your retainage in the amount of $603,697.60 will be released approximately 60 days after this date,
provided all necessary releases have been received, and there are no outstanding claims against the
retainage. All approved Labor & Industries Affidavits of Wages Paid from your firm and all
subcontractors on the project have been received.
This letter also serves as notification that your two -year warranty period began on the date the City
approved your final pay estimate, which was August 4, 2014.
If you have any questions, please contact JoAnne Andersen, Contract Administration Specialist, at
253 - 931 -3012.
Sincerely,
Ingrid Ga , P.E!
Assist 'rector of Engineering & City Engineer
Community Development & Public Works Department
IG /ja /mm
cc: Dani Daskam, City Clerk
Ryan Vondrak, P.E., Capital Projects Manager
File 13.11 (C201A0)