Loading...
HomeMy WebLinkAboutCP1218-Grant Application Cost EstimateAuburn Way South (SR164) Corridor Safety Improvements - Preliminary Engineer's Estimate Prepared 10/17/2011 by Jacob Sweeting, P.E. Checked 10/20/2011 by Leah Dunsdon, P.E. Item DescriptionUnitsUnit PriceQuantity Total Price Minor Changes Eq. Adj.Eq. Adj.1$15,000.00 Temporary Water Pollution/Erosion Control Eq. Adj.Eq. Adj.1$10,000.00 SPCC Plan LSLS1$2,500.00 Utility Potholing EA $500.00 10$5,000.00 Mobilization LS11$120,000.00 Construction Site Sign(s)EA$1,500.00 2 $3,000.00 Traffic Control Supervisor LS115,000$15,000.00 Traffic Control Labor (Min. Bid $32.00 Per Hour) HR$48.002,000$96,000.00 Portable Changeable Message SignDay$125.0050$6,250.00 Police Flagging Day $500.00 20$10,000.00 Removal of Structures and ObstructionsLS110,000$10,000.00 Remove and Reset Existing SignsLS12,000$2,000.00 Property Restoration Eq. Adj.Eq. Adj.1$15,000.00 Curb and Gutter Removal LF $3.00 3,600$10,800.00 Sawcut and Remove Asphalt SY $10.00 670$6,700.00 Remove Sidewalk SY $7.00 2,613$18,300.00 CSBC (Roadway Base)TON $20.00 680$13,600.00 CSTC (Pipe and Conduit Bedding and Backfill TON $20.00 230$4,600.00 Drain Rock (Under Pervious Sidewalk)TON $15.00 350$5,250.00 1/2" and 1" HMA PG64-22 TON $100.00 830$83,000.00 Commercial HMA TON $175.00 50$8,750.00 Asphalt Cold Patch Mix TON $125.00 50$6,250.00 Catch Basin Type 1 w/Connector Pipe EA $1,500.00 10$15,000.00 Cement Concrete Traffic Curb and Gutter LF $15.00 3,600$54,000.00 Pervious Cement Concrete Sidewalk SY $40.00 4,450$178,000.00 Mountable Curb w/Delineators LF $30.00 700$21,000.00 Median Landscaping SY $15.00 670$10,050.00 Roadway Striping, Thermoplastic, and RPM LF $5.00 12,000$60,000.00 Permanent Signing LS16,000$6,000.00 Street Lighting System, Complete LS LS 150,000$150,000.00 Muckleshoot Plaza Signal Modifications, Complete LS175,000$75,000.00 Riverwalk Signal Replacement, Complete LS1450,000$450,000.00 Dogwood Signal Modifications, Complete LS175,000$75,000.00 Subtotal Construction $1,561,050.00 Construction Contingency 15%$234,157.50 Total Construction Estimate $1,795,207.50 Right of Way - Fee Takes SF$15.003,639$54,585.00 Right of Way - Agency Costs $15,000.00 Subtotal Right of Way $69,585.00 Design Engineering and Environmental Permitting 20%$312,210.00 Construction Engineering 10%$156,105.00 Total Project Costs $2,333,107.50 H:\Transportation\07-Grant Management\2011\HSIP\Corridor\Cost Estimate\AWS HSIP Grant Application Cost Estimate.XLS 10/28/2011 2:49 PM