Loading...
HomeMy WebLinkAbout01-07-2013 Agenda Packet Public Works Committee January 7, 2013 - 3:30 PM Annex Room 2 AGENDA I.CALL TO ORDER A.Roll Call B.Announcements C.Agenda Modifications II.CONSENT AGENDA A. Approval of Minutes* B. Public Works Project No. CP1122* (Truong/Lee) Permission to Enter into Consultant Agreement No. AG-C-423 with Otak for Engineering Services for Project No. CP1122, 30th Street NE Area Flooding, Phase 1 C. Public Works Project No. CP1206* (Wickstrom) Approve Final Pay Estimate No. 5 to Contract No. 12-10 in the Amount of $266.85 and Accept Construction of Project No. CP1206, 2012 Pavement Patching, Chipseal and Overlay Project III.DISCUSSION ITEMS A. East Ridge Manor Drainage (Dowdy) B. Resolution No. 4896* (Heid) A Resolution of the City Council of the City of Auburn, Washington, Authorizing the Mayor and City Clerk to Execute an Addendum to the Interlocal Agreement Between the City of Auburn and the City of Pacific for Information Services Technology C. Draft Interlocal Agreement - King County Reddington Levee Project (Dowdy) D. Resolution No. 4895* (Bailey) A Resolution of the City Council of the City of Auburn, Washington Declaring Certain Items of Property as Surplus and Authorizing their Disposal E. Capital Project Status Report* (Gaub) F. Action Tracking Matrix* (Dowdy) IV.ADJOURNMENT Agendas and minutes are available to the public at the City Clerk's Office, on the City website (http://www.auburnwa.gov), and via e-mail. Complete agenda packets are available for review at the City Clerk's Office. *Denotes attachments included in the agenda packet. Page 1 of 47 AGENDA BILL APPROVAL FORM Agenda Subject: Approval of Minutes Date: December 27, 2012 Department: Public Works Attachments: December 17, 2012 Draft Minutes Budget Impact: $0 Administrative Recommendation: Public Works Committee to approve the minutes of the December 17,2012 Public Works Committee meeting. Background Summary: See attached draft minutes. Reviewed by Council Committees: Public Works Councilmember:Wagner Staff: Meeting Date:January 7, 2013 Item Number:CA.A AUBURN * MORE THAN YOU IMAGINEDCA.A Page 2 of 47 Public Works Committee December 17, 2012 - 3:30 PM Annex Room 2 MINUTES I. CALL TO ORDER Chairman Rich Wagner called the meeting to order at 3:30 p.m. in Conference Room #2, located on the second floor of Auburn City Hall, One East Main Street, Auburn, Washington, 98002. A. Roll Call Chairman Wagner, Vice-Chair Bill Peloza, and Member Osborne were present. Also present during the meeting were: Mayor Pete Lewis, Public Works Director Dennis Dowdy, City Engineer/Assistant Director Dennis Selle, Assistant City Engineer Ingrid Gaub, Utilities Engineer Dan Repp, Transportation Manager Pablo Para, Project Engineer Kim Truong, Engineering Aide Amber Mund, Human Resources Director Brenda Heineman, City Attorney Dan Heid, Planning Manger Elizabeth Chamberlain, Employee Relations/Compensation Manager Aaron Barber, Robert Whale from the Auburn Reporter, citizen Scott Pondelick and Public Works Secretary Jennifer Cusmir. B. Announcements There were no announcements. C. Agenda Modifications There were no agenda modifications. II. CONSENT AGENDA A. Approval of Minutes Councilmember Peloza moved and Councilmember Osborne seconded to approve the minutes of the December 3, 2012 Public Works Committee Meeting. Motion Carried Unanimously. 3-0. III. RESOLUTIONS A. Resolution No. 4881 (Mund) A Resolution of the City Council of the City of Auburn, Washington, Authorizing the Renewal of Public Way Agreement (PWA) 99-02 and Amending the Terms of the Agreement with the Olympic Pipeline Page 1 of 9 CA.A Page 3 of 47 Company Councilmember Peloza moved and Councilmember Osborne seconded to recommend City Council adopt Resolution No. 4881. Engineering Aide Mund explained that Olympic Pipeline applied for a renewal of their current Public Way Agreement and Resolution No. 4881 renews the term for an additional five years. The Committee reviewed the map indicating the locations where the pipeline enters the Right-of-Way. Chairman Wagner asked if the applicant is required to restore the landscape. Engineering Aide Mund answered the applicant is required to obtain a Construction Permit when doing work in the Right-of-Way and they are required to restore the Right-of-Way. Engineering Aide Mund stated the only amendment to the agreement is the term, in response to a question asked by Vice-Chair Peloza. Vice-Chair Peloza asked that the phrase “…with minor amendments” be removed from the Resolution. Staff will make the requested changes to the language in the next resolution presented to the Committee. City Attorney Heid responded to questions asked by Vice-Chair Peloza regarding the use of the phrase “imminent domain” in the resolution. City Attorney Heid stated that changes to the language would be addressed in the next resolution presented to the Committee. Vice-Chair Peloza asked that in the future, the monetary figures within the resolution include the decimal places. Motion Carried Unanimously. 3-0. B. Resolution No. 4890 (Para) A Resolution of the City Council of the City of Auburn, Washington, Authorizing the Mayor to Award and Execute an Agreement with the Lowest Responsible Bidder for Construction of Small Public Works Contract Number 12-22 for Project MS1203. 15th St SW and West Valley Highway Signal #128 Repairs Councilmember Peloza moved and Councilmember Osborne seconded to recommend City Council adopt Resolution No. 4890. Transportation Manager Para explained that there was a previous Page 2 of 9 CA.A Page 4 of 47 budget amendment creating the budget for the repairs and that is why the budget impact in zero, in response to a question asked by Chairman Wagner. Transportation Manager Para stated that there is an insurance recovery that will cover some of the cost. The quotes are being verified and it appears the cost will be well under the engineer’s estimate. Transportation Manager Para stated that the driver’s insurance policy does not cover the full cost of the repairs, in response to a question asked by Vice-Chair Peloza. The cost to the City will be approximately $15,000.00 - $20,000.00, according to Transportation Manager Para. Motion Carried Unanimously. 3-0. C. Resolution No. 4891 (Truong) A Resolution of the City Council of the City of Auburn, Washington, Authorizing the Mayor to Accept a Grant from the Washington State Transportation Improvement Board for the Auburn Way South and M Street - 17th Street SE Intersection Improvements Councilmember Peloza moved and Councilmember Osborne seconded to recommend City Council adopt Resolution No. 4891. Project Engineer Truong verified that the anticipated cost for the project is $705,000.00. Chairman Wagner noted that the grant may cover over half of the project amount. Project Engineer Truong answered questions asked by Vice-Chair Peloza regarding the property acquisition. Transportation Manager Para answered questions asked by Chairman Wagner and Member Osborne regarding the engineering of the proposed intersection changes. Chairman Wagner suggested not using any red right-turn arrows, unless absolutely necessary. Motion Carried Unanimously. 3-0. IV. DISCUSSION ITEMS A. Resolution No. 4887 (Lein) A Resolution of the City Council of the City of Auburn, Washington, Authorizing the Mayor and City Clerk to Execute a Lease Agreement Between the City of Auburn and Congressman Dave Reichert, a Member of the U.S. House Of Representatives Mayor Lewis stated the area being leased in a portion of the entry way in the Chamber of Commerce office which will allow the Congressman to have a staff member located in Auburn. Page 3 of 9 CA.A Page 5 of 47 The Committee and the Mayor reviewed the terms of the lease. The Committee supported adoption of Resolution No. 4887. B. Resolution No. 4892 (Heineman) A Resolution of the City Council of the City of Auburn, Washington, Authorizing the Mayor and City Clerk to Execute a Contract for Public Defense Services for January 1, 2013 - June 30, 2013 Between the City and the Law Offices of Matthew J. Rusnak Human Resources Director Heineman distributed an updated version of the contract to the Committee. Human Resources Director Heineman explained that staff is proposing a case waiting system, similar to the systems adopted the Cities of Federal Way and Kent, which will enable the City to gather the case statistics required to put out a proper bid document for public defense services in April. Human Resources Director Heineman reviewed the budget for the contract. Chairman Wagner asked if there is any way to recover cost from indigent defendants. Heineman answered that the City does try to recover costs and tracks defendants to collect when able. Chairman Wagner voiced his support for putting the contract out for bid once the case statistics are collected. Human Resources Director Heineman responded to questions asked by Vice-Chair Peloza regarding the contract appendix. The Committee supported adoption of Resolution No. 4892. C. Ordinance No. 6442 (S. Wagner) Proposed Amendments to the Auburn City Code Concerning the Relocation of and Amendments to the Hearing Examiner Chapter Planning Manager Chamberlain explained that the Hearing Examiner processes are currently located in Title 18, Zoning Code and since the Hearing Examiner does many more functions than adjusting land use, staff is proposing to relocate the duties of the Hearing Examiner to Title 2. Vice-Chair Peloza requested that staff change references from “Council” in the City Code to “City Council” to eliminate any possible confusion with King County Council or other governing councils. Page 4 of 9 CA.A Page 6 of 47 Vice-Chair Peloza recommended including a fee schedule for variances in Section 16.10.160. Planning Manager Chamberlain noted that the costs are included in the City’s fee schedule which gets adopted annually. Vice-Chair Peloza recommended adding an Item G, directing readers to the fee schedule. Planning Manager Chamberlain suggested not making any changes to the Critical Areas Ordinance at this time, but rather considering any changes during the update of the Comprehensive Plan. Planning Manager Chamberlain answered questions asked by Vice- Chair Peloza regarding appeals for Administrative Use Permits. Planning Manager Chamberlain verified that the Legal Department did review other jurisdictions’ codes and made sure the City’s Burden of Proof, Section 2.46.120 is consistent, in response to a question asked by Chairman Wagner. Member Osborne asked about the cost for the Hearing Examiner. Planning Manger Chamberlain stated that there is an application fee and the Hearing Examiner’s time is billed at $140.00/hour. The applicant is responsible for the application fee and the Hearing Examiner’s time. Planning Manager Chamberlain verified with the Committee that the suggested changes are to be made during the update of the Comprehensive Plan. The Committee supported introduction and adoption of Ordinance No. 6442. D. King County Service Agreement Proposal (Para) Chairman Wagner asked how staff tracks the work done by King County versus that done by Pierce County. Transportation Manager Para stated in 2012 Pierce County striped the entire City and King County did the pavement markings city-wide. Transportation Manager Para explained that the proposed service agreement allows the City to ask King County to perform a lot of different types of work and is not limited to pavement marking. Para said that King County will be performing bridge inspections and potential bridge maintenance and repairs in addition to the pavement marking maintenance that they do every year. The agreement and task orders will not be reviewed by the Committee unless the planned work exceeds the budgeted amount already Page 5 of 9 CA.A Page 7 of 47 approved by the Committee. Assistant Director/City Engineer Selle stated that there is budgeted work identified to be completed under this agreement and if there were any additional work that needed to be completed the funding would have to be approved either under the Mayor’s budget authority or approved by the City Council. Member Osborne asked about the percentage of cost of King County’s administrative fee. Transportation Manager Para answered that he has the costs for 2012 and can provide that information to the Committee. Chairman Wagner asked if a limit or not to exceed amount can be applied to the administrative costs. Transportation Manager Para stated that he would need to consult the City Attorney to determine if any limits can be applied to the County’s overhead costs. The Committee and Mayor Lewis discussed limits on administrative costs. Member Osborne asked if the administrative fees are included in the estimates. Transportation Manager Para responded that they are included in the estimates. The Committee and staff discussed budgeting for the agreement and professional services. Transportation Manager Para stated that he will provide the Committee with a list of the 2013 budgeted projects that are to be completed by the County under this agreement. Transportation Manager Para stated that the primary difference between the proposed 2013 agreement and the 2012 agreement is that the new agreement will renew automatically unless staff or the City Council or the County acts to terminate the agreement. Member Osborne asked which agency is responsible for the cost of dispute resolution and non-binding arbitration. Transportation Manager Para answered that he will have to ask the City Attorney to include that each jurisdiction will cover their own cost for dispute resolution in the agreement. Assistant Director/City Engineer Selle explained that a not-to-exceed amount is not included in the new agreement because the amount will change yearly depending on the amount of professional services budgeted for King County to perform, in response to a question asked by Vice-Chair Peloza. Transportation Manager Para explained how task orders are submitted to King County, in response to a question asked by Vice-Chair Peloza. E. Green River Community College Proposed SE 320th Street Page 6 of 9 CA.A Page 8 of 47 Improvements (Para) Transportation Manager Para distributed vicinity maps showing the proposed Green River Community College (GRCC) conceptual plan for improving SE 320th Street. Transportation Manager Para noted that 122nd Ave SE will be closed off, eliminating the connection to SE 320th Street. This closure will reduce turning movements in this vicinity of SE 320th Street and will eliminate cut-through traffic and impacts on the residential neighborhood adjacent to the GRCC new trades building. Transportation Manager Para stated that the new trades building access is off of 124th Ave SE, in response to a question asked by Chairman Wagner. Transportation Manager Para said staff has been working with the GRCC consultants to develop an area transportation plan that will serve the campus and the community and address traffic operations and safety. The Committee and Transportation Manager Para reviewed how residents will reach the neighborhood on SE 319th Pl if direct access to SE 320th Street is eliminated via 122nd Ave SE. Assistant Director/City Engineer Selle stated that the City is asking GRCC to present their proposal to the surrounding neighborhood and get feedback, in response to a question asked by Chairman Wagner. Assistant Director/City Engineer Selle said at this time GRCC is not requesting a Right-of-Way Vacation. Transportation Manager Para pointed out the traffic and pedestrian safety improvements. Planning Manager Chamberlain informed the Committee that the Trades Building site located on the north side of SE 320th Street includes a looped trail and a mid-block crossing of SE 320th Street that will link in to the college’s Student Life Project on the south side of the roadway. Transportation Manager Para confirmed there will be a mid-block pedestrian crossing on SE 320th Street with flashing warning lights but not a traffic signal, in response to a question asked by Member Osborne. Transportation Manager Para reported that GRCC still has plans for constructing a round-a-bout in their master plan, which will require Page 7 of 9 CA.A Page 9 of 47 some additional Right-of-Way, in response to a question asked by Chairman Wagner. Assistant Director/City Engineer Selle stated that GRCC also plans on redesigning their main entrance. F. Capital Project Status Report (Gaub) Item 6 – CP1116 – Downtown Pedestrian Lighting Replacement: Chairman Wagner asked for a map showing where the new lights were installed so the Committee can determine how many more LED lights may be installed through out the City. Item 8 – CP1215 – Banner Pole Foundation Repair: Member Osborne asked if the sidewalk concerns originally discussed were included in the project. Assistant City Engineer Gaub stated that the decision made by the Committee was to not move forward with the larger sidewalk repairs, so the foundation for the banner pole was repaired along with the limited area of sidewalk impacted by the work. Item 15 – C201A – M Street Underpass Project: Assistant City Engineer Gaub stated that the girders for the south bridge are expected to be set on January 3, 2013 due to BNSF’s schedule and the holidays, in response to a question asked by Chairman Wagner. Chairman Wagner asked if train traffic will be interrupted. Assistant City Engineer Gaub answered train traffic will be impacted as the girders are set. Vice-Chair Peloza asked how the BNSF schedule is communicated to staff. Assistant City Engineer Gaub answered that BNSF representatives attend weekly meetings with the City and our contractor to review the project schedules and there are representatives on site almost every day. Assistant City Engineer Gaub stated that May 2013 is the best estimate at this time of when M Street SE will be opened, in response to a question asked by Member Osborne. Director Dowdy noted that work is being allowed on Saturdays in order to try and keep on schedule. Item 11 – C207A – A Street NW Corridor – Phase 1: Vice-Chair Peloza asked about the developer contributions. Assistant City Engineer Gaub stated there were funds provided by Multicare for the half-street improvements and wetland mitigation on 10th Street NW/NE in the amount of $407,000.00. Item D – CP1016 – Fenster Levee Project: Member Osborne asked if the funding has been approved. Vice-Chair Peloza said that he would need to check. Assistant City Engineer Gaub said that she has not heard from Planning’s Project Manager if the funds were approved or Page 8 of 9 CA.A Page 10 of 47 not. G. Action Tracking Matrix (Dowdy) Item G – SDC Burden for Single Family Home: Chairman Wagner asked that the item be changed to “Total Permitting Cost for Single Family Home.” V. ADJOURNMENT There being no further business to come before the Public Works Committee, the meeting was adjourned at 4:52 p.m. Approved this 7th day of January, 2013. _________________________ __________________________ Rich Wagner, Chair Jennifer Cusmir, Department Secretary Page 9 of 9 CA.A Page 11 of 47 AGENDA BILL APPROVAL FORM Agenda Subject: Public Works Project No. CP1122 Date: December 27, 2012 Department: Public Works Attachments: Consultant Scope Summary Budget Status Sheet Vicinity Map Budget Impact: $0 Administrative Recommendation: Public Works Committee recommend City Council grant permission to enter into Consultant Agreement No. AG-C-423 with Otak for Engineering Services for Project No. CP1122, 30th Street NE Area Flooding, Phase 1. Background Summary: The purpose of this project is to design and construct a new 42-inch storm line from the northwest corner of the airport property to the existing Brannan Park Pump Station. The pipe will replace the existing 30-inch storm pipe generally located along 30th Street NE and the northerly boundary of Brannan Park. The project will relieve street flooding that results from the limited capacity of the existing 30-inch line to convey the storm water to its current Brannan Park Pump Station discharge point. City staff has selected Otak to provide survey, design, environmental permitting, and bid assistance for the above-referenced project and the not to exceed amount of this agreement is $320,000.00. It is anticipated that this project will be constructed in the Summer of 2013. The estimated total preliminary cost for this project is $2,822,299.00 from the 432 Storm Fund and a project budget contingency of $152,400.00 remains in this fund. Reviewed by Council Committees: Public Works Councilmember:Wagner Staff:Truong/Lee Meeting Date:January 7, 2013 Item Number:CA.B AUBURN * MORE THAN YOU IMAGINEDCA.B Page 12 of 47 30TH STREET NE AREA FLOODING, PHASE 1 CONSULTANT SCOPE OF WORK SUMMARY PAGE 1 OF 2 CP1122 – 30th Street NE Area Flooding, Phase 1 City of Auburn Scope for Design, Survey, and Environmental Services - Summary This Scope of Work is for the 30th Street NE Area Flooding, Phase 1 Project. This scope includes survey and base mapping, preliminary engineering, geotechnical investigations, environmental documentation and permitting, easement, final design (including plans, specifications, and estimates), and bid assistance. Project Description The City’s 30th Street NE Area Flooding, Phase 1 project will relieve street flooding as a result of the existing 30-inch underground storm pipe within 30th Street having limited capacity to convey the storm water to its current Brannan Park Pump Station (BPPS) discharge point. The project, which spans a distance of approximately 4,000 feet beginning at the northwest corner of the airport property and ending at the BPPS, will install a new 42-inch gravity storm line to replace approximate 3,800 LF of existing 30-inch storm pipe. Task 1: Project Management This task will be continuous throughout the project duration, which is assumed to be 12 months. It will include the work necessary to set up and plan the entire project and establish project-specific procedures, including communication, overall project coordination with the City and project team, and project closeout. Task 2: Survey and Mapping This task involves field surveying within the project limits, collecting existing topographic features and producing a project basemap and Digital Terrain Model (DTM) to be used in design. Task 3: Geotechnical Engineering This scope of work covers geotechnical engineering services needed to support development of contract documents for the purpose of utility trenching, backfill, and pipe loading of the new 42-inch storm line. Task 4: Preliminary Design This task will progress the major design elements to an overall 30% level, and perform specific activities to support this design level. The preliminary design effort will include modifying the design concept based on city staff input. Documentation of the Preliminary Design task will include the preparation of 30% plans addressing temporary erosion & sediment control, demolition, drainage, and final restoration. Task 5: Environmental Documentation The purpose of the Environmental Documentation Task is to ensure that the project complies with all applicable requirements of the Washington State Environmental Policy Act (SEPA), Floodplain Development permit, Shoreline permit and that the regulatory permits and approvals required to construct the project are identified and secured, all within a timeframe that will allow the project to proceed on schedule. CA.B Page 13 of 47 30TH STREET NE AREA FLOODING, PHASE 1 CONSULTANT SCOPE OF WORK SUMMARY PAGE 2 OF 2 Task 6: Cultural Resource Evaluation The Consultant will conduct physical surveys within the project areas to determine if archeological artifacts are present. The Consultant will perform a literature survey and historic research to determine and document any notable cultural and historic resources that may be impacted by the project. The results of the Cultural Resource Evaluation will be documented and reported to the Department of Historical and Archeological Preservation (DAHP). Task 7: Easement It is anticipated that temporary construction easements may be necessary to avoid property impacts. Consultant will prepare legal descriptions and exhibits for temporary construction easements. Task 8: Contract Documents and Cost Estimates The Consultant will prepare construction contract documents (Construction Plans, Specifications and cost estimate) and submit them at the 30%, 60% and 90% completion levels for City review and comment. The final Bid Documents to be provided shall include Contract Plans, Contract Provisions and a final Engineer’s Estimate of probable construction cost. Task 9: Bid Assistance As requested by the City, the Consultant will provide assistance to the City during the advertisement and award of the project as follows: • Response to Technical Bidder questions • Development of Technical Addendums • Checking references of apparent low bidder. Task 10: Construction Record Drawings The Consultant will prepare Construction Record Drawings for the project, incorporating the inspector’s report and records, as required, and the redlined markups of construction drawings. Total Costs = $302,000.00 Optional Tasks Community Involvement Assistance As requested by the City, the Consultant will provide exhibit materials and assistance at community open house meeting. Construction Assistance As requested by the City, the Consultant will provide assistance to the City during the construction of the project as follows: • Review submittals • Provide written responses to Contractors Requests for Information Total Optional Costs= $18,000.00 CA.B Page 14 of 47 Project No: CP1122 Project Title: Project Manager: Kim Truong Consultant Agreement Initiation Date: _ _ Permision to Advertise Advertisement Date: _ Contract Award Award Date: _ _ Change Order Approval Contract Final Acceptance Funding Prior Years 2012 2013 Future Years Total 432 Fund - Storm (Public Works Trust Fund)2,719,700 2,719,700 432 Fund - Storm 49 254,950 254,999 Total 49 254,950 2,719,700 0 2,974,699 Activity Prior Years 2012 2013 Future Years Total Design Engineering - City Costs 49 11,000 20,000 31,049 Design Engineering - Consultant 310,000 310,000 Construction Estimate 1,869,000 1,869,000 Project Contingency 562,250 562,250 Construction Engineering - Consultant 10,000 10,000 Construction Engineering - City Costs 40,000 0 40,000 Total 49 11,000 2,811,250 0 2,822,299 Prior Years 2012 2013 Future Years Total *432 Funds Budgeted ( )(49)(254,950)(2,719,700)0 (2,974,699) 432 Funds Needed 49 11,000 2,811,250 0 2,822,299 *432 Fund Project Contingency ( )0 (243,950)0 0 (152,400) 432 Funds Required 0 0 91,550 0 0 * ( # ) in the Budget Status Sections indicates Money the City has available. BUDGET STATUS SHEET 30th Street NE Area Flooding - PHASE 1 Date: December 26, 2012 The "Future Years" column indicates the projected amount to be requested in future budgets. Funds Budgeted (Funds Available) Estimated Cost (Funds Needed) 432 Storm Budget Status CA.B Page 15 of 47 t h CA.B Page 16 of 47 AGENDA BILL APPROVAL FORM Agenda Subject: Public Works Project No. CP1206 Date: December 27, 2012 Department: Public Works Attachments: Budget Status Sheet Final Pay Estimate Vicinity Maps Budget Impact: $0 Administrative Recommendation: Public Works Committee recommend City Council approve Final Pay Estimate No. 5 to Contract No. 12-10 in the amount of $266.85 and accept construction of Project No. CP1206, 2012 Pavement Patching, Chipseal and Overlay Project. Background Summary: The 2012 Pavement Patching, Chipseal and Overlay Project rehabilitated deficient pavement on 9.9 miles of streets throughout the City as part of both the 2012 Arterial/Collector Pavement Preservation Program and the 2012 Save Our Streets Program. This rehabilitation was accomplished as follows: 1.This project performed a pavement patching treatment (removing and replacing areas of damaged pavement) on 2.0 miles of arterial and collector streets as part of the City's Arterial and Collector Street Pavement Preservation Program. 2.This project performed a double chipseal treatment on 4.6 miles of arterial and collector streets as part of the City's Arterial and Collector Street Pavement Preservation Program. In addition, this project performed a double chipseal treatment on 2.8 miles of local streets as part of the City's Save Our Streets Program. 3.This project performed a thin (1.5-inches thick) asphalt overlay treatment on 0.5 miles of local streets as part of the City's Save Our Streets Program. A project budget contingency of $131,893 remains in the 105 (Arterial/Collector Street Pavement Preservation) fund. A project budget contingency of $7,681 remains in the 103 (Local Street Pavement Preservation) fund. Reviewed by Council Committees: AUBURN * MORE THAN YOU IMAGINEDCA.C Page 17 of 47 Public Works Councilmember:Wagner Staff:Wickstrom Meeting Date:January 7, 2013 Item Number:CA.C AUBURN * MORE THAN YOU IMAGINEDCA.C Page 18 of 47 Page 1 of 1 Project No: CP1206 Project Title: Project Manager: Seth Wickstrom Initiation/Consultant Agreement Initiation Date: _Oct 17, 2011 and Feb 6, 2012 ___ Permission to Advertise Solicitation Date: _June 5, 2012______________ Contract Award Award Date: _July 2, 2012__________________ Change Order Approval Contract Final Acceptance Funds Budgeted (Funds Available) Funding Prior Years 2011 2012 Future Years Total 105 Fund - Arterial/Collector Street Pavement Preservation 1,298,000 1,298,000 103 Fund - Local Street Pavement Preservation 539,500 539,500 Total 0 0 1,837,500 0 1,837,500 Estimated Cost (Funds Needed) Activity Prior Years 2011 2012 Future Years Total Design Engineering - City Costs*5,153 5,153 Construction Estimate 1,261,714 1,261,714 Change Order No. 1 (Added More Chipseal Streets to Project)509,645 509,645 Line Item Changes (97,880) (97,880) Construction Engineering - City Costs*19,295 19,295 Total 0 0 1,697,927 0 1,697,927 Prior Years 2011 2012 Future Years Total **105 Funds Budgeted ( )0 0 (1,298,000)0 (1,298,000) 105 Funds Needed 0 0 1,166,107 0 1,166,107 **105 Fund Project Contingency ( )0 0 (131,893)0 (131,893) 105 Funds Required 0 0 0 0 0 Prior Years 2011 2012 Future Years Total **103 Funds Budgeted ( )0 0 (539,500)0 (539,500) 103 Funds Needed 0 0 531,819 0 531,819 **103 Fund Project Contingency ( )0 0 (7,681)0 (7,681) 103 Funds Required 0 0 0 0 0 ** ( # ) in the Budget Status Sections indicates money the City has available. 103 Local Street Budget Status BUDGET STATUS SHEET 2012 Pavement Patching, Chipseal and Overlay Project Date: December 19, 2012 The "Future Years" column indicates the projected amount to be requested in future budgets. 105 Arterial/Collector Street Budget Status *City staff costs for street design and construction are not charged against the 103 fund project budget and are not shown here (staff costs charged against the 105 project budget are show). CA.C Page 19 of 47 CA.C Page 20 of 47 CA.C Page 21 of 47 CA.C Page 22 of 47 CA.C Page 23 of 47 CA.C Page 24 of 47 CA.C Page 25 of 47 CA.C Page 26 of 47 CA.C Page 27 of 47 CA.C Page 28 of 47 CA.C Page 29 of 47 CA.C Page 30 of 47 AGENDA BILL APPROVAL FORM Agenda Subject: Resolution No. 4896 Date: January 2, 2013 Department: City Attorney Attachments: Resolution No. 4896 Budget Impact: $0 Administrative Recommendation: City Council adopt Resolution No. 4896. Background Summary: This Resolution authorizes an Addendum to the Agreement for Information Technology Services under which the City of Auburn provides services for the City of Pacific. The original Agreement is not only being extended for one year - with one additional year's potential extension - but it also clarifies a scriveners error to reflect that the initial term of the Agreement expired December 31, 2012. The Resolution also provides that any action taken by the Mayor or designee in furtherance of the Agreement Addendum is ratified. Reviewed by Council Committees: Finance, Public Works Councilmember:Partridge Staff:Heid Meeting Date:January 7, 2013 Item Number:DI.B AUBURN * MORE THAN YOU IMAGINEDDI.B Page 31 of 47 RESOLUTION NO. 4 8 9 6 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN ADDENDUM TO THE INTERLOCAL AGREEMENT BETWEEN THE CITY OF AUBURN AND THE CITY OF PACIFIC FOR INFORMATION SERVICES TECHNOLOGY WHEREAS, in September, 2011, the City of Aubum entered into an Interlocal Agreement with the City of Pac c for Information Services; and WHEREAS, the parties wish to extend the original term by one-year, consistent with the provisions in the original agreement that provided for up to two additional one-year extensions; and WHEREAS, it is also appropriate to clarify the term of the original agreement, specifying that it terminated on December 31, 2012; and WHEREAS, insofar as the Addendum One seeks to extend the agreement in advance of the date on which the City Councils could approve the extension, the Resolution also specifies that actions taken in furtherance of that e ension shall be rat ed. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN, KING COUNTY, WASHINGTON, HEREBY RESOLVES as follows: Section 1. The Mayor and the Aubum City Clerk are hereby authorized to execute an Addendum to Interlocal Agreement between the City of Auburn and the City of Pac c, which Addendum shall be in substantial Resolution No.4896 December 31, 2012 Page 1 of 2DI.B Page 32 of 47 conformity with the Addendum attached hereto as Exhibit "A° and that action heretofore taken by the Mayor or designee in furtherance thereof is hereby ratified. Section 2. The Mayor is hereby authorized to implement such administrative procedures as may be necessary to carry out the directives of this legislation. Section 3. This resolution shall be in full force and effect upon passage and signatures hereon. Dated and Signed this day of 2013. CITY OF AUBURN PETER B. LEWIS, MAYOR ATTEST Danielle E. Daskam, Ciry Cle k APP ED S TO FORM: iel B. id, City Atto ey Resolution No.4896 December 31, 2012 Page 2 of 2DI.B Page 33 of 47 ADDENDUM NO. ONE ADDENDUM TO THEINTERLOCAL AGREEMENT BETWEEN THE CITY OF AUBURN AND THE CTl'Y OF PACIFIC FOR INFORMATION SERVICES TECHNOLOGY THIS ADDENDI7M is made and entered into tlus day of 20_, by and between the CITY OF AUBURN, a municipal corporation of the State of Washington (hereinafter referred to as "Auburn"), and CITY OF PACIFIC, a municipal corporation of the State of Washington (hereinafter refeaed to as "Pacifid'), as an addendum to the Interlocal Agreement between the parties for Information Services Technology executed on the 26' day of September, 2011, pursuant to the Interlocal Cooperation Act, Chapter 3934 of the Revised Code of Washington. WITNESSETH: V HEREAS, the parties hereto have heretofore contracted for Information Services Technology, and the said Agreement provided for the opportunity of two one-year extensions; and WHEREAS, it is also appropriate to clarify a scriveners error in terms of the date under which the original Agreement would terminate or by which the Agreement term would need to be extended; and WHEREAS, each of the parties appreciates that contracting for such services provides a number of mutually beneficial advantages, and in order to provide further advantages for each of the parties, they agee that the Agreement referred to above should be amended to extend the term thereof as provided hereinbelow NOW TE REFORE in consideration of their mutual covenants, conditions and promises, the PAR'TIES HERETO HEREBY AGREE as follows: ITEM ONE REVISION TO PARAGRAPH SEVEN: That Pazagraph Seven of the Interlocal Agreement is amended to read as follows: 7 TIME FOR PERFORMANCE AND TERM OF AGREEMENT Aubum sha11 not begin any work under this Agreement until authorized by Pacific's representative. Auburn shall perform the services provided for herein in accordance with the direction and scheduling provided in Exhibit A, unless otherwise agreed to in writiag by the parties. This Agreement shall terminate on 12/31/8d-2013 This Agreement may be extended for taveone additional one-yeaz eaedsperiod upon written agreement of the Parties. It is provided, however, that either party may cancel this Agreement upon sia ty (60)days written notice to the othei party DI.B Page 34 of 47 ITEM TWO REVISION TO PARAGRAPH ELEVEN• That Pazagraph Eleven of the Interlocal Agreement is amended to read as follows: 11 ADMINISTRATION OF AGREEMENT Tt is Agreement shall be administered by Ron Tiedeman, Innovation & Technology Director or designee on behalf of Aubum, and by Patti Kirkpatrick, or designee, on behalf of Pacific. Any written notices requii ed by the terms of this Agreement shall be served on or mailed to the following addresses: CITY OF AUBURN CITY OF PACIFIC Innovation&Technology City Clerk Ran Tiedeman Patti Kirkpatrick 25 West Main Street 100 3rd Avenue S.E. Auburn, WA 98001-4998 Pacific, WA Phone: 253-288-3160 Phone: 253-929-1105 Fax: 253-804-3116 Fax: 253-939-6026 E-mail: rtiedeman@aubumwa.gov E-mail: pkirkpatrick@ci.pacific.waus ITEM THREE REMAINING TERMS LJNCHANGED• That all other provisions of the Interlocal] Agreement between the parties for Informadon Services Technology executed on the lst day of October 2011, pursuant to the Interlocal Cooperation Act, Chapter 3934 of the Revised Code of Waslrington, shall remain unchanged, and in full force and effect. IN WITNESS WHEREOF the parties hereto have executed this Agreement as of the day and yeaz fust above written. CITY OF PACIFIC CITY OF AUBURN By By Its: Petet B. Lewis, Mayor Attest: Attest: By By Patricia J Kirkpatrick, Pacific City Clerk Danielle E. Daskam, Auburn City Clerk Approved as to form: Appro d as to form: Ken Luce,Pacific City Attorney Daniel B. Heid, Aub City ttorney DI.B Page 35 of 47 AGENDA BILL APPROVAL FORM Agenda Subject: Resolution No. 4895 Date: January 2, 2013 Department: Public Works Attachments: Resolution No. 4895 Budget Impact: $0 Administrative Recommendation: Finance Committee recommends that City Council adopt Resolution No. 4895. Background Summary: EQUIPMENT RENTAL DIVISION: The following police patrol vehicles have reached the end of the replacement cycle. Replacements have been purchased and are now in service. P014A - 2008 Ford Crown Victoria - VIN: 2FAFP71V08X100255 Fixed Asset No. 55000 P014A P015A - 2008 Ford Crown Victoria - VIN: 2FAFP71V98X100254 Fixed Asset No. 55000 P015A Reviewed by Council Committees: Finance, Public Works Councilmember:Partridge Staff:Bailey Meeting Date:January 7, 2013 Item Number:DI.D AUBURN * MORE THAN YOU IMAGINEDDI.D Page 36 of 47 ----------------------------- Resolution No. 4895 December 20, 2012 Page 1 of 2 RESOLUTION NO. 4895 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON DECLARING CERTAIN ITEMS OF PROPERTY AS SURPLUS AND AUTHORIZING THEIR DISPOSAL WHEREAS, the City of Auburn Public Works Department has a number of items which are no longer of use to the City; and WHEREAS, it would be appropriate to surplus the property and dispose of it by auction or other sale mechanism, or to dispose of it, in whole or in part, through gift to another governmental agency or an appropriate charitable non- profit entity, as deemed most expedient by the Mayor. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON HEREBY RESOLVES as follows: Section 1. Purpose. That the property identified below is declared to be surplus, and the Mayor is authorized to dispose of and convey such property through appropriate sale or donation to another governmental agency or charitable non-profit entity. Public Works Department Equipment Rental Division: DI.D Page 37 of 47 ----------------------------- Resolution No. 4895 December 20, 2012 Page 2 of 2 The following police patrol vehicles have reached the end of the replacement cycle. Replacements have been purchased and are now in service. P014A – 2008 Ford Crown Victoria VIN: 2FAFP71V08X100255 Fixed Asset No. 55000 P014A P015A – 2008 Ford Crown Victoria VIN: 2FAFP71V98X100254 Fixed Asset No. 55000 P015A Section 2. Implementation. That the Mayor is authorized to implement such administrative procedures as may be necessary to carry out the directives of this legislation. Section 3. Effective Date. That this Resolution shall take effect and be in full force upon passage and signatures hereon. Dated and Signed this _____ day of _________, 2013. CITY OF AUBURN ________________________________ PETER B. LEWIS ATTEST: MAYOR ______________________ Danielle E. Daskam, City Clerk APPROVED AS TO FORM: _____________________ Daniel B. Heid, City Attorney DI.D Page 38 of 47 AGENDA BILL APPROVAL FORM Agenda Subject: Capital Project Status Report Date: December 27, 2012 Department: Public Works Attachments: Capital Project Status Report Budget Impact: $0 Administrative Recommendation: Background Summary: See attached report. Reviewed by Council Committees: Public Works Councilmember:Wagner Staff:Gaub Meeting Date:January 7, 2013 Item Number:DI.F AUBURN * MORE THAN YOU IMAGINEDDI.F Page 39 of 47 Da t e : De c e m b e r 2 4 , 2 0 1 2 No . P r o j . N o . L o c a t i o n / D e s c r i p t i o n Pr i o r i t y Gr o u p (1 - 3 ) S t r e e t F u n d s (1 0 2 / 1 0 5 / 1 0 3 ) W a t e r ( 4 3 0 ) S e w e r ( 4 3 1 ) S t o r m ( 4 3 2 ) O t h e r T o t a l Bu d g e t % C o m p l e t e A d v . D a t e % Co m p l e t e Fi n i s h Da t e Project ManagerStatus 1 CP 1 1 0 9 20 1 1 S t o r m P i p e l i n e R e p a i r a n d Re p l a c e m e n t , P h a s e 1 : Th i s p r o j e c t w i l l c o n s t r u c t s t o r m dr a i n a g e r e p a i r s a n d i m p r o v e m e n t s o n ac a d e m y d r i v e S e , 3 7 t h S t r e e t N W , an d 3 6 t h S t r e e t N E . - 23 2 , 4 0 0 2 3 2 , 4 0 0 2 1 9 , 0 9 0 1 0 0 % S e p - 1 1 1 0 0 % O c t - 1 2 L e e F i n a l P a y i s i n p r o c e s s. 2 CP 1 2 0 6 20 1 2 P a v e m e n t P a t c h i n g , C h i p S e a l , an d O v e r l a y P r o j e c t : Th i s p r o j e c t w i l l c o m p l e t e p a v e m e n t pa t c h i n g , c h i p s e a l s a n d o v e r l a y w o r k on b o t h a r t e r i a l / c o l l e c t o r a n d l o c a l st r e e t s t h r o u g h o u t t h e C i t y . - 1 , 3 0 0 , 0 0 0 5 3 9 , 5 0 0 (S O S ) 1, 8 3 9 , 5 0 0 1 , 8 3 9 , 5 0 0 1 0 0 % J u n - 1 2 1 0 0 % N o v - 1 2 W i c k s t r o m This project combines the remaining 2012 SOS non-rebuild streets with the 2012 arterial/collector preservation program. Final Pay is in process. 3 CP 0 9 2 1 Bi - A n n u a l S a n i t a r y S e w e r R e p a i r & Re p l a c e m e n t : Th i s p r o j e c t w i l l r e p a i r o r r e p l a c e sa n i t a r y s e w e r f a c i l i t i e s ( m a n h o l e s , pi p e s , e t c . ) t h r o u g h o u t t h e C i t y . - 1 1 7 , 0 0 0 8 3 5 , 6 3 5 5 , 0 0 0 9 5 7 , 6 3 5 8 5 3 , 9 8 5 1 0 0 % M a y - 1 2 1 0 0 % N o v - 1 2 L e e F i n a l P a y i s i n p r o c e s s. 4 CP 1 1 1 2 20 1 1 / 2 0 1 2 S i d e w a l k I m p r o v e m e n t Pr o j e c t : Th i s p r o j e c t w i l l c o m p l e t e r e p a i r s a n d re p l a c e m e n t o f e x i s t i n g s i d e w a l k s a t va r i o u s l o c a t i o n s w i t h i n t h e C i t y . - 2 3 5 , 0 0 0 (3 2 8 ) 23 5 , 0 0 0 2 2 9 , 3 2 0 1 0 0 % J u l - 1 2 1 0 0 % N o v - 1 2 W i c k s t r o m F i n a l P a y i s i n process. 5 CP 1 1 1 6 Do w n t o w n P e d e s t r i a n L i g h t i n g Re p l a c e m e n t : Th i s p r o j e c t w i l l r e p l a c e t h e e x i s t i n g te a l l i g h t s t h a t h a v e r e a c h e d t h e e n d o f th e i r s e r v i c e l i f e w i t h l i g h t s m e e t i n g t h e cu r r e n t d o w n t o w n s t a n d a r d s . - 4 8 5 , 0 0 0 (L R F B o n d ) 48 5 , 0 0 0 4 8 5 , 0 0 0 1 0 0 % S e p - 1 1 1 0 0 % N o v - 1 2 T r u o n g F i n a l P a y i s i n p r o c ess. Te m p o r a r y F l o o d C o n t r o l B a r r i e r Re m o v a l : T o t a l Es t i m a t e d Co s t s CA P I T A L P R O J E C T S T A T U S R E P O R T Pr o j e c t B u d g e t ( $ ) De s i g n C o n s t r u c t i o n 6 EM 0 9 0 2 Re m o v a l : Th i s p r o j e c t w i l l r e m o v e t h e 5 m i l e s o f te m p o r a r y b a r r i e r s i n s t a l l e d i n 2 0 0 9 t o ad d r e s s t h e p o t e n t i a l f o r f l o o d i n g f r o m th e d i m i n i s h e d c a p a c i t y o f t h e H o w a r d Ha n s o n D a m . - 2 , 1 4 0 , 6 9 4 (K C F C D ) 2, 1 4 0 , 6 9 4 2 , 1 2 9 , 2 2 2 1 0 0 % J u l - 1 2 1 0 0 % D e c - 1 2 T r u o n g Work is complete and final pay is in process. 7 CP 1 2 1 5 Ba n n e r P o l e F o u n d a t i o n R e p a i r : Th i s p r o j e c t w i l l r e p l a c e t h e f o u n d a t i o n of t h e b a n n e r p o l e l o c a t e d a t t h e N E co r n e r o f E M a i n S t r e e t a n d B S t r e e t NE . - 3 0 , 0 0 0 (3 2 8 ) 30 , 0 0 0 3 0 , 0 0 0 1 0 0 % O c t - 1 2 1 0 0 % D e c - 1 2 T r u o n g F i n a l P a y i s i n p rocess. 8 CP 0 8 1 7 20 0 9 S e w e r & S t o r m P u m p S t a t i o n Re p l a c e m e n t - P h a s e C , W h i t e Ri v e r : Th i s p r o j e c t w i l l c o m p l e t e m a i n t e n a n c e an d r e p a i r s a t t h e W h i t e R i v e r s t o r m pu m p s t a t i o n . - 2, 3 0 6 , 5 7 1 2 , 3 0 6 , 5 7 1 2 , 3 0 4 , 5 9 3 1 0 0 % N o v - 1 0 9 9 % J a n - 1 3 D u n s d o n Pump Station is in service. Punchlist work is all that remains. 9 C4 1 0 A S. 2 7 7 t h W e t l a n d M i t i g a t i o n Mo n i t o r i n g : Th i s p r o j e c t i s a n a n n u a l p r o j e c t t o co m p l e t e t h e r e q u i r e m e n t m o n i t o r i n g an d m a i n t e n a n c e o f t h e w e t l a n d mi t i g a t i o n s i t e s f o r t h e S . 2 7 7 t h G r a d e Se p a r a t i o n P r o j e c t . S i t e s a r e l o c a t e d on t h e N o r t h g e o d e c k e p r o p e r t y a n d a t th e c o r n e r o f 4 4 t h S t N W a n d F r o n t a g e Ro a d . P e r m i t s r e q u i r e t h e C i t y t o mo n i t o r t h e s i t e s f o r 1 0 y e a r s . - 1 4 3 , 5 9 7 14 3 , 5 9 7 1 4 3 , 3 7 4 1 0 0 % A p r - 1 1 9 8 % M a y - 1 3 D u n s d o n Construction Work is complete, however, the project is in the 1-year plant establishment period and the finish date reflects this. Budget shown is for multiple years of this 10 year process. Budget for 2012 only is $57,050.Page 1 of 6 DI.F Page 40 of 47 Da t e : De c e m b e r 2 4 , 2 0 1 2 No . P r o j . N o . L o c a t i o n / D e s c r i p t i o n Pr i o r i t y Gr o u p (1 - 3 ) S t r e e t F u n d s (1 0 2 / 1 0 5 / 1 0 3 ) W a t e r ( 4 3 0 ) S e w e r ( 4 3 1 ) S t o r m ( 4 3 2 ) O t h e r T o t a l Bu d g e t % C o m p l e t e A d v . D a t e % Co m p l e t e Fi n i s h Da t e Project ManagerStatus T o t a l Es t i m a t e d Co s t s CA P I T A L P R O J E C T S T A T U S R E P O R T Pr o j e c t B u d g e t ( $ ) De s i g n C o n s t r u c t i o n 10 C2 0 7 A 'A ' S t r e e t N W C o r r i d o r - P h a s e 1 : Th i s p r o j e c t w i l l c o m p l e t e t h e d e s i g n an d p e r m i t t i n g e f f o r t s a s s o c i a t e d w i t h th e a r t e r i a l s t r e e t c o r r i d o r ‘ A ’ S t r e e t NW f r o m 1 4 t h S t r e e t N W s o u t h t o 3 r d St r e e t N W . - 1 , 2 0 2 , 5 2 6 (1 0 2 a n d T I F ) 40 5 , 9 9 3 1 2 , 1 8 8 6 , 5 8 0 , 7 4 0 (F e d G r a n t s ) 1, 2 8 5 , 1 7 0 (D e v e l o p e r I n - Ki n d ) 40 7 , 5 6 0 (D e v e l o p e r ) 9, 8 9 4 , 1 7 7 9 , 6 5 4 , 0 0 9 1 0 0 % M a y - 1 1 9 8 % J a n - 1 3 G a u b Roadway is open to traffic. Work is nearly completed with the exception of final Landscaping which began in December and will be completed in January. 11 CP 0 9 0 9 La k e l a n d H i l l s B o o s t e r P u m p St a t i o n : Th i s p r o j e c t w i l l u p d a t e / r e p l a c e t h e ex i s t i n g p u m p s t a t i o n i n t h e L a k e l a n d Hi l l s w a t e r s e r v i c e a r e a i n o r d e r t o me e t f i r e f l o w d e m a n d s . - 2 , 7 6 0 , 9 8 2 2, 7 6 0 , 9 8 2 2 , 7 6 0 , 9 8 2 1 0 0 % O c t - 1 0 9 5 % J a n - 1 3 V o n d r a k Final SCADA design has been provided by the SCADA Upgrade Project. Operational testing was completed in December. Demolition of the existing station is anticipated to begin in January. 12 CP 1 1 0 3 13 2 n d A v e S E T a c o m a P i p e l i n e 5 In t e r t i e : Th i s p r o j e c t i n c l u d e s d e s i g n a n d co n s t r u c t i o n o f i n f r a s t r u c t u r e o n 1 3 2 n d Av e S E a n d t h e T a c o m a P i p e l i n e 5 f o r th e p u r c h a s e o f w a t e r f r o m a d j a c e n t pu r v e y o r s . - 1 , 2 9 0 , 0 0 0 1, 2 9 0 , 0 0 0 1 , 2 7 5 , 6 3 8 1 0 0 % F e b - 1 2 8 0 % F e b - 1 3 D u n s d o n W o r k i s u n d e r w a y . 13 C5 2 4 A SC A D A S y s t e m I m p r o v e m e n t : Th i s p r o j e c t w i l l u p g r a d e t h e C i t y ' s SC A D A s y s t e m t o m e e t P u b l i c W o r k s go a l s . - 2 , 6 6 6 , 2 0 0 1 , 9 9 4 , 5 0 0 1 , 0 1 4 , 0 0 0 5 , 6 7 4 , 7 0 0 4 , 9 9 8 , 5 1 2 1 0 0 % N o v - 0 9 8 2 % D e c - 1 2 L e e Implementation Contract executed. Preliminary Design and Final Design are Complete. Installation of the Controls at M&O is complete and conversion of all 3 test sites are complete. The remaining site conversions are underway. 8 7 2 , 3 7 2 (F e d G r a n t ) 6, 0 0 0 , 0 0 0 (F M S I B ) 14 C2 0 1 A M S t r e e t U n d e r p a s s ( G r a d e Se p a r a t i o n ) : Th e p u r p o s e o f t h i s p r o j e c t i s t o g r a d e se p a r a t e ‘ M ’ S t r e e t S E f r o m t h e Bu r l i n g t o n N o r t h e r n S a n t a F e St a m p e d e P a s s R a i l l i n e i n P h a s e 1 an d c o m p l e t i o n o f t h e A u b u r n B l a c k Di a m o n d R o a d B y p a s s c o n n e c t i o n i s a fu t u r e p h a s e . - 5 , 1 6 6 , 5 6 0 1 5 0 , 0 0 0 (F M S I B ) 2, 8 5 6 , 6 1 1 (T I B ) 1, 3 3 5 , 0 7 9 (K i n g C t y ) 1, 5 4 2 , 8 0 0 (P o r t s ) 47 8 , 0 0 0 (B N S F ) 1, 1 4 0 , 0 0 0 (R E E T 2 ) 2, 7 7 2 , 7 5 2 (P W T F ) 22 , 3 1 4 , 1 7 4 2 2 , 3 1 4 , 1 7 4 1 0 0 % D e c - 1 1 5 8 % J u l - 1 3 V o n d r a k M Street Road Closure in place through May 2013, weather dependant. Setting of the Girders for the 1st Bridge is tentatively scheduled for Jan 3rd due to delays from BNSF. 15 CP 0 9 1 5 We l l 1 I m p r o v e m e n t s - Tr a n s m i s s i o n L i n e s : Th i s p r o j e c t i s t h e f i r s t p h a s e o f a la r g e r p r o j e c t a n d w i l l r e p l a c e w a t e r li n e s f r o m t h e W e l l 1 S i t e t o t h e Ho w a r d R o a d C o r r o s i o n C o n t r o l Fa c i l i t y t o a c c o m m o d a t e t h e re p l a c e m e n t o f W e l l 1 . T h i s p r o j e c t w i l l al s o u p g r a d e t h e e x i s t i n g s t o r m l i n e o n M S t r e e t S E t o a c c o m m o d a t e t h e W e l l 1 I m p r o v e m e n t s . - 1 , 9 4 3 , 6 9 7 8 3 1 , 9 0 4 2 , 7 7 5 , 6 0 1 2 , 0 3 1 , 8 5 6 1 0 0 % O c t - 1 2 3 % A p r - 1 3 L e e W o r k i s u n d e r w a y . 16 CP 0 9 0 9 Ac a d e m y B o o s t e r P u m p S t a t i o n : Th i s p r o j e c t w i l l u p d a t e / r e p l a c e t h e ex i s t i n g p u m p s t a t i o n i n t h e A c a d e m y wa t e r s e r v i c e a r e a i n o r d e r t o m e e t f i r e fl o w d e m a n d s . - 3 , 5 2 6 , 2 5 5 3, 5 2 6 , 2 5 5 3 , 1 6 8 , 2 9 5 1 0 0 % S e p - 1 2 0 % J a n - 1 4 V o n d r a k Work is in suspension waiting on material procurement. Work is anticipated to begin in late January. 17 MS 1 2 0 3 15 t h S t r e e t S W a n d W e s t V a l l e y Hi g h w a y S i g n a l # 1 2 8 R e p a i r : Th i s p r o j e c t w i l l r e p l a c e t h e d a m a g e d si g n a l p o l e s f o r t h i s s p a n w i r e s i g n a l . - 6 0 , 0 0 0 (G e n e r a l ) 60 , 0 0 0 6 0 , 0 0 0 1 0 0 % D e c - 1 2 0 % F e b - 1 3 N u t t e r C o n t r a c t E x e c u t i o n is in process Page 2 of 6 DI.F Page 41 of 47 Da t e : De c e m b e r 2 4 , 2 0 1 2 No . P r o j . N o . L o c a t i o n / D e s c r i p t i o n Pr i o r i t y Gr o u p (1 - 3 ) S t r e e t F u n d s (1 0 2 / 1 0 5 / 1 0 3 ) W a t e r ( 4 3 0 ) S e w e r ( 4 3 1 ) S t o r m ( 4 3 2 ) O t h e r T o t a l Bu d g e t % C o m p l e t e A d v . D a t e % Co m p l e t e Fi n i s h Da t e Project ManagerStatus T o t a l Es t i m a t e d Co s t s CA P I T A L P R O J E C T S T A T U S R E P O R T Pr o j e c t B u d g e t ( $ ) De s i g n C o n s t r u c t i o n 18 CP 1 1 0 8 20 1 1 / 1 2 C i t y w i d e S t o r m P o n d Cl e a n i n g : Th i s p r o j e c t w i l l c o m p l e t e t h e r e m o v a l of s e d i m e n t f r o m 8 s t o r m d r a i n a g e po n d s l o c a t e d t h r o u g h o u t t h e C i t y a n d cl e a n t h e d i t c h a l o n g A S t r e e t S E / E a s t Va l l e y H i g h w a y . 1 36 0 , 0 0 0 3 6 0 , 0 0 0 3 3 5 , 8 0 0 9 5 % M a r - 1 3 O c t - 1 3 L e e Project schedule is revised to complete this work during the summer of 2013 due to water levels. 19 CP 1 1 1 8 Au b u r n W a y S o u t h P e d e s t r i a n Im p r o v e m e n t s - D o g w o o d t o F i r St r e e t : Th i s p r o j e c t w i l l c o n s t r u c t a n e w s t r e e t li g h t i n g s y s t e m , l a n d s c a p e d m e d i a n is l a n d , a d e s i g n a t e d m i d - 0 b l o c k cr o s s w a l k , r e l o c a t i o n o f e x i s t i n g u t i l i t y po l e s , a n d m o d i f i c a t i o n s t o t h e e x i s t i n g si g n a l a t D o g w o o d S t . T h i s p r o j e c t al s o i n c l u d e s a p u b l i c e d u c a t i o n el e m e n t f o r p e d e s t r i a n s a f e t y . 1 1 0 0 , 0 0 0 7 4 0 , 8 3 0 (S t a t e ) 10 0 , 0 0 0 (F e d e r a l ) 94 0 , 8 3 0 9 4 0 , 8 3 0 5 5 % J u l - 1 3 O c t - 1 4 D u n s d o n C o n s u l t a n t d e s i g n w o r k is underway. 20 CP 1 1 1 9 Au b u r n W a y S o u t h C o r r i d o r Im p r o v e m e n t s - F i r S t . S E t o He m l o c k S t . S E : Th i s p r o j e c t w i l l w i d e n A W S b e t w e e n Fi r a n d H e m l o c k S t r e e t s f r o m 3 l a n e s to 5 l a n e s a n d i n c l u d e s n e w s i d e w a l k s , st r e e t l i g h t i n g , t r a n s i t i m p r o v e m e n t s an d i n s t a l l a n e w s i g n a l a t H e m l o c k S t . 1 8 4 9 2 , 4 2 6 , 4 0 0 (T I B ) 60 6 , 6 0 0 (M I T ) 3, 0 3 3 , 8 4 9 3 , 0 3 3 , 8 4 9 5 5 % J u l - 1 3 O c t - 1 4 D u n s d o n C o n s u l t a n t d e s i g n w o r k i s underway. We l l 1 I m p r o v e m e n t s - W e l l Re p l a c e m e n t : Th i s p r o j e c t w i l l r e h a b i l i t a t e o r r e p l a c e Design work underway. Project is 21 CP 0 9 1 5 Th i s p r o j e c t w i l l r e h a b i l i t a t e o r r e p l a c e W e l l 1 s o t h a t i t c a n f u n c t i o n a t f u l l ca p a c i t y a n d c o m p l e t e m o d i f i c a t i o n s t o th e H o w a r d R o a d C o r r o s i o n C o n t r o l Fa c i l i t y . 1 2 , 4 7 6 , 5 6 8 2, 4 7 6 , 5 6 8 2 , 4 0 0 , 0 0 0 4 8 % M a r - 1 3 D e c - 1 3 L e e Design work underway. Project is anticipated to be under construction in 2013. 22 CP 1 1 0 9 20 1 1 S t o r m P i p e l i n e R e p a i r a n d Re p l a c e m e n t , P h a s e 2 : Th i s p r o j e c t w i l l c o n s t r u c t s t o r m dr a i n a g e i m p r o v e m e n t s o n H i - C r e s t Dr i v e N W . 1 16 5 , 0 0 0 1 6 5 , 0 0 0 1 7 8 , 3 1 0 3 0 % A p r - 1 3 A u g - 1 3 L e e Design work underway but is not anticipated to be under construction this year. 23 CP 1 1 0 7 Fu l l m e r W e l l f i e l d I m p r o v e m e n t s : Th i s p r o j e c t w i l l b e d o n e i n p h a s e s . Th e f i r s t p h a s e 1 A w i l l c o m p l e t e in v e s t i g a t i o n o f t h e F u l m e r W e l l f i e l d ar e a t o d e t e r m i n e t h e r e q u i r e d a n a l y s i s an d d r i l l i n g p r o g r a m n e e d e d t o u t i l i z e th e f u l l w a t e r r i g h t s . P h a s e 1 B w i l l co m p l e t e a d r i l l i n g a n d t e s t i n g p r o g r a m as w e l l a s a n a l t e r n a t i v e s a n a l y s i s . Ph a s e 2 w i l l c o m p l e t e t h e p h y s i c a l im p r o v e m e n t s . 1 2 , 2 0 0 , 0 0 0 2, 2 0 0 , 0 0 0 4 9 7 , 3 6 4 3 2 % M a r - 1 3 M a r - 1 4 L a m o t h e The estimated costs are for the Phase 1A only and will be revised when this phase is completed. Consultant work is underway and pump test data is under evaluation. 24 CP 1 1 2 0 Le a H i l l S a f e R o u t e s t o S c h o o l s Im p r o v e m e n t s : Th i s p r o j e c t w i l l c o m p l e t e im p r o v e m e n t s f o r s a f e w a l k i n g r o u t e s to H a z e l w o o d E l e m . , L e a H i l l e l e m . , an d R a i n e r M i d d l e S c h o o l a l o n g 1 1 6 t h Av e . S E a n d S E 3 1 2 S t . 1 3 9 8 , 5 0 0 (F e d e r a l ) 21 , 5 9 7 ( A S D ) 42 0 , 0 9 7 4 2 0 , 0 9 7 3 0 % A p r - 1 3 A u g - 1 3 T r u o n g Design work underway. Construction anticipated in 2013 to be during the summer. Agreement with ASD for their portion of the work is complete. 25 C5 1 2 A We l l 4 I m p r o v e m e n t s : Th i s p r o j e c t w i l l c o n s t r u c t a n e w bu i l d i n g t o h o u s e a s t a n d b y g e n e r a t o r an d d i s i n f e c t i o n e q u i p m e n t . 2 7 4 7 , 1 3 8 74 7 , 1 3 8 1 , 2 4 0 , 7 5 9 7 % S e p - 1 3 A p r - 1 4 D u n s d o n C o n s u l t a n t d e s i g n w o r k i s u n derway.Page 3 of 6 DI.F Page 42 of 47 Da t e : De c e m b e r 2 4 , 2 0 1 2 No . P r o j . N o . L o c a t i o n / D e s c r i p t i o n Pr i o r i t y Gr o u p (1 - 3 ) S t r e e t F u n d s (1 0 2 / 1 0 5 / 1 0 3 ) W a t e r ( 4 3 0 ) S e w e r ( 4 3 1 ) S t o r m ( 4 3 2 ) O t h e r T o t a l Bu d g e t % C o m p l e t e A d v . D a t e % Co m p l e t e Fi n i s h Da t e Project ManagerStatus T o t a l Es t i m a t e d Co s t s CA P I T A L P R O J E C T S T A T U S R E P O R T Pr o j e c t B u d g e t ( $ ) De s i g n C o n s t r u c t i o n 26 CP 1 0 2 4 AW S a n d M S t r e e t S E I n t e r s e c t i o n Im p r o v e m e n t s : Th i s p r o j e c t w i l l c o m p l e t e d e s i g n w o r k on l y f o r i m p r o v e m e n t s a t t h e in t e r s e c t i o n p e r O p t i o n 2 s e l e c t e d b y th e P u b l i c W o r k s C o m m i t t e e t o ad d r e s s c a p a c i t y a n d s a f e t y c o n c e r n s . 2 2 5 0 , 0 0 0 4 5 0 , 0 0 0 (T I B ) 70 0 , 0 0 0 7 0 5 , 0 0 0 3 0 % S e p - 1 3 M a y - 1 4 T r u o n g AWS/M St. SE - Installed protected left turn for east/west bound traffic on AWS turning onto M St. SE (Completed)17th/M St. SE - restrict left turn movements from 17th to M. (Completed)AWS/M St. SE Pre-Design - Preliminary configuration and footprint of the intersection is completed and Option 2 was selected by the Committee, June 2012. Final design work is underway. TIB grant obligation is in process. 27 CP 0 7 6 5 La k e l a n d H i l l s R e s e r v o i r Im p r o v e m e n t : Th i s p r o j e c t w i l l p r o v i d e v a r i o u s im p r o v e m e n t s a t t h e r e s e r v o i r , in c l u d i n g p a i n t i n g , s e i s m i c u p g r a d e s , an d f a c i l i t y m o d i f i c a t i o n s . 2 4 0 0 , 0 0 0 40 0 , 0 0 0 4 0 0 , 0 0 0 7 5 % J u n - 1 3 D e c - 1 3 V o n d r a k Project is dependent upon completion of the Lakeland Hills Booster Station improvements. 28 CP 0 6 2 4 We l l 5 U p g r a d e : Th i s p r o j e c t w i l l c o n s t r u c t a n e w w e l l fa c i l i t y i n c l u d i n g e m e r g e n c y g e n e r a t o r an d d i s i n f e c t i o n c a p a b i l i t y . 3 7 5 1 , 9 0 0 75 1 , 9 0 0 7 5 1 , 9 0 0 0 % J a n - 1 3 D e c - 1 3 L e e C o n s u l t a n t scoping in process. 29 CP 0 9 0 6 20 0 9 G a t e w a y P r o j e c t : Th i s p r o j e c t w i l l c o n s t r u c t a n e w ga t e w a y s i g n a t E a s t V a l l e y H i g h w a y an d L a k e T a p p s P a r k w a y . 3 1 0 0 , 0 0 0 (G e n F u n d ) 10 0 , 0 0 0 1 0 0 , 0 0 0 3 0 % H o l d H o l d L e e Easement acquisition completed. Project on hold. 30 C2 2 9 A BN S F / E V H P e d e s t r i a n Un d e r c r o s s i n g : Th i s p r o j e c t w i l l c o n s t r u c t a p e d e s t r i a n un d e r c r o s s i n g o f b o t h E a s t V a l l e y Hi g h w a y ( A S t S E ) a n d t h e B N S F r a i l 3 3 8 5 , 0 0 0 (S t a t e ) 38 5 , 0 0 0 9 , 0 0 0 , 0 0 0 6 0 % H o l d H o l d D u n s d o n Final design on hold pending BNSF issues. Additional funds will be required to complete design, environmental permitting, and construction. Hi g h w a y ( A S t S E ) a n d t h e B N S F r a i l tr a c k s j u s t n o r t h o f t h e W h i t e R i v e r . and construction. CP S T O T A L 8 , 1 6 3 , 5 3 2 1 9 , 4 3 5 , 7 3 3 2 , 8 3 0 , 1 3 5 4 , 9 2 7 , 0 6 3 3 3 , 9 3 0 , 2 0 5 6 9 , 2 8 6 , 6 6 8 7 4 , 4 4 1 , 4 5 9 Page 4 of 6 DI.F Page 43 of 47 Da t e : De c e m b e r 2 4 , 2 0 1 2 No . P r o j . N o . L o c a t i o n / D e s c r i p t i o n Pr i o r i t y Gr o u p (1 - 3 ) L o c a l S t r e e t Fu n d s ( 1 0 3 ) W a t e r ( 4 3 0 ) S e w e r ( 4 3 1 ) S t o r m ( 4 3 2 ) O t h e r T o t a l B u d g e t % Co m p l e t e A d v . D a t e % C o m p l e t e Fi n i s h Da t e Project ManagerStatus 30 31 CP 1 2 0 1 20 1 2 L o c a l S t r e e t P a v e m e n t Re c o n s t r u c t i o n : Th i s p r o j e c t w i l l r e h a b i l i t a t e a n d r e b u i l d de f i c i e n t p a v e m e n t o n l o c a l s t r e e t s th r o u g h o u t t h e C i t y i n c l u d i n g : J S t S E b t w n 2 n d a n d 4 t h S t . S E 2 2 n d S t . S E b t w n M a n d R S t . S E 2 7 t h / H / 2 8 t h S t . S E E a s t o f F S t . S E Wa t e r a n d s t o r m i m p r o v e m e n t s w i l l a l s o be c o m p l e t e d o n t h e s e s t r e e t s . 1, 3 5 0 , 0 8 0 5 0 0 , 0 0 0 - 1 1 8 , 5 0 0 - 1 , 9 6 8 , 5 8 0 1 , 5 6 9 , 7 2 7 1 0 0 % J u n - 1 2 9 5 % M a r - 1 3 W i c k s t r o m Work is complete on 22nd Street SE and on 28th/H/27th Street locations. Roadway work on J Street SE is suspended waiting on appropriate weather to complete paving. Ot h e r S O S P r o j e c t s : CP 1 2 0 6 , P a v e m e n t P a t c h i n g , C h i p Se a l s , a n d O v e r l a y s . N/ A 5 3 9 , 5 0 0 5 3 9 , 5 0 0 5 3 9 , 5 0 0 WickstromFor status see CP1206 1, 8 8 9 , 5 8 0 5 0 0 , 0 0 0 - 1 1 8 , 5 0 0 - 2 , 5 0 8 , 0 8 0 2 , 1 0 9 , 2 2 7 32 CP 1 2 2 4 20 1 3 L o c a l S t r e e t R e c o n s t r u c t i o n : Th i s p r o j e c t w i l l c o m p l e t e t h e re c o n s t r u c t i o n o f t h e f o l l o w i n g l o c a l ro a d w a y s : 23 r d S t S E - M t o R S t S E H S t N E - 4 t h t o 8 t h 5t h S t N E - H t o C u l - d e - s a c Pa r k A v e - A W N t o P a r k Al s o i n c l u d e d i n t h i s p r o j e c t i s t h e re p l a c e m e n t o f w a t e r l i n e o n V S t S E , fr o m 2 n d t o 4 t h S t S E . 1 2 , 4 2 5 , 0 0 0 5 0 0 , 0 0 0 2 0 0 , 0 0 0 2 0 0 , 0 0 0 3 , 3 2 5 , 0 0 0 2 , 9 3 5 , 0 0 0 0 % M a y - 1 3 D e c - 1 3 W i c k s t r o m C o n s u l t a n t C o n t r a c t e x e c u t i o n i n p r o c e s s Ot h e r S O S P r o j e c t s : 20 1 3 P a v e m e n t P a t c h i n g , C h i p S e a l s , an d O v e r l a y s . N/ A 1 6 4 , 2 5 0 16 4 , 2 5 0 1 6 4 , 2 5 0 Wickstrom 2, 5 8 9 , 2 5 0 5 0 0 , 0 0 0 2 0 0 , 0 0 0 2 0 0 , 0 0 0 - 3 , 4 8 9 , 2 5 0 3 , 0 9 9 , 2 5 0 20 1 2 & 2 0 1 3 T O T A L S O S P R O G R A M 4 , 4 7 8 , 8 3 0 1 , 0 0 0 , 0 0 0 2 0 0 , 0 0 0 3 1 8 , 5 0 0 - 5 , 9 9 7 , 3 3 0 5 , 2 0 8 , 4 7 7 20 1 3 S O S P r o g r a m T o t a l s 20 1 2 S O S P r o g r a m T o t a l s SO S P R O G R A M S T A T U S R E P O R T Pr o j e c t B u d g e t ( $ ) T o t a l Es t i m a t e d Co s t s De s i g n C o n s t r u c t i o n Page 5 of 6 DI.F Page 44 of 47 Da t e : De c e m b e r 2 4 , 2 0 1 2 No . P r o j . N o . L o c a t i o n / D e s c r i p t i o n % Co m p l e t e A d v . D a t e % C o m p l e t e Fi n i s h Da t e St a f f Ma n a g e r Ac t i o n Co m m i t t e e Status A CP 0 6 1 6 Wa y f i n d i n g - P e d e s t r i a n K i o s k s : Th i s p r o j e c t w i l l c o m p l e t e t h e d e s i g n o f t h e do w n t o w n P e d e s t r i a n K i o s k a n d i n s t a l l t h e s e st r u c t u r e s a t u p t o 9 l o c a t i o n s w i t h i n t h e D o w n t o w n ar e a . 1 0 1 , 0 0 0 1 1 6 , 0 5 0 1 0 0 % D e c - 1 2 J u l - 1 3 V o n d r a k P C D C P r o j e c t i s a d v e r t i s e d a n d w i l l o p e n b i d s o n J a n u a r y 1 0 t h . B CP 1 1 1 5 Ci t y H a l l N W P l a z a I m p r o v e m e n t s : Th i s p r o j e c t w i l l r e n o v a t e t h e N W e n t r a n c e t o C i t y Ha l l s i m i l a r t o t h e r e c e n t i m p r o v e m e n t s o n t h e so u t h s i d e o f C i t y H a l l . W o r k w i l l i n c l u d e n e w pa v e m e n t , u p d a t e d l i g h t i n g , A D A R a m p u p g r a d e s an d n e w C i t y H a l l s i g n a g e . 4 7 5 , 9 7 7 4 5 8 , 5 7 0 9 9 % A p r - 1 3 S e p - 1 3 C h a m b e r l a i n P C D C C o n s u l t a n t w o r k i s o n h o l d . C CP 1 0 1 6 Fe n s t e r L e v e e P r o j e c t : Th i s p r o j e c t w i l l c o m p l e t e n e w l e v e e i m p r o v e m e n t s on t h e F e n s t e r L e v e e a l o n g t h e G r e e n R i v e r . 9 3 9 , 1 0 0 1 , 2 6 5 , 0 0 0 6 5 % N / A A p r - 1 4 A n d e r s e n P C D C Wo r k w i l l b e c o m p l e t e d b y K i n g C o u n t y . S e c u r e d f u n d i n g is f r o m 4 G r a n t s a n d m a t c h i n g s t o r m f u n d s . T h e ad d i t i o n a l 3 2 7 k i n S R F B f u n d i n g w a s a w a r d e d . P r e - De s i g n w o r k i s c o m p l e t e . T h e D e s i g n A g r e e m e n t w i t h Ki n g C o u n t y i s e x e c u t e d . T O T A L O T H E R P R O J E C T S 1 , 5 1 6 , 0 7 7 1 , 8 3 9 , 6 2 0 T o t a l B u d g e t OT H E R P R O J E C T S - A C T I O N B Y O T H E R C O M M I T T E E T o t a l Es t i m a t e d Co s t s De s i g n C o n s t r u c t i o n Page 6 of 6 DI.F Page 45 of 47 AGENDA BILL APPROVAL FORM Agenda Subject: Action Tracking Matrix Date: December 27, 2012 Department: Public Works Attachments: Action Tracking Matrix Budget Impact: $0 Administrative Recommendation: Background Summary: See attached matrix. Reviewed by Council Committees: Public Works Councilmember:Wagner Staff:Dowdy Meeting Date:January 7, 2013 Item Number:DI.G AUBURN * MORE THAN YOU IMAGINEDDI.G Page 46 of 47 Updated: 1/2/2013 3:01 PM No.Item Description Contact Next PWC Review Date Est. Comp. Date Status A Sidewalk Program Funding Sources Para 11/1/2013 Pending initial discussion with the Committee for 2015-2016 budget B Track completed project on the 2012 Active Capital Improvement Projects Map Gaub C Fulmer Well-Field Feasibility Study Updates Repp 3/18/2013 Initial study finding are not yet completed. D Turns on Red and Flashing Yellow Arrows - Cost Estimate for Signs Para 1/22/2013 Preparing Inventory of Right Turn Arrows, recommendation for signage, and cost estimate. E System Development Charges (SDCs)Repp 11/1/2013 Yearly Review of SDCs F SDC and Cost of Service Analysis Scope Repp 1/22/2013 7/31/2013 Consultant preparing scope and budget G Total Permitting Cost for Single Family Home Repp 1/22/2013 1/22/2013 H Payback/Charge in-lieu Process Repp 2/18/2013 2/18/2013 Review current City process I CP1224, 2013 Local Street Pavement Reconstruction Project Wickstrom 4/15/2013 4/15/2013 50% Design Review J CP1120, Lea Hill Safe Routes to Schools Improvement Truong 4/1/2013 4/1/2013 50% Design Review K Comprehensive Transportation Plan Update Webb 6/3/2013 11/1/2014 Discussion of LOS Standards (Corridors: N/S vs E/W), modeling scenarios Incorporating "Event Traffic", & safety versus efficiency policy. Public Works Committee - Action Tracking Matrix Ongoing - Quarterly updates, next one in January DI.G Page 47 of 47