HomeMy WebLinkAbout05-12-2014 UntitledCity of Auburn PCDC 5/121/14 P91
2015-2020 Transportation Improvement Program Summary III Draft TIP WebbSubmittedby: J
Project TIP
Project Title
Grant 2019 2020 Beyond 2020 Total Project P roject Category
Number # status
Prior to
1
20 16 2-01
1
5 2016 2017 2018 cost
e .O t ABtNW-Phan IrY SNWto1af19NVR se 8257.129 25.000 350,000 1 25.000 25.000 2 O 25,000 1 175.000 89(17129 RoaMy
P11l$ 2 Aubum Way South Pedestrian lmprovamema secured 1,365,830 1,385,630 Roadway
Odayeadd!St SE to Fir St SE
40900 3 Aubum Way Scum(4th St NE to ah St SE) UnsecuW 78,251 818700 3.000.000 3,896,951 Roadwq
i me 4 I Street NE Conidor 145th St NE to 5 277th St) Unsacwea 161,827 6,760,DOO 6,921,827 Roatlwey
201.0 S M Street Underpass(Std St SE to 9m St SE) secured 16.540,705 109,550 109,070 106,590 107,550 108.520 105.490 2,288,640 19.474,116 Roadway
c222aO 6 S 217th Street DAWN to L Street NE)Unsecured 1,258,1750 1,473,000 5.187.300 7,918,350 Roatlwey
cPxxaa 7 150h St SW Reconstruction Unsecured 375,000 3,000,000 3,375,000 Roadway
cpuu a AStreet NW,Phase 2(W Main St to 3rd St NW)UnseeurW 150,000 150.000 3,000,000 3,300,000 Roadway
cpuu 9 D Street NW(37th St NW to 441h St NW1 unsecured 30),000 6,000,000 1 6.300,000 1 Reactive,
cpml 10 F Street SE lath St SE to AWS) Unikkkred 7,620 400,000 250,000 1,80,000 2,457,620 Roadway
epv.a 11 M Siren NE(E main St to an St NQ Unaecurea 50.000 276,000 1,150,000 1,475,000 Roadway
cpux. 12 Grade-Separated Crossing of BNSF Melyard Unsscund 1,125,000 31,000,000 32,125,090 Roatlwey
000767 13 Motuwk Plastics Site Mitigation Protect WA 576.490 25.000 2D.ODD 20.000 65,000 20.000 726,490 Mlscalleneous
cpu.. 14 M Street$012m Street SE Traffic Signal Unsecured 625,000 628000
Intersocti. ,signals
ITS
cpsux 15 Mh StrM NE Widening IRM St NE to R St NE)Unsecured 450.000 1,000,000 1'450'000 Roadway
c "xx 16 491h Street NE Auburn We North to l St NE Uneecured 850000 2500000 3,350,000 Readwe
cpaett 17 unvey Rd Nli NE Intersection Improvements WA 2,080,800 156.500 68.000 85.600 85,200 84,80 S084,400 741,600 3,334,900 Intersection.SAO"ITS
427,000 Inters radon,Signal&
CPIIW 18 Mh St NEI104th Ave SE Intersection Improvements secured 426,000 1,000 ITS
suarsectlon,Sig"&
optta.a 19 Aubum Way NorgVln Stmt NE Sgnal Improvements UnaecurW 60.00D 550,000 600.000 ITS
Auburn Way SouWM Street SE Intenettlon 699 386
IManecilw,$19na1 B
Cale" 20 Unsecured 383,429 315,957 ITS
Improvements Intension.,signal&
cP + 21 Main Street signal UpgSecuredadesSecured 200.000 265,000 ITS
nxx
cram" 22
Lake TepPS Parkway Preservation(City Limit to Unnecered 124,380 628,470 952,850 Preservation
Lakeland Hills W.
dinette 33 AStreet SENon.MMWw and Acwss ImpmvmW% Uneruned 224,300 93,047
317,347 Non-Motorlaed
cpuu 24 Academy Drive Multi Use Trail Unsecured 50,000 425.000 425,000 900,000 I Non,Motorlxarl
Roadway
dime 20 afim Place S Realignment WA
NA 28
METRO Shuttle Auburn Community and Lakeland
ju
240000
M25.00O
13.5,000 140,000 145,000 150,000 155,000 1,095,000 Transit
Bhuree
c 1110 ZT ASereaf SE Sal lm amemS 10000
60000 Stud
1008 29 Annuai add,Structure Pr.aervetien 50,000 50.000 50,000 50,000 50,000 50,000 350,000 Preservation
dide0 20 S2T70,Smt-Watia "Mltlgallw 290,339
315,339 Mlscnlnki
van.. 30 Citywide Pedestrian Accessibility and Safety Program 15,000 150,OOC 150.000 1(0;000 150,000 900.000 Non-MAmix
Various 31 Ckywnde Arterial mcYCb b SafafY imp
100,000 100,000 300.000 Non-Matere,ed
VWaw 32 Ctywide Sidewalk Repairs and Imprwemane, 125,000 125,1%10 125,000 125,000 125,000 750,000 Non-Mmodud
wuu 33 BNSF 300 R.II E.oanalw Roadway Improwmante
25,000 RoatlwaY
175,000 175,000 175,000 1.225000
Inlenecnon,Sipnel&
Variwe 34 Traffic Signet Improvements WA 775,000 175,000 175,000 175,000 ITS
Von. na Anenn Snot Pfrervahw Program WA 1,300.000 180,000 1,850.000 1.700.000 1.700,000 1,800,000 iMx1,000 11750,000 PmarvWw
Various 38 Metal Street Crack Seal WA 200,000 200,000 200;000 200,000 200,000 200;000 200,000 7,400,000 Pmervetlon
Va" 37 Local Sure,Improvamrd Program WA 2.674,250 1,942.300 1.457.243 1,470,315 1.483.519 1.498,854 1.510,322 12.034,803 Pmorvaflw
400
Imensction.Si0na18
ep0810 ]$
37th St NW&B St NW RaIIroW Croaeing Salny SecunO 357,550 26,900
Im rovainenls
epee" » 124th A.SE Corridor Imgavemente-Please 2 UnaeeurW 100.000 750.000 850.000 R9WweY
e 20010OD 1,100,000
Co.... 124h Ave$E Corridor lmprovamards-PhaceUnweaned 2,500,000 3,800,000 Rwdwey
cP"xx 41 RSimt Bypass UrrunM
408.000 5,700.000 6.108.000 RwTvay
ca&vxx 42 SE 320th St Corridor lmprovemann Unsecured 50,00(7 60,000 580,000 690,000 Roadway
01216 a]Auburn Wry Se56h(SR-184)Conmor Safety SevurW 252.684 2.083.106
2.335,792 Roaavrq
I memo
cpuu 44 A Sheet NE ftomanan lmprovemems Unaeeured 150,000 750.000 Non-MOtonad
gpxxu Ad Im4mr4en TIailMad Improvameme UnaeourM 210,000 25,000 Non
study
ad
cpID21 as 104th Ave SE&Green Myer Road Study WA 5,000
5,000
tion,
150,000
Intersection,signal E
cluuax 47 Traffic Management Center ImprowmaM WA 150,000 ITS
A St SE antl 6m St SE Safety and Access 1 50 000 Immwas Signal 8
cpk"x M WA 50,000 700.000 IT$
Im rewmema
vaxx 49 WA
44D 000
Intenemien,Signal e
clikaxx SO ITS Dynamic Mesuge Signs Unsecured 220.000 220'000 ITS
epxxn. Si Seat Vafky Hwy ITS Expenalon unsecured 105,000 1,005,000 Imo int.fi.Signal&
55.000 Imad"Mo w,Signal&
cpxxxx 52 9th Street NE and C Strom NW ITS Improvements Unsecured 50,000 5,000
250.000 300,000
Intersection,Signal e
1.. 53 AWS and 12th Street SE lmena.11w lmprovamems Unsecured 50,000 in
cP"xx 54 Hersey Way SE Condor Study NIA 50,000
50'000 Study
cpsux e5 W Main Street lmwovemema Unsecured 946.000 3,494,400 4,440.400 Reakil
cp1120 56
Evergreen Heights Safe Round to School Unsecured 790,000 563,600 4,620,000 5,973,000 Non.Mdtorimtl
Improvement.
cpuu 57 Arsenal Bridge back RehaMliution WA 100.000 100,000 100.000 100.000 100,000 100000 800.000 PreeervWw
Roadway346
cp1119 IS AWSCwddorlmplFn StSEto Hemlwk5t S6) Secured 348,500
500
Aubum Ave NE&3rd M NE Pedestrian&Aew 00ra877680000 0,000 35B,778 ImeneetlITS signal b
P1023 w
Im
Unsecured
pent 80 MSheaf SE Corridor lam St BE to AWS) Unsecured 1,925,000 4,750,000 6,675,000 Roatlwey
cpu" 61 AWS Same. Unae.urea
6000,000 54.480000 fi0.450.000 Roatlwey
cp"u 82 AWS Streets.ape lmprovemems(SR-18 to M St SE) Unsecured 1,950,000 2,80,0017 4,750,0017 Roadway
1,800.000 1.800,000
Interesation,signal.
cpuu 8] 29th S Sli St SE intersec .Improvenrms 11rMe.arW ITS
cpuu a Lr HIII Rd Segment 1 la St NE to 105th PI SE))))Un...nd 600,000 150,000 2,45(1,000 10,000,000 13,200,000 Roatlw+V
cmWa 8fi W Hlti Rd Segment 2 410511 PI SE to 11M Ave SE) Unsecured 3.500,000 8,500,00 12,000.000 Roadway
cp&vu 88 Lea HIII Rd Segment 3(112ih Ave SE to 124M Ave SE) Unsecured 1,000;000 3,00,000
M-
4,000,000 Roadway
Imereacem.Signed&
1222 67 Citywide Traffic Sgrul Saety imprermms Sawn. 532.208 1,000 as
cake" 88 3nh Strap SE and A Sben SE Treme Signal Safety Unsecuntl 530,292 1,000 Imanect ITS Stpnel 8
Im rovement Innnnwon,Sig"&
69 I street NE and ZU,4 SGM NE ReuM+ban Safety Unaewnd 150,000 1,225.ODD AS
m .mam
w"u '70 Aubum WaY N Preservation 122nd Smt NE W 45th
Unsecured 120.000 1,3(7,000
Preservation
Stm NE
aPnva ry I stunt Ne"Preservnlw SR-1 ST to NE Mh
unsecured 135,000 1,50,000
Preservation
Total I 38899741 13,923,654 1 22,462,393 t n7msTs 2 908288 806174 I 28511213 I KM3,2M I 278383358
Appendix A