ANNUAL CONTRACT TASK ASSIGNMENT DOCUMENT
AGREEMENT NO AG-C-356 TASK NO AGC356-T006
CONSULTANT Terracon Consultants, Inc
PROJECT EM1302: 111th Place SE Storm Outfall Emergency Replacement
The general provisions and clauses of the Agreement referenced above shall be in full force
and effect for this Task Assignment.
Location of Project Hidden Valley Vista - 111th Place SE
Maximum Amount Payable per this Task Assignment: $12,120.00
Completion Date December 31, 2013
Scope of Work:
See Exhibit A, which is attached hereto and by this reference made part of this Task
Assignment.
Approvals. //
Consultant Proj �t M age
Signature. Y Date. 7//6/3
6
City Project Mana•-r:
Signature d Date. /ZZ/Zof3
City Mayor. /
Signature. Dater/; ")/ cx‘3
Page 1 of 2
Exhibit A
Scope of Services
City of Auburn
Agreement AG-C-356-T006
Phase 1 Hillside Evaluation
The Consultant shall complete the following:
• Complete visual site reconnaissance to assess the current condition of the
hillside.
• Provide local and global slope stability analysis of the slide area and surrounding
hillside in the vicinity of the slide.
• Provide recommendations for stabilizing the slope in question, including budget
level cost estimates.
Phase 1 Deliverables:
• Technical Memorandum (draft and final version that incorporates and addresses
City comments) that summarizes the hillside evaluation.
Phase 2: Design Support
The Consultant shall complete the following:
• Provide design support for laying the pipe on the side slope including, but not
limited to, evaluation of slope stability along the proposed alignment for the
replacement storm line, details for the pipe support anchors and spacing of each
support along the hillside, special connections to each drainage structure, and
specialty details needed at each trail crossing.
• Provide additional guidance as necessary during the design and construction of
the pipe and slope stabilization measures, if applicable.
Phase 2 Deliverables:
• Technical Memorandum (draft and final version that incorporates and addresses
City comments) that summarizes that the anchor support and other pipe design
considerations, pipe and structure anchor details, technical specifications (if
needed) approximate unit costs, and any recommendations to address slope
stability concerns along the storm lines proposed alignment.
Page 2 of 2
AMENDMENT #6 TO AGREEMENT NO. AG-C-356 BETWEEN
THE CITY OF AUBURN AND TERRACON CONSULTANTS, INC
RELATING TO ON-CALL GEOTECHNICAL ENGINEERING SERVICES
1 /
THIS AMENDMENT is made and entered into this (ice day of ALLec<P-G , 2013, by
and between the CITY OF AUBURN, a municipal corporation of the State of Washington
(hereinafter referred to as the "CITY"), and Terracon Consultants, Inc (hereinafter referred to as
the "CONSULTANT"), as an Amendment to the Agreement between the parties for AG-C-356
executed on the 4th day of February, 2009 and amended by agreements dated the 21st day of
December, 2009, the 21St day of June, 2010, the 13th of December, 2010; the 8th day of
November, 2011; and the 19th day of December, 2012.
The changes to the agreement are described as follows:
1. CONTRACT TERM: The term of the Agreement for Professional Services is extended to
January 31, 2014.
2. SCOPE OF WORK: There is no change in the scope of work.
3. COMPENSATION: There is no change to the amount authorized in the original agreement
and subsequent amendments.
REMAINING TERMS UNCHANGED: That all other provisions of the Agreement between
the parties for AG-C-356 executed on the 4th day of February, 2009 shall remain unchanged,
and in full force and effect.
IN WITNESS WHEREOF the parties hereto have executed this Agreement as of the day
and year first above written.
TERRACON CONSULTANTS, INC ITY • • = • -N
By k--"z, z i
Authorized signature Peter B77vis, Mayor
ATTEST (Optional): ATTEST:
By:
C ��
Its: Danielle . Daskam, Auburn City Clerk
Approved as to form (Optional): Appro -• as 4o
/
NW' A IA
Attorney for(Other Party) Daniel B. Heid, Auburn City Atto ey
Amendment No. 6 for Agreement No.AG-C-356
Terracon Consultants
Page 1 of 1
(TI YOF
_ _ _ __ _
Peter B. Lewis, Mayor
WAS II ING"'()N 25 Wost Main Street* Auburn WA 98001.4998 * www.auburnwa.gov * 253-931-3000-
December 11, 2013
David Baska
Terracon Consultants, Inc.
21905 64th Avenue West, Suite 100
Mountlake Terrace, WA 98043
RE: Task Assignment AGC356-T007 and Amendment No. 6 to Agreement for Professional
Services, AG-C-356
On-Call Geotechnical Engineering Services
Dear Mr. Baska:
Enclosed please find an executed original of the above-referenced Task Assignment. This
Task Assignment has a completion date of January 31, 2014, and a not-to-exceed amount of
$9,200.00. You are not authorized to perform work beyond the completion date, or expend
funds above and beyond the not-to-exceed amount. This letter serves as your Notice to
Proceed.
Also enclosed, please find an executed original of the above-referenced Amendment No. 6.
This amendment is for a time extension only. This amendment extends the term of the
agreement to January 31, 2014.
For the City's tracking and record keeping purposes, please reference AG-C-356 on all
correspondence and related material. Our records indicate that your Insurance, as required in
Section 8 of the original agreement, will expire on January 1, 2014. Please mail the required
certificate(s) of insurance, within two weeks, to Amanda DeSilver, Contracts Administration
Specialist, Auburn Public Works Department, at the address noted at the top of this letterhead.
As the project manager, I am the designated contact for this agreement and all amendments.
Questions, assignments and coordination shall be routed through me. You can contact me at
253.804.3113.
Sincerely,
Ingrid(tG ub, PE
Assistant City Engineer
Community Development & Public Works Dept.
I G/ad/mh
Enclosure
cc: Dani Daskam, City Clerk (copy letter only)
AG-C-356
iiRORN 4- 10( )R l' III AN YOU IMAGINI..f)