Loading...
HomeMy WebLinkAboutConstruction Standards 2009 (2) Rev 01.04.14-2.pdfSECTION II: STANDARD DETAILS TABLE OF CONTENTS Revised 11/2013 ............................. City of Auburn Engineering Construction Standards .......................... i Ref.: H:\DEVELOPMENT\Manuals\Current Manuals\2009 Construction Standards\Section II Table Of Contents (11-13).doc ENGINEERING CONSTRUCTION STANDARDS STANDARD DETAIL NAME STANDARD DETAIL NUMBER GENERAL BANNER DETAIL ................................................................................................................................................. GENERAL-01 TEMPORARY CONSTRUCTION SITE SIGN BOARD (4’ X 4’) ....................................................................... GENERAL-02 TEMPORARY T.I.B. CONSTRUCTION SITE SIGN BOARD (4’ X 4’) ............................................................. GENERAL-02a TEMPORARY H.U.D. CONSTRUCTION SITE SIGN BOARD (4’ X 4’) .......................................................... GENERAL-02b TEMPORARY CONSTRUCTION SITE SIGN BOARD (4’ X 8’) ....................................................................... GENERAL-03 ROCK WALL DETAIL .......................................................................................................................................... GENERAL-04 CITY TELECOMMUNICATIONS SPLICE VAULT DETAIL (Sheet 1 of 2) ..................................................... GENERAL-05 CITY TELECOMMUNICATIONS SPLICE VAULT DETAIL (Sheet 2 of 2) ..................................................... GENERAL-05a CITY TELECOMMUNICATIONS PULL BOX DETAIL (Sheet 1 of 2) .............................................................. GENERAL-06 CITY TELECOMMUNICATIONS PULL BOX DETAIL (Sheet 2 of 2) .............................................................. GENERAL-06a EROSION TEMPORARY CONSTRUCTION ENTRANCE .................................................................................................. EROSION-01 SMALL SITE TEMPORARY CONSTRUCTION ENTRANCE ........................................................................... EROSION-01a TEMPORARY CONSTRUCTION EXIT WITH TIRE WASH PAN ................................................................. EROSION-02 SILT CONTROL FENCE ....................................................................................................................................... EROSION-03 CATCH BASIN PROTECTION ............................................................................................................................ EROSION-04 GRAVEL FILTER BERM...................................................................................................................................... EROSION-05 STRAW AND HAY BALE BARRIER ................................................................................................................. EROSION-06 SMALL LOT, SITE EROSION CONTROL PLAN ............................................................................................... EROSION-07 TRAFFIC BUMPER CURB DETAIL ..................................................................................................................................... TRAFFIC-01 STREET RIGHT-OF-WAY PIPE TRENCH BACK FILL & PAVEMENT RESTORATION .............................. TRAFFIC-02 TYPICAL PIPE TRENCH DETAIL ...................................................................................................................... TRAFFIC-03 TELECOMMUNICATION CORRIDOR TRENCH DETAIL ............................................................................... TRAFFIC-04 BARRICADES ....................................................................................................................................................... TRAFFIC-05 BOLLARDS ........................................................................................................................................................... TRAFFIC-06 RESIDENTIAL DRIVEWAY ................................................................................................................................ TRAFFIC-07 ALTERNATE RESIDENTIAL DRIVEWAY ........................................................................................................ TRAFFIC-08 COMMERCIAL/INDUSTRIAL DRIVEWAY ...................................................................................................... TRAFFIC-09 ALTERNATE COMMERCIAL/INDUSTRIAL DRIVEWAY RETROFIT .......................................................... TRAFFIC-10 DRIVEWAY WIDTHS AND LOCATION ............................................................................................................ TRAFFIC-11 ADJUSTMENT OF NEW AND EXISTING UTILITY STRUCTURES TO FINISH GRADE ............................. TRAFFIC-12 TYPICAL STREET INTERSECTION DESIGN ELEMENTS .............................................................................. TRAFFIC-13 STREET TREE PLANTING/STAKING ................................................................................................................ TRAFFIC-14 NOT USED ............................................................................................................................................................ TRAFFIC-15 MAILBOX MOUNTING CURB TYPE LOCATION ............................................................................................ TRAFFIC-16 NEIGHBORHOOD DELIVERY AND COLLECTION BOX UNIT (N.D.C.B.U.) INSTALLATION ................. TRAFFIC-17 NEIGHBORHOOD DELIVERY AND COLLECTION BOX UNIT (N.D.C.B.U.) SINGLE UNIT ..................... TRAFFIC-18 NEIGHBORHOOD DELIVERY AND COLLECTION BOX UNIT (N.D.C.B.U.) MULTIPLE UNITS ............. TRAFFIC-19 POURED IN PLACE MONUMENT, TYPE ‘A’ MODIFIED ............................................................................... TRAFFIC-20 POURED IN PLACE MONUMENT, TYPE ‘B’ MODIFIED ............................................................................... TRAFFIC-21 MONUMENT CASE AND COVER ...................................................................................................................... TRAFFIC-22 SIDEWALK WITH LANDSCAPE STRIP ............................................................................................................ TRAFFIC-23 COMMERCIAL/INDUSTRIAL SIDEWALK WITHOUT PLANTER STRIP ..................................................... TRAFFIC-24 WHEELCHAIR RAMP WITH DOMES ................................................................................................................ TRAFFIC-25 ALTERNATE WHEELCHAIR RAMP WITH DOMES ........................................................................................ TRAFFIC-26 SECTION II: STANDARD DETAILS TABLE OF CONTENTS Revised 11/2013 ............................. City of Auburn Engineering Construction Standards ......................... ii Ref.: H:\DEVELOPMENT\Manuals\Current Manuals\2009 Construction Standards\Section II Table Of Contents (11-13).doc STANDARD DETAIL NAME STANDARD DETAIL NUMBER TRAFFIC (continued) PRINCIPAL ARTERIAL ROADWAY SECTION ................................................................................................ TRAFFIC-27 MINOR ARTERIAL ROADWAY SECTION ....................................................................................................... TRAFFIC-28 RESIDENTIAL COLLECTOR ROADWAY SECTION ....................................................................................... TRAFFIC-29 NONRESIDENTIAL COLLECTOR ROADWAY SECTION .............................................................................. TRAFFIC-30 RURAL COLLECTOR ROADWAY SECTION.................................................................................................... TRAFFIC-31 LOCAL RESIDENTIAL ROADWAY SECTION ................................................................................................. TRAFFIC-32 LOCAL NONRESIDENTIAL ROADWAY SECTION ......................................................................................... TRAFFIC-33 RURAL RESIDENTIAL ROADWAY SECTION ................................................................................................. TRAFFIC-34 LANE-USE PAVEMENT MARKING DETAIL ................................................................................................... TRAFFIC-35 34’ WIDE ROADWAY, CROSSWALK AND STOP BAR DETAIL ................................................................... TRAFFIC-36 44’ WIDE ROADWAY, CROSSWALK AND STOP BAR DETAIL ................................................................... TRAFFIC-37 61’ WIDE ROADWAY, CROSSWALK AND STOP BAR DETAIL ................................................................... TRAFFIC-38 2 WAY LEFT TURN LANE TO LEFT TURN LANE .......................................................................................... TRAFFIC-39 PAVEMENT MARKINGS (2-Lane 2-Way Traffic, Left Turn Lane, 2-Way Left Turn Lane, and Standard Lane Markings ................................................................................................ TRAFFIC-40 PAVEMENT MARKINGS (2-Way Left Turn Lane with Left Turn Pocket) ......................................................... TRAFFIC-41 PAVEMENT MARKINGS (Dual Left Turn Lanes and Dual Right Turn Lanes) .................................................. TRAFFIC-42 PAVEMENT MARKINGS (Raised Pavement Marker (RPM), Gore, Center, Skip, and Turn Lane Stripe) .................................................................................................................... TRAFFIC-43 BICYCLE LANE MARKINGS (Right Turn Lane Drop) ....................................................................................... TRAFFIC-44 BICYCLE LANE MARKINGS (Right Turn Pocket) ............................................................................................. TRAFFIC-45 PEDESTRIAN PUSH BUTTON DETAIL ............................................................................................................. TRAFFIC-46 PREEMPTION INDICATOR LIGHT ASSEMBLY .............................................................................................. TRAFFIC-47 LUMINAIRE AND CONDUIT LAYOUT ............................................................................................................. TRAFFIC-48 LUMINAIRE POLE ............................................................................................................................................... TRAFFIC-49 UNIFORM LUMINAIRE WIRING DETAIL ........................................................................................................ TRAFFIC-50 POWER SERVICE CABINET DETAIL ............................................................................................................... TRAFFIC-51 POWER SERVICE AND UPS CABINET DETAIL (Sheet 1 of 2) ....................................................................... TRAFFIC-52 POWER SERVICE AND UPS CABINET DETAIL (Sheet 2 of 2) ....................................................................... TRAFFIC-52a TRAFFIC SIGNAL CONTROLLER AND UPS FOUNDATION DETAIL .......................................................... TRAFFIC-53 TELLECOMMUNICATION AND LUMINAIRE ELECTRICAL TRENCH DETAIL ........................................ TRAFFIC-54 TYPICAL SIGN POST INSTALLATION ............................................................................................................. TRAFFIC-55 MAST ARM MOUNTED, STREET NAME SIGN DETAIL ................................................................................ TRAFFIC-56 POST MOUNTED, STREET NAME SIGN DETAIL ........................................................................................... TRAFFIC-57 50’ WIDE ROADWAY CROSSWALK AND STOP BAR DETAIL .................................................................... TRAFFIC-58 STANDARD DETECTOR LOOP SPACING ........................................................................................................ TRAFFIC-59 REPAIR OF EXISTING CEMENT CONCRETE PANELS IN ROADWAY ....................................................... TRAFFIC-60 DOWNTOWN PEDESTRIAN LIGHTING STANDARD ..................................................................................... TRAFFIC-61 DOWNTOWN PEDESTRIAN POLE MOUNT LIGHTING STANDARD ........................................................... TRAFFIC-61a LOCAL RESIDENTIAL ORNAMENTAL STREET LIGHTING STANDARD ................................................... TRAFFIC-62 DOWNTOWN STREET LIGHTING STANDARD ............................................................................................... TRAFFIC-63 TYPICAL PLAN FOR TREE GRATE ................................................................................................................... TRAFFIC-64 PRIVATE ACCESS ROAD (SHARED DRIVEWAY) ......................................................................................... TRAFFIC-65 SANITARY SEWER SIDE SEWER STUB .............................................................................................................................................. SEWER-01 PRIVATE SANITARY SIDE SEWER CLEANOUT ............................................................................................ SEWER-02 PUBLIC SANITARY OR STORM SEWER CLEANOUT .................................................................................... SEWER-03 24” DIA. MANHOLE FRAME AND COVER ...................................................................................................... SEWER-04 MANHOLE INSIDE DROP DETAIL .................................................................................................................... SEWER-05 EXTRA SHALLOW MANHOLE DETAIL ........................................................................................................... SEWER-06 SECTION II: STANDARD DETAILS TABLE OF CONTENTS Revised 12/2013 ........................... City of Auburn Engineering Construction Standards ...................... iii Ref.: H:\Engineering Standards Manuals\02 Construction Standards\02-3 Current Working Files\2.3.3 Revisions in Progress\Section II Table Of Contents (12-13).doc STANDARD DETAIL NAME STANDARD DETAIL NUMBER STORM DRAINAGE FLOW RESTRICTOR (TEE) ...........................................................................................................................STORM-01 MULTIPLE ORIFICE CONTROL STRUCTURE ............................................................................................STORM-02 SMALL SITE, WATER QUALITY CONTROL STRUCTURE ........................................................................STORM-03 GRADING/EROSION DISCHARGE CONTROL STRUCTURE ......................................................................STORM-04 RESIDENTIAL INFILTRATION TRENCH SYSTEM FOR DOWN SPOUTS .................................................STORM-05 RESIDENTIAL INFILTRATION DRY WELL DETAIL ...................................................................................STORM-06 RESIDENTIAL FOOTING DRAIN DETAIL....................................................................................................STORM-07 HEADWALL WITH GRATE ...........................................................................................................................STORM-08 THROUGH-CURB INLET FRAME & GRATE WITH VERTICAL CURB INSTALLATION ..........................STORM-09 THROUGH-CURB INLET FRAME ................................................................................................................STORM-10 CURB & GUTTER REINFORCING DETAIL..................................................................................................STORM-11 RESIDENTIAL SIDEWALK DRAIN ...............................................................................................................STORM-12 WATER WATER MAIN BLOCKING ...........................................................................................................................WATER-01 TYPICAL AIR & VACUUM RELIEF VALVE DETAIL ..................................................................................WATER-02 2” PERMANENT BLOW OFF ASSEMBLY DETAIL .....................................................................................WATER-03 TEMPORARY BLOW OFF DETAIL ..............................................................................................................WATER-04 DOUBLE DETECTOR CHECK VALVE ASSEMBLY AND VAULT (Page 1 of 2).........................................WATER-05 DOUBLE DETECTOR CHECK VALVE ASSEMBLY AND VAULT (Page 2 of 2).........................................WATER-05a IRRIGATION FROM DOMESTIC SERVICE LINE WITH D.C.V.A. UP TO 2” ..............................................WATER-06 5 ¼” M.V.O. HYDRANT SETTING DETAIL .................................................................................................WATER-07 FIRE HYDRANT LOCATION IN CUT OR FILL WITH GUARD POSTS DETAIL .........................................WATER-08 ¾” TO 3” FIRE SPRINKLER LINES WITH DOMESTIC SERVICE LINE ......................................................WATER-09 PRESSURE REDUCING VALVE STATION FOR 8” DIA. WATERLINE (Sheet 1 of 3) .................................WATER-10 PRESSURE REDUCING VALVE STATION FOR 8” DIA. WATERLINE (Sheet 2 of 3) .................................WATER-10a PRESSURE REDUCING VALVE STATION FOR 8” DIA. WATERLINE (Sheet 3 of 3) .................................WATER-10b PRESSURE REDUCING VALVE STATION FOR 10” DIA. WATERLINE (Sheet 1 of 3) ...............................WATER-11 PRESSURE REDUCING VALVE STATION FOR 10” DIA. WATERLINE (Sheet 2 of 3) ...............................WATER-11a PRESSURE REDUCING VALVE STATION FOR 10” DIA. WATERLINE (Sheet 3 of 3) ...............................WATER-11b PRESSURE REDUCING VALVE STATION FOR 12” DIA WATERLINE (Sheet 1 of 3) ................................WATER-12 PRESSURE REDUCING VALVE STATION FOR 12” DIA. WATERLINE (Sheet 2 of 3) ...............................WATER-12a PRESSURE REDUCING VALVE STATION FOR 12” DIA. WATERLINE (Sheet 3 of 3) ...............................WATER-12b ¾” & 1” WATER METER AND SERVICE LINE INSTALLATION ................................................................WATER-13 1 ½” & 2” WATER METER AND SERVICE LINE INSTALLATION .............................................................WATER-14 NOT USED ......................................................................................................................................................WATER-15 WATER METER LOCATION AND SERVICE LINE MATERIAL SCHEDULE .............................................WATER-16 3” OR 4” WATER METER AND SERVICE LINE INSTALLATION (Sheet 1 of 2) .........................................WATER-17 3” OR 4” WATER METER AND SERVICE LINE INSTALLATION (Sheet 2 of 2) .........................................WATER-17a VALVE WRENCH EXTENSION BOX ...........................................................................................................WATER-18 C.I. 18” VALVE BOX TOP AND VALVE BOX COVER ................................................................................WATER-18a 5” C.I. SOIL PIPE VALVE BOX EXTENSION AND C.I. VALVE BOX BOTTOM ........................................WATER-18b NON-SINGLE FAMILY SERVICE LINES WITH DEDUCT METER..............................................................WATER-19 TEMPORARY COMBINATION HYDRANT METER/REDUCED PRESSURE BACKFLOW ASSY .............WATER-20 REDUCED PRESSURE BACKFLOW ASSEMBLY (OUTSIDE INSTALLATION) ........................................WATER-21 REDUCED PRESSURE BACKFLOW ASSEMBLY (INSIDE INSTALLATION) ............................................WATER-22 DOUBLE CHECK VALVE ASSEMBLY (OUTSIDE INSTALLATION) .........................................................WATER-23 DOUBLE CHECK VALVE ASSEMBLY (INSIDE INSTALLATION) .............................................................WATER-24 SECTION II: STANDARD DETAILS TABLE OF CONTENTS Revised 12/2013 ........................... City of Auburn Engineering Construction Standards ...................... iv Ref.: H:\Engineering Standards Manuals\02 Construction Standards\02-3 Current Working Files\2.3.3 Revisions in Progress\Section II Table Of Contents (12-13).doc STANDARD PLAN NAME STANDARD PLAN NUMBER WSDOT STANDARD PLANS (COMMONLY USED BY CITY OF AUBURN AND NOT INCLUDED HEREIN) CEMENT CONCRETE PAVEMENT JOINTS .......................................................................................... A-40.10-00 CATCH BASIN TYPE 1 ............................................................................................................................ B-05.20-00 CATCH BASIN TYPE 1L ......................................................................................................................... B-05.40-00 CATCH BASIN TYPE 1P (For PARKING LOT) ....................................................................................... B-05.60-00 CATCH BASIN TYPE 2 ............................................................................................................................ B-10.20-00 CATCH BASIN TYPE 2 WITH BAFFLE TYPE FLOW RESTRICTOR..................................................... B-10.60-00 MANHOLE TYPE 1 .................................................................................................................................. B-15.20-00 MANHOLE TYPE 2 .................................................................................................................................. B-15.40-00 MANHOLE TYPE 3 .................................................................................................................................. B-15.60-00 CONCRETE INLET .................................................................................................................................. B-25.60-00 RECTANGULAR FRAME (REVERSIBLE) .............................................................................................. B-30.50.00 RECTANGULAR SOLID METAL COVER ............................................................................................... B-30.20.01 RECTANGULAR VANED GRATE........................................................................................................... B-30.30-00 RECTANGULAR HERRINGBONE GRATE ............................................................................................. B-30.50-00 MISCELLANEOUS DETAILS FOR DRAINAGE STRUCTURES ............................................................. B-30.90-01 CONCRETE THRUST BLOCK FOR CONVEX VERTICAL BENDS ...................................................... B-90.50-00 DROP CONNECTIONS FOR SANITARY SEWER USE........................................................................... B-85.50-01 BEAM GUARDRAIL: TYPES 1 ~ 4 (W-Beam) ..................................................................................................... C-1 REINFORCED CONCRETE RETIANING WALL TYPE 1 AND 1SW ...................................................... D-10.10-01 REINFORCED CONCRETE RETAINING WALL TYPE 2 AND 2SW ...................................................... D-10.15-01 CEMENT CONCRETE CURBS ................................................................................................................. F-10.12-00 EXTRUDED CURB ................................................................................................................................... F-10.42-00 PRECAST CONCRETE SLOPED MOUNTABLE CURB ........................................................................... F-10.62-01 PRECAST CONCRETE DUAL FACED SLOPED MOUNTABLE CURB .................................................. F-10.64-02 SIGNAL STANDARD TYPE DESIGNATIONS AND TYPES PPB, PS, I, RM AND FB DETAILS ...................... J-7a TYPE 3 INDUCTION LOOP ................................................................................................................................ J-8c LOCKING LID STANDARD JUNCTION BOX TYPES 1 & 2 ................................................................... J-40.10-00 PULL BOX ................................................................................................................................................ J-90.10-00 CABLE VAULT ......................................................................................................................................... J-90.20-00 ROAD CLOSURE, WITH DIVERSION..................................................................................................... K-10.20-01 ROAD CLOSURE, WITH OFF-SITE DETOUR ........................................................................................ K-10.40-00 LANE CLOSURE, WITHOUT FLAGGERS ~ LOW VOLUME ROAD ..................................................... K-20.20-01 LANE CLOSURE, WITH FLAGGER CONTROL ..................................................................................... K-20.40-00 LANE CLOSURE, WITH PILOT CAR ...................................................................................................... K-20.60-00 LANE SHIFT, ONTO PASSING LANE ..................................................................................................... K-22.20-01 SINGLE LANE CLOSURE, WITH ENCROACHMENT ............................................................................ K-24.20-00 DOUBLE LANE CLOSURE, ON MULTILANE ROADWAY ................................................................... K-24.40-01 SINGLE LANE CLOSURE, ON MULTILANE ROADWAY ..................................................................... K-24.60-00 SINGLE LANE CLOSURE, WITH TEMPORARY CONCRETE BARRIER .............................................. K-24.80-01 LANE SHIFT, ONTO TWO-WAY LEFT TURN LANE ............................................................................. K-26.20-00 LEFT AND CENTER LANE CLOSURE ~ TWO-WAY LEFT TURN LANE ............................................. K-26.40-01 INTERSECTION ~ LANE SHIFT ON THREE LANE TWO-WAY LEFT TURN LANE ............................ K-30.20-00 INTERSECTION ~ LANE SHIFT ON FIVE LANE TWO-WAY LEFT TURN LANE ................................ K-30.40.01 INTERSECTION ~ RIGHT LANE CLOSURE, FAR SIDE ........................................................................ K-32.20-00 INTERSECTION ~ LEFT LANE CLOSURE, FAR SIDE ........................................................................... K-32.40-00 INTERSECTION ~ MULTIPLE LANE CLOSURE .................................................................................... K-32.60-00 INTERSECTION ~ HALF ROAD CLOSURE WITH LANE SHIFT ........................................................... K-32.80-00 INTERSECTION ~ PEDESTRIAN DETOUR ............................................................................................ K-34.20-00 INTERSECTION ~ SHOULDER WORK................................................................................................... K-36.20-00 SHOULDER CLOSURE ~ HIGH SPEED ROADWAY (45 MPH OR HIGHER) ........................................ K-40.20-00 SHOULDER CLOSURE ~ LOW SPEED ROADWAY (40 MPH OR LESS) .............................................. K-40.40-00 SHOULDER CLOSURE ~ SHORT DURATION ....................................................................................... K-40.60-00 WORK BEYOND THE SHOULDER ........................................................................................................ K-40.80-00 EMERGENCY ~ PASSABLE HAZARD ................................................................................................... K-55.20-00 SPEED ZONE, SUPPLEMENTAL SIGNING ~ CHIP SEAL PROJECT .................................................... K-60.20-02 MOTORCYCLE, SUPPLEMENTAL SIGNING ......................................................................................... K-60.40-00 TEMPORARY CHANNELIZATION ......................................................................................................... K-70.20-00 SECTION II: STANDARD DETAILS TABLE OF CONTENTS Revised 11/2013 ............................. City of Auburn Engineering Construction Standards ......................... v Ref.: H:\DEVELOPMENT\Manuals\Current Manuals\2009 Construction Standards\Section II Table Of Contents (11-13).doc STANDARD PLAN NAME STANDARD PLAN NUMBER WSDOT STANDARD PLANS (continued) (COMMONLY USED BY CITY OF AUBURN AND NOT INCLUDED HEREIN) CLASS A CONSTRUCTION SIGNING INSTALLATION ............................................................................ K-80.10-00 TYPE 3 BARRICADE ..................................................................................................................................... K-80.20-00 ALTERNATE TEMPORARY CONC. BARRIER (F-SHAPE) ....................................................................... K-80.30-00 TEMPORARY CONC. BARRIER ANCHORING .......................................................................................... K-80.35-00 TEMPORARY CONC. BARRIER ANCHORING ~ NARROW..................................................................... K-80.37.00 CHAIN LINK FENCE, TYPES 3 and 4 ............................................................................................................ L-20.10-00 CHAIN LINK GATE ......................................................................................................................................... L-30.10-00