HomeMy WebLinkAbout08-19-2013 PUBLIC WORKS COMMITTEE AGENDA PACKET
Public Works Committee
August 19, 2013 - 3:30 PM
Annex Conference Room 2
AGENDA
I.CALL TO ORDER
A.Roll Call
B.Announcements
C.Agenda Modifications
II.CONSENT AGENDA
A. Approval of Minutes*
B. Public Works Project No. C222A* (Vondrak)
Permission to Enter into Consultant Agreement No. AG-C-435 with Parametrix for
Engineering Services for Project No. C222A The S277th St Corridor Capacity &
Non-motorized Trail Improvement Project
C. Public Works Project No. CP1202* (Lee)
Permission to Enter into Consultant Agreement No. AG-C-425 with KPG, Inc. for
Engineering Services for Project No. CP1202 Auburn Way South Flooding Imp –
Phase II
D. Public Works Project No. CP1218* (Sweeting)
Permission to Enter into Consultant Agreement No. AG-C-430 with CH2M Hill, Inc.
for Engineering Services for Project No. CP1218, Auburn Way South
Improvements – Muckleshoot Plaza to Dogwood
E. Public Works Project No. CP1310* (Carter)
Award Small Works Contract No. 13-14 to Doolittle Construction, LLC on their Low
Bid of $54,870.00 for Project No. CP1310, 2013 Arterial & Collector Crack Seal
F. Public Works Project No. CP1225* (Wickstrom)
Award Contract No. 13-05, to ICON Materials on Their Low Bid of $924,114.00 for
Project No. CP1225, West Valley Highway System Preservation Project
G. Public Works Project No. CP1201* (Wickstrom)
Approve Final Pay Estimate No. 8 to Contract No. 12-08 in the Amount of $0.00
and Accept Construction of Project No. CP1201, 2012 Local Street Pavement
Reconstruction Project
III.DISCUSSION ITEMS
A. Public Works Project No. CP1122 (Truong)
CP1122, 30th Street NE Area Flooding Phase 1 Project - Design Update
B. M Street SE Re-Channelization (Para)
Page 1 of 60
C. Cascade Water Alliance Agreement (Dowdy)
D. Capital Project Status Report* (Gaub)
E. Significant Infrastructure Projects by Others - Public Works Status Report*
(Gaub)
F. Action Tracking Matrix* (Dowdy)
IV.ADJOURNMENT
Agendas and minutes are available to the public at the City Clerk's Office, on the City website
(http://www.auburnwa.gov), and via e-mail. Complete agenda packets are available for
review at the City Clerk's Office.
*Denotes attachments included in the agenda packet.
Page 2 of 60
AGENDA BILL APPROVAL FORM
Agenda Subject:
Approval of Minutes
Date:
August 14, 2013
Department:
Public Works
Attachments:
August 5, 2013 Draft Minutes
Budget Impact:
$0
Administrative Recommendation:
Public Works Committee to approve the minutes of the August 5, 2013 Public Works
Committee meeting.
Background Summary:
See attached draft minutes.
Reviewed by Council Committees:
Public Works
Councilmember:Wagner Staff:
Meeting Date:August 19, 2013 Item Number:CA.A
AUBURN * MORE THAN YOU IMAGINEDCA.A Page 3 of 60
Public Works Committee
August 5, 2013 - 3:30 PM
Annex Conference Room 2
MINUTES
I. CALL TO ORDER
Chairman Rich Wagner called the meeting to order at 3:30 p.m. in
Conference Room #2, located on the second floor of Auburn City Hall, One
East Main Street, Auburn, Washington.
A. Roll Call
Chairman Wagner, Vice-Chair Bill Peloza, and Member Wayne
Osborne were present. Also present during the meeting
were: Councilmember John Partridge, City Engineer/Assistant
Director Dennis Selle, Assistant City Engineer Ingrid Gaub, Utilities
Engineer Dan Repp, Transportation Manager Pablo Para, Engineering
Aide Amber Mund, Economic Development Manager Doug Lein,
Water Utility Engineer Susan Fenhaus, Traffic Engineer James Webb,
Senior Project Engineer Jacob Sweeting, IT Director Ron Tiedeman,
Business Systems Analyst Jim Felty, and Public Works Secretary
Jennifer Cusmir.
Members of the public in attendance included: Citizens Scot Pondelick
and Thomas Sauers.
At approximately 4:19 p.m., Member Osborne was excused from the
meeting due to illness and did not return.
B. Announcements
There were no announcements.
C. Agenda Modifications
There was one agenda modification removing Discussion Item C,
Cascade Water Supply Agreement Review, from the agenda.
There were two agenda modifications adding Consent Item B, Right-
of-Way Use Permit No. 13-23 and Resolution C, Resolution No. 4983.
II. CONSENT AGENDA
A. Approval of Minutes
Member Osborne noted a Scribner’s error on page 7 of 109.
Page 1 of 10
CA.A Page 4 of 60
It was moved by Vice-Chair Peloza, seconded by Member Osborne,
that the Committee approve the Public Works Committee Meeting
minutes for date, July 15, 2013, as amended.
Motion carried 3-0.
B. Right-of-Way Use Permit No. 13-23* (Mund)
Auburn Noon Lions Club
Engineering Aide Mund was present. Vice-Chair Peloza asked why
the beer garden will be located at Main and 1st Streets instead of at
the extended City Hall Plaza. Economic Development Manager Lein
explained that there were already vendors assigned to the plaza
area.
It was moved by Vice-Chair Peloza, seconded by Member Osborne,
that the Committee approve Right-of-Way Use Permit No. 13-23.
Motion carried 3-0.
III. RESOLUTIONS
A. Resolution No. 4976 (Fenhaus)
A Resolution of the City Council of the City of Auburn, Washington,
Authorizing the Mayor to Perform the Necessary Actions to Withdraw
from the South King County Regional Water Association and from the
Joint Operating Agreement Among the Members of the Association
Utilities Engineer Repp reported that staff is recommending the City
terminate the joint operating agreement with the members of the King
County Regional Water Association (KCRWA). Utilities Engineer Repp
stated that staff believes the purpose of the agreement has been
fulfilled. Repp noted that the City’s water supply situation has changed
significantly and the City no longer needs the interlocal agreement.
Chairman Wagner asked when the Cities of Kent and Covington
terminated their agreements. Utilities Engineer Repp stated that the
City of Kent is still a member and the City of Covington terminated its
membership approximately two years ago. Chairman Wagner noted
that Resolution No. 4976 needs to be amended to show that the City
of Kent is still a member. Utilities Engineer Repp stated that staff will
make the amendment prior to the Council meeting.
Utilities Engineer Repp stated that the current active members of the
association include the City of Auburn, Water District No. 111, the City
of Kent and the City of Algona.
Utilities Engineer Repp spoke about the benefits of association
Page 2 of 10
CA.A Page 5 of 60
membership and noted that staff can obtain the same benefits from
attending the Washington Water Utility Council Meetings. Repp stated
that participation in the Water Supply Forum is also being considered
by staff.
Chairman Wagner asked what the City is spending on KCRWA
dues. Repp responded that he recalls the dues are approximately
$27,000.00 per year but will confirm the actual amount. Vice-Chair
Peloza asked that staff provide the exact amount of the dues prior to
the Council Meeting.
It was moved by Vice-Chair Peloza, seconded by Member Osborne,
that the Committee recommend City Council adopt Resolution No.
4976.
Motion carried 3-0.
B. Resolution No. 4978 (Webb)
A Resolution of the City Council of the City of Auburn, Washington,
Setting a Public Hearing Date in Relation to Amending the 2014-2019
Transportation Improvement Program of the City of Auburn Pursuant
to R.C.W. Chapter 35.77
Chairman Wagner asked why the Planning and Community
Development Committee is not the action committee for setting the
Public Hearing. Traffic Engineer James explained that the updates to
the Transportation Improvement Program (TIP) need to be amended
prior to August 23, 2013 and because of a time constraint related to
associated grant application deadlines, Public Works Committee will
be the action committee for setting the Public Hearing. The Planning
and Community Development Committee will be the action committee
for Resolution No. 4979, the actual adoption of the amendments.
It was moved by Vice-Chair Peloza, seconded by Member Osborne,
that the Committee recommend City Council adopt Resolution No.
4978.
Motion carried 3-0.
C. Resolution No. 4983* (Selle)
A Resolution of the City Council of the City of Auburn, Washington,
Authorizing the Mayor to Negotiate and Execute an Agreement with
the Other Jurisdictions of the South County Area Transportation Board
Assistant Director/City Engineer Selle stated that the agreement is
basically the same as the previous agreements.
Chairman Wagner asked if the South County Area Transportation
Board had the ability to borrow or tax. Transportation Manager Para
Page 3 of 10
CA.A Page 6 of 60
answered that they do not, and act as an advisory board.
It was moved by Vice-Chair Peloza, seconded by Chair Wagner, that
the Committee recommend City Council adopt Resolution No. 4983.
Motion carried 2-0.
IV. DISCUSSION ITEMS
A. Resolution No. 4979 (Webb)
A Resolution of the City Council of the City of Auburn, Washington,
Amending the 2014-2019 Six-Year Transportation Improvement
Program of the City of Auburn Pursuant to R.C.W. Chapter 35.77
This item was discussed prior to Resolution No. 4983.
Transportation Manager Para explained the engineer’s estimate
discrepancy between the individual TIP project spreadsheet for
Project No. C222A and the overall Transportation Improvement
Program spreadsheet, in response to questions asked by Chairman
Wagner.
Traffic Engineer Webb stated that the other funding for the 37th Street
SE & A Street SE Traffic Signal Safety Improvement Project is the 105
fund for arterial preservation, in response to a question asked by
Chairman Wagner.
The Committee supported adoption of Resolution No. 4979.
B. Resolution No. 4963 (Tiedeman)
A Resolution of the City Council of the City of Auburn, Washington,
Authorizing the Mayor and City Clerk to Execute a Subscription
Agreement between the City of Auburn and Zonar for Electronic Fleet
Management Service
This item was discussed prior to Resolution No. 4983.
IT Director Tiedeman explained that the resolution is a subscription
agreement to purchase equipment and have services provided by
Zonar. The company provides service to Tacoma Public Utilities and
Seattle.
The equipment will allow the City to map, track, categorize, and
maintain all of the City vehicles. IT Director Tiedeman stated that
Zonar is a local vendor and is able to provide the City with service at a
much lower cost than the other vendors staff considered.
IT Director Tiedeman described the benefits of the new system, such
as the software’s ability to integrate with the existing GIS system.
Page 4 of 10
CA.A Page 7 of 60
IT Director Tiedeman answered questions asked by Chairman
Wagner regarding the cost calculations.
Tiedeman stated that because of the low cost and the capability of the
software, he believes the system will be used to manage additional
fleet vehicles, in response to questions asked by Chairman Wagner.
Vice-Chair Peloza asked questions regarding the termination of
contract language included in the agreement. IT Director Tiedeman
stated that he would need to consult with the Legal Department prior
to the Council Meeting.
IT Director Tiedeman reviewed the quote breakdowns and monthly
costs with the Committee. The Committee asked that the monthly
costs be included with the agreement as an exhibit prior to the Council
Meeting.
C. Cascade Water Supply Agreement Review (Repp)
Discussion Item C was removed from the agenda.
D. Capital Project Status Report (Gaub)
This item was discussed prior to Resolution No. 4983.
Item No. C201A – M Street Underpass: Chairman Wagner asked
about the schedule for the review of Phase 2 of the project. Assistant
City Engineer Gaub stated the Committee review will take place in
September in conjunction with the discussion of the Stampede Pass
Railroad Line. Chairman Wagner asked that Phase 2 of the M Street
Project be included on the Action Tracking Matrix with the Stampede
Pass line item.
Chairman Wagner asked about the clean-up schedule. Assistant City
Engineer Gaub stated that clean-up should be complete within the
next two weeks or so. There is a lot of subcontractor work being
coordinated.
Assistant City Engineer Gaub stated that the parking lot entrance for
the apartment complex is better than it had been previously, in
response to a question asked by Chairman Wagner.
Item 10 – CP0912 – Citywide Guardrail Improvements: Chairman
Wagner asked if the new development on Kersey Way will interfere
with the project. Assistant City Engineer Gaub explained that the
guardrail will be installed on the opposite side of the street from the
development at a location that will not be impacted by the road
Page 5 of 10
CA.A Page 8 of 60
improvements.
Item 11 – CP1310 – 2013 Arterial and Collector Crack Sealing: There
is an error in the total budget column and that amount should be
$100,000.00. Assistant City Engineer Gaub will correct the
spreadsheet.
Item A – CP0616 – Wayfinding Pedestrian Kiosks: Member Osborne
asked about the information that will be posted at the kiosks. Assistant
City Engineer Gaub stated that Planning Manager Chamberlain is
currently working with the Parks Department to develop maps for the
kiosks. The Parks Department will be responsible for posting events
information as well.
E. Significant Infrastructure Projects by Others - Public Works Status
Report (Gaub)
This item was discussed prior to Resolution No. 4983.
Item 3 – King County Wastewater – 17th Street SE, K Street SE to C
Street SW Trunk Sewer Main Installation: Chairman Wagner asked if
there will be a detour route for the project. Assistant City Engineer
Gaub explained that A Street will be open during construction but will
be down to one lane in each direction between the hours of 8 a.m.
and 3 p.m. There will be no detour for A Street. There will be a detour
for 17th Street using F Street, 21st Street and 12th Street.
Vice-Chair Peloza asked if staff knew the cost of the project. Assistant
City Engineer Gaub answered that she did not know the total cost.
The Committee discussed the concept of regionalization.
Item 4 – Puget Sound Energy – 17th Street SE, K Street SE to F
Street SE – Gas Main Replacement: Assistant City Engineer Gaub
stated that PSE is still working on their final design and the county,
City, and PSE are all working to coordinate work in the area, in
response to a question asked by Member Osborne.
Item 5 – King County Flood Control District – Reddington
Levee: Chairman Wagner requested a break down for the project
cost. Assistant Director/City Engineer Selle stated that staff should be
able to get that information from the county.
Item 6 – Auburn School District – Auburn High School
Replacement: Member Osborne asked if the school plans on repairing
the roadway. Assistant City Engineer Gaub stated that some of the
road work will be done by PSE, who is doing work in the area, and
some of it will be completed by the school district.
Page 6 of 10
CA.A Page 9 of 60
Assistant Director/City Engineer Selle stated that the school district is
proposing to overlay a portion of the road, in response to a comment
made by Member Osborne regarding the effectiveness of patching the
road.
Assistant City Engineer Gaub explained that some of the current
patches on Main Street are temporary because additional work needs
to be completed. City staff goes over the quality of patching required
with all permit holders and requires them to make repairs if patching is
of a poor quality before accepting the work.
Item 8 – SR18- Neely Bridge Improvements: Engineer Gaub
responded that the main work that required a closure of SR18 was
completed and that WSDOT has other work they are doing in the
corridor but it would not require the full closure.
F. Action Tracking Matrix (Dowdy)
This item was discussed prior to Resolution No. 4983.
Utilities Engineer Repp provided a briefing on planned unidirectional
flushing of the water system in the Lea Hill area, to the Committee.
Repp stated that there will be detailed customer notifications prior to
the flushing beginning. The notification will include door tags, a
website update, and a Code Red notice.
Water Utility Engineer Fenhaus described how the system will be
flushed and that Maintenance and Operations staff will be completing
the work.
Utilities Engineer Repp stated that flushed water goes into the sanitary
sewer or it is de-chlorinated and released into the storm drain
depending on the situation, in response to a question asked by
Chairman Wagner. Repp explained how the water is de-chlorinated
using large tablets of vitamin C.
Water Utility Engineer answered questions asked by Chairman
Wagner regarding how long the flushing will take.
Vice-Chair Peloza asked if the flushing will have an effect on private
filter systems. Repp answered that there could be a negative effect
and discussed the instructions that are provided to customers to
prevent problems. Utilities Engineer Repp stated that the City would
fix damage caused by the flushing.
Chairman Wagner asked that the instructions be printed in bold type
Page 7 of 10
CA.A Page 10 of 60
on the door hangers.
Water Utility Engineer Fenhaus reviewed the flushing schedule with
the Committee.
G. Public Works Project No. CP1119 (Sweeting)
Auburn Way South, Fir to Hemlock Street: Extesion of Project Limits
and Associated Additional Project Costs to Meet WSDOT
Requirements
Senior Project Engineer Sweeting explained that in the project’s
original design, there were two through lanes, east bound, through the
Hemlock Street intersection, which tapered into one lane at the end of
the project area. The design was submitted to WSDOT and WSDOT
stated that there needs to be at least 300 feet of two full lanes east
past the Hemlock intersection before tapering to a single lane. Staff
determined that the WSDOT requirements would delay the project
and would also increase the cost of the project.
Staff then redesigned the project to have the two east bound lanes
end at Hemlock Street, at which point one lane would go through the
intersection and the second lane would become a right-turn only
lane.
Senior Project Engineer Sweeting stated that at this point staff has a
better estimate of the cost of the original design, including the
WSDOT requirements, and is recommending moving forward with the
original design as conditioned by WSDOT. It would add an estimated
$200,000.00 to the cost of the project.
Sweeting reviewed the benefits of including the two through lanes
past the Hemlock Street intersection with the Committee.
Chairman Wagner asked if additional Right-of-Way would need to be
purchased. Sweeting confirmed that Right-of-Way from three
additional parcels would need to be acquired.
Transportation Manager Para stated that the additional funding for the
project will come from Traffic Impact Fees. Engineer Sweeting
explained that the majority of over $3 million in existing funding is
coming from state and federal sources and the City’s current
contribution to the Auburn Way South projects is only about $100,000
at this time in response to a question from the Committee.
The Committee supported moving forward with staff’s
recommendation.
H. M Street Rechannelization Parking Removal (Para)
Page 8 of 10
CA.A Page 11 of 60
Transportation Manager Para identified the section of the roadway
where on-street parking will be removed following the extension of the
four lane section of M Street, as proposed by staff between Main
Street and Auburn Way South.
The Committee and staff discussed the impact of removing the
parking.
Transportation Manager Para and Assistant Director/City Engineer
Selle responded to questions asked by Chairman Wagner regarding
extension of c-curb.
Chairman Wagner stated that he is in favor of removal of the parking
as long as that does not lead to the installation of c-curb.
Staff discussed the improved traffic flow that would occur as a result
of removing the on-street parking and extending the four lanes.
Vice-Chair Peloza asked for accident data associated with backing
into the street for the corridor location. Chairman Wagner asked for
data for speeding traffic infractions for this portion of the
corridor. Vice-Chair Peloza asked for staff to report on the number of
driveways along this section of roadway.
I. Regional Traffic Signal Maintenance Support (Dowdy)
Assistant Director/City Engineer Selle stated that there are several
cities that are looking for alternatives for their signal maintenance and
operation since King County is planning on reducing some of their
signal staff. The Public Works Directors of South King County are
seeking guidance from their Councils in regards to being involved in a
potential mutual aide agreement for such signal maintenance and
operations support.
A survey has been sent out to the local cities to determine what
resources may be available and determine willingness for
participation.
Assistant Director/City Engineer Selle asked for policy direction from
the Committee as to whether or not staff should spend more time
and/or effort on the proposal.
Chairman Wagner requested additional information regarding the City
of Federal Way’s equivalent costs for traffic signal maintenance and
operations being provided by King County, the City of Renton’s
justification for their high number of traffic signal technicians, and
Auburn’s costs for performing this area of work.
Page 9 of 10
CA.A Page 12 of 60
Chairman Wagner stated that while he is not against the idea of
mutual aide agreements, he generally feels that Auburn should be in
control its own traffic signal maintenance and operations resources so
that Auburn can set its own Level of Service Standards in this critical
area, however, he would like to see the requested additional
information and have further discussions on the topic.
V. ADJOURNMENT
There being no further business to come before the Public Works
Committee, the meeting was adjourned at 4:59 p.m.
Approved this 19th day of August, 2013.
Page 10 of 10
CA.A Page 13 of 60
AGENDA BILL APPROVAL FORM
Agenda Subject:
Public Works Project No. C222A
Date:
August 13, 2013
Department:
Public Works
Attachments:
Consultant Summary Scope
Budget Status Sheet
Vicinity Map
Budget Impact:
$0
Administrative Recommendation:
Public Works Committee recommend City Council grant permission to enter into
Consultant Agreement No. AG-C-435 with Parametrix for Engineering Services for
Project No. C222A The S277th St Corridor Capacity & Non-motorized Trail Improvement
project.
Background Summary:
The S 277th St Corridor Capacity and Non-Motorized Trail Improvement project consists
of intersection improvements and major roadway widening on S 277th St from Auburn
Way North to L Street NE. Project components include adding two new eastbound
through lanes, one new west bound through lane, a Class I separated non motorized
trail, street lighting improvements, storm drainage improvements, streetscape
improvements, Intelligent Transportation System (ITS) improvements, intersection
capacity and safety improvements, and auxiliary turn lanes at Auburn Way North, D
Street NE, and the future I Street NE. The project length is approximately 3,300 feet.
City staff has selected Parametrix to provide Engineering Services for the above
referenced project and the anticipated consultant cost for this agreement is
$1,250,000.00.
The City is in the process of applying for grant funding for construction of this project. At
this time, the City has secured a federal grant to fund the design and property
acquisition portions of the project. A budget adjustment is not required to fund this
consultant work.
Reviewed by Council Committees:
Public Works
Councilmember:Wagner Staff:Vondrak
AUBURN * MORE THAN YOU IMAGINEDCA.B Page 14 of 60
Meeting Date:August 19, 2013 Item Number:CA.B
AUBURN * MORE THAN YOU IMAGINEDCA.B Page 15 of 60
S277TH ST CORRIDOR CAPACITY & NON-MOTORIZED TRAIL IMPROVEMENT PROJECT
CONSULTANT SCOPE OF WORK SUMMARY
PAGE 1 OF 2
C222a – S277th St Corridor Capacity & Non-motorized Trail
Improvement Project
Summary
Scope for Design Services
This Scope of Work is for the S277th St Corridor Capacity & Non-motorized Trail Improvement Project.
The Consultant scope of work includes survey and base mapping, preliminary design, utility
coordination, environmental documentation and permitting, geotechnical investigation, right-of-way
services and final design (including contract plans, specifications, and estimates).
Project Description
The S 277th St Corridor Capacity and Non-Motorized Trail Improvement project consists of
intersection improvements and major roadway widening on S 277th St from Auburn Way North to L
Street NE. Project components include adding two new eastbound through lanes, one new west bound
through lane, a Class I separated non motorized trail, street lighting improvements, storm drainage
improvements, streetscape improvements, Intelligent Transportation System (ITS) improvements,
intersection capacity and safety improvements, and auxiliary turn lanes at Auburn Way North, D Street
NE, and the future I Street NE. The project length is approximately 3,300 feet.
Task 1: Project Management
This task will be continuous throughout the project duration, which is assumed to be 22 months. It will
include managing the project work elements to control costs, maintaining the project schedule and
establishing project-specific procedures, including communication, overall project coordination with
the City and project team, and project closeout.
Task 2: Preliminary Design (30%)
This task will progress the major design elements to an overall 30% level, and perform specific
activities to support this design level. The preliminary design effort will include completing the
conceptual design plan, reviewing and analyzing existing record drawings and traffic data, providing
field survey and basemap, wetland mapping, completing a surface water and stormwater analysis,
right-of-way planning and identifying future right-of-way acquisition efforts, preparing a preliminary
conceptual design report, and preparing preliminary 30% design plans and engineer’s opinion of cost
estimate.
Task 3: Utility Coordination
This task includes identifying potential project conflicts with existing utilities and participating in
project coordination meetings with the City, Puget Sound Energy, Comcast, and Century Link.
Task 4: Environmental
The purpose of the Environmental Documentation Task is to ensure that the project complies with all
applicable requirements of the National Environmental Policy Act (NEPA), Endangered Species Act,
National Historic Preservation Act, the Washington State Environmental Policy Act (SEPA), and other
permitting documents, including the Joint Aquatic Resources (JARPA) permit, Critical Areas
Ordinance, and National Pollution Discharge Elimination System (NPDES) compliance, and that the
CA.B Page 16 of 60
S277TH ST CORRIDOR CAPACITY & NON-MOTORIZED TRAIL IMPROVEMENT PROJECT
CONSULTANT SCOPE OF WORK SUMMARY
PAGE 2 OF 2
regulatory permits and approvals required to construct the project are identified and secured, all
within a timeframe that will allow the project to proceed on schedule.
Task 5: Geotechnical Engineering
The purpose of the geotechnical engineering task is to explore subsurface conditions. A geotechnical
engineer will conduct a site reconnaissance, complete field exploration, and prepare a report that
includes a site map showing exploration locations, boring logs, results of the laboratory testing,
summarizes site subsurface conditions, discusses the impact of the proposed improvements, and offers
design recommendations for the improvements.
Task 6: Right of Way Plans and Legal Descriptions
This task includes preparing right-of-way plans to identify portions of private property for right of way
acquisition. Existing easements will be identified and encumbrances shown on the right of way plans.
Legal descriptions with exhibit maps will be prepared. A record of survey for proposed roadway
centerline alignment and stationing will also be prepared.
Task 7: Right of Way Acquisition
This task includes the development of property acquisition documents, acquisition negotiation, escrow
closing, and right-of-way certification. Parcel files will be prepared to include fair offer letter(s),
recording and ancillary documents, a standard diary form indicating all contacts with owner(s), and
other items necessary for negotiations in a format meeting the City’s requirements.
Task 8: Plans, Specifications, and Estimate (PS&E)
This final design task progresses the design from 30% level to preparing the 70% contract drawings for
review, the 95% contract drawings for review, a 99% check set of the contract drawings and 100% (bid
ready) contract drawings. Technical and general specifications will be developed based on the
WSDOT/APWA 2014 Standard Specifications and the City’s standard special provisions for the contract
documents as applicable to the project design. An engineer’s opinion of cost estimate for the project
will be prepared at the 30%, 70%, 95%, 99% and final levels of completion.
Total Consultant Agreement (not to exceed) = $1,250,000.00
Task 9: Optional Services
This work has not been estimated as part of the current agreement and would require an amendment
to the contract.
Construction Support Services
As requested by the City, the Consultant will provide assistance to the City during the construction of
the project as follows:
· Assistance during bidding
· Assistance during construction
· Construction management, administration, and other related services to support the City
during construction
· Additional right-of-way services
CA.B Page 17 of 60
Project No: C222a0 Project Title:
Project Manager: Ryan Vondrak
Initiation/Consultant Agreement
Initiation Date: _________ Permision to Advertise
Advertisement Date: ________ Contract Award
Award Date: ___________ Change Order Approval
Contract Final Acceptance
Funding Prior Years 2013 2014 Future Years Total
102 Fund - Unrestricted 24,825 382,560 0 407,385
102 Fund - Federal Grant 0 167,440 791,375 61,885 1,020,700
102 Fund - Private Developer (RPG)**0 0 1,300,000 1,000,000 2,300,000
102 Fund - Traffic Impact Fees 0 0 0 581,800 581,800
0
Total 24,825 550,000 2,091,375 1,643,685 4,309,885
**Property being dedicated by RPG is estimated at $1.3 million
Activity Prior Years 2013 2014 Future Years Total
Design Engineering - City Costs 24,825 50,000 65,875 15,000 155,700
Design Engineering - Consultant Costs 500,000 650,000 50,000 1,200,000
ROW - Property Acquisition***0 1,320,000 1,320,000
ROW - Property Acquisition - City Costs 5,500 5,500
ROW - Property Acquisition - Consultant Costs 0 50,000 50,000
Construction Estimate 0 4,661,000 4,661,000
Project Contingency (15%)0 699,150 699,150
Construction Engineering - City Costs 0 0 118,535 118,535
Construction Engineering - Consultant Costs 0 100,000 100,000
Total 24,825 550,000 2,091,375 5,643,685 8,309,885
***$1.3 million of this is anticipated to be dedicated to the City by RPG
Prior Years 2012 2013 Future Years Total
*102 Funds Budgeted ( )(24,825)(550,000)(2,091,375)(1,643,685)(4,309,885)
102 Funds Needed 24,825 550,000 2,091,375 5,643,685 8,309,885
*102 Fund Project Contingency ( )0 0 0 0 0
102 Funds Required 0 0 0 4,000,000 4,000,000
* ( # ) in the Budget Status Sections indicates Money the City has available.
102 Arterial Street Budget Status
BUDGET STATUS SHEET
S 277th St Corridor Capacity & Non Motorized Trail Improvements
Date: 8/12/13
The "Future Years" column indicates the projected amount to be requested in future budgets.
Funds Budgeted (Funds Available)
Estimated Cost (Funds Needed)
H:\PROJ\C222A-S277-AWNtoGreenRvr\Budget\Budget Status 277.xls 1 of 1CA.B Page 18 of 60
CA.B Page 19 of 60
AGENDA BILL APPROVAL FORM
Agenda Subject:
Public Works Project No. CP1202
Date:
August 13, 2013
Department:
Public Works
Attachments:
Consultant Scope Summary
Budget Status Sheet
Vicinity Map
Budget Impact:
$0
Administrative Recommendation:
Public Works Committee recommend City Council grant permission to enter into Consultant
Agreement No. AG-C-425 with KPG, Inc. for engineering services for Project No. CP1202
Auburn Way South Flooding Imp Phase II.
Background Summary:
The City’s Auburn Way South Flooding Imp. - Phase II project will design and construct storm
water drainage improvements along 17th Street SE, from the point of termination of the Phase I
project at 17th St SE/K Street SE, westerly along 17th Street SE, to the A Street SE Infiltration
Pond. From this point west, approximately 3,100 LF of larger diameter pipe will replace the
existing lines in 17th St. SE. Existing pipe flows at J St. SE and B St. SE will re-routed to the
17th Street SE drainage system. This project also includes deepening the existing 17th and A
Street SE infiltration pond to provide additional storm water storage.
City Staff has selected KPG, Inc. to provide Engineering Services for the project and the
anticipated consultant contract for this agreement is $265,000.
A project budget contingency of $0.00 remains in the 432 Storm Drainage Utility Fund for 2013.
Reviewed by Council Committees:
Public Works
Councilmember:Wagner Staff:Lee
Meeting Date:August 19, 2013 Item Number:CA.C
AUBURN * MORE THAN YOU IMAGINEDCA.C Page 20 of 60
CP1202– AUBURN WAY SOUTH FLOODING IMP. - PHASE II PROJECT
CONSULTANT SCOPE OF WORK SUMMARY
PAGE 1 OF 2
CP1202– Auburn Way South Flooding Imp. - Phase II Project
City of Auburn
Scope for Design Services - Summary
This Scope of Work is for the Auburn Way South Flooding Imp. - Phase II Project. This scope includes
survey and base mapping, preliminary engineering, preliminary geotechnical investigations,
environmental documentation and permitting, and final design (including plans, specifications, and
estimates). The scope also contains optional services for bidding assistance, construction support, and
record drawing preparation.
Project Description
The City’s Auburn Way South Flooding Imp. - Phase II project will design and construct storm water
drainage improvements along 17th Street SE, from the point of termination of the Phase I project at 17th
St SE/K Street SE, westerly along 17th Street SE, to the A Street SE Infiltration Pond. At the intersection
of K St SE/17th St. SE, a new flow control structure will be installed to maintain the current flow to K St.
SE. From this point west, approximately 3,100 LF of larger diameter pipe will replace the existing lines
in 17th St. SE. The existing pipes along 17th St. SE at the intersections of J St. SE and B St. SE will be
plugged, diverting all flows west and away from their current connection to the AWS drainage system.
This project also includes deepening the existing 17th and A Street SE infiltration pond to provide
additional storm water storage.
Project Management
This task will be continuous throughout the project duration, which is assumed to be 12 months. It will
include the work necessary to set up and plan the entire project and establish project-specific
procedures, including communication, overall project coordination with the City and project team, and
project closeout.
Survey and Mapping
This task involves field surveying along 17th Street SE from K Street SE through the intersection of A
Street SE, and at the existing A Street SE Infiltration Pond; side street topography will extend to +/- 10’
beyond the curb returns. Collecting of existing topographic features and producing a project basemap
and Digital Terrain Model (DTM) to be used in design.
Geotechnical Engineering
Geotechnical services will support design and construction of the new storm drain utility along 17th
Street SE, provide geotechnical design recommendations for deepening of the existing
detention/infiltration pond, and provide a recommended long-term infiltration rate for the pond.
CA.C Page 21 of 60
CP1202– AUBURN WAY SOUTH FLOODING IMP. - PHASE II PROJECT
CONSULTANT SCOPE OF WORK SUMMARY
PAGE 2 OF 2
Permitting Support
The Consultant shall provide support necessary to complete the three required permitting documents.
These include a State Environmental Policy Act (SEPA) checklist, a Notice of Intent (NOI) for coverage
under the Construction Stormwater General Permit and a Stormwater Pollution Prevention Pan
(SWPPP).
Contract Documents and Cost Estimates
This final design task progresses the design from 30% level to preparing the 70% contract drawings for
review, the 95% contract drawings for review, a 99% check set of the contract drawings and 100% (bid
ready) contract drawings. Technical and general specifications will be developed based on the
WSDOT/APWA 2014 Standard Specifications and the City’s standard special provisions for the contract
documents as applicable to the project design. An engineer’s opinion of cost estimate for the project
will be prepared at the 30%, 70%, 95%, 99% and final levels of completion.
Total Consultant Agreement (not to exceed) = $265,000
Optional Services
This work has not been estimated as part of the current agreement and would require an amendment
to the contract:
Right of Way Research – The Consultant may provide right of way and easement research and/or
acquisition, as requested by the City
Bidding Phase Services – The Consultant may provide the following services as requested by the City:
• Providing written responses to questions during bidding.
• Preparation of Addenda documents if required
Construction Support Services – The Consultant may support City staff during the construction phase
of the project, as requested by the City.
Preparation of Record Drawings – Upon completion of the construction phase of the project,
Consultant may prepare record drawings for the project.
CA.C Page 22 of 60
H:\PROJ\CP1202-AWS Flooding Improvements\Budget\AWS Budget Status.xls1 of 1
Project No: CP1202Project Title:
Project Manager: Robert Lee
Initiation/Consultant Agreement
Initiation Date: _________ Permision to Advertise
Advertisement Date: ________ Contract Award
Award Date: ___________ Change Order Approval
Contract Final Acceptance
Funding Prior Years 20132014 Future Years Total
432 Fund - Storm 01,638,000001,638,000
Total 01,638,000001,638,000
Funds Budgeted (Funds Available)
Estimated Cost (Funds Needed)
BUDGET STATUS SHEET
Auburn Way South Flooding Imp. - Ph II
Date: August 13, 2013
The "Future Years" column indicates the projected amount to be requested in future budgets.
Activity Prior Years 20132014 Future Years Total
Design Engineering - City Costs 35,000035,000
Design Engineering - Consultant Costs 265,0000265,000
Construction Estimate 1,110,00001,110,000
Project Contingency (15%)166,5000166,500
Construction Engineering - City Costs 36,500036,500
Construction Engineering - Consultant Costs25,000025,000
Total 01,638,000001,638,000
Prior Years 20132014 Future Years Total
*432 Funds Budgeted ( )0(1,638,000)00(1,638,000)
432 Funds Needed 01,638,000001,638,000
*432 Fund Project Contingency ( )00000
432 Funds Required 00000
* ( # ) in the Budget Status Sections indicates Money the City has available.
432 Storm Budget Status
Estimated Cost (Funds Needed)
CA.C Page 23 of 60
CP1202 - AWS Flooding - Ph 2
Printed Date:
Information shown is for general reference
purposes only and does not necessarily
represent exact geographic or cartographic
data as mapped. The City of Auburn makes no
warranty as to its accuracy.
Map Created by City of Auburn eGIS
1/11/2013
CA.C Page 24 of 60
AGENDA BILL APPROVAL FORM
Agenda Subject:
Public Works Project No. CP1218
Date:
August 13, 2013
Department:
Public Works
Attachments:
Consultant Scope Summary
Budget Status Sheet
Vicinity Map
Budget Impact:
$0
Administrative Recommendation:
Public Works Committee recommend City Council grant permission to enter into
Consultant Agreement No. AG-C-430 with CH2M Hill, Inc. for engineering services for
Project No. CP1218, Auburn Way South Improvements Muckleshoot Plaza to Dogwood.
Background Summary:
This project will design and construct corridor improvements on Auburn Way South,
from the Muckleshoot Plaza to Dogwood Street SE, including improving access
management, providing u-turns, upgrading transit stops and street lighting, widening to
accommodate turn lanes and 10-foot wide sidewalks, installing pedestrian push buttons
and audible countdown pedestrian signal heads, and upgrading traffic signals.
City staff has selected CH2M Hill, Inc. to provide engineering services for this project
and the anticipated consultant cost for this agreement is $362,000.00.
The total project budget is $2,395,422.00, of which $2,333,108.00 is from a federal grant
and $60,000.00 will be proposed in an upcoming budget adjustment in the 430 fund.
Reviewed by Council Committees:
Public Works
Councilmember:Wagner Staff:Sweeting
Meeting Date:August 19, 2013 Item Number:CA.D
AUBURN * MORE THAN YOU IMAGINEDCA.D Page 25 of 60
AUBURN WAY SOUTH CORRIDOR IMPROVEMENTS – MUCKLESHOOT PLAZA TO DOGWOOD STREET SE
CONSULTANT SCOPE OF WORK SUMMARY
PAGE 1 OF 2
CP1218 – Auburn Way South Corridor Improvements,
Muckleshoot Plaza to Dogwood St SE Project
Summary
Scope for Survey and Design Services
This Scope of Work is for the Auburn Way South Corridor Safety Improvements Project. This scope
includes survey and base mapping, preliminary engineering, environmental documentation and
permitting, and final design (including plans, specifications, and estimates).
Project Description
The purpose of the project is to improve access management, provide u-turns, upgrade transit stops
and street lighting, widen Auburn Way South to accommodate turn lanes and pedestrians and bicycles,
upgrade pavement markings, install countdown pedestrian signals and audible pedestrian push
buttons, and upgrade traffic signals to change the phasing and to improve the visibility of signal heads.
In addition, the project will provide for the future proposed project to master meter the Muckleshoot
Casino site located at 2402 Auburn Way South. This project will provide waterline stubs within the
project area as needed to avoid future work within the new roadway improvements.
Task 1: Project Management
This task will be continuous throughout the project duration, which is assumed to be 14 months. It will
include the work necessary to set up and plan the entire project and establish project-specific
procedures, including communication, overall project coordination with the City and project team, and
project closeout.
Task 2: Survey and Mapping
This task involves field surveying within the project limits, collecting existing topographic features and
producing a project basemap and Digital Terrain Model (DTM) to be used in design.
Task 3: Preliminary Design
This task will progress the major design elements to an overall 30% level, and perform specific
activities to support this design level. The preliminary design effort will include modifying the design
concept based on agency, WSDOT and stakeholder input. Documentation of the Preliminary Design
task will include the preparation of preliminary WSDOT channelization plans and 30% plans
addressing roadway, grading, drainage, utilities, landscaping and traffic signal layout.
Task 4: Environmental Documentation
The purpose of the Environmental Documentation Task is to ensure that the project complies with all
applicable requirements of the National Environmental Policy Act (NEPA) and of the Washington State
Environmental Policy Act (SEPA), and that the regulatory permits and approvals required to construct
the project are identified and secured, all within a timeframe that will allow the project to proceed on
schedule.
CA.D Page 26 of 60
AUBURN WAY SOUTH CORRIDOR IMPROVEMENTS – MUCKLESHOOT PLAZA TO DOGWOOD STREET SE
CONSULTANT SCOPE OF WORK SUMMARY
PAGE 2 OF 2
Task 5: Agency, Stakeholder, Tribal, and Community Coordination
This task consolidates agency, stakeholder, Tribal, and public consultation and coordination required
for the engineering design process and for compliance with NEPA, SEPA and Section 106 of the
National Historic Preservation Act.
Work to be performed under this task also includes general administrative coordination with the key
project review agencies and affected utility companies, as well as detailed technical coordination to
obtain engineering review and approval of project technical work as applicable.
Task 6: Right of Way
Right of Way services including legal descriptions, parcel maps, appraisals, negotiations, and
coordination are not included in this scope of work but may be added under a future amendment once
property needs are better defined.
Task 7: Contract Drawings
This final design task progresses the design from 30% level to preparing the 70% contract drawings for
review, the 95% contract drawings for review, a 99% check set of the contract drawings and 100% (bid
ready) contract drawings.
Task 8: Geotechnical Engineering
This scope of work covers geotechnical engineering services needed to support development of
contract documents for the construction of potential infiltration facilities associated with the widening
of Auburn Way South.
Task 9: Specifications
The Consultant will develop the technical and general specifications based on the WSDOT/APWA 2014
Standard Specifications and the City’s standard special provisions for the contract documents as
applicable to the project design.
Task 10: Cost Estimating
The Consultant will prepare an engineer’s estimate for the project at the 30%, 70%, 95%, 99% and final
levels of completion.
Subtotal Consultant Agreement = $317,000.00
Task 11: Utility Underground (Optional)
Additional work will be required to complete the project design if the City requests that Puget Sound
Energy underground its facilities in accordance with Rate Tariff Agreement Schedule 74. This
additional work has been estimated and included as part of this task. This Task requires written
authorization prior to proceeding. The work would involve coordinating and integrating the design of
Puget Sound Energy underground facilities into the project improvements.
Optional Services = $45,000.00
Total Consultant Agreement (not to exceed) = $362,000.00
CA.D Page 27 of 60
H:\PROJ\CP1218-AWS Corridor Safety Impv\Budget\CP1218.BudgetStatusSheet.xls
1 of 1
8/12/2013 5:41 PM
Project No: CP1218 Project Title:
Project Manager: Jacob Sweeting
Consultant Agreement
Initiation Date: _09/17/12___ Permision to Advertise
Advertisement Date: ________ Contract Award
Award Date: ___________ Change Order Approval
Contract Final Acceptance
Funding Prior Years 2013 2014 Future Years Total
102 Fund - Federal Grant 2,738 247,262 2,083,108 2,333,108
102 Fund 2,684
430 Fund 5,000 55,000
Total 5,422 252,262 2,138,108 0 2,333,108
Activity Prior Years 2013 2014 Future Years Total
Design Engineering - City Costs 5,422 15,000 25,000 45,422
Design Engineering - Consultant Costs 100,000 262,000 362,000
Property Acquisition - Consultant Costs 7,500 5,000 12,500
Property Acquisition 50,000 50,000
Construction Estimate 1,700,000 1,700,000
Project Contingency (10%)170,000 170,000
Construction Engineering - City Costs 40,000 40,000
Construction Engineering - Consultant Costs 15,000 15,000
Total 5,422 122,500 2,267,000 0 2,394,922
Prior Years 2013 2014 Future Years Total
*102 Funds Budgeted ( )(5,422)(247,262)(2,083,108)0 (2,335,792)
102 Funds Needed 5,422 117,500 2,212,000 0 2,334,922
*102 Fund Project Contingency ( )0 (129,762)0 0 (870)
102 Funds Required 0 0 128,892 0 0
Prior Years 2013 2014 Future Years Total
*430 Funds Budgeted ( )0 (5,000)(55,000)0 (60,000)
430 Funds Needed 0 5,000 55,000 0 60,000
*430 Fund Project Contingency ( )0 0 0 0 0
430 Funds Required 0 0 0 0 0
* ( # ) in the Budget Status Sections indicates Money the City has available.
102 Arterial Street Budget Status
430 Water Budget Status
BUDGET STATUS SHEET
Auburn Way South Corridor Safety Improvements - Muckleshoot
Plaza to Dogwood St SE
Date: August 8, 2013
The "Future Years" column indicates the projected amount to be requested in future budgets.
Funds Budgeted (Funds Available)
Estimated Cost (Funds Needed)
CA.D Page 28 of 60
CA.D Page 29 of 60
AGENDA BILL APPROVAL FORM
Agenda Subject:
Public Works Project No. CP1310
Date:
August 13, 2013
Department:
Public Works
Attachments:
Budget Status Sheet
Bid Tab Summary
Vicinity Maps
Budget Impact:
$0
Administrative Recommendation:
Public Works Committee recommend City Council award Small Works Contract No. 13-14 to
Doolittle Construction, LLC on their low bid of $54,870.00 for Project No. CP1310, 2013
Arterial & Collector Crack Seal.
Background Summary:
This project will seal cracks in the pavement on approximately 3.5 miles of arterial and
collector roadways using rubberized asphalt to help preserve the existing pavement. The
attached maps show the specific streets that will be crack sealed as part of this project.
Construction of the project is anticipated to begin in September of 2013 and be completed at
the end of September 2013 weather permitting.
Only one bid was received for this project. Staff recommends award of this project since the
bid amount was well within the anticipated bid range.
This project is within the budget available in the 105 (Arterial and Collector Street Pavement
Preservation) fund.
Reviewed by Council Committees:
Public Works
Councilmember:Wagner Staff:Carter
Meeting Date:August 19, 2013 Item Number:CA.E
AUBURN * MORE THAN YOU IMAGINEDCA.E Page 30 of 60
Project No: CP1310Project Title:
Project Manager: Jai Carter
Initiation/Consultant Agreement
Initiation Date: June 17, 2013 Permission to Advertise
Solicitation Date: July 23, 2013 Contract Award
Award Date: ______________________ Change Order Approval
Contract Final Acceptance
Funding Prior Years 2012 2013 Total
105 Fund - Arterial/Collector Pavement Preservation Fund060,00060,000
Total0060,00060,000
BUDGET STATUS SHEET
2013 Arterial & Collector Street Crack Seal Project
Date: August 13, 2013
The "Future Years" column indicates the projected amount to be requested in future budgets.
Funds Budgeted (Funds Available)
ActivityPrior Years2012 2013 Total
Design Engineering 1,4001,400
Construction Bid 54,87054,870
Authorized Contigency (~2%)1,2301,230
Construction Engineering 2,5002,500
Total0060,00060,000
Prior Years 2012 2013 Total
*105 Funds Budgeted ( )00(60,000)(60,000)
105 Funds Needed 0060,00060,000
**105 Fund Project Contingency ( )0000
105 Funds Required 0000
* ( # ) in the Budget Status Sections indicates Money the City has available.
Estimated Cost (Funds Needed)
105 Arterial/Collector Street Budget Status
Page 1 of 1CA.E Page 31 of 60
CA.E Page 32 of 60
CA.E Page 33 of 60
CA.E Page 34 of 60
CA.E Page 35 of 60
AGENDA BILL APPROVAL FORM
Agenda Subject:
Public Works Project No. CP1225
Date:
August 12, 2013
Department:
Public Works
Attachments:
Budget Status Sheet
Bid Tab Summary
Vicinity Map
Budget Impact:
$0
Administrative Recommendation:
Public Works Committee recommend City Council award Contract No. 13-05, to ICON
Materials on their low bid of $924,114.00 for Project No. CP1225, West Valley Highway System
Preservation Project.
Background Summary:
The West Valley Highway System Preservation project will overlay West Valley Highway
between 15th Street NW and 37th Street NW with a 2-inch layer of new asphalt pavement. This
work will prevent deterioration of the existing pavement and improve the driving surface of the
roadway.
This project will also upgrade seventeen wheelchair ramps and modify the pedestrian signal
system at the 15th St NW intersection to meet American with Disabilities Act requirements.
Construction is anticipated to begin in early September and be complete in December 2013.
A project budget contingency of $26,475 remains in the 105 (Arterial and Collector Street
Pavement Preservation) Fund.
Reviewed by Council Committees:
Public Works
Councilmember:Wagner Staff:Wickstrom
Meeting Date:August 19, 2013 Item Number:CA.F
AUBURN * MORE THAN YOU IMAGINEDCA.F Page 36 of 60
Project No: CP1225Project Title:
Project Manager: Seth Wickstrom
Initiation/Consultant Agreement
Initiation Date: __October 15, 2012___ Permission to Advertise
Advertisement Date: _July 18, 2013__ Contract Award
Award Date: ___________________ Change Order Approval
Contract Final Acceptance
Funding Prior Years 20122013 Future Years Total
105 Fund - Arterial/Collector Preservation 12,323560,000572,323
Federal Highway Administration STP Grant 560,000560,000
Total 012,3231,120,00001,132,323
BUDGET STATUS SHEET
West Valley Highway System Preservation Project
Date: August 9, 2013
The "Future Years" column indicates the projected amount to be requested in future budgets.
Funds Budgeted (Funds Available)
Activity Prior Years 20122013 Future Years Total
Design Engineering - City Costs 12,32352,00064,323
Construction Estimate 924,114924,114
Construction Contingency (10%)92,41192,411
Construction Engineering - City Costs 25,00025,000
Total 012,3231,093,52501,105,848
Prior Years 20122013 Future Years Total
*105 Funds Budgeted ( )0(12,323)(1,120,000)0(1,132,323)
105 Funds Needed 012,3231,093,52501,105,848
*105 Fund Project Contingency ( )00(26,475)0(26,475)
105 Funds Required 00000
* ( # ) in the Budget Status Sections indicates Money the City has available.
Estimated Cost (Funds Needed)
105 Arterial Street Budget Status
1 of 1CA.F Page 37 of 60
CA.F Page 38 of 60
SCALE: 1 inch = 830 feet
0 415ft 830ft
Plotted: June 11, 2013 Location: H:\PROJ\CP1225-W Valley Hwy Overlay\PWCCouncilInfo\Permission to Ad (6-17-13)\Map.dwg
WEST VALLEY
HIGHWAY SYSTEM
PRESERVATION
PROJECT
VICINITY MAP
PROJECT
AREA
CA.F Page 39 of 60
AGENDA BILL APPROVAL FORM
Agenda Subject:
Public Works Project No. CP1201
Date:
August 12, 2013
Department:
Public Works
Attachments:
Budget Status Sheet
Final Pay Estimate
Vicinity Map
Budget Impact:
$0
Administrative Recommendation:
Public Works Committee recommend City Council approve Final Pay Estimate No. 8 to
Contract No. 12-08 in the amount of $0.00 and accept construction of Project No.
CP1201, 2012 Local Street Pavement Reconstruction project.
Background Summary:
The 2012 Local Street Pavement Reconstruction project reconstructed 0.6 miles of local
streets (shown on the attached map) as part of the 2012 Save Our Streets (SOS)
program. Storm drainage improvements were also constructed on the project streets to
address local storm drainage issues. This work was funded by the 103 (Local Street)
Fund.
The 432 (Strom Drainage) fund paid for the design work necessary to connect the new
storm drainage improvements with the existing storm drainage transmission lines.
This project also replaced the deteriorated and undersized water mains on the project
streets which was funded by the 430 (Water) Fund.
A project budget contingency of $207,409 remains in the 103 (Local Street Pavement
Preservation) Fund.
A project budget contingency of $135,377 remains in the 430 (Water) Fund.
A project budget contingency of $3,673 remains in the 432 (Storm Drainage) Fund
Reviewed by Council Committees:
Public Works
Councilmember:Wagner Staff:Wickstrom
AUBURN * MORE THAN YOU IMAGINEDCA.G Page 40 of 60
Meeting Date:August 19, 2013 Item Number:CA.G
AUBURN * MORE THAN YOU IMAGINEDCA.G Page 41 of 60
Project No: CP1201 Project Title:
Project Manager: Seth Wickstrom
Initiation/Consultant Agreement
Initiation Date: _October 17, 2011_______ Permission to Advertise
Solicitation Date: _June 7, 2012________ Contract Award
Award Date: __June 17, 2012__________ Change Order Approval
Contract Final Acceptance
Funds Budgeted (Funds Available)
Funding Prior Years 20112012 2013 Total
103 Fund - Local Street Pavement Preservation
(A portion of funds budgeted in 2012)984,410190,0001,174,410
430 Fund - Water
(Funds budgeted in 2012 for "Street Utility Improvements")400,000100,000500,000
432 Fund - Storm
(Funds budgeted in 2012 for "Street Utility Improvements")
6,3273,67310,000
Funds from Century Link for Utility Conflict
(for Change Order No. 1)29,12529,125
Total 001,390,737322,7981,713,535
Estimated Cost (Funds Needed)
ActivityPrior Years20112012 2013 Total
Design Engineering - City Costs*2,727 2,727
Design Engineering - Consultant Costs 145,208 145,208
Construction Contract Bid 1,143,957 87,211 1,231,168
Change Order No. 1
(for Century Link Conflict)28,591 28,591
BUDGET STATUS SHEET
2012 Local Street Pavement Reconstruction
Date: August 8, 2013
The "Future Years" column indicates the projected amount to be requested in future budgets.
(for Century Link Conflict)
Line Item Changes (60,230) (60,230)
Construction Engineering - City Costs*7,973 371 8,344
Construction Engineering - Consultant Costs 1,408 9,860 11,268
Total 001,329,86437,2121,367,076
*City staff costs for street design and construction are not charged against the project budget and are not shown here.
Prior Years 20112012 2013 Total
**103 Funds Budgeted ( )00(984,410)(219,125)(1,203,535)
103 Funds Needed 00961,25334,873996,126
**103 Fund Project Contingency ( )00(23,157)(184,252)(207,409)
103 Funds Required 00000
Prior Years 20112012 2013 Total
**430 Funds Budgeted ( )00(400,000)(100,000)(500,000)
430 Funds Needed 00362,2842,339364,623
**430 Fund Project Contingency ( )00(37,716)(97,661)(135,377)
430 Funds Required 00000
Prior Years 20112012 2013 Total
**432 Funds Budgeted ( )00(6,327)(3,673)(10,000)
432 Funds Needed 006,32706,327
**432 Fund Project Contingency ( )000(3,673)(3,673)
432 Funds Required 00000
** ( # ) in the Budget Status Sections indicates money the City has available.
432 Storm Budget Status
430 Water Budget Status
103 Local Street Budget Status
Page 1 of 1CA.G Page 42 of 60
CA.G Page 43 of 60
CA.G Page 44 of 60
CA.G Page 45 of 60
CO
.
N
O
.
1
2
-
0
8
C
I
T
Y
O
F
A
U
B
U
R
N
CP
1
2
0
1
,
2
0
1
2
L
o
c
a
l
S
t
r
e
e
t
P
a
v
e
m
e
n
t
R
e
c
o
n
s
t
r
u
c
t
i
o
n
20
1
2
L
o
c
a
l
S
t
r
e
e
t
P
a
v
e
m
e
n
t
R
e
c
o
n
s
t
r
u
c
t
i
o
n
P
R
O
J
E
C
T
S
U
M
M
A
R
Y
CO. NO. 12-08
PA
Y
E
S
T
I
M
A
T
E
#
8
&
F
I
N
A
L
Or
i
g
i
n
a
l
C
o
n
t
r
a
c
t
Am
o
u
n
t
Co
n
t
r
a
c
t
C
h
a
n
g
e
Or
d
e
r
s
To
t
a
l
P
a
y
m
e
n
t
T
h
i
s
P
e
r
i
o
d
P
e
r
c
e
n
t
/
C
o
n
t
r
a
c
t
SC
H
E
D
U
L
E
A
:
S
t
r
e
e
t
I
m
p
r
o
v
e
m
e
n
t
s
Co
n
t
r
a
c
t
88
2
,
0
7
2
.
0
0
$
2
8
,
5
9
1
.
0
0
$
8
6
2
,
1
2
0
.
0
3
$
-
$
95%
NO
T
A
X
Re
t
a
i
n
a
g
e
(
-
5
%
)
(4
3
,
1
0
6
.
0
0
)
$
-
$
SC
H
E
D
U
L
E
T
O
T
A
L
88
2
,
0
7
2
.
0
0
$
2
8
,
5
9
1
.
0
0
$
8
1
9
,
0
1
4
.
0
3
$
$
0
.
0
0
SC
H
E
D
U
L
E
B
:
W
a
t
e
r
S
e
w
e
r
U
t
i
l
i
t
y
I
m
p
r
o
v
m
e
n
t
s
Co
n
t
r
a
c
t
31
8
,
8
0
9
.
0
0
$
-
$
3
0
8
,
1
3
5
.
6
9
$
$
0
.
0
0
9
7
%
Sa
l
e
s
T
a
x
(
+
9
.
5
%
)
30
,
2
8
6
.
8
6
$
-
$
2
9
,
2
7
2
.
8
9
$
-
$
Re
t
a
i
n
a
g
e
(
-
5
%
)
(1
5
,
4
0
6
.
7
8
)
$
-
$
SC
H
E
D
U
L
E
T
O
T
A
L
34
9
,
0
9
5
.
8
6
$
-
$
32
2
,
0
0
1
.
8
0
$
$
0
.
0
0
h:
\
p
r
o
j
\
p
e
\
C
P
1
2
0
1
P
E
.
x
l
s
4
o
f
5
8
/
1
2
/
2
0
1
3
a
t
1
:
4
6
P
M
TO
T
A
L
C
O
N
T
R
A
C
T
A
M
O
U
N
T
T
O
D
A
T
E
(i
n
c
l
u
d
i
n
g
S
a
l
e
s
T
a
x
S
c
h
B
)
1
,
1
9
9
,
5
2
8
.
6
1
$
9
5
%
TO
T
A
L
P
A
Y
M
E
N
T
T
O
C
O
N
T
R
A
C
T
O
R
1,
1
4
1
,
0
1
5
.
8
3
$
-
$
PA
Y
M
E
N
T
D
U
E
C
O
N
T
R
A
C
T
O
R
:
-
$
Pe
r
i
o
d
D
a
t
e
s
Be
g
i
n
:
M
a
y
2
1
,
2
0
1
3
En
d
:
M
a
y
2
1
,
2
0
1
3
h:
\
p
r
o
j
\
p
e
\
C
P
1
2
0
1
P
E
.
x
l
s
4
o
f
5
8
/
1
2
/
2
0
1
3
a
t
1
:
4
6
P
M
CA.G Page 46 of 60
CA.G Page 47 of 60
SCALE: 1 inch = 1,000 feet
0 500ft 1,000ft
Plotted: June 6, 2013 Location: H:\PROJ\CP1201-2012 Local St Pavement Preservation\PWCCouncilInfo\Final PE (6-17-13)\Map.dwg
PROJECT NO.
CP1201
2012 LOCAL
STREET
PAVEMENT
RECONSTRUCTION
VICINITY
MAP
J St SE
STREET IMPROVEMENTS:
Reconstructed street and
improved local storm drainage.
WATER IMPROVEMENTS:
Replaced water line.
22nd St SE
STREET IMPROVEMENTS:
Reconstructed street and
improved local storm
drainage.
WATER IMPROVEMENTS:
Replaced water line.
27th St SE, H St SE
and 28th St SE
STREET IMPROVEMENTS:
Reconstructed street and
improved local storm
drainage.
WATER IMPROVEMENTS:
Replaced water line.
CA.G Page 48 of 60
AGENDA BILL APPROVAL FORM
Agenda Subject:
Capital Project Status Report
Date:
August 14, 2013
Department:
Public Works
Attachments:
Capital Project Status Report
Budget Impact:
$0
Administrative Recommendation:
Background Summary:
See attached report.
Reviewed by Council Committees:
Public Works
Councilmember:Wagner Staff:Gaub
Meeting Date:August 19, 2013 Item Number:DI.D
AUBURN * MORE THAN YOU IMAGINEDDI.D Page 49 of 60
Date: August 13, 2013
No.Prom. No.Location/Description
Priority
Group
(1-3)
Street Funds
(102/105/103) Water (430) Sewer (431) Storm (432) Other Total Budget % Complete Adv. Date % Complete
Finish
Date
Project
Manager Status
1 CP0915
Well 1 Improvements - Transmission
Lines:
This project is the first phase of a larger
project and will replace water lines from
the Well 1 Site to the Howard Road
Corrosion Control Facility to
accommodate the replacement of Well
1. This project will also upgrade the
existing storm line on M Street SE to
accommodate the Well 1 Improvements.
- 1,943,697 831,904 2,775,601 2,031,856 100%Oct-12 100%May-13 Lee Final Pay is in process.
2 CP0909
Lakeland Hills Booster Pump Station:
This project will update/replace the
existing pump station in the Lakeland
Hills water service area in order to meet
fire flow demands.
- 2,760,982 2,760,982 2,760,982 100%Oct-10 99%Aug-13 Vondrak Final Pay is in process.
3 C410A
S. 277th Wetland Mitigation
Monitoring:
This project is an on-going project to
complete the required monitoring and
maintenance of the wetland mitigation
sites for the S. 277th Grade Separation
Project. Sites are located on the North
property and at the corner of 44th St NW
and Frontage Road. Permits require the
City to monitor the sites for 10 years.
- 325,343 325,343 324,606 100%Apr-11 98%May-14 Larson
Construction Work is complete, however, the
project is in the 2-year plant establishment
period and the finish date reflects this.
Budget and Costs shown is are for years
2006 thru 2013 of this 10 year process.
Budget for 2013 only is $50,000.
4 C201A
M Street Underpass (Grade
Separation):
The purpose of this project is to grade
separate ‘M’ Street SE from the
Burlington Northern Santa Fe Stampede
Pass Rail line in Phase 1 and completion
of the Auburn Black Diamond Road
Bypass connection is a future phase.
- 5,166,560 150,000
872,372
(Fed Grant)
5,990,000
(FMSIB)
2,630,509
(TIB)
1,133,978
(King City)
1,542,800
(Ports)
478,000
(BNSF)
1,140,000
(REET2)
2,772,752
(PWTF)
22,314,174 22,314,174 100%Dec-11 96%Aug-13 Vondrak
M Street was opened to traffic on July 22.
Property restoration and final wall and signal
work is underway.
5 C524A
SCADA System Improvement:
This project will upgrade the City's
SCADA system to meet Public Works
goals.
- 2,666,200 1,994,500 1,014,000 5,674,700 4,998,512 100%Nov-09 90%Dec-13 Lee
Implementation Contract executed.
Preliminary Design and Final Design are
Complete. Installation of the Controls at M&O
is complete and conversion of all 3 test sites
are complete. The remaining site
conversions are underway with 30 sites of 37
completed.
6 CP0909
Academy Booster Pump Station:
This project will update/replace the
existing pump station in the Academy
water service area in order to meet fire
flow demands.
- 3,526,255 3,526,255 3,168,295 100%Sep-12 60%Apr-14 Vondrak Work is underway.
Total
Estimated
Costs
CAPITAL PROJECT STATUS REPORT
Project Budget ($)Design Construction
Page 1 of 6DI.D Page 50 of 60
Date: August 13, 2013
No.Prom. No.Location/Description
Priority
Group
(1-3)
Street Funds
(102/105/103) Water (430) Sewer (431) Storm (432) Other Total Budget % Complete Adv. Date % Complete
Finish
Date
Project
Manager Status
Total
Estimated
Costs
CAPITAL PROJECT STATUS REPORT
Project Budget ($)Design Construction
7 CP1120
Lea Hill Safe Routes to Schools
Improvements:
This project will complete improvements
for safe walking routes to Hazelwood
Elem., Lea Hill elem., and Rainer Middle
School along 116th Ave. SE and SE 312
St.
- 34,000
398,500
(Federal)
21,597 (Police
& ASD In Kind
Services)
454,097 447,600 100%Jun-13 1%Oct-13 Truong Work is underway.
8 CP1302
2013 Pavement Patching, Chipseal
and Overlay Project:
This project will complete pavement
patching, chip seal treatments and
overlay work on both arterial/collector
and local roadways for the purpose of
preservation throughout the City.
- 1,878,000 1,878,000 1,848,000 100%Jun-13 0%Nov-13 Wickstrom Work is anticipated to begin the week of
8/19/13.
9 CP1108
2011/12/13 Citywide Storm Pond
Cleaning:
This project will complete the removal of
sediment from storm drainage ponds
located throughout the City and clean the
ditch along A Street SE/East Valley
Highway as the annual budget allows.
- 720,473 720,473 720,261 100%N/A 1%Oct-13 Lee King County Road Services has begun work
on the first task for the cleaning of 3 ponds.
10 CP1225
West Valley Highway Preservation -
15th NW to 37th NW:
This project will complete an overlay of
WVH for the purpose of pavement
preservation.
1 560,000 560,000
(Federal) 1,120,000 1,093,525 100%Jul-13 Dec-13 Wickstrom Award is in process.
11 CP1310
2013 Arterial and Collector Crack
Sealing:
This project will complete crack sealing
on arterial and collector streets through
out the City.
1 60,000 60,000 60,000 100%Jul-13 Oct-13 Carter Award is in process.
12 CP0912
Citywide Guardrail Improvements:
This project will complete guardrail
improvements along Kersey Way, Green
River Road, and Mountain View Drive.
1 50,000 502,275
(Federal) 552,275 552,275 100%Jul-13 Dec-13 Sweeting
Federal Funding is for Construction Only.
Project is advertised and opens bids on
August 20th.
13 CP1207
D Street NE Utility Improvements
(Port of Seattle Mitigation):
This project will complete storm, sewer,
water and street improvements related
to the Port of Seattle mitigation
agreement on D Street NE.
1 170,000 337,797 2,796
42,200
(430 Port Mit)
162,203
(431 Port Mit)
597,204
(432 Port Mit)
1,312,200 1,312,200 100%Aug-13 Dec-13 Truong Project is advertised and bids open on
August 29th.
14 CP1118
Auburn Way South Pedestrian
Improvements - Dogwood to Fir
Street:
This project will construct a new street
lighting system, landscaped median
island, a designated mid-0block
crosswalk, relocation of existing utility
poles, and modifications to the existing
signal at Dogwood St. This project also
includes a public education element for
pedestrian safety.
1 100,000
740,830
(State)
100,000
(Federal)
940,830 1,085,730 92%Feb-14 Mar-15 Sweeting
Consultant design work is underway. Project
Scope is being revised to incorporate
undergrounding of power lines with MIT
funding.
ROW acquisition process has begun.
Page 2 of 6DI.D Page 51 of 60
Date: August 13, 2013
No.Prom. No.Location/Description
Priority
Group
(1-3)
Street Funds
(102/105/103) Water (430) Sewer (431) Storm (432) Other Total Budget % Complete Adv. Date % Complete
Finish
Date
Project
Manager Status
Total
Estimated
Costs
CAPITAL PROJECT STATUS REPORT
Project Budget ($)Design Construction
15 CP1119
Auburn Way South Corridor
Improvements - Fir St. SE to Hemlock
St. SE:
This project will widen AWS between Fir
and Hemlock Streets from 3 lanes to 5
lanes and includes new sidewalks, street
lighting, transit improvements and install
a new signal at Hemlock St.
1 849
2,426,400
(TIB)
606,600
(MIT)
3,033,849 3,033,849 92%Feb-14 Mar-15 Sweeting
Consultant design work is underway. Project
Scope is being revised to incorporate
undergrounding of power lines with MIT
funding.
ROW acquisition process has begun.
16 CP0915
Well 1 Improvements - Well
Replacement:
This project will rehabilitate or replace
Well 1 so that it can function at full
capacity and complete modifications to
the Howard Road Corrosion Control
Facility.
1 2,476,568 2,476,568 2,400,000 85%Nov-13 Oct-14 Lee
Consultant design is underway.
Advertisement is dependant on DOH
approval of the work which is in process but
is not expected to be received until
November, therefore construction is
anticipated later this year.
17 CP1107
Fulmer Wellfield Improvements:
This project will be done in phases. The
first phase 1A will complete investigation
of the Fulmer Wellfield area to determine
the required analysis and drilling
program needed to utilize the full water
rights. Phase 1B will complete a drilling
and testing program as well as an
alternatives analysis. Phase 2 will
complete the physical improvements.
1 2,200,000 2,200,000 497,364 80%N/A Mar-14 Repp
The estimated costs are for the Phase 1A
only and will be revised when this phase is
completed. Consultant work is underway.
Advertisement date for installation of
monitoring wells will be updated after
completion of phase 1A.
18 CP1222
Citywide Traffic Signal
Improvements:
This project will construct safety
improvements at a number of signals
throughout the City.
1 5,000 400,000
(Federal) 405,000 405,000 70%Sep-13 Dec-13 Lee
Design work is underway. Federal
environmental approvals in process but are
not expected until August delaying the
advertisement of this project.
19 CP1109
2011 Storm Pipeline Repair and
Replacement, Phase 2:
This project will construct storm drainage
improvements on Hi-Crest Drive NW.
1 377,740 377,740 411,195 60%Sep-13 Dec-13 Lee Design work underway.
20 CP1122
30th Street NE Storm Improvements:
This project will replace the 30-inch
storm drainage line along 30th Street NE
from the north end of the Airport to the
Brannon Park Storm Pump Station to
address localized flooding issues.
1 2,974,699 2,974,699 2,822,299 60%Sep-13 Dec-13 Truong Consultant design work is underway.
21 CP1024
AWS and M Street SE Intersection
Improvements:
This project will complete improvements
at the intersection per Option 2 selected
by the Public Works Committee to
address capacity and safety concerns.
1 250,000 450,000
(TIB) 700,000 705,000 60%Apr-14 Sep-14 Sweeting
AWS/M St. SE - Installed protected left turn for
east/west bound traffic on AWS turning onto M
St. SE (Completed)
17th/M St. SE - restrict left turn movements
from 17th to M. (Completed)
AWS/M St. SE Intersection - Option 2 was
selected by the Committee, June 2012. Design
work is underway.
Property acquisition is underway.
22 CP1301
2013 Sidewalk Repair Project:
This project will complete repair and
replacement of existing sidewalks at
various locations around Downtown and
Auburn High School.
1 200,000
(328 Fund) 200,000 200,000 55%Sep-13 Dec-13 Carter Design is underway.
Page 3 of 6DI.D Page 52 of 60
Date: August 13, 2013
No.Prom. No.Location/Description
Priority
Group
(1-3)
Street Funds
(102/105/103) Water (430) Sewer (431) Storm (432) Other Total Budget % Complete Adv. Date % Complete
Finish
Date
Project
Manager Status
Total
Estimated
Costs
CAPITAL PROJECT STATUS REPORT
Project Budget ($)Design Construction
23 CP1308
BNSF Utility Crossings Project:
This project will address utility crossings
of the BNSF right-of-way that will be
affected by the 3rd rail line that
BNSF/Sound Transit plan to building in
March 2014.
1 780,000 160,000 500,000 1,440,000 1,440,000 30%Dec-13 May-14 Sweeting Consultant design work is underway.
24 CP1104
104th Street & 8th Street NE U-Turn
Improvements:
This project will complete property
acquisition and widening at the
intersection of 104th and 8th Street NE
to accommodate eastbound U-Turn
traffic.
1 232,000 100,000
(Fed. Grant) 332,000 340,000 20%Oct-13 Mar-14 Sweeting Consultant design work is underway.
25 CP1219
Valley AC Watermain Replacement:
This project will repair or replace
asbestos cement water lines along
AWN, 49th and B St NW and at the
M&O/Parks Maintenance area.
1 1,233,574 1,233,574 1,208,722 20%Mar-14 Oct-14 Truong Design is underway.
26 CP1304
37th St & B St NW BNSF Signal:
This project will complete improvements
to the rail crossing at 37th Street NW
and B Street NW to address safety
concerns.
1 76,900 307,550
(Federal) 384,450 384,450 10%May-14 Dec-14 Sweeting Consultant design work is underway.
Coordination with BNSF in process.
27 CP1218
Auburn Way South & Riverwalk
Intersection Improvements:
This project will construct improvements
to the intersection of AWS and Riverwalk
Drive and complete minor widening and
add additional capacity from the MIT
Plaza signal to the Dogwood signal.
1 2,333,108
(Federal) 2,333,108 2,333,108 0%Jul-14 Nov-15 Sweeting Consultant Agreement to be executed.
28 C512A
Well 4 Improvements:
This project will construct a new building
to house a standby generator and
disinfection equipment.
2 1,306,288 1,306,288 1,296,820 90%Nov-13 Jun-14 Wickstrom Consultant design work is underway.
29 CP0765
Lakeland Hills Reservoir
Improvement:
This project will provide various
improvements at the reservoir, including
painting, seismic upgrades, and facility
modifications.
2 400,000 400,000 400,000 75%Mar-14 Sep-14 Vondrak
Consultant Scoping underway for completion
of design to accommodate recent
improvements at the site.
30 C229A
BNSF/EVH Pedestrian Undercrossing:
This project will construct a pedestrian
undercrossing of both East Valley
Highway (A St SE) and the BNSF rail
tracks just north of the White River.
3 385,000
(State) 385,000 9,000,000 60%Hold Hold Vondrak
Final design on hold pending BNSF issues.
Additional funds will be required to complete
design, environmental permitting, and
construction.
31 CP0906
2009 Gateway Project:
This project will construct a new gateway
sign at East Valley Highway and Lake
Tapps Parkway.
3 100,000
(Gen Fund) 100,000 100,000 30%Hold Hold Lee Easement acquisition completed. Project on
hold.
CPS TOTAL 9,941,178 19,613,564 2,492,297 6,421,612 26,228,555 64,697,206 69,695,823
Page 4 of 6DI.D Page 53 of 60
Date: August 13, 2013
No.Proj. No.Location/Description
Priority
Group
(1-3)
Local Street
Funds (103) Water (430) Sewer (431) Storm (432) Other Total Budget
%
Complete Adv. Date % Complete
Finish
Date
Project
Manager Status31
32 CP1201
2012 Local Street Pavement
Reconstruction:
This project will rehabilitate and rebuild
deficient pavement on local streets
throughout the City including:
J St SE btwn 2nd and 4th St. SE
22nd St. SE btwn M and R St. SE
27th/H/28th St. SE East of F St. SE
Water and storm improvements will also
be completed on these streets.
- 1,174,410 500,000 - 10,000 29,125
(Private Utility) 1,713,535 1,367,076 100%Jun-12 100%May-13 Wickstrom Final Pay is in process.
Other SOS Projects:
CP1206, Pavement Patching, Chip
Seals, and Overlays.
N/A 539,500 539,500 539,500 Wickstrom CP1206 is complete and received final
payment approval by Council on 1/7/2013.
1,713,910 500,000 - 10,000 - 2,253,035 1,906,576
33 CP1224
2013 Local Street Reconstruction:
This project will complete the
reconstruction of the following local
roadways:
23rd St SE - M to R St SE
H St NE - 4th to 8th
5th St NE - H to Cul-de-sac
Park Ave - AWN to Park
Also included in this project is the
replacement of waterline on V St SE,
from 2nd to 4th St SE.
- 2,400,000 500,000 200,000 3,100,000 2,839,427 100%May-13 15%Dec-13 Wickstrom Work is underway on H Street, 5th Street
and 23rd Street.
Other SOS Projects:
CP1302, 2013 Pavement Patching, Chip
Seals, and Overlays.
N/A 242,000 242,000 242,000 Wickstrom For Status see CP1302
2,642,000 500,000 200,000 - - 3,342,000 3,081,427
2012 & 2013 TOTAL SOS PROGRAM 4,355,910 1,000,000 200,000 10,000 - 5,595,035 4,988,003
2013 SOS Program Totals
2012 SOS Program Totals
SOS PROGRAM STATUS REPORT
Project Budget ($)
Total
Estimated
Costs
Design Construction
Page 5 of 6DI.D Page 54 of 60
Date: August 13, 2013
No.Proj. No.Location/Description
%
Complete Adv. Date % Complete
Finish
Date
Staff
Manager
Action
Committee Status
A CP1115
City Hall NW Plaza Improvements:
This project will renovate the NW entrance to City
Hall similar to the recent improvements on the south
side of City Hall. Work will include new pavement,
updated lighting, ADA Ramp upgrades and new City
Hall signage.
475,977 458,570 99%TBD TBD Chamberlain PCDC Consultant work is on hold pending scope discussion with
committee on LRF bond funds in Summer of 2013.
B CP1016
Fenster Levee Project:
This project will complete new levee improvements
on the Fenster Levee along the Green River.
1,266,100 1,265,000 65%N/A Jun-14 Andersen PCDC
Work will be completed by King County. Secured funding
is from 4 Grants and matching storm funds. The additional
327k in SRFB funding was awarded. Pre-Design work is
complete. The Design by King County is underway with
the review of comments from SRFB. Environmental
approvals are also in process.
TOTAL OTHER PROJECTS 1,742,077 1,723,570
Total Budget
OTHER PROJECTS - ACTION BY OTHER COMMITTEE
Total
Estimated
Costs
Design Construction
Page 6 of 6DI.D Page 55 of 60
AGENDA BILL APPROVAL FORM
Agenda Subject:
Significant Infrastructure Projects by Others - Public Works
Status Report
Date:
August 14, 2013
Department:
Public Works
Attachments:
Significant Infrastructure Projects by
Others - Public Works Status Report
Budget Impact:
$0
Administrative Recommendation:
Background Summary:
Reviewed by Council Committees:
Public Works
Councilmember:Wagner Staff:Gaub
Meeting Date:August 19, 2013 Item Number:DI.E
AUBURN * MORE THAN YOU IMAGINEDDI.E Page 56 of 60
Date: August 14, 2013
No.
Sponsor/
Applicant Location/Description Length
Permit(s)
Issued Status
1
Green River
Community
College
320th Street Improvements:
This project will widen 320th Street along the frontage of Green River
Community College from 124th Ave Se to the west College Boundary.
1325 Feet Yes
Construction work underway and will continue through September 6th.
Contractor is working on utility installation and lane interruptions are
anticipated on 320th during this work.
2 Puget Sound
Energy
15th Street NW Gas Line:
This project will install a new gas line to serve the Hospital Laundry project along
15th Street NW from approximately 400 ft east of C St. NW to M St NW, then
North on M St NW to the Laundry site.
3135 Feet Yes Construction is nearly completed, the remaining overlay work on M
Street NW is to be scheduled.
3 King County
Wastewater
17th Street SE, K St SE to C St SW - Trunk Sewer Main Installation:
This project will install a 42-inch sewer trunk line along 17th Street SE from K
Street SE to C Street SW including crossing the BNSF rail yard.
3050 Feet Yes
Project is under construction. Work to cross A Street SE at 17th Street
SE will be underway during daytime hours beginning the week of 8/12
and continuing for a minimum of 2 weeks.
4 Puget Sound
Energy
17th Street SE, K St SE to F St SE - Gas Main Replacement:
This project will replace the existing 2-inch gas main along 17th Street SE from
K Street SE to F Street SE.
1345 Feet No Construction is anticipated to begin in the summer of 2013 and is being
coordinated with King County's work.
5
King County
Flood Control
District
Reddington Levee:
This project will replace the Reddington Levee from approximately 26th St NE to
43rd Street NE.
0.9 Miles KC - Yes
Facility Extension permit and Construction permits have been issued.
Contractor is mobilizing on site and work will be on-going through the
Summer of 2013.
6 Auburn School
District
Auburn High School Replacement:
This project will include roadway and utility improvements to support the new
Auburn High School. Improvements include modifications to Storm, Water and
Sanitary Sewer mainlines and roadway improvements on Main Street and 4th
Street NE.
N/A - Multiple
Block
Development
Partially Work on the Phase 1 portion of the project has begun and is anticipated
to be completed in 2015. Phase 2 plans are begin reviewed.
7 Puget Sound
Energy
2nd Street NE Gas Main Replacement:
This project will replace the 6-inch gas main on 2nd Street NE from Auburn
Avenue to D Street SE, including a crossing of Auburn Way North, then continue
south on D Street NE to Main Street.
1215 Feet No Project is in the permit review phase. Construction is anticipated to
occur in the Summer of 2013.
8 WSDOT
SR18 - Neely Bridge Improvements:
This project will complete bridge deck repairs to the eastbound Neely Bridge on
SR-18 and repair the bridge approach slab at the eastbound UPRR Bridge
located west of C Street SW on SR18.
N/A Yes
Construction is anticipated to occur in the Summer of 2013. Nighttime
closures of EB SR18 at the Neely Bridge will be in effect on August 16th
and 17th from 8pm to 10am. This work is for the repair of the
expansion joints on the bridge.
9 Yarrow Bay
Development
124th Ave SE Half Street Road Improvements:
This project will complete half street roadway improvements on 124th Ave SE
from SE 304th St. north to approximately SE 290th St. for the 3rd phase of the
Verdana (Bridges) Plat development that is in Kent.
3,800 Feet Yes
Work is underway and will continue through mid October 2013.
Contractor has started with roadway and utility work. Lane interruptions
are anticipated on 124th Ave.
SIGNIFICANT INFRASTRUCTURE PROJECTS BY OTHERS - PUBLIC WORKS STATUS REPORT
NOTE: Projects included on this list are those that have a broad public interest, significant impact to the public, involve interlocal agreements, and/or may include the installation of key infrastructure by
others (such as pump stations etc.)
1 of 1
DI.E Page 57 of 60
AGENDA BILL APPROVAL FORM
Agenda Subject:
Action Tracking Matrix
Date:
August 14, 2013
Department:
Public Works
Attachments:
Action Tracking Matrix
Budget Impact:
$0
Administrative Recommendation:
Background Summary:
Reviewed by Council Committees:
Councilmember:Staff:Dowdy
Meeting Date:August 19, 2013 Item Number:DI.F
AUBURN * MORE THAN YOU IMAGINEDDI.F Page 58 of 60
Updated: 8/14/2013 10:46 AM
No.Item Description Staff Lead Next PWC
Review Date
Estimated
Completion
Date
Status
A Track completed project on the Current Year
Active Capital Improvement Projects Map Gaub 10/7/2013 N/A Ongoing - Quarterly updates
B Fulmer Well-Field Feasibility Study Updates Repp 10/7/2013 10/7/2013 Initial study finding are not yet completed.
C System Development Charges Repp 9/3/2013 12/16/2013 Consultant to complete analysis
D Cost of Service Analysis Repp 11/18/2013 12/31/2013 Consultant to complete analysis
E BNSF Stampede Pass Line Welsh 9/3/2013 9/3/2013 Discuss Chairman Wagner's email. This includes discussion of the
Phase 2 of the M Street Underpass project.
F CP1122, 30th Street NE Area Flooding - Phase
1 Truong 8/19/2013 8/19/2013 Review scope at approx. 50% design stage
G LED Lighting Standards Para 10/7/2013 10/7/2013
Discuss research findings and current state of LED lighting
technology. (Topic move from scheduled 7/15/13 date to a future
date that comes after the peak summer construction season)
H Auburn Way South & 17th St SE Webb 10/21/2013 10/21/2013 Study closing of EB connections between M St SE and AWS via 17th
St SE.
I King County Flood Insurance Mailers - Quality
Check Andersen TBD TBD
Councilmember Peloza contacted Councilmemeber von Reichbauer
who subsequently has send a letter to Councilmember Dunn (Chair of
the King County Flood Control District) requesting District staff send
more helpful information to citizens located in the District's Flood
Plains.
J Street Lamp Installation 112th & 295th
Streets Dowdy TBD 8/15/2013 PSE Scheduled install date is 8/15
K Speed Cushion Design Standards Para 10/21/2013 10/21/2013 Review current design standard.
L Green River Watershed/Levee Presentation 2/3/2014 2/3/2014 Review the Levee System within the City of Auburn and how planned
work on the levee's effect the City and the City's finances.
Public Works Committee - Action Tracking Matrix
DI.F Page 59 of 60
Updated: 8/14/2013 10:46 AM
No.Item Description Staff Lead Next PWC
Review Date
Estimated
Completion
Date
Status
M Transportation Impact Fee Structure Analyses Planning/Webb 10/21/2013 10/21/2013 Review competitiveness of fee structure vs. regional agencies.
N Chipseal Application Review Carter 10/7/2013 10/7/2013 Review the application process for chipseals on arterial/collector
streets.
DI.F Page 60 of 60