Loading...
HomeMy WebLinkAbout13-15, CP1222 Valley Electric of Mt. VernonCITY OF AUBURN CONTRACT CHANGE ORDER AGREEMENT NO. 1 Contract No., Project No. and Project Title: Contractor Name and Address: D y, 10 a 18634 13 -15, CP1222, Citywide Traffic Signal Safety Improvements Valley Electric of Mt. Vernon 1100 Merrill Creek Parkway Everett, WA 98203 The Contractor is hereby directed to make the changes to the Contract as described herein. This document and all attachments are a supplement to the contract. All work, materials, measurements and unit bid prices for the type of conshuct ion involved shall be in accordance with the contract documents of the above named project unless stated otherwise in this change order. Summary of Proposed Changes: 1) Add quantity to existing bid items as shown in the table below. 2) Add the lump sum item "Additional Signal Wire" to the Contract. The Contractor shall furnish and install 7 conductor signal wire at the following intersections in accordance with Section 8 -20.3 of the Contract Specifications and as shown on the attached plan sheets: - Auburn Way S and 4th Street SE - A Street SE and 17th Street SE - A Street SE and 29th Street SE The lump sum item "Additional Signal Wire" shall be full pay for all costs to furnish and install the signal wire. The Contract thne is extended by days. Item Sch. Sec. No. Item Description Quantity ( +�) Units Unit Price (S) Total Price ( +t) Sales Tax (Y/N) 9 t t 13 _ . -- 16 17 21 _... C01 -1 A 8 -20 Remove Signal Head 1 _ 4 EA 424.00 $ 424.00 N N A A A A A 6 -2o 8 -20 8-20 8.20 8 -20 Remove and Reset Signal Head EA EA _ 1,160.00 140.00 188.00 156.00 1,440.00 $ 4,640.00 Replace & Recycle Signal Head Modules 39 $ 5,460.00 $ _ 188.00 $ _ 93500 $ 7,200.00 _ N N N N —.— N Backplate Tape Louvered Backplate 1 6 EA EA Signal Head with Mount _ 5 EFl _ A 8 -20 n Additional Signal Wire 1 LS 2,050.00 $ 2,050.00 2 898 Olt Subtotal $ 0, Washington State Sales Tax (9.5 %) on applicable items $ TOTAL $ 20,898.00 H: \Forms \FCO25.x1s (Revised 0512012) Base Amount I Total Incl. Tax 1. Total Cost this GO $ 20,898.00 $ 20,898.00 2. Total Cost Previous CIO $ - $ - 3. Original ContraciAmount 4. Revised Contract Amount $ $ 351,662.00 372,560.00 $ $ 351,662.00 372,560.00 H: \Forms \FCO25.x1s (Revised 0512012) CITY OF AUBURN CONTRACT CHANGE ORDER AGREEMF,NP NO. 1 Contract No., Project No. and Project Title: 13 -15, CP1222, Citywide Traffic Signal Safety Improvements This change order constitutes full and complete compensation for all labor. equipment, materials, overhead, profit, any and all indirect costs, and time adjustment to perform the above described changes. All other costs are non- compensable. NI other terms and conditions of the contract remain unchanged. Contractor: Inspector: Project Manager: llalc City Engineer: oo-,e Approved by: 40t - ° "° HAForrns1FCO25.xls (Revised 05/2012) --- Srs.rw.s 'e'w>Nueo '7c Slr_.,sr.r.. wrec Afr L)'. /?t. a- M'TIIRrr< jl f. A!M1l 11(iPil< <�HJn.rrtiv.rvti du {5.a� W i W. Tir -w, >(a "IHC. Er -(G'n ^rte 6wa,(r fNii^oa AUBURN WAY SOUTH A 4TH ST SE SIGNAL 480 GONSTRU.^TION NOTES n rKKrr.F.--,w I ,-11 r. . mxnrs 1w -TC- SIY,nffFL,. IJ r¢F _ F r vn, —T. —T.T m m m SIMU. xw I'- ro a[m yyyySrr��2 V r ./ —Tw T m rt nrm um xo m —11 1' �i C'Ar nnr I [unir SoOe .r r+rf.a w. - Tt) u Faa r nu'if —11— Tu M.P. 1. (wrCUra)�aa. xiKKr r 6eR'rNirmrp" IrE uMUM- can ut emu[ I GENERAL CONSTRUCTION NOTES I I:- I/ M nr TI OF i l'U9LIC WGRKS OFFAI2TIAfNT e� j �) URN \VH,IJVV RN qW rrs Wnsnrgml ' � _I-- w '. n yrp MtiEn r��� C /r�tz arc'.ru GP12I2 SIGNALIILAO TYPES rvmvr..a r.+.m Arr. ro i..r,.N.ra 1315 • mr[ J a 10 - N 1 i ai vm u e M.v. l+ m cam..or S_ e p ! C :v'[orunor5 AUBURN WAY SOUTH A 4TH ST SE SIGNAL 480 GONSTRU.^TION NOTES n rKKrr.F.--,w I ,-11 r. . mxnrs 1w -TC- SIY,nffFL,. IJ r¢F _ F r vn, —T. —T.T m m m SIMU. xw I'- ro a[m yyyySrr��2 V r ./ —Tw T m rt nrm um xo m —11 1' �i C'Ar nnr I [unir SoOe .r r+rf.a w. - Tt) u Faa r nu'if —11— Tu M.P. 1. (wrCUra)�aa. xiKKr r 6eR'rNirmrp" IrE uMUM- can ut emu[ I m m: ab^ I I:- I/ M nr TI OF i l'U9LIC WGRKS OFFAI2TIAfNT e� j �) URN \VH,IJVV RN qW rrs Wnsnrgml ' � _I-- w '. n yrp MtiEn r��� C /r�tz GIAFETYL IMPROVEMENTS SAFETY IIAPROVEMENiS AUBURN INAYSOUTH 84TH STSE SIGNAL lt00 INTERSECTION PLAN GP12I2 1315 mr[ J a 10 - w� � 7-11 7� --- it - --------- H -------- - A -- - - V —NQ Il To I Ic 4fg II E11-11 Inc IF F-T 0 A $1 SE 817TH ST SE SIGNAL #13) Fl 51 SE &291HSTSE SIGNAL Ill GENERAL CONSTRUCTION NOTFS WNSIRUCTION NOTES 11. l IFA, ­DFID A, ll AAD III, l 'l SIGNAL HEAD Prl .-I' — —1 lAl IFFID11111-1—F—ARAI-1-1 I'll 31�— Al A... A �V FDI IMIST110 �D- ICA) AID Nl 1111 - 11 — —IF' FAA (MIDIF D— All 1. 1IFIFTIFF. TAUNT "'I ..—I III —I'll IF 11 Ill FF.D.I. A (, — ll� ..Ill FIII A, ....... A, 4 C,� — rA— — F m D,F—F A ..... 11 I'll IEI 1— FFFF1C AID- 111— 1 . ....... A al .A",. F,l.- Il ...... z-, .1 1, y �FD11- �—' L-111 11 "1 FDII.T ATIF A-1, 1AIII; A. pro wel DAIIA. 'I' ff l"Ill .1 1", 1111— F—IIIII F— LFFAI Il IF `LA— AD A— l A ."I' TIAII 777-7� DI,T A FIFF. ATl g �ILIL 1. 1�p ore _A Al D.A Al FAA. ADDIFIA-1,4AIDTFAAD-1-1 Al DlI GITEMI)FTRAl"PIC SIGNAL C, ry 11. "X, I,, . POBLICIFOWS CPARtMENT SAFETY IMPROVEMENTS Fl mpnr p1 ASTSE & 17TH STSF&GAIALf,130land Au �Kk �,E All STSE &29TH ST SESIGNALP131 tu �r, �Fl Al ,FIAIFj INAMIN(MM A arS AT""', 11,1110 13 1 All r RSEC7t0W PLAN w ID REDID APR 2 9 2014 18634 CITY OF AUBURN CONTRACT CHANGE ORDER AGREEMENT NO. 2 Contract No., Project No. and Priaject Title: 13 -15. CP 1222, Citywide Traffic Signal Safety Improvements Contractor Name and Address: Valley Electric of Mt. Vernon 1100 Merrill Creek Parkway Everett, WA 98203 The Contractor is hereby directed to make the changes to the Contract as described herein. This document and all attachmed6a are a supplement to the contract. All work, materials and measurements for the type of construction involved shall be in accordance with the contract documents of the above named project unless stated otherwise in this change order. Summary of Proposed Changes: Add the lamp sum item "C St SW B 151h St SW Aerial Conductor" to the Contract. The Contractor shall furnish and install one 5c signal wire at the intersection of C street SW and 15th Street SW for connecting the planned signal head to the existing signal system. This Work shall be in accordance with Section 8 -20.3 of the Contract Specifications. The hunp sum item "C St SW R. 15th St SW Aerial Conductor" shall be fill pay for all costs to furnish and install the signal wire. The Contract time is extended by I day. Subtotal I $ 930.00 Washington State Sales Tax (9.5 %) on applicable items $ - TOTAL $ 930.00 Base Amount Totals incl.Tax 1. 'total Cost this C/O $ 930.00 $ Sales Item Sch. Sec. No. Item Description Quantity Units Unit Price Total Price Tax 351,662.00 4. Revised Contract Amount $ 373,490.00 ( + /-) 373,490.00 ($) ( + / -) (Y/N) 702 -1 A 8-20 C St SW & 15th St SW Aerial Conductor I LS 930.00 $ 930.00 N Subtotal I $ 930.00 Washington State Sales Tax (9.5 %) on applicable items $ - TOTAL $ 930.00 This change order constitutes full and complete compensation fur all labor, equipment, materials, overhead, profit, any and all indirect costs, and time adjustment to perfomt the above described changes. All other costs are non- compensable. All other tents and conditions of the contract remain unchanged. Contractor: ova Inspector: .i-6/-/ y DK Project Manager: �f- -� ��/&/za/ ' City Engineer: Appt•oved by: H: \Forms\FCO25.x1s (Revised 05/2012) M oam Base Amount Totals incl.Tax 1. 'total Cost this C/O $ 930.00 $ 930.00 2. Total Cost Previous C/O $ 20,898.00 $ 20,89R.00 3. Original Contract Amount $ 351,662.00 $ 351,662.00 4. Revised Contract Amount $ 373,490.00 $ 373,490.00 This change order constitutes full and complete compensation fur all labor, equipment, materials, overhead, profit, any and all indirect costs, and time adjustment to perfomt the above described changes. All other costs are non- compensable. All other tents and conditions of the contract remain unchanged. Contractor: ova Inspector: .i-6/-/ y DK Project Manager: �f- -� ��/&/za/ ' City Engineer: Appt•oved by: H: \Forms\FCO25.x1s (Revised 05/2012) M oam _ >` i S CITY OF AUBURN CONTRACT CHANGE ORDER AGREEMENT NO.3 Contract No., Project No. and Project Title: 13 -15. CP 1222, Citywide Traffic Signal Safety Improvements Contractor Name and Address: Valley Electric of Mt. Vernon 1100 Merrill Creek Parkway Everett, WA 98203 The Contractor is hereby directed to make the changes to the Contract as described herein. This document and all attachments are a supplement to the contract. All work materials and measurennents for the type of construction involved shall be in accordance with the contract documents of the above named project unless stated otherwise in this change order. Summary of Proposed Changes: 1.) Reduce the Contract quantity of bid item #20 "Signal Pole Terminal Cabinet" from five to three. 2.) Add a new Contract item, CO3 -1, "Spare Signal Pole Terminal Cabinet (not FHWA eligible) ". The Contractor shall furnish two new NEMA 18 inch x 8 inch Signal Pole Terminal Cabinets per WSDOT Standard Plan J- 75.30 -01 to be delivered to the City's Maintenance facility located at 1305'C' Street SW. The Contract time is extended by 0 days. Item Sch. Sec. No. Item Description Quantity Units Unit Price Total Price $ 1,258.96 2. Total Cost All Previous C/O $ 21,828.00 $ 21,828.00 3. Original Contract Amount 20 A 8 -20 Si nal Pole Terminal Cabinet -2 EA 998.00 $ 1,996.00) 372,231.04 Spare Signal Pole Terminal Cabinet CO3 -1 A 8 -20 (not FHWA eligible) 2 EA 368.52 $ 737.04 Subtotal $ (1,258.96) Washington State Sales Tax (9.5 %) on applicable items $ - TOTAL S (1.258.96) This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any and all indirect costs, and time adjustment to perform the above described changes. All other costs are non - compensable. All other terns and conditions of the contract remain unchanged. Contractor: Inspector: Project Manager: City Engineer: Approved by: H: \Forms \FCO25.xls (Revised 05/2012) Z-/, 10, :�, Y Base Amount I Total me]. Tax 1. Total Cost this C/O $ 1,258.96) $ 1,258.96 2. Total Cost All Previous C/O $ 21,828.00 $ 21,828.00 3. Original Contract Amount $ 351.662.00 $ 351,662.00 4. Revised Contract Amount $ 372,231.04 1 $ 372,231.04 This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any and all indirect costs, and time adjustment to perform the above described changes. All other costs are non - compensable. All other terns and conditions of the contract remain unchanged. Contractor: Inspector: Project Manager: City Engineer: Approved by: H: \Forms \FCO25.xls (Revised 05/2012) Z-/, 10, :�, Y o (1.10-7— AD-nouRN CITY Of * r Nancy Backus, Mayor WASH INGGTON 25 West Main Street * Auburn WA 98001 -4998 * www.auburnwa.gov * 253 -931 -3000 August 6, 2014 CERTIFIED MAIL RETURN RECEIPT REQUESTED Alan Guthmiller Valley Electric of Mt. Vernon 1100 Merrill Creek Parkway Everett, WA 98203 RE: Contract No. 13 -15 Project No. CP1222, Citywide Traffic Signal Safety Improvements Final Pay Estimate Dear Mr. Guthmiller: Enclosed is your Final Pay Estimate in the amount of $3,978.39. The total contract amount for this project, as shown on your Final Pay Estimate, is $354,936.96. Please be aware that contract completion will not be granted prior to receipt of Affidavits of Wages Paid for your firm and that incorrect information supplied to L &I may delay the clearance of your bond. If you have any questions, please contact JoAnne Andersen, Contract Administration Specialist, at 253 - 931 -3012. This notification does not constitute contract completion or acceptance of the contract by the City of Auburn. Since - Matthew Larson, P.E. Project Engineer Community Development and Public Works Department Enclosure cc: Dani Daskam, City Clerk File 13.11 (CP1222) AUBURN* MORI:- 1.1-IAN YOU IMAGINED CITY OF AUBURN CP1222 PAY ESTIMATE 93 & FINAL CO. NO. 13 -15 Citywide Traffic Signal Safety improvements SCHEDULE A: Street Improvements ITEM NO- (ITEM DESCRIPTION ESTIMATE QUANTITY TOTAL QUANTITY PERIOD I QUANTITY I TYPE I UNIT COST TOTAL COST PERIOD COST I PERCQE�T EST. 1 One Year Warranty, Bond (not FHV✓A eligilble SPCC Plan .._ ,. Mobilization 1 1 1 LS _- _2,000.00 _'I _350,00. 30,000_00 50.00 2,000.00 s 5o0.o0 100% _- -- _ 100% 100% _ -- 53 _'-'�p2 00% 2 1 1 LS 1,350.00 $ - 3 1 -- ___5_00 .. 1 1 174 LS HR .$_ $ 30,000.00 1$ - 4 - - Traffic Control labor __...a Outside Agency _Uniformed_P_o_L FI_agging Labor_ Se uenlial Arrow Sign _ $ $ - S 5 6 0.528364 0.24654 Est. _ 2,500.00 _ _ 45 -._ 1 46 Da 25.00 $_ _ 1,15 .00 7 _._ Traffic Control Supervise _ _ 1 LS 17 750.00 $ 17.750.00 e 9 10 Roadside Restoration „ Remove Signal Hezd_ ,.. _. , .._ ., Remove Traffic Video Defection Camera Remove and Reset Signal Head 1 .0 E 1,000.00 -'-- - -" - 0� %' -- ' -' 100oj 14 14 EA 42460 5,936.00 $ - 8 I 8 EA 74.60 .? $ 592.00 $ 10,440.00 $ $ - __ 100% � � 113 °i 11 8 1 g 1 _EA EA EA _- -'- 1,160.00 . _ 12 Remove and Reset Video Detection Camera 1,15 .00 $ ,155.00 _ $ -_ 100% 13 14 !15 Replace & Recycle Signal Head Modules 257 257 140.00 30, 00.00 4, 25.0 $ 5,98 .00 61,000.00 $ 4,625.06 _ I $ _ $ $ 100% 100% 100% Replace Si nal Controller Cabinet 2 2 EA Traffic Signal Revision SI na e 1 1 __ _LS 16 Bac late Tae 12 12 _ -�_EA 188.00 2,256.00 _ __ _ $ I 100 °% 17 Louvered Back late 70 70 _ _ _ EA EA 56.00 r $ 10920.00 T­­ _ —__ 100% 18 Traffic Video Detection Camera 13 13 6,434 4,367.00 83,655.00 $ 4,36Z00 _ $ ___I —s—­­ '- _ 100% 100% 19 Wide Angle Traffic Video Detection Camera 1 I _ 1 - _ _�_ _E4 20 21 Signal Pole Terminal Cabinet Si naI Head with Mount Signal Controller and Smart Monitor 3 39 1 3 39_ 1 _ _.._._.- .. E4 FJt EA 998.00 1,440.00 7,615.00 $ 994:00 2 56,160.00 7,615.00 __ �_ -'- $ �I ff 100% 100% 100% 22 23 Remove Traffic Sign 17 _ 1.7 -_ -EA 37.00 _$ $ 629.00 5�_�_- -' ---- - 100% 24 Traffic Sign 1 ^ i 1 EA 625.00 $ 625:00 S 625.00 100% CO-1 Remove Signal Head -Add 1 Bid Item #9 CO -1 Remove &Reset Signal Head -Add 4 Bid Item CO-1 Replace 8 Recycle Signal Head Modules Add 39 C0.1 Backplate_Plate Add_(1) Bid Item #16 L_ owered Bac late Plate Add 1 Bid Item #17 $ _ CO-1 Cal c 4 -1 CO-2-1 _ $ - Si nal Head with Mount Add (51 Bid item#21_ Moral Signal Wire --- �--�---...- .__....- 1- -- ---- 1 _ ...-- _-. $ 100 % C-51-SW &iSt 5ivv on u or y 930 011 C• em e e na o e erma a m — g - -- -- CO-3 -1 o r n a nt . -g '— _ 6B . p °O h:1pro51petCP1222.xis SCHEDULE SUBTOTAL $ 3,978.39 Period Dates Begin: May 21, 2014 End: June 01, 2014 1 d 3 7/10/2014 at 9:38 AM CO. NO. 13 -15 Citywide Traffic Signal Safety Improvements SCHEDULE A: Street Improvements Contract $ No Tax Applicable Warranty Bond _ SCHEDULE TOTAL $ TOTAL CONTRACT AMOUNT TO DATE TOTAL PAYMENT TO CONTRACTOR PAYMENT DUE CONTRACTOR: CITY OF AUBURN PROJECT SUMMARY PAY ESTIMATE #3 & FINAL Original Contract Contract Change Amount Orders 351,662.00 $ 20,569.04 $ 351,662.00 $ 20,569.04 $ Period Dates Begin: May 21, 2014 End: June 01, 2014 i CP1222, Citywide Traffic Signal Safety Improvements CO. NO. 13 -15 Total Payment This Period 354,936.96 $ 3,978.39 354,936.96 S 3,978.39 $ 354,936.96 $ 354,936.96 S 3,978.39 $ 3,978.39 Percent/Contract 95% h:lprolpe1CP1222.xis 2 of 3 7/102014 at 9:38 AM C|TYOFAUBURN CO. NO. i345 CP1322 PAY ESTIMATE #J&FINAL ^ CONTRACTOR: � Valley Electric of Mt. Vernon 118O Merril Creek Parkv�ay [vo/otiYVA Phone: 425'407-0832 The undersigned has reviewed and approved this final pay estimate. I agree that it is a true and correct statement showing all monies due me from the City of Auburn under this contract, that I have carefully examined the final pay estimate estimate and understand itand 'hat | hereby release the City uf Auburn �nm any and all claims ofwhatsoever nature which | may have, arising out of this contract, which are not set forth in this estimate. PAYMENT DUE TOCONTRACTOR 3.978.39 Signatures: � Contractor Date �� � /nopoUm / ~ Date Project Manager Date / City Engineer Date :2 a