Loading...
HomeMy WebLinkAboutScarsella Brothers 12-04 CP0915 • CONTRACT Contract No. 12-04 THIS AGREEMENT AND CONTRACT, made and entered into, in duplicate, at Auburn, Washington, this 511` day of , 2012, by and between the CITY OF AUBURN, WASHINGTON, a municipal corporation and Scarsella Brothers, Inc., PO Box 68697, Seattle, WA 98168, hereinafter called the CONTRACTOR. WITNESSETH. That, in consideration of the terms and conditions contained in the Contract Documents entitled 'CP0915, Well 1 Transmission Main, which are by this reference incorporated herein and made a part of this Contract, the parties hereto covenant and agree as follows: I. The CONTRACTOR shall do all work and furnish all tools, materials and equipment for Project CP0915 Well 1 Transmission Main — the construction of 4,500 linear feet of 16-inch water transmission main, 2,400 linear feet of 18-inch storm drainage piping, and 400 linear feet of 12-inch storm drainage piping; installation of 1 temporary and 1 permanent blow-off assemblies, 1 hydrant assembly 15 type 1 catch basins, 13 type 2 catch basins, temporary video detections system, induction loop repairs, water appurtenances and 2,800 tons of asphalt pavement repair for a unit bid price of one million five hundred eleven thousand nine hundred fifty-seven dollars ($1,511 957.00) and Washington State Sales Tax of sixty four thousand four hundred twelve dollars and thirty-three cents ($64 412.33) for a total contract value of one million five hundred seventy-six thousand three hundred sixty-nine dollars and thirty-three cents ($1,576,369.33) in accordance with and as described in the Contract Documents which are by this reference incorporated herein and made a part hereof, and shall perform any alterations in or additions to the work provided under this Contract and every part thereof This Contract shall be executed by the Contractor and returned to the City within 7 calendar days after the receipt of the dated notification of award and the Contract time shall commence within 5 working days after execution of the Contract by the City and so designated on the Notice to Proceed. Physical completion shall be within 120 working days of the date on the Notice to Proceed. If said work is not completed within the time specified, the CONTRACTOR agrees to pay liquidated damages to the CITY OF AUBURN, as specified in Section 1-08.9 (Liquidated Damages) of the Standard Specifications. The CONTRACTOR shall provide and bear the expense of all equipment, work and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this Contract and every part thereof, except such as are mentioned in the Contract Documents to be furnished by the CITY OF AUBURN IL The CITY OF AUBURN hereby promises and agrees with the CONTRACTOR to employ, and does employ the CONTRACTOR to provide the materials and to do and cause to be done the above described work and to complete and finish the same according to the Contract Documents and the terms and conditions herein contained and hereby contracts to pay for the same according to said Contract Documents and the aforesaid proposal hereto attached, at the time and in the manner and upon the conditions provided for in this Contract. 1\ III. The CONTRACTOR for himself, and for his heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all the covenants herein contained upon by part of the CONTRACTOR. IV It is further provided that no liability shall attach to the CITY OF AUBURN, WASHINGTON by reason of entering into this Contract, except as expressly provided herein. IN WITNESS WHEREOF the parties hereto have caused this Contract to be executed the day and year first hereinabove written. CI T OF AU INGTON By Peter B. Lewis, Mayor Countersigned: this 64�A day of 4,Fe¢„t.(A/ 2012 ATTEST Dam le E. Daskam, City Clerk APR E FO 4. Daniel B. Heid, City Attorney CAS LLA BROTHERS INC. AA rized Official Signature