Loading...
HomeMy WebLinkAboutConstruction Standards 2009 (2) Rev 11.01.13.pdfSECTION II: STANDARD DETAILS TABLE OF CONTENTS Revised 11/2013 ............................. City of Auburn Engineering Construction Standards .......................... i Ref.: H:\DEVELOPMENT\Manuals\Current Manuals\2009 Construction Standards\Section II Table Of Contents (11-13).doc ENGINEERING CONSTRUCTION STANDARDS STANDARD DETAIL NAME STANDARD DETAIL NUMBER GENERAL BANNER DETAIL ................................................................................................................................................. GENERAL-01 TEMPORARY CONSTRUCTION SITE SIGN BOARD (4’ X 4’) ....................................................................... GENERAL-02 TEMPORARY T.I.B. CONSTRUCTION SITE SIGN BOARD (4’ X 4’) ............................................................. GENERAL-02a TEMPORARY H.U.D. CONSTRUCTION SITE SIGN BOARD (4’ X 4’) .......................................................... GENERAL-02b TEMPORARY CONSTRUCTION SITE SIGN BOARD (4’ X 8’) ....................................................................... GENERAL-03 ROCK WALL DETAIL .......................................................................................................................................... GENERAL-04 CITY TELECOMMUNICATIONS SPLICE VAULT DETAIL (Sheet 1 of 2) ..................................................... GENERAL-05 CITY TELECOMMUNICATIONS SPLICE VAULT DETAIL (Sheet 2 of 2) ..................................................... GENERAL-05a CITY TELECOMMUNICATIONS PULL BOX DETAIL (Sheet 1 of 2) .............................................................. GENERAL-06 CITY TELECOMMUNICATIONS PULL BOX DETAIL (Sheet 2 of 2) .............................................................. GENERAL-06a EROSION TEMPORARY CONSTRUCTION ENTRANCE .................................................................................................. EROSION-01 SMALL SITE TEMPORARY CONSTRUCTION ENTRANCE ........................................................................... EROSION-01a TEMPORARY CONSTRUCTION EXIT WITH TIRE WASH PAN ................................................................. EROSION-02 SILT CONTROL FENCE ....................................................................................................................................... EROSION-03 CATCH BASIN PROTECTION ............................................................................................................................ EROSION-04 GRAVEL FILTER BERM...................................................................................................................................... EROSION-05 STRAW AND HAY BALE BARRIER ................................................................................................................. EROSION-06 SMALL LOT, SITE EROSION CONTROL PLAN ............................................................................................... EROSION-07 TRAFFIC BUMPER CURB DETAIL ..................................................................................................................................... TRAFFIC-01 STREET RIGHT-OF-WAY PIPE TRENCH BACK FILL & PAVEMENT RESTORATION .............................. TRAFFIC-02 TYPICAL PIPE TRENCH DETAIL ...................................................................................................................... TRAFFIC-03 TELECOMMUNICATION CORRIDOR TRENCH DETAIL ............................................................................... TRAFFIC-04 BARRICADES ....................................................................................................................................................... TRAFFIC-05 BOLLARDS ........................................................................................................................................................... TRAFFIC-06 RESIDENTIAL DRIVEWAY ................................................................................................................................ TRAFFIC-07 ALTERNATE RESIDENTIAL DRIVEWAY ........................................................................................................ TRAFFIC-08 COMMERCIAL/INDUSTRIAL DRIVEWAY ...................................................................................................... TRAFFIC-09 ALTERNATE COMMERCIAL/INDUSTRIAL DRIVEWAY RETROFIT .......................................................... TRAFFIC-10 DRIVEWAY WIDTHS AND LOCATION ............................................................................................................ TRAFFIC-11 ADJUSTMENT OF NEW AND EXISTING UTILITY STRUCTURES TO FINISH GRADE ............................. TRAFFIC-12 TYPICAL STREET INTERSECTION DESIGN ELEMENTS .............................................................................. TRAFFIC-13 STREET TREE PLANTING/STAKING ................................................................................................................ TRAFFIC-14 NOT USED ............................................................................................................................................................ TRAFFIC-15 MAILBOX MOUNTING CURB TYPE LOCATION ............................................................................................ TRAFFIC-16 NEIGHBORHOOD DELIVERY AND COLLECTION BOX UNIT (N.D.C.B.U.) INSTALLATION ................. TRAFFIC-17 NEIGHBORHOOD DELIVERY AND COLLECTION BOX UNIT (N.D.C.B.U.) SINGLE UNIT ..................... TRAFFIC-18 NEIGHBORHOOD DELIVERY AND COLLECTION BOX UNIT (N.D.C.B.U.) MULTIPLE UNITS ............. TRAFFIC-19 POURED IN PLACE MONUMENT, TYPE ‘A’ MODIFIED ............................................................................... TRAFFIC-20 POURED IN PLACE MONUMENT, TYPE ‘B’ MODIFIED ............................................................................... TRAFFIC-21 MONUMENT CASE AND COVER ...................................................................................................................... TRAFFIC-22 SIDEWALK WITH LANDSCAPE STRIP ............................................................................................................ TRAFFIC-23 COMMERCIAL/INDUSTRIAL SIDEWALK WITHOUT PLANTER STRIP ..................................................... TRAFFIC-24 WHEELCHAIR RAMP WITH DOMES ................................................................................................................ TRAFFIC-25 ALTERNATE WHEELCHAIR RAMP WITH DOMES ........................................................................................ TRAFFIC-26 SECTION II: STANDARD DETAILS TABLE OF CONTENTS Revised 11/2013 ............................. City of Auburn Engineering Construction Standards ......................... ii Ref.: H:\DEVELOPMENT\Manuals\Current Manuals\2009 Construction Standards\Section II Table Of Contents (11-13).doc STANDARD DETAIL NAME STANDARD DETAIL NUMBER TRAFFIC (continued) PRINCIPAL ARTERIAL ROADWAY SECTION ................................................................................................ TRAFFIC-27 MINOR ARTERIAL ROADWAY SECTION ....................................................................................................... TRAFFIC-28 RESIDENTIAL COLLECTOR ROADWAY SECTION ....................................................................................... TRAFFIC-29 NONRESIDENTIAL COLLECTOR ROADWAY SECTION .............................................................................. TRAFFIC-30 RURAL COLLECTOR ROADWAY SECTION.................................................................................................... TRAFFIC-31 LOCAL RESIDENTIAL ROADWAY SECTION ................................................................................................. TRAFFIC-32 LOCAL NONRESIDENTIAL ROADWAY SECTION ......................................................................................... TRAFFIC-33 RURAL RESIDENTIAL ROADWAY SECTION ................................................................................................. TRAFFIC-34 LANE-USE PAVEMENT MARKING DETAIL ................................................................................................... TRAFFIC-35 34’ WIDE ROADWAY, CROSSWALK AND STOP BAR DETAIL ................................................................... TRAFFIC-36 44’ WIDE ROADWAY, CROSSWALK AND STOP BAR DETAIL ................................................................... TRAFFIC-37 61’ WIDE ROADWAY, CROSSWALK AND STOP BAR DETAIL ................................................................... TRAFFIC-38 2 WAY LEFT TURN LANE TO LEFT TURN LANE .......................................................................................... TRAFFIC-39 PAVEMENT MARKINGS (2-Lane 2-Way Traffic, Left Turn Lane, 2-Way Left Turn Lane, and Standard Lane Markings ................................................................................................ TRAFFIC-40 PAVEMENT MARKINGS (2-Way Left Turn Lane with Left Turn Pocket) ......................................................... TRAFFIC-41 PAVEMENT MARKINGS (Dual Left Turn Lanes and Dual Right Turn Lanes) .................................................. TRAFFIC-42 PAVEMENT MARKINGS (Raised Pavement Marker (RPM), Gore, Center, Skip, and Turn Lane Stripe) .................................................................................................................... TRAFFIC-43 BICYCLE LANE MARKINGS (Right Turn Lane Drop) ....................................................................................... TRAFFIC-44 BICYCLE LANE MARKINGS (Right Turn Pocket) ............................................................................................. TRAFFIC-45 PEDESTRIAN PUSH BUTTON DETAIL ............................................................................................................. TRAFFIC-46 PREEMPTION INDICATOR LIGHT ASSEMBLY .............................................................................................. TRAFFIC-47 LUMINAIRE AND CONDUIT LAYOUT ............................................................................................................. TRAFFIC-48 LUMINAIRE POLE ............................................................................................................................................... TRAFFIC-49 UNIFORM LUMINAIRE WIRING DETAIL ........................................................................................................ TRAFFIC-50 POWER SERVICE CABINET DETAIL ............................................................................................................... TRAFFIC-51 POWER SERVICE AND UPS CABINET DETAIL (Sheet 1 of 2) ....................................................................... TRAFFIC-52 POWER SERVICE AND UPS CABINET DETAIL (Sheet 2 of 2) ....................................................................... TRAFFIC-52a TRAFFIC SIGNAL CONTROLLER AND UPS FOUNDATION DETAIL .......................................................... TRAFFIC-53 TELLECOMMUNICATION AND LUMINAIRE ELECTRICAL TRENCH DETAIL ........................................ TRAFFIC-54 TYPICAL SIGN POST INSTALLATION ............................................................................................................. TRAFFIC-55 MAST ARM MOUNTED, STREET NAME SIGN DETAIL ................................................................................ TRAFFIC-56 POST MOUNTED, STREET NAME SIGN DETAIL ........................................................................................... TRAFFIC-57 50’ WIDE ROADWAY CROSSWALK AND STOP BAR DETAIL .................................................................... TRAFFIC-58 STANDARD DETECTOR LOOP SPACING ........................................................................................................ TRAFFIC-59 REPAIR OF EXISTING CEMENT CONCRETE PANELS IN ROADWAY ....................................................... TRAFFIC-60 DOWNTOWN PEDESTRIAN LIGHTING STANDARD ..................................................................................... TRAFFIC-61 DOWNTOWN PEDESTRIAN POLE MOUNT LIGHTING STANDARD ........................................................... TRAFFIC-61a LOCAL RESIDENTIAL ORNAMENTAL STREET LIGHTING STANDARD ................................................... TRAFFIC-62 DOWNTOWN STREET LIGHTING STANDARD ............................................................................................... TRAFFIC-63 TYPICAL PLAN FOR TREE GRATE ................................................................................................................... TRAFFIC-64 PRIVATE ACCESS ROAD (SHARED DRIVEWAY) ......................................................................................... TRAFFIC-65 SANITARY SEWER SIDE SEWER STUB .............................................................................................................................................. SEWER-01 PRIVATE SANITARY SIDE SEWER CLEANOUT ............................................................................................ SEWER-02 PUBLIC SANITARY OR STORM SEWER CLEANOUT .................................................................................... SEWER-03 24” DIA. MANHOLE FRAME AND COVER ...................................................................................................... SEWER-04 MANHOLE INSIDE DROP DETAIL .................................................................................................................... SEWER-05 EXTRA SHALLOW MANHOLE DETAIL ........................................................................................................... SEWER-06 SECTION II: STANDARD DETAILS TABLE OF CONTENTS Revised 11/2013 ............................. City of Auburn Engineering Construction Standards ......................... iii Ref.: H:\DEVELOPMENT\Manuals\Current Manuals\2009 Construction Standards\Section II Table Of Contents (11-13).doc STANDARD DETAIL NAME STANDARD DETAIL NUMBER STORM DRAINAGE FLOW RESTRICTOR (TEE) ................................................................................................................................. STORM-01 MULTIPLE ORIFICE CONTROL STRUCTURE ................................................................................................. STORM-02 SMALL SITE, WATER QUALITY CONTROL STRUCTURE ............................................................................ STORM-03 GRADING/EROSION DISCHARGE CONTROL STRUCTURE ......................................................................... STORM-04 RESIDENTIAL INFILTRATION TRENCH SYSTEM FOR DOWN SPOUTS ................................................... STORM-05 RESIDENTIAL INFILTRATION DRY WELL DETAIL ...................................................................................... STORM-06 RESIDENTIAL FOOTING DRAIN DETAIL ........................................................................................................ STORM-07 HEADWALL WITH GRATE ................................................................................................................................. STORM-08 THROUGH-CURB INLET FRAME & GRATE WITH VERTICAL CURB INSTALLATION ........................... STORM-09 THROUGH-CURB INLET FRAME ...................................................................................................................... STORM-10 CURB & GUTTER REINFORCING DETAIL ...................................................................................................... STORM-11 RESIDENTIAL SIDEWALK DRAIN.................................................................................................................... STORM-12 WATER WATER MAIN BLOCKING ................................................................................................................................. WATER-01 TYPICAL AIR & VACUUM RELIEF VALVE DETAIL ..................................................................................... WATER-02 2” PERMANENT BLOW OFF ASSEMBLY DETAIL ......................................................................................... WATER-03 TEMPORARY BLOW OFF DETAIL .................................................................................................................... WATER-04 DOUBLE DETECTOR CHECK VALVE ASSEMBLY AND VAULT (Page 1 of 2) .......................................... WATER-05 DOUBLE DETECTOR CHECK VALVE ASSEMBLY AND VAULT (Page 2 of 2) .......................................... WATER-05a IRRIGATION FROM DOMESTIC SERVICE LINE WITH D.C.V.A. UP TO 2” ................................................ WATER-06 5 ¼” M.V.O. HYDRANT SETTING DETAIL ...................................................................................................... WATER-07 FIRE HYDRANT LOCATION IN CUT OR FILL WITH GUARD POSTS DETAIL .......................................... WATER-08 ¾” TO 3” FIRE SPRINKLER LINES WITH DOMESTIC SERVICE LINE ........................................................ WATER-09 PRESSURE REDUCING VALVE STATION FOR 8” DIA. WATERLINE (Sheet 1 of 3) .................................. WATER-10 PRESSURE REDUCING VALVE STATION FOR 8” DIA. WATERLINE (Sheet 2 of 3) .................................. WATER-10a PRESSURE REDUCING VALVE STATION FOR 8” DIA. WATERLINE (Sheet 3 of 3) .................................. WATER-10b PRESSURE REDUCING VALVE STATION FOR 10” DIA. WATERLINE (Sheet 1 of 3) ................................ WATER-11 PRESSURE REDUCING VALVE STATION FOR 10” DIA. WATERLINE (Sheet 2 of 3) ................................ WATER-11a PRESSURE REDUCING VALVE STATION FOR 10” DIA. WATERLINE (Sheet 3 of 3) ................................ WATER-11b PRESSURE REDUCING VALVE STATION FOR 12” DIA WATERLINE (Sheet 1 of 3) ................................. WATER-12 PRESSURE REDUCING VALVE STATION FOR 12” DIA. WATERLINE (Sheet 2 of 3) ................................ WATER-12a PRESSURE REDUCING VALVE STATION FOR 12” DIA. WATERLINE (Sheet 3 of 3) ................................ WATER-12b ¾” & 1” WATER METER AND SERVICE LINE INSTALLATION ................................................................... WATER-13 1 ½” & 2” WATER METER AND SERVICE LINE INSTALLATION ................................................................ WATER-14 ¾” DUAL WATER METER AND SERVICE LINE INSTALLATION ................................................................ WATER-15 WATER METER LOCATION AND SERVICE LINE MATERIAL SCHEDULE ............................................... WATER-16 3” OR 4” WATER METER AND SERVICE LINE INSTALLATION (Sheet 1 of 2) ........................................... WATER-17 3” OR 4” WATER METER AND SERVICE LINE INSTALLATION (Sheet 2 of 2) ........................................... WATER-17a VALVE WRENCH EXTENSION BOX ................................................................................................................ WATER-18 C.I. 18” VALVE BOX TOP AND VALVE BOX COVER ................................................................................... WATER-18a 5” C.I. SOIL PIPE VALVE BOX EXTENSION AND C.I. VALVE BOX BOTTOM .......................................... WATER-18b NON-SINGLE FAMILY SERVICE LINES WITH DEDUCT METER ................................................................ WATER-19 TEMPORARY COMBINATION HYDRANT METER/REDUCED PRESSURE BACKFLOW ASSY .............. WATER-20 REDUCED PRESSURE BACKFLOW ASSEMBLY (OUTSIDE INSTALLATION) .......................................... WATER-21 REDUCED PRESSURE BACKFLOW ASSEMBLY (INSIDE INSTALLATION) .............................................. WATER-22 DOUBLE CHECK VALVE ASSEMBLY (OUTSIDE INSTALLATION) ........................................................... WATER-23 DOUBLE CHECK VALVE ASSEMBLY (INSIDE INSTALLATION) ............................................................... WATER-24 SECTION II: STANDARD DETAILS TABLE OF CONTENTS Revised 11/2013 ............................. City of Auburn Engineering Construction Standards ........................ iv Ref.: H:\DEVELOPMENT\Manuals\Current Manuals\2009 Construction Standards\Section II Table Of Contents (11-13).doc STANDARD PLAN NAME STANDARD PLAN NUMBER WSDOT STANDARD PLANS (COMMONLY USED BY CITY OF AUBURN AND NOT INCLUDED HEREIN) CEMENT CONCRETE PAVEMENT JOINTS ............................................................................................... A-40.10-00 CATCH BASIN TYPE 1 .................................................................................................................................. B-05.20-00 CATCH BASIN TYPE 1L ................................................................................................................................ B-05.40-00 CATCH BASIN TYPE 1P (For PARKING LOT)............................................................................................ B-05.60-00 CATCH BASIN TYPE 2 .................................................................................................................................. B-10.20-00 CATCH BASIN TYPE 2 WITH BAFFLE TYPE FLOW RESTRICTOR ....................................................... B-10.60-00 MANHOLE TYPE 1 ........................................................................................................................................ B-15.20-00 MANHOLE TYPE 2 ........................................................................................................................................ B-15.40-00 MANHOLE TYPE 3 ........................................................................................................................................ B-15.60-00 CONCRETE INLET ......................................................................................................................................... B-25.60-00 RECTANGULAR FRAME (REVERSIBLE) .................................................................................................... B-30.50.00 RECTANGULAR SOLID METAL COVER .................................................................................................... B-30.20.01 RECTANGULAR VANED GRATE ................................................................................................................ B-30.30-00 RECTANGULAR HERRINGBONE GRATE .................................................................................................. B-30.50-00 MISCELLANEOUS DETAILS FOR DRAINAGE STRUCTURES ................................................................ B-30.90-01 CONCRETE THRUST BLOCK FOR CONVEX VERTICAL BENDS ......................................................... B-90.50-00 DROP CONNECTIONS FOR SANITARY SEWER USE .............................................................................. B-85.50-01 BEAM GUARDRAIL: TYPES 1 ~ 4 (W-Beam) .......................................................................................................... C-1 REINFORCED CONCRETE RETIANING WALL TYPE 1 AND 1SW ......................................................... D-10.10-01 REINFORCED CONCRETE RETAINING WALL TYPE 2 AND 2SW ......................................................... D-10.15-01 CEMENT CONCRETE CURBS ....................................................................................................................... F-10.12-00 EXTRUDED CURB .......................................................................................................................................... F-10.42-00 PRECAST CONCRETE SLOPED MOUNTABLE CURB............................................................................... F-10.62-01 PRECAST CONCRETE DUAL FACED SLOPED MOUNTABLE CURB ..................................................... F-10.64-02 SIGNAL STANDARD TYPE DESIGNATIONS AND TYPES PPB, PS, I, RM AND FB DETAILS ....................... J-7a TYPE 3 INDUCTION LOOP ....................................................................................................................................... J-8c LOCKING LID STANDARD JUNCTION BOX TYPES 1 & 2 ....................................................................... J-40.10-00 PULL BOX ........................................................................................................................................................ J-90.10-00 CABLE VAULT ................................................................................................................................................ J-90.20-00 ROAD CLOSURE, WITH DIVERSION ......................................................................................................... K-10.20-01 ROAD CLOSURE, WITH OFF-SITE DETOUR ............................................................................................. K-10.40-00 LANE CLOSURE, WITHOUT FLAGGERS ~ LOW VOLUME ROAD ........................................................ K-20.20-01 LANE CLOSURE, WITH FLAGGER CONTROL .......................................................................................... K-20.40-00 LANE CLOSURE, WITH PILOT CAR ........................................................................................................... K-20.60-00 LANE SHIFT, ONTO PASSING LANE .......................................................................................................... K-22.20-01 SINGLE LANE CLOSURE, WITH ENCROACHMENT ................................................................................ K-24.20-00 DOUBLE LANE CLOSURE, ON MULTILANE ROADWAY ....................................................................... K-24.40-01 SINGLE LANE CLOSURE, ON MULTILANE ROADWAY ......................................................................... K-24.60-00 SINGLE LANE CLOSURE, WITH TEMPORARY CONCRETE BARRIER ................................................ K-24.80-01 LANE SHIFT, ONTO TWO-WAY LEFT TURN LANE ................................................................................. K-26.20-00 LEFT AND CENTER LANE CLOSURE ~ TWO-WAY LEFT TURN LANE ............................................... K-26.40-01 INTERSECTION ~ LANE SHIFT ON THREE LANE TWO-WAY LEFT TURN LANE ............................. K-30.20-00 INTERSECTION ~ LANE SHIFT ON FIVE LANE TWO-WAY LEFT TURN LANE ................................. K-30.40.01 INTERSECTION ~ RIGHT LANE CLOSURE, FAR SIDE ............................................................................ K-32.20-00 INTERSECTION ~ LEFT LANE CLOSURE, FAR SIDE .............................................................................. K-32.40-00 INTERSECTION ~ MULTIPLE LANE CLOSURE ........................................................................................ K-32.60-00 INTERSECTION ~ HALF ROAD CLOSURE WITH LANE SHIFT .............................................................. K-32.80-00 INTERSECTION ~ PEDESTRIAN DETOUR................................................................................................. K-34.20-00 INTERSECTION ~ SHOULDER WORK ........................................................................................................ K-36.20-00 SHOULDER CLOSURE ~ HIGH SPEED ROADWAY (45 MPH OR HIGHER) .......................................... K-40.20-00 SHOULDER CLOSURE ~ LOW SPEED ROADWAY (40 MPH OR LESS) ................................................ K-40.40-00 SHOULDER CLOSURE ~ SHORT DURATION ........................................................................................... K-40.60-00 WORK BEYOND THE SHOULDER .............................................................................................................. K-40.80-00 EMERGENCY ~ PASSABLE HAZARD ........................................................................................................ K-55.20-00 SPEED ZONE, SUPPLEMENTAL SIGNING ~ CHIP SEAL PROJECT ....................................................... K-60.20-02 MOTORCYCLE, SUPPLEMENTAL SIGNING ............................................................................................. K-60.40-00 TEMPORARY CHANNELIZATION .............................................................................................................. K-70.20-00 SECTION II: STANDARD DETAILS TABLE OF CONTENTS Revised 11/2013 ............................. City of Auburn Engineering Construction Standards ......................... v Ref.: H:\DEVELOPMENT\Manuals\Current Manuals\2009 Construction Standards\Section II Table Of Contents (11-13).doc STANDARD PLAN NAME STANDARD PLAN NUMBER WSDOT STANDARD PLANS (continued) (COMMONLY USED BY CITY OF AUBURN AND NOT INCLUDED HEREIN) CLASS A CONSTRUCTION SIGNING INSTALLATION ............................................................................ K-80.10-00 TYPE 3 BARRICADE ..................................................................................................................................... K-80.20-00 ALTERNATE TEMPORARY CONC. BARRIER (F-SHAPE) ....................................................................... K-80.30-00 TEMPORARY CONC. BARRIER ANCHORING .......................................................................................... K-80.35-00 TEMPORARY CONC. BARRIER ANCHORING ~ NARROW..................................................................... K-80.37.00 CHAIN LINK FENCE, TYPES 3 and 4 ............................................................................................................ L-20.10-00 CHAIN LINK GATE ......................................................................................................................................... L-30.10-00