Loading...
HomeMy WebLinkAboutContract#2202 Project C201A CITY OF AUBURN CONTRACT CHANGE ORDER AGREEMENT NO,_7_ 3. / 3 a Contract No. Project No,and Project 1 Contract# 11-01, Project#C201A M Street Grade Separation (Underpass) Contractor Name and Add.ess. Scarsella Brothers, Inc P O. Box 68697 Seattle, WA 98168-0397 The sontraclor is hereby directed to make the changes to the Contract as described herein. This document and all attachments are a supplement to the contract. All work,materials and measurements for the type of construction involved shall be in accordance with the emitted documents of the above named project unless stated other wise in this change older Summary of Proposed Changes. 1 Fat the purpose of settlement of a dispute,parties agree to a lump sum payment for halt of the costs incurred to remove and repair a stuck casing during shaft drilling at Abutment I Shaft#8 for the Side Tracking Linc(ST Line). 2 For the purpose of settlement of a dispute,parties agree to a lump sum payment for half of the costs incun'ed for out of sequence shaft drilling work due to the stuck casing at Abutment I Shaft#8 for the ST Line. 3 Pot the purpose of settlement ofd dispute,parties agree to lump sum payment fot half tit the hone office and field office 'vet head costs inclined tin dehrcs due to the stuck cast ig(luting shaft drilling at Abutment I Shaft#8 and fur the delays for the out of sequence shaft dulling ivurk The Contract time is extended by 10 days. Item Sch. Sec.Ni,, Iten.Description Quantity Units (+1-) Unit Price($) Total Price (+1-) ST Line Abutment 1 Shaft#8 CO#7 1A A 6-16 Casing Removal and Repair LS Settlement 0 5 123,754.44 $ 61,877 22 ST Line Abutment 1 Shaft CO 6/7 18 A 6-16 Out of Sequence Work LS Settlement 0 5 17,717.50 $ 8,858 75 CO#7 1C A 1-04.4 Home Office Overhead LS Settlement 0.5 36,390.00 $ 18,19500 Field Office Overhead GO#7 1D i A 1-04.4 Settlement 0 5 LS 12,300 00 $ 6,150 00 Subtotal $ 95,080 97 Washington State Sales Tax(9 5%)on applicable items $ TOTAL $ 95,080 97 'Base Amount ".Total iAei,Tax Tota6Cost'this CIO '4). $.' . 95;080.97 .$ , . W" '..: `r '` 95,08097 2.-:Total Cost Previous C/O ._ . .5. .' 169;229.19 $ .>a' :' , 169,229.19i 3:Original Contract Amount,.. $ 11,224;631.63 $ . ' f.' L. 11',278,54380; 4.:Revised Contract Amdunt H. $ ,, 11;485,941.79 $ it '11,542,853:76i This change of dci constitutes full and complete compensation fel all labor,equipment,materials,overhead,profit,any and all indirect costs, and time adi usiment to perform the abos e described changes. All other costs are non-con.pensiblc All other terms and conditions of the cowl act ieniam unchanged all Contractor. _a� lank • — -.7— 13 Inspector- r tat /u'Li- e Y- / l/z y l,ij /, "ale Project Manager / 7 Z3 A3 Dale 7L4 b/ Resident Engineer „ / 7 Z3 ))/. 9 j 1-701—City Engineer 41, /'liqit3 o,a Approved by / 7/,:.2C//3 H:\Forms FCO25 xis lfarrir,Gus'nfAuhit One \ (Revised 05/2012)